KR20130062586A - Retaining wall form of construction work of block for retaining wall and block for retaining wall - Google Patents

Retaining wall form of construction work of block for retaining wall and block for retaining wall Download PDF

Info

Publication number
KR20130062586A
KR20130062586A KR1020110128938A KR20110128938A KR20130062586A KR 20130062586 A KR20130062586 A KR 20130062586A KR 1020110128938 A KR1020110128938 A KR 1020110128938A KR 20110128938 A KR20110128938 A KR 20110128938A KR 20130062586 A KR20130062586 A KR 20130062586A
Authority
KR
South Korea
Prior art keywords
block
retaining wall
fixing pin
fixing
front block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Abandoned
Application number
KR1020110128938A
Other languages
Korean (ko)
Inventor
윤종희
Original Assignee
윤종희
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 윤종희 filed Critical 윤종희
Priority to KR1020110128938A priority Critical patent/KR20130062586A/en
Publication of KR20130062586A publication Critical patent/KR20130062586A/en
Abandoned legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D17/00Excavations; Bordering of excavations; Making embankments
    • E02D17/20Securing of slopes or inclines
    • E02D17/205Securing of slopes or inclines with modular blocks, e.g. pre-fabricated
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0225Retaining or protecting walls comprising retention means in the backfill
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/025Retaining or protecting walls made up of similar modular elements stacked without mortar
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D29/00Independent underground or underwater structures; Retaining walls
    • E02D29/02Retaining or protecting walls
    • E02D29/0258Retaining or protecting walls characterised by constructional features
    • E02D29/0266Retaining or protecting walls characterised by constructional features made up of preformed elements
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D2600/00Miscellaneous
    • E02D2600/20Miscellaneous comprising details of connection between elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Environmental & Geological Engineering (AREA)
  • Retaining Walls (AREA)

Abstract

본 발명은 옹벽용 블럭 및 옹벽용 블럭을 이용한 옹벽시공방법에 관한 것으로서, 절토지로부터 흙메움과 함께 횡방향으로 다단 축조되고, 연결부재(200)로서 절토지측으로 지지되어 벽체를 형성하는 옹벽용 블럭(100)에 있어서,
상기 옹벽용 블럭(100)은, 사각형체로 내측에 격자형태의 제1보강철근(P1)이 매입되고, 외부 양 측면은 라운드지게 형성되되, 양 측면에 다수개의 수직되는 요홈(111)이 배열 형성된 전면부(112)와, 전면부의 후면으로부터 돌출되는 한편, 전면부(111)와 이웃하는 상,하부에 상하 조적을 위한 조립턱(113)을 갖고, 내측에 격자형태의 제2보강철근(P2)이 매입된 후면부(114)와, 전면부(112)의 전면으로부터 후면부(114)의 배면까지 적어도 하나 이상 관통되어 침수를 배수하기 위한 경사배수공(115) 및 경사배수공(115)의 후면 양측에 고정홈(116)이 대응되게 형성된 전방블럭(110)과; 상기 전면부(112)의 요홈(111) 중 어느 요홈에 삽입되어 전방블럭(110)을 횡방향으로 연결 지지하는 연결핀(120)과; 상기 후면부(114)의 고정홈(116)에 삽입되어 상기 연결부재(200)를 걸어 지지하는 제1고정핀(130)과; 상기 전방블럭(110)과 수평으로 대응되며, 절토지 내에 매립되는 것으로 중앙에 연결공(141)이 관통형성되고, 연결공(141)의 전방과 후방에 고정홈(142)이 대응되게 형성된 후방블럭(140)과; 상기 연결공(141)의 고정홈(142)에 삽입되어 상기 연결부재(200)를 걸어 지지하는 제2고정핀(150) 및; 제3고정핀(160);을 포함하는 것을 특징으로 하는바, 전방블럭과 후방블럭으로 나뉘어지고 전방블럭의 횡열 조적에 있어 각 블럭 사이사이에는 연결핀으로 결합됨과 동시에, 블럭의 각도를 조정하여 조적이 가능하도록 하고, 연결부재로서 전방블럭측 경사배수공내에 제1고정핀, 후방블럭측 연결공에 형성된 고정홈 전후에 안내 삽입되는 제2고정핀, 제3고정핀에 효율적으로 걸쳐서 걸어줌으로써, 전방블럭의 후방으로 뒷채움되는 잡석과 토사에 의해 후방블럭은 매립되고 전방블럭은 안정된 지지로서 오랜시간이 경과하더라도 블럭사이의 이탈이 발생하지 않기 때문에 견고한 옹벽을 구축할 수 있는 효과가 있다.
The present invention relates to a retaining wall construction method using a retaining wall block and a retaining wall block, wherein the retaining wall is multi-stage constructed in the transverse direction together with the filling of soil, and is supported on the cut surface side as a connecting member 200 to form a wall. In block 100,
The retaining wall block 100 has a rectangular body with a first reinforcing steel reinforcement (P1) embedded in a grid shape, the outer both sides are rounded, a plurality of vertical grooves 111 are formed on both sides A front reinforcement 112, and protruding from the rear of the front part, and has an upper and lower assembly jaw 113 for the upper and lower sides adjacent to the front part 111, the second reinforcing bar (P2) of the grid-shaped inside ) Is embedded in the rear portion 114, and at least one penetrating from the front surface of the front portion 112 to the rear surface of the rear portion 114, the inclined drain hole 115 and the rear side of the inclined drain hole 115 for draining the immersion A front block 110 formed with a fixing groove 116 corresponding thereto; A connection pin 120 inserted into one of the grooves 111 of the front part 112 to support the front block 110 in the lateral direction; A first fixing pin 130 inserted into the fixing groove 116 of the rear part 114 to support the connection member 200 by walking; The rear side corresponding to the front block 110 in a horizontal direction, embedded in the cut land, the connection hole 141 is formed through the center, the rear and the fixing groove 142 is formed to correspond to the front and rear of the connection hole 141 Block 140; A second fixing pin 150 inserted into the fixing groove 142 of the connection hole 141 to support the connection member 200 by walking; The third fixing pin 160, characterized in that it comprises a bar, divided into a front block and a rear block, and in the row block of the front block is coupled between the blocks between the blocks and at the same time, by adjusting the angle of the block It is possible to make masonry, and as a connecting member, by walking efficiently across the first fixing pin, the second fixing pin and the third fixing pin which are guided before and after the fixing groove formed in the rear block side connecting hole as a connecting member, The rear block is buried by the rubble and soil that is filled in the rear of the front block, and the front block is a stable support, so that the separation between the blocks does not occur even after a long time.

Description

옹벽용 블럭 및 옹벽용 블럭의 옹벽시공방법{Retaining wall form of construction work of block for retaining wall and block for retaining wall}Retaining wall form of construction work of block for retaining wall and block for retaining wall}

본 발명은 옹벽용 블럭 및 옹벽용 블럭을 이용한 옹벽시공방법에 관한 것으로서, 좀더 상세하게는 옹벽을 구축하기 위한 블럭을 개선하여 오랜 시간 경과 후에도 조적된 블럭 간의 유격발생을 방지하고, 특히 옹벽을 이루는 내,외측의 곡선형태의 코너부분 조적이 용이하도록 하면서 블럭들의 상호 지지력을 높여 절토지로부터 견고한 옹벽을 구축할 수 있도록 한 옹벽용 블럭 및 옹벽용 블럭의 옹벽시공방법에 관한 것이다.
The present invention relates to a retaining wall construction method using a retaining wall block and a retaining wall block, and more particularly, to improve a block for constructing a retaining wall, to prevent the occurrence of play between the stacked blocks even after a long time, and particularly to form a retaining wall. A retaining wall construction method and a retaining wall construction method for retaining wall blocks for constructing a solid retaining wall from cuts by increasing mutual support of blocks while facilitating internal and external curved corners are easy to assemble.

일반적으로 옹벽(擁壁, Retaining wall)은 흙을 쌓아 올리거나 산을 깎아 내거나 해안을 메울 때 등과 같이 토압력(土壓力)에 저항하여 흙이 무너지지 못하게 하여 토사의 붕괴를 방지하기 위한 벽체로서, 산악지는 물론 토지 가격이 높은 지역 등에서 토지를 효율적으로 이용하기 위하여 콘크리트, 석조, 벽돌 및 석재나 콘크리트로 된 블럭 등에 의해 여러 가지 형태 및 방법으로 구축되며, 여기서, 블럭은 보강토 옹벽을 구축하기 위하여 횡렬로, 그리고 서로 위로 겹치게 축조되어 땅 깎기 또는 흙 쌓기를 한 비탈면이 흙의 압력으로 무너지는 것을 막기 위한 것이다.In general, retaining walls are walls for preventing soil from collapsing by preventing soil collapse by resisting earth pressure, such as when piling up soil, cutting down mountains, or filling shores. In order to use the land efficiently in mountainous areas as well as in high land prices, it is constructed in various forms and methods by concrete, masonry, bricks, and blocks made of stone or concrete, where the blocks are arranged in order to build a retaining wall. This is to prevent the slopes of the soil, which are built up and overlapping each other, from falling under the pressure of the soil.

최근에는 산이 인접한 지역에 여가를 즐길 수 있는 각종 펜션 등이 지어지고 있는바, 산이 인접한 지역에는 옹벽은 필수적으로 구축되어야 한다.Recently, various pensions for leisure are built in the area adjacent to the mountain. A retaining wall must be constructed in the area adjacent to the mountain.

이러한 옹벽은 시공지역의 토사를 절토하거나 또는 산간지역의 계곡부 및 낮은 지역을 메우기 위해 철근 및 패널 등으로 거푸집을 형성하고, 거푸집에 콘크리트를 타설한 다음 그 배면에 토사 및 쇄석을 채워 축조되는 것이 일반적이지만, 이러한 철근콘크리트의 옹벽은 성형 및 양생 등으로 인하여 비용 및 공기 측면에서 바람직하지 않을 뿐만 아니라, 역학적 허용 응력의 확보가 용이하지 않을 경우도 있다.Such a retaining wall is to be formed by reinforcing bars and panels to cut soils in construction areas, or to fill valleys and low areas in mountainous areas, cast concrete on formwork, and then build soils and crushed stone on the back. In general, such a retaining wall of reinforced concrete is not preferable in terms of cost and air due to molding and curing, and also may not be easy to secure mechanically allowable stresses.

옹벽의 구축은 자연을 해치지않고 환경 친화적이며 자연스러운 외관을 연출하기 위해 자연석을 이용하거나, 혹은 성형한 블럭을 조적하여 나가는 방식으로 옹벽을 구축한다.Retaining wall is constructed by using natural stone or by molding molded blocks to create environmentally friendly and natural appearance without harming nature.

거푸집을 통한 콘크리트의 타설 공법과는 달리 다수의 블럭을 이용한 옹벽 조적은 공기 단축, 시공의 편리성, 경제성이 작용하는 특장점이 있기 때문에 최근에는 절토지의 기초공사를 포함하는 블럭의 조적과 절토부분의 다양한 흙다짐 공법 및 부식에 강한 와이어 혹은 지오그리드 등을 이용한 보강요소들로 하여금 조적된 블럭을 지지하는 방식으로 옹벽 구축이 이루어진다.Unlike the concrete casting method through the formwork, retaining wall masonry using a large number of blocks has the advantages of shortening the air, convenience of construction, and economic feasibility. The retaining wall is constructed by supporting the blocks with stiffening elements using various soil compaction methods and corrosion resistant wires or geogrids.

그러나, 옹벽의 구축 후 시간이 오래 경과하면, 동일한 열(횡열)의 블럭과 블럭사이의 유격이 점차 발생하는 문제점이 있었다.However, when time elapses after the construction of the retaining wall, there is a problem in that the clearance between blocks in the same row (row) is gradually generated.

상기와 같이 발생하는 블럭간의 유격은 특히 절토지의 곡선부를 이루는 코너부분에서 더욱 심하게 발생하며, 이에 따라 옹벽의 외관은 미관상에도 좋지 않을 뿐만 아니라 점차 옹벽에 취약성을 가져다주는 안전성의 문제점이 있었다.The clearance between the blocks occurs as described above more particularly at the corners of the cut section, and thus the appearance of the retaining wall is not only good in appearance, but also has a problem of safety that gradually brings weakness to the retaining wall.

상기와 같이 블럭 사이의 유격이 점차 커지게 됨에 따라 지진이나 홍수 등과 같은 자연 재해가 발생할 경우 자칫 배면 토사와 함께 무너져 내림으로써 대형사고로 이어질 수도 있는 문제점을 유발하게 된다.As the clearance between the blocks is gradually increased as described above, when a natural disaster such as an earthquake or a flood occurs, it may cause a problem that may lead to a large accident by collapsing with the back soil.

통상 블럭에는 지면으로 스며든 침수배출을 용이하게 하기 위하여 침수배출공이 각각 마련되어 있어, 우천시 침수로 인한 토사의 붕괴를 방지하고 있으나, 근본적으로 블럭과 블럭 사이에 발생한 유격은 그만큼 안전성이 떨어지기 때문에 옹벽구축 후 상부 혹은 옹벽과 근접한 지점에 건물에 피해를 줄 수 있는 안전상의 문제점이 있었다.
In general, the blocks are provided with immersion discharge holes to facilitate the immersion discharge into the ground, which prevents the collapse of the soil due to immersion in rainy weather, but basically the clearance between the blocks is less secure, so the retaining wall There was a safety problem that could damage the building near the top or retaining wall after construction.

본 발명은 상기와 같이 제반되는 종래의 문제점을 해결하기 위하여 발명한 것으로서, 그 목적은 옹벽을 구축하기 위한 블럭을 개선하여 오랜 시간 경과 후에도 조적된 블럭 간의 유격발생을 방지하고, 특히 옹벽을 이루는 내,외측의 곡선형태의 코너부분 조적이 용이하도록 하면서 블럭들의 상호 지지력을 높여 절토지로부터 견고한 옹벽을 구축할 수 있도록 한 옹벽용 블럭 및 옹벽용 블럭의 옹벽시공방법을 제공함에 있다.
The present invention has been invented to solve the conventional problems as described above, the object of which is to improve the block for building the retaining wall to prevent the occurrence of play between the blocks even after a long time, especially forming a retaining wall It is to provide a retaining wall construction method of retaining wall blocks and retaining wall blocks to facilitate the construction of the outer curved corner portion while increasing the mutual support of the blocks to build a solid retaining wall from the cut.

상기 목적을 달성하기 위한 본 발명에 의하면, 절토지로부터 흙메움과 함께 횡방향으로 다단 축조되고, 연결부재로서 절토지측으로 지지되어 벽체를 형성하는 옹벽용 블럭에 있어서,According to the present invention for achieving the above object, in the retaining wall block that is multi-stage construction in the transverse direction together with the soil filling from the cut land, supported by the cut land side as a connecting member to form a wall,

상기 옹벽용 블럭은, 사각형체로 내측에 격자형태의 제1보강철근이 매입되고, 외부 양 측면은 라운드지게 형성되되, 양 측면에 다수개의 수직되는 요홈이 배열 형성된 전면부와, 전면부의 후면으로부터 돌출되는 한편, 전면부와 이웃하는 상,하부에 상하 조적을 위한 조립턱을 갖고, 내측에 격자형태의 제2보강철근이 매입된 후면부와, 전면부의 전면으로부터 후면부의 배면까지 적어도 하나 이상 관통되어 침수를 배수하기 위한 경사 배수공 및 경사배수공의 후면 양측에 고정홈이 대응되게 형성된 전방블럭과; 상기 전면부의 요홈 중 어느 요홈에 삽입되어 전방블럭을 횡방향으로 연결 지지하는 연결핀과; 상기 후면부의 고정홈에 삽입되어 상기 연결부재를 걸어 지지하는 제1고정핀과; 상기 전방블럭과 수평으로 대응되며, 절토지 내에 매립되는 것으로 중앙에 연결공이 관통형성되고, 연결공의 전방과 후방에 고정홈이 대응되게 형성된 후방블럭과; 상기 연결공의 고정홈에 삽입되어 상기 연결부재를 걸어 지지하는 제2고정핀 및; 제3고정핀;을 포함하는 것을 특징으로 한다.The retaining wall block has a rectangular body with a first reinforcing bar in a lattice shape, and both outer sides are rounded, and the front part has a plurality of vertical grooves arranged on both sides thereof, and protrudes from the rear of the front part. On the other hand, the upper and lower sides adjacent to the front portion has an assembly jaw for the upper and lower masonry, the rear portion is embedded with a second reinforcing bar of the grid-shaped inside, at least one penetrates from the front of the front portion to the back of the rear portion and flooded An inclined drain hole for draining the water and a front block formed to have fixing grooves corresponding to both rear sides of the inclined drain hole; A connection pin inserted into one of the grooves of the front part to connect and support the front block in a lateral direction; A first fixing pin inserted into the fixing groove of the rear part and supporting the connection member by a hook; A rear block corresponding to the front block horizontally and embedded in the cut land, and having a connection hole formed in the center thereof, and having a fixing groove corresponding to the front and rear of the connection hole; A second fixing pin inserted into the fixing groove of the connection hole and supporting the connection member by a hook; It characterized in that it comprises a; third fixing pin.

또한 본 발명에 의한 옹벽을 시공하는 방법은,In addition, the method for constructing the retaining wall according to the present invention,

흙깍기 작업으로 경사진 절토지의 전방으로부터 옹벽을 구축하기 위해 상부에 조립턱이 형성되도록 콘크리트 기초부를 시공하는 단계; 콘크리트 기초부로부터 전방블럭을 횡방향으로 위치시키는 한편, 상호 이웃하는 전방블럭의 측면에 형성한 요홈을 일치시킨 다음, 일치된 요홈 내에 연결핀을 삽입하는 방식으로 전방블럭을 횡방향으로 연속 이음시키는 단계; 콘트리트 기초부로부터 세워진 전방블럭에 대해 그 후방으로 잡석과 토사를 뒷 채움하여 전방블럭의 후방을 지지하는 단계; 콘트리트 기초부로부터 세워진 전방블럭으로부터 이격되는 위치에 후방블럭을 수직으로 세워 위치시킨 다음, 전방블럭에 형성된 경사배수공 내의 제2보강철근, 경사배수공측의 고정홈에 삽입되는 제1고정핀, 후방블럭의 연결공 전후측에 형성된 고정홈에 삽입되는 제2고정핀 및 제3고정핀에 벨트형의 연결부재의 단부를 결속시켜 전방블럭과 후방블럭을 상호 연결하는 단계; Constructing a concrete foundation such that an assembling jaw is formed at the top to build the retaining wall from the front of the inclined cut soil by the mowing operation; While the front block is positioned laterally from the concrete foundation, the grooves formed on the sides of the neighboring front blocks are matched, and then the front block is continuously joined in the transverse direction by inserting a connecting pin into the matched groove. step; Supporting the rear of the front block by backfilling the rubble and soil with the rear of the front block erected from the concrete foundation; The rear block is placed vertically at a position spaced apart from the front block erected from the concrete foundation, and then the second reinforcing bar in the inclined drain hole formed in the front block, the first fixing pin inserted into the fixing groove on the inclined drain hole side, and the rear block Coupling the front block and the rear block to each other by binding end portions of the belt-type connecting member to the second fixing pin and the third fixing pin which are inserted into the fixing grooves formed at the front and rear sides of the connection hole of the connecting hole;

상기 전방블럭의 상부측 조립턱에 또 다른 전방블럭을 위치시켜 조적, 잡석 및 토사를 이용한 뒷채움, 연결부재를 이용한 전방블럭과 후방블럭을 연결하는 반복공정으로 전방블럭을 요구하는 높이로 다단으로 조적하고, 전방블럭과 뒷채움이 이루어진 최상층부에 바닥 콘트리트를 시공하는 단계;로 이루어지는 것을 특징으로 하는 옹벽용 블럭의 시공방법이 제공된다.
Position another front block on the upper side assembly jaw of the front block, and backfill using masonry, rubble and soil, and repeat the process of connecting the front block and the rear block using the connecting member. And, the step of constructing the bottom concrete in the uppermost layer consisting of the front block and the back filling; Provides a method of constructing a retaining wall block comprising a.

본 발명에 따른 옹벽용 블럭은 전방블럭과 후방블럭으로 나뉘어지고 전방블럭의 횡열 조적에 있어 각 블럭 사이사이에는 연결핀으로 결합됨과 동시에, 블럭의 각도를 조정하여 조적이 가능하도록 하고, 연결부재로서 전방블럭측 경사배수공내에 제1고정핀, 후방블럭측 연결공에 형성된 고정홈 전후에 안내 삽입되는 제2고정핀, 제3고정핀에 효율적으로 걸쳐서 걸어줌으로써, 전방블럭의 후방으로 뒷채움되는 잡석과 토사에 의해 후방블럭은 매립되고 전방블럭은 안정된 지지로서 오랜시간이 경과하더라도 블럭사이의 이탈이 발생하지 않기 때문에 견고한 옹벽을 구축할 수 있는 효과가 있다.
The retaining wall block according to the present invention is divided into a front block and a rear block, and is coupled with a connecting pin between the blocks in the horizontal row of the front block, and at the same time, it is possible to adjust the angle of the block so as to enable the connection. Rubble that is backfilled to the rear of the front block by effectively walking over the first fixing pin, the second fixing pin, and the third fixing pin inserted into the front and rear fixing grooves formed in the rear block side connection hole in the front block side drain hole. The rear block is buried by soil and the front block is a stable support, so that even if a long time does not occur between the blocks, there is an effect that can build a strong retaining wall.

도 1 및 도 2는 본 발명인 옹벽용 블럭을 도시한 사시도,
도 3은 본 발명에 따른 옹벽용 블럭이 조적된 상태를 보여주는 정면 사시도,
도 4는 본 발명에 따른 옹벽용 블럭이 조적된 상태를 보여주는 배면 사시도,
도 5는 본 발명에 따른 옹벽용 블럭의 연결상태를 보여주는 횡단면도,
도 6 및 도 7은 도 2에서 도시한 옹벽용 블럭의 연결상태를 보여주는 평면도,
도 8 내지 도 10은 본 발명에 따른 절토지에 옹벽이 시공되는 상태를 순차적으로 도시한 측단면도,
도 11은 본 발명에 따른 옹벽용 블럭을 지지하는 밴드를 발췌하여 도시한 확대측면도,
도 12는 본 발명에 따른 옹벽이 구축된 상태를 보여주는 측단면도,
도 13은 본 발명에 따른 일 실시예의 옹벽을 보여주는 측단면도이다.
1 and 2 are a perspective view showing a retaining wall block of the present invention,
3 is a front perspective view showing a state in which the retaining wall block is stacked according to the present invention;
4 is a rear perspective view showing a state in which the retaining wall block is stacked according to the present invention;
5 is a cross-sectional view showing a connection state of the retaining wall block according to the present invention;
6 and 7 are a plan view showing a connection state of the retaining wall block shown in FIG.
8 to 10 are side cross-sectional views sequentially illustrating a state in which a retaining wall is constructed in cut land according to the present invention;
11 is an enlarged side view showing an extract of a band for supporting the retaining wall block according to the present invention;
12 is a side sectional view showing a state in which a retaining wall is constructed according to the present invention;
Figure 13 is a side cross-sectional view showing a retaining wall of one embodiment according to the present invention.

이하, 본 발명을 첨부된 도 1 내지 도 13을 참조하여 더욱 상세하게 설명하면 다음과 같다.Hereinafter, the present invention will be described in more detail with reference to FIGS. 1 to 13.

본 발명은, 절토지로부터 흙메움과 함께 횡방향으로 다단 축조되고, 연결부재(200)로서 절토지측으로 지지되어 벽체를 형성하는 옹벽용 블럭(100)에 있어서,The present invention, in the retaining wall block 100 which is multi-stage construction in the transverse direction with the filling of soil from the cut land, is supported as the connection member 200 to the cut land side to form a wall,

상기 옹벽용 블럭(100)은, 사각형체로 내측에 격자형태의 제1보강철근(P1)이 매입되고, 외부 양 측면은 라운드지게 형성되되, 양 측면에 다수개의 수직되는 요홈(111)이 배열 형성된 전면부(112)와, 전면부의 후면으로부터 돌출되는 한편, 전면부(111)와 이웃하는 상,하부에 상하 조적을 위한 조립턱(113)을 갖고, 내측에 격자형태의 제2보강철근(P2)이 매입된 후면부(114)와, 전면부(112)의 전면으로부터 후면부(114)의 배면까지 적어도 하나 이상 관통되어 침수를 배수하기 위한 경사배수공(115) 및 경사배수공(115)의 후면 양측에 고정홈(116)이 대응되게 형성된 전방블럭(110)이 마련된다.The retaining wall block 100 has a rectangular body with a first reinforcing steel reinforcement (P1) embedded in a grid shape, the outer both sides are rounded, a plurality of vertical grooves 111 are formed on both sides A front reinforcement 112, and protruding from the rear of the front part, and has an upper and lower assembly jaw 113 for the upper and lower sides adjacent to the front part 111, the second reinforcing bar (P2) of the grid-shaped inside ) Is embedded in the rear portion 114, and at least one penetrating from the front surface of the front portion 112 to the rear surface of the rear portion 114, the inclined drain hole 115 and the rear side of the inclined drain hole 115 for draining the immersion The front block 110 in which the fixing groove 116 is formed is provided.

상기 전방블럭(110)을 이루는 전면부(112)의 요홈(111) 중 어느 요홈에 삽입되어 전방블럭(110)을 횡방향으로 연결 지지하기 위해 연결핀(120)이 설치된다.A connecting pin 120 is installed to be inserted into any one of the grooves 111 of the front portion 112 constituting the front block 110 to support the front block 110 in the lateral direction.

상기 요홈(111)은 반원형의 홈 형상으로 형성되며, 상기 연결핀(120)은 환봉형으로 형성되며, 그 소재는 부식에 강한 금속소재로 제작된다.The groove 111 is formed in a semi-circular groove shape, the connecting pin 120 is formed in a round bar shape, the material is made of a metal material resistant to corrosion.

한편, 상기 후면부(114)의 고정홈(116)에는 상기 연결부재(200)를 걸어 지지하는 제1고정핀(130)이 설치된다. 도면상에서 상기 제1고정핀(130)은 환봉형으로 구성되었지만 상기 후면부(114)측 고정홈(116)의 형상에 따라 사각형으로 봉 형상으로 적용가능하다.On the other hand, the fixing groove 116 of the rear portion 114 is provided with a first fixing pin 130 to hang the connection member 200. In the drawing, the first fixing pin 130 is configured as a round bar, but may be applied in a bar shape in a quadrangular shape according to the shape of the fixing groove 116 on the rear side 114.

상기 전방블럭(110)과 수평으로 대응되며, 절토지 내에 매립되는 것으로, 중앙에 연결공(141)이 관통형성되고, 연결공(141)의 전방과 후방에 고정홈(142)이 대응되게 형성된 후방블럭(140)이 마련된다.Corresponding to the front block 110 horizontally, and embedded in the cut land, the connection hole 141 is formed through the center, the fixing groove 142 is formed to correspond to the front and rear of the connection hole 141 The rear block 140 is provided.

상기 연결공(141)의 고정홈(142)에는 상기 연결부재(200)를 걸어 지지하는 제2고정핀(150) 및; 제3고정핀(160)이 설치된다.A second fixing pin 150 supporting the connection member 200 by a fixing groove 142 of the connection hole 141; The third fixing pin 160 is installed.

상기 격자형태로 후면부(114) 내에 매입되는 제2보강철근(P2) 중 횡방향으로 교차되는 제2보강철근(P2)과 상기 고정홈(116)내에 안내되는 제1고정핀(130)은 수평선상에 배치되어 연결부재(200)가 결속이 이루어지는 구조를 갖는다.The second reinforcing bar P2 intersecting in the transverse direction among the second reinforcing bars P2 embedded in the rear part 114 in the lattice form and the first fixing pin 130 guided in the fixing groove 116 are horizontal lines. Is disposed on the connection member 200 has a structure in which the binding is made.

상기 경사배수공(115)은 전면부(112)에서 후면부(114)로 갈수록 상하 높이가 점차 크게 형성된다. 이는 우천시 지면 내에 흡수된 침수를 원활하게 배출하기 위한 목적이다.The inclined drain hole 115 is gradually formed in the vertical height from the front portion 112 toward the rear portion 114. This is for the purpose of smoothly draining the immersion absorbed in the ground during rain.

이와 같이 구성된 본 발명인 옹벽용 블럭을 절토지로부터 구축하여 옹벽을 형성하기 위한 시공방법은 다음과 같다.The construction method for forming the retaining wall by constructing the retaining wall block of the present invention configured as described above from the cut paper is as follows.

상기 옹벽(W)의 시공은, 흙깍기 작업으로 경사진 절토지를 확보한다.The construction of the retaining wall (W) secures the cut land inclined by the mowing operation.

절토지의 전방으로부터 옹벽을 구축하기 위해서는 일정거리를 두고 콘크리트 기초부(10)를 시공한다.In order to build the retaining wall from the front of the cut, the concrete foundation 10 is constructed at a certain distance.

여기서 상기 콘크리트 기초부(10)는 도시된 바와 같이 상부에 조립턱(12)이 형성되도록 시공하여 상술한 옹벽용 블럭(100)을 이루는 전방블럭(110)측 하부 조립턱(113)이 안내되는 조적조건을 갖도록 하여 조적이 이루어지도록 한다.Here, the concrete foundation 10 is constructed so that the assembly jaw 12 is formed at an upper portion as shown, and the lower assembly jaw 113 on the front block 110 forming the retaining wall block 100 is guided. Have masonry conditions to achieve masonry.

상기와 같이 시공된 콘크리트 기초부(10)로부터 전방블럭(110)을 횡방향으로 각각 배열 위치시키는 한편, 상호 이웃하는 전방블럭(110)의 측면에 형성한 요홈(111)을 일치시켜 준다.The front blocks 110 are arranged in the transverse direction from the concrete foundation 10 constructed as described above, and the grooves 111 formed on the side surfaces of the adjacent front blocks 110 coincide with each other.

여기서 전방블럭간의 일치된 요홈 내에 연결핀(120)을 삽입하는 방식으로 전방블럭(110)을 횡방향으로 연속되게 이음 시킬 수 있게 된다.Here, the front block 110 can be continuously joined in the transverse direction by inserting the connecting pin 120 into the matching groove between the front blocks.

상기와 같이 전방블럭의 횡방향 연결은 첨부된 도 6 및 도 7에서 도시한 바와 같이, 직선코스에서 곡선을 이루는 코너가 자연스럽게 이음될 수 있도록 축조할 수 있는바, 첨부된 도 2에서 도시된 전방블럭(110)은 상술한 바의 전방블럭보다 횡방향의 길이가 좀더 짧게 제작된 블럭으로서 코너부위를 완만하게 조적할 때 사용된다.As described above, the lateral connection of the front block may be constructed such that corners curved in a straight course may be naturally connected, as shown in FIGS. 6 and 7. Block 110 is a block made of a shorter transverse length than the front block of the bar is used when gently angling the corner portion.

첨부된 도 6은 전방블럭(110)의 조적이 외형으로 코너를 형성하여 조적할 때 이고, 첨부된 도 7은 내형으로 코너를 형성하여 조절할 때를 각각 나타낸다.6 is when the masonry of the front block 110 is formed by forming a corner to the outer shape, and FIG.

상기와 같이 코너측에 위치하는 전방블럭(110) 또한 라운드진 양측에 형성된 요홈(111)중 상호 블럭간의 일치하는 요홈(111)에 연결핀(120)이 삽입되는 방식으로 횡방향 전방블럭을 지지한다.As described above, the front block 110 positioned at the corner side also supports the lateral front block in such a manner that the connecting pin 120 is inserted into the groove 111 corresponding to each other among the grooves 111 formed on both rounded sides. do.

상기와 같이 콘트리트 기초부(10)로부터 세워진 전방블럭(110)에 대해 그 후방으로는 첨부된 도 8에서 도시한 바와 같이, 잡석(A)과 토사(B)를 뒷 채움하여 전방블럭(110)의 후방을 지지시켜준다.As shown in FIG. 8 attached to the rear of the front block 110 erected from the concrete base portion 10 as described above, the front block 110 by backfilling the rubble (A) and the soil (B) Support the rear of the.

상기와 같은 작업이 완료되면, 상기 콘트리트 기초부(10)로부터 세워진 전방블럭(110)으로부터 이격되는 위치에 후방블럭(140)을 수직으로 세워 위치시키고, 전방블럭(110)에 형성된 경사배수공(115) 내의 제2보강철근(P2), 경사배수공(115)측의 고정홈(116)에 삽입되는 제1고정핀(130), 후방블럭(140)의 연결공(141) 전후측에 형성된 고정홈(142)에 삽입되는 제2고정핀(150) 및 제3고정핀(160)에 벨트형 연결부재(200)의 단부를 결속시켜 전방블럭(110)과 후방블럭(140)을 상호 연결부재(200)로서 연결 지지한다.When the above operation is completed, the rear block 140 is vertically positioned at a position spaced apart from the front block 110 erected from the concrete base 10, the inclined drain hole 115 formed in the front block 110 2) the reinforcing bars (P2) in the, the first fixing pin 130 is inserted into the fixing groove 116 of the inclined drain hole 115 side, the fixing grooves formed in the front and rear sides of the connection hole 141 of the rear block 140 The front block 110 and the rear block 140 are connected to each other by binding the ends of the belt-type connecting member 200 to the second fixing pin 150 and the third fixing pin 160 inserted into the 142. 200) to support the connection.

상기 연결부재(12)는 첨부된 도 11에서 도시한 바와 같이 전방블럭(110)의 경사배수공(115) 내에 횡방향으로 가로지르는 제2보강철근(P2)에 단부가 걸쳐져 관통되는 한편, 상기 고정홈(116)에 안내되는 제1고정핀(130)을 거치고, 다시 제2보강철근(P2)을 거쳐 연결 지지되도록 한다.As shown in FIG. 11, the connecting member 12 penetrates through the second reinforcing bar P2 transversely in the inclined drain hole 115 of the front block 110 and is fixed thereto. After passing through the first fixing pin 130 guided in the groove 116, the second reinforcing bar (P2) to be connected and supported.

또한 연결부재의 반대측은 후방블럭(140)의 연결공(141)측 전후방측 고정홈(142)에 삽입되는 제3고정핀(160)을 걸쳐져 관통되는 한편, 제3고정핀(160)과 대응되는 고정홈(142)에 위치한 제2고정핀(150)을 거치고 제3고정핀(60)을 거쳐 연결 지지되도록 한다.In addition, the opposite side of the connecting member penetrates through the third fixing pin 160 inserted into the front and rear fixing grooves 142 of the connecting hole 141 side of the rear block 140, while corresponding to the third fixing pin 160 Through the second fixing pin 150 located in the fixing groove 142 is to be connected and supported via the third fixing pin (60).

도면상에서는 상기 제2보강철근(P2), 제1고정핀(130), 제2고정핀(150) 및 제3고정핀(160)만을 도시하여 연결부재의 결속상태를 간략하게 도시하였다.In the drawings, only the second reinforcing bar P2, the first fixing pin 130, the second fixing pin 150, and the third fixing pin 160 are illustrated to briefly show the binding state of the connecting member.

상기와 같이 연결부재(200)를 이용한 전방블럭(110)과 후방블럭(140)의 연결이 이루어진 상태에서 상기 전방블럭(110)의 상부측 조립턱(113)에 또 다른 전방블럭(110)을 위치시켜 조적한다.Another front block 110 on the upper assembly jaw 113 of the front block 110 in a state in which the front block 110 and the rear block 140 is connected using the connection member 200 as described above. Location and masonry.

또한 이후 공정은 상술한 바와 같이 잡석(A) 및 토사(B)를 이용한 뒷채움시켜준다.In addition, the subsequent process is backfilled using rubble (A) and soil (B) as described above.

상기 잡석과 토사로 뒷채움 이후 땅을 다지는 기구를 이용하여 전반적으로 다져주게 되면, 연결부재(200)는 잡석(A)과 토사(B)의 무게에 의해 장력이 발생하고, 이러한 장력은 전방블럭(110)과 후방블럭(140)을 더욱 안정되게 잡아준다.After the backfilling with the rubble and earth and sand, using a mechanism for compacting the ground, the connection member 200 is tensioned by the weight of the rubble (A) and soil (B), this tension is the front block ( 110 and the rear block 140 to hold more stable.

따라서 상기와 같은 전방블럭(110), 후방블럭(140), 연결부재(200)는 첨부되된 도 9 및 도 10에서와 같은 반복공정으로 전방블럭을 요구하는 높이로 다단으로 조적하고, 첨부된 도 12에서 도시한 바와 같이 전방블럭과 뒷채움이 이루어진 최상층부에 바닥 콘트리트(20)를 시공하여 옹벽(W)을 완성할 수 있게 된다. Therefore, the front block 110, the rear block 140, the connection member 200 as described above is attached to the multi-stage to the height required for the front block in the iterative process as shown in Figures 9 and 10 attached, As shown in FIG. 12, the bottom concrete 20 may be constructed on the uppermost layer formed with the front block and the backfill to complete the retaining wall W. As shown in FIG.

한편, 첨부된 도 13은 본 발명에 따른 일 실시예로서 도 1에 도시된 전방블럭(110)을 양측에 두고 연결부재(200)로서 상호 전방블럭(110)을 연결하며, 잡석(A)과 토사(B)의 채움으로 둑 형태와 같은 옹벽을 실시할 수도 있다.
On the other hand, Figure 13 attached as an embodiment according to the present invention with the front block 110 shown in Figure 1 on both sides connecting the front block 110 as a connecting member 200, rubble (A) and The retaining wall like a weir can also be implemented by filling the soil (B).

10: 콘크리트 기초부 20: 바닥 콘크리트
100: 옹벽용 블럭 110: 전방블럭
111: 요홈 112: 전면부
113: 조립턱 114: 후면부
115: 경사배수공 116: 고정홈
120: 연결핀 130: 제1고정핀
140: 후방블럭 141: 연결공
142: 고정홈 150: 제2고정핀
160: 제3고정친 200: 연결부재
A: 잡석 B: 토사
P1: 제1보강철근 P2: 제2보강철근
W: 옹벽
10: concrete foundation 20: floor concrete
100: retaining wall block 110: front block
111: groove 112: front part
113: assembly jaw 114: rear
115: inclined drainage 116: fixed groove
120: connecting pin 130: first fixing pin
140: rear block 141: connector
142: fixing groove 150: second fixing pin
160: third fixed parent 200: connecting member
A: Rubble B: Tosa
P1: First rebar P2: Second rebar
W: retaining wall

Claims (6)

절토지로부터 흙메움과 함께 횡방향으로 다단 축조되고, 연결부재(200)로서 절토지측으로 지지되어 벽체를 형성하는 옹벽용 블럭(100)에 있어서,
상기 옹벽용 블럭(100)은,
사각형체로 내측에 격자형태의 제1보강철근(P1)이 매입되고, 외부 양 측면은 라운드지게 형성되되, 양 측면에 다수개의 수직되는 요홈(111)이 배열 형성된 전면부(112)와, 전면부의 후면으로부터 돌출되는 한편, 전면부(111)와 이웃하는 상,하부에 상하 조적을 위한 조립턱(113)을 갖고, 내측에 격자형태의 제2보강철근(P2)이 매입된 후면부(114)와, 전면부(112)의 전면으로부터 후면부(114)의 배면까지 적어도 하나 이상 관통되어 침수를 배수하기 위한 경사배수공(115) 및 경사배수공(115)의 후면 양측에 고정홈(116)이 대응되게 형성된 전방블럭(110)과;
상기 전면부(112)의 요홈(111) 중 어느 요홈에 삽입되어 전방블럭(110)을 횡방향으로 연결 지지하는 연결핀(120)과;
상기 후면부(114)의 고정홈(116)에 삽입되어 상기 연결부재(200)를 걸어 지지하는 제1고정핀(130)과;
상기 전방블럭(110)과 수평으로 대응되며, 절토지 내에 매립되는 것으로 중앙에 연결공(141)이 관통형성되고, 연결공(141)의 전방과 후방에 고정홈(142)이 대응되게 형성된 후방블럭(140)과;
상기 연결공(141)의 고정홈(142)에 삽입되어 상기 연결부재(200)를 걸어 지지하는 제2고정핀(150) 및; 제3고정핀(160);을 포함하는 것을 특징으로 하는 옹벽용 블럭.
In the retaining wall block (100) which is multi-stage constructed in the transverse direction with the soil filling from the cut paper, and is supported on the cut land side as the connecting member (200) to form a wall,
The retaining wall block 100,
The first reinforcing bar (P1) of the lattice shape is embedded in a quadrangular body, the outer both sides are rounded, the front portion 112 is formed with a plurality of vertical grooves 111 are arranged on both sides, and the front portion The rear part 114 which protrudes from the rear side and has an assembling jaw 113 for upper and lower masonry adjacent to the front part 111 and adjacent to the front part 111, and has a second reinforcing bar P2 having a lattice shape embedded therein; At least one penetrating from the front of the front portion 112 to the rear surface of the rear portion 114, the inclined drain hole 115 for draining the immersion and the fixing grooves 116 are formed to correspond to both sides of the rear of the inclined drain hole 115 A front block 110;
A connection pin 120 inserted into one of the grooves 111 of the front part 112 to support the front block 110 in the lateral direction;
A first fixing pin 130 inserted into the fixing groove 116 of the rear part 114 to support the connection member 200 by walking;
The rear side corresponding to the front block 110 in a horizontal direction, embedded in the cut land, the connection hole 141 is formed through the center, the rear and the fixing groove 142 is formed to correspond to the front and rear of the connection hole 141 Block 140;
A second fixing pin 150 inserted into the fixing groove 142 of the connection hole 141 to support the connection member 200 by walking; Retaining wall block comprising a; third fixing pin (160).
제1항에 있어서,
상기 격자형태로 후면부(114) 내에 매입되는 제2보강철근(P2) 중 횡방향으로 교차되는 제2보강철근(P2)과 상기 고정홈(116)내에 안내되는 제1고정핀(130)은 수평선상에 배치되어 연결부재(200)가 결속 설치되는 것을 특징으로 하는 옹벽용 블럭.
The method of claim 1,
The second reinforcing bar P2 intersecting in the transverse direction among the second reinforcing bars P2 embedded in the rear part 114 in the lattice form and the first fixing pin 130 guided in the fixing groove 116 are horizontal lines. Retaining wall block is characterized in that the connection member 200 is installed on the binding.
제1항에 있어서,
상기 경사배수공(115)은 전면부(112)에서 후면부(114)로 갈수록 상하 높이가 점차 크게 형성된 것을 특징으로 하는 옹벽용 블럭.
The method of claim 1,
The inclined drain hole 115 is a retaining wall block, characterized in that the vertical height is gradually increased toward the rear portion 114 from the front portion 112.
옹벽(W)을 시공하는 방법에 있어서,
흙깍기 작업으로 경사진 절토지의 전방으로부터 옹벽을 구축하기 위해 상부에 조립턱(12)이 형성되도록 콘크리트 기초부(10)를 시공하는 단계;
콘크리트 기초부(10)로부터 전방블럭(110)을 횡방향으로 위치시키는 한편, 상호 이웃하는 전방블럭(110)의 측면에 형성한 요홈(111)을 일치시킨 다음, 일치된 요홈 내에 연결핀(120)을 삽입하는 방식으로 전방블럭(110)을 횡방향으로 연속 이음시키는 단계;
콘트리트 기초부(10)로부터 세워진 전방블럭(110)에 대해 그 후방으로 잡석(A)과 토사(B)를 뒷 채움하여 전방블럭(110)의 후방을 지지하는 단계;
콘트리트 기초부(10)로부터 세워진 전방블럭(110)으로부터 이격되는 위치에 후방블럭(140)을 수직으로 세워 위치시킨 다음, 전방블럭(110)에 형성된 경사배수공(115) 내의 제2보강철근(P2), 경사배수공(115)측의 고정홈(116)에 삽입되는 제1고정핀(130), 후방블럭(140)의 연결공(141) 전후측에 형성된 고정홈(142)에 삽입되는 제2고정핀(150) 및 제3고정핀(160)에 벨트형 연결부재(200)의 단부를 결속시켜 전방블럭(110)과 후방블럭(140)을 상호 연결하는 단계;
상기 전방블럭(110)의 상부측 조립턱(113)에 또 다른 전방블럭(110)을 위치시켜 조적, 잡석(A) 및 토사(B)를 이용한 뒷채움, 연결부재(200)를 이용한 전방블럭(110)과 후방블럭(140)을 연결하는 반복공정으로 전방블럭을 요구하는 높이로 다단으로 조적하고, 전방블럭과 뒷채움이 이루어진 최상층부에 바닥 콘트리트(20)를 시공하는 단계;로 이루어지는 것을 특징으로 하는 옹벽용 블럭의 시공방법.
In the method of constructing the retaining wall (W),
Constructing the concrete foundation 10 so that the assembly jaw 12 is formed at the top to build the retaining wall from the front of the inclined cut soil by the mowing operation;
While positioning the front block 110 in the transverse direction from the concrete foundation 10, while matching the groove 111 formed on the side of the neighboring front block 110 to match, then connecting pin 120 in the matching groove Continuously jointing the front block 110 in the lateral direction by inserting a);
Supporting the rear of the front block 110 by backfilling the rubble A and the soil B to the rear of the front block 110 erected from the concrete foundation 10;
The rear block 140 is vertically positioned at a position spaced apart from the front block 110 erected from the concrete foundation 10, and then the second reinforcing bar P2 in the inclined drain hole 115 formed in the front block 110. ), The first fixing pin 130 is inserted into the fixing groove 116 of the inclined drain hole 115 side, the second insertion into the fixing groove 142 formed on the front and rear sides of the connection hole 141 of the rear block 140 Coupling the front block 110 and the rear block 140 to each other by binding end portions of the belt type connecting member 200 to the fixing pin 150 and the third fixing pin 160;
Another front block 110 is placed on the upper assembly jaw 113 of the front block 110, and the back block using masonry, rubble (A) and soil (B), and the front block using the connection member (200) ( 110) and the repetitive process of connecting the rear block 140 in the step of assemble in multiple stages to the required height of the front block, the step of constructing the bottom concrete 20 in the uppermost layer consisting of the front block and the back filling; Construction method of retaining wall block.
제4항에 있어서,
상기 연결부재(200)는 전방블럭(110)의 경사배수공(115) 내에 횡방향으로 가로지르는 제2보강철근(P2)에 단부가 걸쳐져 관통되는 한편, 상기 고정홈(116)에 안내되는 제1고정핀(130)을 거치고, 다시 제2보강철근(P2)을 거쳐 연결 지지되도록 한 것을 특징으로 하는 옹벽용 블럭의 옹벽시공방법.
5. The method of claim 4,
The connecting member 200 passes through the second reinforcing bar P2 transversely transversely in the inclined drain hole 115 of the front block 110 while being guided through the fixing groove 116. Retaining wall construction method of the retaining wall block, characterized in that through the fixing pin 130, the second reinforcing bars (P2) to be connected and supported.
제4항에 있어서,
상기 연결부재(200)는 후방블럭(140)의 연결공(141)측 전후방측 고정홈(142)에 삽입되는 제3고정핀(160)을 걸쳐져 관통되는 한편, 제3고정핀과 대응되는 고정홈에 위치한 제2고정핀(150)을 거치고 제3고정핀(60)을 거쳐 연결 지지되도록 한 것을 특징으로 하는 옹벽용 블럭의 옹벽시공방법.
5. The method of claim 4,
The connecting member 200 penetrates through the third fixing pin 160 inserted into the front and rear fixing grooves 142 of the connecting hole 141 of the rear block 140, and is fixed to correspond to the third fixing pin. Retaining wall construction method of the retaining wall block, characterized in that through the second fixing pin (150) located in the groove to be connected and supported through the third fixing pin (60).
KR1020110128938A 2011-12-05 2011-12-05 Retaining wall form of construction work of block for retaining wall and block for retaining wall Abandoned KR20130062586A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
KR1020110128938A KR20130062586A (en) 2011-12-05 2011-12-05 Retaining wall form of construction work of block for retaining wall and block for retaining wall

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
KR1020110128938A KR20130062586A (en) 2011-12-05 2011-12-05 Retaining wall form of construction work of block for retaining wall and block for retaining wall

Publications (1)

Publication Number Publication Date
KR20130062586A true KR20130062586A (en) 2013-06-13

Family

ID=48860256

Family Applications (1)

Application Number Title Priority Date Filing Date
KR1020110128938A Abandoned KR20130062586A (en) 2011-12-05 2011-12-05 Retaining wall form of construction work of block for retaining wall and block for retaining wall

Country Status (1)

Country Link
KR (1) KR20130062586A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102396106B1 (en) * 2021-04-16 2022-05-09 김석환 Protection system for falling-rock by controlling angle
KR102553714B1 (en) * 2022-10-26 2023-07-10 주식회사자연기술 Multistage Vertical PC Retaining Wall and Construction Method Thereof

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR102396106B1 (en) * 2021-04-16 2022-05-09 김석환 Protection system for falling-rock by controlling angle
KR102553714B1 (en) * 2022-10-26 2023-07-10 주식회사자연기술 Multistage Vertical PC Retaining Wall and Construction Method Thereof

Similar Documents

Publication Publication Date Title
KR101254145B1 (en) Gravity type concrete precast modular retaining wall utilizing shear key and connected steel bar and constructing method thereof
KR101707523B1 (en) Precast concrete block for cascade retaining wall for slope protection And method of constructing a retaining wall using the same
KR102234513B1 (en) Block type reinforcement retaining wall structure and constructing method for the same
KR101693345B1 (en) Retaining wall using natural stones and construction method for this same
KR101077949B1 (en) Block for reinforcement and construction method
KR101147459B1 (en) Construction method of cutting the ground retaining wall using the pole
KR102052591B1 (en) Geobelt support device, geobelt fix device and retaining wall construction method
KR101262357B1 (en) Inclined Earth Retaining Structure Method
KR101255027B1 (en) Precast rahmen type box culvert
KR100824713B1 (en) Shelf retaining wall using PC wall board and its construction method
JP5229913B2 (en) Slope reinforcement method
JP5309378B2 (en) Self-supporting retaining wall
KR20120131693A (en) Prefabricated block for retaining wall and method for constructing retaining wall using the same
KR100660379B1 (en) Plantable reinforced earth wall and its block and construction method of reinforced earth wall
KR102263958B1 (en) the Method of Construction of Prefabricated Block for Retaining Wall Bulwark
KR20130062586A (en) Retaining wall form of construction work of block for retaining wall and block for retaining wall
KR101212619B1 (en) Cavity box type foundation
KR101733928B1 (en) panel type retaining wall with a continuous beam structure
KR102153322B1 (en) Compound block and construction method thereof
KR200413303Y1 (en) Mountain wall structure using steel beam
CN209816901U (en) Connection type precast concrete retaining wall
JP6279892B2 (en) Form for wall construction and construction method of wall using the same
KR100601126B1 (en) Anchor Structure of Shelf Greening Retaining Wall
JP5851088B2 (en) Construction method of cast-in-place concrete block formwork and retaining wall
KR20140034582A (en) Method of construction for rwc reinforced soil retaining wall

Legal Events

Date Code Title Description
A201 Request for examination
PA0109 Patent application

Patent event code: PA01091R01D

Comment text: Patent Application

Patent event date: 20111205

PA0201 Request for examination
E902 Notification of reason for refusal
PE0902 Notice of grounds for rejection

Comment text: Notification of reason for refusal

Patent event date: 20130328

Patent event code: PE09021S01D

PG1501 Laying open of application
E701 Decision to grant or registration of patent right
PE0701 Decision of registration

Patent event code: PE07011S01D

Comment text: Decision to Grant Registration

Patent event date: 20130829

PC1904 Unpaid initial registration fee