[go: up one dir, main page]

JP7630289B2 - Ceiling unit - Google Patents

Ceiling unit Download PDF

Info

Publication number
JP7630289B2
JP7630289B2 JP2021013815A JP2021013815A JP7630289B2 JP 7630289 B2 JP7630289 B2 JP 7630289B2 JP 2021013815 A JP2021013815 A JP 2021013815A JP 2021013815 A JP2021013815 A JP 2021013815A JP 7630289 B2 JP7630289 B2 JP 7630289B2
Authority
JP
Japan
Prior art keywords
deck plate
plate
concrete
ceiling unit
deck
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
JP2021013815A
Other languages
Japanese (ja)
Other versions
JP2022117232A (en
Inventor
勝輝 関
歩未 山本
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
JFE Metal Products and Engineering Inc
Original Assignee
JFE Metal Products and Engineering Inc
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by JFE Metal Products and Engineering Inc filed Critical JFE Metal Products and Engineering Inc
Priority to JP2021013815A priority Critical patent/JP7630289B2/en
Publication of JP2022117232A publication Critical patent/JP2022117232A/en
Application granted granted Critical
Publication of JP7630289B2 publication Critical patent/JP7630289B2/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Description

本発明は、天井ユニットに関する。 The present invention relates to a ceiling unit.

建物の床スラブを構築する際の型枠として、デッキプレートが広く用いられている(例えば、特許文献1参照)。デッキプレートは、梁間に架け渡されるように設置されており、デッキプレートの両端部が梁に固定されている。デッキプレートを固定した後、デッキプレートの上にはコンクリートが打設され、コンクリートが固化することにより、床スラブが構築される。
床スラブは、下階からみれば天井を構成するものであり、天井には電気や空調設備等の配管や配線を配置するため、天井となる床スラブには吊り具(吊りボルト等)が設けられる。
Deck plates are widely used as formwork for constructing floor slabs of buildings (see, for example, Patent Document 1). The deck plate is installed so as to span between beams, and both ends of the deck plate are fixed to the beams. After the deck plate is fixed, concrete is poured on the deck plate, and the floor slab is constructed by the concrete solidifying.
The floor slab constitutes the ceiling when viewed from the floor below, and since pipes and wiring for electrical and air conditioning equipment are placed in the ceiling, hanging devices (hanging bolts, etc.) are installed on the floor slab, which serves as the ceiling.

特開平7-238621号公報Japanese Patent Application Publication No. 7-238621

ところで、天井となる床スラブには、予め吊り具を設置するために、コンクリートの打設時にインサート部材を設けておくが、コンクリートが固化して床スラブが構築された後に吊り具による吊り位置の変更が生じた場合、インサート部材の位置を変更することができないので、吊り位置の変更は困難であった。
また、インサート部材の設置位置を事前に決めてコンクリートの固化前に設けておく必要があり、作業性が良くなかった。
また、デッキプレートに吊り具を設けることで、吊り位置の変更に柔軟に対応できるようにすることも考えられるが、デッキプレートの種類によっては床スラブに係留される構造になっていないものもあり、デッキプレートが配管や配線の重量で床スラブから落下してしまうおそれがあるため、実現が困難であった。
Incidentally, in order to install hanging devices in advance in the floor slab that will become the ceiling, insert members are placed when the concrete is poured; however, if the hanging position of the hanging device needs to be changed after the concrete has solidified and the floor slab has been constructed, it is difficult to change the hanging position because the position of the insert member cannot be changed.
In addition, the installation position of the insert member had to be determined in advance and installed before the concrete hardened, which resulted in poor workability.
It is also possible to provide a lifting device on the deck plate to allow for flexible changes to the lifting position, but this has been difficult to achieve because some types of deck plates are not designed to be moored to the floor slab, and there is a risk that the deck plate will fall from the floor slab due to the weight of the piping and wiring.

そこで、本発明は、上記課題に鑑みてなされたものであり、事前にインサート部材を設ける必要がなく、床スラブ構築後の吊り位置の変更に対応できる天井ユニットを提供することを目的とする。 Therefore, the present invention was made in consideration of the above problems, and aims to provide a ceiling unit that does not require the installation of an insert member in advance and can accommodate changes to the hanging position after the floor slab is constructed.

上記の課題を解決するため、本発明は、デッキプレートを備える天井ユニットであって、前記デッキプレートの一方の面に延在し、前記デッキプレートへのコンクリート打設時に当該コンクリートと一体化される定着部と、前記デッキプレートの他方の面に延在して前記定着部に連続し、吊り具が取り付けられる取付部と、を備えることを特徴とする。 To solve the above problems, the present invention provides a ceiling unit that includes a deck plate, and is characterized by having an anchoring portion that extends on one side of the deck plate and is integrated with the concrete when the concrete is poured onto the deck plate, and an attachment portion that extends on the other side of the deck plate, is continuous with the anchoring portion, and is adapted to attach a hanging device.

また、前記取付部に設けられ、前記吊り具の係合部が複数形成されたプレート部を備えることが好ましい。 It is also preferable that the mounting portion is provided with a plate portion on which multiple engagement portions for the sling are formed.

また、前記係合部は、前記プレート部の幅方向及び長さ方向に沿って形成されていることが好ましい。 It is also preferable that the engagement portion is formed along the width and length directions of the plate portion.

また、前記係合部は、貫通孔であり、前記貫通孔には、前記吊り具に螺合するねじ溝が形成されていることが好ましい。 It is also preferable that the engagement portion is a through hole, and that the through hole is formed with a threaded groove that screws into the sling.

また、前記プレート部は、波形状に形成されていることが好ましい。 It is also preferable that the plate portion is formed in a corrugated shape.

また、前記定着部は、前記デッキプレートの厚さ方向に交差する方向に延在する係止部を備えることが好ましい。 It is also preferable that the fixing portion has a locking portion extending in a direction intersecting the thickness direction of the deck plate.

本発明によれば、事前にインサート部材を設ける必要がなく、床スラブ構築後の吊り位置の変更に対応できる。 According to the present invention, there is no need to install insert members in advance, and the suspension position can be changed after the floor slab is constructed.

天井ユニットを用いて構築された床スラブの部分断面図である。FIG. 1 is a partial cross-sectional view of a floor slab constructed with ceiling units. プレート部を取り付ける前の天井ユニットの斜視図である。1 is a perspective view of a ceiling unit before the plate portion is attached. FIG. プレート部の部分平面図である。FIG. プレート部の部分斜視図である。FIG. プレート部を取り付けた天井ユニットの斜視図である。1 is an oblique view of a ceiling unit with a plate portion attached.

本発明の好ましい実施の形態について、図面を参照しながら説明する。なお、以下に示す実施の形態は一例であり、本発明の範囲において、種々の実施の形態をとりうる。 A preferred embodiment of the present invention will be described with reference to the drawings. Note that the embodiment described below is merely an example, and various embodiments are possible within the scope of the present invention.

図1から図5に示すように、天井ユニット1は、デッキプレート2と、定着部3と、取付部4と、プレート部5と、を備えている。
デッキプレート2は、建築構造物の床スラブ(天井スラブ)100を構築する際に打設されるコンクリートの型枠となる。また、図1に示すように、デッキプレート2は、コンクリートの固化後、コンクリートと一体となって床スラブ(天井スラブ)100の剛性を高めるものである。すなわち、図1に示すように、床スラブ(天井スラブ)100は、天井ユニット1と、この天井ユニット1におけるデッキプレート2の上面に打設され、固化によりデッキプレート2と一体に形成されたコンクリート部10と、を備えている。
As shown in Figures 1 to 5, the ceiling unit 1 comprises a deck plate 2, a fixing portion 3, a mounting portion 4, and a plate portion 5.
The deck plate 2 serves as a formwork for concrete to be poured when constructing a floor slab (ceiling slab) 100 of an architectural structure. As shown in Fig. 1, the deck plate 2 becomes one with the concrete after the concrete hardens to increase the rigidity of the floor slab (ceiling slab) 100. That is, as shown in Fig. 1, the floor slab (ceiling slab) 100 includes a ceiling unit 1 and a concrete portion 10 that is poured on the upper surface of the deck plate 2 in the ceiling unit 1 and is formed one with the deck plate 2 upon hardening.

デッキプレート2は、対向する梁間に架け渡されている。デッキプレート2は、一端が一方の梁に載置され、溶接等によって梁に固定されており、他端が他方の梁に載置され、溶接等によって梁に固定されている。具体的に、梁は、例えば、H形鋼によって構成されており、デッキプレート2の各端部はそれぞれの梁を構成するH形鋼のフランジ部に載置され、固定されている。 The deck plate 2 is placed across the opposing beams. One end of the deck plate 2 is placed on one beam and fixed to the beam by welding or the like, and the other end is placed on the other beam and fixed to the beam by welding or the like. Specifically, the beams are made of, for example, H-shaped steel, and each end of the deck plate 2 is placed on and fixed to the flanges of the H-shaped steel that constitutes each beam.

図1、図2に示すように、デッキプレート2は、薄板状の鋼板(金属板)から形成されている。デッキプレート2には、鋼板に亜鉛メッキ等の表面処理が施されたものもある。デッキプレート2は、一枚の平板状の鋼板をロール成形機によってロール成形することにより製造される。デッキプレート2は、ロール成形機によって複数の箇所で曲げ加工が施される。
デッキプレート2は、リブ21と、平坦部22と、エンドクローズ部23と、突条部24(凹凸部)と、を備えている。
As shown in Figures 1 and 2, the deck plate 2 is formed from a thin steel plate (metal plate). Some deck plates 2 are made of steel plate that has been subjected to a surface treatment such as galvanization. The deck plate 2 is manufactured by roll-forming a single flat steel plate using a roll-forming machine. The deck plate 2 is bent at multiple locations by the roll-forming machine.
The deck plate 2 has a rib 21, a flat portion 22, an end closed portion 23, and a protrusion portion 24 (uneven portion).

リブ21は、鋼板が曲げ加工されることによって形成されている。リブ21は、所定間隔をあけて鋼板の一方の面側に曲げられ、途中で複数回曲げられた後、最初の曲げ位置で鋼板の面方向に沿うように曲げられて構成されている。リブ21は、一部において折り返された鋼板同士がカシメ加工等によって連結されている。これによって、リブ21が開かないようになっている。リブ21は、デッキプレート2の幅方向(短手方向)に沿って所定の間隔をあけて複数形成されている。リブ21は、デッキプレート2の長さ方向(長手方向)に沿って延在するように形成されている。すなわち、リブ21は、梁への懸架方向に沿って一端から他端にわたって連続して形成されている。 The ribs 21 are formed by bending steel plates. The ribs 21 are bent toward one side of the steel plate at a predetermined interval, bent multiple times along the way, and then bent at the first bending position so that they are aligned along the surface direction of the steel plate. The ribs 21 are formed by connecting the steel plates that are folded back in parts by crimping or the like. This prevents the ribs 21 from opening. A plurality of ribs 21 are formed at predetermined intervals along the width direction (short direction) of the deck plate 2. The ribs 21 are formed to extend along the length direction (longitudinal direction) of the deck plate 2. In other words, the ribs 21 are formed continuously from one end to the other end along the suspension direction on the beam.

平坦部22は、デッキプレート2において曲げ加工が施されていない部分である。すなわち、平坦部22は、隣接するリブ21に挟まれた部分である。デッキプレート2において、各平坦部22は、同一平面上に形成されている。 The flat portions 22 are the portions of the deck plate 2 that have not been bent. In other words, the flat portions 22 are the portions sandwiched between adjacent ribs 21. In the deck plate 2, each flat portion 22 is formed on the same plane.

エンドクローズ部23は、デッキプレート2の長さ方向(長手方向)の両端部に形成されている。エンドクローズ部23は、リブ21の両端部がデッキプレート2の面に対して直角方向に潰されることによって形成されている。これにより、リブ21は、両端部のエンドクローズ部23が押し潰された断面に形成されており、エンドクローズ部23に挟まれた他の部分は断面視略三角形状に形成されている。その結果、リブ21の両端部は、他の部分よりも高さが低くなるため、梁のフランジ部上面に載置することができる。エンドクローズ部23は、リブ21の延在方向に沿った長さが梁のフランジ部上面に載置する長さよりも長くなるように形成されている。 The end-closed portions 23 are formed at both ends in the length direction (longitudinal direction) of the deck plate 2. The end-closed portions 23 are formed by crushing both ends of the rib 21 in a direction perpendicular to the surface of the deck plate 2. As a result, the rib 21 is formed with a cross section in which the end-closed portions 23 at both ends are crushed, and the other portion sandwiched between the end-closed portions 23 is formed in a roughly triangular cross section. As a result, both ends of the rib 21 are lower in height than the other portions, so that they can be placed on the upper surface of the flange portion of the beam. The end-closed portions 23 are formed so that the length along the extension direction of the rib 21 is longer than the length at which it is placed on the upper surface of the flange portion of the beam.

突条部24は、各平坦部22に形成されている。突条部24は、例えば、エンボス加工によって形成されており、デッキプレート2においてリブ21とは反対側に突出するように形成されている。ここで、突条部24は、リブ21と同じ側に突出するように形成されていてもよい。突条部24により、デッキプレート2は強度と剛性が高められている。突条部24は、例えば、リブ21の延在方向に直交する方向、すなわち、デッキプレート2の幅方向(短手方向)に沿って延在している。突条部24は、デッキプレート2の上面にコンクリートを打設して固化した後、コンクリートに係合していることで水平荷重に対する抵抗力を高めることができる。 The protrusions 24 are formed on each flat portion 22. The protrusions 24 are formed, for example, by embossing, and are formed so as to protrude on the opposite side of the deck plate 2 from the ribs 21. Here, the protrusions 24 may be formed so as to protrude on the same side as the ribs 21. The protrusions 24 increase the strength and rigidity of the deck plate 2. The protrusions 24 extend, for example, in a direction perpendicular to the extension direction of the ribs 21, i.e., along the width direction (short direction) of the deck plate 2. After concrete is poured on the upper surface of the deck plate 2 and hardened, the protrusions 24 engage with the concrete, thereby increasing resistance to horizontal loads.

図1、図2、図5に示すように、定着部3は、デッキプレート2の一方の面側に延在し、デッキプレート2へのコンクリート打設後、固化する際に当該コンクリートと一体化される部分である。すなわち、定着部3は、デッキプレート2が梁間に設置された際において、デッキプレート2の上面に延在するように設けられている。定着部3は、例えば、丸棒状に延びる金属製の部材であり、デッキプレート2の一方の面に対して垂直方向に延在するようにデッキプレート2に溶接等によって取り付けられている。定着部3のうち、デッキプレート2から遠い方の一端部には、デッキプレート2の厚さ方向に交差する方向に延在する係止部31が形成されている。具体的には、係止部31は、デッキプレート2の面方向に沿って延在するように屈曲されて形成されている。係止部31は、定着部3に引き抜き方向(図1における下向きの方向)に力が作用した際に、コンクリート部10に係止されて、コンクリート部10からの定着部3の離脱を防止する。 1, 2, and 5, the fixing portion 3 extends on one side of the deck plate 2 and is integrated with the concrete when the concrete is poured on the deck plate 2 and solidifies. That is, the fixing portion 3 is provided so as to extend on the upper surface of the deck plate 2 when the deck plate 2 is installed between the beams. The fixing portion 3 is, for example, a metal member extending in a round bar shape, and is attached to the deck plate 2 by welding or the like so as to extend perpendicularly to one side of the deck plate 2. At one end of the fixing portion 3 that is farther from the deck plate 2, a locking portion 31 is formed that extends in a direction intersecting the thickness direction of the deck plate 2. Specifically, the locking portion 31 is formed by bending so as to extend along the surface direction of the deck plate 2. When a force is applied to the fixing portion 3 in the pull-out direction (downward direction in FIG. 1), the locking portion 31 is locked to the concrete portion 10, preventing the fixing portion 3 from coming off the concrete portion 10.

図1、図2、図5に示すように、取付部4は、デッキプレート2の他方の面側に延在して定着部3に連続し、プレート部5、もしくは吊り具6が取り付けられる部分である。すなわち、取付部4は、デッキプレート2が梁間に設置された際において、デッキプレート2の下面(リブ21が形成されている側の面)に延在するように設けられている。取付部4は、例えば、丸棒状に延びる金属製の部材であり、デッキプレート2の他方の面に対して垂直方向に延在するようにデッキプレート2に溶接等によって取り付けられている。取付部4は、例えば、定着部3と一体に形成されており、係止部31を除いて、同一軸線上に並んで形成されている。取付部4における定着部3と反対側の端部は、デッキプレート2のリブ21よりも下方に突出するように設けられている。取付部4における定着部3と反対側の端部には、その表面にねじ溝41が形成されており、ねじ溝41に螺合するナット42が設けられている。
一体に形成された定着部3及び取付部4は、例えば、デッキプレート2の四隅近傍に設けられている。
As shown in Figs. 1, 2 and 5, the mounting portion 4 extends to the other surface side of the deck plate 2, continues to the fixing portion 3, and is a portion to which the plate portion 5 or the hoisting device 6 is attached. That is, the mounting portion 4 is provided so as to extend to the underside of the deck plate 2 (the surface on the side on which the rib 21 is formed) when the deck plate 2 is installed between the beams. The mounting portion 4 is, for example, a metal member extending in a round bar shape, and is attached to the deck plate 2 by welding or the like so as to extend in a direction perpendicular to the other surface of the deck plate 2. The mounting portion 4 is, for example, formed integrally with the fixing portion 3, and is formed side by side on the same axis line, except for the locking portion 31. The end of the mounting portion 4 opposite the fixing portion 3 is provided so as to protrude downward from the rib 21 of the deck plate 2. A screw groove 41 is formed on the surface of the end of the mounting portion 4 opposite the fixing portion 3, and a nut 42 that screws into the screw groove 41 is provided.
The integrally formed fixing portion 3 and mounting portion 4 are provided, for example, near the four corners of the deck plate 2.

図1、図3~図5に示すように、プレート部5は、平面視矩形状に形成された板材(金属板)である。プレート部5には、亜鉛メッキなどの表面処理が施されていてもよい。プレート部5は、側面視した際に、凹部と凸部が交互に連続する波形状に形成されている。凹部と凸部は、プレート部5の長さ方向に沿って形成されている。
プレート部5には、長さ方向と幅方向に沿って、厚さ方向に貫通する複数の貫通孔51が形成されている。貫通孔51は、吊り具6の係合部として機能するものである。貫通孔51は、プレート部5における凹部に形成されているが、凸部に形成してもよいし、凹部と凸部に形成してもよい。幅方向に隣接する複数の貫通孔51は、例えば、千鳥状に形成されている。貫通孔51には、例えば、吊り具6に螺合するねじ溝52が形成されている。
プレート部5は、例えば、その四隅付近で取付部4に取り付けられる。具体的には、貫通孔51は、取付部4における定着部3と反対側の端部を挿通可能な大きさに形成されており、貫通孔51に取付部4を挿通した後、ナット42をねじ溝41に螺合させることで、プレート部5は取付部4に取り付けられる。プレート部5が取付部4に取り付けられた状態において、プレート部5は、デッキプレート2の平坦部22の面方向に沿って延在している。
1 and 3 to 5, the plate portion 5 is a plate material (metal plate) formed in a rectangular shape in a plan view. The plate portion 5 may be subjected to a surface treatment such as zinc plating. When viewed from the side, the plate portion 5 is formed in a wave shape in which concave portions and convex portions are alternately and continuously formed. The concave portions and convex portions are formed along the length direction of the plate portion 5.
The plate portion 5 is formed with a plurality of through holes 51 penetrating in the thickness direction along the length and width directions. The through holes 51 function as engagement portions for the suspender 6. The through holes 51 are formed in the recesses of the plate portion 5, but may be formed in the protrusions, or may be formed in both the recesses and the protrusions. The plurality of through holes 51 adjacent in the width direction are formed, for example, in a staggered pattern. The through holes 51 are formed with, for example, screw grooves 52 that screw into the suspender 6.
The plate portion 5 is attached to the mounting portion 4, for example, near its four corners. Specifically, the through hole 51 is formed with a size that allows the end of the mounting portion 4 opposite the fixing portion 3 to be inserted therethrough, and after the mounting portion 4 is inserted into the through hole 51, the nut 42 is screwed into the thread groove 41, thereby attaching the plate portion 5 to the mounting portion 4. When the plate portion 5 is attached to the mounting portion 4, the plate portion 5 extends along the surface direction of the flat portion 22 of the deck plate 2.

床スラブ100を構築する際には、デッキプレート2にプレキャストされた定着部3、取付部4及びプレート部5を備える天井ユニット1を梁間に架け渡す。
次いで、天井ユニット1におけるデッキプレート2の一方の面にコンクリートを打設する。ここで、コンクリートが打設される領域には、定着部3が延在しているので、定着部3は、コンクリートと共に一体化される。
これにより、デッキプレート2とプレート部5とが高さ方向に間隔をあけて並んだ床スラブ100が構築される。
When constructing the floor slab 100, a ceiling unit 1 having a fixing portion 3, a mounting portion 4 and a plate portion 5 precast on a deck plate 2 is spanned between the beams.
Next, concrete is poured onto one surface of the deck plate 2 of the ceiling unit 1. Since the anchoring portion 3 extends into the area where the concrete is poured, the anchoring portion 3 is integrated with the concrete.
This results in the construction of a floor slab 100 in which the deck plate 2 and the plate portion 5 are arranged at intervals in the height direction.

以上のように、天井ユニット1は、コンクリート部10に一体化される定着部3に連続し、吊り具6が取り付けられる取付部4を備えているので、予め吊り具6を設置するために、コンクリートの打設時にコンクリートと一体化させるためのインサート部材(吊り具用)を設けておく必要がない。また、床スラブ100の施工後に吊り位置に変更が生じたとしても、取付部4に変更後の吊り位置まで吊り具6を導く部材を取り付けることで対応することができる。
また、取付部4にプレート部5を設けることにより、プレート部5に吊り具6を設けることができる。ここで、プレート部5には、ねじ溝52を有する複数の貫通孔51が形成されているので、貫通孔51を吊り具6の係合部とすることができ、床スラブ100の施工後に吊り位置に変更が生じたとしても、吊り具6を係合する貫通孔51を変更するだけで吊り具6の取り付け位置を容易に変更することができる。
また、プレート部5の上面に配線7や配管7を設置することができるので、配線7や配管7を室内に露出させることがない。
また、プレート部5は、取付部4及び定着部3を介してコンクリートに吊り下げられており、デッキプレート2に吊り下げられているわけではないので、デッキプレート2が脱落するおそれもない。特に、フラットデッキは、コンクリート部10との密着性に欠けるが、定着部3がコンクリート部10に埋設されているので、フラットデッキとコンクリート部10の合成構造として、床スラブ100の強度・剛性を高めることができる。
As described above, the ceiling unit 1 is provided with the mounting portion 4 to which the hanging device 6 is attached, which is continuous with the anchoring portion 3 integrated with the concrete portion 10, so that there is no need to provide an insert member (for the hanging device) for integrating with the concrete when pouring the concrete in order to install the hanging device 6 in advance. Furthermore, even if the hanging position is changed after the construction of the floor slab 100, this can be accommodated by attaching a member to the mounting portion 4 that guides the hanging device 6 to the new hanging position.
Furthermore, by providing the plate portion 5 on the mounting portion 4, the hanging device 6 can be provided on the plate portion 5. Here, since the plate portion 5 is formed with a plurality of through holes 51 each having a thread groove 52, the through holes 51 can be used as an engagement portion for the hanging device 6, and even if the hanging position is changed after the construction of the floor slab 100, the attachment position of the hanging device 6 can be easily changed by simply changing the through holes 51 that engage the hanging device 6.
Furthermore, since the wiring 7 and piping 7 can be installed on the upper surface of the plate portion 5, the wiring 7 and piping 7 are not exposed to the interior of the room.
In addition, since the plate portion 5 is suspended from the concrete via the mounting portion 4 and the anchoring portion 3, and not suspended from the deck plate 2, there is no risk of the deck plate 2 falling off. In particular, the flat deck lacks adhesion to the concrete portion 10, but since the anchoring portion 3 is embedded in the concrete portion 10, the composite structure of the flat deck and the concrete portion 10 can increase the strength and rigidity of the floor slab 100.

また、定着部3、取付部4及びプレート部5は、デッキプレート2にプレキャストさせることができるので、事前に工場で天井ユニット1として製作しておくことができ、施工現場での作業を軽減することができる。
また、プレート部5には、複数の貫通孔51が形成されているので、プレート部5の軽量化を図ることができる。
また、貫通孔51を介してプレート部5の上方の空間と下方の空間の空気の循環が可能となり、プレート部5とデッキプレート2の間の空間をパッシブ空調に利用可能となる。
また、貫通孔51から光を透過させることができるので、プレート部5とデッキプレート2の間の空間に間接照明を設置することができる。
また、プレート部5を天井の下地として用いることもできる。
In addition, since the fixing portion 3, the mounting portion 4 and the plate portion 5 can be precast onto the deck plate 2, they can be manufactured in advance as a ceiling unit 1 in a factory, thereby reducing the work at the construction site.
Furthermore, since the plate portion 5 has a plurality of through holes 51 formed therein, the weight of the plate portion 5 can be reduced.
In addition, air can circulate between the spaces above and below the plate portion 5 through the through holes 51, making it possible to use the space between the plate portion 5 and the deck plate 2 for passive air conditioning.
In addition, since light can be transmitted through the through hole 51, indirect lighting can be installed in the space between the plate portion 5 and the deck plate 2.
The plate portion 5 can also be used as a base for a ceiling.

<その他>
なお、本発明は、上記実施の形態に限られるものではない。
例えば、プレート部5の貫通孔51にねじ溝52を形成することなく、単なる孔とし、吊り具に螺合するナットで吊り具を固定するようにしてもよい。
天井ユニット1は、QLデッキプレートや鉄筋付デッキプレート等のように、あらゆるデッキプレート2を用いて構成することができる。
また、プレート部5は、上述のように側面視した際に波形状に形成されているものに限らず、側面視した際に凹凸のない平板状に形成されていてもよい。
<Other>
The present invention is not limited to the above-described embodiment.
For example, the through hole 51 of the plate portion 5 may be a simple hole without forming the screw groove 52, and the hanging tool may be fixed by a nut that screws onto the hanging tool.
The ceiling unit 1 can be constructed using any deck plate 2, such as a QL deck plate or a reinforced deck plate.
Furthermore, the plate portion 5 is not limited to being formed in a corrugated shape when viewed from the side as described above, but may be formed in a flat plate shape with no irregularities when viewed from the side.

1 天井ユニット
2 デッキプレート
21 リブ
22 平坦部
23 エンドクローズ部
24 突条部
3 定着部
31 係止部
4 取付部
41 ねじ溝
42 ナット
5 プレート部
51 貫通孔(係合部)
52 ねじ溝
6 吊り具
7 配線、配管
10 コンクリート部
100 床スラブ
REFERENCE SIGNS LIST 1 Ceiling unit 2 Deck plate 21 Rib 22 Flat portion 23 End closed portion 24 Protrusion portion 3 Fixing portion 31 Locking portion 4 Mounting portion 41 Thread groove 42 Nut 5 Plate portion 51 Through hole (engagement portion)
52 Screw groove 6 Hanging fixture 7 Wiring, piping 10 Concrete part 100 Floor slab

Claims (6)

デッキプレートを備える天井ユニットであって、
前記デッキプレートの一方の面に延在し、前記デッキプレートへのコンクリート打設時に当該コンクリートと一体化される定着部と、
前記デッキプレートの他方の面に延在して前記定着部に連続し、吊り具が取り付けられる取付部と、
前記取付部に設けられ、前記吊り具の係合部が幅方向及び長さ方向に沿って複数形成されたプレート部と、を備え
前記係合部は、貫通孔であり、
前記貫通孔には、前記吊り具に螺合するねじ溝が形成されていることを特徴とする天井ユニット。
A ceiling unit having a deck plate,
An anchoring portion extending on one surface of the deck plate and integrated with the concrete when concrete is poured onto the deck plate;
An attachment portion extending on the other surface of the deck plate and continuing to the fixing portion, to which a hoisting tool is attached;
a plate portion provided on the mounting portion, the plate portion having a plurality of engagement portions for the suspender formed along the width direction and the length direction ;
The engagement portion is a through hole,
A ceiling unit characterized in that the through hole has a threaded groove formed therein for screwing into the hanging device .
前記プレート部は、波形状に形成されていることを特徴とする請求項に記載の天井ユニット。 The ceiling unit according to claim 1 , wherein the plate portion is formed in a corrugated shape. 前記定着部は、前記デッキプレートの厚さ方向に交差する方向に延在する係止部を備えることを特徴とする請求項1又は2に記載の天井ユニット。 The ceiling unit according to claim 1 or 2 , characterized in that the fixing portion has a locking portion extending in a direction intersecting the thickness direction of the deck plate. デッキプレートを備える天井ユニットであって、
前記デッキプレートの一方の面に延在し、前記デッキプレートへのコンクリート打設時に当該コンクリートと一体化される定着部と、
前記デッキプレートの他方の面に延在して前記定着部に連続し、吊り具が取り付けられる取付部と、
前記取付部に設けられ、前記吊り具の係合部が複数形成されたプレート部と、を備え、
前記係合部は、貫通孔であり、
前記貫通孔には、前記吊り具に螺合するねじ溝が形成されていることを特徴とする天井ユニット。
A ceiling unit having a deck plate,
An anchoring portion extending on one surface of the deck plate and integrated with the concrete when concrete is poured onto the deck plate;
An attachment portion extending on the other surface of the deck plate and continuing to the fixing portion, to which a hoisting tool is attached;
a plate portion provided on the mounting portion and having a plurality of engagement portions for the suspender,
The engagement portion is a through hole,
A ceiling unit characterized in that the through hole has a threaded groove formed therein for screwing into the hanging device.
前記プレート部は、波形状に形成されていることを特徴とする請求項4に記載の天井ユニット。The ceiling unit according to claim 4, wherein the plate portion is formed in a corrugated shape. 前記定着部は、前記デッキプレートの厚さ方向に交差する方向に延在する係止部を備えることを特徴とする請求項4又は5に記載の天井ユニット。The ceiling unit according to claim 4 or 5, characterized in that the fixing portion has a locking portion extending in a direction intersecting the thickness direction of the deck plate.
JP2021013815A 2021-01-29 2021-01-29 Ceiling unit Active JP7630289B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2021013815A JP7630289B2 (en) 2021-01-29 2021-01-29 Ceiling unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2021013815A JP7630289B2 (en) 2021-01-29 2021-01-29 Ceiling unit

Publications (2)

Publication Number Publication Date
JP2022117232A JP2022117232A (en) 2022-08-10
JP7630289B2 true JP7630289B2 (en) 2025-02-17

Family

ID=82749551

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2021013815A Active JP7630289B2 (en) 2021-01-29 2021-01-29 Ceiling unit

Country Status (1)

Country Link
JP (1) JP7630289B2 (en)

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2579591Y2 (en) 1991-12-26 1998-08-27 株式会社竹中工務店 Hanging bolt mounting structure
JP2000170310A (en) 1998-12-04 2000-06-20 Sawata Kenzaisha:Kk Ceiling board mounting hanger
JP2014051792A (en) 2012-09-05 2014-03-20 Oono Bankin Co Ltd Roof structure
JP2017180058A (en) 2016-03-31 2017-10-05 三機工業株式会社 Suspension structure with insert fitted on deck plate with reinforcement truss and ceiling equipment hung and supported underneath on lower floor, and fitting method for ceiling equipment underneath deck plate with reinforcement truss using insert
JP2019039157A (en) 2017-08-23 2019-03-14 公益財団法人鉄道総合技術研究所 Ceiling structure

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2579591Y2 (en) 1991-12-26 1998-08-27 株式会社竹中工務店 Hanging bolt mounting structure
JP2000170310A (en) 1998-12-04 2000-06-20 Sawata Kenzaisha:Kk Ceiling board mounting hanger
JP2014051792A (en) 2012-09-05 2014-03-20 Oono Bankin Co Ltd Roof structure
JP2017180058A (en) 2016-03-31 2017-10-05 三機工業株式会社 Suspension structure with insert fitted on deck plate with reinforcement truss and ceiling equipment hung and supported underneath on lower floor, and fitting method for ceiling equipment underneath deck plate with reinforcement truss using insert
JP2019039157A (en) 2017-08-23 2019-03-14 公益財団法人鉄道総合技術研究所 Ceiling structure

Also Published As

Publication number Publication date
JP2022117232A (en) 2022-08-10

Similar Documents

Publication Publication Date Title
US6920724B1 (en) Bracket for a structural panel and a structural panel made with such a bracket
WO1998051889A1 (en) Bracket for interconnecting a building stud to primary structural components
KR20190119570A (en) Ceiling structure with increased workability and space utilization and construction method
US4637175A (en) Construction for fastening parts to a concrete wall
JP2017180058A (en) Suspension structure with insert fitted on deck plate with reinforcement truss and ceiling equipment hung and supported underneath on lower floor, and fitting method for ceiling equipment underneath deck plate with reinforcement truss using insert
CA3080594A1 (en) Decking anchor, decking system utilizing the decking anchor, and method of installing the decking anchor
JP7630289B2 (en) Ceiling unit
CN112663823A (en) Sliding groove type prefabricated fixing component, manufacturing and using method thereof and equipment installation method
JP2008281083A (en) Pipe support metal fitting
JP2013104208A (en) Member holding device used for construction joint part of concrete
CN112663822B (en) Mounting rack used between masonry structure walls
US6634151B1 (en) Support apparatus for supporting one or more objects from a concrete structure
JP7409945B2 (en) Ceiling hanging bracket and how to fix the ceiling hanging bracket
KR20100002506A (en) Built-up beam having profiled steel web
KR200286055Y1 (en) Anchor bolt fastener and spacer for reinforcement bar arrangement of building
KR100213561B1 (en) Composite deck plate for construction
KR200289587Y1 (en) Anchor bolt fastener for slab of building
JP2020159153A (en) Wall tie mount metal fitting and connection structure of temporary scaffold using metal fitting
KR19990042947A (en) Support structure of slab for high rise apartment
GB2416011A (en) Anchor device
JPH0742752B2 (en) Floor structure in buildings
JP2719636B2 (en) Composite hollow slab
KR0140138Y1 (en) Variable Formwork Panels
AU2009100419A4 (en) Open web lateral load distributing joist assembly
WO2008115082A1 (en) An adjustable washer system for building elements

Legal Events

Date Code Title Description
RD07 Notification of extinguishment of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7427

Effective date: 20210811

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20211220

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20231002

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20240531

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20240604

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20240719

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20241002

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20241101

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20250121

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20250204

R150 Certificate of patent or registration of utility model

Ref document number: 7630289

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150