JP2004107951A - Diagonal cable suspending method and its device - Google Patents

Diagonal cable suspending method and its device Download PDF

Info

Publication number
JP2004107951A
JP2004107951A JP2002270097A JP2002270097A JP2004107951A JP 2004107951 A JP2004107951 A JP 2004107951A JP 2002270097 A JP2002270097 A JP 2002270097A JP 2002270097 A JP2002270097 A JP 2002270097A JP 2004107951 A JP2004107951 A JP 2004107951A
Authority
JP
Japan
Prior art keywords
wire
cable
gauge
guide
main tower
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002270097A
Other languages
Japanese (ja)
Inventor
Akiyoshi Suzuki
鈴木 昭好
Wataru Ohashi
大橋 渡
Hiroshi Kibe
木部 洋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SE Corp
Original Assignee
SE Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SE Corp filed Critical SE Corp
Priority to JP2002270097A priority Critical patent/JP2004107951A/en
Publication of JP2004107951A publication Critical patent/JP2004107951A/en
Pending legal-status Critical Current

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To efficiently and quickly suspend a diagonal cable in regard to a suspending method for the diagonal cable. <P>SOLUTION: The suspending method is for a diagonal cable 4 diagonally suspended between a main tower 1 and a bridge girder 2. After suspending a guide gage suspending wire 6 between the main tower 1 and the bridge girder 2, a suspending device 5 is installed comprising an interval retaining wire 7 suspended along a lower side of the guide gage suspending wire 6, annular guiding gages 8 installed on the interval retaining wire 7 at appropriate intervals, embracing the suspending wire 6, and suspended from the suspending wire 6, and a tension wire 9 passed through the guide gages 8. A strand 3 connected to the tension wire 9 is drawn toward a main tower 1 side, it is suspended between the main tower 1 and the bridge girder 2, and the diagonal cable is formed by sequentially repeating the suspending. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は斜張ケーブルの架設方法およびその装置に関するものである。
【0002】
【従来の技術】
従来の斜張ケーブルの架設方法およびその装置として、図9に示すように、最初に架設された第1のストランド30に誘導ゲージ31が適宜間隔ごとに吊り下げられ、この誘導ゲージ31に通した誘導レール32を走行する台車33によってストランド34を主塔35と橋桁36との間に架設するものが知られている(例えば、特許文献1参照。)。
【0003】
【特許文献1】
特開平6−299517号公報(第4頁乃至第6頁、第2図)
【0004】
【発明が解決しようとする課題】
しかし、上記の架設方法においては、誘導ゲージのストランドへの設置または解体を一つずつ行うため架設に手間がかかり、迅速な架設ができなかった。また架設装置は誘導ゲージ内に通した誘導レールに台車を設置しているため複雑な構成になっていた。
【0005】
本発明は上記のような問題に鑑みてなされたものであり、その目的は、斜張ケーブルの効率的かつ迅速な架設ができるとともに、簡単な架設装置を提供することである。
【0006】
【課題を解決するための手段】
以上の課題を解決するための斜張ケーブルの架設方法の発明の要旨は、主塔と橋桁との間に斜めに架設される斜張ケーブルの架設方法であって、主塔と橋桁との間に誘導ゲージ吊りワイヤーを架設した後、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーと、この間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなる架設装置を設置し、前記引張用ワイヤーに接続したストランドを主塔側に引き寄せて主塔と橋桁との間に架設し、この架設を順次繰り返して斜張ケーブルを形成することを特徴とする構成である。
【0007】
上記の架設装置における間隔保持用ワイヤーを主塔と橋桁間に架設すると同時に誘導ゲージが誘導ゲージ吊りワイヤーに適宜間隔ごとに吊り下げられる一方、間隔保持用ワイヤーと誘導ゲージとを取り外して他に転用することができるものであり、前記誘導ゲージの設置および解体が簡単かつ迅速におこなえる。
【0008】
またストランドは誘導ゲージの底部に形成したガイド凹部内を通して主塔側に引き寄せることを含むものである。このストランドが誘導ゲージのガイド凹部内を通して主塔側に引き寄せられ、緊張されることで前記ガイド凹部から抜け出して上方向に引き上げられて所定の架設位置に配設される。
【0009】
また引張用ワイヤーは、主塔の下部に設置したウインチから導出されて斜張ケーブルの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って斜張ケーブルの先端付近の主塔に設置された金車を介してウインチに巻き取られることを含むものである。上記引張用ワイヤーは誘導ゲージ内を通って環状に張られているため、ストランドの引き寄せ、および引張用ワイヤーへの設置が簡単にできる。
【0010】
また斜張ケーブルの架設装置の発明の要旨は、主塔と橋桁との間に架設された誘導ゲージ吊りワイヤーと、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーと、この間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなり、該引張用ワイヤーは、主塔の下部に設置したウインチから導出されて誘導ゲージ吊りワイヤーの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って誘導ゲージ吊りワイヤーの先端付近の主塔に設置された金車を介してウインチに接続されたことを特徴とする構成である。この斜張ケーブルの架設装置が誘導ゲージ吊りワイヤーと、間隔保持用ワイヤーと、環状の誘導ゲージと、引張用ワイヤーとからなるため、大型重機等の架設機材が必要無く、容易に主塔と橋桁との間にケーブルを設置でき、かつ解体も簡単にできる。
【0011】
また誘導ゲージの底部にストランドを通すためのガイド凹部が形成されたことを含むものである。上記のガイド凹部にストランドを通すと安定した引き寄せができる。
【0012】
【発明の実施の形態】
以下、本発明の斜張ケーブルの架設方法およびその装置の実施の形態を図面に基づいて説明する。
【0013】
この斜張ケーブルの架設は、図1に示すように、主塔1と橋桁2との間にストランド3を1本ずつ架設して、例えば1ケーブルにつき数本〜百数十本のストランドからなる斜張ケーブル4を架設するものであり、1ケーブルの上部に位置するストランドより順次架設し緊張していく。複数あるケーブルは、主塔1の下部から上部にかけて順次架設するものである。
【0014】
この斜張ケーブル4の架設方法は、はじめに主塔1に沿った足場を組立形成すし(図示せず)、これを利用して主塔1と橋桁2との間に架設装置5を組み立てる。この架設装置5は、誘導ゲージ吊りワイヤー6と、間隔保持用ワイヤー7に適宜間隔ごとに設置された環状の誘導ゲージ8と、該誘導ゲージ8内を通した引張用ワイヤー9とから構成されている。
【0015】
そして、図2に示すように、前記誘導ゲージ吊りワイヤー6を主塔1との間に架設するとともに、環状の誘導ゲージ8を組立形成する。この誘導ゲージ8は、図3に示すように、上部と両側の間隔保持用ワイヤー7に適宜間隔ごとに取り付けた上部リング10と、該上部リング10にカプラー11で取り付けた下部リング12とからなり、この下部リング12の底部には引張用ワイヤーを通すガイド凹部13が形成されている。
【0016】
このガイド凹部13はU字形であるが、同図の(2)に示すように、ガイド凹部13からの引張ワイヤーの飛び出しを防ぐためにU字の下部に膨らみ部14を形状にすることもでき、これによりストランドの一層の安定した引き寄せができる。
【0017】
この誘導ゲージ8の組み立ては、図3に示すように、誘導ゲージ吊りワイヤー6に上部リング10を被せ、これに下部リング12をカプラー11で接合すると、誘導ゲージ吊りワイヤー6を囲むようにした誘導ゲージ8が組み立てられる。
【0018】
そして必要な本数の誘導ゲージ8を組み立てた後、図4に示すように、ウインチ15から誘導ゲージ吊りワイヤー6の末端付近の橋桁に設置した金車16を介して導出した引張用ワイヤー9をガイド凹部13に通し、これとともに間隔保持用ワイヤー7をウインチ15で主塔1側に引き寄せて主塔1と橋桁2との間に架設する。前記誘導ゲージ8が2〜3mごとに前記誘導ゲージ吊りワイヤー6に吊り下げられる。
【0019】
次に、前記引張用ワイヤー9を、誘導ゲージ吊りワイヤー6の先端付近の主塔1に設置した金車16を介して、ウインチ15に接続すると、主塔1上部と橋桁2との間に架設装置5が組み立てられる。
【0020】
次に、図5(1)に示すように、ストランドドラム17から引き出した二本のストランド3の先端を、引張用ワイヤー9に取り付けた接続用カプラー18に接続する。この接続用カプラー18は、図5(2),(3)に示すように、取付本体19にバネ20を介して蓋体21がねじ込まれて形成され、取付本体19の取付孔22に差し込んだストランド3が仮止めウエッジ23で固定されている。
【0021】
次に、ウインチ15の巻取用ロラーで引張用ワイヤー9を巻き取って、図6の(1)に示すように、ストランド3の先端を主塔1に引き寄せ、当該ストランド3の先端から少し離れた距離に仮止ワイヤー24を接続する。
【0022】
そして、図6(2)に示すように、前記ストランド3の先端を接続用カプラー18から取り外し、そこにパイロットバー25を接続するとともに、仮止ワイヤー24を手巻きウインチ26で巻き取って、主塔1に設置した定着体27にストランド3を挿入して定着ウエッジ34で定着する。
【0023】
一方、ストランド3の末端は、図7に示すように、必要な箇所で切断し、そこに接続したガイドバー28で橋桁2に取り付けた定着体27に挿入するとともに、所定の緊張力を付与して定着ウエッジ34で定着する。
【0024】
そして、上記のような架設作業を繰り返して、斜張ケーブルの構成に必要な本数のストランド3、例えば数本〜百数十本を架設して、図8の(1)に示すように、斜張ケーブル4を主塔1と橋桁2との間に架設する。
【0025】
次に、上記のような斜張ケーブル4を架設した後、同図の(2)および(3)に示すように、間隔保持用ワイヤー7を取り外すとともに、誘導ゲージ吊りワイヤー6の末端に集めた誘導ゲージ8を上部リング10と下部リング12とに分割して、誘導ゲージ吊りワイヤー6から取り外すと、1本の斜張ケーブル4の架設が完了する。
【0026】
そして、前記誘導ゲージ吊りワイヤー6を盛り替えて、次のケーブルの架設を行い、このような作業を順次繰り返して、前記斜張ケーブル4を順次架設する。
【0027】
【発明の効果】
本発明に係る斜張ケーブルの架設方法は、主塔と橋桁との間に斜めに架設される斜張ケーブルの架設方法であって、主塔と橋桁との間に誘導ゲージ吊りワイヤーを架設した後、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなる架設装置を設置し、前記引張用ワイヤーに接続したストランドを主塔側に引き寄せて主塔と橋桁との間に架設し、この架設を順次繰り返して斜張ケーブルを形成する架設方法なので、斜張ケーブルの効率的かつ迅速な架設ができると言う優れた効果を奏するものである。
【0028】
また、前記ストランドは誘導ゲージの底部に形成したガイド凹部内を通して主塔側に引き寄せるので、安定した斜材ケーブルの架設作業となる。
【0029】
前記引張用ワイヤーは、主塔の下部に設置したウインチから導出されて誘導ゲージ吊りワイヤーの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って誘導ゲージ吊りワイヤーの先端付近の主塔に設置された金車を介してウインチに巻き取られるので、引張用ワイヤーを循環させてストランドの引張り作業ができるようになり、作業能率が向上する。
【0030】
本発明の斜張ケーブルの架設装置は、主塔と橋桁との間に架設された誘導ゲージ吊りワイヤーと、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーと、この間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなり、該引張用ワイヤーは、主塔の下部に設置したウインチから導出されて誘導ゲージ吊りワイヤーの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って誘導ゲージ吊りワイヤーの先端付近の主塔に設置された金車を介してウインチに接続されているので、能率的で簡単な架設装置を提供することができる。前記誘導ゲージの底部にストランドを通すためのガイド凹部が形成されたことで、ストランドを確実、且つ、安定して架設できるものである。
【図面の簡単な説明】
【図1】斜張ケーブルの架設方法を示す図である。
【図2】(1)は主塔と橋桁との間に誘導ゲージ吊りワイヤーを架設した図、(2)は誘導ゲージ吊りワイヤーに誘導ゲージを設置する図である。
【図3】(1)は誘導ゲージの正面図、(2)は同側面図、(3)は他の誘導ゲージの正面図である。
【図4】(1)および(2)は架設装置を設置する図である。
【図5】(1)はストランドを引張用ワイヤーに接続した図、(2)は接続カプラーの断面図、(3)は同図(2)のA−A線に沿った断面図である。
【図6】(1)〜(3)はストランドの先端を主塔に定着する図である。
【図7】(1)および(2)はストランドの末端を橋桁に定着する図である。
【図8】(1)は斜張ケーブルを架設した図、(2)および(3)は誘導ゲージを解体する図である。
【図9】(1)は従来の斜張ケーブルの架設方法の図、(2)は誘導ゲージの斜視図である。
【符号の説明】
1,35    主塔、        2,36   橋桁、
3,30,34 ストランド、     4      斜張ケーブル、
5       架設装置、
6       誘導ゲージ吊りワイヤー、
7       間隔保持用ワイヤー、 8      誘導ゲージ、
9        引張用ワイヤー、   10     上部リング、
11       カプラー、      12     下部リング、
13       ガイド凹部、     14     膨らみ部、
15       ウインチ、      16     金車、
17       ストランドドラム、  18     接続用カプラー、
19       取付本体、      20     バネ、
21       蓋体、        22     取付孔、
23       仮止めウエッジ、   24     仮止ワイヤー、
25        パイロットバー、   26     手巻きウインチ、
27       定着体、       28     ガイドバー、
31       誘導ゲージ、     32     誘導レール、
33       台車、        34     定着ウエッジ。
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a cable staying cable erection method and apparatus.
[0002]
[Prior art]
As a conventional cable stayed cable laying method and apparatus, as shown in FIG. 9, an induction gauge 31 is hung at an appropriate interval on a first strand 30 erected first and passed through the induction gauge 31. There is known one in which a strand 34 is erected between a main tower 35 and a bridge girder 36 by a bogie 33 traveling on a guide rail 32 (for example, see Patent Document 1).
[0003]
[Patent Document 1]
JP-A-6-299517 (pages 4 to 6, FIG. 2)
[0004]
[Problems to be solved by the invention]
However, in the above-described erection method, installation and disassembly of the guide gauges on the strands are performed one by one, so that erection is troublesome, and rapid erection cannot be performed. In addition, the erection device has a complicated configuration because the bogie is installed on a guide rail passed through a guide gauge.
[0005]
The present invention has been made in view of the above-described problems, and an object of the present invention is to provide a simple installation device that can efficiently and quickly install a cable stayed cable.
[0006]
[Means for Solving the Problems]
The gist of the invention of a method of erection of a cable stayed cable for solving the above-mentioned problem is a method of erection of a cable stayed cable which is erected diagonally between a main tower and a bridge girder, wherein After arranging the guide gauge suspending wire, a spacing wire laid along the lower side of the guide gauge suspending wire, and installed at appropriate intervals on the spacing maintaining wire, and surrounding the guide gauge suspending wire. An installation device consisting of an annular guide gauge suspended from the wire and a pulling wire passed through the guide gauge is installed, and the strand connected to the pulling wire is drawn toward the main tower side to form a main tower. It is constructed between a bridge girder and a cable-stayed cable formed by repeating this construction sequentially.
[0007]
At the same time as the guide wire is suspended between the main tower and the bridge girder at the same time as the guide gauge is suspended from the guide gauge suspending wire at appropriate intervals, the spacing wire and the guide gauge are removed and diverted to another. The installation and disassembly of the guide gauge can be performed easily and quickly.
[0008]
In addition, the strand includes drawing toward the main tower side through a guide recess formed at the bottom of the guide gauge. The strand is drawn toward the main tower through the guide recess of the guide gauge, and is pulled out of the guide recess by being tensioned, and is lifted upward and disposed at a predetermined erection position.
[0009]
The pulling wire is led out of the winch installed at the lower part of the main tower, hung on a wheel set on the bridge girder near the end of the cable stayed cable, and passed through the induction gauge, and near the tip of the cable stayed cable. This includes winding on a winch via a wheel set on the main tower. Since the above-mentioned tension wire is stretched annularly through the inside of the guide gauge, pulling of the strand and installation on the tension wire can be easily performed.
[0010]
The gist of the invention of the cable staying cable erection device is that an induction gauge suspension wire erected between the main tower and the bridge girder, a spacing wire erected along the lower side of the induction gage suspension wire, and An annular guide gauge is provided on the interval maintaining wire at appropriate intervals, and surrounds the guide gauge suspending wire and is suspended from the wire. The wire is led out of the winch installed at the lower part of the main tower, hung on a wheel set on the bridge girder near the end of the guide gauge suspension wire, and passed through the guide gauge and the main wire near the tip of the guide gauge suspension wire. This is a configuration characterized by being connected to a winch via a wheel set on a tower. This cable staying cable erection device is composed of a guide gauge suspension wire, a spacing wire, a ring-shaped induction gauge, and a tension wire. A cable can be set up between them, and disassembly is easy.
[0011]
This also includes that a guide recess for passing the strand is formed at the bottom of the guide gauge. When the strand is passed through the above-described guide recess, stable pulling can be performed.
[0012]
BEST MODE FOR CARRYING OUT THE INVENTION
Hereinafter, embodiments of a cable stayed cable erection method and device of the present invention will be described with reference to the drawings.
[0013]
As shown in FIG. 1, this cable stayed cable is constructed by arranging strands 3 one by one between the main tower 1 and the bridge girder 2, for example, several to one hundred and several tens of strands per cable. The cable stayed cable 4 is erected, and it is erected sequentially from the strand located at the upper part of one cable and tightened. The plurality of cables are installed sequentially from the lower part to the upper part of the main tower 1.
[0014]
In the method of erection of the cable stayed cable 4, first, a scaffold along the main tower 1 is assembled and formed (not shown), and an erection device 5 is assembled between the main tower 1 and the bridge girder 2 using this. This erection device 5 is composed of a guide gauge hanging wire 6, an annular guide gauge 8 provided at appropriate intervals on a spacing wire 7, and a pulling wire 9 passing through the guide gauge 8. I have.
[0015]
Then, as shown in FIG. 2, the guide gauge hanging wire 6 is installed between the main tower 1 and the annular guide gauge 8 is assembled. As shown in FIG. 3, the guide gauge 8 includes an upper ring 10 attached to the upper and lower spacing wires 7 at appropriate intervals, and a lower ring 12 attached to the upper ring 10 with a coupler 11. A guide recess 13 through which a pulling wire passes is formed at the bottom of the lower ring 12.
[0016]
The guide recess 13 has a U-shape, but as shown in (2) of the figure, a bulging portion 14 can be formed at the lower part of the U-shape to prevent the pulling wire from jumping out of the guide recess 13. Thereby, the strand can be more stably pulled.
[0017]
As shown in FIG. 3, the assembling of the guide gauge 8 is performed by covering the guide gauge suspending wire 6 with the upper ring 10 and joining the lower ring 12 with the coupler 11 to surround the guide gauge suspending wire 6. The gauge 8 is assembled.
[0018]
After assembling the required number of guide gauges 8, as shown in FIG. 4, as shown in FIG. 4, a guide wire 9 led out from a winch 15 via a wheel 16 installed on a bridge girder near the end of the guide gauge hanging wire 6 is guided. The wire 7 is passed through the recess 13, and at the same time, the spacing wire 7 is pulled toward the main tower 1 by the winch 15, and is installed between the main tower 1 and the bridge girder 2. The guide gauge 8 is hung on the guide gauge hanging wire 6 every 2 to 3 m.
[0019]
Next, when the tension wire 9 is connected to the winch 15 via a wheel 16 installed on the main tower 1 near the tip of the guide gauge hanging wire 6, the tension wire 9 is installed between the upper part of the main tower 1 and the bridge girder 2. The device 5 is assembled.
[0020]
Next, as shown in FIG. 5A, the distal ends of the two strands 3 drawn from the strand drum 17 are connected to the connecting coupler 18 attached to the pulling wire 9. As shown in FIGS. 5 (2) and 5 (3), the connecting coupler 18 is formed by screwing a lid 21 into a mounting body 19 via a spring 20, and is inserted into a mounting hole 22 of the mounting body 19. The strand 3 is fixed by the temporary fixing wedge 23.
[0021]
Next, the pulling wire 9 is wound up by the winding roller of the winch 15, and as shown in FIG. 6A, the tip of the strand 3 is drawn to the main tower 1 and slightly separated from the tip of the strand 3. The temporary fixing wire 24 is connected to the set distance.
[0022]
Then, as shown in FIG. 6 (2), the distal end of the strand 3 is detached from the connecting coupler 18, the pilot bar 25 is connected thereto, and the temporary fixing wire 24 is wound up by the manually wound winch 26. The strand 3 is inserted into the fixing body 27 installed in the tower 1 and fixed by the fixing wedge 34.
[0023]
On the other hand, as shown in FIG. 7, the end of the strand 3 is cut at a necessary place, inserted into a fixing body 27 attached to the bridge girder 2 by a guide bar 28 connected thereto, and given a predetermined tension. And is fixed by the fixing wedge 34.
[0024]
Then, by repeating the above-described erection work, the number of strands 3 required for the configuration of the cable stayed cable, for example, several to a hundred and several tens, are erected, and as shown in FIG. An extension cable 4 is installed between the main tower 1 and the bridge girder 2.
[0025]
Next, after installing the cable stayed cable 4 as described above, as shown in (2) and (3) of the same figure, the spacing wire 7 was removed and collected at the end of the guide gauge hanging wire 6. When the guide gauge 8 is divided into an upper ring 10 and a lower ring 12 and removed from the guide gauge hanging wire 6, the installation of one cable stayed cable 4 is completed.
[0026]
Then, the induction gauge hanging wire 6 is replaced and the next cable is erected, and the above operation is sequentially repeated to erroneously install the cable stayed cable 4.
[0027]
【The invention's effect】
The method for laying a cable stayed cable according to the present invention is a method for laying a cable stayed cable which is laid diagonally between a main tower and a bridge girder, wherein an induction gauge hanging wire is laid between the main tower and a bridge girder. Thereafter, an annular guide gauge which is provided at appropriate intervals on a spacing wire provided along the lower side of the guide gauge hanging wire, surrounds the guide gauge hanging wire, and is suspended from the wire, An installation device consisting of a pulling wire passed through the gauge is installed, and the strand connected to the pulling wire is drawn to the main tower side to be installed between the main tower and the bridge girder. The method of erection of forming the cable stays has an excellent effect that the cable staying cable can be erected efficiently and quickly.
[0028]
Further, since the strand is drawn toward the main tower through the guide recess formed at the bottom of the guide gauge, a stable work of laying the diagonal cable is performed.
[0029]
The pulling wire is drawn out of a winch installed at the lower part of the main tower, and is hung on a wheel set on a bridge girder near the end of the guide gauge hanging wire, and passes through the inside of the induction gauge and the tip of the guide gauge hanging wire. Since the wire is wound around a winch via a wheel wheel installed in a nearby main tower, the pulling wire can be circulated and the strand can be pulled, thereby improving work efficiency.
[0030]
The cable staying cable erection device of the present invention includes an induction gauge suspension wire erected between a main tower and a bridge girder, a spacing wire erected along a lower side of the induction gage suspension wire; An annular guide gauge is provided at an appropriate interval on the wire for use, and surrounds the guide gauge hanging wire and is suspended from the wire, and comprises a pull wire passing through the guide gauge, and the pull wire is , Is pulled out from the winch installed at the bottom of the main tower, is hung on a wheel set on the bridge girder near the end of the guide gauge hanging wire, and passes through the induction gauge to the main tower near the tip of the guide gauge hanging wire. Since it is connected to the winch via the installed wheel, an efficient and simple erection device can be provided. Since the guide recess for passing the strand is formed at the bottom of the guide gauge, the strand can be reliably and stably installed.
[Brief description of the drawings]
FIG. 1 is a diagram showing a method of erection of a cable stayed cable.
FIG. 2A is a diagram in which a guide gauge hanging wire is erected between a main tower and a bridge girder, and FIG. 2B is a diagram in which a guide gauge is installed on the guide gauge hanging wire.
3 (1) is a front view of an induction gauge, FIG. 3 (2) is a side view of the same, and FIG. 3 (3) is a front view of another induction gauge.
FIGS. 4A and 4B are diagrams for installing a erection device.
5A is a diagram in which a strand is connected to a pulling wire, FIG. 5B is a cross-sectional view of a connecting coupler, and FIG. 5B is a cross-sectional diagram along a line AA in FIG.
FIGS. 6A to 6C are diagrams in which the tip of the strand is fixed to the main tower.
FIGS. 7 (1) and (2) are views in which the ends of the strands are fixed to the bridge girders.
FIG. 8A is a diagram in which a cable stayed cable is installed, and FIGS. 8B and 8C are diagrams in which an induction gauge is disassembled.
FIG. 9 (1) is a diagram of a conventional method of laying a cable stayed cable, and FIG. 9 (2) is a perspective view of an induction gauge.
[Explanation of symbols]
1,35 main tower, 2,36 bridge girder,
3, 30, 34 strands, 4 cable stayed cables,
5 erection equipment,
6 Induction gauge hanging wire,
7 spacing wire, 8 induction gauge,
9 tension wire, 10 upper ring,
11 coupler, 12 lower ring,
13 guide recess, 14 bulge,
15 winches, 16 gold cars,
17 strand drum, 18 connecting coupler,
19 mounting body, 20 spring,
21 lid, 22 mounting hole,
23 Temporary fixing wedge, 24 Temporary fixing wire,
25 pilot bar, 26 manual winch,
27 fixing body, 28 guide bar,
31 Induction gauge, 32 Induction rail,
33 bogies, 34 anchoring wedges.

Claims (5)

主塔と橋桁との間に斜めに架設される斜張ケーブルの架設方法であって、主塔と橋桁との間に誘導ゲージ吊りワイヤーを架設した後、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなる架設装置を設置し、前記引張用ワイヤーに接続したストランドを主塔側に引き寄せて主塔と橋桁との間に架設し、この架設を順次繰り返して斜張ケーブルを形成することを特徴とする斜張ケーブルの架設方法。A method of erection of a cable stayed cable which is erected diagonally between a main tower and a bridge girder, wherein an induction gauge suspension wire is erected between the main tower and a bridge girder, and then along a lower side of the induction gauge suspension wire. An annular guide gauge which is installed at appropriate intervals on the spacing wire and is suspended around the guide gauge hanging wire, and a tension wire passing through the guide gauge. Installing a device, pulling the strand connected to the pulling wire to the main tower side, and erection between the main tower and the bridge girder, and repeating this erection sequentially to form a cable stay cable. How to lay the cable. ストランドは誘導ゲージの底部に形成したガイド凹部内を通して主塔側に引き寄せることを特徴とする請求項1に記載の斜張ケーブルの架設方法。The method according to claim 1, wherein the strand is drawn toward the main tower through a guide recess formed at the bottom of the guide gauge. 引張用ワイヤーは、主塔の下部に設置したウインチから導出されて誘導ゲージ吊りワイヤーの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って誘導ゲージ吊りワイヤーの先端付近の主塔に設置された金車を介してウインチに巻き取られることを特徴とする請求項1または2に記載の斜張ケーブルの架設方法。The pulling wire is led out of the winch installed at the lower part of the main tower, hung on a wheel set on a bridge girder near the end of the guide gauge suspension wire, and passed through the guide gauge and near the tip of the guide gauge suspension wire. The cable-stayed cable laying method according to claim 1, wherein the cable is wound around a winch via a wheel wheel installed on a main tower of the cable. 主塔と橋桁との間に架設された誘導ゲージ吊りワイヤーと、該誘導ゲージ吊りワイヤーの下側に沿って架設した間隔保持用ワイヤーと、この間隔保持用ワイヤーに適宜間隔ごとに設置され、かつ誘導ゲージ吊りワイヤーを取り囲んで該ワイヤーに吊り下げられた環状の誘導ゲージと、該誘導ゲージ内を通した引張用ワイヤーとからなり、該引張用ワイヤーは、主塔の下部に設置したウインチから導出されて誘導ゲージ吊りワイヤーの末端付近の橋桁に設置された金車に掛けられるとともに、誘導ゲージ内を通って誘導ゲージ吊りワイヤーの先端付近の主塔に設置された金車を介してウインチに接続されたことを特徴とする斜張ケーブルの架設装置。An induction gauge suspension wire erected between the main tower and the bridge girder, an interval maintenance wire erected along the lower side of the induction gauge hanger wire, and installed on the interval maintenance wire at appropriate intervals, and It consists of an annular guide gauge that surrounds the guide gauge hanging wire and is suspended from the wire, and a pull wire that passes through the guide gauge, and the pull wire is derived from a winch installed at the lower part of the main tower. The wire is then hanged on a wheel set on the bridge girder near the end of the guide gauge suspension wire, and connected to the winch via a wire wheel installed on the main tower near the tip of the guide gauge suspension wire through the guide gauge. A cable stayed cable erection device, characterized in that: 誘導ゲージの底部にストランドを通すためのガイド凹部が形成されたことを特徴とする請求項4に記載の斜張ケーブルの架設装置。The installation device for a cable-stayed cable according to claim 4, wherein a guide recess for passing the strand is formed at the bottom of the guide gauge.
JP2002270097A 2002-09-17 2002-09-17 Diagonal cable suspending method and its device Pending JP2004107951A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002270097A JP2004107951A (en) 2002-09-17 2002-09-17 Diagonal cable suspending method and its device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002270097A JP2004107951A (en) 2002-09-17 2002-09-17 Diagonal cable suspending method and its device

Publications (1)

Publication Number Publication Date
JP2004107951A true JP2004107951A (en) 2004-04-08

Family

ID=32267835

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002270097A Pending JP2004107951A (en) 2002-09-17 2002-09-17 Diagonal cable suspending method and its device

Country Status (1)

Country Link
JP (1) JP2004107951A (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969005B1 (en) 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
CN106592441A (en) * 2017-01-16 2017-04-26 中交路桥华南工程有限公司 Installation method of cable-stayed bridge
CN110644370A (en) * 2019-09-30 2020-01-03 中铁大桥局第七工程有限公司 Cable hoisting system of space self-anchored suspension bridge and construction method thereof
CN113152281A (en) * 2021-03-15 2021-07-23 中交二公局第二工程有限公司 Main cable structure of suspension bridge cable crane
CN113356076A (en) * 2021-07-01 2021-09-07 中铁二局集团有限公司 Stay cable construction method and stay cable construction device

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100969005B1 (en) 2009-11-06 2010-07-09 동아대학교 산학협력단 Constructing method of suspension bridge and temporary cable therefor
US8627530B2 (en) 2009-11-06 2014-01-14 Dong-A University Research Foundation For Industry-Academy Cooperation Constructing method of cable-stayed bridge and temporary cable therefor
CN106592441A (en) * 2017-01-16 2017-04-26 中交路桥华南工程有限公司 Installation method of cable-stayed bridge
CN110644370A (en) * 2019-09-30 2020-01-03 中铁大桥局第七工程有限公司 Cable hoisting system of space self-anchored suspension bridge and construction method thereof
CN113152281A (en) * 2021-03-15 2021-07-23 中交二公局第二工程有限公司 Main cable structure of suspension bridge cable crane
CN113356076A (en) * 2021-07-01 2021-09-07 中铁二局集团有限公司 Stay cable construction method and stay cable construction device

Similar Documents

Publication Publication Date Title
CN102444086A (en) Cable hanging system for inclined stay cable of bridge and cable hanging method for inclined stay cable of bridge
CN212670303U (en) Stay cable beam end mounting structure
JP4336401B2 (en) How to install an oblique cable
KR101405010B1 (en) Lifting Gantry for Girder Erection Works of Suspension Bridges
CN204651779U (en) A kind of anti-hopping releasing pulley being applicable to transmission line construction
CN212025936U (en) Equipment for mounting continuous steel strand stay cable at tower end of cable-stayed bridge
CN107834434A (en) Crossing method for the construction of transmission line of electricity tension stringing
CN110172919A (en) A kind of low-pylon cable-stayed bridge is reeved method and system
JP2004107951A (en) Diagonal cable suspending method and its device
JP5597443B2 (en) Construction method of PC structure
JP2004282984A (en) Electric cable laying method
CN205985949U (en) Tension formula transmission line protection system
CN103296616A (en) Rigid crossing support and crossing method for construction of overhead transmission lines
CN217174390U (en) Wind-resistant system for catwalk
KR20170067983A (en) Electric Power Transmission Cable Laying Method Between Long Span Tower
CN218114849U (en) Curtain wall material hoisting device
KR101327759B1 (en) Pulling up apparatus for installing cable of suspension bridge and installing condition thereof
JP4041108B2 (en) Aerial cable laying method and cable lifting jig
KR20100076142A (en) A pair of spinning wheels and installing method of mono calble of suspension bridge using that spinning wheels
CN205399213U (en) Space cable face structure funicular system is transversely to drawing device
CN210482051U (en) Single-span type cable crane mounting structure for construction of suspension bridge main beam
CN112281676B (en) An ultra-long prestressed steel strand laying and turning strand threading system and construction method thereof
JP5944361B2 (en) Method for constructing bundled pipelines and method for laying overhead cables
JP5883729B2 (en) Overhead work method and support net
JP4605506B2 (en) Partially hanging tension wire drawing method