- trench
- underground wall
- soil
- pit
- excavated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Landscapes
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
- Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
Abstract
PURPOSE: To eliminate the discharging work of soil as well as to prevent the degradation of surrounding ground during the excavation work of pit by a method in which soil and sand digged out of a trench excavated in the ground are mixed with a soil hardening agent, and the mixture is embedded in the excavated trench and hardened to form an underground wall.
CONSTITUTION: A trench 3 is formed in a place where an underground wall 2 is to be constructed by using a power shovel, etc., and soil and sand 4 digged out of the trench 3 are mixed with a soil hardening agent 5. And, the mixture is embedded in the trench 3, and compacted by rammer, etc., where the mixture is naturally hardened to finally form the underground wall 2 having the same compressive strength as that of concrete. Then, the ground surrounded by the underground wall 2 thus formed is excavated to obtain a pit, where the underground wall 2 prevents the degradation of the ground. Then, concrete is placed into the bottom the pit to form the foundation 7 of a basement. According to need, a basement unit 8 is fitted into the excavated pit.
COPYRIGHT: (C)1982,JPO&Japio
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55183736A JPS6049734B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP55183736A JPS6049734B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Publications (2)
Publication Number | Publication Date |
---|---|
JPS57108328A true JPS57108328A (en) | 1982-07-06 |
JPS6049734B2 JPS6049734B2 (en) | 1985-11-05 |
Family
ID=16141067
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP55183736A Expired JPS6049734B2 (en) | 1980-12-26 | 1980-12-26 | How to form a basement |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPS6049734B2 (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61109870A (en) * | 1984-11-02 | 1986-05-28 | 株式会社スリ−・ユ− | Structure of steel basement |
JPS63233115A (en) * | 1987-03-20 | 1988-09-28 | Sumitomo Cement Co Ltd | Soil reclaiming and filling work |
JPH01142118A (en) * | 1987-11-26 | 1989-06-05 | Ohbayashi Corp | Improving work of low-strength regulating ground |
JPH01312118A (en) * | 1988-06-11 | 1989-12-15 | Mitsubishi Mining & Cement Co Ltd | Strength-applied backfilled material and backfilling construction with its material |
-
1980
- 1980-12-26 JP JP55183736A patent/JPS6049734B2/en not_active Expired
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS61109870A (en) * | 1984-11-02 | 1986-05-28 | 株式会社スリ−・ユ− | Structure of steel basement |
JPH0542554B2 (en) * | 1984-11-02 | 1993-06-28 | Surii Yuu Kk | |
JPS63233115A (en) * | 1987-03-20 | 1988-09-28 | Sumitomo Cement Co Ltd | Soil reclaiming and filling work |
JPH01142118A (en) * | 1987-11-26 | 1989-06-05 | Ohbayashi Corp | Improving work of low-strength regulating ground |
JPH01312118A (en) * | 1988-06-11 | 1989-12-15 | Mitsubishi Mining & Cement Co Ltd | Strength-applied backfilled material and backfilling construction with its material |
Also Published As
Publication number | Publication date |
---|---|
JPS6049734B2 (en) | 1985-11-05 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JPS57108328A (en) | Formation of basement | |
JPS56142923A (en) | Construction of foundation pile and case auger used therefor | |
JPS57108321A (en) | Construction of foundation for building and structure | |
JPS5771923A (en) | Construction work of continuous underground wall | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
JPH09209371A (en) | Method for constructing foundation | |
JPS5530039A (en) | Method for constructing underground structures | |
RU2014392C1 (en) | Method for reinforcing foundation base | |
JPS57112513A (en) | Construction of foundation pile for ground improvement | |
JPS56163318A (en) | Settling guider for foundation pile | |
SU1599481A1 (en) | Method of erecting building foundation in heaving soil | |
JPS563714A (en) | Foundation pile constructing method | |
JPS5721622A (en) | Construction of large-diameter pile in site | |
JP2003221825A (en) | Construction method of foundation ground | |
FR2558862A1 (en) | PROCESS OF TREATING THE SOIL BY IMPLEMENTING A MORTAR OBTAINED BY GRINDING AND / OR DISINTEGRATION OF THE EXTRACTED MATERIALS, WITH ADDITION OF WATER AND A BINDER | |
JPS57100217A (en) | Refilling work for vacant area of concrete pile driven in site | |
JP2003293354A (en) | Construction method of foundation ground | |
JPS57108329A (en) | Formation of basement | |
JPS55161116A (en) | Constructing method for cut-off/sheathing wall by benoto pile excavator | |
JPS5628936A (en) | Construction work method | |
JPS55136322A (en) | Expansion piling method | |
JPS5781525A (en) | Construction of underground continuous wall | |
RU2256028C1 (en) | Method for soft ground consolidation | |
JP2683814B2 (en) | Reinforcement method of soft ground around the front face of shield tunnel | |
SU1728382A1 (en) | Foundation construction method |