[go: up one dir, main page]

JP2673634B2 - How to connect the underground wall to the floor - Google Patents

How to connect the underground wall to the floor

Info

Publication number
JP2673634B2
JP2673634B2 JP4161626A JP16162692A JP2673634B2 JP 2673634 B2 JP2673634 B2 JP 2673634B2 JP 4161626 A JP4161626 A JP 4161626A JP 16162692 A JP16162692 A JP 16162692A JP 2673634 B2 JP2673634 B2 JP 2673634B2
Authority
JP
Japan
Prior art keywords
steel sheet
screw rod
horizontal screw
sheet pile
horizontal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
JP4161626A
Other languages
Japanese (ja)
Other versions
JPH05331843A (en
Inventor
和之 田崎
甫 三木
昌毅 龍田
俊雄 渡辺
浩 古部
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nippon Steel Corp
Shimizu Corp
Original Assignee
Nippon Steel Corp
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nippon Steel Corp, Shimizu Corp filed Critical Nippon Steel Corp
Priority to JP4161626A priority Critical patent/JP2673634B2/en
Publication of JPH05331843A publication Critical patent/JPH05331843A/en
Application granted granted Critical
Publication of JP2673634B2 publication Critical patent/JP2673634B2/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Foundations (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【産業上の利用分野】本発明は、土留め用地中連続壁と
コンクリート製床盤との連結方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for connecting a continuous underground wall for retaining soil and a concrete floorboard.

【0002】[0002]

【従来の技術】従来、鋼矢板からなる地中連続壁とコン
クリート製床盤とを連結する方式として、(1)予め鉄
筋を溶接により固着した鋼板を、地中連続壁の鋼矢板に
溶接またはボルトにより固定し、次に地中連続壁を被覆
する側壁用コンクリートおよび前記鉄筋を埋込む床盤コ
ンクリートを打設する方式、(2)地中連続壁鋼矢板
に、スタッド鉄筋を直接溶接により固定し、次に地中連
続壁を被覆する側壁用コンクリートおよびスタッド鉄筋
を埋込む床盤コンクリートを打設する方式が知られてい
る。
2. Description of the Related Art Conventionally, as a method of connecting an underground continuous wall made of steel sheet pile and a concrete floor board, (1) a steel plate having reinforcing bars fixed in advance by welding is welded to a steel sheet pile of the underground continuous wall or Fixing with bolts, then placing concrete for sidewalls covering the underground wall and floor concrete for embedding the reinforcing bars, (2) Fixing stud rebars directly to steel sheet piles in the underground wall by welding Then, a method of placing concrete for the side wall covering the underground continuous wall and floor concrete for embedding the stud rebar is known.

【0003】[0003]

【発明が解決しようとする課題】前記従来の方式におい
て、鋼矢板に鋼板またはスタッド鉄筋を溶接する場合
は、水分の多い現場での溶接であるため、溶接品質の管
理が難しく、熟練した溶接工を必要とした。また溶接を
する場合、現場の環境が悪くなる傾向にあった。さらに
スタッド鉄筋を溶接する場合は、水平方向に直径22mm
のスタッド鉄筋を溶接するのが施工上の限界であるた
め、大断面の床盤には用いることができないなどの問題
があった。
In the conventional method described above, when a steel sheet or a stud rebar is welded to a steel sheet pile, it is difficult to control the welding quality because it is welding at a site where the water content is high, and a skilled welder is required. Needed. Also, when welding, the environment at the work site tended to deteriorate. When welding stud rebar, the diameter is 22 mm in the horizontal direction.
There is a problem that welding of the stud rebar of No. 1 cannot be applied to a floorboard having a large cross-section because it is the limit of construction.

【0004】[0004]

【課題を解決するための手段】前述の問題を有利に解決
するために、本発明の地中連続壁と床盤との連結方法に
おいては、平行なフランジ1,2を有する鋼矢板3にお
ける各フランジ1,2にわたって、横螺杆4を挿通し
て、その横螺杆4を外側のフランジ1に固定し、内側の
フランジ2から突出している横螺杆4の雄ねじ部を被覆
部材5により被覆して鋼矢板8を構成し、多数の前記横
螺杆付き鋼矢板8同士を、当該鋼矢板8に設けた継手を
介して連結しながら、地盤6に設けた溝孔7内の泥水中
に建て込んで、地中連続壁9を構築し、次にその地中連
続壁9の内側を掘削して排出したのち、横螺杆4から被
覆部材5を取外して、その横螺杆4に横鉄筋10を埋込
む床盤コンクリート13を打設する。
In order to advantageously solve the above-mentioned problems, in the method for connecting an underground continuous wall and a floorboard of the present invention, each of the steel sheet piles 3 having parallel flanges 1 and 2 is used. The horizontal screw rod 4 is inserted through the flanges 1 and 2, the horizontal screw rod 4 is fixed to the outer flange 1, and the male screw portion of the horizontal screw rod 4 projecting from the inner flange 2 is covered with the covering member 5 to make the steel. While constructing the sheet pile 8, while connecting a large number of the steel sheet piles 8 with the horizontal screw rods through a joint provided in the steel sheet pile 8, the sheet pile 8 is built in the muddy water in the groove hole 7 provided in the ground 6, A floor in which the underground continuous wall 9 is constructed, and then the inside of the underground continuous wall 9 is excavated and discharged, after which the covering member 5 is removed from the horizontal screw rod 4 and the horizontal reinforcing bar 10 is embedded in the horizontal screw rod 4. Placing concrete 13 on the board.

【0005】[0005]

【実施例】次に本発明の実施例について詳細に説明す
る。まず図1および図2に示すように、平行なフランジ
1,2を有するH形断面の鋼矢板3における外側のフラ
ンジ1の表面に、鋼製補強板14を当接して溶接により
固着し、前記鋼矢板3における内側のフランジ2の裏面
に、鋼製補強板15を当接して溶接により固着し、かつ
鋼矢板3における各フランジ1,2と各補強板14,1
5とにわたって、複数本の横螺杆4を挿通し、各横螺杆
4を、外側のフランジ1および補強板14に対し一対の
挟持用ナット16,17により固定し、内側のフランジ
2から突出している横螺杆4に、その横螺杆4の雄ねじ
部を被覆する雌ねじ付きキャップからなる被覆部材5を
螺合する。
Next, embodiments of the present invention will be described in detail. First, as shown in FIGS. 1 and 2, a steel reinforcing plate 14 is brought into contact with the surface of an outer flange 1 of a steel sheet pile 3 having an H-shaped cross section having parallel flanges 1 and 2 and fixed by welding. A steel reinforcing plate 15 is abutted and fixed by welding on the back surface of the inner flange 2 of the steel sheet pile 3, and each flange 1, 2 and each reinforcing plate 14, 1 of the steel sheet pile 3 are fixed.
5, a plurality of horizontal screw rods 4 are inserted, and each horizontal screw rod 4 is fixed to the outer flange 1 and the reinforcing plate 14 by a pair of clamping nuts 16 and 17, and protrudes from the inner flange 2. A covering member 5 made of a cap with a female screw for covering the male screw portion of the lateral screw rod 4 is screwed into the lateral screw rod 4.

【0006】前記鋼矢板3における平行フランジ1,2
のそれぞれの一端には雌継手19を設け、他端には、前
記雌継手19と係合できる雄継手20が設けられてい
る。そして、図3および図4に示すように、多数の横螺
杆付き鋼矢板8同士を前記雌継手19に雄継手20を係
合させることで連結しつつ、地盤6に設けた溝孔7内の
泥水中に建て込んで、地中連続壁9を構築する。なお、
前記横螺杆付き鋼矢板8同士の継手手段は、雄雌継手の
ほか、より簡易な汎用継手である鉤状の継手であっても
かまわない。
Parallel flanges 1 and 2 in the steel sheet pile 3
A female joint 19 is provided at one end of each of the above, and a male joint 20 capable of engaging with the female joint 19 is provided at the other end. As shown in FIGS. 3 and 4, a large number of steel sheet piles 8 with horizontal screw rods are connected to each other by engaging the female joint 19 with the male joint 20, and the inside of the groove hole 7 provided in the ground 6 is connected. It is built in muddy water to construct the underground continuous wall 9. In addition,
The joint means between the steel sheet piles 8 with the horizontal screw rods may be a male-female joint or a hook-shaped joint which is a simpler general-purpose joint.

【0007】次に図5に示すように、溝孔7にコンクリ
ート等の常温硬化性材料21を充填して硬化させたの
ち、図6に示すように、地中連続壁9の内側の地盤およ
び常温硬化性材料21を掘削して排出し、次いで被覆部
材5を横螺杆4から取外す。
Next, as shown in FIG. 5, after the room temperature hardening material 21 such as concrete is filled into the groove hole 7 and hardened, as shown in FIG. 6, the ground inside the underground continuous wall 9 and The room temperature curable material 21 is excavated and discharged, and then the covering member 5 is removed from the lateral screw rod 4.

【0008】次に図7および図8に示すように、内側の
フランジ2から突出している横螺杆4にロックナット2
2およびねじ式カップラー11を順次螺合し、かつ横鉄
筋10の端部の雄ねじ部を前記ねじ式カップラー11に
螺合すると共に、横鉄筋10に螺合したロックナット2
3を前記ねじ式カップラー11の端面に圧接させる。次
に図9および図10に示すように、横鉄筋10を埋込む
床盤コンクリート13および地中連続壁9の内側に位置
する側壁コンクリート12を打設する。
Next, as shown in FIGS. 7 and 8, the lock nut 2 is attached to the lateral screw rod 4 protruding from the inner flange 2.
2 and the screw type coupler 11 are sequentially screwed, and the male screw portion at the end of the horizontal reinforcing bar 10 is screwed to the screw type coupler 11 and the lock nut 2 screwed to the horizontal reinforcing bar 10.
3 is pressed against the end face of the screw type coupler 11. Next, as shown in FIGS. 9 and 10, floor concrete 13 in which the horizontal reinforcing bars 10 are embedded and side wall concrete 12 located inside the underground continuous wall 9 are poured.

【0009】本発明を実施する場合、鋼矢板としては、
巾方向の両側に雄継手を有する鋼矢板および巾方向の両
側に雌継手を有する鋼矢板を組合わせて使用してもよ
い。
When carrying out the present invention, as the steel sheet pile,
A steel sheet pile having male joints on both sides in the width direction and a steel sheet pile having female joints on both sides in the width direction may be used in combination.

【0010】[0010]

【発明の効果】本発明によれば、平行なフランジ1,2
を有する鋼矢板3における各フランジ1,2にわたっ
て、横螺杆4を挿通して、その横螺杆4を外側のフラン
ジ1に固定し、内側のフランジ2から突出している横螺
杆4の雄ねじ部を被覆部材5により被覆して鋼矢板8を
構成し、多数の前記横螺杆付き鋼矢板8同士を、当該鋼
矢板8に設けた継手を介して連結しながら、地盤6に設
けた溝孔7内の泥水中に建て込んで、地中連続壁9を構
築し、次にその地中連続壁9の内側を掘削して排出した
のち、横螺杆4から被覆部材5を取外して、その横螺杆
4に横鉄筋10を埋込む床盤コンクリート13を打設す
るので、水分の多い施工現場で溶接を行なう必要がな
く、任意の太さの横鉄筋10を使用して、簡単な手段に
よって地中連続壁9と床盤コンクリート13とを強力に
連結することができる。
According to the present invention, the parallel flanges 1, 2
A horizontal screw rod 4 is inserted over each of the flanges 1 and 2 of the steel sheet pile 3 having the above, the horizontal screw rod 4 is fixed to the outer flange 1, and the male screw portion of the horizontal screw rod 4 protruding from the inner flange 2 is covered. The steel sheet pile 8 is covered with the member 5 and a large number of the steel sheet piles 8 with horizontal screw rods are connected to each other through a joint provided in the steel sheet pile 8 while the inside of the groove hole 7 provided in the ground 6 is connected. After building in the muddy water to construct the underground continuous wall 9, and then excavating and discharging the inside of the underground continuous wall 9, the covering member 5 is removed from the horizontal screw rod 4, and the horizontal screw rod 4 is attached to the horizontal screw rod 4. Since the flooring concrete 13 in which the horizontal reinforcing bars 10 are embedded is placed, it is not necessary to perform welding at a construction site with high water content, and by using the horizontal reinforcing bars 10 having an arbitrary thickness, the underground continuous wall can be simply constructed. 9 and floor concrete 13 can be strongly connected

【図面の簡単な説明】[Brief description of the drawings]

【図1】横螺杆付き鋼矢板を示す平面図である。FIG. 1 is a plan view showing a steel sheet pile with a horizontal screw rod.

【図2】図1のA−A線断面図である。FIG. 2 is a sectional view taken along line AA of FIG.

【図3】横螺杆付き鋼矢板を溝孔内に建込んで地中連続
壁を構成した状態を示す横断平面図である。
FIG. 3 is a cross-sectional plan view showing a state in which a steel sheet pile with a horizontal screw rod is built in a slot to form an underground continuous wall.

【図4】図3のB−B線断面図である。FIG. 4 is a sectional view taken along line BB of FIG. 3;

【図5】溝孔内および地中連続壁内に常温硬化性材料を
充填した状態を示す縦断側面図である。
FIG. 5 is a vertical cross-sectional side view showing a state in which the room temperature curable material is filled in the groove hole and the underground continuous wall.

【図6】地中連続壁の内側を掘削して横螺杆から被覆部
材を取外した状態を示す縦断側面図である。
FIG. 6 is a vertical cross-sectional side view showing a state in which the inside of the underground continuous wall is excavated and the covering member is removed from the horizontal screw rod.

【図7】地中連続壁に横鉄筋を連結した状態を示す縦断
側面図である。
FIG. 7 is a vertical sectional side view showing a state in which a horizontal reinforcing bar is connected to an underground continuous wall.

【図8】図7の一部を拡大して示す縦断側面図である。8 is a longitudinal sectional side view showing a part of FIG. 7 in an enlarged manner.

【図9】床盤コンクリートおよび側壁コンクリートを打
設した状態を示す縦断側面図である。
FIG. 9 is a vertical sectional side view showing a state in which floor concrete and side wall concrete are cast.

【図10】図9の一部を拡大して示す縦断側面図であ
る。
FIG. 10 is a vertical sectional side view showing a part of FIG. 9 in an enlarged manner.

【符号の説明】[Explanation of symbols]

1 フランジ 2 フランジ 3 鋼矢板 4 横螺杆 5 被覆部材 6 地盤 7 溝孔 8 横螺杆付き鋼矢板 9 地中連続壁 10 横鉄筋 11 ねじ式カップラー 12 側壁コンクリート 13 床盤コンクリート 14 補強板 15 補強板 16 挟持用ナット 17 挟持用ナット 18 泥水 19 雌継手 20 雄継手 21 常温硬化性材料 22 ロックナット 23 ロックナット 1 Flange 2 Flange 3 Steel sheet pile 4 Side screw 5 Covering member 6 Ground 7 Slot hole 8 Steel sheet pile with side screw 9 Underground continuous wall 10 Horizontal rebar 11 Screw type coupler 12 Sidewall concrete 13 Floor concrete 14 Reinforcing plate 15 Reinforcing plate 16 Clamping nut 17 Clamping nut 18 Muddy water 19 Female joint 20 Male joint 21 Room temperature curable material 22 Lock nut 23 Lock nut

───────────────────────────────────────────────────── フロントページの続き (72)発明者 三木 甫 東京都千代田区大手町2丁目6番3号 新日本製鐵株式会社内 (72)発明者 龍田 昌毅 東京都千代田区大手町2丁目6番3号 新日本製鐵株式会社内 (72)発明者 渡辺 俊雄 東京都港区芝浦一丁目2番3号 清水建 設株式会社内 (72)発明者 古部 浩 東京都港区北青山二丁目5番8号 株式 会社間組内 (56)参考文献 特開 平5−321245(JP,A) 特開 昭61−102915(JP,A) 特開 平3−221612(JP,A) 特開 昭58−17918(JP,A) 特開 平1−203513(JP,A) ─────────────────────────────────────────────────── ─── Continuation of the front page (72) Inventor Miki Tsukasa 2-6-3 Otemachi, Chiyoda-ku, Tokyo Within Nippon Steel Corporation (72) Inventor Masaki Tatsuda 2-6, Otemachi, Chiyoda-ku, Tokyo No. 3 In Nippon Steel Co., Ltd. (72) Inventor Toshio Watanabe 1-2-3 Shibaura, Minato-ku, Tokyo Inside Shimizu Construction Co., Ltd. (72) Hiroshi Furube 2-chome, Kita-Aoyama, Minato-ku, Tokyo No. 8 Intra-company group (56) Reference JP 5-321245 (JP, A) JP 61-102915 (JP, A) JP 3-221612 (JP, A) JP 58-17918 (JP, A) JP-A-1-203513 (JP, A)

Claims (1)

(57)【特許請求の範囲】(57) [Claims] 【請求項1】 平行なフランジ1,2を有する鋼矢板3
における各フランジ1,2にわたって、横螺杆4を挿通
して、その横螺杆4を外側のフランジ1に固定し、内側
のフランジ2から突出している横螺杆4の雄ねじ部を被
覆部材5により被覆して鋼矢板8を構成し、多数の前記
横螺杆付き鋼矢板8同士を、当該鋼矢板8に設けた継手
を介して連結しながら、地盤6に設けた溝孔7内の泥水
中に建て込んで、地中連続壁9を構築し、次にその地中
連続壁9の内側を掘削して排出したのち、横螺杆4から
被覆部材5を取外して、その横螺杆4に横鉄筋10を埋
込む床盤コンクリート13を打設する地中連続壁と床盤
との連結方法。
1. A steel sheet pile 3 having parallel flanges 1, 2.
The horizontal screw rod 4 is inserted through each of the flanges 1 and 2 in FIG. 1, the horizontal screw rod 4 is fixed to the outer flange 1, and the male screw portion of the horizontal screw rod 4 protruding from the inner flange 2 is covered with the covering member 5. To construct a steel sheet pile 8 and connect a large number of the steel sheet piles 8 with the horizontal screw rods to each other through a joint provided in the steel sheet pile 8 while being built in the muddy water in the groove hole 7 provided in the ground 6. Then, after constructing the underground continuous wall 9, and then excavating and discharging the inside of the underground continuous wall 9, the covering member 5 is removed from the horizontal screw rod 4, and the horizontal reinforcing bar 10 is embedded in the horizontal screw rod 4. A method for connecting a continuous underground wall and a floorboard, in which the floorboard concrete 13 is placed.
JP4161626A 1992-05-29 1992-05-29 How to connect the underground wall to the floor Expired - Fee Related JP2673634B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP4161626A JP2673634B2 (en) 1992-05-29 1992-05-29 How to connect the underground wall to the floor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP4161626A JP2673634B2 (en) 1992-05-29 1992-05-29 How to connect the underground wall to the floor

Publications (2)

Publication Number Publication Date
JPH05331843A JPH05331843A (en) 1993-12-14
JP2673634B2 true JP2673634B2 (en) 1997-11-05

Family

ID=15738764

Family Applications (1)

Application Number Title Priority Date Filing Date
JP4161626A Expired - Fee Related JP2673634B2 (en) 1992-05-29 1992-05-29 How to connect the underground wall to the floor

Country Status (1)

Country Link
JP (1) JP2673634B2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122190A (en) * 2010-12-06 2012-06-28 Taisei Corp Underground structure and construction method for the same

Families Citing this family (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP4982352B2 (en) * 2007-12-25 2012-07-25 株式会社大林組 Reinforcement structure for joint between wall and floor or beam, construction method for joint between wall and floor or beam, reinforcement method for joint between wall and floor or beam
JP6333774B2 (en) * 2015-06-02 2018-05-30 日本スタッドウェルディング株式会社 Construction method for top plate joints using threaded studs and mechanical joints
JP2017206882A (en) * 2016-05-19 2017-11-24 鹿島建設株式会社 Method of constructing underground structure

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2012122190A (en) * 2010-12-06 2012-06-28 Taisei Corp Underground structure and construction method for the same

Also Published As

Publication number Publication date
JPH05331843A (en) 1993-12-14

Similar Documents

Publication Publication Date Title
JPH0135969B2 (en)
JP3770772B2 (en) Concrete wall reinforcement structure
JP2673634B2 (en) How to connect the underground wall to the floor
JPH1025735A (en) Steel material for sheathing
JPS61122320A (en) How to connect continuous underground walls and underground structures
EP0327563B1 (en) In situ brick or block making formwork
JP2880027B2 (en) Joint structure between steel pipe column and reinforced concrete slab
JPH0517961A (en) Stone piling retaining wall structure
JPH05106339A (en) Precast concrete formwork for concrete splicing
JPH08209653A (en) Form block for civil engineering and construction building, building structure using it, and construction thereof
JP3826348B2 (en) Construction method of composite wall with mountain retaining core and underground outer wall
KR100465287B1 (en) A rein forcement unit for a head of H-beam used as a pile
JPH0593423A (en) Guide wall constructing pc slab and construction method of guide wall
JP2583058B2 (en) Basement method
JP2552860B2 (en) Basement method
JP2003171928A (en) Compound underground wall body and its construction method
JP3031185B2 (en) Connection structure between steel beam and PC slab and connection method
JPS6294620A (en) Concrete member for sheathing wall
JP2569991B2 (en) Concrete removal method for reinforced concrete joints
JP3416793B2 (en) Construction method of stepped floor
JP2847422B2 (en) Masonry method of concrete block
JPH0218088Y2 (en)
JP2602362B2 (en) Thick wall and beam or floor slab joining method
JPH0439905Y2 (en)
JP2818845B2 (en) Comb-type continuous wall and its construction method

Legal Events

Date Code Title Description
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 19970617

LAPS Cancellation because of no payment of annual fees