[go: up one dir, main page]

SU756010A1 - Method of mining gently sloping mineral deposits - Google Patents

Method of mining gently sloping mineral deposits Download PDF

Info

Publication number
SU756010A1
SU756010A1 SU782610787A SU2610787A SU756010A1 SU 756010 A1 SU756010 A1 SU 756010A1 SU 782610787 A SU782610787 A SU 782610787A SU 2610787 A SU2610787 A SU 2610787A SU 756010 A1 SU756010 A1 SU 756010A1
Authority
SU
USSR - Soviet Union
Prior art keywords
chamber
wedge
space
mineral deposits
mineral
Prior art date
Application number
SU782610787A
Other languages
Russian (ru)
Inventor
Gennadij K Gubin
Original Assignee
Gennadij K Gubin
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gennadij K Gubin filed Critical Gennadij K Gubin
Priority to SU782610787A priority Critical patent/SU756010A1/en
Application granted granted Critical
Publication of SU756010A1 publication Critical patent/SU756010A1/en

Links

Landscapes

  • Metal Rolling (AREA)

Description

Изобретение относится к горной промышленности и может быть использовано при разработке пологих пластов полезных ископаемых, преимущественно угля и сланца.The invention relates to the mining industry and can be used in the development of flat seams of minerals, mainly coal and slate.

Известен способ разработки пологих пластов полезных ископаемых камерами 5 с оставлением частично отработанных межкамерных целиков [1].There is a method of developing flat seams of minerals by chambers 5 , leaving partially developed chamber space sections [1].

Известен способ разработки пологих пластов полезных ископаемых, включающий проведение очистной камеры и последующее ю ее расширение путем частичной выемки межкамерного целика клинообразными в плане заходками в направлении, противоположном направлению проведения камеры [2].There is a method of developing flat seams of minerals, which includes carrying out a cleaning chamber and its subsequent expansion by partially excavating the inner-chamber pillar with wedge-shaped steps in the direction opposite to the direction of the chamber [2].

Однако оба указанных способа характеризуются значительными потерями полез- 15 ного ископаемого.However, both of these methods are characterized by significant loss of useful Nogo fossil 15.

Целью изобретения является устранение указанного недостатка.The aim of the invention is to eliminate this drawback.

Цель достигается тем, что после выемки 20 каждой клинообразной заходки производят ее расширение путем последовательного снятия полос полезного ископаемого с боковой стороны заходки.The goal is achieved by the fact that after excavation 20 of each wedge-shaped stopping, it is expanded by successive removal of the mineral strip from the lateral side of the stopping.

22

Между очистным пространством расширенной заходки и выработанным пространством оставляют целики угля.Coal pillars are left between the cleansing space of the extended entry and the open space.

На фиг. 1, 2, 3 и 4 представлены схемы последовательной разработки.FIG. 1, 2, 3, and 4 show sequential design diagrams.

При разработке пологого пласта полезного ископаемого от конвейерного штрека 1 до вентиляционного штрека 2 проводят очистную камеру 3 с оставлением межкамерного целика 4 между камерой и выработанным пространством 5. Затем в направлении, противоположном направлению проведения камеры,производят частичную выемку межкамерного целика клинообразными в плане заходками 6. После выемки каждой клинообразной заходки производят ее расширение путем последовательного снятия полос полезного ископаемого с боковой стороны заходки. Отработанные полосы вместе образуют в плане ромбоподобную фигуру 7. При выемке полос между очистным пространством заходки и выработанным пространством могут быть оставлены целики 8. В дальнейшем операции повторяют, уменьшая тем самым потери полезного ископаемого в межкамерном целике.When developing a flat mineral layer from the conveyor drift 1 to the ventilation drift 2, a cleaning chamber 3 is left, leaving the inner-chamber tube 4 between the chamber and the exhausted space 5. Then, in the direction opposite to the chamber, the inner chamber is wedge-shaped in plan 6. After the removal of each wedge-shaped entry, it is expanded by successive removal of the mineral strip from the side of the entry. The spent stripes together form a rombom-like figure 7 in plan. When the strips between the clearing space of the stopover and the developed space are drilled, the pillars can be left 8. In the future, the operations are repeated, thereby reducing the loss of the mineral in the cell chamber.

756010756010

Claims (2)

Формула изобретения 1. Способ разработки пологих пластов полезных ископаемых, включающий проведение очистной камеры и последующее ее расширение путем частичной выемки межкамерного целика клинообразными в плане 5 заходками в направлении, противоположном направлению проведения камеры, отличающийся тем, что, с целью уменьшения потерь полезного ископаемого, после выемки каждой клинообразной заходки производят ее расширение путем последовательного снятия полос полезного ископаемого с боковой стороны заходки.Claim 1. A method of developing flat seams of minerals, including holding a cleaning chamber and its subsequent expansion by partially dredging the inner-chamber pillar wedge-shaped in 5 planes in the direction opposite to the direction of the chamber, in order to reduce the loss of mineral, the excavations of each wedge-shaped approach produce its expansion by successive removal of the mineral strip from the side of the entrance. 2. Способ по π. 1, отличающийся тем, что между очистным пространством расширенной заходки и выработанным пространством оставляют целики угля.2. The method according to π. 1, characterized in that between the cleansing space of the extended stopping and the goaf space, the pillars of the coal are left.
SU782610787A 1978-05-05 1978-05-05 Method of mining gently sloping mineral deposits SU756010A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
SU782610787A SU756010A1 (en) 1978-05-05 1978-05-05 Method of mining gently sloping mineral deposits

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
SU782610787A SU756010A1 (en) 1978-05-05 1978-05-05 Method of mining gently sloping mineral deposits

Publications (1)

Publication Number Publication Date
SU756010A1 true SU756010A1 (en) 1980-08-15

Family

ID=20762521

Family Applications (1)

Application Number Title Priority Date Filing Date
SU782610787A SU756010A1 (en) 1978-05-05 1978-05-05 Method of mining gently sloping mineral deposits

Country Status (1)

Country Link
SU (1) SU756010A1 (en)

Similar Documents

Publication Publication Date Title
SU756010A1 (en) Method of mining gently sloping mineral deposits
SU1668667A1 (en) Method for combination mining of gently sloping seams
RU2168628C1 (en) Method of mining of stratified deposits
SU912934A1 (en) Method of strip mining of mineral deposits
SU1067214A1 (en) Method of working gently sloping deposits
SU825964A1 (en) Method of working thick steeply-inclined ore bodies
SU539147A1 (en) The method of extracting the elastic separating perkry
SU649845A1 (en) Method of excavating slightly inclined seams of minerals
SU703661A1 (en) Method of excavating gently sloping mineral beds
SU703662A2 (en) Method of preparing ore deposits to stoping
SU1751332A1 (en) Method of mining steep coal seams prone to gas-dynamic effects
SU903566A1 (en) Method of working thick gently-sloping coal beds
SU898067A1 (en) Method of working thick coal beds
SU773273A1 (en) Method of working the erection layer
SU673736A1 (en) Method of mining thick orebodies
SU589408A1 (en) Method of mining pillars
SU787685A1 (en) Method of filling-in excavated space
SU690183A1 (en) Method of mining coal seams
SU1337517A1 (en) Method of combined underground/open mining of coal beds
SU690181A1 (en) Method of combined mining of mineral fields
SU1203241A1 (en) Method of mining mineral deposits with filling-up of excavated space
SU1254161A1 (en) Method of mining seam deposits
SU1624160A1 (en) Method of mining sloping mineral bed deposits
SU643644A1 (en) Method of mining thick steep coal seams
RU2215148C2 (en) Method of opencast mining of permafrost placer deposits with internal dump formation