[go: up one dir, main page]

NL8501130A - FOUNDATION FOR A WORK PLATFORM. - Google Patents

FOUNDATION FOR A WORK PLATFORM. Download PDF

Info

Publication number
NL8501130A
NL8501130A NL8501130A NL8501130A NL8501130A NL 8501130 A NL8501130 A NL 8501130A NL 8501130 A NL8501130 A NL 8501130A NL 8501130 A NL8501130 A NL 8501130A NL 8501130 A NL8501130 A NL 8501130A
Authority
NL
Netherlands
Prior art keywords
foundation pile
foundation
pile according
pipe
pipe section
Prior art date
Application number
NL8501130A
Other languages
Dutch (nl)
Other versions
NL193498B (en
NL193498C (en
Original Assignee
Marine Structure Consul
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Marine Structure Consul filed Critical Marine Structure Consul
Priority to NL8501130A priority Critical patent/NL193498C/en
Priority to NO861458A priority patent/NO861458L/en
Priority to GB8609400A priority patent/GB2174742B/en
Priority to DE19863613058 priority patent/DE3613058A1/en
Publication of NL8501130A publication Critical patent/NL8501130A/en
Publication of NL193498B publication Critical patent/NL193498B/en
Application granted granted Critical
Publication of NL193498C publication Critical patent/NL193498C/en

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B17/00Artificial islands mounted on piles or like supports, e.g. platforms on raisable legs or offshore constructions; Construction methods therefor
    • E02B17/04Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction
    • E02B17/08Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering
    • E02B17/0836Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks
    • E02B17/0872Equipment specially adapted for raising, lowering, or immobilising the working platform relative to the supporting construction for raising or lowering with climbing jacks with locking pins engaging holes or cam surfaces
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/24Prefabricated piles
    • E02D5/28Prefabricated piles made of steel or other metals
    • E02D5/285Prefabricated piles made of steel or other metals tubular, e.g. prefabricated from sheet pile elements

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Civil Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Mechanical Engineering (AREA)
  • Piles And Underground Anchors (AREA)
  • Foundations (AREA)

Description

* 4...... * VO 7149* 4 ...... * VO 7149

Titel: Fundatiepaal voor een werkplatform.Title: Foundation pole for a work platform.

De uitvinding heeft betrekking op een fundatiepaal voor een hefeiland voorzien van een bodemsteundeel met een zich in hoofdzaak loodrecht op de paallangsrichting uitstrekkend steunvlak. Dergelijke, algemeen bekende en 5 toegepaste fundatiepalen, die uit al dan niet in dwarsdoorsnede cirkelvormige buiselementen, uit vakwerkconstructies e.d. kunnen bestaan, zijn aan hun ondereinde voorzien van een gesloten voet met een steunvlak. Bij het plaatsen van een dergelijk hefeiland worden de fundatiepalen omlaag 10 gebracht en afhankelijk van de bodemgesteldheid over een bepaalde afstand de bodem ingedrukt. Dit geschiedt met een zodanige kracht, dat belastingen tijdens het gebruik van het hefeiland geen verdere indrukking tot gevolg hebben. Bedoelde belastingen zijn onder meer het gevolg van het 15 gewicht van het hefeiland alsmede van wind en golven. Gebruikelijk is dat bedoelde voorbelasting bij het installeren van het hefeiland geen of slechts een geringe veiligheidsmarge bezit ten opzichte van de maximaal mogelijke belasting tijdens het gebruik.The invention relates to a foundation pile for a lifting island provided with a bottom support part with a support surface extending substantially perpendicular to the pile length direction. Such generally known and used foundation piles, which may consist of tubular elements, whether or not circular in cross-section, of truss structures and the like, are provided at their lower end with a closed base with a supporting surface. When such a lifting platform is placed, the foundation piles are lowered and, depending on the soil conditions, the soil is pressed in over a certain distance. This is done with such a force that loads during use of the lifting platform do not result in any further compression. Intended loads are, among other things, the consequence of the weight of the lifting island, as well as of wind and waves. It is usual that the pre-load referred to when installing the jack-up platform has no or only a small safety margin compared to the maximum possible load during use.

20 Het op de bodem staan van de voet van de fundatie paal heeft het voordeel, dat het horizontale contactoppervlak tussen de gesloten voet en de grond een schijnbaar inklem-of terugstelmoment voor de paal oplevert. Dit moment, dat groter is naarmate de voet groter is, heeft een gunstige 25 invloed op in de paal en het hefeiland zelf opgewekte spanningen alsmede op het dynamische gedrag van het eiland.Standing the base of the foundation pile on the bottom has the advantage that the horizontal contact surface between the closed base and the ground provides an apparent clamping or reset moment for the pile. This moment, which is greater as the foot is larger, has a favorable influence on tensions generated in the pile and the lifting platform itself, as well as on the dynamic behavior of the island.

Gesloten en met name grote voeten vertonen in veel grondsoorten ongewenste ontgrondingsverschijnselen.Closed and in particular large feet show undesirable decontamination phenomena in many soil types.

Het wegspoelen van grond rond en onder de voet kan tot 30 een verminderde ondersteuning en inklemming en daardoor zelfs tot het wegzakken van de voet leiden.Flushing of soil around and under the foot can lead to reduced support and entrapment and therefore even to the foot sinking.

Met de uitvinding wordt beoogd om zonder wezenlijke vergroting van de belasting tijdens het installeren of het gebruik van heiinstallaties te voorzien in een aanmerke-35 lijke veiligheidsmarge voor de fundering, zodat pas na . - * J Λ /*The object of the invention is to provide a substantial safety margin for the foundation without substantial increase of the load during the installation or use of pile-driving installations, so that only after. - * J Λ / *

1 ' V s.' · i O O1 'V s.' I O O

-2- V* & een aanzienlijke overschrijding van de installatiebelasting verdere penetratie kan optreden, waarbij er tevens voor wordt gezorgd, dat zich pas na het voordoen van een aanzienlijke ontgronding de paal onder invloed van de maximale 5 gebruiksbelasting verder de grond in kan worden gedrukt.-2- V * & a further exceeding of the installation load further penetration can occur, while it is also ensured that the pile can only be pushed further into the ground under the influence of the maximum usage load after the significant excavation has occurred. .

Dit wordt overeenkomstig de uitvinding bij een fundatiepaal van de in de aanhef bedoelde soort bereikt, doordat zich vanaf het steunvlak in langsrichting van de paal ten minste een buisdeel uitstrekt, dat voorzien is 10 van een in hoofdzaak gesloten manteloppervlak en aan zijn van het steunvlak afgekeerde uiteinde open is uitgevoerd.According to the invention, this is achieved with a foundation pile of the type referred to in the preamble, in that at least one pipe section extending from the supporting surface in the longitudinal direction of the pile is provided with a substantially closed jacket surface and facing away from the supporting surface open end.

Door deze maatregelen is de fundatiepaal in vergelijking met die met een gesloten voet met dezelfde kracht aanmerkelijk verder de bodem in te drijven met als resultaat een 15 aanmerkelijk groter inklemmoment, ook bij een relatief klein contactvlak, en een aanzienlijk geringere gevoeligheid voor ontgronding. Daarbij worden optimale resultaten verkregen indien de lengte van het buisdeél gelegen is tussen een zodanige maximale lengte dat het hele buisdeel nog 20 net in de bodem kan worden gedrukt en zodoende het steunvlak nog net in contact met de bodem kan komen, en een zodanige minimale lengte, die groter is dan de diameter van het buisdeel, dat de gewenste inklemming wordt bereikt.As a result of these measures, the foundation pile can be driven considerably further into the ground with the same force compared to that with a closed foot, resulting in a considerably greater clamping moment, even with a relatively small contact surface, and a considerably lower sensitivity to excavation. Optimal results are obtained here if the length of the pipe part lies between such a maximum length that the whole pipe part can still just be pressed into the ground and thus the supporting surface can only just come into contact with the ground, and such a minimum length which is greater than the diameter of the pipe section to achieve the desired clamping.

Afhankelijk van de grondeigenschappen en de afmetin-25 gen van de fundatiepaal kan het ook wenselijk zijn om de fundatiepaal met meerdere korte buisdelen uit te voeren.Depending on the soil properties and the dimensions of the foundation pile, it may also be desirable to construct the foundation pile with several short pipe sections.

Een robuuste, sterke en tevens relatief eenvoudig te vervaardigen constructie met een maximaal bodemsteuneffect is daarbij te verkrijgen, als overeenkomstig een voorkeurs-30 uitvoeringsvorm van de uitvinding het buisdeel vast verbonden is met de steunplaat. Daarbij is de constructie bovendien relatief licht en gemakkelijk uit te voeren, als overeenkomstig een uitvoeringsvorm van de uitvinding het buisdeel een kleinere dwarsdoorsnede heeft dan de paal. Als dan 35 verder het buisdeel telescoperend ten opzichte van de paal verplaatsbaar is en met behulp van grendelmiddelen in ten j i o 0 -3- W v minste één uitgeschoven stand ten opzichte van de paal vastzetbaar is, is een buisdeel tijdens het transport van het hefeiland op voordeelbiedende wijze in de fundatiepaal terug te trekken, d.w.z., dat niet alleen de benodigde 5 vaarwegdiepte minder kan zijn, doch tevens ook de weerstand tijdens het verplaatsen is verlaagd.A robust, strong and at the same time relatively easy to manufacture construction with a maximum bottom support effect is obtainable if, according to a preferred embodiment of the invention, the tube part is fixedly connected to the support plate. In addition, the construction is relatively light and easy to design, if, according to an embodiment of the invention, the pipe section has a smaller cross-section than the pile. If the pipe part can then be moved telescopically with respect to the pole and if it can be fixed with at least one extended position relative to the pole with the aid of locking means, a pipe part during transport of the lifting platform is in an advantageous manner to retract into the foundation pile, that is to say that not only the required waterway depth can be less, but also the resistance during displacement is also reduced.

Bestaat de fundatiepaal uit een buisvormig element, dan is het open buisdeel op eenvoudige wijze te verwezenlijken, als overeenkomstig een verdere uitvoeringsvorm van 10 de uitvinding het buisdeel een verlenging van het buisvormige element vormt. Het buisvormige element kan daarbij ten opzichte van het bodemsteundeel, bijvoorbeeld een plaat of schot, onderbroken zijn met een tussengelast bodemsteundeel of ononderbroken doorlopen met ingelast bodemsteundeel.If the foundation pile consists of a tubular element, the open tube part can be realized in a simple manner if, according to a further embodiment of the invention, the tube part forms an extension of the tubular element. The tubular element can here be interrupted with respect to the bottom support part, for instance a plate or partition, with an intermediate welded bottom support part or continuous with welded bottom support part.

15 Ten einde bij het installeren van het hefeiland tijdens het in de bodem drukken van het buisdeel het daarin opgesloten geraakte water te laten ontwijken kunnen er in het buisdeel openingen zijn aangebracht. Overeenkomstig een verdere uitvoeringsvorm van de uitvinding wordt er 20 evenwel een voorkeur voor uitgesproken, dat het bodemsteundeel voorzien is van ten minste één doorlaatopening. Daarbij is het op verder voordeelbiedende wijze mogelijk, dat bij ten minste één doorlaatopening middelen voor het toevoeren van water onder druk of vulmateriaal zijn aangebracht.In order to allow the water trapped therein to escape during the installation of the lifting island during the pressing of the pipe part into the ground, openings can be provided in the pipe part. In accordance with a further embodiment of the invention, however, it is preferred that the bottom support part is provided with at least one passage opening. In a further advantageous manner it is possible for means for supplying water under pressure or filling material to be provided at at least one passage opening.

25 Met de waterpersmiddelen is het uit de bodem trekken van het buisdeel te vergemakkelijken door het onder het bodemsteundeel persen van water.With the water press means it is easier to pull the pipe part out of the bottom by pressing water under the bottom support part.

Het toevoeren van vulmateriaal kan geschieden indien bij het plaatsen van de fundatiepaal het buisdeel 30 niet zo ver in de bodem kan worden gedrukt dat het bodemsteundeel contact gaat maken met de bodem. Door opvullen van de resterende ruimte onder het bodemsteundeel, bijvoorbeeld met beton, grout of een ander vulmateriaal, is dan de draag-functie van het bodemsteundeel te verwezenlijken.The filling material can be supplied if, when the foundation pile is placed, the pipe part 30 cannot be pressed into the ground so far that the bottom support part will make contact with the ground. The filling function of the bottom support part can then be realized by filling up the remaining space under the bottom support part, for instance with concrete, grout or another filling material.

35 Onder verwijzing naar in de tekening schematisch weergegeven uitvoeringsvoorbeelden zal de fundatiepaal 5 ;1’ ? ?' - «V ^ Z 5 -4- volgens de uitvinding thans nader worden besproken en toegelicht.35 With reference to exemplary embodiments schematically shown in the drawing, the foundation pile 5; 1 "? ? " The present invention will now be discussed and explained in more detail according to the invention.

Fig. 1 toont een buisvormige fundatiepaal met open buisdeel; 5 Fig. 2 toont een vakwerkpaal met open buisdeel; enFig. 1 shows a tubular foundation pile with an open tube section; FIG. 2 shows a lattice pole with an open tube section; and

Fig. 3 toont een fundatiepaal met intrekbaar buisdeel.Fig. 3 shows a foundation pile with a retractable pipe section.

Fig. 1 toont het onderuiteinde van een buisvormige 10 fundatiepaal 1 voor een niet-weergegeven hefeiland, dat zoals gebruikelijk door ten minste drie van dergelijke fundatiepalen wordt gedragen. De schematische weergave van de fundatiepaal houdt in dat gebruikelijk aanwezige middelen, zoals voorzieningen om de fundatiepaal ten opzichte 15 van het hefeiland te kunnen verplaatsen, zijn weggelaten.Fig. 1 shows the bottom end of a tubular foundation pile 1 for a lifting island, not shown, which is supported by at least three such foundation piles as usual. The schematic representation of the foundation pile means that the usual means available, such as provisions for moving the foundation pile relative to the lifting platform, have been omitted.

De fundatiepaal 1 is aan zijn onderuiteinde afge- » sloten door een plaat of schot 2, waaraan een open buisdeel 3 is vastgelast. De in zijn geïnstalleerde positie getoonde fundatiepaal is in zijn optimaal steunende stand weergegeven, 20 d.w.z. het schot 2 bevindt zich na het in de bodem 4 drukken van het buisdeel 3 iets onder het niveau van de bodem 4 en steunt zodoende op de grondkolom binnen het buisdeel 3, terwijl het buisdeel 3 over zijn gehele lengte in de bodem 4 steekt en zodoende een maximaal terugstel- of inklem-25 moment geeft. Deze optimale installatie is te verkrijgen door afhankelijk van de uit te oefenen installatiekracht en de bodemgesteldheid de juiste lengte van het buisdeel 3 te kiezen.The foundation pile 1 is closed at its lower end by a plate or partition 2, to which an open pipe section 3 is welded. The foundation pile shown in its installed position is shown in its optimally supporting position, ie the bulkhead 2 is located slightly below the level of the bottom 4 after pressing the pipe part 3 into the bottom 4 and thus rests on the ground column within the pipe part 3, while the pipe part 3 protrudes into the bottom 4 over its entire length and thus gives a maximum reset or clamping moment. This optimum installation can be obtained by choosing the correct length of the pipe section 3, depending on the installation force to be exerted and the soil condition.

In fig. 2 is een vakwerkpaal 10 weergegeven, 30 die zoals gebruikelijk bestaat uit een aantal staanders 11, die verbonden zijn door dwarsverbindingen 12 en schoren 13, en aan zijn onderuiteinde voorzien is van een gesloten voet 14 met een ondergelegen steunvlak 15. Aan dit laatste is een open buisdeel 16 bevestigd.Fig. 2 shows a lattice post 10, which as usual consists of a number of uprights 11, which are connected by cross connections 12 and struts 13, and at its lower end is provided with a closed foot 14 with an underlying supporting surface 15. At this last, an open pipe section 16 is attached.

35 Fig. 3 toont het onderuiteinde van een fundatiepaal 20 met een voet 21, die voorzien is van een doorlaatopening ** 7 ·' i $ η? λ .·»..· i i \j -5- s* > voor een open buisdeel 22. In het buisdeel 22 is een bodem-steundeel 23 in de vorm van een schot of plaat aangebracht, boven welk deel 23 het buisdeel 22 zich voortzet door een in de voet 21 aangebrachte geleiding en eindigt in een 5 flensrand 24, die steunneemt op het bovenvlak van de voet 21. In deze stand is het buisdeel 22 middels grendelmiddelen 25 te borgen. Verder is ter hoogte van de flensrand 24 in het buisdeel 22 een verstijvingsplaat 26 aangebracht.FIG. 3 shows the lower end of a foundation pile 20 with a foot 21, which is provided with a passage opening ** 7 · 'i $ η? λ. · ».. · ii \ j -5- s *> for an open pipe section 22. In the pipe section 22, a bottom support section 23 in the form of a partition or plate is arranged, above which part 23 the pipe section 22 is located continues through a guide arranged in the foot 21 and ends in a flange edge 24, which takes up support on the top surface of the foot 21. In this position, the pipe part 22 can be locked by means of locking means 25. A stiffening plate 26 is further arranged at the level of the flange edge 24 in the pipe part 22.

Het voordeel van deze constructie is het tijdens het transpor-10 teren van het hefeiland met opgetrokken poten kunnen intrekken van de buisdelen 22 waardoor de vereiste vaarwegdiepte en de ondervonden transportweerstand worden verminderd.The advantage of this construction is that the pipe sections 22 can be retracted during transport of the lifting platform with the legs raised, thereby reducing the required waterway depth and the transport resistance encountered.

Het spreekt vanzelf, dat er binnen het kader van de uitvinding vele wijzigingen en varianten mogelijk zijn.It goes without saying that many modifications and variants are possible within the scope of the invention.

15 Zo kunnen in de delen 2, 14, 23 en 26 één of een aantal openingen zijn aangebracht om water te laten ontwijken tijdens het indrijven van het open buisdeel 3, 16 of 22.In parts 2, 14, 23 and 26, for instance, one or more openings can be arranged to allow water to escape during driving of the open pipe part 3, 16 or 22.

Verder kunnen bij dergelijke openingen waterpersmiddelen worden aangebracht om het uit de bodem trekken van het 20 buisdeel te vergemakkelijken middels het inpersen van water onder de delen 2, 14 en 26. De grendelmiddelen 25 kunnen zodanig zijn uitgevoerd, dat het buisdeel op verschillende onder de fundatiepaal uitstekende lengten kan worden geborgd.Furthermore, water-pressing means can be arranged at such openings to facilitate the pulling out of the tube part from the bottom by pressing water in under parts 2, 14 and 26. The locking means 25 can be designed in such a way that the pipe part is arranged at different positions under the foundation pile protruding lengths can be secured.

Om daarbij het bodemsteundeel 23 steeds ongeveer ter hoogte 25 van het onderuiteinde van de paal te kunnen situeren, kan bijvoorbeeld het bodemsteundeel 23 worden gevormd door de bodem van een gesloten verder buisdeel, dat binnen het buisdeel 22 kan telescoperen en op verschillende hoogten door verdere grendelmiddelen kan worden geborgd.In order to always be able to position the bottom support part 23 approximately at the level of the lower end of the pile, the bottom support part 23 can for instance be formed by the bottom of a closed further pipe part, which can telescope inside the pipe part 22 and at different heights by further locking means can be secured.

30 ~ r. -i * 4 's30 ~ r. -i * 4's

l* V/ *>’ . ï 'Jl * V / *> ". J

3535

Claims (7)

1. Fundatiepaal voor een hefeiland voorzien van een bodemsteundeel met een zich in hoofdzaak loodrecht op de paallangsrichting uitstrekkend steunvlak, met het kenmerk, dat zich vanaf het steunvlak in langsrichting 5 van de paal ten minste een buisdeel uitstrekt, dat voorzien is van een in hoofdzaak gesloten manteloppervlak en aan zijn van het steunvlak afgekeerde uiteinde open is uitgevoerd.1. Foundation pole for a lifting platform provided with a bottom support part with a support surface extending substantially perpendicular to the pile-long direction, characterized in that at least one pipe part, which is provided with a substantially longitudinal direction of the pole in the longitudinal direction of the pole closed casing surface and open at its end facing away from the supporting surface. 2. Fundatiepaal volgens conclusie 1, met het kenmerk, dat het buisdeel vast verbonden is met de steunplaat.Foundation pile according to claim 1, characterized in that the pipe section is fixedly connected to the support plate. 3. Fundatiepaal volgens conclusie 1 of 2, met het kenmerk, dat het buisdeel een kleinere dwarsdoorsnede heeft dan de paal.Foundation pile according to claim 1 or 2, characterized in that the pipe section has a smaller cross-section than the pile. 4. Fundatiepaal volgens conclusie 3, met het kenmerk, dat het buisdeel telescoperend ten opzichte van de paal 15 verplaatsbaar is en met behulp van grendelmiddelen in ten minste, één uitgeschoven stand ten opzichte van de paal vastzetbaar is.A foundation pile according to claim 3, characterized in that the pipe section is movable telescopically with respect to the post 15 and can be locked in at least one extended position relative to the post by means of locking means. 5. Fundatiepaal volgens conclusie 1 of 2 en bestaande uit een buisvormig element, met het kenmerk, dat het buisdeel 20 een verlenging van het buisvormige element vormt.Foundation pile according to claim 1 or 2 and consisting of a tubular element, characterized in that the pipe part 20 forms an extension of the tubular element. 6. Fundatiepaal volgens één der voorgaande conclusies, met het kenmerk, dat het bodemsteundeel voorzien is van ten minste één doorlaatopening.Foundation pile according to one of the preceding claims, characterized in that the bottom support part is provided with at least one passage opening. 7. Fundatiepaal volgens conclusie 6, met het kenmerk, 25 dat bij ten minste één doorlaatopening middelen voor het toevoeren van water onder druk of vulmateriaal zijn aangebracht . SS ft 1^07. Foundation pile according to claim 6, characterized in that means for supplying water under pressure or filling material are arranged at at least one passage opening. SS ft 1 ^ 0
NL8501130A 1985-04-18 1985-04-18 Foundation pole for a jack-up platform. NL193498C (en)

Priority Applications (4)

Application Number Priority Date Filing Date Title
NL8501130A NL193498C (en) 1985-04-18 1985-04-18 Foundation pole for a jack-up platform.
NO861458A NO861458L (en) 1985-04-18 1986-04-15 A FOUNDATION SOIL FOR A DRILL PLATFORM.
GB8609400A GB2174742B (en) 1985-04-18 1986-04-17 A foundation pile for a lifting platform
DE19863613058 DE3613058A1 (en) 1985-04-18 1986-04-18 FOUNDATION PILE FOR A WORKING PLATFORM

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL8501130 1985-04-18
NL8501130A NL193498C (en) 1985-04-18 1985-04-18 Foundation pole for a jack-up platform.

Publications (3)

Publication Number Publication Date
NL8501130A true NL8501130A (en) 1986-11-17
NL193498B NL193498B (en) 1999-08-02
NL193498C NL193498C (en) 1999-12-03

Family

ID=19845853

Family Applications (1)

Application Number Title Priority Date Filing Date
NL8501130A NL193498C (en) 1985-04-18 1985-04-18 Foundation pole for a jack-up platform.

Country Status (4)

Country Link
DE (1) DE3613058A1 (en)
GB (1) GB2174742B (en)
NL (1) NL193498C (en)
NO (1) NO861458L (en)

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2908142A (en) * 1956-09-28 1959-10-13 De Long Corp Supporting leg assembly for marine platform
US3851483A (en) * 1972-12-12 1974-12-03 M Holley Sleeved-pile structure
EP0080143A1 (en) * 1981-11-19 1983-06-01 Eskilstuna Invest Ab Foundation for a pole, a pillar or the like

Family Cites Families (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2961837A (en) * 1956-09-28 1960-11-29 Delong Corp Supporting leg assembly for marine platform
US2948120A (en) * 1956-09-28 1960-08-09 De Long Corp Supporting leg assembly for marine platform
GB1396415A (en) * 1971-07-31 1975-06-04 Tecnomare Spa Platform suitable for positioning on a river-or sea-bed
US3834168A (en) * 1973-03-13 1974-09-10 M Holley Slip-jointed pile and dolphin construction
FR2486562A1 (en) * 1980-07-09 1982-01-15 Coyne Bellier Bureau Ingenieur FOUNDATION DEVICE FOR STRUCTURE, SUCH AS A PLATFORM, INCLUDING SELF-LIFTING, BASED ON A SUB-MARINE BASE, AND PLATFORMS OF THIS TYPE

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2908142A (en) * 1956-09-28 1959-10-13 De Long Corp Supporting leg assembly for marine platform
US3851483A (en) * 1972-12-12 1974-12-03 M Holley Sleeved-pile structure
EP0080143A1 (en) * 1981-11-19 1983-06-01 Eskilstuna Invest Ab Foundation for a pole, a pillar or the like

Also Published As

Publication number Publication date
GB2174742A (en) 1986-11-12
GB8609400D0 (en) 1986-05-21
NL193498B (en) 1999-08-02
NL193498C (en) 1999-12-03
DE3613058A1 (en) 1986-10-23
GB2174742B (en) 1989-07-12
NO861458L (en) 1986-10-20

Similar Documents

Publication Publication Date Title
NL1016859C2 (en) Method and device for placing at least one windmill on open water.
US7470090B2 (en) Lifting bracket system supported on a pier for lifting a foundation
DK2372143T3 (en) EQUIPMENT AND PROCEDURE TO RISE A LARGE SLIM BODY ON THE SEA, LIKE A MONOPOLY FOR A WIND TURBINE
CA2112722C (en) Lifting and shoring jack assembly
US9644337B1 (en) Systems and methods for positioning and anchoring columns
GB2435664A (en) Barrier with flexible membrane
US4372707A (en) Pile installation and removal mechanisms in off-shore rigs and method of using same
US20110088336A1 (en) Integrated post and jack system
NL2024640B1 (en) Method of Installing a Support for Supporting a Load Structure, such as a Wind Turbine, on, for instance, a Sea Bed
WO2009147449A1 (en) Tower structure and method of raising and lowering said structure
SK119198A3 (en) Hoisting device
NL8501130A (en) FOUNDATION FOR A WORK PLATFORM.
US4388024A (en) Support structure for offshore platforms
NL1014122C2 (en) Lifting platform with a deck construction and a single support post as well as a method for placing such a lifting platform.
GB1587334A (en) Bridge structures
CN215290138U (en) Packway system suitable for inner support structure foundation pit
KR102452211B1 (en) Multipurpose concrete floating box structure and The construction method thereof
NL1008239C2 (en) Offshore platform
NL1033620C2 (en) Method and pile-driving device for installing foundation piles in the ground.
CN112431233A8 (en) Steel pipe pile bearing capacity detection device
CN222391071U (en) Building structure reinforcement device
CN111608429A (en) Assembled ultra-deep foundation pit ramp system and construction method thereof
NL8020370A (en) SUPPORT CONSTRUCTION FOR COASTAL PLATFORMS.
CN221438299U (en) Self-limiting floating platform
CN219100805U (en) Protective shed

Legal Events

Date Code Title Description
A1B A search report has been drawn up
BC A request for examination has been filed
V4 Lapsed because of reaching the maximum lifetime of a patent

Effective date: 20050418