[go: up one dir, main page]

JP2004137072A - Trolley crane - Google Patents

Trolley crane Download PDF

Info

Publication number
JP2004137072A
JP2004137072A JP2002305695A JP2002305695A JP2004137072A JP 2004137072 A JP2004137072 A JP 2004137072A JP 2002305695 A JP2002305695 A JP 2002305695A JP 2002305695 A JP2002305695 A JP 2002305695A JP 2004137072 A JP2004137072 A JP 2004137072A
Authority
JP
Japan
Prior art keywords
hoisting
trolley
drum
ropes
pulleys
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
JP2002305695A
Other languages
Japanese (ja)
Other versions
JP4190854B2 (en
Inventor
Katsumi Takeuchi
竹内 克己
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
IHI Transport Machinery Co Ltd
Original Assignee
Ishikawajima Transport Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ishikawajima Transport Machinery Co Ltd filed Critical Ishikawajima Transport Machinery Co Ltd
Priority to JP2002305695A priority Critical patent/JP4190854B2/en
Publication of JP2004137072A publication Critical patent/JP2004137072A/en
Application granted granted Critical
Publication of JP4190854B2 publication Critical patent/JP4190854B2/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

【課題】巻上索の寿命を長くし得るトロリクレーンを提供する。
【解決手段】トロリ台枠1に設けられた巻上ドラム3と、トロリ台枠1に枢支した6つの滑車4,5と、トロリ台枠1の下方に位置すべき構体2と、巻上ドラム3より夫々の滑車4,5を介して構体2に接続される6本の巻上索25,26とを備え、巻上ドラム3から構体2までの巻上索25,26はS字曲げを無くして巻かれる。これにより、巻上索25,26はS字曲げを無くして巻き掛けられるので、巻上索25,26の寿命を長くすることができる。
【選択図】    図1
An object of the present invention is to provide a trolley crane capable of extending a service life of a hoisting line.
A hoist drum provided on a trolley frame, six pulleys pivotally supported by the trolley frame, a structure to be positioned below the trolley frame, and a hoist. And six hoisting cables 25 and 26 connected to the structure 2 from the drum 3 via respective pulleys 4 and 5, and the hoisting cables 25 and 26 from the hoisting drum 3 to the structure 2 are S-shaped bent. And rolled up. Thereby, since the hoisting ropes 25 and 26 are wound around without the S-shaped bending, the life of the hoisting ropes 25 and 26 can be extended.
[Selection diagram] Fig. 1

Description

【0001】
【発明の属する技術分野】
本発明はトロリクレーンに関するものである。
【0002】
【従来の技術】
図11、図12は従来のトロリクレーンのうち、特に巻上索が16本のトロリクレーンであり、このトロリクレーンは、水平に架設したガーダ(図示せず)に沿って横行するトロリ台枠101と、該トロリ台枠101に昇降可能に吊り下げるべきヘッドブロック102とを備えている。
【0003】
トロリ台枠101の上方には左右一対の巻上ドラム103を備え、トロリ台枠101の前方両側部、後方両側部には、ヘッドブロック102の左右方向への振れを抑制するための案内滑車104,105を夫々枢支し、トロリ台枠101における案内滑車104,105の至近には、ヘッドブロック102の前後方向への振れを抑制するための一対の案内滑車106,107を夫々枢支し、又、トロリ台枠101における案内滑車104,105の上方近傍で巻上ドラムに相対する位置には転向滑車108,109を枢支すると共に、案内滑車104,105,106,107の近傍には複数の係止部材110,111,112,113を設けている。一方、ヘッドブロック102の前端中央部、後端中央部には、昇降滑車114,115を夫々2つずつ、両側中央部には、昇降滑車116を左右に夫々2つずつ枢支しており、ヘッドブロック102の下部には、揚重対象物に係合可能なフック等吊具(図示せず)を有している。
【0004】
巻上ドラム103の外側位置には、転向滑車108、案内滑車104及び昇降滑車114を介して係止部材110まで延在する2本の巻上索117と、転向滑車109、案内滑車105及び昇降滑車115を介して係止部材111まで延在する2本の巻上索118とを備えている。2本の巻上索117は、互いに交差するよう昇降滑車114に巻き掛けられると共に、巻上ドラム103と転向滑車108の間でS字曲げの配置に掛け廻されており、2本の巻上索118は、互いに交差する配置されてよう昇降滑車115に巻き掛けられている。ここで、巻上索117のS字曲げとは、巻上索117が巻上ドラム、転向滑車、案内滑車等(図11では巻上ドラム103)により一方に曲げられた後、今度は巻上索117の進行に伴って巻上ドラム、転向滑車、案内滑車等(図11では転向滑車108)により他方(図11では逆方向)に曲げられることをいい、以下、S字曲げは同様の意味を示す。
【0005】
又、巻上ドラム103の内側位置には、案内滑車106及び昇降滑車116を介して係止部材112まで延在する左右で2本の巻上索119と、案内滑車107及び昇降滑車116を介して係止部材113まで延在する左右で2本の巻上索120とを備え、前後で2本の巻上索119,120は、互いに交差するよう昇降滑車116に巻き掛けられており、そのうち巻上索119は、巻上ドラム103と案内滑車106の間でS字曲げの配置に掛け廻されている。
【0006】
上述した巻上索117、118、119,120の巻き掛け形式を採用して16本のタスキ掛けのトロリクレーンを形成することにより、トロリ台枠101とヘッドブロック102の間における巻上索117,117の間隔、巻上索118,118の間隔、左右の巻上索119,120の間隔が、トロリ台枠101に近づくほど拡大している。
【0007】
図11、図12に示すトロリクレーンでは、巻上ドラム103を回転させて巻上索117、118、119,120を同時に繰り出すと、案内滑車104、105、106、107と昇降滑車114、115、116の間での夫々の巻上索117、118、119,120の見掛けの繰り出し長が増大し、トロリ台枠101に対してヘッドブロック102が下降する。一方、これとは逆に、巻上ドラム103を逆回転させて巻上索117、118、119,120を同時に巻き取ると、これらの巻上索117、118、119,120の見掛けの繰り出し長が減少し、トロリ台枠101に対してヘッドブロック102が上昇する。
【0008】
又、2本の巻上索117に作用する張力と2本の巻上索118に作用する張力により、ヘッドブロック102の左右方向への振れが抑制され、巻上索119,120に作用する張力と巻上索119,120に作用する張力により、ヘッドブロック102の前後方向への振れが抑制される。
【0009】
図13〜図16はトロリクレーンの他の例であって、特に巻上索が6本のトロリクレーンであり、このトロリクレーンは、水平に架設したガーダ(図示せず)に沿って横行するトロリ台枠201と、該トロリ台枠201に昇降可能に吊り下げるべきヘッドブロック202とを備えている。
【0010】
トロリ台枠201の上方には巻上ドラム203を備え、トロリ台枠201の前端右側部、前端左側部で下面至近には、トロリ台枠201の横行方向に対して夫々異なる方向へ回転軸を備える一対の案内滑車204及び一対の案内滑車205を夫々枢支し、トロリ台枠201の後端中央部で下面至近には、トロリ台枠201の横行方向に対して略直角方向へ回転軸を備える一対の案内滑車206を枢支し、又、トロリ台枠201における案内滑車204,205,206の上方近傍で巻上ドラム203に相対する位置には一対の転向滑車207,208,209を夫々枢支している。一方、ヘッドブロック202の前端部、後端右側部、後端左側部には、連結具210,211,212を備えており、ヘッドブロック202の下部には、揚重対象物に係合可能なフック吊具213を有している。
【0011】
ここで、連結具210,211,212は、ヘッドブロック202のブラケット214にピン215を介して枢着される可傾機構216と、可傾機構216の上部に枢着した2つのターンバックル217,218とを備え、可傾機構216は、左右の傾斜を調整し得るイコライザを構成するよう、ピン215側に位置する基部支持部219と、ターンバックル側に位置して基部支持部219に直交ピン220を介して枢着される連結支持部221と、基部支持部219と連結支持部221とを所望の角度で固定するよう連結支持部221の両側に配置されるスクリュー軸222及び螺合ホルダ223の固定手段224とを備えている。
【0012】
一方、巻上ドラム203の一方の外側位置には、転向滑車207及び案内滑車204を介して連結具210のターンバックル217及び連結具211のターンバックル218に夫々接続される巻上索225及び巻上索226とを備え、巻上ドラム203の他方の外側位置には、転向滑車208及び案内滑車205を介して連結具210のターンバックル218及び連結具212のターンバックル217に夫々接続される巻上索227及び巻上索228とを備えている。巻上ドラム203の内側位置には、転向滑車209及び案内滑車206を介して連結具211のターンバックル217及び連結具212のターンバックル218に夫々接続される巻上索229及び巻上索230とを備えている。ここで、巻上索225〜228は、巻上ドラム203と転向滑車207,208の間でS字曲げの配置に掛け廻されている。なお、図中、231は巻上ドラム203を回転させる駆動装置を示している。
【0013】
上述した巻上索225〜230の巻き掛け形式を採用して6本のトロリクレーンを形成することにより、トロリ台枠201とヘッドブロック202の間における巻上索225,227の間隔、巻上索226,229の間隔、及び巻上索227,228の間隔が、トロリ台枠201に近づくほど拡大している。
【0014】
図13〜図16に示すトロリクレーンでは、駆動装置231により巻上ドラム203を回転させて巻上索225〜230を同時に繰り出すと、案内滑車204,205,206と連結具210,211,212の間での巻上索225〜230の見掛けの繰り出し長が増大し、トロリ台枠201に対してヘッドブロック202が下降する。一方、これとは逆に、駆動装置231によって巻上ドラム203を逆回転させて巻上索225〜230を同時に巻き取ると、これらの巻上索225〜230の見掛けの繰り出し長が減少し、トロリ台枠201に対してヘッドブロック202が上昇する。
【0015】
又、トロリ台枠201とヘッドブロック202の間における巻上索225,227の間隔、巻上索228,230の間隔、及び巻上索226,229の間隔を、トロリ台枠201に近づくほど拡大させていることにより、巻上索225,227に作用する張力、巻上索228,230に作用する張力、及び巻上索225,227に作用する張力により、ヘッドブロック202の前後左右への振れを抑制する。ここで、トロリクレーンに関しては、例えば、次の特許文献1等において開示がなされている。
【0016】
【特許文献1】
特開2002−193676号公報
【0017】
【発明が解決しようとする課題】
しかしながら、図11、図12に示すトロリクレーンでは巻上索119がS字曲げに配置され、且つ他の巻上索117,118が転向滑車108,109、案内滑車104,105及び昇降滑車114,115によって曲げ回数を3回以上に構成されると共に、図13〜図16に示すトロリクレーンでは巻上索225〜228がS字曲げに配置されるので、夫々の巻上索117〜119、225〜228の寿命が短く、トロリクレーンの管理及び維持コストが上昇するといった問題がある。
【0018】
本発明は上述した実情に鑑みてなしたもので、巻上索の寿命を長くし得るトロリクレーンを提供することを目的としている。
【0019】
【課題を解決するための手段】
本発明の請求項1に記載の発明は、トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支した6つの滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより夫々の滑車を介して構体に接続される6本の巻上索とを備え、前記巻上ドラムから構体までの巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン、に係るものである。
【0020】
本発明の請求項2に記載の発明は、トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支する2つの第一の案内滑車と、前記トロリ台枠に枢支して第一の案内滑車と異なる方向に回転軸を備える2つの第二の案内滑車と、前記トロリ台枠に枢支して第一の案内滑車及び第二の案内滑車と異なる方向に回転軸を備える2つの第三の案内滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより2つの第一の案内滑車を介して垂下する2本の第一の巻上索と、前記巻上ドラムより2つの第二の案内滑車を介して垂下する2本の第二の巻上索と、前記巻上ドラムより2つの第三の案内滑車を介して垂下する2本の第三の巻上索と、前記2本の第一の巻上索を構体にまとめて接続する第一の連結具と、前記2本の第二の巻上索を構体にまとめて接続する第二の連結具と、前記2本の第三の巻上索を構体にまとめて接続する第三の連結具とを備え、前記第一の案内滑車、第二の案内滑車及び第三の案内滑車から構体までの第一の巻上索、第二の巻上索及び第三の巻上索は水平面で三角形の辺上に配置され、且つ前記巻上ドラムから構体までの第一の巻上索、第二の巻上索及び第三の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン、に係るものである。
【0021】
本発明の請求項3に記載の発明は、トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支した12つの滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより夫々の滑車を介して構体に接続される12本の巻上索とを備え、前記巻上ドラムから構体までの12本の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン、に係るものである。
【0022】
本発明の請求項4に記載の発明は、トロリ台枠に設けられて水平面で三角形の辺上に配置される第一の巻上ドラム、第二の巻上ドラム及び第三の巻上ドラムと、前記第一の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第一の案内滑車及び一対の第二の案内滑車と、前記第二の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第三の案内滑車及び一対の第四の案内滑車と、前記第三の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第五の案内滑車及び一対の第六の案内滑車と、前記トロリ台枠の下方に位置すべき構体と、前記第一の巻上ドラムより第一の案内滑車及び第二案内滑車を介して垂下する2本の第一の巻上索及び2本の第二の巻上索と、前記第二の巻上ドラムより第三の案内滑車及び第四案内滑車を介して垂下する2本の第三の巻上索及び2本の第四の巻上索と、前記第三の巻上ドラムより第五の案内滑車及び第六の案内滑車を介して垂下する2本の第五の巻上索及び2本の第六の巻上索と、前記2本の第一の巻上索及び2本の第三の巻上索を構体にまとめて接続する第一の連結具と、前記2本の第四の巻上索及び2本の第五の巻上索を構体にまとめて接続する第二の連結具と、前記2本の第六の巻上索及び2本の第二の巻上索を構体にまとめて接続する第三の連結具とを備え、前記巻上ドラムから構体までの第一の巻上索、第二の巻上索、第三の巻上索、第四の巻上索、第五の巻上索及び第六の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン、に係るものである。
【0023】
本発明の請求項5に記載の発明は、巻上ドラムから構体までの巻上索が曲げ回数を2回以下にして巻き掛けられたことを特徴とする請求項1〜4のいずれかに記載のトロリクレーン、に係るものである。
【0024】
本発明の請求項6に記載の発明は、トロリ台枠に転向滑車を備えた請求項1、2又は5記載のトロリクレーン、に係るものである。
【0025】
本発明の請求項7に記載の発明は、連結具は、構体に取り付けたイコライザと、該イコライザに枢着されて巻上索を連結させるターンバックルとを備えた請求項1〜6のいずれかに記載のトロリクレーン、に係るものである。
【0026】
このように、本発明の請求項1、2、3又は4によれば、巻上索はS字曲げを無くして巻き掛けられるので、巻上索の寿命を長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0027】
請求項5に示す如く、巻上ドラムから構体までの巻上索が曲げ回数を2回以下にして巻き掛けられると、曲げ回数を低減するので、巻上索の寿命を一層長くし、トロリクレーンの管理及び維持コストを大幅に低減することができる。
【0028】
請求項6に示す如く、トロリ台枠に転向滑車を備えると、請求項1、2又は5記載のトロリクレーンにおける巻上索の配置及び移動方向を適切にするので、巻上索への負荷を低減して巻上索の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0029】
本発明の請求項7に示す如く、連結具は、構体に取り付けたイコライザと、該イコライザに枢着されて巻上索を連結させるターンバックルとを備えると、構体の水平方向の位置を調整して、巻上索に係る荷重を適切に配分するので、巻上索の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0030】
【発明の実施の形態】
以下、本発明の実施の形態を、図示例とともに説明する。
【0031】
図1〜図5は本発明のトロリクレーンの実施の形態の第一例を示すものであり、特に巻上索が6本のトロリクレーンである。
【0032】
第一例のトロリクレーンは、水平に架設したガーダ(図示せず)上を横行するトロリ台枠1と、該トロリ台枠1に吊り下げるべき構体のヘッドブロック2とを備えている。
【0033】
トロリ台枠1の上方には、駆動装置(図示せず)を介して駆動する一本の巻上ドラム3を設けており、トロリ台枠1の前部と右側部で下面至近には、トロリ台枠1の横行方向に対して異なる方向の直線上に回転円周の方向を向けるよう、所定の間隔を介して略平行な回転軸を備える2つの第一の案内滑車4,5を枢支し、又、トロリ台枠1の前部と左側部で下面至近には、トロリ台枠1の横行方向に対して他の異なる方向の略直線上に回転円周の方向を向けるよう、所定の間隔を介して略平行な回転軸を備える2つの第二の案内滑車6,7を枢支し、更に、トロリ台枠1における巻上ドラム3の下方位置には、トロリ台枠1の横行方向に対して略垂直な直線上に回転円周の方向を向けるよう、所定の間隔を介して略平行な回転軸を備える2つの第三の案内滑車8,9を枢支している。更に、トロリ台枠1おける案内滑車4,6の上方近傍で巻上ドラム3に相対する位置には転向滑車10,11を枢支している。
【0034】
一方、ヘッドブロック2の前端右側部、前端左側部、後端部には、第一の連結具12、第二の連結具13及び第三の連結具14を備え、ヘッドブロック2の下部には、揚重対象物に係合可能なフック等吊具(図示せず)を設けている。
【0035】
ここで、第一の連結具12、第二の連結具13は、ヘッドブロック2のブラケット15にピン16を介して枢着される可傾機構17を備え、可傾機構17は、左右の傾斜を調整し得るイコライザを構成するよう、ヘッドブロック2側に位置する基部支持部18と、反ヘッドブロック側に位置して基部支持部18に直交ピン(図示せず)を介して枢着される連結支持部19と、基部支持部18と連結支持部19とを所望の角度で固定する固定手段20とを備えている。ここで、第一の連結具12、第二の連結具13はターンバックルを備えてもよい。なお、固定手段は従来例と略同様なものでもよいし、他の構成のものでもよい。又、第三の連結具14は、ヘッドブロック2のブラケット21にピン22を介して枢着される可傾機構23と、可傾機構23の上部に枢着した2つのターンバックル24とを備え、可傾機構23は、第一の連結具12、第二の連結具13と略同様な構成を備えている。
【0036】
一方、巻上ドラム3の一方の外側及び中央位置には、トロリ台枠1の右側部の第一の案内滑車5を介するよう延在して垂下する一方の第一の巻上索25と、一方の転向滑車10及び他方の第一の案内滑車4を介するよう延在して垂下する他方の第一の巻上索26とを備え、巻上ドラム3の他方の外側及び中央位置には、トロリ台枠1の左側部の第二の案内滑車7を介するよう延在して垂下する一方の第二の巻上索27と、転向滑車11及び他方の第二の案内滑車6を介するよう延在して垂下する他方の第二の巻上索28とを備え、巻上ドラム3の両側位置には、一方の第三の案内滑車8を介するよう延在して垂下する一方の第三の巻上索29と、他方の第三の案内滑車9を介するよう延在して垂下する他方の第三の巻上索30を備えている。
【0037】
2本の第一の巻上索25,26は、第一の連結具12の連結支持部19に夫々接続されることによって、まとめてヘッドブロック2に接続されており、2本の第二の巻上索27,28は、第二の連結具13の連結支持部19に夫々接続されることによって、まとめてヘッドブロック2に接続されており、2本の第三の巻上索29,30は、第三の連結具14のターンバックル24に夫々接続されることによって、まとめてヘッドブロック2に接続されている。ここで、第一の案内滑車4,5、第二の案内滑車6,7及び第三の案内滑車8,9からヘッドブロック2までの第一の巻上索25,26、第二の巻上索27,28及び第三の巻上索29,30は、水平面で三角形の辺上に配置されている。
【0038】
以下、本発明の実施の形態の第一例の作用を説明する。
【0039】
構体のヘッドブロック2を移動させる際には、駆動装置(図示せず)で巻上ドラム3を回転させて6本の巻上索25〜30を同時に繰り出すことにより、案内滑車4〜9と連結具12,13,14の間での6本の巻上索25〜30の見掛けの繰り出し長が増大し、トロリ台枠1に対してヘッドブロック2が下降する。一方、これとは逆に、駆動装置によって巻上ドラム3を逆回転させて6本の巻上索25〜30を同時に巻き取ると、これらの6本の巻上索25〜30の見掛けの繰り出し長が減少し、トロリ台枠1に対してヘッドブロック2が上昇する。
【0040】
又、トロリ台枠1とヘッドブロック2の間における巻上索25,26の間隔、巻上索27,28の間隔、及び巻上索29,30の間隔を、トロリ台枠1に近づくほど拡大させていることにより、巻上索25,26に作用する張力、巻上索27,28に作用する張力、及び巻上索29,30に作用する張力により、ヘッドブロック2の前後左右への振れを抑制する。
【0041】
このように、第一例によれば、6本の巻上索25〜30はS字曲げを無くして、巻上ドラム3、転向滑車10,11、案内滑車4〜9等に巻き掛けられるので、6本の巻上索25〜30の寿命を長くし、トロリクレーンの管理及び維持コストを低減することができる。又、第一例によれば、第一の連結具12及び第二の連結具13に対して第三の連結具14の配置を変更することにより、ヘッドブロック2のヘッドブロック2の大きさを変更し得るので、吊具等を大きくしたり、小さくしたりするよう適宜変更することができる。
【0042】
又、巻上ドラム3から構体のヘッドブロック2までの6本の巻上索25〜30のうち少なくとも1本以上、巻上索25〜30が曲げ回数を転向滑車10,11、案内滑車4〜9により2回以下にして巻かれると、曲げ回数を3回から低減し得るので、巻上索25〜30の寿命を一層長くし、トロリクレーンの管理及び維持コストを大幅に低減することができる。
【0043】
更に、トロリ台枠1に転向滑車10,11を備えると、第一例における巻上索25〜30の配置及び移動方向を適切にするので、巻上索25〜30への負荷を低減して巻上索25〜30の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0044】
更に又、連結具は、ヘッドブロック2に取り付けて、基部支持部18、連結支持部19、固定手段20等から成るイコライザと、該イコライザに枢着されて巻上索25〜30を連結させるターンバックル24とを備えると、ヘッドブロック2の水平方向の位置を調整して、巻上索25〜30に係る荷重を適切に配分するので、巻上索25〜30の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0045】
図6〜図10は本発明のトロリクレーンの実施の形態の第二例を示すものであり、特に巻上索が12本のトロリクレーンである。
【0046】
第二例のトロリクレーンは、水平に架設したガーダ(図示せず)上を横行するトロリ台枠41と、該トロリ台枠41に吊り下げるべき構体のヘッドブロック42とを備えている。
【0047】
トロリ台枠41の上方には、水平面で正三角形の辺上に配置されて駆動する第一の巻上ドラム43、第二の巻上ドラム44及び第三の巻上ドラム45とを備えている。
【0048】
トロリ台枠41の下面至近における第一の巻上ドラム43の下方位置には、巻上ドラム43の回転軸と異なる二方向へ回転軸を備える一対の第一の案内滑車46及び一対の第二の案内滑車47を枢支し、トロリ台枠41の下面至近における第二の巻上ドラム44の下方位置には、巻上ドラム44の回転軸と異なる二方向へ回転軸を備える一対の第三の案内滑車48及び一対の第四の案内滑車49を枢支し、トロリ台枠41の下面至近における第三の巻上ドラム45の下方位置には、巻上ドラム45の回転軸と異なる二方向へ回転軸を備える一対の第五の案内滑車50及び一対の第六の案内滑車51を枢支し、ここで、図9に示す如く、一対の第一の案内滑車46と一対の第五の案内滑車50、一対の第二の案内滑車47と一対の第四の案内滑車49、一対の第三の案内滑車48と一対の第六の案内滑車51は、回転軸を夫々略平行に向けている。
【0049】
一方、ヘッドブロック42の前端右側部、後端部、前端左側部には、水平面で正三角形の頂点位置に配置されて第一の連結具52、第二の連結具53及び第三の連結具54を備え、ヘッドブロック42の下部には、揚重対象物に係合可能なフック等吊具(図示せず)を設けている。
【0050】
ここで、第一の連結具52、第二の連結具53、第三の連結具54は、図10に示す如く、ヘッドブロック42のブラケット55にピン56を介して枢着される可傾機構57と、可傾機構57の上部両側にピン58を介して枢着される連結体59と、連結体59の上部に夫々枢着した2つ(計4つ)のターンバックル60とを備え、可傾機構57は、左右の傾斜を調整し得るイコライザを構成するよう、ヘッドブロック側に位置する基部支持部61と、反ヘッドブロック側に位置して基部支持部61に直交ピン62を介して枢着される連結支持部63と、基部支持部61と連結支持部63とを所望の角度で固定する固定手段(図示せず)とを備えている。ここで、固定手段は従来例と略同様なものでもよいし、他の構成のものでもよい。
【0051】
一方、第一の巻上ドラム43の両側位置には、一対の第一の案内滑車46を介するよう延在して垂下する2本の第一の巻上索64と、一対の第二の案内滑車47を介するよう延在して垂下する2本の第二の巻上索65とを備え、第二の巻上ドラム44の両側位置には、一対の第三の案内滑車48を介するよう延在して垂下する2本の第三の巻上索66と、一対の第四の案内滑車49を介するよう延在して垂下する2本の第四の巻上索67と、第三の巻上ドラム45の両側位置には、一対の第五の案内滑車50を介するよう延在して垂下する2本の第五の巻上索68と、一対の第六の案内滑車51を介するよう延在して垂下する2本の第六の巻上索69とを備えている。
【0052】
2本の第一の巻上索64及び2本の第三の巻上索66は、第一の連結具52のターンバックル60に夫々接続されることによって、4本をまとめてヘッドブロック42に接続されており、2本の第四の巻上索67及び2本の第五の巻上索68は、第二の連結具53のターンバックル60に夫々接続されることによって、4本をまとめてヘッドブロック42に接続されており、2本の第六の巻上索69及び2本の第二の巻上索65は、第三の連結具54のターンバックル60に夫々接続されることによって、4本をまとめてヘッドブロック42に接続されている。
【0053】
以下、本発明の実施の形態の第二例の作用を説明する。
【0054】
構体のヘッドブロック42を移動させる際には、駆動装置(図示せず)で巻上ドラム43〜45を回転させて12本の巻上索64〜69を同時に繰り出すことにより、案内滑車46〜51と連結具52〜54の間での巻上索64〜69の見掛けの繰り出し長が増大し、トロリ台枠41に対してヘッドブロック42が下降する。一方、これとは逆に、駆動装置によって巻上ドラム43〜45を逆回転させて巻上索64〜69を同時に巻き取ると、これらの巻上索64〜69の見掛けの繰り出し長が減少し、トロリ台枠41に対してヘッドブロック42が上昇する。
【0055】
又、トロリ台枠41とヘッドブロック42の間における巻上索64,66の間隔、巻上索67,68の間隔、及び巻上索69,64の間隔を、トロリ台枠41に近づくほど拡大させていることにより、巻上索64,66に作用する張力、巻上索67,68に作用する張力、及び巻上索69,64に作用する張力により、ヘッドブロック42の前後左右への振れを抑制する。
【0056】
このように、第二例によれば、12本の巻上索64〜69はS字曲げを無くして、巻上ドラム43〜45、案内滑車46〜51等に巻き掛けられるので、12本の巻上索64〜69の寿命を長くし、トロリクレーンの管理及び維持コストを低減することができる。なお、このような巻き掛け方は他の種類のトロリクレーン等に利用することができる。
【0057】
巻上ドラム43〜45から構体のヘッドブロック42までの巻上索64〜69のうち少なくとも1本以上の巻上索64〜69が曲げ回数を案内滑車46〜51による1回にして巻き掛けられると、曲げ回数を3回から大幅に低減し得るので、巻上索64〜69の寿命を一層長くし、トロリクレーンの管理及び維持コストを大幅に低減することができる。又、ヘッドブロックの昇降滑車を不要にして巻上索64〜69を上方へ戻すような配置を防止することができる。
【0058】
連結具52〜54は、ヘッドブロック2に取り付けて、基部支持部61、連結支持部63、固定手段等から成るイコライザと、該イコライザに枢着されて巻上索64〜69を連結させるターンバックル60とを備えると、ヘッドブロック42の水平方向の位置を調整して、巻上索64〜69に係る荷重を適切に配分するので、巻上索64〜69の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0059】
更に又、巻上索64〜69を12本にするので、巻上索が6本のトロリクレーンよりも巻上索64〜69のロープ径dを小さくし、巻上ドラム43〜45のドラム径Dに対する巻上索64〜69のロープ径dの比(D/d)を大きくし、トロリクレーンの性能を向上させることができる。
【0060】
なお、本発明のトロリクレーンは、上述した実施の形態のみに限定されるものではなく、本発明の要旨を逸脱しない範囲において変更を加え得ることは勿論である。
【0061】
【発明の効果】
以上述べたように、本発明のトロリクレーンによれば下記のような優れた効果を奏し得る。
【0062】
(1)本発明の請求項1、2、3又は4によれば、巻上索はS字曲げを無くして巻き掛けられるので、巻上索の寿命を長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0063】
(2)請求項5に示す如く、巻上ドラムから構体までの巻上索が曲げ回数を2回以下にして巻き掛けられると、曲げ回数を低減するので、巻上索の寿命を一層長くし、トロリクレーンの管理及び維持コストを大幅に低減することができる。
【0064】
(3)請求項6に示す如く、トロリ台枠に転向滑車を備えると、請求項1、2又は5記載のトロリクレーンにおける巻上索の配置及び移動方向を適切にするので、巻上索への負荷を低減して巻上索の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【0065】
(4)本発明の請求項7に示す如く、連結具は、構体に取り付けたイコライザと、該イコライザに枢着されて巻上索を連結させるターンバックルとを備えると、構体の水平方向の位置を調整して、巻上索に係る荷重を適切に配分するので、巻上索の寿命を更に長くし、トロリクレーンの管理及び維持コストを低減することができる。
【図面の簡単な説明】
【図1】本発明のトロリクレーンの実施の形態の第一例を示す概念図である。
【図2】図1のII−II矢視図である。
【図3】図1のIII−III矢視図である。
【図4】図1のIV−IV矢視図である。
【図5】図1のV−V矢視図である。
【図6】本発明のトロリクレーンの実施の形態の第二例を示す概念図である。
【図7】図6のVII−VII矢視図である。
【図8】図6のVIII−VIII矢視図である。
【図9】図6のIX−IX矢視図である。
【図10】図6に関連するヘッドブロック及び連結具の外観図である。
【図11】従来のトロリクレーンの一例を示す概念図である。
【図12】図11のXII−XII矢視図である。
【図13】従来のトロリクレーンの他の例を示す概念図である。
【図14】図13のXIV−XIV矢視図である。
【図15】図13のXV−XV矢視図である。
【図16】図13に関連するヘッドブロック及び連結具の外観図である。
【符号の説明】
1  トロリ台枠
2  ヘッドブロック(構体)
3  巻上ドラム
4  第一の案内滑車(滑車)
5  第一の案内滑車(滑車)
6  第二の案内滑車(滑車)
7  第二の案内滑車(滑車)
8  第三の案内滑車(滑車)
9  第三の案内滑車(滑車)
10  転向滑車
11  転向滑車
12  第一の連結具
13  第二の連結具
14  第三の連結具
18  基部支持部(イコライザ)
19  連結支持部(イコライザ)
20  固定手段(イコライザ)
24  ターンバックル
25  第一の巻上索
26  第一の巻上索
27  第二の巻上索
28  第二の巻上索
29  第三の巻上索
30  第三の巻上索
41  トロリ台枠
42  ヘッドブロック(構体)
43  第一の巻上ドラム
44  第二の巻上ドラム
45  第三の巻上ドラム
46  第一の案内滑車(滑車)
47  第二の案内滑車(滑車)
48  第三の案内滑車(滑車)
49  第四の案内滑車(滑車)
50  第五の案内滑車(滑車)
51  第六の案内滑車(滑車)
52  第一の連結具
53  第二の連結具
54  第三の連結具
60  ターンバックル
61  基部支持部(イコライザ)
62  直交ピン(イコライザ)
63  連結支持部(イコライザ)
64  第一の巻上索
65  第二の巻上索
66  第三の巻上索
67  第四の巻上索
68  第五の巻上索
69  第六の巻上索
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a trolley crane.
[0002]
[Prior art]
FIGS. 11 and 12 show a conventional trolley crane, in particular, a trolley crane having 16 hoisting lines. The trolley crane 101 traverses along a horizontally mounted girder (not shown). And a head block 102 to be hung up and down on the trolley frame 101.
[0003]
A pair of right and left hoisting drums 103 are provided above the trolley frame 101, and guide pulleys 104 for suppressing the swing of the head block 102 in the left and right directions are provided on both front and rear sides of the trolley frame 101. , 105, and a pair of guide pulleys 106, 107 for restraining the head block 102 from swinging in the front-rear direction near the guide pulleys 104, 105 in the trolley frame 101, respectively. Turning pulleys 108 and 109 are pivotally supported at positions near the pulleys 104 and 105 on the trolley underframe 101 and opposite to the hoisting drum, and a plurality of turning pulleys 108 and 109 are provided near the guide pulleys 104, 105, 106 and 107. Locking members 110, 111, 112, 113 are provided. On the other hand, two lifting pulleys 114 and 115 are pivotally supported at the center of the front end and the rear end of the head block 102, respectively, and two lifting pulleys 116 are pivotally supported at the center on both sides. At the lower part of the head block 102, there are hooks (not shown) such as hooks that can be engaged with the lifting object.
[0004]
At the outer position of the hoisting drum 103, two hoisting ropes 117 extending to the locking member 110 via the turning pulley 108, the guide pulley 104, and the elevating pulley 114, the turning pulley 109, the guide pulley 105, and the elevating And two hoisting ropes 118 extending to the locking member 111 via the pulley 115. The two hoisting ropes 117 are wound around the elevating pulley 114 so as to intersect with each other, and are also wound around the hoisting drum 103 and the turning pulley 108 in an S-shaped bending arrangement. The ropes 118 are wrapped around lifting sheaves 115 so as to be arranged crossing each other. Here, the S-shaped bending of the hoisting cable 117 means that the hoisting cable 117 is bent to one side by a hoisting drum, a turning pulley, a guide pulley, or the like (the hoisting drum 103 in FIG. 11), and then hoisting. It means that it is bent in the other direction (in the opposite direction in FIG. 11) by a hoisting drum, a turning pulley, a guide pulley or the like (the turning pulley 108 in FIG. 11) as the rope 117 advances. Hereinafter, the S-shaped bending has the same meaning. Is shown.
[0005]
Also, at the inner position of the hoisting drum 103, two right and left hoisting ropes 119 extending to the locking member 112 via the guide pulley 106 and the elevating pulley 116, and the guide pulley 107 and the elevating pulley 116. And two hoisting ropes 120 extending right and left extending to the locking member 113. The two hoisting ropes 119 and 120 are wound around the lifting pulley 116 so as to intersect with each other. The hoisting rope 119 is wound between the hoisting drum 103 and the guide pulley 106 in an S-shaped bending arrangement.
[0006]
By adopting the above-described winding type of the hoisting ropes 117, 118, 119, and 120 to form a 16-rolling trolley crane, the hoisting ropes 117, 117 between the trolley underframe 101 and the head block 102 are formed. The spacing of 117, the spacing of the hoisting ropes 118, 118, and the spacing of the left and right hoisting ropes 119, 120 increase as approaching the trolley frame 101.
[0007]
In the trolley crane shown in FIG. 11 and FIG. 12, when the hoisting drum 103 is rotated and the hoisting ropes 117, 118, 119, and 120 are simultaneously unreeled, the guide pulleys 104, 105, 106, 107, and the lifting pulleys 114, 115, The apparent payout length of each hoisting cable 117, 118, 119, 120 between 116 increases, and the head block 102 descends with respect to the trolley frame 101. On the other hand, if the hoisting drums 103, 118, 119, and 120 are simultaneously wound by rotating the hoisting drum 103 in the reverse direction, the apparent unwinding lengths of these hoisting ropes 117, 118, 119, and 120 are obtained. Is reduced, and the head block 102 moves up with respect to the trolley frame 101.
[0008]
In addition, the tension acting on the two hoisting ropes 117 and the tension acting on the two hoisting ropes 118 suppresses the swing of the head block 102 in the left-right direction, and the tension acting on the hoisting ropes 119 and 120. And the tension acting on the hoisting ropes 119 and 120 suppresses the swing of the head block 102 in the front-rear direction.
[0009]
13 to 16 show another example of a trolley crane, particularly a trolley crane having six hoisting lines. The trolley crane traverses along a girder (not shown) that is horizontally erected. A trolley frame 201 and a head block 202 to be suspended from the trolley frame 201 so as to be able to move up and down are provided.
[0010]
A hoisting drum 203 is provided above the trolley frame 201, and the rotating shafts are respectively provided in different directions with respect to the traversing direction of the trolley frame 201 near the lower surface at the front right side and the front left side of the trolley frame 201. The pair of guide pulleys 204 and the pair of guide pulleys 205 are pivotally supported, and a rotation shaft is provided in a direction substantially perpendicular to the transverse direction of the trolley frame 201 near the lower surface at the center of the rear end of the trolley frame 201. A pair of guide pulleys 206 are pivotally supported, and a pair of turning pulleys 207, 208, and 209 are provided at positions near the guide pulleys 204, 205, and 206 on the trolley frame 201 and facing the hoisting drum 203, respectively. It is pivoting. On the other hand, the front end portion, the rear end right side portion, and the rear end left side portion of the head block 202 are provided with connecting members 210, 211, and 212, and the lower portion of the head block 202 can be engaged with a lifting object. It has a hook hanging tool 213.
[0011]
Here, the coupling tools 210, 211, and 212 include a tilting mechanism 216 pivotally attached to the bracket 214 of the head block 202 via a pin 215, and two turnbuckles 217 pivotally mounted on the upper part of the tilting mechanism 216. The tiltable mechanism 216 includes a base support portion 219 located on the pin 215 side and an orthogonal pin mounted on the turnbuckle side so as to constitute an equalizer capable of adjusting the left and right tilt. And a screw shaft 222 and a screw holder 223 disposed on both sides of the connection support 221 to fix the base support 219 and the connection support 221 at a desired angle. And fixing means 224.
[0012]
On the other hand, at one outer position of the hoisting drum 203, a hoisting cable 225 and a hoisting wire 225 connected to the turnbuckle 217 of the connecting tool 210 and the turnbuckle 218 of the connecting tool 211 via the turning pulley 207 and the guide pulley 204, respectively. An upper cable 226 is provided, and at the other outer position of the hoisting drum 203, a winding connected to the turnbuckle 218 of the connecting tool 210 and the turnbuckle 217 of the connecting tool 212 via a turning pulley 208 and a guide pulley 205, respectively. An upper rope 227 and a hoisting rope 228 are provided. At a position inside the hoist drum 203, a hoisting rope 229 and a hoisting rope 230 connected to the turnbuckle 217 of the connecting tool 211 and the turnbuckle 218 of the connecting tool 212 via the turning pulley 209 and the guide pulley 206, respectively. It has. Here, the hoisting ropes 225 to 228 are wound around the winding drum 203 and the deflection pulleys 207 and 208 in an S-shaped bending arrangement. In the drawing, reference numeral 231 denotes a driving device for rotating the hoist drum 203.
[0013]
By forming the six trolley cranes by adopting the above-described winding type of the hoisting ropes 225 to 230, the interval between the hoisting ropes 225 and 227 between the trolley underframe 201 and the head block 202, the hoisting rope. The intervals between 226 and 229 and the intervals between the hoisting ropes 227 and 228 increase as approaching the trolley frame 201.
[0014]
In the trolley crane shown in FIGS. 13 to 16, when the hoisting drum 203 is rotated by the driving device 231 to simultaneously unwind the hoisting ropes 225 to 230, the guide pulleys 204, 205, 206 and the connecting members 210, 211, 212 are connected. The apparent extension length of the hoisting ropes 225 to 230 between them increases, and the head block 202 moves down with respect to the trolley frame 201. On the other hand, when the driving device 231 rotates the hoist drum 203 in the reverse direction and simultaneously winds the hoisting ropes 225 to 230, the apparent unwinding length of these hoisting ropes 225 to 230 decreases. The head block 202 moves up with respect to the trolley frame 201.
[0015]
In addition, the distance between the hoisting ropes 225 and 227, the distance between the hoisting ropes 228 and 230, and the distance between the hoisting ropes 226 and 229 between the trolley frame 201 and the head block 202 are increased as the distance to the trolley frame 201 increases. Due to this, the head block 202 swings back and forth and right and left due to the tension acting on the hoisting ropes 225 and 227, the tension acting on the hoisting ropes 228 and 230, and the tension acting on the hoisting ropes 225 and 227. Suppress. Here, a trolley crane is disclosed in, for example, the following Patent Document 1.
[0016]
[Patent Document 1]
JP-A-2002-193676
[0017]
[Problems to be solved by the invention]
However, in the trolley crane shown in FIGS. 11 and 12, the hoisting rope 119 is arranged in an S-shaped bend, and the other hoisting ropes 117 and 118 are turning pulleys 108 and 109, guide pulleys 104 and 105, and lifting pulleys 114 and 118. The number of bends is made three or more by 115, and in the trolley crane shown in FIGS. 13 to 16, the hoisting ropes 225 to 228 are arranged in an S-shaped bending. 228 have a short life span, and increase the management and maintenance costs of the trolley crane.
[0018]
The present invention has been made in view of the above circumstances, and has as its object to provide a trolley crane that can prolong the service life of a hoisting line.
[0019]
[Means for Solving the Problems]
The invention according to claim 1 of the present invention provides a hoisting drum provided on a trolley frame, six pulleys pivotally supported by the trolley frame, and a structure to be positioned below the trolley frame. Six hoisting ropes connected to the structure via respective pulleys from the hoisting drum, wherein the hoisting ropes from the hoisting drum to the structure are wound without S-bending. A trolley crane characterized by the above.
[0020]
According to a second aspect of the present invention, there is provided a hoisting drum provided on a trolley frame, two first guide pulleys pivotally supported by the trolley frame, and a first guide pulley pivotally supported by the trolley frame. Two second guide pulleys having a rotation axis in a different direction from the first guide pulley; and a rotation axis pivotally supported by the trolley frame in a different direction from the first guide pulley and the second guide pulley. Two third guide pulleys, a structure to be positioned below the trolley underframe, two first hoisting ropes hanging from the hoisting drum via two first guide pulleys, Two second hoisting ropes hanging from the hoisting drum via two second guide pulleys, and two third hoisting ropes hanging from the hoisting drum via two third guide pulleys , A first connector for connecting the two first hoisting cables together in a structure, and the two second hoisting cables. A second connecting member for connecting the two third hoisting cables to the structure; a second connecting member for connecting the two hoisting cables to the structure; and the first guide pulley and the second guide. The first hoisting rope, the second hoisting rope, and the third hoisting rope from the pulley and the third guide pulley to the structure are arranged on a triangular side in a horizontal plane, and are arranged from the hoisting drum to the structure. The first hoisting rope, the second hoisting rope, and the third hoisting rope of the present invention are related to a trolley crane characterized by being wound around without S-shaped bending.
[0021]
The invention according to claim 3 of the present invention provides a hoisting drum provided on a trolley frame, twelve pulleys pivotally supported by the trolley frame, and a structure to be positioned below the trolley frame. Twelve hoisting cables connected to the structure via respective pulleys from the hoisting drum, and twelve hoisting cables from the hoisting drum to the structure are wound around without the S-shaped bending. And a trolley crane.
[0022]
The invention according to claim 4 of the present invention provides a first hoisting drum, a second hoisting drum, and a third hoisting drum which are provided on a trolley underframe and arranged on a triangular side in a horizontal plane. A pair of first guide pulleys and a pair of second guide pulleys positioned below the first hoist drum and pivotally supported by the trolley underframe; and positioned below the second hoist drum. And a pair of third guide pulleys and a pair of fourth guide pulleys pivotally supported by the trolley underframe, and a pair of pivotally supported by the trolley underframes located below the third hoisting drum. A fifth guide pulley and a pair of sixth guide pulleys, a structure to be positioned below the trolley underframe, and a droop from the first hoisting drum via the first guide pulley and the second guide pulley. Two first hoisting ropes and two second hoisting ropes, and a third guide pulley and a fourth guide from the second hoisting drum. Two third hoisting ropes and two fourth hoisting ropes hanging from a car, and hanging from the third hoisting drum via a fifth guide pulley and a sixth guide pulley. The second fifth hoisting rope and the two sixth hoisting ropes, and the second first hoisting rope and the two third hoisting ropes which are collectively connected to the structure. One connecting tool, a second connecting tool that connects the two fourth hoisting cables and the two fifth hoisting cables to a structure, and the two sixth hoisting cables. And a third connecting member for connecting the two second hoisting cables to the structure together, and a first hoisting cable from the hoisting drum to the structure, a second hoisting cable, , A fourth hoisting cable, a fifth hoisting rope, and a sixth hoisting rope are related to a trolley crane characterized by being wound around without S-shaped bending.
[0023]
The invention according to claim 5 of the present invention is characterized in that the hoisting cable from the hoisting drum to the structure is wound with the number of bending times being two or less. Trolley crane.
[0024]
The invention according to claim 6 of the present invention relates to the trolley crane according to claims 1, 2 or 5, wherein the trolley underframe is provided with a turning pulley.
[0025]
The invention according to claim 7 of the present invention is the connector according to any one of claims 1 to 6, wherein the connecting tool includes an equalizer attached to the structure, and a turnbuckle pivotally connected to the equalizer to connect the hoisting cable. A trolley crane according to item 1.
[0026]
As described above, according to the first, second, third, or fourth aspect of the present invention, the hoisting rope is wound around without the S-shaped bend, so that the service life of the hoisting rope is extended, and the trolley crane is managed and maintained. Cost can be reduced.
[0027]
When the hoisting cable from the hoisting drum to the structure is wound with the number of bends being two or less, the number of bends is reduced, so that the service life of the hoisting cable is further lengthened and the trolley crane is provided. Management and maintenance costs can be significantly reduced.
[0028]
According to a sixth aspect of the present invention, when the trolley underframe is provided with a turning pulley, the trolley crane according to the first, second, or fifth aspect has an appropriate arrangement and a moving direction of the hoisting rope. Thus, the service life of the hoisting rope can be further increased, and the management and maintenance costs of the trolley crane can be reduced.
[0029]
According to a seventh aspect of the present invention, when the connecting device includes an equalizer attached to the structure and a turnbuckle pivotally connected to the equalizer to connect the hoisting cable, the connecting device adjusts the horizontal position of the structure. As a result, the load on the hoisting rope is appropriately distributed, so that the service life of the hoisting rope can be further extended, and the management and maintenance costs of the trolley crane can be reduced.
[0030]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of the present invention will be described with reference to the drawings.
[0031]
FIGS. 1 to 5 show a first embodiment of a trolley crane according to the present invention, particularly a trolley crane having six hoisting lines.
[0032]
The trolley crane of the first example includes a trolley frame 1 that traverses a girder (not shown) that is laid horizontally, and a head block 2 of a structure to be hung on the trolley frame 1.
[0033]
Above the trolley frame 1, a single hoisting drum 3 that is driven via a drive device (not shown) is provided. The two first guide pulleys 4 and 5 having substantially parallel rotation axes at predetermined intervals are pivotally supported so as to direct the direction of the rotation circumference on a straight line in a direction different from the transverse direction of the underframe 1. In addition, a predetermined direction is set near the lower surface of the front and left sides of the trolley frame 1 so as to direct the direction of the rotating circle on a substantially straight line in another direction different from the traversing direction of the trolley frame 1. Two second guide sheaves 6 and 7 having substantially parallel rotation axes are pivotally supported at intervals, and furthermore, at a position below the hoisting drum 3 in the trolley frame 1, the traverse direction of the trolley frame 1 Two rotation axes that are substantially parallel to each other at a predetermined interval so as to direct the direction of the rotation circumference on a straight line substantially perpendicular to It is pivotally supported a third guide pulley 8 and 9. Further, turning pulleys 10 and 11 are pivotally supported at positions near the guide pulleys 4 and 6 in the trolley underframe 1 and facing the hoisting drum 3.
[0034]
On the other hand, the front end right side, the front end left side, and the rear end of the head block 2 are provided with a first connector 12, a second connector 13, and a third connector 14, and a lower portion of the head block 2 is provided. , And hooks (not shown), such as hooks, that can be engaged with the lifting object.
[0035]
Here, the first connecting tool 12 and the second connecting tool 13 include a tilting mechanism 17 pivotally attached to the bracket 15 of the head block 2 via the pin 16. A base support 18 located on the head block 2 side and a base support 18 located on the side opposite to the head block via a perpendicular pin (not shown) so as to constitute an equalizer capable of adjusting It has a connection support 19 and fixing means 20 for fixing the base support 18 and the connection support 19 at a desired angle. Here, the first connector 12 and the second connector 13 may include a turnbuckle. The fixing means may be substantially the same as that of the conventional example, or may have another configuration. The third connecting member 14 includes a tilting mechanism 23 pivotally connected to a bracket 21 of the head block 2 via a pin 22, and two turnbuckles 24 pivotally mounted on the upper part of the tilting mechanism 23. The tilting mechanism 23 has substantially the same configuration as the first connector 12 and the second connector 13.
[0036]
On the other hand, at one outer side and the central position of the hoisting drum 3, one first hoisting rope 25 extending and hanging down via the first guide pulley 5 on the right side of the trolley frame 1, A first hoisting cable 26 extending and hanging down through one of the turning pulleys 10 and the other first guiding pulley 4, and at the other outer and central positions of the hoisting drum 3, One of the second hoisting ropes 27 that extends and hangs down through the second guide pulley 7 on the left side of the trolley frame 1 and extends through the turning pulley 11 and the other second guide pulley 6. And a second hoisting rope 28 which is present and hangs down. At both sides of the hoisting drum 3, one third hoisting line extending and hanging via one third guide pulley 8 is provided. A hoisting rope 29 is provided, and the other third hoisting rope 30 extending and hanging down through the other third guide pulley 9 is provided.
[0037]
The two first hoisting ropes 25, 26 are connected to the head block 2 collectively by being connected to the connection support portion 19 of the first connection tool 12, respectively. The hoisting ropes 27 and 28 are connected to the head block 2 collectively by being connected to the connection support portion 19 of the second connecting member 13 respectively, and the two third hoisting ropes 29 and 30 are provided. Are connected to the head block 2 collectively by being connected to the turnbuckle 24 of the third connecting member 14, respectively. Here, the first hoisting ropes 25, 26 from the first guide pulleys 4, 5, the second guide pulleys 6, 7, and the third guide pulleys 8, 9 to the head block 2, the second hoisting. The ropes 27 and 28 and the third hoisting ropes 29 and 30 are arranged on the sides of the triangle in the horizontal plane.
[0038]
Hereinafter, the operation of the first example of the embodiment of the present invention will be described.
[0039]
When the head block 2 of the structure is moved, the hoisting drum 3 is rotated by a driving device (not shown) to simultaneously unwind the six hoisting ropes 25 to 30, thereby connecting with the guide pulleys 4 to 9. The apparent payout length of the six hoisting ropes 25 to 30 between the tools 12, 13, 14 increases, and the head block 2 moves down with respect to the trolley frame 1. On the other hand, when the hoist drum 3 is reversely rotated by the driving device to wind up the six hoisting ropes 25 to 30 at the same time, the apparent unwinding of these six hoisting ropes 25 to 30 is performed. The length decreases, and the head block 2 moves up relative to the trolley frame 1.
[0040]
The distance between the hoisting ropes 25 and 26, the distance between the hoisting ropes 27 and 28, and the distance between the hoisting ropes 29 and 30 between the trolley underframe 1 and the head block 2 are increased as the distance from the trolley underframe 1 increases. The head block 2 swings back and forth and right and left by the tension acting on the hoisting ropes 25 and 26, the tension acting on the hoisting ropes 27 and 28, and the tension acting on the hoisting ropes 29 and 30. Suppress.
[0041]
As described above, according to the first example, the six hoisting ropes 25 to 30 are wound around the hoisting drum 3, the turning pulleys 10, 11, the guide pulleys 4 to 9, etc. without the S-shaped bend. , The service life of the six hoisting ropes 25 to 30 can be extended, and the management and maintenance costs of the trolley crane can be reduced. Also, according to the first example, the size of the head block 2 of the head block 2 is changed by changing the arrangement of the third connecting tool 14 with respect to the first connecting tool 12 and the second connecting tool 13. Since it can be changed, it can be appropriately changed so as to increase or decrease the size of the hanger or the like.
[0042]
Further, at least one or more of the six hoisting ropes 25 to 30 from the hoisting drum 3 to the head block 2 of the structure, and the hoisting ropes 25 to 30 change the number of bendings by turning the pulleys 10 and 11, the guide pulleys 4 to If it is wound twice or less according to 9, the number of bending can be reduced from three times, so that the service life of the hoisting ropes 25 to 30 can be further extended, and the management and maintenance costs of the trolley crane can be greatly reduced. .
[0043]
Furthermore, when the trolley underframe 1 is provided with the turning pulleys 10 and 11, the arrangement and the moving direction of the hoisting ropes 25 to 30 in the first example are made appropriate, so that the load on the hoisting ropes 25 to 30 is reduced. The life of the hoisting ropes 25 to 30 can be further extended, and the management and maintenance costs of the trolley crane can be reduced.
[0044]
Further, the connecting tool is attached to the head block 2 and is a turn for connecting the equalizer including the base support portion 18, the connecting support portion 19, the fixing means 20, and the like, and the hoisting cables 25 to 30 pivotally connected to the equalizer. When the buckle 24 is provided, the horizontal position of the head block 2 is adjusted, and the load on the hoisting ropes 25 to 30 is appropriately distributed. Crane management and maintenance costs can be reduced.
[0045]
6 to 10 show a second example of the embodiment of the trolley crane of the present invention, particularly a trolley crane having 12 hoisting lines.
[0046]
The trolley crane of the second example is provided with a trolley frame 41 traversing a girder (not shown) erected horizontally and a head block 42 of a structure to be hung on the trolley frame 41.
[0047]
Above the trolley frame 41, a first hoist drum 43, a second hoist drum 44, and a third hoist drum 45, which are arranged and driven on the sides of an equilateral triangle in a horizontal plane, are provided. .
[0048]
A pair of first guide pulleys 46 and a pair of second pulleys 46 provided with rotation shafts in two directions different from the rotation shaft of the winding drum 43 are provided below the first winding drum 43 near the lower surface of the trolley frame 41. A pair of third pulleys having rotation axes in two directions different from the rotation axis of the hoisting drum 44 is provided at a position below the second hoisting drum 44 near the lower surface of the trolley frame 41. And a pair of fourth guide pulleys 49 and a pair of fourth guide pulleys 49, and at a position below the third hoisting drum 45 near the lower surface of the trolley frame 41, there are two directions different from the rotation axis of the hoisting drum 45. A pair of fifth guide pulleys 50 and a pair of sixth guide pulleys 51 each having a rotating shaft are pivotally supported. Here, as shown in FIG. 9, a pair of first guide pulleys 46 and a pair of fifth pulleys 46 are provided. Guide pulley 50, a pair of second guide pulleys 47 and a pair of fourth guide slips 49, a pair of third guide pulleys 48 and a pair of sixth guide pulley 51 is a rotary shaft respectively oriented substantially parallel.
[0049]
On the other hand, a first connector 52, a second connector 53, and a third connector 53 are disposed on the front right side, rear end, and front left side of the head block 42 at the apexes of an equilateral triangle on the horizontal plane. A hook (not shown) such as a hook that can be engaged with a lifting object is provided below the head block 42.
[0050]
Here, as shown in FIG. 10, the first connector 52, the second connector 53, and the third connector 54 are pivotally attached to brackets 55 of the head block 42 via pins 56. 57, a connecting body 59 pivotally mounted on both upper sides of the tilting mechanism 57 via pins 58, and two (four in total) turnbuckles 60 pivotally mounted on the upper part of the connecting body 59, respectively. The tilting mechanism 57 is connected to the base support 61 located on the head block side and the base support 61 located on the side opposite to the head block via an orthogonal pin 62 so as to constitute an equalizer capable of adjusting left and right inclination. It has a connection support 63 that is pivotally attached, and fixing means (not shown) for fixing the base support 61 and the connection support 63 at a desired angle. Here, the fixing means may be substantially the same as the conventional example, or may have another configuration.
[0051]
On the other hand, on both sides of the first hoisting drum 43, two first hoisting ropes 64 extending and hanging down via a pair of first guide pulleys 46, and a pair of second guides And two second hoisting ropes 65 extending and hanging down through the pulleys 47, and at both sides of the second hoisting drum 44, extending through a pair of third guide pulleys 48. Two third hoisting ropes 66 that are present and hang down, two fourth hoisting ropes 67 that extend and hang down through a pair of fourth guide pulleys 49, and a third winding On both sides of the upper drum 45, two fifth hoisting ropes 68 extending and hanging down through a pair of fifth guide pulleys 50 and extending through a pair of sixth guide pulleys 51 are provided. There are two sixth hoisting ropes 69 that are present and hang down.
[0052]
The two first hoisting ropes 64 and the two third hoisting ropes 66 are respectively connected to the turnbuckle 60 of the first coupling tool 52, so that the four hoisting ropes 64 are collectively connected to the head block 42. The two fourth hoisting ropes 67 and the two fifth hoisting ropes 68 are connected to the turnbuckle 60 of the second connecting tool 53, respectively, so that the four hoisting ropes 67 and the two fifth hoisting ropes 68 are connected together. The second sixth hoisting rope 69 and the two second hoisting ropes 65 are connected to the turnbuckle 60 of the third coupling tool 54, respectively. And four are collectively connected to the head block 42.
[0053]
Hereinafter, the operation of the second example of the embodiment of the present invention will be described.
[0054]
When moving the head block 42 of the structure, the drive pulleys (not shown) rotate the hoisting drums 43 to 45 and simultaneously pull out the twelve hoisting ropes 64 to 69 to thereby guide the pulleys 46 to 51. The apparent unwinding length of the hoisting ropes 64 to 69 between the connecting members 52 to 54 increases, and the head block 42 descends with respect to the trolley frame 41. On the other hand, if the driving devices rotate the hoisting drums 43 to 45 in reverse to wind the hoisting ropes 64 to 69 at the same time, the apparent unwinding length of these hoisting ropes 64 to 69 decreases. The head block 42 moves up with respect to the trolley frame 41.
[0055]
Further, the distance between the hoisting ropes 64 and 66, the distance between the hoisting ropes 67 and 68, and the distance between the hoisting ropes 69 and 64 between the trolley frame 41 and the head block 42 are increased as the distance from the trolley frame 41 increases. Due to this, the head block 42 swings back and forth and right and left due to the tension acting on the hoisting ropes 64 and 66, the tension acting on the hoisting ropes 67 and 68, and the tension acting on the hoisting ropes 69 and 64. Suppress.
[0056]
As described above, according to the second example, the twelve hoisting ropes 64 to 69 are wound around the hoisting drums 43 to 45, the guide pulleys 46 to 51, etc. without the S-shaped bend. The service life of the hoisting ropes 64 to 69 can be extended, and the management and maintenance costs of the trolley crane can be reduced. In addition, such a winding method can be used for other types of trolley cranes and the like.
[0057]
At least one or more hoisting ropes 64 to 69 among the hoisting ropes 64 to 69 from the hoisting drums 43 to 45 to the head block 42 of the structure are wound around the guide pulleys 46 to 51 with one bending. And the number of bending can be greatly reduced from three times, so that the service life of the hoisting ropes 64 to 69 can be further extended, and the management and maintenance costs of the trolley crane can be significantly reduced. In addition, it is possible to prevent an arrangement in which the hoisting ropes 64 to 69 are returned upward without the necessity of raising / lowering pulleys of the head block.
[0058]
The connecting tools 52 to 54 are attached to the head block 2 and are turnbuckles that connect the equalizer including the base support portion 61, the connecting support portion 63, the fixing means, and the like, and the hoisting ropes 64 to 69 pivotally connected to the equalizer. 60, the horizontal position of the head block 42 is adjusted to appropriately distribute the load on the hoisting ropes 64 to 69, so that the life of the hoisting ropes 64 to 69 is further extended, and the trolley crane Management and maintenance costs can be reduced.
[0059]
Further, since the number of the hoisting ropes 64 to 69 is 12, the rope diameter d of the hoisting ropes 64 to 69 is made smaller than that of the trolley crane having six hoisting ropes, and the drum diameter of the hoisting drums 43 to 45 is reduced. The ratio (D / d) of the rope diameter d of the hoisting ropes 64 to 69 to D can be increased, and the performance of the trolley crane can be improved.
[0060]
Note that the trolley crane of the present invention is not limited to the above-described embodiment, and it goes without saying that changes can be made without departing from the spirit of the present invention.
[0061]
【The invention's effect】
As described above, according to the trolley crane of the present invention, the following excellent effects can be obtained.
[0062]
(1) According to the first, second, third or fourth aspect of the present invention, since the hoisting line is wound around without the S-shaped bend, the service life of the hoisting line is lengthened, and the management and maintenance cost of the trolley crane. Can be reduced.
[0063]
(2) When the hoisting cable from the hoisting drum to the structure is wound with the number of bends being two or less, the number of bends is reduced, so that the service life of the hoisting cable is further extended. In addition, the trolley crane management and maintenance costs can be significantly reduced.
[0064]
(3) When the trolley underframe is provided with a turning pulley as described in claim 6, the arrangement and the moving direction of the hoisting rope in the trolley crane according to claim 1, 2, or 5 are made appropriate. , The life of the hoisting rope can be further extended, and the management and maintenance costs of the trolley crane can be reduced.
[0065]
(4) According to a seventh aspect of the present invention, when the connecting device includes an equalizer attached to the structure and a turnbuckle pivotally connected to the equalizer and connecting the hoisting cable, the position of the structure in the horizontal direction is improved. Is adjusted to appropriately distribute the load on the hoisting cable, so that the service life of the hoisting cable can be further extended, and the management and maintenance costs of the trolley crane can be reduced.
[Brief description of the drawings]
FIG. 1 is a conceptual diagram showing a first example of an embodiment of a trolley crane of the present invention.
FIG. 2 is a view taken in the direction of arrows II-II in FIG.
FIG. 3 is a view taken in the direction of arrows III-III in FIG. 1;
FIG. 4 is a view taken in the direction of arrows IV-IV in FIG. 1;
FIG. 5 is a view taken in the direction of arrows VV in FIG. 1;
FIG. 6 is a conceptual diagram showing a second example of the embodiment of the trolley crane of the present invention.
FIG. 7 is a view taken along the line VII-VII in FIG. 6;
FIG. 8 is a view taken in the direction of arrows VIII-VIII in FIG. 6;
FIG. 9 is a view taken along the line IX-IX in FIG. 6;
FIG. 10 is an external view of a head block and a connector related to FIG. 6;
FIG. 11 is a conceptual diagram showing an example of a conventional trolley crane.
FIG. 12 is a view taken in the direction of arrows XII-XII in FIG. 11;
FIG. 13 is a conceptual diagram showing another example of a conventional trolley crane.
FIG. 14 is a view taken in the direction of arrows XIV-XIV in FIG. 13;
FIG. 15 is a view taken in the direction of arrows XV-XV in FIG. 13;
FIG. 16 is an external view of a head block and a connector related to FIG. 13;
[Explanation of symbols]
1 trolley underframe
2 Head block (structure)
3 Hoisting drum
4 First guide pulley (pulley)
5 First guide pulley (pulley)
6 second guide pulley (pulley)
7. Second guide pulley (pulley)
8. Third guide pulley (pulley)
9. Third guide pulley (pulley)
10 Turning pulley
11 Turning pulley
12 First connector
13 Second connector
14 Third connection tool
18 Base support (equalizer)
19 Connection support (equalizer)
20 Fixing means (equalizer)
24 Turnbuckle
25 First hoisting rope
26 First hoisting rope
27 Second hoisting rope
28 Second hoisting rope
29 Third hoisting rope
30 Third hoisting rope
41 trolley underframe
42 Head Block (Structure)
43 First Hoisting Drum
44 Second hoisting drum
45 Third Hoisting Drum
46 first guide pulley
47 Second guide pulley (pulley)
48 Third Guide Pulley
49 Fourth guide pulley (pulley)
50 Fifth guide pulley (pulley)
51 sixth guide pulley
52 First connector
53 Second connector
54 Third Connector
60 turnbuckle
61 Base Support (Equalizer)
62 orthogonal pin (equalizer)
63 Connecting support (Equalizer)
64 First hoisting rope
65 Second Hoisting Cable
66 Third hoisting rope
67 Fourth Hoisting Cable
68 Fifth Hoisting Cable
69 Sixth Hoisting Cable

Claims (7)

トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支した6つの滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより夫々の滑車を介して構体に接続される6本の巻上索とを備え、前記巻上ドラムから構体までの巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン。A hoisting drum provided on a trolley underframe, six pulleys pivotally supported by the trolley underframe, a structure to be positioned below the trolley underframe, and a structure via respective pulleys from the hoisting drum. 6. A trolley crane, comprising: six hoisting cables connected to the hoisting drum, wherein the hoisting cable from the hoisting drum to the structure is wound without S-shaped bending. トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支する2つの第一の案内滑車と、前記トロリ台枠に枢支して第一の案内滑車と異なる方向に回転軸を備える2つの第二の案内滑車と、前記トロリ台枠に枢支して第一の案内滑車及び第二の案内滑車と異なる方向に回転軸を備える2つの第三の案内滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより2つの第一の案内滑車を介して垂下する2本の第一の巻上索と、前記巻上ドラムより2つの第二の案内滑車を介して垂下する2本の第二の巻上索と、前記巻上ドラムより2つの第三の案内滑車を介して垂下する2本の第三の巻上索と、前記2本の第一の巻上索を構体にまとめて接続する第一の連結具と、前記2本の第二の巻上索を構体にまとめて接続する第二の連結具と、前記2本の第三の巻上索を構体にまとめて接続する第三の連結具とを備え、前記第一の案内滑車、第二の案内滑車及び第三の案内滑車から構体までの第一の巻上索、第二の巻上索及び第三の巻上索は水平面で三角形の辺上に配置され、且つ前記巻上ドラムから構体までの第一の巻上索、第二の巻上索及び第三の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン。A hoisting drum provided on a trolley frame, two first guide pulleys pivotally supported by the trolley frame, and a rotating shaft pivotally supported by the trolley frame in a direction different from the first guide pulley. Two second guide pulleys, two third guide pulleys pivotally supported by the trolley frame and provided with rotation axes in directions different from the first guide pulley and the second guide pulley; A structure to be positioned below the frame, two first hoisting ropes hanging from the hoisting drum via two first guide pulleys, and two second guiding pulleys from the hoisting drum , Two second hoisting ropes hanging down from the hoisting drum, two third hoisting ropes hanging down from the hoisting drum via two third guide pulleys, and the two first hoisting ropes. A first connecting member for connecting the hoisting cables of the two together to the structure, and a second connecting means for connecting the two second hoisting cables to the structure together. Tool, and a third connecting tool for connecting the two third hoisting ropes together to the structure, from the first guide pulley, the second guide pulley, and the third guide pulley to the structure. The first hoisting rope, the second hoisting rope, and the third hoisting rope are arranged on the sides of a triangle in a horizontal plane, and the first hoisting rope from the hoisting drum to the structure, The trolley crane characterized in that the hoisting line and the third hoisting line are wound without S-shaped bending. トロリ台枠に設けられた巻上ドラムと、前記トロリ台枠に枢支した12つの滑車と、前記トロリ台枠の下方に位置すべき構体と、前記巻上ドラムより夫々の滑車を介して構体に接続される12本の巻上索とを備え、前記巻上ドラムから構体までの12本の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン。A hoist drum provided on the trolley frame, twelve pulleys pivotally supported by the trolley frame, a structure to be positioned below the trolley frame, and a structure via the pulleys from the hoist drum. A trolley crane comprising: twelve hoisting cables connected to the hoisting drum, wherein twelve hoisting cables from the hoisting drum to the structure are wound without S-shaped bending. トロリ台枠に設けられて水平面で三角形の辺上に配置される第一の巻上ドラム、第二の巻上ドラム及び第三の巻上ドラムと、前記第一の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第一の案内滑車及び一対の第二の案内滑車と、前記第二の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第三の案内滑車及び一対の第四の案内滑車と、前記第三の巻上ドラムの下方に位置してトロリ台枠に枢支される一対の第五の案内滑車及び一対の第六の案内滑車と、前記トロリ台枠の下方に位置すべき構体と、前記第一の巻上ドラムより第一の案内滑車及び第二案内滑車を介して垂下する2本の第一の巻上索及び2本の第二の巻上索と、前記第二の巻上ドラムより第三の案内滑車及び第四案内滑車を介して垂下する2本の第三の巻上索及び2本の第四の巻上索と、前記第三の巻上ドラムより第五の案内滑車及び第六の案内滑車を介して垂下する2本の第五の巻上索及び2本の第六の巻上索と、前記2本の第一の巻上索及び2本の第三の巻上索を構体にまとめて接続する第一の連結具と、前記2本の第四の巻上索及び2本の第五の巻上索を構体にまとめて接続する第二の連結具と、前記2本の第六の巻上索及び2本の第二の巻上索を構体にまとめて接続する第三の連結具とを備え、前記巻上ドラムから構体までの第一の巻上索、第二の巻上索、第三の巻上索、第四の巻上索、第五の巻上索及び第六の巻上索はS字曲げを無くして巻き掛けられたことを特徴とするトロリクレーン。A first hoisting drum, a second hoisting drum, and a third hoisting drum provided on the trolley frame and arranged on the sides of the triangular shape in a horizontal plane; and a position below the first hoisting drum. And a pair of first guide pulleys and a pair of second guide pulleys pivotally supported by the trolley underframe, and a pair of pivotally supported by the trolley underframe located below the second hoisting drum. A third guide pulley and a pair of fourth guide pulleys, and a pair of fifth guide pulleys and a pair of sixth guides positioned below the third hoisting drum and pivotally supported by a trolley frame; A pulley, a structure to be located below the trolley underframe, and two first hoisting ropes and 2 hanging from the first hoisting drum via a first guide pulley and a second guide pulley. A second hoisting rope of the book, and two third hoisting ropes hanging from the second hoisting drum via a third guide pulley and a fourth guide pulley. An upper rope and two fourth hoisting ropes, and two fifth hoisting ropes and two hanging from the third hoisting drum via fifth and sixth guide pulleys. A sixth hoisting cable, a first connector for connecting the two first hoisting cables and two third hoisting cables to a structure together, and the two fourth hoisting cables. A second connector for integrally connecting the hoisting rope and the two fifth hoisting ropes to the structure; and the two sixth hoisting ropes and the two second hoisting ropes forming the structure. A third hoisting cable from the hoisting drum to the structure, a second hoisting cable, a third hoisting cable, a fourth hoisting cable, a fourth hoisting cable, A trolley crane, wherein the fifth hoisting rope and the sixth hoisting rope are wound without S-shaped bending. 巻上ドラムから構体までの巻上索が曲げ回数を2回以下にして巻き掛けられたことを特徴とする請求項1〜4のいずれかに記載のトロリクレーン。The trolley crane according to any one of claims 1 to 4, wherein the hoisting rope from the hoisting drum to the structure is wound with the number of bending times being two or less. トロリ台枠に転向滑車を備えた請求項1、2又は5記載のトロリクレーン。6. The trolley crane according to claim 1, wherein the trolley underframe is provided with a turning pulley. 連結具は、構体に取り付けたイコライザと、該イコライザに枢着されて巻上索を連結させるターンバックルとを備えた請求項1〜6のいずれかに記載のトロリクレーン。The trolley crane according to any one of claims 1 to 6, wherein the connection tool includes an equalizer attached to the structure and a turnbuckle pivotally connected to the equalizer to connect the hoisting rope.
JP2002305695A 2002-10-21 2002-10-21 Trolley crane Expired - Lifetime JP4190854B2 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002305695A JP4190854B2 (en) 2002-10-21 2002-10-21 Trolley crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002305695A JP4190854B2 (en) 2002-10-21 2002-10-21 Trolley crane

Publications (2)

Publication Number Publication Date
JP2004137072A true JP2004137072A (en) 2004-05-13
JP4190854B2 JP4190854B2 (en) 2008-12-03

Family

ID=32452733

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002305695A Expired - Lifetime JP4190854B2 (en) 2002-10-21 2002-10-21 Trolley crane

Country Status (1)

Country Link
JP (1) JP4190854B2 (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012055255A1 (en) * 2010-10-28 2012-05-03 湖南三一智能控制设备有限公司 Hoisting mechanism for container crane and container crane
JP2012116591A (en) * 2010-11-30 2012-06-21 Ihi Transport Machinery Co Ltd Rope-trolley type unloader
KR20160011270A (en) 2014-07-21 2016-02-01 한전케이피에스 주식회사 Disassembly and assembly apparatus for horizontal type large scale and high pressure valve
JP2017178499A (en) * 2016-03-29 2017-10-05 三井造船株式会社 crane
CN111943067A (en) * 2020-07-09 2020-11-17 新疆众和股份有限公司 Movable tank body hoisting device and tank body hoisting system
CN112158714A (en) * 2020-09-28 2021-01-01 河南卫华重型机械股份有限公司 Lifting device with synchronous lifting and auxiliary turning functions

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108423557B (en) * 2018-04-26 2019-11-15 罗仙凤 Stable lifting device for chemical equipment

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2012055255A1 (en) * 2010-10-28 2012-05-03 湖南三一智能控制设备有限公司 Hoisting mechanism for container crane and container crane
JP2012116591A (en) * 2010-11-30 2012-06-21 Ihi Transport Machinery Co Ltd Rope-trolley type unloader
KR20160011270A (en) 2014-07-21 2016-02-01 한전케이피에스 주식회사 Disassembly and assembly apparatus for horizontal type large scale and high pressure valve
KR101631372B1 (en) * 2014-07-21 2016-06-17 한전케이피에스 주식회사 Disassembly and assembly apparatus for horizontal type large scale and high pressure valve
JP2017178499A (en) * 2016-03-29 2017-10-05 三井造船株式会社 crane
CN111943067A (en) * 2020-07-09 2020-11-17 新疆众和股份有限公司 Movable tank body hoisting device and tank body hoisting system
CN112158714A (en) * 2020-09-28 2021-01-01 河南卫华重型机械股份有限公司 Lifting device with synchronous lifting and auxiliary turning functions

Also Published As

Publication number Publication date
JP4190854B2 (en) 2008-12-03

Similar Documents

Publication Publication Date Title
CN101547854B (en) Turning device for hoist
CN101186266A (en) Crane
TW200415112A (en) Electric hoist
JP3849797B2 (en) Suspension cart moving mechanism in gondola device
JP6638434B2 (en) Crane boom mounting method
JP2004137072A (en) Trolley crane
US10640341B2 (en) Method for raising raisable and lowerable member, and crane
AU655725B2 (en) Device for suspending a working cage
JP2004155580A (en) Trolley crane
JP2001039678A (en) Crane guide sheave device
JP2004035171A (en) Trolley crane and its operation method
WO2022075012A1 (en) Crane
JP2598964B2 (en) Wire rope hanging structure of high lift crane
JP3872495B1 (en) Mobile scaffold equipment
JP3477521B2 (en) Jib trolley type horizontal retraction crane
JP2004035170A (en) Trolley crane
JP7275703B2 (en) front strut backstop
CN220998906U (en) Template overhead hoist is used in hydraulic engineering construction
JP7447613B2 (en) working machine
JPH10338470A (en) Rope hoisting and lowering device of crane
JP2004155579A (en) Trolley crane
WO2017149847A1 (en) Wire rope entanglement prevention structure for crane device
CN214217936U (en) Gantry crane anti-rolling mechanism and gantry crane
JP3263029B2 (en) Lifting device
JP2621587B2 (en) High head construction crane

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20050927

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20080129

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20080520

A521 Request for written amendment filed

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20080718

TRDD Decision of grant or rejection written
A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

Effective date: 20080909

A01 Written decision to grant a patent or to grant a registration (utility model)

Free format text: JAPANESE INTERMEDIATE CODE: A01

A61 First payment of annual fees (during grant procedure)

Free format text: JAPANESE INTERMEDIATE CODE: A61

Effective date: 20080917

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R150 Certificate of patent or registration of utility model

Free format text: JAPANESE INTERMEDIATE CODE: R150

Ref document number: 4190854

Country of ref document: JP

Free format text: JAPANESE INTERMEDIATE CODE: R150

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

S533 Written request for registration of change of name

Free format text: JAPANESE INTERMEDIATE CODE: R313533

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

S531 Written request for registration of change of domicile

Free format text: JAPANESE INTERMEDIATE CODE: R313531

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20110926

Year of fee payment: 3

R350 Written notification of registration of transfer

Free format text: JAPANESE INTERMEDIATE CODE: R350

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20120926

Year of fee payment: 4

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

FPAY Renewal fee payment (event date is renewal date of database)

Free format text: PAYMENT UNTIL: 20130926

Year of fee payment: 5

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

R250 Receipt of annual fees

Free format text: JAPANESE INTERMEDIATE CODE: R250

EXPY Cancellation because of completion of term