- Publication number
- JPS57108329A JPS57108329A JP55183737A JP18373780A JPS57108329A JP S57108329 A JPS57108329 A JP S57108329A JP 55183737 A JP55183737 A JP 55183737A JP 18373780 A JP18373780 A JP 18373780A JP S57108329 A JPS57108329 A JP S57108329A
- Authority
- JP
- Japan
- Prior art keywords
- pillar
- soil
- shaft
- ground
- pit
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
PURPOSE: To exactly form a continuous and strong pillar row even in soft ground by a method in which each pillar row surrounding a basement to be formed under the ground is formed by agitating soil and sand while excavating pits of a pillar form by an excavating stirrer and at the same time by injecting a soil hardening agent, and the adjacent pillars are mutually and partly overlapped with each other.
CONSTITUTION: A rotary excavating stirrer shaft 5 is brought down to the ground, a pillar pit 8 is excavated in the ground, and soil and sand 9 in the pit 8 are stirred. When reaching a given depth, the shaft 5 is pulled up to drain water from the pit 8, and while the shaft 5 is brought down or lifted, a soil hardening agent is injected into the mixed with soil and sand 9 through a nozzle at the tip of the shaft 5 from a pressure supply pipe 7. Since the excavating stirrer 3 has a pair of the shafts 5, two pillars 2 can be concurrently formed and partly overlapped with each other. Before the pillars 2 are hardened, a pillar to be formed next is built while overlapping partly with the adjacent pillar already formed. In the same way thereafter, the pillar row is built.
COPYRIGHT: (C)1982,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55183737A JPS6049735B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55183737A JPS6049735B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS57108329A true JPS57108329A (en) | 1982-07-06 |
JPS6049735B2 JPS6049735B2 (en) | 1985-11-05 |
Family
ID=16141084
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP55183737A Expired JPS6049735B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6049735B2 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6013124A (en) * | 1983-07-04 | 1985-01-23 | Misawa Homes Co Ltd | Construction of basement |
JPH06257169A (en) * | 1993-03-03 | 1994-09-13 | Kajima Corp | Small-scale basement |
CN102400469A (en) * | 2011-08-02 | 2012-04-04 | 北京健安诚岩土工程有限公司 | Secant pile drum type foundation and construction method thereof |
-
1980
- 1980-12-26 JP JP55183737A patent/JPS6049735B2/en not_active Expired
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6013124A (en) * | 1983-07-04 | 1985-01-23 | Misawa Homes Co Ltd | Construction of basement |
JPH06257169A (en) * | 1993-03-03 | 1994-09-13 | Kajima Corp | Small-scale basement |
CN102400469A (en) * | 2011-08-02 | 2012-04-04 | 北京健安诚岩土工程有限公司 | Secant pile drum type foundation and construction method thereof |
Also Published As
Publication number | Publication date |
---|---|
JPS6049735B2 (en) | 1985-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0335709A3 (en) | Shaft construction method | |
JPS57108329A (en) | Formation of basement | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS5634823A (en) | Concrete pile injection constructing method | |
JPS5631928A (en) | Constructing method for soil pile | |
JPS55142835A (en) | Earth retaining method | |
JPS57133918A (en) | Improvement of ground | |
JPS55116923A (en) | Method for construction of pile foundation | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS57108328A (en) | Formation of basement | |
JPS56163318A (en) | Settling guider for foundation pile | |
JPS5781525A (en) | Construction of underground continuous wall | |
JPS6436820A (en) | Filler grouting work by h-steel drawing in underground structure construction | |
JPS57108321A (en) | Construction of foundation for building and structure | |
JPS57155432A (en) | Method of erecting construction of existing pile | |
JPS5766223A (en) | Deformation reduction work for landslide protection wall | |
JPS5545910A (en) | Pile pulling method | |
JPS57133920A (en) | Method and apparatus for strengthening horizontal bearing force of pile | |
JPS55155823A (en) | Burying method for pile | |
JPS573912A (en) | Method and apparatus for improving soft ground by grout with telescoping stirring shaft | |
JPS56156317A (en) | Soil sheathing work | |
JPS5526356A (en) | Soft ground improvement method and its device | |
JPS5736216A (en) | Method and apparatus for driving pile | |
JPS57100217A (en) | Refilling work for vacant area of concrete pile driven in site | |
JPS57146833A (en) | Pressure-driving work of knotted pile |