JP4202548B2 - Pile foundation - Google Patents
Pile foundation Download PDFInfo
- Publication number
- JP4202548B2 JP4202548B2 JP24589099A JP24589099A JP4202548B2 JP 4202548 B2 JP4202548 B2 JP 4202548B2 JP 24589099 A JP24589099 A JP 24589099A JP 24589099 A JP24589099 A JP 24589099A JP 4202548 B2 JP4202548 B2 JP 4202548B2
- Authority
- JP
- Japan
- Prior art keywords
- pile
- ground
- support
- small
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims description 21
- 239000010959 steel Substances 0.000 claims description 21
- 239000000945 filler Substances 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 description 8
- 238000010276 construction Methods 0.000 description 7
- 238000000034 method Methods 0.000 description 7
- 230000035515 penetration Effects 0.000 description 4
- 238000005553 drilling Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 239000011280 coal tar Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
Images
Landscapes
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
- Piles And Underground Anchors (AREA)
Description
【0001】
【発明の属する技術分野】
本発明は、杭基礎、杭基礎の施工方法及び支持杭に関する。
【0002】
【従来の技術】
軟弱層が厚く堆積した広域地盤沈下帯では、軟弱地盤の地盤沈下により、杭に負の下向きの摩擦力が働き、建設後に不同沈下を生じることがある。そのため、その対策として、従来より、軟弱地盤の下に存在する支持地盤への杭の根入れを深くし、杭先端の支持力と正の摩擦力を大きくすることや、負の摩擦力の作用する杭上部にコールタールを塗布してスリップレイヤーを設け、杭に作用する負の摩擦力を小さくすることなどが行われていた。
【0003】
【発明が解決しようとする課題】
しかしながら、支持地盤への杭の根入れを深くすることは、施工上の困難性が大きいという問題がある。即ち、杭打ち中、杭には、その全長にわたって正の摩擦力が作用するため、相当大きな力で杭打ちを行わなければ、支持地盤への杭の根入れを深くすることは難しい。そのため、例えば住宅用の小型杭打ち機では、施工は困難である。
【0004】
また、スリップレイヤーを設けることは、コストを上昇させると共に、施工に手間を要するという問題がある。例えば住宅用のなどに用いられる杭では、このスリップレイヤーの採用は難しい。
【0005】
本発明は、上記のような従来の問題点に鑑み、小さな杭打ち力で支持地盤への支持杭の根入れを深くすることができ、しかも、軟弱地盤の地盤沈下による不同沈下の発生をスリップレイヤーを設けなくとも有効的、効果的に防ぐことができる構造の杭基礎、杭基礎の施工方法及び支持杭を提供することを課題とする。
【0006】
【課題を解決するための手段】
上記の課題は、支持杭が軟弱地盤を介してその下の支持地盤に達するよう打ち込まれた杭基礎において、この支持杭は、軟弱地盤に地盤沈下が発生した際に負の摩擦力の作用する長さ領域部分の横断面外周長さ寸法が、その下の正の摩擦力の作用する長さ領域部分の横断面外周長さ寸法よりも小に設定されていることを特徴とする杭基礎及びその支持杭によって解決される。
【0007】
この構造では、軟弱地盤に地盤沈下が発生して、支持杭に、負の摩擦力が作用しても、この負の摩擦力の作用する部分の横断面外周長さ寸法は小さく設定されているので、軟弱地盤との接触面積は小さく、そのため、負の摩擦力は小さく抑えられる。従って、支持地盤への支持杭の根入れをあまり深くしなくとも、また、スリップレイヤーを設けなくとも、不同沈下の発生を有効的、効果的に防ぐことができる。
【0008】
しかも、負の摩擦力の作用する長さ領域部分は、正の摩擦力の作用する長さ領域部分の上方に位置しているから、支持杭の打込みの過程では、正の摩擦力の作用する長さ領域部分と周囲地盤との打込み摩擦力は大きいけれども、負の摩擦力の作用する長さ領域部分と周囲地盤との摩擦力は非常に小さく、そのため、支持杭を、小さな打込み力で、支持地盤に深く根入れすることができ、小型の杭打ち機での施工も可能となる。従ってまた、このように根入れ深さを大きくすることができることでも、軟弱地盤の地盤沈下による不同沈下の発生を有効的、効果的に防ぐことができる。
【0009】
また、支持杭は、負の摩擦力の作用する部分の横断面外周長さ寸法を小さく設定しているから、杭の材料コストを削減することが可能である。
【0010】
上記の杭基礎において、支持杭が鋼管杭からなり、軟弱地盤に地盤沈下が発生した際に負の摩擦力の作用する長さ領域部分の外径が、その下の正の摩擦力の作用する長さ領域部分の外径よりも小に設定され、かつ、外径の小さい長さ領域部分の鋼管内にはコンクリート等の構造用充填材が充填されている構造とする場合は、外径の小さい長さ領域部分の耐力を高めることができる。従ってまた、このように充填材の充填で外径の小さい長さ領域部分の耐力が高められるから、外径の小さいこの長さ領域部分の外径をより一層小さくすることができて、軟弱地盤の地盤沈下による負の摩擦力をより一層小さいものにすることができる。
【0011】
上記の杭基礎の施工を、支持杭の先端部に掘削刃を備えさせ、支持杭を回転させながら圧入していくという方法で行うことにより、支持層への支持杭の貫入を小さな力でより深くすることが可能となる。
【0012】
【発明の実施の形態】
次に、本発明の実施形態を図面に基づいて説明する。
【0013】
図1は、支持杭の打設時の状態を示すもので、1は軟弱地盤、2はその下の支持地盤である。図1(イ)は、実施形態の支持杭3を用いた場合のものであり、図1(ロ)は、従来の支持杭53を用いた場合のものである。
【0014】
図2は、軟弱地盤1に地盤沈下を生じた際の状態を示す。図2(イ)は、実施形態の支持杭3を用いた杭基礎4の場合のもので、図2(ロ)は従来の支持杭53を用いた杭基礎54の場合のものである。
【0015】
実施形態の支持杭3は、鋼管杭からなり、軟弱地盤1を介してその下の支持地盤2に達するよう打ち込まれる。この支持杭3は、図2(イ)に示すように、軟弱地盤1に地盤沈下が発生した際に負の摩擦力Rnfの作用する長さ領域部分5の外周直径が、その下の正の摩擦力Rfの作用する長さ領域部分6の外周直径よりも小に設定されているもので、大径鋼管6を下杭とし、小径鋼管5を上杭として、これら外径の異なる上下の杭材5,6を連結して構成されているものである。下杭である大径鋼管6の先端部には、掘削刃7が取り付けられている。小径鋼管5には、図示しないが、その内部にコンクリートあるいはモルタルなどからなる構造用充填材が充填され、それにより、小径鋼管5の耐力が確保されている。
【0016】
一方、従来の支持杭53も同じく鋼管杭からなり、その全長にわたって、その外径が同一であり、その外径は、実施形態の支持杭3における大径鋼管6の外径と同じものである。
【0017】
図1(イ)に示すように、実施形態の支持杭3では、回転圧入による打設の過程で、大径鋼管部分6の外周面は、周囲の地盤1,2と接触し、その接触面積も大きいが、小径鋼管部分5は、大径鋼管部分6によって掘られた穴8の内周面から離間して軟弱地盤1に入っていくので、周囲の地盤1との接触はないか、あるいは、あってもわずかである。従って、打設時に実施形態の支持杭3に作用する正の摩擦力Rfは、主として大径鋼管部分6において作用するだけであり、そのため、この支持杭3を、小さな杭打ち力で、支持地盤2に深く根入れすることができる。掘削刃7はその効果をより一層大きなものにする。
【0018】
これに対し、従来の支持杭53では、図1(ロ)に示すように、打設の過程で、その外周面がその全長にわたって周囲の地盤1,2と接触し、その接触面積が、実施形態の支持杭3の場合とは比べものにならないほど大きい。そのため、打設時の正の摩擦力Rfは、支持杭53の全長にわたって作用し、そのため、この支持杭53は、これを大きな杭打ち力で打ち込んでいかなければならず、にもかかわらず、支持地盤2に深く根入れするのはなかなかに難しい。
【0019】
このように、実施形態の支持杭3によれば、小さな杭打ち力で支持地盤2への支持杭3の根入れを深くすることができる。
【0020】
そして、軟弱地盤1に地盤沈下が発生した場合は、図2(イ)に示すように、負の摩擦力Rnfは、主として小径鋼管5の外周面に作用し、この小径鋼管5は、外径が小さく、そのため周囲地盤1との接触面積が小さいから、支持杭3に作用する負の摩擦力Rnfは小さい。そのため、軟弱地盤1に地盤沈下による不同沈下の発生は防がれる。また、上記のように支持地盤2への根入れ深さを大きくし得ることからも、不同沈下の発生をより一層有効的に防ぐことができる。更に、小径鋼管部分5には、その内部に構造用充填材が充填されているから、この部分が軟弱地盤1の地盤沈下による軸方向圧縮力によって座屈してしまうこともない。なお、Pは杭頭荷重、Rpは杭先端の支持力である。
【0021】
これに対し、従来の支持杭53では、軟弱地盤1に地盤沈下が発生した場合は、図2(ロ)に示すように、軟弱地盤1中における支持杭53と地盤1との接触面積は非常に大きいから、支持杭53に作用する負の摩擦力Rnfが非常に大きい。そのため、この負の摩擦力Rnfの作用によって、軟弱地盤1の地盤沈下による不同沈下の発生を生じることが起こり得る。
【0022】
このように、実施形態の支持杭3によれば、軟弱地盤1に地盤沈下を生じても、不同沈下の発生を有効的、効果的に防ぐことができる。
【0023】
以上に、本発明の実施形態を従来例との比較において示したが、本発明はこれに限られるものではなく、発明思想を逸脱しない範囲で、各種の変更が可能である。例えば、本発明は、支持杭3の真上を基礎とする杭基礎4に適用される場合に限らず、その他、不同沈下建物の水平修復のために、基礎の側近に支持杭を打ち、この支持杭に偏心荷重を負担させる形式の修復用杭基礎構造に適用されてもよい。この水平修復工法に本発明構造を用いることで、修復用の支持杭を小さな杭打ち機で深く打ち込んでいくことが可能である。また、本発明の支持杭の施工は、回転圧入法以外の打込み法で行われてもよいことはいうまでもない。
【0024】
【発明の効果】
上述の次第で、本発明は、上記のような構成を有するものであるから、小さな杭打ち力で支持地盤への支持杭の根入れを深くすることができ、しかも、軟弱地盤の地盤沈下による不同沈下の発生をスリップレイヤーを設けなくとも有効的、効果的に防ぐことができる。
【図面の簡単な説明】
【図1】支持杭の打設時の状態を示すもので、図(イ)は実施形態を、図(ロ)は従来を示す断面側面図である。
【図2】軟弱地盤に地盤沈下を生じた状態を示すもので、図(イ)は実施形態を、図(ロ)は従来例を示す断面側面図である。
【符号の説明】
1…軟弱地盤
2…支持地盤
3…支持杭
4…杭基礎
5…小径鋼管(負の摩擦力の作用する長さ領域部分)
6…大径鋼管(正の摩擦力の作用する長さ領域部分)
7…掘削刃[0001]
BACKGROUND OF THE INVENTION
The present invention relates to a pile foundation, a pile foundation construction method, and a support pile.
[0002]
[Prior art]
In a wide land subsidence zone where the soft layer is thickly deposited, a negative downward frictional force acts on the pile due to the land subsidence of the soft ground, which may cause uneven settlement after construction. Therefore, as countermeasures, it has been necessary to deepen the penetration of the pile into the supporting ground existing under the soft ground to increase the supporting force and the positive frictional force at the tip of the pile, and the action of negative frictional force. Coal tar was applied to the upper part of the pile to be provided with a slip layer to reduce the negative frictional force acting on the pile.
[0003]
[Problems to be solved by the invention]
However, deepening the piles into the supporting ground has a problem that the construction is difficult. That is, during pile driving, a positive frictional force acts on the pile over its entire length, so it is difficult to deepen the pile into the support ground unless the pile driving is performed with a considerable force. Therefore, for example, construction is difficult with a small pile driver for a house.
[0004]
In addition, the provision of the slip layer raises the cost and has the problem of requiring labor for construction. For example, it is difficult to adopt this slip layer for a pile used for housing.
[0005]
In view of the conventional problems as described above, the present invention can deepen the support pile into the support ground with a small pile driving force, and slips the occurrence of the uneven settlement due to the ground subsidence of the soft ground. It is an object to provide a pile foundation having a structure that can be effectively and effectively prevented without providing a layer, a method for constructing the pile foundation, and a support pile.
[0006]
[Means for Solving the Problems]
The above problem is that, in a pile foundation that is driven so that the support pile reaches the support ground below it through the soft ground, this support pile is subjected to negative frictional force when subsidence occurs in the soft ground A pile foundation characterized in that the outer peripheral length dimension of the cross section of the length region portion is set smaller than the outer peripheral length dimension of the cross section of the length region portion under which the positive frictional force acts, and It is solved by the support pile.
[0007]
In this structure, even if a ground subsidence occurs in the soft ground and a negative friction force acts on the support pile, the outer peripheral length dimension of the cross section of the portion where the negative friction force acts is set small. Therefore, the contact area with the soft ground is small, so that the negative frictional force can be kept small. Therefore, even if the support pile is not deeply embedded in the support ground and the slip layer is not provided, the occurrence of the uneven settlement can be effectively and effectively prevented.
[0008]
Moreover, since the length region portion where the negative friction force acts is located above the length region portion where the positive friction force acts, the positive friction force acts in the process of driving the support pile. Although the driving friction force between the length region and the surrounding ground is large, the friction force between the length region where the negative friction force acts and the surrounding ground is very small. It can be deeply embedded in the support ground and can be constructed with a small pile driver. Accordingly, the fact that the depth of penetration can be increased in this way can also effectively and effectively prevent the occurrence of uneven settlement due to ground settlement of soft ground.
[0009]
Moreover, since the support pile has set the cross-sectional outer periphery length dimension of the part to which a negative frictional force acts small, it is possible to reduce the material cost of a pile.
[0010]
In the above pile foundation, the support pile is made of steel pipe pile, and when the ground subsidence occurs in the soft ground, the outer diameter of the length region where the negative frictional force acts is the positive frictional force below it When the structure is such that the steel pipe of the length region portion having a small outer diameter is set to be smaller than the outer diameter of the length region portion and the structural filler such as concrete is filled, The yield strength of the small length region can be increased. Accordingly, since the proof stress of the length region portion having a small outer diameter is increased by filling the filler as described above, the outer diameter of the length region portion having a small outer diameter can be further reduced, and the soft ground The negative frictional force due to the ground subsidence can be further reduced.
[0011]
By carrying out the above pile foundation construction by providing a drilling blade at the tip of the support pile and press-fitting while rotating the support pile, the support pile can be penetrated into the support layer with a small force. It becomes possible to deepen.
[0012]
DETAILED DESCRIPTION OF THE INVENTION
Next, embodiments of the present invention will be described with reference to the drawings.
[0013]
FIG. 1 shows a state at the time of placing a support pile, where 1 is a soft ground and 2 is a support ground therebelow. FIG. 1 (a) shows a case where the
[0014]
FIG. 2 shows a state when ground subsidence occurs in the
[0015]
The
[0016]
On the other hand, the
[0017]
As shown in FIG. 1 (a), in the
[0018]
On the other hand, in the
[0019]
Thus, according to the
[0020]
When ground subsidence occurs in the
[0021]
On the other hand, in the
[0022]
Thus, according to the
[0023]
As mentioned above, although embodiment of this invention was shown in the comparison with a prior art example, this invention is not limited to this, A various change is possible in the range which does not deviate from an invention thought. For example, the present invention is not limited to the case where the present invention is applied to a
[0024]
【The invention's effect】
As described above, since the present invention has the above-described configuration, it is possible to deepen the support pile into the support ground with a small pile driving force, and due to the ground subsidence of the soft ground. The occurrence of uneven settlement can be effectively and effectively prevented without providing a slip layer.
[Brief description of the drawings]
FIG. 1 shows a state at the time of placing a support pile, in which FIG. (A) is an embodiment and FIG. (B) is a sectional side view showing a conventional one.
FIG. 2 shows a state in which ground subsidence has occurred in soft ground. FIG. (A) is an embodiment and FIG. (B) is a sectional side view showing a conventional example.
[Explanation of symbols]
DESCRIPTION OF
6 ... Large diameter steel pipe (length area where positive frictional force acts)
7 ... Drilling blade
Claims (1)
前記外径の小さい長さ領域部分の鋼管内にはコンクリート等の構造用充填材が充填されていることを特徴とする杭基礎。 When the ground subsidence occurs in the soft ground, the outer diameter of the length area where the negative friction force acts is set smaller than the outer diameter of the length area where the positive friction force acts A pile foundation formed by driving a support pile made of steel pipe piles into the support ground under the soft ground without slip layer and by pressing it in while rotating.
A pile foundation characterized in that a structural filler such as concrete is filled in a steel pipe in a length region portion having a small outer diameter.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24589099A JP4202548B2 (en) | 1999-08-31 | 1999-08-31 | Pile foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP24589099A JP4202548B2 (en) | 1999-08-31 | 1999-08-31 | Pile foundation |
Publications (2)
Publication Number | Publication Date |
---|---|
JP2001064964A JP2001064964A (en) | 2001-03-13 |
JP4202548B2 true JP4202548B2 (en) | 2008-12-24 |
Family
ID=17140345
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP24589099A Expired - Fee Related JP4202548B2 (en) | 1999-08-31 | 1999-08-31 | Pile foundation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP4202548B2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU219792U1 (en) * | 2022-12-12 | 2023-08-07 | Общество с ограниченной ответственностью "НК "Роснефть" - Научно-Технический Центр" | VARIABLE SECTION PILE |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040052779A (en) * | 2004-03-20 | 2004-06-23 | 윤 용 송 | Pile with an Extended Head and working method of the same |
KR100760888B1 (en) * | 2005-05-30 | 2007-09-21 | 송기용 | Head extension pile with internal and external reinforcement |
CN104131550B (en) * | 2014-07-17 | 2016-02-03 | 河海大学 | A kind of variable diameters steel pipe combination stake reducing negative friction |
CN112211183B (en) * | 2020-09-30 | 2021-11-12 | 南京工程学院 | Device for reducing drag by negative friction and transmitting positive friction on prefabricated piles and using method |
-
1999
- 1999-08-31 JP JP24589099A patent/JP4202548B2/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU219792U1 (en) * | 2022-12-12 | 2023-08-07 | Общество с ограниченной ответственностью "НК "Роснефть" - Научно-Технический Центр" | VARIABLE SECTION PILE |
Also Published As
Publication number | Publication date |
---|---|
JP2001064964A (en) | 2001-03-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP5932124B1 (en) | Steel pipe pile construction method | |
JPS60500875A (en) | Method and device for constructing reinforced concrete walls underground | |
JP2003232033A (en) | Foundation pile structure | |
JP6847899B2 (en) | Ring-shaped tip hardware | |
JPS5985028A (en) | Steel pipe pile and laying work thereof | |
JP4202548B2 (en) | Pile foundation | |
JP4195707B2 (en) | Screw shaft used to form improved body | |
JP3135220B2 (en) | Flanged expanded steel pipe pile | |
RU2238366C1 (en) | Method of injection pile building | |
JPS6115209B2 (en) | ||
JP2690361B2 (en) | Pile construction method | |
JP6093458B1 (en) | Construction method of subsidence structure | |
JP3932069B2 (en) | Construction method for hollow ready-made piles | |
JPH06272244A (en) | Execution method for tip opened pile | |
JP4481662B2 (en) | Pile setting method and blade plate | |
JP3170604B2 (en) | Steel pipe construction method by medium digging method | |
JPS6110624A (en) | Pile erecting method | |
JP3011381B2 (en) | Construction method of rotary penetration steel pipe pile | |
JPS63114719A (en) | Foundation pile | |
JPH0121288B2 (en) | ||
JP3680953B2 (en) | Root structure of ready-made piles by embedded pile method | |
JPS62170614A (en) | Steel pipe pile construction method | |
JPS6319390Y2 (en) | ||
JPS6350484B2 (en) | ||
JPS6129786Y2 (en) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20060821 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20080225 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080311 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080512 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20080701 |
|
A521 | Written amendment |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20080806 |
|
TRDD | Decision of grant or rejection written | ||
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 Effective date: 20081007 |
|
A01 | Written decision to grant a patent or to grant a registration (utility model) |
Free format text: JAPANESE INTERMEDIATE CODE: A01 |
|
A61 | First payment of annual fees (during grant procedure) |
Free format text: JAPANESE INTERMEDIATE CODE: A61 Effective date: 20081009 |
|
R150 | Certificate of patent or registration of utility model |
Free format text: JAPANESE INTERMEDIATE CODE: R150 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20111017 Year of fee payment: 3 |
|
FPAY | Renewal fee payment (event date is renewal date of database) |
Free format text: PAYMENT UNTIL: 20141017 Year of fee payment: 6 |
|
LAPS | Cancellation because of no payment of annual fees |