[go: up one dir, main page]

KR950005637B1 - Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center - Google Patents

Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center Download PDF

Info

Publication number
KR950005637B1
KR950005637B1 KR1019920004380A KR920004380A KR950005637B1 KR 950005637 B1 KR950005637 B1 KR 950005637B1 KR 1019920004380 A KR1019920004380 A KR 1019920004380A KR 920004380 A KR920004380 A KR 920004380A KR 950005637 B1 KR950005637 B1 KR 950005637B1
Authority
KR
South Korea
Prior art keywords
test
request
subscriber
operator
result
Prior art date
Application number
KR1019920004380A
Other languages
Korean (ko)
Other versions
KR930020892A (en
Inventor
이충일
Original Assignee
한국전기통신공사
조백제
재단법인한국전자통신연구소
양승택
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 한국전기통신공사, 조백제, 재단법인한국전자통신연구소, 양승택 filed Critical 한국전기통신공사
Priority to KR1019920004380A priority Critical patent/KR950005637B1/en
Publication of KR930020892A publication Critical patent/KR930020892A/en
Application granted granted Critical
Publication of KR950005637B1 publication Critical patent/KR950005637B1/en

Links

Landscapes

  • Monitoring And Testing Of Exchanges (AREA)

Abstract

내용 없음.No content.

Description

전전자교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비 시험 방법Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center

제1도는 본 발명의 하드 웨어 구성도.1 is a hardware configuration diagram of the present invention.

제2도는 본 발명의 소프트 웨어 블록구성도.2 is a software block diagram of the present invention.

제3도는 본 발명의 전체 흐름도.3 is a general flow diagram of the present invention.

제4도는 본 발명의 운용자 요구 시험의 실시예를 보이는 흐름도.4 is a flowchart showing an embodiment of an operator required test of the present invention.

제5도는 본 발명의 시스템 자체 요구에 의한 시험을 보이는 흐름도.5 is a flow chart showing testing by the system itself requirements of the present invention.

제6도는 본 발명의 주기적 자동 시험을 보이는 흐름도.6 is a flow chart showing a periodic automated test of the present invention.

제7도는 본 발명의 시험 관련 데이터 변경 및 조회에 따른 흐름도.7 is a flow chart according to the change and inquiry of the test-related data of the present invention.

제8도는 본 발명의 시험을 제어하는 흐름도.8 is a flow chart for controlling the test of the present invention.

본 발명은 전전자 교환기에서 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 장애 검출 시험 방법에 관한 것이다.The present invention relates to a method for detecting fault detection of a facility for basic information network subscriber basic access in an electronic switchboard.

종래에는 아날로그 가입자 설비에 대한 시험만이 있었으나, 종합 정보 통신망 기능이 실용화 되어감에 따라 종합 정보 통신망 가입자 기본 액세스에 대한 설비 시험이 요구되었다.Conventionally, only an analog subscriber facility was tested, but as the integrated information network function became practical, a facility test for basic access to the subscriber network was required.

따라서, 상기의 요구에 따라 안출된 본 발명은 종합 정보 통신망 가입자 기본 액세스에 대한 설비를 시험하기 위하여, 상기의 기능을 내장하고, 교환기 자체만의 기능으로 가입자 설비 시험을 수행하도록 하여, 경제적으로 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 고장을 신속히 발견할 수 있도록 하는 설비 시험 방법을 제공하는데 그 목적이 있다.Therefore, the present invention devised in accordance with the above requirements allows the economics to be integrated by incorporating the above functions and performing the subscriber equipment test by the function of the exchange itself in order to test the equipment for basic information network subscriber basic access. The goal is to provide a facility testing method that enables the rapid detection of equipment failures for basic access to information network subscribers.

본 발명은 상기 목적을 달성하기 위해 운용자와의 인터페이스를 제공하는 시험대와, 상기 시험대와 입/출력제어를 수행하는 맨머쉰 프로세서(MMP)와, 교환기의 유지보수를 담당하는 운영 및 유지보수 프로세서(OMP)와, 가입자 및 통화로를 제어하는 액세스 스위칭 프로세서(ASP)와, 가입자 설비의 시험을 수행하는 종합 통신망 테스트 제어장치(ITEC)와, 상기 액세스 스위칭 프로세서(ASP)와 종합 정보 통신망 테스트 제어장치(ITEC)간의 통신로를 제공하는 액세스 스위칭 모듈 프로세서(ASMP), 및 가입자와의 인터페이스 기능을 수행하는 종합 정보 통신망 액세스 프로세서(ISAP)를 구비한 설비 시험 방법에 있어서, 시스템이 시작되면, 종합 종보 통신망 가입자 기본 액세스 설비에 대한 시험을 위해 필요한 데이터를 초기화 하는 제1단계와, 시험요구, 시험 관련 데이터 변경/조회 요구를 기다리는 제2단계와, 운용자 요구에 의한 시험 요구가 오면, 운용자 요구에 의해 시험하는 프로세스를 생성하는 제3단계와, 시스템 자체 요구에 의한 시험 요구가 오면, 시스템 자체 요구에 위해 시험하는 프로세스를 생성하는 제4단계와, 주기적 시험요구가 오면, 주기적 시험을 위해 프로세스를 생성하는 제5단계와, 시험 관련 데이터 변경/조회 요구가 오면, 이를 위해 프로세스를 생성하는 제6단계와, 시험 제어 요구가 오면, 이를 위해 프로세스를 생성하는 제7단계, 및 각각 해당하는 일을 처리한 후 다시 다른 요구가 있기를 기다리는 상태로 복귀하는 제8단계로 이루어지는 것을 특징으로 한다.The present invention provides a test bench that provides an interface with an operator to achieve the above object, a man machine processor (MMP) that performs input / output control with the test bench, and an operation and maintenance processor that is in charge of maintenance of the exchanger. OMP), an access switching processor (ASP) for controlling subscribers and a call path, an integrated network test control device (ITEC) for testing subscriber equipment, the access switching processor (ASP) and an integrated information network test control device A facility testing method comprising an access switching module processor (ASMP) providing a communication path between (ITEC) and an integrated information network access processor (ISAP) performing an interface function with a subscriber. The first step of initializing the data necessary for the test of the subscriber network basic access facility, the test request, The second step of waiting for a change request / inquiry request, the third step of creating a process for testing according to the operator's request when the test request comes from the operator's request, and the system's own request if the test request comes from the system's own request. A fourth step of generating a process for risk testing, a fifth step of generating a process for periodic testing if a periodic test request is received, and a sixth step of creating a process for this, when a request for changing / retrieving data related to a test comes And a seventh step of generating a process for this, and an eighth step of returning to a state waiting for another request after processing the corresponding work.

이하, 별첨의 도면을 참조하여 일실시예를 상세히 설명한다.Hereinafter, an embodiment will be described in detail with reference to the accompanying drawings.

제1도는 본 발명의 하드웨어 구성도로서, 운용자와의 인터페이스를 제공하는 시험대(텔레타이프, CRT, 퍼스날 컴퓨터 등)(1)와, 입/출력제어를 수행하는 맨 머쉰프로세서(MMP) (Man Machine Processor)(2)와, 교환기의 유지 보수를 담당하는 운영 및 유지보수 프로세서(OMP)(3)와, 가입자 및 통화로를 제어하는 액세스 스위칭 프로세서(ASP)(4)와, 가입자 설비의 시험을 수행하는 종합 정보 통신망 테스트 제어장치( ITEC)(5)와, 상기 액세스 스위칭 프로세서(ASP)(4)와 종합 정보 통신망 테스트 제어장치(ITEC)(5)간의 통신로를 제공하는 액세스 스위칭 모듈 프로세서(ASMP)(6), 및 가입자와의 인터페이스 기능을 수행하는 종합 정보 통신망 액세스 프로세서 (ISAP)(7)로 구성되어 있다.1 is a hardware configuration diagram of the present invention, a test bench (teletype, CRT, personal computer, etc.) 1 for providing an interface with an operator, and a man machine processor (MMP) for performing input / output control. (2), an operation and maintenance processor (OMP) 3, which is responsible for the maintenance of the exchange, an access switching processor (ASP) 4, which controls subscribers and call paths, and subscriber equipment. An access switching module processor (ASMP) that provides a communication path between the integrated information network test controller (ITC) 5 and the access switching processor (ASP) 4 and the integrated information network test controller (ITEC) 5; 6), and an integrated information network access processor (ISAP) 7 which performs an interface function with a subscriber.

제2도는 본 발명의 소프트 웨어의 블록도이며, 각각의 기능은 다음과 같다.Figure 2 is a block diagram of the software of the present invention, each function is as follows.

EC(Execution Control)(8) 블록은 시험의 수행제어를 하며, FLM(Fault Management)(9) 블록은 장애를 관리하고, TDMH( Telephone Device Maintenance Handing)(10) 블록은 통화로계 장비 상태를 관리하며, SNC(Switch Network control)(11) 블록은 스위치 망의 제어를 수행하며, TSL(Time Switch and Link)(12)는 시분할 스위치, LTTM(Line and Trunk Test Management)(13)블럭은 종합 정보 통신망 가입자 기본 액세스에 대한 설비 시험을 관리하며, DST(Digital Subscriber Test)(14) 블록은 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 시험을 제어하며, ITEC(ISDN Test Equipment control)(16) 블록은 시험 장치를 제어하며, ASMI(Access Switching Maintenance Interface)(15) 블록은 DST(14)와 ITEC(16)와의 통신로를 제공하며, DCRH(Diagnostics Control and Result Handling)(17) 블록은 진단제어 및 결과처리를 수행하며, NTR(Number Translation)(18)은 가입자 선로의 번호를 기기 번호를 기기 번호로 번역하고, LPA(Line Peripheral Audit)(19)블럭은 라인계 감사를 수행하며, DSI(Digital Subscriber Interface)(20) 블록은 종합 정보 통신망 가입자 기본 액세스에 대한 정합을 수행하는 것으로 구성된다.The Execution Control (EC) block controls the performance of the test, the Fault Management (FLM) block manages faults, and the Telephone Device Maintenance Handing (TDMH) block controls the state of the call line equipment. The switch network control (SNC) block performs control of the switch network, the time switch and link (TSL) 12 is a time division switch, and the line and trunk test management (LTTM) block 13 is integrated. Manages facility testing for telecommunications subscriber basic access, the Digital Subscriber Test (DST) block controls testing of the facility for comprehensive telecommunications subscriber basic access, and ISDN Test Equipment Control (ICT) block. Control the test unit, the ASMI (Access Switching Maintenance Interface) 15 block provides the communication path between the DST 14 and the ITEC 16, and the Diagnostics Control and Result Handling (DCRH) block 17 is diagnostic control. And result processing, and NTR (Number Translation) 18 converts the number of subscriber lines. Translates the device number to the device number, the Line Peripheral Audit (LPA) block 19 performs line-based auditing, and the Digital Subscriber Interface (DSI) block 20 performs registration on the aggregated telecommunications subscriber basic access. It consists of doing.

제3도는 본 발명의 전체적인 흐름도이다.3 is a general flow diagram of the present invention.

시스템이 시작되면, 종합 정보 통신망 가입자 기본 액세스 설비에 대한 시험을 위해 필요한 데이터를 초기화하는 (301) 제1단계와, 시험 요구, 시험 관련 데이터 변경/조회 요구를 기다리는 제2단계 (302)와, 운용자 요구에 의한 시험 요구가 오면, 운용자 요구에 의해 시험하는 프로세스를 생성하는(303 및 304) 제3단계, 시스템 자체요구에 의한 시험 요구가 오면, 시스템 자체 요구에 의해 시험하는 프로세스를 생성하는 (305 및 306) 제4단계와, 주기적 시험 요구가 오면, 주기적 시험을 위해 프로세스를 생성하는(307 및 308) 제5단계와, 시험 관련 데이터 변경/조회 요구가 오면, 이를 위해 프로세스를 생성하는 (309 및 310) 제6단계와, 시험 제어 요구가 오면, 이를 위해 프로세스를 생성하는 (301 및 312) 제7단계, 및 각각 해당하는 일을 처리한 후 다시 다른 요구가 있기를 기다리는 상태로 복귀하는 제8단계로 이루어진다.When the system is started, a first step (301) of initiating data necessary for testing the general information network subscriber basic access facility, a second step (302) waiting for a test request, a test related data change / view request, Step 3, which creates a process for testing according to the operator's request (303 and 304) when the test request by the operator demand comes, and a process for testing according to the system's own request when the test request due to the system itself demands ( 305 and 306) and the fifth step of generating a process for periodic testing (307 and 308) when the periodic test request comes, and the process of generating a process for this when the request for changing / retrieving data related to the test comes ( 309 and 310) and the seventh step of creating a process (301 and 312) for this, when the test control request comes in, and again after the corresponding work has been processed. A wait is made by the eighth step that returns to the state.

제4도는 상기 제3단계 (303 및 304)운용자 요구 시험의 실시예를 나타내는 흐름도이다.4 is a flowchart showing an embodiment of the third step (303 and 304) operator request test.

운용자가 입력한 명령어를 MMP(2)에서 분석하여 OMP(3)의 EC(8)로 전달되어 LTTM(13)으로 전달하는 (401) 제1단계와, LTTM(13)에서 번호 번역을 수행하는 (402) 제2단계와, 해당 프로세서의 상태 및 시험장비의 상태를 확인하는(403 및 404) 제 3단계와, 시험 수행이 가능한 경우 해당 ASP(4)의 DST(14)로 전달하며, DST(14)에서는 ASMP(6)로 시험 장치를 연결하는(405) 제4단계와, 가입자 상태 확인 후 시험 가능한가를 판단하는(406) 제5단계와, 제5단계 수행 후 시험 가능한 경우 가입자 상태를 시험중으로 변경하고, DSI(20)로 디지털 가입자 시험용 릴레이를 연결하여, 시험 장치로 시험 수행 명령을 전달, 수행하게 하는 (407 내지 409)제6단계와, 시험 장치로부터 결과를 받으면, 가입자 상태 시험 이전 상태로 변경하고, 시험용 릴레이를 복구하는 (410 내지 409) 제6단계와, 시험장치로부터 결과를 받으면, 가입자 상태 시험 이전 상태로 변경하고, 시험용 릴레이를 복구하는 (410 내지 412) 제7단계, 및 시험장치를 복구 복구완료 후 시험 결과를 LTTM(13)으로 전달하고, 시험 장치 비사용 시험은 DSI(20)로 시험 요구 후 결과를 입력받아 LTTM(13)으로 전달하여 그 결과를 EC(8)로 전달하여 운용자에게 출력하게 하는 (413 및 414) 제8단계로 구성된다.The first step (401) for analyzing the command input by the operator in the MMP (2) and delivered to the EC (8) of the OMP (3) to the LTTM (13), and performing the number translation in the LTTM (13) (402) the second step, and the third step of checking the state of the processor and the state of the test equipment (403 and 404), and if the test can be carried out to the DST (14) of the corresponding ASP (4), the DST 14, the fourth step of connecting the test device to the ASMP 6 (405), the fifth step of determining whether the test is possible after the subscriber status check (406), and the subscriber status if the test is possible after performing the fifth step Step 6 (407 to 409) for changing to under test, connecting the digital subscriber test relay to the DSI 20, and transmitting and performing a test execution command to the test device, and receiving the result from the test device, the subscriber state test. The sixth step of changing to the previous state and restoring the test relay (410 to 409), and the test apparatus Upon receiving the result, step 7 of changing to the state before the subscriber state test, recovering the test relay (410 to 412), and transferring the test result to the LTTM 13 after the recovery of the test device is completed, and the test device is not used. The test consists of the eighth step of receiving the test request from the DSI 20, receiving the result, passing the result to the LTTM 13, and delivering the result to the EC 8 for output to the operator (413 and 414).

제5도는 상기 제4단계(305 및 306)의 시스템 자체 요구에 의한 시험을 나타내는 흐름도이다.5 is a flow chart showing a test by the system itself request of the fourth steps 305 and 306 above.

시스템 자체 요구에 의한 시험으로 FLM(9)의 요구에 의한 장애검증 시험(501)과, PA(19)의 요구에 의한 감사 시험(502)와, 주기적 감시로 장시간 미사용 가입자 및 장시간 장애로 격리된 가입자에 대한 상태확인시험(506)의 세가지 유형으로 나뉘어 각각의 경로를 거치는 제1단계와, 상기 각 경로에 연속성 시험 수행을 요구하는 (503) 제2단계, 및 시험 수행의 결과를 입력받아, 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 고장여부를 확인하여, 시험을 요구한 블록으로 결과를 보고하며, 이때의 상태 확인 시험 수행 후, 시험 결과를 상태 변경이 있는 경우 TDMH(10)로 결과를 통보하는(504 및 505) 제3단계로 구성된다.The system self-required test isolates the failure verification test (501) by the request of the FLM 9, the audit test (502) by the request of the PA 19, and the long-term unused subscriber and long-term failure by periodic monitoring. Receives the first step through each of the three types of status check test (506) for the subscriber, the second step (503) for requesting the continuity test to be performed in each path, and the results of the test execution, It checks whether the equipment has failed for basic access of the general information communication network and reports the result in the block that requested the test.After performing the status check test, the test result is reported to the TDMH (10) if there is a state change. Notification (504 and 505) consists of a third step.

제6도는 상기 제5단계(307 및 308)의 주기적 자동 시험을 나타내는 흐름도이다.6 is a flowchart showing the periodic automatic test of the fifth step (307 and 308).

주기적인 자동 시험은 DST(14)에서 자체적으로 타이머를 운용하여 일정 주기가 되면, 자동 시험 시작요구를 입력받은(601) 제1단계와, 시험 시작 가입자 정보를 조회하는 (602) 제2단계와, 시험 대상 가입자를 선정하는(603) 제3단계와, 연속성 시험을 수행하여 그 결과를 입력받아 분석하는(604 내지 606) 제4단계와, 종합정보 통신망 가입자 기본 액세스에 대한 고장 여부를 판단하는(607) 제5단계, 및 TDMH(10)로 보고하여, 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 상태를 관리하고, 이러한 시험이 시험 종료 시간까지 반복되도록 하는(608 및 609) 제6단계로 구성된다.The periodic automatic test is performed by the DST 14 by itself using a timer, and when a predetermined period is reached, a first step of receiving an automatic test start request (601) and a second step of inquiring test start subscriber information (602) and A third step of selecting a test target subscriber (603), a fourth step of performing a continuity test to receive and analyzing the results (604 to 606), and determining whether there is a failure for basic access to subscribers of the integrated information network; (607) step 5, and reporting to the TDMH 10 to manage the status of the facility for the aggregate information network subscriber basic access and to step 6 such that the tests are repeated until the end of the test (608 and 609). It is composed.

제7도는 상기 제6단계(309 및 310)의 실행 후, 시험 관련 데이터를 변경 및 조회하는 흐름도이다.7 is a flowchart for changing and inquiring test-related data after the execution of the sixth steps 309 and 310.

시험 관련 데이터 변경기능은 교환국과 선로의 환경에 따라 운용자가 입력 장치를 통해 각 측정 항복의 측정 기준치, 각종 자동 시험의 주기, 전송 오류 임계값에 대해 변경을 요구하면, 해당 데이터를 찾아 변경 하고, 변경시 수반되는 타이머등을 재조정하여 그 결과를 운용자에게 출력하는(701 내지 703) 제1단계와, 시험 관리 데이터 조회기능은 운용자가 입력 장치를 통해 각 측정 항목의 측정 기준치, 각종 자동 시험의 주기, 전송오류의 임계값에 대해 조회를 요구하면, 해당 데이터를 검색, 운용자에게 출력하는(704 내지 706) 제2단계로 구성된다.The test-related data change function finds and changes the corresponding data when the operator requests to change the measurement reference value of each measurement yield, the cycle of various automatic tests, and the transmission error threshold value through the input device according to the switching center and the line environment. The first step of re-adjusting the timer accompanied by the change and outputting the result to the operator (701 to 703), and the test management data inquiry function allows the operator to input the measurement reference value of each measurement item through the input device and the cycle of various automatic tests. In response to requesting an inquiry about a threshold value of a transmission error, a second step of retrieving the corresponding data and outputting the data to the operator (704 to 706).

제8도는 상기 제7단계(311 및 312) 실행후, 시험을 제어하는 흐름도이다.8 is a flowchart of controlling a test after executing the seventh steps 311 and 312.

시험 제어에는 운용자에 의한 시험 및 주기적 시험의 허용 및 금지, 진행되는 시험이 운용자에 의한 중단, 일시 중단 또는 재개가 있으며, 이러한 과정을 흐름도를 통해 보인다.In test control, the operator allows and prohibits periodic and periodic tests, and the ongoing test is suspended, suspended, or resumed by the operator, and this process is shown in a flow chart.

운용자가 입력 장치를 통해 운용자에 의한 시험 및 주기적인 시험의 허용 및 금지를 요구하면, 이를 위해 데이터를 변경 처리하는(801 및 802) 제1단계와, 진행되고 있는 시험을 운용자 요구에 의해 중단을 요구하면, 해당 시험을 중단하는(803 및 804) 제2단계와, 진행되고 있는 시험을 운용자 요구에 의해 일시 중단을 요구하면, 해당 시험을 일시 중단하는(805 및 806) 제3단계와, 일시 중단된 운용자 요구에 의한 시험 재개를 요구하면, 해당 시험을 재해하는(807 및 808) 제4단계, 및 결과를 운용자에게 출력하는(809) 제5단계로 구성된다.If the operator requests permission or prohibition of testing and periodic testing by the operator via the input device, the first step of changing and processing the data (801 and 802) for this purpose, and interrupting the ongoing test at the operator's request. A second step of suspending the test (803 and 804) if required; a third step of suspending the test (805 and 806) if the pending test is requested to be suspended by an operator request; When the test is requested to be resumed by the interrupted operator's request, it comprises the fourth step of disrupting the test (807 and 808), and the fifth step of outputting the result to the operator (809).

따라서, 교환기에 종합 정보 통신망 가입자 기본 액세스 설비를 시험할 수 있도록, 다른 부가 장치 없이 시험 장치를 내장하여 교환기 자체만의 기능으로 가입자 설비의 교환기 내부의 시험장치에서 제공하는 각종 시험 기능을 수행할 수 있도록 환경을 구성함으로써, 종합 정보 통신망 가입자 기본 액세스에 대한 설비의 고장을, 부가 설비에 드는 경비의 절감으로 경제적이며 신속하게 발전할 수 있게 된다.Therefore, it is possible to perform the various test functions provided by the test apparatus inside the switchboard of the subscriber equipment with the function of the switch itself by incorporating a test device without any additional device, so that the switch may test the basic access facility of the integrated telecommunication network. By configuring the environment so that the failure of the facility for basic information network subscriber basic access can be economically and quickly developed by reducing the cost of additional equipment.

Claims (6)

운용자와의 인터페이스를 제공하는 시험대(1)와, 상기 시험대(1)와 입/출력제어를 수행하는 맨 머쉰 프로세서(MMP)(2)와, 교환기의 유지 보수를 담당하는 운영 및 유지보수 프로세서(OMP)(3)와, 가입자 및 통화로를 제어하는 액세스 스위칭 프로세서(ASP)(4)와, 가입자 설비의 시험을 수행하는 종합 정보 통신망 테스트 제어장치(ITEC)(5) 와, 상기 액세스 스위칭 프로세서(ASP)(4)와 종합 정보 통신망 테스트 제어장치(ITEC)(5)간의 통신로를 제공하는 액세스 스위칭 모듈 프로세서(ASMP)(6), 및 가입자와의 인터페이스 기능을 수행하는 종합 정보 통신망 액세스 프로세서(ISAP)(7)를 구한 설비 시험 방법에 있어서, 시스템이 시작되면, 종합 정보통신망 가입자 기본 액세스 설비에 대한 시험을 위해 필요한 데이터를 초기화하는(301)제 1단계와, 시험요구, 시험 관련 데이터 변경/조회 요구를 기다리는(302) 제2단계와, 운용자 요구에 의한 시험 요구가 오면(303), 운용자 요구에 의해 시험하는 프로세스를 생성하는(304) 제3단계와, 시스템 자체 요구에 의한 시험 요구가 오면(305), 시스템 자체 요구에 의해 시험하는 프로세스를 생성하는(306) 제4단계와, 주기적 시험 요구가 오면(307), 주기적 시험을 위해 프로세스를 생성하는(308) 제5단계와, 시험 관련 데이터 변경/조회 요구가 오면(309), 이를 위해 프로세스를 생성하는(310) 제6단계와, 시험 제어 요구가 오면(311), 이를 위해 프로세스를 생성하는(312) 제7단계, 및 각각 해당하는 일을 처리한 후 다시 다른 요구가 있기를 기다리는 상태로 복귀하는 제8단계로 이루어지는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비시험 방법.A test bench (1) providing an interface with an operator, a man machine processor (MMP) (2) performing input / output control with the test bench (1), and an operation and maintenance processor in charge of maintenance of the exchanger ( OMP (3), an access switching processor (ASP) 4 for controlling subscribers and call paths, an integrated information network test control apparatus (ITEC) 5 for testing subscriber equipment, and the access switching processor An access switching module processor (ASMP) 6 which provides a communication path between the ASP 4 and the Integrated Circuit Communication Test Control (ITEC) 5, and the integrated information network access processor performing an interface function with a subscriber. In the facility test method obtained (ISAP) (7), the first step of initializing the data necessary for the test of the general information network subscriber basic access facility (301), the test request, the test-related data side A second step of waiting for a query request (302), a third step of creating a process for testing by an operator request (303) when a test request by the operator request comes (303), and a test request by the system itself request A fourth step of generating 306 a process for testing on demand of the system itself, and a fifth step of creating a process for periodical testing of the periodic test request, 308. A sixth step of generating a process 310 for this, when a test-related data change / view request comes 309; a seventh step of creating a process 312 for this, and a third control control request 311; And an eighth step of returning to a state waiting for another request after processing the corresponding work, respectively. 제1항에 있어서, 상기 제3단계(303 및 304)는, 시험 명령어를 수신하는(401) 제9단계와, 상기 제9단계 후 번호 번역을 수행하는(402) 제10단계와, 상기 제10단계후 시험 가능 여부를 확인하는(403 및 404) 제11단계와, 시험 가능의 경우 시험 장치를 연결하는(405) 제12단계와, 상기 제12단계후 가입자 상태를 확인하는(406) 제13단계와, 상태 가능인 경우 가입자 상태를 시험중으로 변경하여 시험용 릴레이로 연결하여 시험 수행하고, 결과를 기다리는 (407 내지 409) 제14단계와, 시험 결과를 수신하여 가입자 상태를 이전 상태로 변경하여 시험용 릴레이를 복구하는(410 내지 412) 제15단계, 및 시험 장치 복구 후 시험 결과를 운용자에게 출력하는(413 및 414) 제16단계를 구비하고 있는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비시험 방법.The method of claim 1, wherein the third step (303 and 304), the ninth step of receiving a test command (401), the tenth step of performing a number translation (402) after the ninth step, Step 11 of checking whether or not the test is possible after step 10 (403 and 404), step 12 of connecting a test apparatus (405) in the case of test, and step 406 of checking the subscriber status after step 12 (406). Step 13 and, if the state is possible, change the state of the subscriber to under test, connect to the test relay, perform a test, and wait for the results (407 to 409) step 14, and receive the test result to change the state of the subscriber to the previous state. And a sixteenth step of restoring the test relay (410 to 412) and a sixteenth step of outputting the test results to the operator after the test device is restored (413 and 414). Facility test for basic access Way. 제1항에 있어서, 상기 제4단계(305 및 306)는 장애 검증 시정 요구(501), 감사 시험 요구(502), 상태 확인 시험 요구(506)의 경로를 각각 거치는 제9단계와, 상기 제9단계 후 연속성 시험을 요구하는(503) 제10단계, 및 시험 결과 수신 후 결과를 통보하여 종료하는(504 및 505) 제11단계를 구비하고 있는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비시험 방법.The method of claim 1, wherein the fourth steps (305 and 306) comprise a ninth step of passing through a path of a failure verification corrective request (501), an audit test request (502), and a health check test request (506), respectively; A tenth step for requesting the continuity test after step 9 (503) and an eleventh step for notifying and ending the result after receiving the test result (504 and 505). Facility test method for basic access. 제1항에 있어서, 상기 제5단계(307 및 308)는 타이머에 의한 주기적 자동 시험 기작을 요구하는(601) 제9단계와, 시험 시작 가입자 정보를 조회하는(602) 제10단계와, 시험 대상 가입자를 선정하는(603) 제11단계와, 연속성 시험 수행 후 결과를 수신하여 분석하는(604 내지 606) 제12단계와, 종합 정보 통신망 가입자 기본 액세스에 대한 고장 여부를 판단하는(607) 제13단계와, 고장의 경우 이를 통보하는(608) 제14단계, 및 고장인 경우에 고장 통보후에, 고장이 아닌 경우에는 시간이 종료할 때까지 상기의 시험 가입자 선정(603)의 과정부터 반복 실시하는 제15단계를 구비하고 있는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신 가입자 기본 액세스에 대한 설비시험 방법.The fifth step (307 and 308) is a ninth step of requesting a periodic automatic test mechanism by the timer (601), the tenth step of querying (602) the test start subscriber information, and the test An eleventh step of selecting a target subscriber (603), a twelve step of receiving and analyzing a result after performing a continuity test (604 to 606), and determining (607) whether a failure of the basic information network subscriber basic access has occurred. Step 13, step 14 of notifying the case of failure (608), and after the notification of failure in case of failure, and repeating from the above process of selecting the test subscriber 603 until the time expires in case of failure And a fifteenth step, wherein the facility test method for basic access to the general information and communication subscriber of the electronic switching system. 제1항에 있어서, 제6단계(309 및 310)는 데이터 변경 요구로 해당 데이터를 변경한후, 결과를 출력하여 종료하는(701 내지 706) 제9단계와, 데이터 조회요구시 해당 데이터를 검색하여, 그 결과를 데이터 출력하여 종료하게 하는(704 내지 706) 제10단계를 구비하고 있는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비시험 방법.The sixth step (309 and 310) is a nineth step of changing the corresponding data by the data change request, and outputs the result (701 to 706) and the search for the data when the data inquiry request And a tenth step (704 to 706) for outputting the result and ending the result (704 to 706). 제1항에 있어서, 상기 제7단계(311 및 312)는 운용자가 입력 장치를 통해 운용자에 의한 시험 및 주기적 시험의 허용 및 금지 요구를 하여, 데이터 변경 처리하는(801 및 802) 제9단계와, 진행되는 시험에 운용자의 시험 중단 요구로 해당 시험을 중단하는 (803 및 604) 제10단계와, 진행중인 시험에 운용자의 일시중단 요구로 해당 시험을 일시 중단하는(805 및 806) 제11단계와, 일시 중단된 시험진행을 운용자에 의한 시험 재개 요구로 해당 시험을 개재하는(807 및 808) 제12단계, 및 각각의 경우 결과를 운용자에게 출력하는(809)의 제13단계를 구비하고 있는 것을 특징으로 하는 전전자 교환기의 종합 정보 통신망 가입자 기본 액세스에 대한 설비시험 방법.The ninth step of claim 1, wherein the seventh step (311 and 312) is a nineth step of the data change process (801 and 802) by the operator requesting permission and prohibition of the test and the periodic test by the operator through the input device; In step 10, the test is stopped by the operator's request to stop the test (803 and 604), and step 11 (805 and 806) is suspended by the operator's request to suspend the test in progress. And the thirteenth step of intervening the corresponding test (807 and 808) at the request for resumption of the test by the operator, and the thirteenth step of outputting the result to the operator (809) in each case. A facility test method for basic access to subscribers of an integrated telecommunication network.
KR1019920004380A 1992-03-17 1992-03-17 Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center KR950005637B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1019920004380A KR950005637B1 (en) 1992-03-17 1992-03-17 Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1019920004380A KR950005637B1 (en) 1992-03-17 1992-03-17 Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center

Publications (2)

Publication Number Publication Date
KR930020892A KR930020892A (en) 1993-10-20
KR950005637B1 true KR950005637B1 (en) 1995-05-27

Family

ID=19330500

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1019920004380A KR950005637B1 (en) 1992-03-17 1992-03-17 Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center

Country Status (1)

Country Link
KR (1) KR950005637B1 (en)

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100482284B1 (en) * 1999-12-18 2005-04-13 주식회사 케이티 Apparatus and method for processing camp-on test in answer

Also Published As

Publication number Publication date
KR930020892A (en) 1993-10-20

Similar Documents

Publication Publication Date Title
TWI638548B (en) Broadband subscriber lines malfunction testing system
Ehrlich et al. Applying reliability measurement: a case study
KR950005637B1 (en) Facility test method for basic access to subscribers of integrated telecommunication network of electronic switching center
JPH02271763A (en) Digital subscriber line quality monitor system
KR0174404B1 (en) Subscriber Service Control Signal Tracking Function
KR920004151B1 (en) A testing method of electronic exchange
KR920002955B1 (en) Analog subscribers equipment testing method
KR970008997B1 (en) The full electronic switching system and method thereof
KR0173207B1 (en) Subscriber's line loop-back testing method of full electronic switching system
KR920006550B1 (en) Subscriber's lines test method
KR0168883B1 (en) Method for testing line of isdn digital subscriber
KR100247423B1 (en) Input/output port testing method
KR960010869B1 (en) Processor State Management and Auditing Method in Distributed Systems
KR100321441B1 (en) Method for attending trunk audit function in an exchange
JPH02209051A (en) Method for detecting faulty protocol
KR100463852B1 (en) Test error protection method for exchange
KR100270677B1 (en) Subscriber test equipment using analog subscriber test module in exchange system
KR100440058B1 (en) State Management Method of Internet Gateway Access System
KR19980061851A (en) Online / Offline Test Method of Packet Handler Board of Electronic Switching System
KR100365779B1 (en) Apparatus for testing function of digital exchange system and method thereof
KR0168230B1 (en) Improved Time Division Switching Subscriber Test System
KR19990061884A (en) Call Management System and Method in Call in Local Exchange
KR100214148B1 (en) Method for testing hand-off trunk in pcx
KR100225735B1 (en) Test controlling method by displaying idle message full electronic telephone exchange
KR100279827B1 (en) Independent operation control method of remote access switch module

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 19920317

PA0201 Request for examination

Patent event code: PA02012R01D

Patent event date: 19920317

Comment text: Request for Examination of Application

PG1501 Laying open of application
N231 Notification of change of applicant
PN2301 Change of applicant

Patent event date: 19931217

Comment text: Notification of Change of Applicant

Patent event code: PN23011R01D

G160 Decision to publish patent application
PG1605 Publication of application before grant of patent

Comment text: Decision on Publication of Application

Patent event code: PG16051S01I

Patent event date: 19950427

E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 19950812

GRNT Written decision to grant
PR0701 Registration of establishment

Comment text: Registration of Establishment

Patent event date: 19951110

Patent event code: PR07011E01D

PR1002 Payment of registration fee

Payment date: 19951110

End annual number: 3

Start annual number: 1

PR1001 Payment of annual fee

Payment date: 19971227

Start annual number: 4

End annual number: 4

PR1001 Payment of annual fee

Payment date: 19990430

Start annual number: 5

End annual number: 5

PR1001 Payment of annual fee

Payment date: 20000502

Start annual number: 6

End annual number: 6

PR1001 Payment of annual fee

Payment date: 20010427

Start annual number: 7

End annual number: 7

PR1001 Payment of annual fee

Payment date: 20020430

Start annual number: 8

End annual number: 8

PR1001 Payment of annual fee

Payment date: 20030430

Start annual number: 9

End annual number: 9

PR1001 Payment of annual fee

Payment date: 20040401

Start annual number: 10

End annual number: 10

PR1001 Payment of annual fee

Payment date: 20050502

Start annual number: 11

End annual number: 11

PR1001 Payment of annual fee

Payment date: 20060502

Start annual number: 12

End annual number: 12

PR1001 Payment of annual fee

Payment date: 20070502

Start annual number: 13

End annual number: 13

FPAY Annual fee payment

Payment date: 20080428

Year of fee payment: 14

PR1001 Payment of annual fee

Payment date: 20080428

Start annual number: 14

End annual number: 14

LAPS Lapse due to unpaid annual fee
PC1903 Unpaid annual fee

Termination category: Default of registration fee

Termination date: 20100410