JP2004512444A - Pre-assembled bathroom structure and bathroom installation method - Google Patents
Pre-assembled bathroom structure and bathroom installation method Download PDFInfo
- Publication number
- JP2004512444A JP2004512444A JP2001581664A JP2001581664A JP2004512444A JP 2004512444 A JP2004512444 A JP 2004512444A JP 2001581664 A JP2001581664 A JP 2001581664A JP 2001581664 A JP2001581664 A JP 2001581664A JP 2004512444 A JP2004512444 A JP 2004512444A
- Authority
- JP
- Japan
- Prior art keywords
- panel
- plate
- floor
- wall
- panels
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 title claims description 38
- 238000010276 construction Methods 0.000 claims abstract description 10
- 238000007689 inspection Methods 0.000 claims description 7
- 239000010440 gypsum Substances 0.000 claims description 6
- 229910052602 gypsum Inorganic materials 0.000 claims description 6
- 229910052751 metal Inorganic materials 0.000 claims description 6
- 239000002184 metal Substances 0.000 claims description 6
- 239000004575 stone Substances 0.000 claims description 5
- 229910052782 aluminium Inorganic materials 0.000 claims description 4
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 claims description 4
- 239000004568 cement Substances 0.000 claims description 4
- 239000007788 liquid Substances 0.000 claims description 4
- 229910000831 Steel Inorganic materials 0.000 claims description 2
- 239000011440 grout Substances 0.000 claims description 2
- 239000010959 steel Substances 0.000 claims description 2
- 238000005406 washing Methods 0.000 claims description 2
- 239000004579 marble Substances 0.000 description 13
- 239000000463 material Substances 0.000 description 7
- 239000000243 solution Substances 0.000 description 7
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 238000005520 cutting process Methods 0.000 description 4
- 239000000919 ceramic Substances 0.000 description 3
- 238000013461 design Methods 0.000 description 2
- 239000010438 granite Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000009428 plumbing Methods 0.000 description 2
- 238000005498 polishing Methods 0.000 description 2
- 230000000750 progressive effect Effects 0.000 description 2
- 238000007634 remodeling Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 241001248533 Euchloe ausonides Species 0.000 description 1
- 239000000853 adhesive Substances 0.000 description 1
- 230000001070 adhesive effect Effects 0.000 description 1
- 238000004378 air conditioning Methods 0.000 description 1
- 239000010425 asbestos Substances 0.000 description 1
- 238000004140 cleaning Methods 0.000 description 1
- 238000004040 coloring Methods 0.000 description 1
- 239000002131 composite material Substances 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000007796 conventional method Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 239000000428 dust Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000009429 electrical wiring Methods 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 239000005002 finish coating Substances 0.000 description 1
- 239000011521 glass Substances 0.000 description 1
- 239000011491 glass wool Substances 0.000 description 1
- 238000002347 injection Methods 0.000 description 1
- 239000007924 injection Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 238000007726 management method Methods 0.000 description 1
- 238000005259 measurement Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 238000005192 partition Methods 0.000 description 1
- 238000009420 retrofitting Methods 0.000 description 1
- 229910052895 riebeckite Inorganic materials 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F19/00—Other details of constructional parts for finishing work on buildings
- E04F19/08—Built-in cupboards; Masks of niches; Covers of holes enabling access to installations
- E04F19/083—Covers with fixing means providing for snap locking
-
- A—HUMAN NECESSITIES
- A47—FURNITURE; DOMESTIC ARTICLES OR APPLIANCES; COFFEE MILLS; SPICE MILLS; SUCTION CLEANERS IN GENERAL
- A47K—SANITARY EQUIPMENT NOT OTHERWISE PROVIDED FOR; TOILET ACCESSORIES
- A47K4/00—Combinations of baths, douches, sinks, wash-basins, closets, or urinals, not covered by a single other group of this subclass
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04F—FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
- E04F13/00—Coverings or linings, e.g. for walls or ceilings
- E04F13/07—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor
- E04F13/08—Coverings or linings, e.g. for walls or ceilings composed of covering or lining elements; Sub-structures therefor; Fastening means therefor composed of a plurality of similar covering or lining elements
- E04F13/0801—Separate fastening elements
- E04F13/0832—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements
- E04F13/0853—Separate fastening elements without load-supporting elongated furring elements between wall and covering elements adjustable perpendicular to the wall
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Health & Medical Sciences (AREA)
- Public Health (AREA)
- Residential Or Office Buildings (AREA)
- Floor Finish (AREA)
- Bathtubs, Showers, And Their Attachments (AREA)
- Sink And Installation For Waste Water (AREA)
- Finishing Walls (AREA)
Abstract
浴室として使用するよう意図された部屋に設置する浴室の構造において、設置すべき部屋の壁および床の少なくとも一部を連続的に裏打ちするため、適切な寸法で作成された複数のカバー用パネル(1、2、3)、および浴室の水圧回路を完成するような方法で相互接続され、設置すべき部屋の水圧導管(100、101)に接続されるようになっている自身の管(41、51、61、71)および自身の支持構造がそれぞれ予め設定された複数の衛生構成要素またはモジュール(4、5、6、7)を含む構造。組立済みの浴室の床、天井および壁の構造。組立済み浴室の床構造を設置する方法、および完全な組立済み浴室を室内で作成し設置する方法において、部屋の壁のために適切な寸法で工場生産したカバー類のパネルを作成する段階と、相互接続され次に部屋の管類と接続されるように予め設定された管および継手を設けた自立式衛生構成要素を作成する段階と、壁作業の介入または従来通りの構築をすることなしに前記パネルおよび前記構成要素を設置する段階とを含む方法。In the construction of a bathroom to be installed in a room intended to be used as a bathroom, a plurality of appropriately sized cover panels (continuously lining at least part of the walls and floor of the room to be installed) 1, 2, 3), and their own tubes (41, 42) interconnected in such a way as to complete the hydraulic circuit of the bathroom and adapted to be connected to the hydraulic conduits (100, 101) of the room to be installed. 51, 61, 71) and their own support structure each comprising a plurality of pre-set sanitary components or modules (4, 5, 6, 7). Prefabricated bathroom floor, ceiling and wall construction. Creating a factory-made cover panel with appropriate dimensions for the walls of the room in a method of installing a floor structure of an assembled bathroom, and in a method of creating and installing a complete assembled bathroom in a room; Creating self-supporting sanitary components with pre-set pipes and fittings to be interconnected and then connected to room tubing, without the intervention of wall work or conventional construction Installing said panel and said components.
Description
【0001】
(発明の分野)
本発明はホテル構造用、家庭用またはオフィス用の浴室の構築および設置の分野に関する。特に、本発明は初回設置のために更にはホテルその他の建物の浴室用の部屋の改造のために、迅速かつ経済的に設置することができる、浴室の完全な組立済み構造に関する。
【0002】
現在、完全な浴室を実現するためには、多量の作業時間が必要であり、配管、建設、電気など、様々な部門の熟練労働の協力も必要である。この要件には、期間、したがって費用が関与し、特にホテルにとって改造のために日々を失うことはその部屋の占有による収入を失うことも意味することを考慮に入れると、非常に高くつく。さらに、様々なスタッフおよびタイミングを調整する必要がある結果、費用の維持を考慮すると、必ずしも満足できる仕上げの品質が得られない。
【0003】
(発明の目的)
本発明の目的は、既知のタイプの浴室組立済み構造(プレハブ構造)の欠陥を解消し、未熟な労働者によっても簡単かつ迅速に設置が実行される浴室を提案することである。第2の目的は、寸法でも品質でも組立済み製品という限界のない高品質の仕上げを備え、熟練労働者の介入を必要とせずに現場で設置することができる浴室を提案することである。特に、大理石および天然石などの高価な材料で作製した浴室構造が考慮される。第3の目的は、コスト管理向上により設置費を節約することである。
【0004】
(発明の要約)
これらの目的は、全ての必要な構成要素、水圧部品および電気器具、さらにカバー類を完備した組立済み浴室の構造を実現する本発明により達成された。カバー類(壁、床、および必要な場合は天井も)は、大理石または他の適切な材料で工場にて所要寸法に生産された連続パネルの形態であることが好ましい。本発明によると、隅に配置すべきプレハブ式壁パネルは、部屋または設置される浴室構成要素の実寸法に対して発生し得る寸法誤差を補正するため、相互に滑動できることが好ましい。望ましいカバー類の仕上げが得られたら、パネルを相互に接続し、距離調節可能な取付具によって壁に固定することができる。取付具はこの場合、浴室の水圧系統または電気系統の検査を可能にするように、1つまたは複数のパネルを簡単に除去できるようにしてもよい。
【0005】
衛生構成要素(例えば洗面ユニット、浴槽、トイレのタンク、水中マッサージ)には、それらの支持構造を予め配置し、また、電気系統と同様に、さらなる介入を必要とせずに、浴室の水回路を完成するために相互に接続され、次に既に存在する部屋の給水カラム/排水パイプに接続されるようにした管類を予め配置する。床および天井は、工場で作製して現場で設置することができるが、この場合も現場の最終要件に適合させるようにするため、寸法は極めて融通性がある。実際、他のプレハブ式システムと異なり、本発明のさらなる態様によると、床および天井の構造は「適切なサイズへの切断」が実行されているが、全ての部品は、垂直および水平の壁および床または天井の最終的な寸法要件のために重ねて滑動させることができ、従来通りの作業で相互に別個に使用することができる。
【0006】
さらに詳細に述べると、
−床は最初に従来通り、または以下で規定するように「逆さま」の方法で設置し、壁は、必要に応じてその上で滑動できるよう、仕上げた床の上に設置する。本発明は、完全な浴室さらに床構造および天井構造の製造方法、事前組立および設置についても言及する。
【0007】
得られる利点は基本的に、壁構造の作業の熟練労働なしに、又は大理石作業に関しては大理石の切断または設置の作業者の介入なしに、そして水圧部品の必要労働力を最小限に抑えた状態で、「完成品引き渡し」の浴室を完全に設置することが可能であり、また浴室の計画作成を工場にて手作業でまたはコンピュータ化した器具の補助によって実行できるということにある。
【0008】
第2の利点は、組み立てるべき浴室の寸法、仕様および材料を工場にて正確に規定し、次に現場では発生し得る誤りを熟練労働の介入なしに修正することが可能なことにある。パネル壁は、大理石/花崗岩または他の天然石で作製した場合、構造的であり仕上げにもなる大きい中実石の平板である。
【0009】
第3の利点は、カバー類で達成される向上した仕上げにある。
【0010】
第4の利点は、目に見える継ぎ目がほぼないことにある。
【0011】
第5の利点は、実際には準備的な壁作業が必要なく、作業現場のないような設置すべき部屋で単に組み立てるだけでよく、これによって設置時間を比較にならないほど短縮し、関連するホテル構造または住宅へ損害を与える(騒音、埃などの)妨害を最小限に抑えることにある。
【0012】
第6の利点は、保守および清掃の問題を最小にして、非常に規則正しく連続的な平坦面を組み立てることが可能であることにある。
【0013】
第7の利点は、1つまたは複数のカバー・パネルを取り外すことによってアクセス可能な状態である構成要素の水圧部品を簡単かつ迅速に検査することが可能であることにある。
【0014】
さらなる利点は、工場製造の全部品が「完璧」な品質であり、したがって高レベルの正確さを達成することができ、また高品質の仕上げを維持することにある。実際、現場では構成要素の切断/研磨(接着または固定)を実行する必要がない。
【0015】
セラミックのタイルの場合は、タイルを工場にて(アルミニウムのハニカムまたは石膏ボードなどの)支持パネルに適用し、それによってタイル部品の全切断を工場の機械で実行し、通常は現場で達成することが非常に困難な完全なジョイントを持つものとすることができる。主に、本発明の外隅(外部コーナー)は工場で予め組み立ててみることで、完璧に整合させることが可能である。
【0016】
パネルを大理石(または他の天然石)で作成する場合には、床および側部パネルの厚さを2cm以下として構造的機能と仕上げ機能の両方を持たせることができれば十分である。実際、浴室の構成要素は、同じ材料(大理石)を使用し、全ての荷重を床に加えて固定して、将来の構造的後退を回避することができる。例えば、浴室の化粧トップを2つまたは3つの垂直の大理石側部パネルに配置することができる。これによって迅速に固定し、横方向にぴったり配置することができ、現場での固定が不要で、現場での材料組立てが不要で、および現場での作業が不要で、したがって単純な作業者しか必要でなくなる。
【0017】
以上およびさらなる利点は、非制限的な例として与えられる図面によって理解される。
【0018】
(詳細な説明)
図1から図7の添付図面を参照すると、本発明による組立済み浴室は、適切な寸法の複数のカバー・パネルを含み、その中には壁パネル1、床パネル2、および天井が必要な場合(例えばホテル構造の浴室の場合)は天井パネル3があり、さらに複数の付属品を含み、その中には洗面ユニット4、複合水蛇口6を伴う浴槽5、トイレのタンク7がある。
【0019】
特に図2を参照すると、カバー壁パネルを従来の方法で、または接続プレート9が隣接パネルに入り、その背後に隠れるような方法で接続プレート9を使用することにより、相互に接続することができる(図16)。隣接するパネルのプレート9は、相互に干渉しないよう互い違いに位置するのが有利である。組立中、閉塞した状態になるよう隣接するパネルのプレート9をパネルと壁との間に挿入しながら、パネルと一体のプレートを通常のねじで壁に固定する。隅パネル1の場合は、第2パネルのプレート9を第1パネル側面と壁との間に挿入して隠すような方法で、2つの隣接するパネルのうちの一方のプレートを「L」字形にすることができる。
【0020】
本発明のさらなる態様によると、図11には、隅パネルの相互位置、および設置すべき部屋または挿入すべき構成要素の測定寸法と真の寸法との間に発生し得る差のために必要になる調節の後におけるそれらの位置(点線で図示)が概略的に図示される。図11のパネルは、一方を他方の中へと滑動させることができるので調節可能である。つまり、パネルは図面の通りの寸法で生産されるが、順次相互に滑動し、このような方法でさらに小さい部屋を生成することができる。例えば、図8および図8aから図8mの洗面ユニット4’の設置について考察することができる。その場合、4’の幅は、図8lのシーケンス・ステップ20でR10およびR11とマークされた横方向パネル間で使用可能なスペースより大きい。
【0021】
本発明により、パネルR11を、矢印の方向に壁パネルR12に沿って必要な距離だけ並進させるよう、変位させることが可能である。代替方法として、パネルR11およびR12で作成した複合体も、R12がR13の背後へと滑動するよう、しっかり変位させることができる。次に(図8mのシーケンス21)ユニット4’は、R11およびR12をユニットと接触するように並進させた後に、挿入させることができる(シーケンス22)。
【0022】
したがって、本発明により未熟練な使用者が高い精度で浴室の構成要素およびパネルを切断または他の困難な作業なしに完全に設置できることが明白である。
【0023】
本発明のさらなる態様による床構造について記載する。
【0024】
第1の好ましい技術的解決策では、特に図10cを参照すると、パネル2に調節可能な自立式(即ち自己保持式)支持体を設けてもよい。支持体は、既存の床50上に媒介する調節用ねじ29を有するプレート28により形成されており、パネル2の支持の必要なレベルに応じて調節される。設置中には、第1パネル2の一方の側部を固定したマッチ(match)R上に配置し、他方の側部に沿って2つ以上のプレート28を通常のねじ27で固定した状態で供給する。プレート28を通して圧力ねじ29をねじ込み、それは必要なレベルに応じて調節してよい。次に、カバーが完成するまで、第2パネル2を、一方側がプレート28上にあり(必要な場合は、ねじ頭29を収容するため、空隙200を形成してもよい)、他方側が次のプレート28上にある状態で配置する。
【0025】
本発明の第2の好ましい技術的解決策では、特に図10、図10a、図10bを参照すると、本発明の床パネル2に調節可能な自立式支持体を設けてもよい。支持体はプレート280で形成し、これは垂直ピン200によって床50に旋回自在に取り付けられており、水平面上で回転することができる。プレート280は、調整用ねじ290と一体である支持ディスク201とともに供給され、床パネル2と既存の床50との間で作用し、パネル2の支持に必要なレベルに応じて調節される。設置中には、パネル2を幾つかのディスク201上に配置し、これは床50上のパネルの均一な高さを保証するため、各ディスクが隣接するパネル2の両方を支持するよう、隣接パネルの側部に応じて整列させることが好ましい。
【0026】
ディスク201に発生し得る位置決め誤差は、ピン200の周囲におけるプレート280の回転によって修正することができる。
【0027】
あるいは、図10dおよび図10eで図示した第3の実施形態によると、パネル2の調節可能な支持体は、単純なボルト110およびナット111で構成することができ、これは大理石・花崗岩の床平板2の端部に配置され、第2平板を設置しなければならない場合の調節が可能とされている。上記のケースと同様、第2平板とボルトおよびナットを共用し、床表面が完全に連続することを保証するのが好ましい。
【0028】
上記の全ての床構造では、後に、パネル2と床50の間との間の空隙120が完全に充填されるまで、注入路121を通して下から液体グラウトを注入することが好ましい。
【0029】
本発明のさらなる態様によると、好ましくはパネル2を使用することによって床構造を設置する方法は、以下のステップを備える:
a)配置すべき床パネル2の側部に対応する線に沿って整列することが好ましい複数の調節可能な支持体を床50に取り付ける;
b)第1パネル2を設置する;
c)パネルの支持体の調整手段に作用する第1パネルのレベルを調節する;
d)必要に応じて、1つまたは複数の支持体の位置を調節する;
e)可能であれば側部が整列した支持体の上で、既に設置したパネルの隣に床パネルを配置する;
f)支持体の規則正しさを完璧にするような方法で、パネル2と下の表面50との間の空隙に収縮しない液体セメントを注入する。
【0030】
例えば、モルタル/セメントを、部屋の壁に近い最後に配置したパネル2の側部から注ぐか、大きい区域ではポンプで送ることができる。あるいは、同じシステムを使用して、セラミック・タイルの支持体として適切なグリッド(金属またはプラスチック)を、パネル2の代わりに適用してもよい。
【0031】
表面50の規則正しさ以外に、この解決策は、従来の窓間壁を実現した後にカバー類を配置するための熟練者の介入なしに床を正確に実現することができるので有利である。比較的大きい(2m×2m以上の)面積の大理石の床パネルでは、本発明の構造および方法により、大理石パネルの下に注入したセメントによって保証されるほぼ完全な支持体のおかげで、パネルが破損する危険なく高品質を達成できるので有利である。
【0032】
さらなる利点は、大きい大理石パネルを設置することができ、その際、平坦な表面が得られ、従来の方法とは異なり、現場での最終研磨の必要がないことである。さらなる利点は、未熟練な労働者でも任意のサイズの大理石パネルを設置できることである。さらなる利点は、床構造が構造的に頑丈であり、したがって設置直後に、さらに下からセメント注入する前でもパネル上を歩行できることである。
【0033】
記載された床の構造および設置方法は、浴室について説明してきたが、例えば空港、ホテルのホールなどの床構造のような任意の床構造にも同じ解決策を適用できることが明白である。天井パネル3の場合、天井が必要な場合は、側部パネル1上にパネル3を設置し、必要ならば電気作業を行うことによって、設置を実行することができる。パネル1〜3の寸法は、部屋の測定および設置の形状に従って既に予め設定され、したがって短時間で、かつ高い仕上げレベルでのカバー類の完成が可能になる。
【0034】
図13の例で図示した本発明のさらなる態様によると、天井構造は以下のように説明される。天井パネル3は、従来通りの石膏ボードまたはアルミニウム・ハニカムの大きい薄板で組立済みであり、これは両方とも既に構造的に自立式で、任意の照明システムおよび着色を含む。石膏ボードの場合、天井を覆うために必要な数の薄板を工場で作製し、鋼のスタッド33(支持構造内で石膏壁の仕切りに使用する)またはアルミニウムのプロフィールとともに、天井パネルに沿って接着して機械的に取り付け、これを平坦に維持する。これで、スタッド33の端部を壁パネル1上に配置し、パネル3を従来の「吊り下げ天井」とも呼ばれる装飾的な低い天井のように天井から吊すのに代えて自立式とすることができる。
【0035】
上記の天井構造は以下の利点を有する:
−既に照明システムおよび仕上げコーティングを装備した垂直壁の縁に、平板が単純に配置されるので、非常に簡単でぴったりした設置である;
−パイプ(多くの場合、コンクリートの床の下にある)、電気系または空調システムの保守または検査には、これらがどこにも取り付けられていないので、持ち上げるだけで常に簡単に取り外すことができる。
【0036】
本発明のさらなる態様によると、パネル1の壁40への設置は、調節可能な取付具によってなされ、これによりパネルの迅速な設置及び取り外しを可能にして、浴室の組立後の検査を可能にすることができる。
【0037】
図9で説明した実現化の第1の好ましい例では、これらの手段は、一般的なねじ手段23を使用してパネル1の背部に取り付けることができる第1穿孔プレート20にある。プレート20の中心には穿孔された円形領域21が設けられ、これはパネル1と円形領域21との間に内ねじのあるワッシャ26を配置し、自由に回転することができるような空隙22を残すような方法で、プレート20と部分的に重ねられる。ねじ24は、ワッシャ26と係合し、パネル1に作成した対応する穴11を通るねじ回し25によって作動させることができる。孔11の直径は、後に取り付けることができるパネル1の外側に相当の美的影響を与えないような方法で、極端に(5〜6mm以下にさえ)制限するのが好ましい。取付手段は、プレート20に対応して一般的なねじ32を使用して、壁40に取り付けることができる第2プレート30も含む。プレート30は、ねじ24を受けるのに適切なねじボルト31の中心に存する。
【0038】
設置中は、ねじ11を所定の長さだけワッシャ26を通して挿入し、次にボルト31に挿入する。
【0039】
ねじ24をボルト31にねじ込むと、ワッシャ26が空隙22内で回転し、壁40へと引っ張られる。これにより、パネル1を引っ張って、その位置を簡単に調整することができる。ボルト31に対応して、ねじ24が前進する余地を残すような方法で、壁40に穴41を作成することができる。
【0040】
図9a、図9bでは、横方向パネル1の調節可能な取付手段の第2の好ましい解決策が図示されている。この場合は、第1プレート20’を、パネル1の横側に突き出すパネル背面に(例えば接着剤またはねじ手段によって)取り付けることができる。一般的なねじ32’によって部屋の壁40に取り付けることができる第2プレート30’も設ける。プレート30’の中心部分は、壁40から浮き上がっており横断スロット24’を備えた凹形状を有する。プレート20’は貫通穴11’、および座ぐり穴を有する横断スロット56を備える。穴11’は、第2プレートに使用されるねじ32’に面する。
【0041】
調整ねじ31’は、プレート20’のスロット56、および第2プレート30’のスロット24’を通して挿入し、ロック・ナット54によってプレート30’と一体にされた調整ボルト31’と係合することができる。したがって、ボルト31’を回転することにより、第1、第2プレート20’、30’間の距離を調節することが可能である。プレート間に所望の距離を維持するため、さらなるロック・ナット57および58も設けることができる。
【0042】
設置時には、壁パネル1に1枚または複数のプレート20’を設ける。穴11’を通してねじ24’を作動させ、第2プレート30’を適正な位置で壁40に取り付けることができる。その後、調整ボルト31’を配置し、プレート20’と30’との間の距離を調節し、さらにスロット24’の細長い形状のため、横方向の位置を調節することができる。
【0043】
次に図8、図8aから図8m、および図16を参照すると、第1パネル1を壁40に取り付けたら、第2隣接パネルをプレート20’上にそれを覆い隠すように適用することができる。第1パネルの隠れた面と壁40との間に挿入することができる1枚または複数の横方向プレート9を、第2パネルに設けることが好ましい。通常、パネルの一方側には3枚のプレートが予め取り付けられ、他方の側には以前のパネルの3枚のプレート間に挿入する2枚の平坦なプレート9を有する。第1パネルは、言うまでもなく、両側に調節可能な取付プレートを有する。したがって、パネルはそれら自身の間での位置を調節し、浴室に異なる寸法を与えることができ、改造、置換、または別の場所での再構築のため、全てを機械的に取り外すことができる。
【0044】
図8aから図8dは、累進的な参照番号R01からR16で特定された横方向パネル1の設置を示す。図8は、対応する累進的な参照番号R01からR16でマークされた横方向パネル1によって完全に覆われた浴室を示す。
【0045】
この解決策では、取付手段は視界から完全に隠され、それと同時にパネル1は、検査のための取り外しまたは置換が簡単であるのが有利である。
【0046】
図1から図7を参照すると、本発明による浴室の付属品は、従来通りの構成要素で作成され、相互に接続される管および水圧部品と組立済みである。記載の例では、洗面器4に、湯および水の回路および廃棄口に対応する端末継手を伴う管41を設ける。同じ方法で、シャワー6と水洗トイレのタンク7のための蛇口複合体を伴う浴槽5に、対応する管51、61および71、および端末継手52、62および72を設ける。
【0047】
設置中には、複合体6の管61を部屋に存在する湯および水のカラム100に接続し、継手62によってタンク7および浴槽5の対応する継手72および52に接続する。また、浴槽5の管51を、洗面器4の対応する管41および廃棄口101に接続し、タンク7の管71を既知のタイプのトイレ(図示せず)に接続する。様々な付属品の端末継手は全て、浴室の設置時に正確に対応し、簡単に接続でき、視界から完全に隠れるような方法で、予め設定されているのが好ましい。
【0048】
本発明のさらなる特徴によると、構成要素4から7の全ての管は、簡単に検査される。例えば、浴槽5、水洗ユニット7および蛇口複合体6の場合、これは単に予め適切に設定された1枚または複数のカバー・パネル53、63を取り外すことにより可能になる。
【0049】
設置中には、作業者は記載の通りに、既に適切な寸法に作成されたパネル1〜3の組立を進行する。アセンブリは、様々なカバー類上で、さらに壁に対して直接実行することができ、その後に構成要素4〜7を、構造的介入または特定の技量を必要とせずに、部屋に既に存在する水圧回路に接続し、相互に接続する。設置の終了時には、全ての管は視界から隠れ、さらに穴11を除くカバー類のパネルの全ての取付手段も視界から隠れる。したがって、このように完成した浴室は、高レベルの仕上げを呈しており、それと同時に驚くほど単純に設置され、最後にその後の管の検査のため簡単にアクセスすることができる。
【0050】
図12に図示した本発明のさらなる態様によると、既存の壁からの距離を生成しなければならない場合、組立済みの浴室の壁300を設けることができる。その場合、金属構造301をパネル1の背後に準備し、場合によっては入れ子式バー“T”を設けて距離を調節する。
【0051】
壁がない場合(図14a、図14b)は、構造的に自立式の金属フレーム、既に予め塗装された石膏ボード(通常は2層)を含めて、部屋の側面に対する壁の完全な位置を工場で作成することができ、断熱材(石綿またはグラスウールなど)、(浴室の側面への)大理石の平板や任意の種類のタイルなどの仕上げ用カバー、および全ての配管/電気配線を全て設置することができる。この壁または壁の区間を所定の位置で調節し、次にそれら自身の間を接続して、完全な浴室を生成することができる。
【0052】
1つまたは複数の壁は、予め取り付けたドアまたはドア・フレームを含むことができる。実現の好ましい形態では、カバー用パネルが大理石の平板で構成されるが、これに使用する材料は、組立済みで、現場で設置されるセラミック・タイル、木、合成材料、ガラスその他のパネルを含め、種々の適切なタイプでもよいことが理解される。
【0053】
設計、材料、サイズ、詳細、目に見える要素の取り付け、または組立済みプロセスに関連するいかなることにも制限がないことも理解される。それどころか、従来通りの現場作業ではできなかった「無限」の細部または設計の解決策を用いて、作業を実行することができる。
【図面の簡単な説明】
【図1】
本発明による浴室の組立分解上面図を示す。
【図2】
設置が完了した図1の浴室の上面図を示す。
【図3】
設置するため管を相対的に予備配置した、本発明による浴室の標準的構成要素を示す。
【図4】
図3の1つの構成要素の上面図を示す。
【図5】
図3の1つの構成要素の上面図を示す。
【図6】
図3の1つの構成要素の上面図を示す。
【図7】
図3の1つの構成要素の上面図を示す。
【図8】
本発明による浴室構造の上面図を概略的に示す。
【図8a】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8b】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8c】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8d】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8e】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8f】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8g】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8h】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8i】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8l】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図8m】
図8の浴室構造の壁パネルおよび他の構成要素のステップ1から22の設置シーケンスの一部を示す。
【図9】
壁パネルを固定する調節可能な手段の本発明による第1実施形態の詳細を示す。
【図9a】
壁パネルを固定する調節可能な手段の本発明による第1実施形態の断面図を示す。
【図9b】
壁パネルを固定する調節可能な手段の本発明による第1実施形態の前面図を示す。
【図10】
本発明による床構造の断面図を示す。
【図10a】
本発明による床構造の断面図の詳細を示す。
【図10b】
本発明による床構造の上面図を示す。
【図10c】
本発明による床構造のさらなる実施形態を示す。
【図10d】
本発明による床構造のさらなる実施形態を示す。
【図10e】
本発明による床構造のさらなる実施形態を示す。
【図11】
本発明の方法により設置した壁パネルの相互位置を概略的に示す。
【図12】
本発明により入れ子式バー「T」を設けたプレハブ式壁構造を示す。
【図13】
本発明による天井構造を示す。
【図14a】
図12の組立済み壁の設置前を示す。
【図14b】
図12の組立済み壁の設置後を示す。
【図15】
検査のために取り外し可能なカバー・パネルを有する本発明によるトイレのタンク・ユニットを示す。
【図16】
接続手段を有する本発明の壁パネルを概略的に示す。[0001]
(Field of the Invention)
The present invention relates to the field of building and installing bathrooms for hotel construction, home or office. In particular, the present invention relates to a complete pre-assembled construction of a bathroom that can be quickly and economically installed for initial installation and also for retrofitting a bathroom for a hotel or other building.
[0002]
At present, realizing a complete bathroom requires a lot of work time, and also requires the cooperation of skilled labor in various departments such as plumbing, construction and electricity. This requirement is very costly, taking into account the duration, and thus the cost, especially for the hotel, losing days due to remodeling also means losing the revenue from occupying the room. In addition, the need to coordinate various staff and timings does not always result in satisfactory finish quality given the cost considerations.
[0003]
(Object of the invention)
It is an object of the present invention to overcome the deficiencies of known types of bathroom prefabricated structures (prefabricated structures) and to propose a bathroom which can be installed easily and quickly even by unskilled workers. A second object is to propose a bathroom which can be installed on site without the need for the intervention of skilled workers, with a high quality finish without the limit of an assembled product in size and quality. In particular, bathroom structures made of expensive materials such as marble and natural stone are considered. A third object is to reduce installation costs by improving cost management.
[0004]
(Summary of the Invention)
These objectives have been achieved by the present invention which realizes an assembled bathroom structure complete with all necessary components, hydraulic components and appliances, as well as covers. The coverings (walls, floors and, where necessary, ceilings) are preferably in the form of continuous panels manufactured to the required dimensions at the factory with marble or other suitable material. According to the invention, the prefabricated wall panels to be located in the corners are preferably slidable relative to one another in order to compensate for possible dimensional errors with respect to the actual dimensions of the room or of the installed bathroom component. Once the desired covering finish is obtained, the panels can be interconnected and secured to the wall with adjustable distance fittings. The fixture may in this case allow one or more panels to be easily removed so as to allow inspection of the bathroom hydraulics or electrical system.
[0005]
Sanitary components (e.g. wash units, bathtubs, toilet tanks, underwater massages) are pre-positioned with their support structures and, like the electrical system, can be equipped with a bathroom water circuit without the need for further intervention. Pre-place tubing that is interconnected to complete and then connected to the water column / drain pipe of the already existing room. The floors and ceilings can be made in the factory and installed on site, but the dimensions are still very flexible in order to meet the final requirements of the site. Indeed, unlike other prefabricated systems, according to a further aspect of the present invention, the floor and ceiling structure is "cut to size", but all parts are vertical and horizontal walls and It can be slid over one another for the final dimensional requirements of the floor or ceiling and can be used separately from one another in conventional operations.
[0006]
To elaborate further,
-The floor is first installed conventionally or in an "upside-down" manner as defined below, and the wall is installed on a finished floor so that it can slide on it if necessary. The invention also refers to the method of manufacture, pre-assembly and installation of a complete bathroom as well as floor and ceiling structures.
[0007]
The advantages gained are basically without skilled labor in the work of wall construction or, for marble work, without the intervention of marble cutting or installation workers, and with a minimum workforce of hydraulic components. Thus, it is possible to completely set up a bathroom for "delivery of goods", and to plan a bathroom manually at a factory or with the aid of computerized equipment.
[0008]
A second advantage is that the dimensions, specifications and materials of the bathroom to be assembled can be precisely defined at the factory and errors that can occur on site can then be corrected without the intervention of skilled labor. Panel walls are large solid stone slabs that are structural and also finish when made of marble / granite or other natural stones.
[0009]
A third advantage resides in the improved finish achieved with covers.
[0010]
A fourth advantage is that there are almost no visible seams.
[0011]
A fifth advantage is that it does not actually require any preparatory wall work, but simply assembles in a room to be installed where there is no work site, thereby shortening the installation time incomparably and the associated hotel The aim is to minimize disturbances (noise, dust, etc.) that damage the structure or the house.
[0012]
A sixth advantage is that it is possible to assemble a very regular and continuous flat surface with minimal maintenance and cleaning problems.
[0013]
A seventh advantage is that it is possible to easily and quickly inspect the hydraulic components of a component that are accessible by removing one or more cover panels.
[0014]
A further advantage is that all parts of the factory production are of "perfect" quality, so that a high level of accuracy can be achieved and a high quality finish is maintained. In fact, there is no need to perform the cutting / polishing (adhering or fixing) of the components on site.
[0015]
In the case of ceramic tiles, the tile is applied to a support panel (such as an aluminum honeycomb or gypsum board) at the factory, whereby all cutting of the tile parts is performed on the factory machine, usually accomplished on site Can have perfect joints that are very difficult. Mainly, the outer corner (outer corner) of the present invention can be perfectly matched by assembling in advance at a factory.
[0016]
If the panels are made of marble (or other natural stone), it is sufficient that the thickness of the floor and side panels be less than 2 cm to have both structural and finishing functions. In fact, the bathroom components can use the same material (marble) and apply all the loads to the floor and secure them to avoid future structural retreat. For example, a bathroom top can be placed on two or three vertical marble side panels. This allows quick fixation and lateral alignment, no on-site fixing, no on-site material assembly, and no on-site work, thus requiring only simple operators No longer.
[0017]
The above and further advantages are understood by the drawings, given as non-limiting examples.
[0018]
(Detailed description)
Referring to the accompanying drawings of FIGS. 1 to 7, an assembled bathroom according to the invention comprises a plurality of appropriately sized cover panels, in which a wall panel 1, a floor panel 2 and a ceiling are required. (For example, in the case of a hotel-structured bathroom) has a ceiling panel 3 and further includes a plurality of accessories, including a wash unit 4, a bath 5 with a combined water tap 6, and a toilet tank 7.
[0019]
With particular reference to FIG. 2, the cover wall panels can be interconnected in a conventional manner, or by using the connection plates 9 in such a way that the connection plates 9 enter adjacent panels and hide behind them. (FIG. 16). Advantageously, the plates 9 of adjacent panels are staggered so as not to interfere with each other. During assembly, the plate integral with the panel is fixed to the wall with ordinary screws while the plate 9 of the adjacent panel is inserted between the panel and the wall so as to be in a closed state. In the case of the corner panel 1, one of the two adjacent panels is shaped “L” in such a way that the plate 9 of the second panel is inserted and hidden between the side of the first panel and the wall. can do.
[0020]
In accordance with a further aspect of the present invention, FIG. 11 illustrates the need for the mutual location of the corner panels and the differences that may occur between the measured and true dimensions of the room to be installed or the component to be inserted. Their position (shown in dashed lines) after the adjustment is schematically illustrated. The panel of FIG. 11 is adjustable because one can slide into the other. That is, the panels are produced in the dimensions shown in the drawing, but slide sequentially with respect to each other, and in this way smaller rooms can be created. For example, the installation of the washbasin unit 4 ′ of FIGS. 8 and 8a to 8m can be considered. In that case, the width of 4 'is greater than the space available between the lateral panels marked R10 and R11 in sequence step 20 of FIG. 8l.
[0021]
According to the present invention, the panel R11 can be displaced so as to translate by a required distance along the wall panel R12 in the direction of the arrow. Alternatively, the composite made with panels R11 and R12 can also be displaced tightly such that R12 slides behind R13. Next (sequence 21 in FIG. 8m) unit 4 'can be inserted after translating R11 and R12 into contact with the unit (sequence 22).
[0022]
Thus, it is clear that the invention allows an unskilled user to completely install bathroom components and panels with high precision without cutting or other difficult operations.
[0023]
A floor structure according to a further aspect of the present invention is described.
[0024]
In a first preferred technical solution, in particular with reference to FIG. 10c, the panel 2 may be provided with an adjustable free-standing (ie self-supporting) support. The support is formed by a plate 28 with adjusting screws 29 intervening on the existing floor 50 and is adjusted according to the required level of support of the panel 2. During installation, one side of the first panel 2 is placed on a fixed match R, and two or more plates 28 are fixed along the other side with normal screws 27. Supply. A pressure screw 29 is screwed through the plate 28, which may be adjusted according to the required level. Then, until the cover is completed, the second panel 2 is placed on one side on the plate 28 (if necessary, a gap 200 may be formed to accommodate the screw head 29) and the other side on the next. It is arranged while being on the plate 28.
[0025]
In a second preferred technical solution of the invention, in particular with reference to FIGS. 10, 10a and 10b, the floor panel 2 of the invention may be provided with an adjustable free-standing support. The support is formed by a plate 280, which is pivotally mounted to the floor 50 by a vertical pin 200 and can rotate in a horizontal plane. The plate 280 is supplied with a support disk 201 which is integral with the adjusting screw 290 and acts between the floor panel 2 and the existing floor 50 and is adjusted according to the level required to support the panel 2. During installation, panel 2 is placed on several disks 201, which are adjacent to each other to support both adjacent panels 2, to ensure a uniform height of the panel on floor 50. It is preferred to align according to the side of the panel.
[0026]
Positioning errors that can occur in the disk 201 can be corrected by rotation of the plate 280 around the pins 200.
[0027]
Alternatively, according to the third embodiment illustrated in FIGS. 10d and 10e, the adjustable support of the panel 2 can consist of simple bolts 110 and nuts 111, which is a marble-granite floor slab. 2 and can be adjusted when a second flat plate must be installed. As in the case described above, it is preferable to share the bolts and nuts with the second flat plate to ensure that the floor surface is completely continuous.
[0028]
In all of the above floor structures, it is preferable to subsequently inject liquid grout from below through the injection channel 121 until the gap 120 between the panel 2 and the floor 50 is completely filled.
[0029]
According to a further aspect of the invention, a method of installing a floor structure, preferably by using panels 2, comprises the following steps:
a) attaching to the floor 50 a plurality of adjustable supports, preferably aligned along a line corresponding to the side of the floor panel 2 to be placed;
b) installing the first panel 2;
c) adjusting the level of the first panel acting on the adjusting means of the support of the panel;
d) adjusting the position of one or more supports, if necessary;
e) placing the floor panel next to the panel already installed, preferably on a side-aligned support;
f) Inject non-shrinking liquid cement into the gap between the panel 2 and the lower surface 50 in such a way as to perfect the regularity of the support.
[0030]
For example, the mortar / cement can be poured from the side of the last placed panel 2 close to the wall of the room or pumped in large areas. Alternatively, a grid (metal or plastic) suitable as a support for ceramic tiles may be applied instead of panel 2 using the same system.
[0031]
In addition to the regularity of the surface 50, this solution is advantageous because the floor can be accurately realized without the intervention of a skilled person for placing the coverings after realizing a conventional inter-window wall. For relatively large (2m x 2m or larger) area marble floor panels, the structure and method of the present invention may result in panel breakage due to the almost perfect support assured by the cement poured under the marble panel. Advantageously, high quality can be achieved without the danger of doing so.
[0032]
A further advantage is that large marble panels can be installed, where a flat surface is obtained and, unlike conventional methods, there is no need for final polishing on site. A further advantage is that unskilled workers can install marble panels of any size. A further advantage is that the floor structure is structurally robust, so that it can be walked on the panel immediately after installation, even before cementing from below.
[0033]
Although the described floor structure and installation method has been described for a bathroom, it is clear that the same solution can be applied to any floor structure such as a floor structure such as an airport, a hotel hall and the like. In the case of the ceiling panel 3, when a ceiling is required, the installation can be performed by installing the panel 3 on the side panel 1 and performing electric work if necessary. The dimensions of the panels 1 to 3 are already preset according to the shape of the measurement and installation of the room, thus making it possible to complete the covers in a short time and at a high finishing level.
[0034]
According to a further aspect of the present invention illustrated in the example of FIG. 13, the ceiling structure is described as follows. The ceiling panel 3 is pre-assembled with large sheets of conventional gypsum board or aluminum honeycomb, both of which are already structurally free standing and include any lighting system and coloring. In the case of gypsum board, the necessary number of sheets to cover the ceiling are made in the factory and glued along the ceiling panels with steel studs 33 (used for gypsum wall partitions in the support structure) or aluminum. And mechanically attached, keeping it flat. This allows the end of the stud 33 to be placed on the wall panel 1 and the panel 3 to be free standing instead of hanging from the ceiling like a decorative low ceiling, also known as a conventional "suspended ceiling". it can.
[0035]
The above ceiling structure has the following advantages:
Very simple and close installation, since the flat plate is simply placed on the edge of a vertical wall already equipped with a lighting system and a finish coating;
-For maintenance or inspection of pipes (often under concrete floors), electrical or air conditioning systems, they are not installed anywhere, so they can always be removed simply by lifting.
[0036]
According to a further aspect of the invention, the installation of the panel 1 on the wall 40 is made by means of adjustable fittings, which allows a quick installation and removal of the panel and allows a post-assembly inspection of the bathroom. be able to.
[0037]
In a first preferred embodiment of the realization described in FIG. 9, these means are in a first perforated plate 20 which can be attached to the back of the panel 1 using common screw means 23. The center of the plate 20 is provided with a perforated circular area 21 which places an internally threaded washer 26 between the panel 1 and the circular area 21 to create a gap 22 which can be freely rotated. It is partially overlapped with the plate 20 in such a way as to leave it. The screw 24 engages a washer 26 and can be actuated by a screwdriver 25 through a corresponding hole 11 made in the panel 1. The diameter of the holes 11 is preferably extremely limited (even to 5-6 mm or less) in such a way that it does not have a considerable aesthetic effect on the outside of the panel 1 which can be mounted later. The attachment means also includes a second plate 30 that can be attached to wall 40 using common screws 32 corresponding to plate 20. Plate 30 is centered on a screw bolt 31 suitable for receiving screw 24.
[0038]
During installation, the screw 11 is inserted through the washer 26 by a predetermined length and then into the bolt 31.
[0039]
When the screw 24 is screwed into the bolt 31, the washer 26 rotates in the gap 22 and is pulled toward the wall 40. This makes it possible to easily adjust the position of the panel 1 by pulling it. A hole 41 can be made in the wall 40 in such a way that the screw 24 leaves room for advancement in response to the bolt 31.
[0040]
9a, 9b, a second preferred solution of the adjustable mounting means of the transverse panel 1 is illustrated. In this case, the first plate 20 ′ can be attached (for example, by means of an adhesive or a screw means) to the back side of the panel that projects to the side of the panel 1. There is also provided a second plate 30 'that can be attached to the room wall 40 by common screws 32'. The central portion of the plate 30 'has a concave shape that rises from the wall 40 and has a transverse slot 24'. The plate 20 'has a through hole 11' and a transverse slot 56 with a counterbore. The hole 11 'faces the screw 32' used for the second plate.
[0041]
The adjustment screw 31 ′ is inserted through the slot 56 of the plate 20 ′ and the slot 24 ′ of the second plate 30 ′ and can engage with the adjustment bolt 31 ′ integrated with the plate 30 ′ by the lock nut 54. it can. Therefore, by rotating the bolt 31 ', it is possible to adjust the distance between the first and second plates 20', 30 '. Additional lock nuts 57 and 58 can also be provided to maintain the desired distance between the plates.
[0042]
At the time of installation, the wall panel 1 is provided with one or more plates 20 '. The screw 24 'can be actuated through the hole 11' to attach the second plate 30 'to the wall 40 in the proper position. Thereafter, the adjustment bolt 31 'can be arranged to adjust the distance between the plates 20' and 30 ', and furthermore the lateral position can be adjusted due to the elongated shape of the slot 24'.
[0043]
Referring now to FIGS. 8, 8a to 8m, and 16, once the first panel 1 is mounted on the wall 40, a second adjacent panel can be applied over the plate 20 'to cover it. . Preferably, the second panel is provided with one or more transverse plates 9 that can be inserted between the hidden surface of the first panel and the wall 40. Typically, one plate has three plates pre-mounted on one side and the other side has two flat plates 9 inserted between the three plates of the previous panel. The first panel has, of course, adjustable mounting plates on both sides. Thus, the panels can adjust their position between themselves, give the bathroom different dimensions, and all can be mechanically removed for remodeling, replacement, or rebuilding elsewhere.
[0044]
8a to 8d show the installation of the transverse panel 1 identified by the progressive reference numbers R01 to R16. FIG. 8 shows a bathroom completely covered by a transverse panel 1 marked with the corresponding progressive reference numbers R01 to R16.
[0045]
In this solution, the mounting means is completely hidden from view, while the panel 1 is advantageously simple to remove or replace for inspection.
[0046]
Referring to FIGS. 1-7, a bathroom accessory according to the present invention is made of conventional components and is pre-assembled with interconnecting tubing and hydraulic components. In the example described, the basin 4 is provided with a pipe 41 with a terminal fitting corresponding to the hot water and water circuit and the waste port. In the same way, the bath 5 with the faucet complex for the shower 6 and the flush toilet tank 7 is provided with the corresponding pipes 51, 61 and 71 and the terminal fittings 52, 62 and 72.
[0047]
During installation, the tubing 61 of the complex 6 is connected to the hot water and water column 100 present in the room and to the corresponding fittings 72 and 52 of the tank 7 and bath 5 by means of the fitting 62. Also, the pipe 51 of the bathtub 5 is connected to the corresponding pipe 41 and the waste port 101 of the basin 4, and the pipe 71 of the tank 7 is connected to a known type toilet (not shown). The terminal fittings of the various accessories are all preferably preset in such a way that they correspond exactly when the bathroom is installed, can be easily connected and are completely hidden from view.
[0048]
According to a further feature of the invention, all tubes of components 4 to 7 are easily inspected. For example, in the case of the bath 5, the washing unit 7 and the faucet complex 6, this can be achieved simply by removing one or a plurality of cover panels 53, 63 which are appropriately set in advance.
[0049]
During installation, the operator proceeds with assembling the panels 1 to 3 that have already been made to appropriate dimensions, as described. The assembly can be performed on a variety of coverings and even directly against the wall, after which the components 4 to 7 can be installed without the need for structural interventions or specific skills, with the hydraulic pressure already present in the room. Connect to circuits and connect to each other. At the end of the installation, all the tubes are hidden from view, and all the mounting means of the panels of the cover except the holes 11 are also hidden from view. Thus, the bathroom thus completed exhibits a high level of finish, while at the same time being surprisingly simple to install and finally easily accessible for subsequent inspection of the tube.
[0050]
According to a further aspect of the invention illustrated in FIG. 12, if a distance from an existing wall has to be generated, an assembled bathroom wall 300 can be provided. In that case, a metal structure 301 is provided behind the panel 1 and a telescopic bar "T" is optionally provided to adjust the distance.
[0051]
If there is no wall (FIGS. 14a, 14b), the complete position of the wall with respect to the side of the room, including the structurally self-supporting metal frame, the pre-painted gypsum board (usually two layers), is factory Insulation (such as asbestos or glass wool), finishing covers such as marble slabs (to the side of the bathroom) and any type of tile, and all plumbing / electrical wiring should be installed Can be. This wall or section of wall can be adjusted in place and then connected between themselves to create a complete bathroom.
[0052]
The one or more walls may include a pre-mounted door or door frame. In a preferred form of implementation, the cover panels are constructed of marble slabs, but the materials used include assembled, on-site ceramic tiles, wood, synthetic materials, glass and other panels. It is understood that various suitable types may be used.
[0053]
It is also understood that there is no limitation on the design, material, size, details, mounting of visible elements, or anything related to the assembled process. On the contrary, the work can be performed using "infinite" details or design solutions not possible with conventional field work.
[Brief description of the drawings]
FIG.
1 shows an exploded top view of a bathroom according to the invention.
FIG. 2
FIG. 2 shows a top view of the bathroom of FIG. 1 with installation completed.
FIG. 3
1 shows a standard component of a bathroom according to the invention, with the tubes relatively pre-arranged for installation.
FIG. 4
FIG. 4 shows a top view of one component of FIG. 3.
FIG. 5
FIG. 4 shows a top view of one component of FIG. 3.
FIG. 6
FIG. 4 shows a top view of one component of FIG. 3.
FIG. 7
FIG. 4 shows a top view of one component of FIG. 3.
FIG. 8
1 schematically shows a top view of a bathroom structure according to the invention.
FIG. 8a
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8b.
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8c
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8d
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8e
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8f
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8g
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8h
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8i
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG.
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 8m
FIG. 10 illustrates a portion of the installation sequence of steps 1 to 22 of the wall panels and other components of the bathroom structure of FIG.
FIG. 9
3 shows details of a first embodiment according to the invention of an adjustable means for fixing a wall panel.
FIG. 9a
FIG. 3 shows a sectional view of a first embodiment according to the invention of an adjustable means for fixing a wall panel.
FIG. 9b
FIG. 3 shows a front view of a first embodiment according to the invention of an adjustable means for fixing a wall panel.
FIG. 10
1 shows a sectional view of a floor structure according to the invention.
FIG. 10a
FIG. 2 shows a detail of a sectional view of a floor structure according to the invention.
FIG.
1 shows a top view of a floor structure according to the invention.
FIG. 10c
3 shows a further embodiment of the floor structure according to the invention.
FIG.
3 shows a further embodiment of the floor structure according to the invention.
FIG. 10e
3 shows a further embodiment of the floor structure according to the invention.
FIG. 11
1 schematically shows the mutual position of a wall panel installed according to the method of the invention.
FIG.
Figure 2 shows a prefabricated wall structure provided with telescoping bars "T" according to the present invention.
FIG. 13
1 shows a ceiling structure according to the invention.
FIG. 14a
FIG. 13 shows the assembled wall of FIG. 12 before installation.
FIG. 14b
FIG. 13 shows the assembled wall of FIG. 12 after installation.
FIG.
1 shows a toilet tank unit according to the invention with a removable cover panel for inspection.
FIG.
1 schematically shows a wall panel according to the invention with connecting means.
Claims (29)
a)表面(50)からの自由空隙を残して1つまたは複数の床パネル(2)を設置するステップと、
b)前記空隙を完全に充填するため、既に設置したパネル(2)と下の表面(50)との間の空隙に、収縮しない液体グラウトを注入するステップとを含む方法。A method of installing a floor structure on an existing floor surface (50),
a) installing one or more floor panels (2) leaving free voids from the surface (50);
b) injecting non-shrinking liquid grout into the gap between the already installed panel (2) and the lower surface (50) to completely fill said gap.
b)第1パネルを設置するステップと、
c)調整要素に作用する第1パネルのレベルを調節するステップと、
d)隣接するパネルが調整要素の線を共有するよう、既に設置したパネルに隣接して床パネルを設置するステップと、
e)調整要素に作用する設置済みパネルのレベルを調節するステップと、
f)床表面を完全に覆うため、ステップ(d,e)を繰り返すステップと、
g)設置したパネルと下の表面との間の空隙に収縮しない液体セメントを注入するステップとを含む、請求項24に記載の方法。a) attaching a plurality of height adjustment elements to the existing floor along a line corresponding to one or more floor panels to be installed;
b) installing a first panel;
c) adjusting the level of the first panel acting on the adjusting element;
d) installing a floor panel adjacent to the already installed panel so that adjacent panels share the line of adjustment elements;
e) adjusting the level of the installed panel acting on the adjusting element;
f) repeating steps (d, e) to completely cover the floor surface;
g) injecting a non-shrinking liquid cement into the gap between the installed panel and the underlying surface.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP00830335 | 2000-05-05 | ||
PCT/EP2001/005125 WO2001084999A1 (en) | 2000-05-05 | 2001-05-07 | Structure for pre-assembled bathroom and method of installation of the bathroom |
Publications (1)
Publication Number | Publication Date |
---|---|
JP2004512444A true JP2004512444A (en) | 2004-04-22 |
Family
ID=8175318
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
JP2001581664A Pending JP2004512444A (en) | 2000-05-05 | 2001-05-07 | Pre-assembled bathroom structure and bathroom installation method |
Country Status (13)
Country | Link |
---|---|
EP (1) | EP1280445A1 (en) |
JP (1) | JP2004512444A (en) |
CN (1) | CN1427688A (en) |
AU (1) | AU2001263905A1 (en) |
BR (1) | BR0110560A (en) |
CA (1) | CA2408039A1 (en) |
CZ (1) | CZ20023645A3 (en) |
HU (1) | HUP0302047A2 (en) |
IL (1) | IL152621A0 (en) |
MX (1) | MXPA02010835A (en) |
PL (1) | PL357244A1 (en) |
WO (1) | WO2001084999A1 (en) |
ZA (1) | ZA200209758B (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797366A (en) * | 2011-05-23 | 2012-11-28 | 乐雅株式会社 | Bathroom system module |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107427165B (en) * | 2015-01-16 | 2020-12-11 | A·B·史密斯 | Shower room and installation method |
CN104895302B (en) * | 2015-06-25 | 2017-10-03 | 浙江乔兴建设集团有限公司 | A kind of wall body structure for accommodating cistern |
CN108278010B (en) * | 2018-04-26 | 2019-08-02 | 圣康源养生科技(苏州)有限公司 | A kind of optical wave house lateral plate structure |
CN113250493B (en) * | 2021-05-18 | 2024-07-12 | 浙江亚厦装饰股份有限公司 | Bathroom with quick detach function |
CN113250492B (en) * | 2021-05-18 | 2024-09-06 | 浙江亚厦装饰股份有限公司 | Modularized assembly integral bathroom |
CN118881080B (en) * | 2024-09-23 | 2025-01-10 | 中建五局装饰幕墙有限公司 | A stable high-strength aluminum curtain wall |
Family Cites Families (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3802142A (en) * | 1972-10-13 | 1974-04-09 | C Fehr | Ceiling panels |
DE2537877A1 (en) * | 1975-08-26 | 1977-03-10 | Bosch Gmbh Robert | Bathroom assembled from prefabricated components - has wall panels mounted on base for removable floor panel with sub-floor plumbing |
EP0044055B1 (en) * | 1980-07-10 | 1984-06-20 | Frank Huster | Toilet cabin constructed from prefabricated elements |
AU587275B2 (en) * | 1985-08-08 | 1989-08-10 | Neil Migliore | Installing marble panels |
US5155958A (en) * | 1991-10-17 | 1992-10-20 | Huff James C | Fastening and support system for architectural panels |
FR2735674B1 (en) * | 1995-06-23 | 1997-07-25 | Spie Citra | MODULAR SANITARY ASSEMBLY |
DE19537000C1 (en) * | 1995-10-04 | 1997-05-28 | Adrian Rogger | Method for the adjustable fastening of slats, rails, plates or the like to a solid surface and fastening element for carrying out the method |
DE19810773A1 (en) * | 1998-03-07 | 1999-09-16 | Volker Reinhold | Method for laying floor panels onto rough base |
DE19815665A1 (en) * | 1998-04-08 | 1999-10-14 | Eba Paneelwerk Gmbh | Connecting claw for connecting grooved panel elements |
-
2001
- 2001-05-07 CA CA002408039A patent/CA2408039A1/en not_active Abandoned
- 2001-05-07 JP JP2001581664A patent/JP2004512444A/en active Pending
- 2001-05-07 AU AU2001263905A patent/AU2001263905A1/en not_active Abandoned
- 2001-05-07 WO PCT/EP2001/005125 patent/WO2001084999A1/en not_active Application Discontinuation
- 2001-05-07 HU HU0302047A patent/HUP0302047A2/en unknown
- 2001-05-07 CZ CZ20023645A patent/CZ20023645A3/en unknown
- 2001-05-07 BR BR0110560-4A patent/BR0110560A/en not_active Application Discontinuation
- 2001-05-07 PL PL01357244A patent/PL357244A1/en not_active Application Discontinuation
- 2001-05-07 MX MXPA02010835A patent/MXPA02010835A/en not_active Application Discontinuation
- 2001-05-07 CN CN01809071A patent/CN1427688A/en active Pending
- 2001-05-07 EP EP01938182A patent/EP1280445A1/en not_active Withdrawn
- 2001-05-07 IL IL15262101A patent/IL152621A0/en unknown
-
2002
- 2002-12-02 ZA ZA200209758A patent/ZA200209758B/en unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102797366A (en) * | 2011-05-23 | 2012-11-28 | 乐雅株式会社 | Bathroom system module |
CN102797366B (en) * | 2011-05-23 | 2015-01-28 | 乐雅株式会社 | Bathroom system module |
Also Published As
Publication number | Publication date |
---|---|
MXPA02010835A (en) | 2004-09-06 |
IL152621A0 (en) | 2003-06-24 |
ZA200209758B (en) | 2004-04-08 |
CA2408039A1 (en) | 2001-11-15 |
CZ20023645A3 (en) | 2003-04-16 |
WO2001084999A1 (en) | 2001-11-15 |
BR0110560A (en) | 2003-04-01 |
EP1280445A1 (en) | 2003-02-05 |
HUP0302047A2 (en) | 2003-09-29 |
PL357244A1 (en) | 2004-07-26 |
CN1427688A (en) | 2003-07-02 |
AU2001263905A1 (en) | 2001-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4118854A (en) | Powder room and bathroom system and method of assembling same | |
US2340323A (en) | Plumbing system | |
CN110295768A (en) | Assembled steel structure building with integrated kitchen and bathroom | |
US1978842A (en) | Building construction | |
DE102018103649A1 (en) | Sanitary wall module and method for building a sanitary wall | |
JPH07122340B2 (en) | Building equipment for multi-storey buildings | |
US20030140572A1 (en) | Structure for pre-assembled bathroom and method of installation of the bathroom | |
JP2004512444A (en) | Pre-assembled bathroom structure and bathroom installation method | |
US3230549A (en) | Modular frame construction and installation of bathroom fixtures | |
DE19639770C2 (en) | Process and kit for cladding and piping of sanitary rooms | |
AU2011201797B2 (en) | Prefabricated Room Assembly | |
CN103982042B (en) | The assembling process of the assembled engineering of a kind of quick house ornamentation | |
CN210713944U (en) | Prefabricated steel structure building with integrated kitchen and bathroom | |
JP3140229B2 (en) | Dwelling unit variable housing system | |
KR100259422B1 (en) | Construction method of prefabricated bathroom | |
GB2592176A (en) | Prebuilt module for installing water-related fittings | |
AU593457B2 (en) | Prefabricated plumbing units | |
JP2003138630A (en) | Attaching structure of wall ornament type sanitary facility and equipment in sanitary unit | |
KR101050191B1 (en) | How to install the faucet | |
JP3525075B2 (en) | Underfloor equipment construction method of apartment house | |
JPH0542139Y2 (en) | ||
JP2001123681A (en) | Unit type kitchen and sanitary space facility | |
JPH0754371Y2 (en) | Toilet bowl installation structure | |
KR200413493Y1 (en) | Bathroom hot and cold water pipe joint | |
WO2019093517A1 (en) | Sanitary apparatus, room unit, method for constructing sanitary apparatus, and method for constructing room unit |