- SU1186731A1 SU1186731A1 SU833672510A SU3672510A SU1186731A1 SU 1186731 A1 SU1186731 A1 SU 1186731A1 SU 833672510 A SU833672510 A SU 833672510A SU 3672510 A SU3672510 A SU 3672510A SU 1186731 A1 SU1186731 A1 SU 1186731A1
- Authority
- SU
- USSR - Soviet Union
- Prior art keywords
- tunnel
- reinforced concrete
- supports
- lining
- pipeline
- Prior art date
Links
- 239000011150 reinforced concrete Substances 0.000 claims abstract description 14
- 239000000463 material Substances 0.000 claims abstract description 4
- 239000004567 concrete Substances 0.000 abstract description 2
- 239000011435 rock Substances 0.000 description 6
- 229910000831 Steel Inorganic materials 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 230000002787 reinforcement Effects 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- XOJVVFBFDXDTEG-UHFFFAOYSA-N Norphytane Natural products CC(C)CCCC(C)CCCC(C)CCCC(C)C XOJVVFBFDXDTEG-UHFFFAOYSA-N 0.000 description 1
- 239000010426 asphalt Substances 0.000 description 1
- 238000009412 basement excavation Methods 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- -1 for example Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/20—Hydro energy
Landscapes
- Lining And Supports For Tunnels (AREA)
Abstract
1. НАПОРНЫЙ ТУННЕЛЬ, вьшолненный в.виде сталежелезобетонного трубопровода, расположенного на опорах в закрепленной железобетонной обделкой выработке, отличающийс тем, что, с целью повышени эксплуатационной надежн ости туннел на участках пересечени активных тектонических разломов,, железобетонный слой трубопровода, его опоры и обделка выполнены с кольцевыми швами, совмещенными в одних плоск-ст х и заполненными пластичным материалом. 2. Туннель по п.1, о т л и ч аS ю щ и и с тем, что опоры сво (Л бодно установлены на дне обделки. с 00 сь 001. A PRESSURE TUNNEL, made in the form of an iron-concrete pipeline, which is located on supports in a fixed reinforced concrete lining, characterized in that, in order to increase the operational reliability of the tunnel at the intersections of active tectonic faults, the reinforced concrete layer of the pipeline, and its sections, and its openings, and its openings in the intersection of active tectonic faults of the reinforced concrete layer of the tunnel, and its openings. with annular seams combined in some planes and filled with plastic material. 2. The tunnel according to claim 1, about tl and h aS y y and with the fact that the supports are free (L is installed at the bottom of the lining. From 00 to 00
Description
Изобретение относится к гидротехнике,а именно к строительству напорных туннелей на участках пересечения туннелями активных тектонических разломов.The invention relates to hydraulic engineering, in particular to the construction of pressure tunnels in areas where tunnels intersect active tectonic faults.
Цель изобретения - повышение эксплуатационной надежности туннеля на участках пересечения активных тектонических разломов.The purpose of the invention is to increase the operational reliability of the tunnel at the intersection of active tectonic faults.
На фиг. 1 изображен туннель,продольный разрез; на фиг.2 - разрез А-А на фиг. 1; на фиг. 3 - разрез Б-Б на фиг. 1.In FIG. 1 shows a tunnel, a longitudinal section; figure 2 - section aa in fig. 1; in FIG. 3 - section BB in FIG. 1.
Напорный туннель выполнен в виде сталежелезобетонного трубопровода 1 1, расположенного на железобетонных опорах 2 в выработке 3, закрепленной железобетонной обделкой 4. Туннель проходит в скальном массиве 5 и пересекает тектонический разлом 6. 'The pressure tunnel is made in the form of a steel-reinforced concrete pipeline 1 1 located on reinforced concrete supports 2 in the excavation 3, fixed by a reinforced concrete lining 4. The tunnel passes in the rock mass 5 and crosses the tectonic fault 6. '
В торцах выработки 3 трубопровод заделан в скальный массив 5.At the ends of the mine 3, the pipeline is embedded in the rock mass 5.
Железобетонный слой 7 трубопровода 1, его опоры 2 и обделка 4 выработки 3 разрезаны кольцевыми швами 8, которые совмещены в одних вертикаль ных плоскостях и заполнены пластичным материалом,например битумматами.The reinforced concrete layer 7 of the pipeline 1, its supports 2 and the lining 4 of the mine 3 are cut by annular seams 8, which are combined in the same vertical planes and filled with plastic material, for example, bitumen.
Швы 8 в обделке 4 и опорах 2 выполнены сквозными, а в сталежеле- 30 зобетонном трубопроводе - только в пределах железобетонного слоя 7.The seams 8 in the lining 4 and the supports 2 are made through, and in the steel-steel-30 concrete pipeline - only within the reinforced concrete layer 7.
Стальная оболочка 9 трубопровода выполнена сплошной. Опоры 2 могут д-д быть отделены швом от дна 10 обделки 4. Поперечная кольцевая арматура 11 в обделке 4 и железобетонном слое 7 может быть однорядной или двухрядной. Продольная арматура 12 установлена только в пределах колец, ограниченных швами 8, и не пересекает эти швы.The steel shell 9 of the pipeline is solid. The supports 2 can be dd separated by a seam from the bottom 10 of the lining 4. The transverse ring reinforcement 11 in the lining 4 and the reinforced concrete layer 7 can be single-row or double-row. Longitudinal reinforcement 12 is installed only within the rings bounded by seams 8 and does not intersect these seams.
В период эксплуатации туннеля внутреннее давление воды в трубопроводе 1 воспринимается стальной оболочкой 9 и железобетонным слоем 7.During the operation of the tunnel, the internal pressure of the water in the pipeline 1 is perceived by the steel sheath 9 and the reinforced concrete layer 7.
Вес воды в трубопроводе и вес трубопровода воспринимаются опорами 2 и передаются на дно 10 обделки 4, а от него на скальный мэссие 5 и породу в зоне разлома 6.The weight of the water in the pipeline and the weight of the pipeline are perceived by the supports 2 and transferred to the bottom 10 of the lining 4, and from it to the rock messiah 5 and the rock in the fault zone 6.
При тектонических подвижках относительно один другого блоков нетронутого массива 5 пород происходит, в общих случаях, пространственный изгиб трубопровода. Так как железобетонный слой 7, опоры 2 и обделка 4 разрезаны кольцевыми швами 8, совмещенными в одних плоскостях, а швы 8 заполнены плас тичным материалом, конструкция туннеля имеет гибкость в продольном направлении, обеспечивающую ей свободу деформаций совместно с массивом пород.During tectonic movements relative to each other, blocks of the pristine massif of 5 rocks occur, in general cases, spatial bending of the pipeline. Since the reinforced concrete layer 7, the supports 2 and the lining 4 are cut by annular seams 8, aligned in the same planes, and the seams 8 are filled with plastic material, the tunnel construction has flexibility in the longitudinal direction, providing it with freedom of deformation together with the rock mass.
Наличие сквозного шва под опорами 2 способствует большей гйбкости конструкции.The presence of a through seam under the supports 2 contributes to greater design flexibility.
Б~5B ~ 5
Фиг. 2.FIG. 2.
Фиг.ЗFig.Z
ВНИИПИ Заказ 6511/32 Тираж 648 ПодписноеVNIIIPI Order 6511/32 Circulation 648 Subscription
Филиал ППП Патент’’, г.Ужгород, ул.Проектная, 4Branch of PPP Patent ’’, Uzhgorod, Project 4,
Claims (2)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833672510A SU1186731A1 (en) | 1983-12-09 | 1983-12-09 | Pressure tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SU833672510A SU1186731A1 (en) | 1983-12-09 | 1983-12-09 | Pressure tunnel |
Publications (1)
Publication Number | Publication Date |
---|---|
SU1186731A1 true SU1186731A1 (en) | 1985-10-23 |
Family
ID=21092835
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
SU833672510A SU1186731A1 (en) | 1983-12-09 | 1983-12-09 | Pressure tunnel |
Country Status (1)
Country | Link |
---|---|
SU (1) | SU1186731A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106557608A (en) * | 2016-09-26 | 2017-04-05 | 昆明理工大学 | A kind of plastic limit analysis upper bound method of the non across jointed rock mass discrete based on Mix Amount |
-
1983
- 1983-12-09 SU SU833672510A patent/SU1186731A1/en active
Non-Patent Citations (1)
Title |
---|
Архипов A.M.Турбинные водоводы с оболочками, усиленными железобетоном и скальными массивами. - Л.:Энерги , 1973, с. 59-70. Там же, с.1 1-12. * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106557608A (en) * | 2016-09-26 | 2017-04-05 | 昆明理工大学 | A kind of plastic limit analysis upper bound method of the non across jointed rock mass discrete based on Mix Amount |
CN106557608B (en) * | 2016-09-26 | 2019-09-27 | 昆明理工大学 | An Upper Limit Method for Limit Analysis of Jointed Rock Mass Based on Mixed Numerical Discretization |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106894830B (en) | A double-curved arch support structure and construction method for underground engineering | |
RU2436959C2 (en) | Tubing ring for attachment of vertical shafts of mine workings | |
SU1186731A1 (en) | Pressure tunnel | |
JP4750568B2 (en) | Tunnel junction construction method and tunnel junction structure | |
SU926288A1 (en) | Method for hydraulically deposing muck in stock-piles and tail storage facilities | |
CN218991648U (en) | Deep roadway anchoring and filling supporting structure | |
CN102392660A (en) | Three-dimensional pressure-relieving supporting method for prolonging service lives of deep soft rock supports | |
JPH03244799A (en) | Large sectional tunnel structure and constucting method thereof | |
SU1576646A1 (en) | Lining of pressure hydro-engineering tunnel | |
SU861614A1 (en) | Method of erecting steel-concrete lining | |
SU1441016A1 (en) | Steel-ferroconcrete tunnel lining | |
SU1124088A1 (en) | Lining of pressure-free hydraulic tunnel | |
SU947270A1 (en) | Combination lining of underground water duct | |
SU972109A1 (en) | Mine working support | |
SU1406297A1 (en) | Lining of pressure-free hydraulic tunnel | |
SU1740540A1 (en) | Dome-shaped pressure tunnel | |
SU928021A1 (en) | Lining of underground structure | |
SU1213208A1 (en) | Water duct for active tectonic split area | |
CN118881379B (en) | A construction method for shield cutting existing operating pipe gallery | |
RU1783056C (en) | Lining of pressureless hydraulic tunnel | |
SU1328426A1 (en) | Lining of pressure-free hydraulic engineering tunnel | |
RU2474693C1 (en) | Modular support of vertical shaft | |
SU1191590A1 (en) | Tunnel lining | |
JP3900684B2 (en) | Construction method for underground structures | |
RU2114377C1 (en) | Combination lining of special underground structure |