[go: up one dir, main page]

FR2307936A1 - Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform - Google Patents

Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform

Info

Publication number
FR2307936A1
FR2307936A1 FR7512110A FR7512110A FR2307936A1 FR 2307936 A1 FR2307936 A1 FR 2307936A1 FR 7512110 A FR7512110 A FR 7512110A FR 7512110 A FR7512110 A FR 7512110A FR 2307936 A1 FR2307936 A1 FR 2307936A1
Authority
FR
France
Prior art keywords
posts
platform
floor
unit
wedged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
FR7512110A
Other languages
French (fr)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
DELEAU DANIEL
Original Assignee
DELEAU DANIEL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by DELEAU DANIEL filed Critical DELEAU DANIEL
Priority to FR7512110A priority Critical patent/FR2307936A1/en
Priority to ES447106A priority patent/ES447106A1/en
Publication of FR2307936A1 publication Critical patent/FR2307936A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G3/00Scaffolds essentially supported by building constructions, e.g. adjustable in height
    • E04G3/18Scaffolds essentially supported by building constructions, e.g. adjustable in height supported by cantilevers or other provisions mounted in openings in the building, e.g. window openings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)
  • Jib Cranes (AREA)

Abstract

The working platform is mounted on a frame which wedges between successive floors of the building. When the unit is in position the unit projects beyond the building. The unit is esp. useful during the finishing operations on buildings of which teh sub strcture has been erected. The platform includes a guard rail and cantilevers out from a two post frame. The posts are identical and wedge between the floor and the ceiling due to the cantilever effect of the platform. Both vertical and inclined lengths of the posts may be individually adjusted for length. Non-skid bearing pads may be provided at post extremities.
FR7512110A 1975-04-18 1975-04-18 Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform Withdrawn FR2307936A1 (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
FR7512110A FR2307936A1 (en) 1975-04-18 1975-04-18 Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform
ES447106A ES447106A1 (en) 1975-04-18 1976-04-15 Improvements in the safety scaffoldings. (Machine-translation by Google Translate, not legally binding)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR7512110A FR2307936A1 (en) 1975-04-18 1975-04-18 Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform

Publications (1)

Publication Number Publication Date
FR2307936A1 true FR2307936A1 (en) 1976-11-12

Family

ID=9154138

Family Applications (1)

Application Number Title Priority Date Filing Date
FR7512110A Withdrawn FR2307936A1 (en) 1975-04-18 1975-04-18 Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform

Country Status (2)

Country Link
ES (1) ES447106A1 (en)
FR (1) FR2307936A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2641018A1 (en) * 1988-12-22 1990-06-29 Otis Elevator Co Building-site scaffolding to be climbed in particular in elevator hoppers
EP0960993A1 (en) * 1998-03-31 1999-12-01 Poul Jensen A suspended scaffold and a method of replacing windows using a suspended scaffold
EP1441088A2 (en) * 2003-01-24 2004-07-28 Alvaro Mesaguer Matamoros Multifunction scaffolding
WO2010056202A1 (en) * 2008-11-12 2010-05-20 Dost International Pte Ltd. Mobile cantilever platforms and methods of installation thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2641018A1 (en) * 1988-12-22 1990-06-29 Otis Elevator Co Building-site scaffolding to be climbed in particular in elevator hoppers
EP0960993A1 (en) * 1998-03-31 1999-12-01 Poul Jensen A suspended scaffold and a method of replacing windows using a suspended scaffold
EP1441088A2 (en) * 2003-01-24 2004-07-28 Alvaro Mesaguer Matamoros Multifunction scaffolding
EP1441088A3 (en) * 2003-01-24 2004-12-08 Alvaro Mesaguer Matamoros Multifunction scaffolding
WO2010056202A1 (en) * 2008-11-12 2010-05-20 Dost International Pte Ltd. Mobile cantilever platforms and methods of installation thereof

Also Published As

Publication number Publication date
ES447106A1 (en) 1977-06-16

Similar Documents

Publication Publication Date Title
ATE22144T1 (en) CLIMBING FORMWORK.
GB1514616A (en) Climbing scaffolding assemblies with associated shutterin
US3841609A (en) Perimeter guard rail system
FR2307936A1 (en) Working platform unit for building construction - has two posts wedged between floor and ceiling due to moment of cantilevered platform
CN215760339U (en) Staircase outer probe frame that staggered floor was built
US3893219A (en) Apparatus and method for suspending elevator guide rails
IT1027058B (en) Cast-slab multi-storey building erection - with temporary paired columns containing permanent base slabs covered by separating layer
FR2347507A2 (en) Scaffolding with adjustable height cradle - has mounting on two parallel uprights with holes through which locking pins are inserted
JP2602310B2 (en) Scaffolding equipment for elevator installation
CN211735015U (en) Trestle with rescue escape way
CN213390903U (en) Prefabricated stair board
SU791865A1 (en) Device for forming voids in concrete and ferroconcrete articles
JP2606539B2 (en) Guide rail alignment for hydraulic elevators
CN216949403U (en) Mounting structure of overlong double-support-arm cantilever scaffold for special-shaped profile building
GB2242473A (en) Method and apparatus for making a floor or walkway
JPS6054231B2 (en) Elevator installation equipment
SU1361276A2 (en) Shiftable modular forms
JP2845305B2 (en) Shaft block of unit type elevator
JP2002356813A (en) Movable scaffolding device and construction method thereof
JPH09296610A (en) Outside curing unit
JP3562400B2 (en) escalator
JP3069213B2 (en) Lifting device in all-weather construction method
JPS592063Y2 (en) Safety device at elevator entrance/exit
JPS603318A (en) Pile driver
JPS626204Y2 (en)

Legal Events

Date Code Title Description
ST Notification of lapse