KR100719523B1 - 파형강판을 이용한 조립식 교량 및 그 시공방법 - Google Patents
파형강판을 이용한 조립식 교량 및 그 시공방법 Download PDFInfo
- Publication number
- KR100719523B1 KR100719523B1 KR1020050074358A KR20050074358A KR100719523B1 KR 100719523 B1 KR100719523 B1 KR 100719523B1 KR 1020050074358 A KR1020050074358 A KR 1020050074358A KR 20050074358 A KR20050074358 A KR 20050074358A KR 100719523 B1 KR100719523 B1 KR 100719523B1
- Authority
- KR
- South Korea
- Prior art keywords
- corrugated steel
- steel sheet
- members
- prefabricated bridge
- face wall
- Prior art date
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D15/00—Movable or portable bridges; Floating bridges
- E01D15/12—Portable or sectional bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D4/00—Arch-type bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D22/00—Methods or apparatus for repairing or strengthening existing bridges ; Methods or apparatus for dismantling bridges
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/20—Concrete, stone or stone-like material
- E01D2101/24—Concrete
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D2101/00—Material constitution of bridges
- E01D2101/30—Metal
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Revetment (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
Description
다수의 파형강판이 아치형의 수로/통로부가 형성되도록 조립되어 상기 수로/통로부의 양측 하단부가 상기 기초부재와 각각 결합되는 파형강판 구조물; 및
상기 수로/통로부의 입,출구 가장자리에는 상기 수로/통로부와 동일한 곡률로 형성되어 양단이 수평하게 절곡되어 제 2설치부재가 서로 대응되도록 각각 설치되며, 면벽부재가 직립한 상태로 각각 결합되는 제 2설치부재;를 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량을 제공한다.
Claims (21)
- 하천의 양측 바닥면에 서로 평행하게 설치되는 한 쌍의 기초부재;다수의 파형강판이 아치형의 수로/통로부가 형성되도록 조립되어 상기 수로/통로부의 양측 하단부가 상기 기초부재와 각각 결합되는 파형강판 구조물; 및상기 수로/통로부의 입,출구 가장자리에는 상기 수로/통로부와 동일한 곡률로 형성되어 양단이 수평하게 절곡되어 서로에 대하여 대응되도록 각각 설치되며, 면벽부재가 직립한 상태로 각각 결합되는 제 2설치부재; 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 1에 있어서, 상기 기초부재는 철근과 콘크리트가 결합된 콘크리트 구조물로 이루어지는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 1에 있어서, 상기 기초부재는 다수의 파형강판을 조립하여 형성되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 3에 있어서, 상기 기초부재의 길이방향 양단에는 세굴을 방지하기 위한 세굴방지부재가 각각 결합되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 4에 있어서, 상기 기초부재들의 상면에는 길이방향으로 소정의 길이를 갖는 "L"자형 제 1설치부재가 서로에 대하여 각각 대응되도록 결합되고, 상기 제 1설치부재에 상기 파형강판 구조물의 양측 하단부가 각각 결합되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 삭제
- 청구항 1에 있어서, 상기 면벽부재는 다수의 파형강판을 조립하여 형성되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 1에 있어서, 상기 면벽부재는 철근과 콘크리트가 결합된 콘크리트 구조물로 이루어지는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 7 또는 청구항 8에 있어서, 상기 파형강판 구조물의 상부에는 상기 면벽부재의 직립한 상태를 보강하기 위한 면벽보강수단이 구비되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 9에 있어서, 상기 면벽보강수단은,상기 면벽부재들의 서로 마주보는 면에 길이방향으로 서로 대응되도록 각각 결합되는 면벽보강부재; 및상기 면벽보강부재들 사이에 배치되도록 나사부가 형성된 양단이 면벽보강부재의 서로 마주보는 면과 상기 면벽부재로 관통되어 상기 나사부에 결합되는 너트를 통해 상기 면벽부재에 각각 결합되는 다수의 보강봉;을 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 9에 있어서, 상기 면벽보강수단은,상기 파형강판 구조물의 상부 양측에 각각 형성되는 제 1연결고리에 일단이 각각 연결되는 와이어부재; 및양단이 상기 와이어부재의 타단과 상기 면벽부재들의 서로 마주보는 면에 각각 형성되는 제 2연결고리에 각각 연결되어 상기 와이어부재의 장력을 조절하기 위한 장력조절부재;를 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 하천의 양측 바닥면에 서로 평행하도록 한 쌍의 기초부재를 시공하는 단계; 및다수의 파형강판을 조립하여 아치형의 수로/통로부를 형성하고, 상기 수로/통로부의 양측 하단부가 상기 기초부재들과 각각 결합되도록 파형강판 구조물을 시공하는 단계;상기 수로/통로부의 입,출구 가장자리에는 상기 수로/통로부와 동일한 곡률을 형성되어 양단이 수평하게 절곡되는 제 2설치부재를 서로 대응되도록 각각 결합하는 단계; 및상기 제 2설치부재에 상기 면벽부재를 직립한 상태로 각각 결합하는 단계;를 더 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 청구항 12에 있어서, 상기 기초부재는 철근과 콘크리트가 결합된 콘크리트 구조물로 이루어지는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 청구항 12에 있어서, 상기 기초부재는 다수의 파형강판을 조립하여 형성되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 청구항 14에 있어서, 상기 기초부재의 길이방향 양단에는 세굴을 방지하기 위한 세굴방지부재를 각각 시공하는 단계를 더 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 청구항 15에 있어서, 상기 기초부재들 상면에는 길이방향으로 소정의 길이를 갖는 "L"자형 제 1설치부재를 서로에 대하여 대응되도록 각각 설치하는 단계; 및상기 제 1설치부재에 상기 파형강판 구조물의 양측 하단부를 각각 결합하는 단계;를 더 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 삭제
- 청구항 16에 있어서, 상기 면벽부재는 다수의 파형강판을 조립하여 형성되는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 16에 있어서, 상기 면벽부재는 철근과 콘크리트가 결합된 콘크리트 구조물로 이루어지는 것을 특징으로 하는 파형강판을 이용한 조립식 교량.
- 청구항 18 또는 청구항 19에 있어서, 상기 면벽부재들의 직립한 상태를 보강하기 위한 면벽보강수단을 시공하는 단계를 포함하되, 상기 면벽보강수단을 시공하는 단계는,상기 면벽부재들의 서로 마주보는 면에 길이방향으로 서로 대응되도록 면벽보강부재를 각각 결합하는 단계; 및상기 면벽보강부재들 사이에 배치되도록 나사부가 형성된 양단을 면벽보강부재의 서로 마주보는 면과 상기 면벽부재로 관통시켜 상기 나사부에 결합되는 너트를 통해 상기 면벽부재에 다수의 보강봉을 각각 결합하는 단계;를 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
- 청구항 18 또는 청구항 19에 있어서, 상기 면벽부재들의 직립한 상태를 보강하기 위한 면벽보강수단을 시공하는 단계를 포함하되, 상기 면벽보강수단을 시공하는 단계는,상기 파형강판 구조물의 상부 양측에 제 1연결고리를 각각 형성하고, 상기 제 1연결고리에 와이어부재의 일단을 각각 연결하는 단계; 및상기 면벽부재들의 서로 마주보는 면에 제 2연결고리를 각각 형성하고, 상기 와이어부재의 타단과 상기 제 2연결고리에 장력조절부재의 양단을 각각 연결하는 단계;를 포함하는 것을 특징으로 하는 파형강판을 이용한 조립식 교량 시공방법.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050074358A KR100719523B1 (ko) | 2005-08-12 | 2005-08-12 | 파형강판을 이용한 조립식 교량 및 그 시공방법 |
PCT/KR2006/003182 WO2007021113A1 (en) | 2005-08-12 | 2006-08-14 | Prefabricated bridge using corrugated steel plate and method for constructing the same |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
KR1020050074358A KR100719523B1 (ko) | 2005-08-12 | 2005-08-12 | 파형강판을 이용한 조립식 교량 및 그 시공방법 |
Publications (2)
Publication Number | Publication Date |
---|---|
KR20070019408A KR20070019408A (ko) | 2007-02-15 |
KR100719523B1 true KR100719523B1 (ko) | 2007-05-17 |
Family
ID=37757747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
KR1020050074358A KR100719523B1 (ko) | 2005-08-12 | 2005-08-12 | 파형강판을 이용한 조립식 교량 및 그 시공방법 |
Country Status (2)
Country | Link |
---|---|
KR (1) | KR100719523B1 (ko) |
WO (1) | WO2007021113A1 (ko) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100906161B1 (ko) | 2007-08-22 | 2009-07-03 | 정병삼 | 와이어로프를 이용한 파형강판 구조물 |
CN102359058A (zh) * | 2011-07-15 | 2012-02-22 | 广东冠生土木工程技术有限公司 | 一种组合桥梁及其制造方法 |
KR200467424Y1 (ko) * | 2013-03-25 | 2013-06-17 | (주) 렉스틸 | 현장 조립식 박스형 파형강판 교량 |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100898945B1 (ko) * | 2009-02-09 | 2009-05-25 | 김영관 | 통수로가 구비된 콘크리트 아치교 및 이의 시공방법 |
KR200466593Y1 (ko) * | 2010-12-16 | 2013-04-30 | 주식회사 에스코 이엠씨 | 휨 저항력을 향상시킨 가설교량 |
AU2013217639B2 (en) * | 2012-02-06 | 2016-11-03 | Contech Engineered Solutions LLC | Concrete bridge system and related methods |
CN103758048B (zh) * | 2014-01-23 | 2016-05-04 | 岩土科技股份有限公司 | 采用钢波纹板加固危桥的方法 |
CN105464006B (zh) * | 2015-12-31 | 2017-07-14 | 长安大学 | 一种圬工拱桥加固结构及其施工方法 |
CN108487088B (zh) * | 2018-02-09 | 2020-07-31 | 广西交通科学研究院有限公司 | 悬链线拱拱上建筑合理拆装工序确定方法 |
CN108416116B (zh) * | 2018-02-09 | 2021-10-22 | 广西交通科学研究院有限公司 | 拱脚增大截面加固抛物线拱时拱顶压重量的确定方法 |
CN110578287B (zh) * | 2019-09-29 | 2024-06-11 | 浙江师范大学 | 一种装配式覆土波纹钢板-预应力混凝土组合拱桥及其施工方法 |
CN111424551B (zh) * | 2020-04-08 | 2021-08-10 | 江西省高速公路投资集团有限责任公司 | 一种含波纹的拱形钢板与钢梁的连接结构的施工工艺 |
CN111676836A (zh) * | 2020-04-22 | 2020-09-18 | 青海路拓工程设施制造集团有限公司 | 一种现役旧小桥涵波纹钢加固施工方法 |
CN111549664A (zh) * | 2020-05-28 | 2020-08-18 | 浙江交工集团股份有限公司 | 一种人行悬索桥压型钢板组合桥面体系及施工方法 |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4211504A (en) * | 1976-06-24 | 1980-07-08 | Sivachenko Eugene W | High strength corrugated metal plate and method of fabricating same |
US4318635A (en) * | 1980-07-07 | 1982-03-09 | Bethlehem Steel Corporation | Culvert structure having corrugated ribbing support |
KR200296004Y1 (ko) | 2002-08-30 | 2002-11-22 | 평산에스아이 주식회사 | 다중 파형강판 구조물 교량 |
-
2005
- 2005-08-12 KR KR1020050074358A patent/KR100719523B1/ko active IP Right Grant
-
2006
- 2006-08-14 WO PCT/KR2006/003182 patent/WO2007021113A1/en active Application Filing
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4211504A (en) * | 1976-06-24 | 1980-07-08 | Sivachenko Eugene W | High strength corrugated metal plate and method of fabricating same |
US4318635A (en) * | 1980-07-07 | 1982-03-09 | Bethlehem Steel Corporation | Culvert structure having corrugated ribbing support |
KR200296004Y1 (ko) | 2002-08-30 | 2002-11-22 | 평산에스아이 주식회사 | 다중 파형강판 구조물 교량 |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR100906161B1 (ko) | 2007-08-22 | 2009-07-03 | 정병삼 | 와이어로프를 이용한 파형강판 구조물 |
CN102359058A (zh) * | 2011-07-15 | 2012-02-22 | 广东冠生土木工程技术有限公司 | 一种组合桥梁及其制造方法 |
KR200467424Y1 (ko) * | 2013-03-25 | 2013-06-17 | (주) 렉스틸 | 현장 조립식 박스형 파형강판 교량 |
Also Published As
Publication number | Publication date |
---|---|
KR20070019408A (ko) | 2007-02-15 |
WO2007021113A1 (en) | 2007-02-22 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
KR100719523B1 (ko) | 파형강판을 이용한 조립식 교량 및 그 시공방법 | |
KR100794922B1 (ko) | 에이치형강과 스크린이 결합된 빔크린 사방댐 | |
KR101633431B1 (ko) | 기존 교량 콘크리트와 구조적 일체화를 확보한 교량 확장형 인도 및 이의 시공방법 | |
CN109594663B (zh) | 用于后浇带位置的钢筋混凝土诱导带结构及其施工方法 | |
JP2004092078A (ja) | 橋梁の構造と構築方法 | |
KR100847726B1 (ko) | 프리스트레스트 콘크리트 포장 구조 및 그 시공 방법 | |
KR101170327B1 (ko) | 슬래브를 이용한 인도 확장장치 | |
JP4477467B2 (ja) | 橋梁の構造およびその架け替え方法 | |
JP2015101948A (ja) | 雪崩予防施設 | |
CN218911182U (zh) | 一种柔性防落石棚洞 | |
CN218346208U (zh) | 基于钢筋混凝土桩的永久边坡支护结构 | |
KR200452943Y1 (ko) | 혼용 스크린부를 적용한 버트러스 사방댐 | |
KR200406615Y1 (ko) | 티형 프리캐스트 콘크리트 패널 | |
KR101322420B1 (ko) | 프리캐스트 블록 벽체, 프리캐스트 블록 벽체를 이용한 내민식 슬래브 교량 및 이의 공법 | |
KR100964721B1 (ko) | 도로 확장 블록 시공방법 | |
KR101056395B1 (ko) | 조립식 저류조 구조물 및 상기 저류조 구조물의 시공방법 | |
KR101920789B1 (ko) | 하부기초 보강용 구조물의 세굴방지공 | |
KR100949868B1 (ko) | 파이프형의 가이드와 거푸집을 이용한 교량의 기초 단면증설 공법 | |
KR20070019410A (ko) | 토목구조물의 조립식 기초 및 그 시공방법 | |
JP2007291801A (ja) | 高架道路構造体とその構築方法 | |
KR100485480B1 (ko) | 다이아프램 벽 커넥팅 시스템 | |
KR101059539B1 (ko) | 도로 확장 블록 | |
CN216809531U (zh) | 河床冲刷综合防护结构 | |
KR200212405Y1 (ko) | 아치형 통로 구축용 프리캐스트 부재 | |
CN214194677U (zh) | 一种柱墩后浇带技术构造 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A201 | Request for examination | ||
PA0109 | Patent application |
Patent event code: PA01091R01D Comment text: Patent Application Patent event date: 20050812 |
|
PA0201 | Request for examination | ||
E902 | Notification of reason for refusal | ||
PE0902 | Notice of grounds for rejection |
Comment text: Notification of reason for refusal Patent event date: 20060929 Patent event code: PE09021S01D |
|
PG1501 | Laying open of application | ||
E701 | Decision to grant or registration of patent right | ||
PE0701 | Decision of registration |
Patent event code: PE07011S01D Comment text: Decision to Grant Registration Patent event date: 20070425 |
|
GRNT | Written decision to grant | ||
PR0701 | Registration of establishment |
Comment text: Registration of Establishment Patent event date: 20070511 Patent event code: PR07011E01D |
|
PR1002 | Payment of registration fee |
Payment date: 20070514 End annual number: 3 Start annual number: 1 |
|
PG1601 | Publication of registration | ||
G170 | Re-publication after modification of scope of protection [patent] | ||
PG1701 | Publication of correction | ||
PR1001 | Payment of annual fee |
Payment date: 20100503 Start annual number: 4 End annual number: 4 |
|
PR1001 | Payment of annual fee |
Payment date: 20110504 Start annual number: 5 End annual number: 5 |
|
PR1001 | Payment of annual fee |
Payment date: 20120504 Start annual number: 6 End annual number: 6 |
|
FPAY | Annual fee payment |
Payment date: 20130506 Year of fee payment: 7 |
|
PR1001 | Payment of annual fee |
Payment date: 20130506 Start annual number: 7 End annual number: 7 |
|
FPAY | Annual fee payment |
Payment date: 20140509 Year of fee payment: 8 |
|
PR1001 | Payment of annual fee |
Payment date: 20140509 Start annual number: 8 End annual number: 8 |
|
FPAY | Annual fee payment |
Payment date: 20150511 Year of fee payment: 9 |
|
PR1001 | Payment of annual fee |
Payment date: 20150511 Start annual number: 9 End annual number: 9 |
|
FPAY | Annual fee payment |
Payment date: 20160511 Year of fee payment: 10 |
|
PR1001 | Payment of annual fee |
Payment date: 20160511 Start annual number: 10 End annual number: 10 |
|
FPAY | Annual fee payment |
Payment date: 20170707 Year of fee payment: 11 |
|
PR1001 | Payment of annual fee |
Payment date: 20170707 Start annual number: 11 End annual number: 11 |
|
FPAY | Annual fee payment |
Payment date: 20190703 Year of fee payment: 13 |
|
PR1001 | Payment of annual fee |
Payment date: 20190703 Start annual number: 13 End annual number: 13 |
|
PR1001 | Payment of annual fee |
Payment date: 20210510 Start annual number: 15 End annual number: 15 |
|
PR1001 | Payment of annual fee |
Payment date: 20220510 Start annual number: 16 End annual number: 16 |
|
PR1001 | Payment of annual fee |
Payment date: 20230510 Start annual number: 17 End annual number: 17 |