JPS6051226A - Steel sheet pile sheathing work using stay steel sheet pile - Google Patents
Steel sheet pile sheathing work using stay steel sheet pileInfo
- Publication number
- JPS6051226A JPS6051226A JP15628583A JP15628583A JPS6051226A JP S6051226 A JPS6051226 A JP S6051226A JP 15628583 A JP15628583 A JP 15628583A JP 15628583 A JP15628583 A JP 15628583A JP S6051226 A JPS6051226 A JP S6051226A
- Authority
- JP
- Japan
- Prior art keywords
- steel sheet
- sheet pile
- stay
- earth retaining
- sheet piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D17/00—Excavations; Bordering of excavations; Making embankments
- E02D17/02—Foundation pits
- E02D17/04—Bordering surfacing or stiffening the sides of foundation pits
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Retaining Walls (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
【発明の詳細な説明】
この発明は、土留工における根切りに先立って土留鋼矢
板の片側に所定間隔に控え鋼矢板を一建込んだ後、土留
鋼矢板を残して根切り施工する鋼矢板土留工法に関する
。Detailed Description of the Invention This invention provides a steel sheet pile in which, prior to root cutting in earth retaining work, one steel sheet pile is erected at a predetermined interval on one side of the earth retaining steel sheet pile, and then root cutting is performed while leaving the earth retaining steel sheet pile. Regarding earth retaining method.
従来、土留工における土留壁の安定には腹起し切梁また
は土留アンカーを建込んで行われている。しかし、この
切梁または土留アンカーの設置は切梁またはアンカー設
置位置が施工できる位置まで根切を行ってから切梁また
はアンカーを行って土留壁の安定を図っている。この場
合、切梁またはアンカーを設置して、さらに切梁または
土留アンカー設置位置下を掘削すると土留壁には掘削に
したがって変形し、切梁または土留アンカーの荷重が増
加したり地表面の変形が大きくなる欠点があった。Conventionally, the stabilization of retaining walls in earth retaining works has been carried out by erecting raised struts or retaining anchors. However, in order to install the struts or retaining anchors, the roots are cut to a position where the struts or anchors can be installed, and then the struts or anchors are installed in order to stabilize the retaining wall. In this case, if you install a strut or anchor and then excavate below the location where the strut or earth retaining anchor is installed, the earth retaining wall will deform due to the excavation, and the load on the strut or earth retaining anchor will increase and the ground surface will deform. There was a downside to getting bigger.
この発明は、上述の欠点を解決して控え鋼矢板による鋼
矢板土留工法を提供するものである。The present invention solves the above-mentioned drawbacks and provides a steel sheet pile earth retaining method using braced steel sheet piles.
次に、この発明の実施例を図面に基づいて説明する。第
1図は、この発明の平面図、第一図は縦断面図である。Next, embodiments of the present invention will be described based on the drawings. FIG. 1 is a plan view of the present invention, and FIG. 1 is a longitudinal sectional view.
図において、地盤/内に土留鋼矢板3を建込むとともに
片側に所定間隔に直線鋼矢板を控え鋼矢板グを主働崩壊
角のfr而(A−B線)まで打込む。In the figure, earth retaining steel sheet piles 3 are erected in the ground, and straight steel sheet piles are placed on one side at predetermined intervals, and the steel sheet piles are driven up to the active collapse angle (line A-B).
次いで土留鋼矢板3の土圧、水圧の反力を控え鋼矢板グ
に伝え、この背面部の摩擦力による抵抗させることによ
り土留鋼矢板3の変形および地表面変形を減少させ、土
留鋼矢板3を残して対向する地盤lを所定位置まで掘削
すればよい。この際、腹起しコは所定の位置に設置すれ
ばよい。Next, the reaction force of the earth pressure and water pressure of the earth retaining steel sheet pile 3 is transmitted to the steel sheet pile, and the frictional force of this rear part is used to resist the deformation of the earth retaining steel sheet pile 3 and the ground surface deformation, thereby reducing the earth retaining steel sheet pile 3. All you have to do is to excavate the opposing ground l to a predetermined position, leaving . At this time, the belly riser may be installed at a predetermined position.
上述の通り、この発明によれば従来のアースアンカーに
よる土留工法に比較して、削孔、グラウト、緊張等の工
程は、控え鋼矢板を打ち込むだけでよく、工程の効率が
向上されるとともに、控え鋼矢板の転用が可能である。As mentioned above, according to the present invention, compared to the conventional earth retaining method using earth anchors, processes such as drilling, grouting, and tensioning only require driving the steel sheet piles, which improves the efficiency of the process. It is possible to repurpose the steel sheet piles.
第1図は、この発明の平面図、第2図は、縦断面図であ
る。
/:地盤
、2:H形鋼
3:土留鋼矢板
tI:控え鋼矢板
」陣I4FIG. 1 is a plan view of the invention, and FIG. 2 is a longitudinal sectional view. /: Ground, 2: H-shaped steel 3: Earth retaining steel sheet pile tI: Steel sheet pile tI: ``Steel sheet pile'' camp I4
Claims (1)
矢板を主働崩壊角の背面まで建込んだ後、土留鋼矢板を
残して根切り施工することを特徴とする控え鋼矢板によ
る鋼矢板土留工法In earth retaining work, steel sheet piles are constructed on one side of the earth retaining steel sheet piles at predetermined intervals to the back of the main collapse angle, and then root cutting is carried out while leaving the earth retaining steel sheet piles. Earth retaining method
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15628583A JPS6051226A (en) | 1983-08-29 | 1983-08-29 | Steel sheet pile sheathing work using stay steel sheet pile |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP15628583A JPS6051226A (en) | 1983-08-29 | 1983-08-29 | Steel sheet pile sheathing work using stay steel sheet pile |
Publications (1)
Publication Number | Publication Date |
---|---|
JPS6051226A true JPS6051226A (en) | 1985-03-22 |
Family
ID=15624470
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP15628583A Pending JPS6051226A (en) | 1983-08-29 | 1983-08-29 | Steel sheet pile sheathing work using stay steel sheet pile |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6051226A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003278391A (en) * | 2002-03-22 | 2003-10-02 | Shimizu Corp | Seismic support method and structure for temporary receiving of buildings |
JP2014105553A (en) * | 2012-11-29 | 2014-06-09 | Ohbayashi Corp | Earth retaining wall structure, and construction method for the same |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5844119A (en) * | 1981-09-10 | 1983-03-15 | Shuzo Toriuchi | Stabilization work for sheathing wall |
-
1983
- 1983-08-29 JP JP15628583A patent/JPS6051226A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5844119A (en) * | 1981-09-10 | 1983-03-15 | Shuzo Toriuchi | Stabilization work for sheathing wall |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003278391A (en) * | 2002-03-22 | 2003-10-02 | Shimizu Corp | Seismic support method and structure for temporary receiving of buildings |
JP2014105553A (en) * | 2012-11-29 | 2014-06-09 | Ohbayashi Corp | Earth retaining wall structure, and construction method for the same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN100489198C (en) | Prestressed scaffolding system | |
JP3505213B2 (en) | Construction method of diagonally cut beam | |
JP2001262594A (en) | Construction method for underground structures | |
JPS6051226A (en) | Steel sheet pile sheathing work using stay steel sheet pile | |
JP2001271497A (en) | Temporary receiving method for existing buildings | |
JP2868651B2 (en) | Earth retaining method above existing underground structure | |
JPH05179647A (en) | Supporting structure for earth retaining wall | |
JPH0424398A (en) | Construction of underground space with arched member | |
JPH07158085A (en) | Simple underground construction method | |
JPH0721196B2 (en) | Reverse construction method of underground structure | |
JPH0813494A (en) | Fixing method of earth retaining wall and timbering | |
JPS5844119A (en) | Stabilization work for sheathing wall | |
JPH06173278A (en) | Basic structure of building structure | |
JP2566162B2 (en) | Method for cutting and expanding between parallel tunnels and supporting device used therefor | |
JPH06173284A (en) | How to build a freestanding wall | |
JP2987371B2 (en) | Underground diaphragm wall | |
JPH059930A (en) | Self-erecting type landslide protection wall construction | |
JPH073777A (en) | Independent mountain retaining wall method | |
JPS6059228A (en) | Steel sheet pile sheathing work using stay steel sheet pile | |
JP2555838B2 (en) | Independent panel mountain retaining method | |
JPH08134913A (en) | Soil retaining method | |
JPS6175126A (en) | Large-scale underground excavation method incorporating trench cut method | |
JPS6272817A (en) | Construction of retaining wall concurrently serving as sheathing | |
JPH10298976A (en) | Foundation structure of building with soil cement pillar row retaining wall tied to frame | |
JPH0481004B2 (en) |