RU2215148C2 - Method of opencast mining of permafrost placer deposits with internal dump formation - Google Patents
Method of opencast mining of permafrost placer deposits with internal dump formation Download PDFInfo
- Publication number
- RU2215148C2 RU2215148C2 RU2001135573/03A RU2001135573A RU2215148C2 RU 2215148 C2 RU2215148 C2 RU 2215148C2 RU 2001135573/03 A RU2001135573/03 A RU 2001135573/03A RU 2001135573 A RU2001135573 A RU 2001135573A RU 2215148 C2 RU2215148 C2 RU 2215148C2
- Authority
- RU
- Russia
- Prior art keywords
- block
- overburden
- worked
- permafrost
- previous
- Prior art date
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 230000015572 biosynthetic process Effects 0.000 title claims description 10
- 238000005065 mining Methods 0.000 title abstract description 7
- 239000011435 rock Substances 0.000 claims abstract description 9
- 238000000605 extraction Methods 0.000 abstract description 2
- 239000000126 substance Substances 0.000 abstract 1
- 238000005406 washing Methods 0.000 description 4
- 238000005516 engineering process Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000003415 peat Substances 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 238000010257 thawing Methods 0.000 description 2
- 238000013459 approach Methods 0.000 description 1
- 238000005422 blasting Methods 0.000 description 1
- 238000010835 comparative analysis Methods 0.000 description 1
- 229910052500 inorganic mineral Inorganic materials 0.000 description 1
- 239000011707 mineral Substances 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 238000000926 separation method Methods 0.000 description 1
Landscapes
- Devices Affording Protection Of Roads Or Walls For Sound Insulation (AREA)
Abstract
Description
Изобретение относится к горной промышленности и может быть использовано при открытой разработке многолетнемерзлых россыпных месторождений с внутренним отвалообразованием. The invention relates to the mining industry and can be used in the open development of permafrost alluvial deposits with internal dumping.
Известен способ разработки горизонтальных месторождений полезных ископаемых с применением конвейерного транспорта и внутренним отвалообразованием, где отработку карьерного поля ведут двумя встречными разрезными траншеями с оставлением целика - перемычки, расположенного перпендикулярно фронту работ и служащего для установки на нем конвейера (авт. св. СССР 343042, МКИ Е 21 С 41/00. Сидоров А.С., Оноприенко Н.А., Головко Л.К. и др.. Открытый способ разработки). There is a method of developing horizontal mineral deposits using conveyor transport and internal dumping, where the quarry field is mined by two oncoming cutting trenches with a pillar — a lintel located perpendicular to the front of the work and used to install a conveyor on it (ed. St. USSR 343042, MKI E 21 C 41/00 Sidorov AS, Onoprienko NA, Golovko LK et al. Open development method).
Наиболее близким по существу техническим решением является способ открытой разработки многолетнемерзлых россыпных месторождений, включающий разделение карьерного поля на блоки, расположенные вкрест простирания россыпи, разупрочнение пород в пределах блока, вскрытие и выемку продуктивного пласта песков с последующим транспортированием их к обогатительной установке с разработкой пласта в блоке поперечными заходками и размещением вскрышных пород в выработанное пространство отрабатываемого по порядку блока (авт. св. СССР 852010, МКИ Е 21 С 41/00. Емельянов В.И., Мамаев Ю.А., Савенко Р.Г. и др. Способ открытой разработки многолетнемерзлых россыпных месторождений.)
Однако при разработке многолетнемерзлых россыпных месторождений внутреннее отвалообразование предусматривает рыхление и транспортирование продуктивного пласта в зимний период на отвал обогатительной установки, что является более затратным, чем летняя промывка песков по мере оттайки. Существующие технологии бульдозерной вскрыши торфов с внешним отвалообразованием не отвечают требованиям природоохраны, а повторное бульдозерование внешних отвалов в выработанное пространство требует таких же затрат, как и на вскрыше торфов. Как правило, на эти работы финансирование не предусматривается.The closest technical solution is the method of open development of permafrost alluvial deposits, including dividing the quarry field into blocks located across the strike of the placer, softening the rocks within the block, opening and excavating the productive formation of sand, followed by their transportation to the concentration plant with the development of the formation in the block transverse approaches and placement of overburden in the worked-out space of a block mined in order (ed. St. USSR 852010, MKI E 21 C 41/00. Emelyanov VI, Mamaev Yu.A., Savenko RG and others. Method of open development of permafrost alluvial deposits.)
However, in the development of permafrost alluvial deposits, internal dumping involves loosening and transporting the productive formation in the winter to the dump of the processing plant, which is more expensive than summer washing of the sands as the defrost occurs. Existing technologies for peat bulldozer overburden with external dump formation do not meet environmental protection requirements, and repeated bulldozering of external dumps into the worked out space requires the same costs as for peat overburden. As a rule, funding for these works is not provided.
В связи с этим возникла проблема снижения себестоимости разработки многолетнемерзлых россыпей с внутренним отвалообразованием и промывкой песков по мере оттайки без транспортирования на зимний отвал. In this regard, there was a problem of reducing the cost of developing permafrost placers with internal dumping and washing the sands as a result of defrosting without transportation to a winter dump.
Таким образом, известные способы не обеспечивают эффективной разработки многолетнемерзлых россыпей с внутренним отвалообразованием и не отвечают требованиям экологической безопасности. Thus, the known methods do not provide for the effective development of permafrost placers with internal dumping and do not meet environmental safety requirements.
Задача заявляемого технического решения заключается в обеспечении подготовки песков к промывке по мере оттайки с одновременным внутренним отвалообразованием и рекультивацией карьерного поля. The objective of the proposed technical solution is to ensure the preparation of sand for washing as the defrost with simultaneous internal dumping and reclamation of the quarry field.
Технический результат, получаемый при осуществлении предлагаемого изобретения, заключается в том, что блок делят на параллельные заходки по направлению их отработки с размещением продуктивного пласта последующей заходки на продуктивный пласт предыдущей заходки, на освободившуюся площадь последующей заходки размещают вскрышные породы последующего блока. The technical result obtained by the implementation of the invention is that the block is divided into parallel runs in the direction of their development with the placement of a productive layer of a subsequent run to a productive layer of a previous run, overburden rocks of a subsequent block are placed on the vacant area of a subsequent run.
Сопоставительный анализ с прототипом показывает, что в заявляемом способе блок делят на две параллельные заходки по направлению их отработки, вскрышные породы предыдущего блока (двух заходок) размещают на выработанное пространство предыдущей заходки. Затем продуктивный пласт последующей (второй) заходки размещают на продуктивный пласт предыдущей (первой) заходки. На освободившуюся площадь последующей (второй) заходки размещают вскрышные породы предыдущего блока. Таким образом, достигается внутреннее отвалообразование без транспортирования продуктивного пласта на временный отвал промустановки. Comparative analysis with the prototype shows that in the claimed method, the block is divided into two parallel runs in the direction of their mining, overburden of the previous block (two runs) is placed on the worked out space of the previous sunset. Then the reservoir of the subsequent (second) entry is placed on the reservoir of the previous (first) entry. Overburden of the previous block is placed on the vacant area of the subsequent (second) entry. Thus, internal dumping is achieved without transporting the reservoir to a temporary dumping site.
Сравнение заявляемого решения с другими техническими решениями в данной области техники не позволило выявить в них признаки, отличающие заявляемое решение от прототипа, что позволяет сделать вывод о соответствии критерию "существование отличия". Comparison of the proposed solutions with other technical solutions in this technical field did not allow to identify in them the features that distinguish the claimed solution from the prototype, which allows us to conclude that the criterion of "existence of differences".
На чертеже показан поперечный разрез фронта горных работ с внутренним отвалообразованием. The drawing shows a cross section of the front of mining with internal dumping.
Предлагается способ открытой разработки многолетнемерзлых россыпных месторождений с внутренним отвалообразованием с разделением карьерного поля на блоки. Способ предусматривает разупрочнение пород одним из известных способов, например буровзрывным, механическим или гидравлическим оттаиванием. Затем производят вскрышные работы с размещением пород вскрыши в выработанное пространство отработанного по порядку блока. A method for the open development of permafrost alluvial deposits with internal dump formation with the separation of the quarry field into blocks is proposed. The method involves softening rocks by one of the known methods, for example, by blasting, mechanical or hydraulic thawing. Then overburden is performed with the placement of overburden rocks in the worked-out space of the block worked out in order.
Способ включает операции проходки первоначальной разрезной траншеи 1, разделение месторождений на блоки 2, 3, разделение блока на предыдущую 4 и последующую 5 заходки, перемещение вскрышных пород 6 и продуктивного пласта 7, формирование внутреннего отвала 8. The method includes the operations of sinking the initial split trench 1, dividing the deposits into blocks 2, 3, dividing the block into the previous 4 and the next 5 calls, moving the overburden 6 and the productive formation 7, forming an internal dump 8.
Способ осуществляется следующим способом. Сначала проходят разрезную траншею 1, затем в выработанное пространство траншеи размещают вскрышные породы блока 2, например, бульдозером с механическим рыхлением. После этого блок 2 делят на заходки. Продуктивный пласт последующей заходки 5 размещают на продуктивный пласт предыдущей заходки 4, а на освободившуюся площадь заходки 4 размещают вскрышные породы блока 3. Далее цикл повторяется. После промывки продуктивного пласта на освободившуюся площадь размещают часть вскрыши размещенных на предыдущих заходках блоков. The method is carried out in the following way. First, a cutting trench 1 passes, then overburden rocks of block 2 are placed into the excavated space of the trench, for example, by a bulldozer with mechanical loosening. After that, block 2 is divided into sets. The productive layer of the subsequent sunset 5 is placed on the productive layer of the previous sunset 4, and overburden of block 3 is placed on the vacant area of the sunset 4. Next, the cycle repeats. After washing the reservoir, a part of the overburden of blocks placed at previous runs is placed on the vacated area.
Таким образом, достигается извлечение продуктивного пласта наиболее экономичной технологией по мере оттайки бульдозером с одновременным внутренним отвалообразованием. Thus, extraction of the productive formation by the most economical technology is achieved as the bulldozer defrosts with simultaneous internal dumping.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001135573/03A RU2215148C2 (en) | 2001-12-21 | 2001-12-21 | Method of opencast mining of permafrost placer deposits with internal dump formation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
RU2001135573/03A RU2215148C2 (en) | 2001-12-21 | 2001-12-21 | Method of opencast mining of permafrost placer deposits with internal dump formation |
Publications (2)
Publication Number | Publication Date |
---|---|
RU2001135573A RU2001135573A (en) | 2003-09-20 |
RU2215148C2 true RU2215148C2 (en) | 2003-10-27 |
Family
ID=31988638
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
RU2001135573/03A RU2215148C2 (en) | 2001-12-21 | 2001-12-21 | Method of opencast mining of permafrost placer deposits with internal dump formation |
Country Status (1)
Country | Link |
---|---|
RU (1) | RU2215148C2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112814681A (en) * | 2021-03-29 | 2021-05-18 | 神华北电胜利能源有限公司 | Coal mining method for open pit coal mine in frozen soil area |
-
2001
- 2001-12-21 RU RU2001135573/03A patent/RU2215148C2/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112814681A (en) * | 2021-03-29 | 2021-05-18 | 神华北电胜利能源有限公司 | Coal mining method for open pit coal mine in frozen soil area |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
RU2344291C2 (en) | System of deposit development | |
RU2215148C2 (en) | Method of opencast mining of permafrost placer deposits with internal dump formation | |
CN109630116B (en) | Mining method for inclined medium-thickness blind ore body | |
RU2425220C1 (en) | Method for formation of steeply inclined transport access track | |
RU2439321C1 (en) | Open-underground method of bedded deposits mining | |
RU2224107C1 (en) | Process of opencast-underground mining of mineral resources | |
RU2114307C1 (en) | Method for opencast mining of flooded mineral deposits | |
CN100485161C (en) | Upward spacing admission passage filling mining method | |
RU2488693C1 (en) | Method for in-line production of work at non-benching version of extraction of chambers along strike on chamber-and-pillar system | |
RU2177548C1 (en) | Method of mining the tailings dumps | |
SU1756567A1 (en) | Method for mineral opencast mining | |
RU2231642C1 (en) | Method of barring and development of elongated in width and gradient coal fields with flat dipping and inclined beds of big thickness | |
RU2810041C1 (en) | Method for developing powerful steeply dipping ore bodies with goaf stowing | |
RU2399764C1 (en) | Development method of shallow placers with clay sands in conditions of repeated dragging | |
SU1323716A1 (en) | Method of remining mineral deposits | |
RU2239066C1 (en) | Method for extraction and primary concentration of diamond-placers | |
RU2777214C1 (en) | Method for mining coal seams from the sides of coal mines using underground coal mining technologies | |
RU2762170C1 (en) | Method for developing thin and low-powered steel-falling ore bodies | |
RU2182664C2 (en) | Method of mining solid mineral deposits | |
SU1188326A1 (en) | Method of mining bedded deposits | |
RU2093679C1 (en) | Method for opencast mining of contiguous horizontal and slightly inclined seams of minerals | |
RU2187643C2 (en) | Method of combined mining of mineral deposits in opencast contour zone | |
SU912934A1 (en) | Method of strip mining of mineral deposits | |
RU2148713C1 (en) | Method for opencast mining of sloping and steep deposits of minerals | |
RU2575283C1 (en) | Method of open mining of cryolithic zone fields |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
MM4A | The patent is invalid due to non-payment of fees |
Effective date: 20041222 |