JP2019007132A - Construction method of steel pipe sheet pile well foundation - Google Patents
Construction method of steel pipe sheet pile well foundation Download PDFInfo
- Publication number
- JP2019007132A JP2019007132A JP2017120524A JP2017120524A JP2019007132A JP 2019007132 A JP2019007132 A JP 2019007132A JP 2017120524 A JP2017120524 A JP 2017120524A JP 2017120524 A JP2017120524 A JP 2017120524A JP 2019007132 A JP2019007132 A JP 2019007132A
- Authority
- JP
- Japan
- Prior art keywords
- steel pipe
- pipe sheet
- scouring
- sheet pile
- construction method
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Images
Landscapes
- Foundations (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
Description
本発明は、鋼管矢板井筒基礎の施工方法に関する。 The present invention relates to a construction method for a steel pipe sheet pile well foundation.
従来、河川や海上における大型橋梁の基礎形式として鋼管矢板井筒基礎が多用される(例えば、特許文献1、特許文献2参照)。
Conventionally, steel pipe sheet pile well foundations are often used as the basic form of large bridges in rivers and the sea (see, for example,
この鋼管矢板井筒基礎を施工する際には、鋼管矢板を打設し、継手内の土砂洗浄とモルタル充填を行い、底盤コンクリート打設、井筒内排水を行う。そして、水面下で仮締切りとして機能する鋼管矢板井筒の内部でドライ環境を確保しながら躯体を構築する。 When constructing this steel pipe sheet pile canopy foundation, a steel pipe sheet pile is cast, soil and sand in the joint are washed and mortar filled, bottom concrete is cast, and drainage in the pipe is performed. And a frame is constructed while ensuring a dry environment inside a steel pipe sheet pile well that functions as a temporary cutoff under the surface of the water.
また、隣り合う鋼管矢板同士を繋ぐ継手内のモルタル充填時には、地盤面より上はグラウトジャケットを用いるのに対し、地盤面より下は地盤を型枠代わりとして充填を行うようにしている。 In addition, when filling mortar in a joint that connects adjacent steel pipe sheet piles, a grout jacket is used above the ground surface, whereas the ground is used as a substitute for the formwork below the ground surface.
しかしながら、図3(a)、図3(b)、図3(c)に示すように、隣り合う鋼管矢板1同士を繋ぐ継手2内のモルタル充填時に鋼管矢板1の外側の地盤Gが洗掘(洗掘凹部M)されている場合がある。
However, as shown in FIG. 3 (a), FIG. 3 (b), and FIG. 3 (c), the ground G outside the steel
そして、この場合には、地盤Gによって洗掘凹部Mの継手2が覆われていないために継手2の内部に注入したグラウトPが継手2の隙間から漏えいし、継手2内にモルタル未充填箇所ができてしまう。また、継手2にモルタル未充填箇所ができると、継手2による鋼管矢板1の一体化が不充分になったり、井筒内排水時に未充填箇所から漏水が発生し、排水が困難になるおそれがある。
In this case, since the
上記事情に鑑み、本発明は、隣り合う鋼管矢板同士を繋ぐ継手内を好適にモルタル充填することを可能にする鋼管矢板井筒基礎の施工方法を提供することを目的とする。 In view of the above circumstances, an object of the present invention is to provide a method for constructing a steel pipe sheet pile well foundation that enables mortar filling of a joint that connects adjacent steel pipe sheet piles.
上記の目的を達するために、この発明は以下の手段を提供している。 In order to achieve the above object, the present invention provides the following means.
本発明の鋼管矢板井筒基礎の施工方法は、隣り合う鋼管矢板の継手同士を嵌合させつつ複数の鋼管矢板を水底の地盤に打設し、閉鎖形状に組み合わせてなる鋼管矢板井筒基礎の施工方法において、前記複数の鋼管矢板を打設した地盤の洗掘状態を探査し、洗掘が予測される地盤領域を先行改良する対策と、洗掘が生じている領域の洗掘凹部に、洗掘によって露出した前記鋼管矢板を被覆するようにグラウト漏洩防止材を配設する対策の少なくとも一方の対策を講じることを特徴とする。 The steel pipe sheet pile cantilever foundation construction method of the present invention is a steel pipe sheet pile canopy foundation construction method in which a plurality of steel pipe sheet piles are placed on the bottom of the water bottom while fitting the joints of adjacent steel pipe sheet piles together. In this case, the scouring state of the ground where the plurality of steel pipe sheet piles are placed is explored, and the ground area where scouring is predicted is improved in advance, and the scouring recess in the area where scouring occurs, At least one of the measures of disposing a grout leakage prevention material so as to cover the steel pipe sheet pile exposed by the above is taken.
また、本発明の鋼管矢板井筒基礎の施工方法おいては、前記グラウト漏洩防止材が箱体または袋体の内部に充填材を充填して構成され、該グラウト漏洩防止材を前記洗掘凹部に複数積み上げて配設することが望ましい。 Moreover, in the construction method of the steel pipe sheet pile well foundation of the present invention, the grout leakage preventing material is configured by filling a box or bag with a filling material, and the grout leakage preventing material is disposed in the scouring recess. It is desirable to arrange a plurality of them.
本発明の鋼管矢板井筒基礎の施工方法においては、継手内部へのモルタル充填前に外周地盤の状況を超音波探査などで確認し、洗掘の大きさに応じて対策を鋼管矢板の打設が完了した箇所から随時対策を行うことで、工程への遅延を抑えることができる。 In the construction method of the steel pipe sheet pile well foundation of the present invention, the condition of the outer periphery ground is confirmed by ultrasonic survey etc. before filling the mortar inside the joint, and measures according to the size of the scouring can be put in the steel pipe sheet pile. By taking measures as needed from the completed location, delay to the process can be suppressed.
また、モルタルの充填性の確保だけでなく、洗掘防止対策にも効果があるため、設計地盤面の確保ができる。 In addition to ensuring mortar fillability, it is also effective in scouring prevention measures, so the design ground surface can be secured.
よって、本発明の鋼管矢板井筒基礎の施工方法によれば、隣り合う鋼管矢板同士を繋ぐ継手内を好適にモルタル充填することが可能になり、好適に鋼管矢板井筒基礎を構築することが可能になる。 Therefore, according to the construction method of the steel pipe sheet pile cantilever foundation of the present invention, it becomes possible to suitably fill the mortar inside the joint connecting adjacent steel pipe sheet piles, making it possible to construct a steel pipe sheet pile well foundation. Become.
以下、図1及び図2(図3)を参照し、本発明の一実施形態に係る鋼管矢板井筒基礎の施工方法について説明する。 Hereinafter, with reference to FIG.1 and FIG.2 (FIG. 3), the construction method of the steel pipe sheet pile well foundation which concerns on one Embodiment of this invention is demonstrated.
本実施形態は、図1(及び図3)に示すように、河川や海上における大型橋梁の基礎などとして用いられ、隣り合う鋼管矢板1の継手2同士を嵌合させつつ複数の鋼管矢板1を水底の地G盤に打設し、閉鎖形状に組み合わせてなる鋼管矢板井筒基礎Aの施工方法に関するものである。
As shown in FIG. 1 (and FIG. 3), the present embodiment is used as a foundation for a large bridge on a river or the sea, and a plurality of steel
本実施形態の鋼管矢板井筒基礎Aの施工方法は、まず、水中地盤Gに打設するとともに環状の空間を形成するように連続的に複数の鋼管矢板1を並設する。このとき、継手2を嵌合させ、隣り合う鋼管矢板1同士を接続しながら複数の鋼管矢板1を設置する。
In the construction method of the steel pipe sheet pile well foundation A of the present embodiment, first, a plurality of steel
さらに、隣り合う鋼管矢板1同士を接続する継手2内を洗浄して土砂等を除去するとともに、継手2内にモルタル(グラウト材P)を充填し、水密性を確保する。このとき、地盤面(水底面)G1より上方の継手部分はグラウトジャケットを用いて漏洩を防止しながらその内部にモルタルを充填し、地盤面G1より下方の継手部分は地盤Gを型枠代わりとしてモルタルを充填する。
Furthermore, while the inside of the
次に、複数の鋼管矢板1を並設して形成された内部空間の底部に水中コンクリートを打設して底盤コンクリートを構築するとともに、井筒内の水を排水する。
Next, underwater concrete is constructed at the bottom of the internal space formed by juxtaposing a plurality of steel
そして、水面下で仮締切りとして機能する鋼管矢板井筒の内部でドライ環境を確保しながら躯体を構築する。 And a frame is constructed while ensuring a dry environment inside a steel pipe sheet pile well that functions as a temporary cutoff under the surface of the water.
一方、鋼管矢板井筒基礎Aの周囲地盤Gに洗掘が生じてしまうと、型枠代わりとなる地盤Gがなくなるため、継手2内にモルタルを充填した際に漏洩するおそれがある。なお、地盤Gに洗掘が生じた部分はグラウトジャケットを用いてモルタル充填することも考えられるが、洗掘が局所的に生じたり、急に生じることもあり、グラウトジャケットに変更して対応できないケースが多々ある。
On the other hand, if scouring occurs in the surrounding ground G of the steel pipe sheet pile well foundation A, the ground G as a substitute for the formwork disappears, and there is a risk of leakage when the
これに対し、本実施形態の鋼管矢板井筒基礎Aの施工方法では、図1に示すように、洗掘が予想される地盤Gを薬液注入工法、高圧噴射工法等によって先行改良し、地盤改良部3を型枠代わりとする対策と、図2に示すように、地盤Gの洗掘凹部Mに、洗掘によって露出した鋼管矢板1の継手2を被覆するようにグラウト漏洩防止材4を設置し、これを型枠代わりとする対策を選択的に用いる。
On the other hand, in the construction method of the steel pipe sheet pile canopy foundation A of this embodiment, as shown in FIG. 1, the ground G where scouring is expected is improved in advance by a chemical injection method, a high-pressure injection method, etc. As shown in FIG. 2, a grout leakage prevention material 4 is installed in the scouring recess M of the ground G so as to cover the
また、グラウト漏洩防止材4を設置し、これを型枠代わりとする対策では、グラウト漏洩防止材4を、箱体または袋体(例えば、トンパックやフィルターユニットなど)の内部に充填材を充填して構成し、このグラウト漏洩防止材4を洗掘凹部Mに複数積み上げて配設することが好ましい。 In addition, the grout leakage prevention material 4 is installed and used as a substitute for the formwork. The grout leakage prevention material 4 is filled with a filling material inside a box or bag (for example, a ton pack or a filter unit). It is preferable that a plurality of the grout leakage preventing materials 4 are stacked and disposed in the scouring recess M.
このとき、本実施形態では、鋼管矢板打設終了後に外周地盤Gの洗掘状況を超音波探査等で探査/確認し、洗掘が小さい場合に、洗掘を防止するために外周に地盤改良を行う。
既に洗掘が大きい場合には、漏えい防止として地盤Gの代わりとなるトンパック等のグラウト漏洩防止材4を設置する。
At this time, in this embodiment, after finishing the steel pipe sheet pile driving, the scouring condition of the outer peripheral ground G is investigated / confirmed by ultrasonic exploration or the like. I do.
If the scouring is already large, a grout leakage prevention material 4 such as a ton pack as a substitute for the ground G is installed as a leakage prevention.
したがって、本実施形態の鋼管矢板井筒基礎Aの施工方法においては、モルタル充填前に外周地盤Gの状況を超音波探査などで探査/確認し、洗掘の大きさに応じて対策を鋼管矢板1の打設が完了した箇所から、随時対策を行うことで、工程への遅延を抑えることができる。 Therefore, in the construction method of the steel pipe sheet pile canopy foundation A of this embodiment, the state of the outer peripheral ground G is investigated / confirmed by ultrasonic exploration before filling the mortar, and measures are taken according to the size of the scour. By taking measures from time to time from the point where the placement of the process has been completed, delay to the process can be suppressed.
また、モルタルの充填性の確保だけでなく、洗掘防止対策にも効果があるため、設計地盤面の確保ができる。 In addition to ensuring mortar fillability, it is also effective in scouring prevention measures, so the design ground surface can be secured.
よって、本実施形態の鋼管矢板井筒基礎Aの施工方法によれば、隣り合う鋼管矢板1同士を繋ぐ継手2内を好適にモルタル充填することが可能になる。
Therefore, according to the construction method of the steel pipe sheet pile canopy foundation A of the present embodiment, the inside of the
以上、本発明に係る鋼管矢板井筒基礎の施工方法の一実施形態について説明したが、本発明は上記の一実施形態に限定されるものではなく、その趣旨を逸脱しない範囲で適宜変更可能である。 As mentioned above, although one Embodiment of the construction method of the steel pipe sheet pile well foundation based on this invention was described, this invention is not limited to said one Embodiment, It can change suitably in the range which does not deviate from the meaning. .
1 鋼管矢板
2 継手
3 地盤改良部
4 グラウト漏洩防止材
A 鋼管矢板井筒基礎
G 地盤
G1 水底
M 洗掘凹部
P モルタル(グラウト材)
DESCRIPTION OF
Claims (2)
前記複数の鋼管矢板を打設した地盤の洗掘状態を探査し、洗掘が予測される地盤領域を先行改良する対策と、洗掘が生じている領域の洗掘凹部に、洗掘によって露出した前記継手を被覆するようにグラウト漏洩防止材を配設する対策の少なくとも一方の対策を講じることを特徴とする鋼管矢板井筒基礎の施工方法。 In the construction method of the steel pipe sheet pile well foundation, which is formed by combining multiple steel pipe sheet piles on the bottom of the water bottom while fitting the joints of adjacent steel pipe sheet piles together,
Exploring the scouring condition of the ground where the plurality of steel pipe sheet piles are laid, measures to advance the ground area where scouring is predicted, and the scouring recess in the area where scouring occurs, exposed by scouring A construction method for a steel pipe sheet pile well foundation characterized by taking at least one of the measures for disposing a grout leakage preventing material so as to cover the joint.
前記グラウト漏洩防止材が箱体または袋体の内部に充填材を充填して構成され、該グラウト漏洩防止材を前記洗掘凹部に複数積み上げて配設することを特徴とする鋼管矢板井筒基礎の施工方法。 In the construction method of the steel pipe sheet pile well foundation according to claim 1,
The steel pipe sheet pile foundation is characterized in that the grout leakage preventing material is configured by filling a box or bag body with a filler, and a plurality of the grout leakage preventing materials are stacked in the scouring recess. Construction method.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017120524A JP2019007132A (en) | 2017-06-20 | 2017-06-20 | Construction method of steel pipe sheet pile well foundation |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2017120524A JP2019007132A (en) | 2017-06-20 | 2017-06-20 | Construction method of steel pipe sheet pile well foundation |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2019007132A true JP2019007132A (en) | 2019-01-17 |
Family
ID=65025819
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2017120524A Pending JP2019007132A (en) | 2017-06-20 | 2017-06-20 | Construction method of steel pipe sheet pile well foundation |
Country Status (1)
Country | Link |
---|---|
JP (1) | JP2019007132A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117966828A (en) * | 2024-02-18 | 2024-05-03 | 中国海洋大学 | Offshore wind power foundation scour protection filling reinforcement construction device and method |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040081403A (en) * | 2004-09-01 | 2004-09-21 | 주식회사 엠티마스타 | The scour part repair method of a underwater structure of having used scour prevention member for underwater structures, and this |
KR100641677B1 (en) * | 2006-07-24 | 2006-11-10 | (주)미래기술단 | Safety protection device of bridge well base |
JP2006342614A (en) * | 2005-06-10 | 2006-12-21 | Yokoyama Kiso Koji:Kk | Protection method for the foundation of floating structures |
-
2017
- 2017-06-20 JP JP2017120524A patent/JP2019007132A/en active Pending
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20040081403A (en) * | 2004-09-01 | 2004-09-21 | 주식회사 엠티마스타 | The scour part repair method of a underwater structure of having used scour prevention member for underwater structures, and this |
JP2006342614A (en) * | 2005-06-10 | 2006-12-21 | Yokoyama Kiso Koji:Kk | Protection method for the foundation of floating structures |
KR100641677B1 (en) * | 2006-07-24 | 2006-11-10 | (주)미래기술단 | Safety protection device of bridge well base |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN117966828A (en) * | 2024-02-18 | 2024-05-03 | 中国海洋大学 | Offshore wind power foundation scour protection filling reinforcement construction device and method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP6266821B2 (en) | Deadline structure and deadline method | |
JP4293435B2 (en) | Construction method of managed revetment | |
KR20130013287A (en) | Wet-type constructing method of pier foundation | |
JP4761780B2 (en) | Construction method of impermeable layer | |
JP2019007132A (en) | Construction method of steel pipe sheet pile well foundation | |
JP5093862B2 (en) | Construction method of impermeable layer | |
JP5728206B2 (en) | Construction method of partition revetment | |
JP4726147B2 (en) | Construction method of impermeable layer | |
JP4822375B2 (en) | Water-blocking structure of revetment | |
JP2009085005A (en) | Method of constructing management bulkhead | |
JP4315620B2 (en) | Impermeable treatment method for managed waste landfill revetment | |
JP4979228B2 (en) | Additional construction method of impermeable layer | |
JP6018804B2 (en) | Cell body water-blocking structure | |
JP5977604B2 (en) | Construction method of impermeable revetment | |
JPH11209998A (en) | Impermeable construction method of underground structure by self-standing type double impermeable walls | |
JP2011084868A (en) | Reclaimed land partition revetment using caisson | |
JP4761386B2 (en) | Construction method of impermeable walls | |
JP3999628B2 (en) | Construction method of caisson dyke | |
JP2005171505A (en) | Partition bulkhead | |
JP2012180669A (en) | Breakwater reinforcing method and reinforced breakwater | |
JP5131742B2 (en) | Foundation construction method for revetment structures | |
KR100768552B1 (en) | Steel well ventilation foundation construction method and equipment | |
JPH09242081A (en) | Dry work method and work box used therefor | |
JP4606454B2 (en) | Construction method of managed revetment | |
JP5099728B2 (en) | Repair method for impermeable layer of landfill revetment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
A621 | Written request for application examination |
Free format text: JAPANESE INTERMEDIATE CODE: A621 Effective date: 20200616 |
|
A977 | Report on retrieval |
Free format text: JAPANESE INTERMEDIATE CODE: A971007 Effective date: 20210519 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20210601 |
|
A521 | Request for written amendment filed |
Free format text: JAPANESE INTERMEDIATE CODE: A523 Effective date: 20210702 |
|
A131 | Notification of reasons for refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A131 Effective date: 20211124 |
|
A02 | Decision of refusal |
Free format text: JAPANESE INTERMEDIATE CODE: A02 Effective date: 20220524 |