JPH01285571A - Method of replacing guide rail for elevator - Google Patents
Method of replacing guide rail for elevatorInfo
- Publication number
- JPH01285571A JPH01285571A JP11143188A JP11143188A JPH01285571A JP H01285571 A JPH01285571 A JP H01285571A JP 11143188 A JP11143188 A JP 11143188A JP 11143188 A JP11143188 A JP 11143188A JP H01285571 A JPH01285571 A JP H01285571A
- Authority
- JP
- Japan
- Prior art keywords
- guide
- guide rail
- rail
- hoistway
- counterweight
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66B—ELEVATORS; ESCALATORS OR MOVING WALKWAYS
- B66B19/00—Mining-hoist operation
- B66B19/002—Mining-hoist operation installing or exchanging guide rails
Landscapes
- Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
Abstract
(57)【要約】本公報は電子出願前の出願データであるた
め要約のデータは記録されません。(57) [Summary] This bulletin contains application data before electronic filing, so abstract data is not recorded.
Description
【発明の詳細な説明】
〔産業上の利用分野〕
本発明は、エレベータのガイドレール取替え方法に関す
る。DETAILED DESCRIPTION OF THE INVENTION [Field of Industrial Application] The present invention relates to a method for replacing an elevator guide rail.
従来、特開昭62−16995号公報に開示されている
ように、乗りかごの上部に作業床を取付けるとともに、
操作ケーブルを介してエレベータ制御盤を操作できる手
元操作器を設け、作業床上の作業者が手元操作器を操作
することで作業床を昇降させ、固定足場なしで昇降路内
機器の取外し作業を行えるようにしたものが提案されて
いる。Conventionally, as disclosed in Japanese Unexamined Patent Publication No. 16995/1983, a work floor is attached to the top of the car, and
A hand-operated device that can operate the elevator control panel via an operating cable is installed, and workers on the work floor can raise and lower the work floor by operating the hand-held device, and can remove equipment in the hoistway without a fixed scaffold. Something like this has been proposed.
しかしながら、上記した従来提案は、昇降路内を移動す
る作業床を利用するという点については明記されている
ものの、この作業床を利用してガイドレールを取替える
ための具体的方法については言及されておらず、特につ
り合いおもりを案内するガイドレールをいかにして取替
えるかについて課題が残されていた。However, although the above-mentioned conventional proposal clearly states the use of a working platform that moves within the hoistway, it does not mention a specific method for replacing the guide rail using this working platform. In particular, there remained issues regarding how to replace the guide rails that guide the counterweights.
したがって本発明の目的とするところは、乗りかごに設
置された作業床を利用してガイドレールを安全かつ迅速
に取替えることができるエレベータのガイドレール取替
え方法を提供することにある。SUMMARY OF THE INVENTION Accordingly, it is an object of the present invention to provide an elevator guide rail replacement method that allows guide rails to be replaced safely and quickly using a work floor installed in a car.
上記目的を達成するために、本発明は、乗りかごに設置
されて昇降する作業床を利用してガイドレールの取替え
を行う際に、器材の搬出入を行う階床に揚荷用のウィン
チを据付ける工程と前後して、昇降路の頂部および底部
に配設したガイドロープ取付金臭間にガイドロープを張
設するとともにこのガイドロープをつり合いおもりに取
付けたガイド機構に係合せしめ、この後、所定のガイド
レールを上記ウィンチで支持した状態でレールブラケッ
トから取外すとともに、このガイドレールを上記ウィン
チにより昇降路内から上記搬出入階床へと搬出し、この
工程を繰り返すことで連結されていた複数本のガイドレ
ールをすべて搬出し、次に、新ガイドレールを上記ウィ
ンチにより昇降路内の所定位置まで運んで芯出し後にレ
ールブラケットに取付け、この工程を繰り返すことで複
数本の新ガイドレールをすべて連結・固定し、しかる後
、上記ガイドロープを取外し、必要に応じて上記ガイド
ロープ取付金臭も取外すようにした。In order to achieve the above object, the present invention provides a winch for unloading on the floor where equipment is carried in and out when replacing guide rails using a work floor installed on a car and raised and lowered. Before and after the installation process, a guide rope is stretched between the guide rope fittings installed at the top and bottom of the hoistway, and this guide rope is engaged with the guide mechanism attached to the counterweight. , the predetermined guide rail was removed from the rail bracket while being supported by the winch, the guide rail was carried out from the hoistway to the loading/unloading floor by the winch, and this process was repeated to connect the rails. All of the multiple guide rails are carried out, and then the new guide rail is carried to a predetermined position in the hoistway using the above-mentioned winch, and after centering, it is attached to the rail bracket. By repeating this process, multiple new guide rails can be installed. After everything was connected and fixed, the guide rope was removed, and if necessary, the guide rope mounting metal was also removed.
すなわち、本発明は、ガイドレール取外し作業を行う前
にガイドロープを張設しておき、このガイドロープがつ
り合いおもりを案内するようになっているので、作業床
を付設した乗りかΣ′を昇降させながら安全かつ迅速に
つり合いおもり用のガイドレールを取替えることができ
る。That is, in the present invention, a guide rope is stretched before the guide rail removal work is performed, and this guide rope guides the counterweight, so that it is possible to raise and lower the carriage with the work floor attached. It is possible to safely and quickly replace the guide rail for the counterweight while
以下、本発明の実施例を図に基づいて説明する。 Embodiments of the present invention will be described below with reference to the drawings.
第1図ないし第3図は本発明の一実施例を説明するため
のもので、第1図はつり合いおもり用ガイドレールの取
替え作業を示す要部模式図、第2図はつり合いおもりと
ガイドロープの保合状態を示す斜視図、第3図は昇降路
の概略断面図である。Figures 1 to 3 are for explaining one embodiment of the present invention. Figure 1 is a schematic diagram of the main part showing the replacement work of the counterweight guide rail, and Figure 2 is the balance weight and guide rope. FIG. 3 is a schematic cross-sectional view of the hoistway.
これらの図において、昇降路1の頂部2には、巻上8!
4や制御盤(図示せず)が設置された機械室3が設けら
れており、この昇降路1と各階床5A、5B、・・・・
・・、5Nの乗場との間にはそれぞれ乗場ドア6が設置
されている。また、この昇降路1の壁面には、2列にわ
たって複数本連結された乗かご用ガイドレール7と、同
じく2列にわたって複数本連結されたつり合いおもり用
ガイドレール8が、レールブラケット9を介して取付け
られている。これらのガイドレール7.8はそれぞれ、
昇降路l内で乗りかご10とつり合いおもり11の昇降
を案内するためのもので、主ロープ12を介して上記巻
上機4につるべ式に懸吊されている乗りかご10および
つり合いおもり11は、ガイドレール7.8に沿って互
いに反対方向に昇降する。In these figures, the top 2 of the hoistway 1 has a hoist 8!
4 and a machine room 3 in which a control panel (not shown) is installed, and this hoistway 1 and each floor 5A, 5B, . . .
..., 5N, and a landing door 6 is installed between each of them. Further, on the wall surface of the hoistway 1, a plurality of car guide rails 7 connected in two rows and a plurality of counterweight guide rails 8 connected in two rows are mounted via rail brackets 9. installed. These guide rails 7.8 are each
The car 10 and the counterweight 11 are used to guide the lifting and lowering of the car 10 and the counterweight 11 in the hoistway l, and are suspended from the hoisting machine 4 via the main rope 12 in a hanging manner. , are raised and lowered in mutually opposite directions along guide rails 7.8.
さらに、ガイドレール取替え作業を行うにあたって、昇
降路lの頂部2には一対のガイドロープ取付金臭14が
、また底部(ピット) 13には一対のガイドロープ取
付金臭15が配設され、これらの取付金臭14.15間
に張設された2本のガイドロープ16がそれぞれ、つり
合いおもり11に取付けたガイド機構17.18と可動
的に係合するように設定される。また、乗りかご10上
には作業床19が設置され、器材の搬出入を行う階床5
Nの乗場には揚荷用ウィンチ20が据付けられる。Furthermore, when performing the guide rail replacement work, a pair of guide rope attachment metal holders 14 are provided at the top 2 of the hoistway l, and a pair of guide rope attachment metal holders 15 are provided at the bottom (pit) 13. Two guide ropes 16 stretched between the mounting bolts 14, 15 are each set to movably engage a guide mechanism 17, 18 mounted on the counterweight 11. In addition, a work floor 19 is installed above the car 10, and a floor 5 where equipment is carried in and out is installed.
A cargo unloading winch 20 is installed at the N landing.
次に、つり合いおもり用ガイドレール8の取替え作業に
ついて、具体的に説明する。Next, the replacement work of the counterweight guide rail 8 will be specifically explained.
まず、乗りかご10の上部に作業床19を組付け(工程
1)、器材の搬出入階床5Nの乗場には揚荷用ウィンチ
20を据付け(工程2)、これらの工程1.2と前後し
て、昇降路1の頂部2と底部13にそれぞれガイドロー
プ取付金臭14.15を取付ける(工程3)。First, the work floor 19 is assembled on the top of the car 10 (step 1), and the unloading winch 20 is installed at the landing of the equipment loading/unloading floor 5N (step 2). Then, guide rope attachments 14 and 15 are attached to the top 2 and bottom 13 of the hoistway 1, respectively (step 3).
次いで、つり合いおもり11にガイド機構17゜18を
取付け、これらのガイド機構17.18と係合する2本
のガイドロープ16を取付金臭14゜15間に張る(工
程4)、これにより、ガイド機構17.18を介してつ
り合いおちり11は、ガイドロープ16に沿って移動可
能となる。Next, the guide mechanisms 17 and 18 are attached to the counterweight 11, and the two guide ropes 16 that engage with these guide mechanisms 17 and 18 are stretched between the attachments 14 and 15 (step 4). Via the mechanism 17,18 the counterweight 11 is movable along the guide rope 16.
そして、最上階に位置するガイドレール8を揚荷用ウィ
ンチ20の吊りロー121で支持してから、このガイド
レール8をレールブラケット9に固定しているボルトを
弛めるとともに、連結用ボルトを弛めて連結部材(図示
せず)を外し、このガイドレール8を揚荷用ウィンチ2
0で吊り揚げて昇降路1内から階床5Nへ搬出する。以
下同様にして、下方のガイドレール8を順次階床5Nへ
搬出し、1列分のガイドレール8をすべて搬出し終えた
なら、もう1列のガイドレール8についても同様にして
順次搬出する(工程5)、なお、この工程5は作業床1
9を移動させながら行う。Then, after supporting the guide rail 8 located on the top floor with the lifting row 121 of the lifting winch 20, loosen the bolts fixing the guide rail 8 to the rail bracket 9, and loosen the connecting bolts. Remove the connecting member (not shown) and attach the guide rail 8 to the unloading winch 2.
0 and take it out from the hoistway 1 to floor 5N. Thereafter, in the same manner, the lower guide rails 8 are sequentially carried out to the floor 5N, and when all the guide rails 8 for one row have been carried out, the guide rails 8 in the other row are sequentially carried out in the same manner ( Step 5), Note that this step 5 is performed on the work floor 1.
Do this while moving 9.
しかる後、つり合いおもり用の新ガイドレール1本を揚
荷用ウィンチ20の吊りロー121で昇降路lの最下端
まで吊り下げ、これを芯出ししてからレールブラケット
9に固定し、以下同様に上方に向かって新ガイドレール
を順次新出し・固定していき、1列分が終わったならも
う1列分についても最下端から順次新ガイドレールを新
出し・固定していく(工程6)。なお、この工程6も作
業床19を移動させながら行う。After that, one new guide rail for the counterweight is suspended to the lowest end of the hoistway l by the lifting row 121 of the unloading winch 20, and after centering it, it is fixed to the rail bracket 9, and the same goes as follows. New guide rails are sequentially taken out and fixed upwards, and when one row is completed, new guide rails are taken out and fixed one after another from the bottom end for the other row (Step 6). Note that this step 6 is also performed while moving the work floor 19.
こうしてつり合いおもり用ガイドレール8をすべて取替
えたなら、ガイドロープ16を取外し、さらにガイドロ
ープ取付金臭14.15を取外す(工程7)、ただし、
これらの取付金臭14.15は、特に、邪魔にならない
場合には取付けたままにしておいてもよい。After all the guide rails 8 for the counterweight have been replaced in this way, remove the guide rope 16 and further remove the guide rope mounting hardware 14 and 15 (Step 7), however,
These fittings 14,15 may be left in place, especially if they do not get in the way.
このように、上記実施例にあっては、ガイドレール8を
取外してもつり合いおもり11はガイドロープ°16に
より案内されるので、作業床19と反対方向に移動する
ことになるつり合いおちり11の昇降は常に支障なく行
われ、よって作業床19を適宜昇降させながらつり合い
おもり用ガイドレールの取替え作業を安全かつ迅速に遂
行することができる。
dなお、上記工程1.2.3は順不同であり
、いずれの工程を先に行ってもよい、また、上記工程5
.6において、ガイドレール8の取外し作業や新ガイド
レールの取付は作業は必ずしも1列ずつ行う必要はなく
、2列分を同時進行させてもよい。In this way, in the above embodiment, even if the guide rail 8 is removed, the counterweight 11 is guided by the guide rope 16, so that the counterweight 11 that moves in the opposite direction to the work floor 19 is Raising and lowering is always carried out without any trouble, and therefore, the work of replacing the counterweight guide rail can be carried out safely and quickly while raising and lowering the work floor 19 as appropriate.
d Note that the above steps 1.2.3 are in any order, and any step may be performed first, and the above step 5.
.. In 6, the removal work of the guide rail 8 and the installation of a new guide rail do not necessarily have to be performed one row at a time, but may be performed simultaneously for two rows.
そして、つり合いおもり用ガイドレールの取替え作業が
終了したなら、作業床19を移動させながら、乗りかご
用ガイドレール7を1本取外してそこに新ガイドレール
を取付ける作業を繰り返し、すべての乗りかご用ガイド
レール7を新しいものに取替える。なお、乗りかご用ガ
イドレール7の取替え作業をつり合いおもり用ガイドレ
ール8の取替え作業よりも先に行ってもよい。When the work of replacing the counterweight guide rail is completed, while moving the work floor 19, the work of removing one car guide rail 7 and installing a new guide rail there is repeated. Replace the guide rail 7 with a new one. Note that the replacement work for the car guide rail 7 may be performed before the replacement work for the counterweight guide rail 8.
以上説明したように、本発明は、ガイドレールを取外し
てもつり合いおもりがガイドロープにより案内されるよ
うになっているので、作業床を適宜昇降させながら安全
かつ迅速にガイドレールの取替え作業を行うことができ
る。As explained above, in the present invention, even when the guide rail is removed, the counterweight is guided by the guide rope, so the guide rail can be replaced safely and quickly while raising and lowering the work floor as appropriate. be able to.
第1図ないし第3図は本発明の一実施例を説明するため
のもので、第1図はつり合いおもり用ガイドレールの取
替え作業を示す要部模式図、第2図はつり合いおもりと
ガイドロープの係合状態を示す斜視図、第3図は昇降路
の概略断面図である。
1・・・・・・昇降路、2・・・・・・頂部、5N・・
・・・・器材搬出入階床、7・・・・・・乗りかご用ガ
イドレール、8・・・・・・つり合いおもり用ガイドレ
ール、9・旧・・レールブラケット、10・・・・・・
乗りかご、11・・・・・・つり合いおもり、13・・
・・・・底部、14.15・・・・・・ガイドロープ取
付金臭、16・・・・・・ガイドロープ、17゜18・
・・・・・ガイド機構、19・・・・・・作業床、20
・・・・・・揚荷用ウィンチ。
第1図Figures 1 to 3 are for explaining one embodiment of the present invention. Figure 1 is a schematic diagram of the main part showing the replacement work of the counterweight guide rail, and Figure 2 is the balance weight and guide rope. FIG. 3 is a schematic cross-sectional view of the hoistway. 1...Hoistway, 2...Top, 5N...
...Equipment loading/unloading floor, 7...Guide rail for car, 8...Guide rail for counterweight, 9.Old...Rail bracket, 10...・
Cart, 11... Counterweight, 13...
...Bottom, 14.15...Guide rope installation metal smell, 16...Guide rope, 17°18.
...Guide mechanism, 19 ...Working floor, 20
...Winch for unloading. Figure 1
Claims (1)
レールが長手方向に複数本連結されており、これらのガ
イドレールが乗りかごおよびつり合いおもりの昇降を案
内するエレベータにおいて、上記乗りかごに設置されて
昇降する作業床を利用して上記ガイドレールの取替えを
行う際に、器材の搬出入を行う階床に揚荷用のウインチ
を据付ける工程と前後して、昇降路の頂部および底部に
配設したガイドロープ取付金具間にガイドロープを張設
するとともにこのガイドロープをつり合いおもりに取付
けたガイド機構に係合せしめ、この後、所定のガイドレ
ールを上記ウインチで支持した状態でレールブラケット
から取外すとともに、このガイドレールを上記ウインチ
により昇降路内から上記搬出入階床へと搬出し、この工
程を繰り返すことで連結されていた複数本のガイドレー
ルをすべて搬出し、次に、新ガイドレールを上記ウイン
チにより昇降路内の所定位置まで運んで芯出し後にレー
ルブラケットに取付け、この工程を繰り返すことで複数
本の新ガイドレールをすべて連結・固定し、しかる後、
上記ガイドロープを取外し、必要に応じて上記ガイドロ
ープ取付金臭も取外すようにしたことを特徴とするエレ
ベータのガイドレール取替え方法。A plurality of guide rails fixed to the hoistway wall via rail brackets are connected in the longitudinal direction, and these guide rails are installed in the car and guide the lifting and lowering of the car and counterweight. When replacing the above-mentioned guide rail using a work floor that goes up and down, winches for lifting cargo are installed at the top and bottom of the hoistway before and after the process of installing winches on the floor where equipment is carried in and out. A guide rope is stretched between the guide rope mounting brackets, and this guide rope is engaged with a guide mechanism attached to a counterweight. After that, the designated guide rail is supported by the winch and removed from the rail bracket. This guide rail is carried out from the hoistway to the loading/unloading floor using the winch, and by repeating this process, all the connected guide rails are carried out, and then the new guide rail is Use a winch to transport it to a specified position in the hoistway, center it, and attach it to the rail bracket. Repeat this process to connect and fix all the new guide rails. After that,
A method for replacing an elevator guide rail, characterized in that the guide rope is removed and, if necessary, the guide rope attachment metal smell is also removed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11143188A JPH01285571A (en) | 1988-05-10 | 1988-05-10 | Method of replacing guide rail for elevator |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP11143188A JPH01285571A (en) | 1988-05-10 | 1988-05-10 | Method of replacing guide rail for elevator |
Publications (1)
Publication Number | Publication Date |
---|---|
JPH01285571A true JPH01285571A (en) | 1989-11-16 |
Family
ID=14561015
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP11143188A Pending JPH01285571A (en) | 1988-05-10 | 1988-05-10 | Method of replacing guide rail for elevator |
Country Status (1)
Country | Link |
---|---|
JP (1) | JPH01285571A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101792082A (en) * | 2010-04-07 | 2010-08-04 | 东莞市快意电梯有限公司 | Damage resistant protecting device for elevator traveling cable and protecting method thereof |
JP2017149553A (en) * | 2016-02-26 | 2017-08-31 | 三菱電機ビルテクノサービス株式会社 | Elevator equipment carry-in/out method and elevator equipment carry-in/out device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5548182A (en) * | 1978-09-29 | 1980-04-05 | Hitachi Ltd | Method of construction of scaffolddless installation of elevator |
-
1988
- 1988-05-10 JP JP11143188A patent/JPH01285571A/en active Pending
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5548182A (en) * | 1978-09-29 | 1980-04-05 | Hitachi Ltd | Method of construction of scaffolddless installation of elevator |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101792082A (en) * | 2010-04-07 | 2010-08-04 | 东莞市快意电梯有限公司 | Damage resistant protecting device for elevator traveling cable and protecting method thereof |
JP2017149553A (en) * | 2016-02-26 | 2017-08-31 | 三菱電機ビルテクノサービス株式会社 | Elevator equipment carry-in/out method and elevator equipment carry-in/out device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN112566864B (en) | Application method of lift extension technology of elevator | |
JP6969686B2 (en) | How to extend the lift of a construction elevator | |
JP2007210703A (en) | Device and method for installing hoist machine in machine-room-less elevator | |
JP2008222382A (en) | Method for moving lifting device for installation | |
JPH01285571A (en) | Method of replacing guide rail for elevator | |
JP6798644B2 (en) | Elevator balance weight lifting device and lifting method | |
JP5930842B2 (en) | Elevator installation method and installation jig | |
CN100333990C (en) | Elevator appts. | |
JPH05262475A (en) | Installation method of elevator | |
JPH04129981A (en) | Method of installing construction for hydraulic elevator | |
JP2815251B2 (en) | Elevator main cable replacement method | |
JP3872833B2 (en) | Elevator repair method | |
JPH1088787A (en) | Knocked-down gondola in elevatable parking device | |
JP7583224B2 (en) | Hoist installation guide device and hoist installation method | |
JP6882082B2 (en) | Lifting support device in the hoistway of the elevator | |
JP2019043760A (en) | Guide rail installation method | |
JPH1111822A (en) | Elevator guide rail installation method | |
JP3301948B2 (en) | Elevator installation method | |
JP6950458B2 (en) | Elevator weight removal device and weight removal method | |
JP3035099B2 (en) | Elevator main cable replacement method | |
JP2000351555A (en) | Method for replacing elevator main rope | |
JPH05201648A (en) | Installation of elevator | |
JP2022150841A (en) | Renewal method of elevator and elevator | |
JP3378806B2 (en) | Elevator installation method | |
JP2812590B2 (en) | How to modify the elevator |