GB2582376B - Method and system of constructing an underground tunnel - Google Patents
Method and system of constructing an underground tunnel Download PDFInfo
- Publication number
- GB2582376B GB2582376B GB1903979.1A GB201903979A GB2582376B GB 2582376 B GB2582376 B GB 2582376B GB 201903979 A GB201903979 A GB 201903979A GB 2582376 B GB2582376 B GB 2582376B
- Authority
- GB
- United Kingdom
- Prior art keywords
- constructing
- underground tunnel
- underground
- tunnel
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/08—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/001—Improving soil or rock, e.g. by freezing; Injections
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B7/00—Special methods or apparatus for drilling
- E21B7/02—Drilling rigs characterised by means for land transport with their own drive, e.g. skid mounting or wheel mounting
- E21B7/025—Rock drills, i.e. jumbo drills
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/005—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries by forcing prefabricated elements through the ground, e.g. by pushing lining from an access pit
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/03—Driving non-circular tunnels
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/06—Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
- E21D9/0621—Shield advancing devices
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D9/00—Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
- E21D9/10—Making by using boring or cutting machines
Landscapes
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- Environmental & Geological Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Soil Sciences (AREA)
- Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
- Sampling And Sample Adjustment (AREA)
- Geophysics And Detection Of Objects (AREA)
- Lining And Supports For Tunnels (AREA)
- Earth Drilling (AREA)
- Investigation Of Foundation Soil And Reinforcement Of Foundation Soil By Compacting Or Drainage (AREA)
Priority Applications (25)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB2105273.3A GB2591691B (en) | 2019-03-22 | 2019-03-22 | Method and system of constructing an underground tunnel |
GB1903979.1A GB2582376B (en) | 2019-03-22 | 2019-03-22 | Method and system of constructing an underground tunnel |
MX2021011532A MX2021011532A (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel. |
CN202080023310.9A CN113692476A (en) | 2019-03-22 | 2020-03-20 | Method and system for constructing underground tunnel |
EA202192429A EA202192429A1 (en) | 2019-03-22 | 2020-03-20 | METHOD AND SYSTEM FOR CONSTRUCTION OF UNDERGROUND TUNNEL |
ES20723471T ES2927425T3 (en) | 2019-03-22 | 2020-03-20 | Method and system of construction of an underground tunnel |
PCT/GB2020/050756 WO2020193960A1 (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
AU2020249771A AU2020249771B2 (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
JP2021559457A JP2022524893A (en) | 2019-03-22 | 2020-03-20 | Methods and systems for constructing underground tunnels |
EP20723471.7A EP3942154B1 (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
CA3149384A CA3149384C (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
EP22155907.3A EP4019737A1 (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
BR112021018735A BR112021018735A2 (en) | 2019-03-22 | 2020-03-20 | Method and system of construction of an underground tunnel |
DK20723471.7T DK3942154T3 (en) | 2019-03-22 | 2020-03-20 | METHOD AND SYSTEM FOR CONSTRUCTING AN UNDERGROUND TUNNEL |
PL20723471.7T PL3942154T3 (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
PT207234717T PT3942154T (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
CA3133618A CA3133618C (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
SG11202110350UA SG11202110350UA (en) | 2019-03-22 | 2020-03-20 | Method and system of constructing an underground tunnel |
ZA2021/06987A ZA202106987B (en) | 2019-03-22 | 2021-09-20 | Method and system of constructing an underground tunnel |
US17/480,650 US11591908B2 (en) | 2019-03-22 | 2021-09-21 | Method and system of constructing an underground tunnel |
SA521430384A SA521430384B1 (en) | 2019-03-22 | 2021-09-22 | Method and System of Constructing an Underground Tunnel |
US18/102,750 US20230175395A1 (en) | 2019-03-22 | 2023-01-29 | Method and system of constructing an underground tunnel |
AU2023201956A AU2023201956B2 (en) | 2019-03-22 | 2023-03-30 | Method and System of Constructing an Underground Tunnel |
JP2023091556A JP2023113780A (en) | 2019-03-22 | 2023-06-02 | Method and system for constructing underground tunnel |
ZA2024/00177A ZA202400177B (en) | 2019-03-22 | 2024-01-04 | Method and system of constructing an underground tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB1903979.1A GB2582376B (en) | 2019-03-22 | 2019-03-22 | Method and system of constructing an underground tunnel |
Publications (3)
Publication Number | Publication Date |
---|---|
GB201903979D0 GB201903979D0 (en) | 2019-05-08 |
GB2582376A GB2582376A (en) | 2020-09-23 |
GB2582376B true GB2582376B (en) | 2021-06-09 |
Family
ID=66381560
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB1903979.1A Active GB2582376B (en) | 2019-03-22 | 2019-03-22 | Method and system of constructing an underground tunnel |
Country Status (18)
Country | Link |
---|---|
US (2) | US11591908B2 (en) |
EP (2) | EP3942154B1 (en) |
JP (2) | JP2022524893A (en) |
CN (1) | CN113692476A (en) |
AU (2) | AU2020249771B2 (en) |
BR (1) | BR112021018735A2 (en) |
CA (2) | CA3133618C (en) |
DK (1) | DK3942154T3 (en) |
EA (1) | EA202192429A1 (en) |
ES (1) | ES2927425T3 (en) |
GB (1) | GB2582376B (en) |
MX (1) | MX2021011532A (en) |
PL (1) | PL3942154T3 (en) |
PT (1) | PT3942154T (en) |
SA (1) | SA521430384B1 (en) |
SG (1) | SG11202110350UA (en) |
WO (1) | WO2020193960A1 (en) |
ZA (2) | ZA202106987B (en) |
Families Citing this family (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB2582376B (en) * | 2019-03-22 | 2021-06-09 | Hypertunnel Ip Ltd | Method and system of constructing an underground tunnel |
CN111119913B (en) * | 2020-02-24 | 2024-05-17 | 中铁二院工程集团有限责任公司 | TBM escaping treatment method in tunnel construction and tunnel construction structure |
GB2592699B (en) * | 2020-09-21 | 2022-03-16 | Hypertunnel Ip Ltd | Tunnelling shield |
CN112267899A (en) * | 2020-10-12 | 2021-01-26 | 广东冠粤路桥有限公司 | Tunnel exit construction method |
WO2023082168A1 (en) * | 2021-11-12 | 2023-05-19 | 于宙 | Drilling robot and ground excavation-free method for laying pipeline |
AU2022462279A1 (en) * | 2022-06-10 | 2025-01-02 | Epiroc Rock Drills Aktiebolag | Control system, drill rig and method therein |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1991016524A1 (en) * | 1990-04-25 | 1991-10-31 | Kabushiki Kaisha Komatsu Seisakusho | Method of excavating tunnel |
CN106089174A (en) * | 2016-06-30 | 2016-11-09 | 太原理工大学 | The method in hydrofracturing chemically expansible agent filling speedy drivage tunnel |
KR101910351B1 (en) * | 2017-10-26 | 2018-10-23 | 주식회사 건석이엔지 | Excavating method and drilling apparatus rock wall cutting-typed |
KR101922175B1 (en) * | 2017-03-06 | 2018-11-27 | 주식회사 장평건설 | Rock cutting apparatus, rock cutting method, and excavation method using the same |
Family Cites Families (33)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US528367A (en) * | 1894-10-30 | Robert l | ||
FR1363959A (en) * | 1963-04-05 | 1964-06-19 | Improvements in the digging of wells and galleries in sands and aquifers | |
US3943722A (en) * | 1970-12-31 | 1976-03-16 | Union Carbide Canada Limited | Ground freezing method |
US4017121A (en) * | 1974-11-25 | 1977-04-12 | Allied Chemical Corporation | Longwall mining of trona with prefracturing to prevent slabbing |
JPS5236834U (en) * | 1975-09-09 | 1977-03-15 | ||
JPS5918895A (en) * | 1982-07-24 | 1984-01-31 | 古河鉱業株式会社 | Method of excavating tunnel and tunnel excavator |
JPS62273392A (en) * | 1986-05-19 | 1987-11-27 | 鹿島建設株式会社 | Method of tunnel excavation construction by hydraulic tube |
JPS63194098A (en) * | 1987-02-06 | 1988-08-11 | 鉄建建設株式会社 | Method of lining shield tunnel |
JP2593356B2 (en) * | 1990-03-16 | 1997-03-26 | 清水建設株式会社 | Tunnel construction method |
JP2932197B2 (en) * | 1990-03-28 | 1999-08-09 | 株式会社間組 | Excavation method for large or very large tunnel |
JPH06102957B2 (en) * | 1990-08-24 | 1994-12-14 | 鉄建建設株式会社 | Underground joining method of shield tunnel |
JP2920851B2 (en) * | 1991-04-02 | 1999-07-19 | 清水建設株式会社 | Repair method of concrete wall |
JPH0742483A (en) * | 1993-07-28 | 1995-02-10 | Tekken Constr Co Ltd | Fully opened face shielding excavating machine |
CA2102760C (en) * | 1993-11-09 | 1996-12-03 | David M. Brown | Underground horizontal pipe installation method and apparatus |
JP3567939B2 (en) * | 1994-05-09 | 2004-09-22 | 鉄建建設株式会社 | How to build a tunnel |
JP2874561B2 (en) * | 1994-07-22 | 1999-03-24 | 株式会社大林組 | Fore piling method with stiffening of the leading leg using a shaft |
JPH11280093A (en) * | 1998-03-27 | 1999-10-12 | Hazama Gumi Ltd | Watertight structure of underground bedrock tank |
US6520718B1 (en) * | 1998-11-27 | 2003-02-18 | Shigeki Nagatomo, Et Al. | Sardine-bone construction method for large-section tunnel |
JP3391444B2 (en) * | 2000-10-30 | 2003-03-31 | 株式会社アグルー・ジャパン | Tunnel lining method |
JP4480907B2 (en) * | 2001-02-15 | 2010-06-16 | 島田 巌乃 | Tunnel excavation method |
JP4253801B2 (en) * | 2004-09-30 | 2009-04-15 | 清水建設株式会社 | Tunnel construction method |
CN101403314B (en) * | 2008-11-18 | 2011-03-23 | 河南理工大学 | Coal mine down-hole drilling hydraulic fracturing anti-reflection mash gas extraction technique |
JP5642130B2 (en) * | 2012-02-23 | 2014-12-17 | 日本シビックコンサルタント株式会社 | Tunnel boring machine |
US10094172B2 (en) * | 2012-08-23 | 2018-10-09 | Ramax, Llc | Drill with remotely controlled operating modes and system and method for providing the same |
JP5807096B2 (en) * | 2014-07-08 | 2015-11-10 | 鹿島建設株式会社 | Underground structure and cross-sectional structure of underground structure |
CN104863602B (en) * | 2015-04-09 | 2018-08-10 | 重庆大学 | A kind of soil property shield tunnel construction disease advanced prediction method |
CN105756700B (en) * | 2016-03-11 | 2019-01-22 | 中铁十八局集团有限公司 | Large section tunnel wears the construction method and hole sealing structure of coal measure strata section |
CN105822316B (en) * | 2016-03-18 | 2019-06-18 | 张清林 | Integral type cheats rock tunnel(ling) machine |
JP2017172280A (en) * | 2016-03-25 | 2017-09-28 | 清水建設株式会社 | Main body lining wall and its construction method |
CN106050243B (en) * | 2016-07-28 | 2019-01-22 | 中冶建工集团有限公司 | An ultra shallow buries the Multiple tunnel concurrent construction method of small spacing big cross section |
WO2018049311A1 (en) * | 2016-09-09 | 2018-03-15 | Schlumberger Technology Corporation | Drilling and stimulating of subterranean formation |
CN107905834A (en) * | 2017-12-20 | 2018-04-13 | 中原工学院 | A kind of hypotonic high prominent coal seam architecture gas production method |
GB2582376B (en) * | 2019-03-22 | 2021-06-09 | Hypertunnel Ip Ltd | Method and system of constructing an underground tunnel |
-
2019
- 2019-03-22 GB GB1903979.1A patent/GB2582376B/en active Active
-
2020
- 2020-03-20 EA EA202192429A patent/EA202192429A1/en unknown
- 2020-03-20 DK DK20723471.7T patent/DK3942154T3/en active
- 2020-03-20 EP EP20723471.7A patent/EP3942154B1/en active Active
- 2020-03-20 CA CA3133618A patent/CA3133618C/en active Active
- 2020-03-20 BR BR112021018735A patent/BR112021018735A2/en not_active Application Discontinuation
- 2020-03-20 SG SG11202110350UA patent/SG11202110350UA/en unknown
- 2020-03-20 MX MX2021011532A patent/MX2021011532A/en unknown
- 2020-03-20 EP EP22155907.3A patent/EP4019737A1/en active Pending
- 2020-03-20 PT PT207234717T patent/PT3942154T/en unknown
- 2020-03-20 CA CA3149384A patent/CA3149384C/en active Active
- 2020-03-20 CN CN202080023310.9A patent/CN113692476A/en active Pending
- 2020-03-20 ES ES20723471T patent/ES2927425T3/en active Active
- 2020-03-20 JP JP2021559457A patent/JP2022524893A/en active Pending
- 2020-03-20 PL PL20723471.7T patent/PL3942154T3/en unknown
- 2020-03-20 AU AU2020249771A patent/AU2020249771B2/en active Active
- 2020-03-20 WO PCT/GB2020/050756 patent/WO2020193960A1/en active Application Filing
-
2021
- 2021-09-20 ZA ZA2021/06987A patent/ZA202106987B/en unknown
- 2021-09-21 US US17/480,650 patent/US11591908B2/en active Active
- 2021-09-22 SA SA521430384A patent/SA521430384B1/en unknown
-
2023
- 2023-01-29 US US18/102,750 patent/US20230175395A1/en active Pending
- 2023-03-30 AU AU2023201956A patent/AU2023201956B2/en not_active Expired - Fee Related
- 2023-06-02 JP JP2023091556A patent/JP2023113780A/en active Pending
-
2024
- 2024-01-04 ZA ZA2024/00177A patent/ZA202400177B/en unknown
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1991016524A1 (en) * | 1990-04-25 | 1991-10-31 | Kabushiki Kaisha Komatsu Seisakusho | Method of excavating tunnel |
CN106089174A (en) * | 2016-06-30 | 2016-11-09 | 太原理工大学 | The method in hydrofracturing chemically expansible agent filling speedy drivage tunnel |
KR101922175B1 (en) * | 2017-03-06 | 2018-11-27 | 주식회사 장평건설 | Rock cutting apparatus, rock cutting method, and excavation method using the same |
KR101910351B1 (en) * | 2017-10-26 | 2018-10-23 | 주식회사 건석이엔지 | Excavating method and drilling apparatus rock wall cutting-typed |
Also Published As
Publication number | Publication date |
---|---|
AU2023201956B2 (en) | 2024-07-11 |
WO2020193960A1 (en) | 2020-10-01 |
SG11202110350UA (en) | 2021-10-28 |
EA202192429A1 (en) | 2021-12-13 |
CA3149384A1 (en) | 2020-10-01 |
AU2020249771B2 (en) | 2023-04-27 |
CN113692476A (en) | 2021-11-23 |
GB2582376A (en) | 2020-09-23 |
JP2022524893A (en) | 2022-05-10 |
AU2020249771A1 (en) | 2021-10-14 |
CA3149384C (en) | 2023-11-14 |
EP4019737A1 (en) | 2022-06-29 |
ZA202106987B (en) | 2024-04-24 |
CA3133618A1 (en) | 2020-10-01 |
CA3133618C (en) | 2022-04-05 |
US20220003115A1 (en) | 2022-01-06 |
ZA202400177B (en) | 2024-05-30 |
ES2927425T3 (en) | 2022-11-04 |
AU2023201956A1 (en) | 2023-05-18 |
EP3942154B1 (en) | 2022-08-17 |
PT3942154T (en) | 2022-10-17 |
SA521430384B1 (en) | 2022-06-27 |
GB201903979D0 (en) | 2019-05-08 |
JP2023113780A (en) | 2023-08-16 |
EP3942154A1 (en) | 2022-01-26 |
PL3942154T3 (en) | 2022-11-07 |
DK3942154T3 (en) | 2022-10-03 |
MX2021011532A (en) | 2021-10-22 |
US11591908B2 (en) | 2023-02-28 |
BR112021018735A2 (en) | 2021-12-21 |
US20230175395A1 (en) | 2023-06-08 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB2582376B (en) | Method and system of constructing an underground tunnel | |
GB2588290B (en) | System and method for conducting subterranean operations | |
GB2589461B (en) | System and method for conducting subterranean operations | |
GB2588319B (en) | System and method for conducting subterranean operations | |
GB2588028B (en) | System and method for conducting subterranean operations | |
GB2573652B (en) | Excavation positioning system and method for curved roadway construction | |
EP3841548A4 (en) | Cryptocurrency mining selection system and method | |
GB2589017B (en) | Fracturing system and method | |
GB201912769D0 (en) | Free viewpoint method and system | |
GB2583305B (en) | Foundation system and method of construction | |
GB2591691B (en) | Method and system of constructing an underground tunnel | |
GB2590126B (en) | Navigation system and method | |
GB2585915B (en) | System and method of automatically logging and compliance-monitoring data | |
GB2582746B (en) | Methods and systems for earth drilling | |
ZA201908298B (en) | Underground guidance system and method | |
ZA202106110B (en) | Method and system for mining | |
AU2018901873A0 (en) | Mine planning method and system | |
SG10201901625PA (en) | Construction method of underground structure | |
ZA201905483B (en) | Method of underground mining | |
KR102118636B9 (en) | Method for construction for underground tunnel | |
GB2589109B (en) | Building system and method of assembly | |
ZA201908468B (en) | Backfilling system and method | |
FI3951135T3 (en) | Tunnel excavator, measurement method, and measurement system | |
GB201905059D0 (en) | System and method for underground tunnelling and installation of services | |
SG10201907723QA (en) | Semi-automated blasting system and method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
732E | Amendments to the register in respect of changes of name or changes affecting rights (sect. 32/1977) |
Free format text: REGISTERED BETWEEN 20210325 AND 20210331 |