EP3715562A1 - Pipe tower and base station - Google Patents
Pipe tower and base station Download PDFInfo
- Publication number
- EP3715562A1 EP3715562A1 EP18896083.5A EP18896083A EP3715562A1 EP 3715562 A1 EP3715562 A1 EP 3715562A1 EP 18896083 A EP18896083 A EP 18896083A EP 3715562 A1 EP3715562 A1 EP 3715562A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- side plate
- air duct
- plate
- power portion
- sealing room
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000007789 sealing Methods 0.000 claims abstract description 89
- 230000004308 accommodation Effects 0.000 claims abstract description 53
- 238000004891 communication Methods 0.000 claims abstract description 50
- 238000009423 ventilation Methods 0.000 claims abstract description 36
- 230000017525 heat dissipation Effects 0.000 claims abstract description 34
- 238000012546 transfer Methods 0.000 claims abstract description 7
- 238000005192 partition Methods 0.000 claims description 18
- 238000010586 diagram Methods 0.000 description 5
- 238000013461 design Methods 0.000 description 3
- 230000000694 effects Effects 0.000 description 2
- 239000000284 extract Substances 0.000 description 2
- 230000005404 monopole Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000006073 displacement reaction Methods 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000002708 enhancing effect Effects 0.000 description 1
- 230000014509 gene expression Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000010295 mobile communication Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012806 monitoring device Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/003—Access covers or locks therefor
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F13/00—Details common to, or for air-conditioning, air-humidification, ventilation or use of air currents for screening
- F24F13/30—Arrangement or mounting of heat-exchangers
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F24—HEATING; RANGES; VENTILATING
- F24F—AIR-CONDITIONING; AIR-HUMIDIFICATION; VENTILATION; USE OF AIR CURRENTS FOR SCREENING
- F24F7/00—Ventilation
- F24F7/007—Ventilation with forced flow
Definitions
- the present utility model relates to the field of communications technologies, and in particular, to a tube tower and a base station.
- a monopole tube tower is easy to mount, has a simple structure, and has a beautiful appearance, so that more monopole towers are applied to planned projects in urban centers, for example, communications base stations, square lighting, street lamps, power transmission, and landscape signs.
- a cabinet is separately deployed around a tube tower to mount a power supply, an electric control device, a communications device, and the like, and a heat dissipation system is also disposed.
- the disadvantage is that an equipment room needs to occupy an independent area. This is not beautiful, not conducive to city planning, and easy for thefts.
- Embodiments of the present utility model provide a tube tower and a base station, to resolve a problem that a storage bottom surface of the tube tower and a cabinet occupies a large space.
- the tube tower includes a tower wall, an accommodation space and a heat dissipation apparatus that are defined by the tower wall, where a compartment door including an air intake vent and an air exhaust vent is disposed on the tower wall, the accommodation space includes an accommodation compartment, and the accommodation compartment includes a sealing room and a ventilation room located above the sealing room; the compartment door closes the accommodation compartment, the air exhaust vent is in communication with the ventilation room, and the air intake vent is located outside the accommodation compartment.
- the sealing room is configured to accommodate a communications device, a power supply, and the like of a base station.
- the cabinet connected to the tube tower does not need to be externally disposed, thereby saving external space and further reducing costs.
- the heat dissipation apparatus includes an external power portion, a first power portion, and a first heat exchanger, where the first power portion is located at a top of the sealing room, the first heat exchanger is disposed on a side wall of the sealing room and includes a first internal air duct and a first external air duct, the external power portion is located in the ventilation room and in communication with one end of the first external air duct; the other end of the first external air duct is in communication with the air intake vent, and after air absorbed from the air intake vent passes through the first external air duct, the external power portion exhausts the air through the air exhaust vent.
- the first power portion is configured to: form, in the sealing room, an air flow that circularly flows, and transfer heat of the air flow to an outside of the sealing room through the first internal air duct.
- the external power portion and the first power portion perform heat dissipation inside and outside the sealing room, to improve heat dissipation efficiency.
- the accommodation compartment is defined by a top plate, a bottom plate disposed opposite to the top plate, and the tower wall located between the top plate and the bottom plate, and a partition plate, a first side plate, a second side plate, and a third side plate that are located between the top plate and the bottom plate are disposed in the accommodation compartment; and the first side plate and the second side plate are located between the top plate and the bottom plate and pass through the partition plate, the third side plate is located between the partition plate and the bottom plate, the first side plate, the second side plate, and the third side plate are disposed at intervals along a circumferential direction of the tower wall, the first side plate, the second side plate, and the third side plate are all connected by using the tower wall on two opposite sides to define a side wall of the sealing room, and the partition plate, the top plate, and the tube wall form the ventilation room.
- the accommodation compartment directly uses the tower wall of the tube tower as the side wall, and a heat dissipation wall and the accommodation space is defined by using the first side plate, the second side plate, and the third side plate, to properly use an internal space and structure of the tube tower.
- a cabling channel that runs through the top plate and the bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and the second side plate, so that cables can be accommodated and arranged, thereby avoiding damage and disorder caused when the cables are disposed outside the tube tower.
- the heat dissipation apparatus includes a second power portion disposed adjacent to the first power portion and a second heat exchanger, the second heat exchanger is disposed on the third side plate and faces away from the outside of the sealing room, the second heat exchanger includes a second internal air duct and a second air duct, one end of the second external air duct is in communication with the external power portion, the other end is in communication with the air intake vent, the second heat exchanger is located in the second external air duct, and the second power portion is configured to: form heat in the sealing room into the air flow that circularly flows, and transfer the heat of the air flow to the outside of the sealing room through the second internal air duct.
- the first internal air duct is provided with a ventilation opening in communication with the sealing room and the first power portion
- the second internal air duct is provided with a ventilation opening in communication with the sealing room and the second power portion.
- the first side plate, the second side plate, and the third side plate are arranged in an arc shape in the sealing room, and the compartment door is located in a center position of the arc shape.
- a support rack connected to the first side plate, the second side plate, and the third side plate is disposed in the sealing room, the support rack, the first side plate, the second side plate, and the third side plate separate a plurality of support areas, and the plurality of support areas are arranged in an arc shape.
- the arrangement can facilitate taking and placing of a device in the sealing room after the compartment door is opened.
- the compartment door includes a door frame, a door plate, and a sealing portion
- the door frame is provided on the tower wall and in communication with the accommodation compartment
- the door plate is flippable and mounted on the door frame
- the sealing portion seals an area between the door plate and the door frame, so that the sealing room can be effectively sealed.
- the external power portion, the first power portion, and the second power portion each include an air deflector and a centrifugal fan located in the air deflector.
- Two through holes are provided on the bottom plate, and the two through holes respectively enable the first external air duct and the second external air duct to be in communication with the air intake vent.
- the accommodation space further includes several accommodation cavities located above the accommodation compartment, and the accommodation cavities are configured to accommodate other devices.
- the base station provided in the present utility model includes the tube tower, a base station application device, and a power supply, where the base station application device and the power supply are mounted in the sealing room.
- a cabling channel that runs through the top plate and a bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and a second side plate, and cabling of the base station application device and the power supply is connected to another device of the tube tower through the channel.
- the tube tower is provided with the sealing room to accommodate the base station application device and the power supply, the cabling channel, and the heat dissipation apparatus inside. This not only resolves a problem that the cabinet disposed outside the tube tower occupies an area and affects an appearance, but also saves a design of the cabinet, and fully uses an internal space of the tube tower for properly arranging a device placement position, cabling, and heat dissipation, so that the tube tower and the cabinet are actually integrated.
- the tube tower disclosed in the present utility model usually has a tube tower structure used in a tube tower type base station to accommodate a device inside, but is not limited thereto, or may have a tube tower structure that is applied to another occasion to accommodate a device inside.
- the tube tower is mounted vertically or approximately vertically. Expressions of upper, lower, and height are all based on a vertical state that the tube tower has after the tube tower is mounted.
- the described position in an upper part or a lower part of an object is a position in the upper half part or the lower half part of the object.
- the described position above or below an object is a position outside the object and above or below the object.
- the corresponding means that between corresponding objects, there is cooperation for jointly implementing a function, or a location correspondence, and a person skilled in the art may determine a meaning of the "corresponding" based on a scenario.
- the tube tower provided in an embodiment of the present utility model includes a tower wall 10, an accommodation space 11 and a heat dissipation apparatus (not shown in the figure) that are defined by the tower wall 10.
- a compartment door 12 including an air intake vent 121 and an air exhaust vent 122 is disposed on the tower wall 10.
- the accommodation space 11 includes an accommodation compartment 20, the accommodation compartment 20 includes a sealing room 21 and a ventilation room 22 located above the sealing room 21, the compartment door 12 closes the accommodation compartment 20, the air exhaust vent 122 is in communication with the ventilation room 22, and the air intake vent 121 is located outside the accommodation compartment 20.
- the sealing room 21 is configured to accommodate a communications device, a power supply, and the like of a base station.
- the heat dissipation apparatus includes an external power portion 30, a first power portion 31, and a first heat exchanger (not shown in the figure).
- the first power portion 31 is located at the top of the sealing room 21.
- the first heat exchanger is disposed on a side wall of the sealing room 21, and includes a first internal air duct (not shown in the figure) and a first external air duct A isolated from the first internal air duct.
- the external power portion 30 is located in the ventilation room 22 and in communication with one end of the first external air duct A, and the other end of the first external air duct A is in communication with the air intake vent 121.
- the external power portion 30 After air absorbed from the air intake vent passes through the first external air duct, the external power portion 30 exhausts the air through the air exhaust vent 122, to perform external circulation heat dissipation on the sealing room 21.
- the first power portion 31 is configured to form an air flow that circularly flows in the sealing room 21, and transfers heat of the air flow to an outside of the sealing room 21 through the first internal air duct, to form an internal circulation air duct that dissipates heat for the sealing room 21.
- a heat exchange core of the first heat exchanger and a housing of the heat exchanger form the first internal air duct and the first external air duct A that are isolated from each other.
- the first internal air duct is provided with a first ventilation opening 215 in communication with the sealing room 21 and a second ventilation opening 216 in communication with the first power portion 31.
- the first ventilation opening 215 is located at the bottom of the sealing room, and the second ventilation opening 216 is located at the top of the sealing room and in communication with the first power portion 31.
- the tower wall 10 of the tube tower defines the cylindrical accommodation space 11, and an interior of the accommodation space further includes several accommodation cavities located above the accommodation compartment 20, and the accommodation cavities are configured to accommodate a device such as a communications device of a base station.
- the accommodation compartment is a cylindrical structure in the accommodation space.
- the accommodation compartment 20 is defined by a top plate 201, a bottom plate 202 disposed opposite to the top plate 201, and the tower wall located between the top plate 201 and the bottom plate 202. That is, the tower wall located between the top plate 201 and the bottom plate 202 is a side wall of the accommodation compartment.
- a partition plate 23, a first side plate 24, a second side plate 25, and a third side plate 26 that are located between the top plate 201 and the bottom plate 202 are disposed in the accommodation compartment 20.
- the first side plate 24 and the second side plate 25 are located between the top plate 201 and the bottom plate 202 and pass through the partition plate 23.
- the third side plate 26 is located between the partition plate 23 and the bottom plate 202.
- the first side plate 24, the second side plate 25, and the third side plate 26 are disposed (on a part located between the top plate 201 and the bottom plate 202) at intervals along a circumferential direction of the tower wall 10.
- first side plate 24, the second side plate 25, and the third side plate 26 are all connected by using the tower wall 10 on two opposite sides to define the sealing room 21.
- the partition plate 23, the top plate 201, and the tube wall 10 form the ventilation room 22.
- the external power portion 30 is fastened in the ventilation room 22 and includes an air deflector and a centrifugal fan.
- the top plate 201, the bottom plate 202, and the partition plate 23 are approximately circular plates, and the top plate 201, the partition plate 23, and the bottom plate 202 are sequentially disposed, at intervals along a length direction of the tube tower in parallel, in the accommodation space defined by the tube wall 10.
- Two through holes are provided on the bottom plate 202, and one of the two through holes enables the first external air duct A to be in communication with the air intake vent 121.
- a baffle plate 203 is further disposed on a side that is of the bottom wall 202 and that is away from the top plate 201.
- An air intake cavity is formed between the baffle plate 203 and the bottom plate 202.
- the air intake vent 121 of the compartment door 12 is in communication with the air intake cavity, so that air flows from the air intake vent 121 into the first external air duct A through the air intake cavity.
- a through hole is provided on the partition plate 23 and in communication with the first external air duct A, and the air that flows out of the first external air duct A is exhausted by using the ventilation room 22 between the partition plate 23 and the top plate 201.
- the tower wall between the first side plate 24 and the second side plate 25, the tower wall between the second side plate 25 and the third side plate 26, the tower wall between the third side plate 26 and the first side plate 24, the first side plate 24, the second side plate 25, and the third side plate 26 jointly form a circumferential side wall of the sealing room 21.
- the first heat exchanger is fastened on the first side plate 24 and is located in the sealing room 21.
- a cross section of the first side plate 24 is approximately V-shaped, and the first side plate 24 includes a V-shaped surface 241. Two opposite sides of the first side plate 24 are connected to an internal surface of the tower wall 10, and the V-shaped surface 241 faces the tower wall 10 and a cabling channel 242 is formed between the V-shaped surface 241 and the tower wall.
- a cross section of the second side plate 25 is approximately V-shaped, and the second side plate 25 includes a V-shaped surface 251. Two opposite sides of the second side plate 25 are connected to the internal surface of the tower wall 10, and the V-shaped surface 251 faces the tower wall 10 and a cabling channel 252 is formed between the V-shaped surface 251 and the tower wall.
- the cabling channel 242 and the channel 252 run through the top plate 201 and/or the bottom plate 202.
- Two opposite sides of the third side plate 26 are connected to the tower wall and a cavity is formed between the third side plate 26 and the tower wall. The cavity runs through the partition plate 23.
- first side plate 24, the second side plate 25, and the third side plate 26 are arranged in an arc shape in the sealing room 21.
- the compartment door 12 is approximately located at a center of the arc shape.
- a displacement faces the first side plate 24, the second side plate 25, and the third side plate 26.
- the first side plate 24, the second side plate 25, and the third side plate 26 are located at an arc line of a same center.
- a support rack 27 connected to the first side plate 24, the second side plate 25, and the third side plate 26 is disposed in the sealing room 21, and the support rack 27, the first side plate 24, the second side plate 25, and the third side plate 26 separate a plurality of support areas B ( FIG. 2 and FIG.
- the plurality of support areas are arranged in an arc shape, to fully use a cylindrical space structure of the tube tower.
- the device is disposed in close contact with an outer wall of the first heat exchanger or with the second side plate 25 or with the third side plate 26. This is more conducive to heat dissipation of the device.
- An internal structure of the sealing room and a design of the compartment door in this embodiment can facilitate taking and placing the device located in the sealing room 21 from the compartment door 12, and a replacement of components of air ducts in which the first side plate 24, the second side plate 25, and the third side plate 26 are located, to properly arrange and use an internal space of the tube tower.
- the compartment door 12 includes a door frame 123, a door plate 124, and a sealing portion.
- the door frame is provided on the tower wall 10, is in communication with the accommodation compartment 20, and is used for taking and placing the device inside the sealing room.
- the door plate 124 may be flippable and mounted on the door frame 123.
- the sealing portion is a sealing ring disposed at a circumferential edge of the prime number door plate 124 and a circumferential edge of the door frame 123. After the door plate 124 is closed, the sealing portion seals an area between the door plate 124 and the door frame 123.
- the air intake vent 121 and the air exhaust vent 122 are disposed at two opposite ends of the door plate 124.
- the first side plate 24, the second side plate 25, and the third side plate 26 are arranged in an arc shape, and the plurality of support areas are arranged in an arc shape, so that the tube tower and the device are highly integrated, and a hole area of the tube tower is reduced, thereby improving a strength and reliability of the tube tower.
- the first heat exchanger is disposed on the first side plate 24, and the first side plate 24 may be used as the housing of the first heat exchanger. Certainly, the first side plate 24 may be used as a support of the first heat exchanger.
- the external power portion 30 is located in the ventilation room 22 and in communication with the first external air duct A through the through hole on the partition plate 23. Referring to FIG. 8 , after being started, the external power portion 30 draws the air from the air intake vent 121 into the first external air duct A, and then the external power portion 30 exhausts the air in the ventilation room 22 out of the tube tower, to form a flow channel for external circulation heat dissipation on the sealing room 21, and an air flow direction is W in the figure.
- the first power portion 31 extracts heat in the sealing room, exhausts the heat into the first internal air duct of the first heat exchanger through the second ventilation opening 216, and then returns the heat to the sealing room 21 through the first ventilation opening 215, to form an air flow and circulate the air flow.
- the heat exhausted from the first power portion 31 into the first internal air duct passes through the heat exchange core and the air in the first external air duct for heat dissipation, and then returns to the sealing room 21, to form a flow channel for internal circulation heat dissipation on the sealing room 21, and an air flow direction is N in the figure, to implement both internal circulation heat dissipation and external circulation heat dissipation on the sealing room 21.
- the tube tower is provided with the sealing room 21 to accommodate the base station application device and the power supply, the cabling channel, and the heat dissipation apparatus inside.
- This not only resolves a problem that the cabinet disposed outside the tube tower occupies an area and affects an appearance, but also saves a housing of the cabinet, and fully uses the internal space of the tube tower for properly arranging a device placement position, cabling, and heat dissipation, so that the tube tower and the cabinet are actually integrated, and an anti-theft effect of the internal device, and the like can be enhanced.
- the heat dissipation apparatus further includes a second power portion 33 disposed adjacent to the first power portion 31 and a second heat exchanger.
- the second heat exchanger is disposed on the third side plate 26 and faces away from the outside of the sealing room 21, that is, inside the cavity.
- the second heat exchanger includes a second internal air duct and a second external air duct C. One end of the second external air duct C is in communication with the external power portion 30, and the other end is in communication with the air intake vent 121 through another through hole provided on the bottom plate 202.
- the second power portion 33 is in communication with the second internal air duct, and is configured to: form the heat in the sealing room 21 into an air flow that circularly flows, and transfer the heat of the air flow to the outside of the sealing room through the second heat exchanger, thereby further enhancing a heat dissipation effect of the sealing room 21.
- the first power portion 31 and the second power portion 33 each include an air deflector and a centrifugal fan, and external air and internal heat are formed, by using the centrifugal fan, into an air flow to flow.
- the third side plate 26 may be used as a housing of the second heat exchanger, and a heat exchange core of the second heat exchanger and the housing of the heat exchanger form the second internal air duct and the second external air duct C that are isolated from each other.
- the second internal air duct is provided with a third ventilation opening 217 in communication with the sealing room 21 and a fourth ventilation opening 218 in communication with the second power portion 33.
- the third ventilation opening 217 is located at the bottom of the sealing room, and the fourth ventilation opening 218 is located at the top of the sealing room and in communication with the second power portion 33.
- the external power portion 30 draws air from the air intake vent 121 into the second external air duct C, and then the external power portion 30 exhausts the air in the ventilation room 22 out of the tube tower, to perform external circulation heat dissipation on the sealing room 21.
- the second power portion 33 extracts the heat in the sealing room, exhausts the heat into the second internal air duct of the second heat exchanger through the second ventilation opening 216, and then returns the heat to the sealing room 21 through the third ventilation opening 217, to form internal circulation heat dissipation.
- the device is mounted in the support area, and may be in close contact with the third side plate 26, thereby helping remove the heat. Setting of the second heat exchanger further assists heat dissipation of the first heat exchanger, and heat dissipation of a communications device with a relatively large heat emission volume can be more efficient, thereby reducing damage to the device.
- the first power portion 31 and the second power portion 33 are disposed to cooperate with the first heat exchanger and the second heat exchanger, to form two internal circulation flow channels inside the sealing room and two external circulation flow channels outside the sealing room.
- the external power portion 30, the first external air duct, and the second external air duct are cooperated to take away heat of the first heat exchanger and the second heat exchanger, to implement efficient heat dissipation.
- the present utility model further provides a base station, including the tube tower, a base station application device, and a power supply.
- the base station application device and the power supply are mounted in the sealing room 20.
- the base station application device includes a communications device, a monitoring device, and the like. Cables of the base station application device and the power supply, and an optical cable, a cable, and the like of the tube tower may extend out from the cabling channel, and be connected to an external cable or another device of the tube tower.
- the base station application device and components such as the power supply, the optical cable, and the cable are arranged inside the tube tower and a heat dissipation system is added to dissipate heat.
- the cabinet does not need to occupy an additional area, so that a design and costs of the cabinet are saved, and an occupied space of the bottom surface is reduced, an entire occupation area of the base station is reduced, and an appearance completeness of the base station is increased.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Cooling Or The Like Of Electrical Apparatus (AREA)
- Wind Motors (AREA)
Abstract
Description
- This application claims priority to Chinese Patent Application No.
201721886511.3 - The present utility model relates to the field of communications technologies, and in particular, to a tube tower and a base station.
- The development of mobile communication services brings a large quantity of requirements for communication site locations. Previous base stations are all deployed on the ground surface, including communications towers, and cabinets matching tower pipes. A monopole tube tower is easy to mount, has a simple structure, and has a beautiful appearance, so that more monopole towers are applied to planned projects in urban centers, for example, communications base stations, square lighting, street lamps, power transmission, and landscape signs. Usually, a cabinet is separately deployed around a tube tower to mount a power supply, an electric control device, a communications device, and the like, and a heat dissipation system is also disposed. However, the disadvantage is that an equipment room needs to occupy an independent area. This is not beautiful, not conducive to city planning, and easy for thefts.
- Embodiments of the present utility model provide a tube tower and a base station, to resolve a problem that a storage bottom surface of the tube tower and a cabinet occupies a large space.
- The tube tower includes a tower wall, an accommodation space and a heat dissipation apparatus that are defined by the tower wall, where a compartment door including an air intake vent and an air exhaust vent is disposed on the tower wall, the accommodation space includes an accommodation compartment, and the accommodation compartment includes a sealing room and a ventilation room located above the sealing room; the compartment door closes the accommodation compartment, the air exhaust vent is in communication with the ventilation room, and the air intake vent is located outside the accommodation compartment. The sealing room is configured to accommodate a communications device, a power supply, and the like of a base station. The cabinet connected to the tube tower does not need to be externally disposed, thereby saving external space and further reducing costs.
- The heat dissipation apparatus includes an external power portion, a first power portion, and a first heat exchanger, where the first power portion is located at a top of the sealing room, the first heat exchanger is disposed on a side wall of the sealing room and includes a first internal air duct and a first external air duct, the external power portion is located in the ventilation room and in communication with one end of the first external air duct; the other end of the first external air duct is in communication with the air intake vent, and after air absorbed from the air intake vent passes through the first external air duct, the external power portion exhausts the air through the air exhaust vent.
- The first power portion is configured to: form, in the sealing room, an air flow that circularly flows, and transfer heat of the air flow to an outside of the sealing room through the first internal air duct. The external power portion and the first power portion perform heat dissipation inside and outside the sealing room, to improve heat dissipation efficiency.
- The accommodation compartment is defined by a top plate, a bottom plate disposed opposite to the top plate, and the tower wall located between the top plate and the bottom plate, and a partition plate, a first side plate, a second side plate, and a third side plate that are located between the top plate and the bottom plate are disposed in the accommodation compartment; and the first side plate and the second side plate are located between the top plate and the bottom plate and pass through the partition plate, the third side plate is located between the partition plate and the bottom plate, the first side plate, the second side plate, and the third side plate are disposed at intervals along a circumferential direction of the tower wall, the first side plate, the second side plate, and the third side plate are all connected by using the tower wall on two opposite sides to define a side wall of the sealing room, and the partition plate, the top plate, and the tube wall form the ventilation room. The accommodation compartment directly uses the tower wall of the tube tower as the side wall, and a heat dissipation wall and the accommodation space is defined by using the first side plate, the second side plate, and the third side plate, to properly use an internal space and structure of the tube tower.
- A cabling channel that runs through the top plate and the bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and the second side plate, so that cables can be accommodated and arranged, thereby avoiding damage and disorder caused when the cables are disposed outside the tube tower.
- The heat dissipation apparatus includes a second power portion disposed adjacent to the first power portion and a second heat exchanger, the second heat exchanger is disposed on the third side plate and faces away from the outside of the sealing room, the second heat exchanger includes a second internal air duct and a second air duct, one end of the second external air duct is in communication with the external power portion, the other end is in communication with the air intake vent, the second heat exchanger is located in the second external air duct, and the second power portion is configured to: form heat in the sealing room into the air flow that circularly flows, and transfer the heat of the air flow to the outside of the sealing room through the second internal air duct.
- The first internal air duct is provided with a ventilation opening in communication with the sealing room and the first power portion, and the second internal air duct is provided with a ventilation opening in communication with the sealing room and the second power portion.
- The first side plate, the second side plate, and the third side plate are arranged in an arc shape in the sealing room, and the compartment door is located in a center position of the arc shape. A support rack connected to the first side plate, the second side plate, and the third side plate is disposed in the sealing room, the support rack, the first side plate, the second side plate, and the third side plate separate a plurality of support areas, and the plurality of support areas are arranged in an arc shape. The arrangement can facilitate taking and placing of a device in the sealing room after the compartment door is opened.
- The compartment door includes a door frame, a door plate, and a sealing portion, the door frame is provided on the tower wall and in communication with the accommodation compartment, the door plate is flippable and mounted on the door frame, and the sealing portion seals an area between the door plate and the door frame, so that the sealing room can be effectively sealed.
- The external power portion, the first power portion, and the second power portion each include an air deflector and a centrifugal fan located in the air deflector. Two through holes are provided on the bottom plate, and the two through holes respectively enable the first external air duct and the second external air duct to be in communication with the air intake vent.
- The accommodation space further includes several accommodation cavities located above the accommodation compartment, and the accommodation cavities are configured to accommodate other devices.
- The base station provided in the present utility model includes the tube tower, a base station application device, and a power supply, where the base station application device and the power supply are mounted in the sealing room.
- A cabling channel that runs through the top plate and a bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and a second side plate, and cabling of the base station application device and the power supply is connected to another device of the tube tower through the channel.
- In the embodiments, the tube tower is provided with the sealing room to accommodate the base station application device and the power supply, the cabling channel, and the heat dissipation apparatus inside. This not only resolves a problem that the cabinet disposed outside the tube tower occupies an area and affects an appearance, but also saves a design of the cabinet, and fully uses an internal space of the tube tower for properly arranging a device placement position, cabling, and heat dissipation, so that the tube tower and the cabinet are actually integrated.
- To describe technical solutions in embodiments of the present utility model or in the background more clearly, the following describes the accompanying drawings required for describing the embodiments of the present utility model or the background.
-
FIG. 1 is a schematic diagram of a tube tower according to the present utility model; -
FIG. 2 is a schematic structural diagram of a part of an accommodation compartment of the tube tower shown inFIG. 1 ; -
FIG. 3 to FIG. 5 are schematic diagrams of different angles of an internal structure of the accommodation compartment of the tube tower shown inFIG. 2 , where a part of a tower wall is removed; -
FIG. 6 is a schematic diagram in which an external power portion, a first power portion, and a second power portion are disposed inside the tube tower shown inFIG. 2 ; -
FIG. 7 is a top view of the tube tower shown inFIG. 2 in which an internal structure can be seen; and -
FIG. 8 is a schematic diagram of a heat dissipation direction inside the tube tower inFIG. 1 . - The following describes embodiments of the present utility model with reference to the accompanying drawings in the embodiments of the present utility model.
- The tube tower disclosed in the present utility model usually has a tube tower structure used in a tube tower type base station to accommodate a device inside, but is not limited thereto, or may have a tube tower structure that is applied to another occasion to accommodate a device inside. The tube tower is mounted vertically or approximately vertically. Expressions of upper, lower, and height are all based on a vertical state that the tube tower has after the tube tower is mounted. The described position in an upper part or a lower part of an object is a position in the upper half part or the lower half part of the object. The described position above or below an object is a position outside the object and above or below the object. The corresponding means that between corresponding objects, there is cooperation for jointly implementing a function, or a location correspondence, and a person skilled in the art may determine a meaning of the "corresponding" based on a scenario.
- Referring to
FIG. 1 andFIG. 2 , the tube tower provided in an embodiment of the present utility model includes atower wall 10, anaccommodation space 11 and a heat dissipation apparatus (not shown in the figure) that are defined by thetower wall 10. Acompartment door 12 including anair intake vent 121 and anair exhaust vent 122 is disposed on thetower wall 10. Theaccommodation space 11 includes anaccommodation compartment 20, theaccommodation compartment 20 includes asealing room 21 and aventilation room 22 located above thesealing room 21, thecompartment door 12 closes theaccommodation compartment 20, theair exhaust vent 122 is in communication with theventilation room 22, and theair intake vent 121 is located outside theaccommodation compartment 20. Thesealing room 21 is configured to accommodate a communications device, a power supply, and the like of a base station. - Referring to
FIG. 3 ,FIG. 6 , andFIG. 8 together, the heat dissipation apparatus includes anexternal power portion 30, afirst power portion 31, and a first heat exchanger (not shown in the figure). Thefirst power portion 31 is located at the top of thesealing room 21. The first heat exchanger is disposed on a side wall of thesealing room 21, and includes a first internal air duct (not shown in the figure) and a first external air duct A isolated from the first internal air duct. Theexternal power portion 30 is located in theventilation room 22 and in communication with one end of the first external air duct A, and the other end of the first external air duct A is in communication with theair intake vent 121. After air absorbed from the air intake vent passes through the first external air duct, theexternal power portion 30 exhausts the air through theair exhaust vent 122, to perform external circulation heat dissipation on thesealing room 21. Thefirst power portion 31 is configured to form an air flow that circularly flows in thesealing room 21, and transfers heat of the air flow to an outside of thesealing room 21 through the first internal air duct, to form an internal circulation air duct that dissipates heat for thesealing room 21. Specifically, a heat exchange core of the first heat exchanger and a housing of the heat exchanger form the first internal air duct and the first external air duct A that are isolated from each other. The first internal air duct is provided with a first ventilation opening 215 in communication with thesealing room 21 and a second ventilation opening 216 in communication with thefirst power portion 31. Thefirst ventilation opening 215 is located at the bottom of the sealing room, and the second ventilation opening 216 is located at the top of the sealing room and in communication with thefirst power portion 31. - In this embodiment, the
tower wall 10 of the tube tower defines thecylindrical accommodation space 11, and an interior of the accommodation space further includes several accommodation cavities located above theaccommodation compartment 20, and the accommodation cavities are configured to accommodate a device such as a communications device of a base station. The accommodation compartment is a cylindrical structure in the accommodation space. In this embodiment, theaccommodation compartment 20 is defined by atop plate 201, abottom plate 202 disposed opposite to thetop plate 201, and the tower wall located between thetop plate 201 and thebottom plate 202. That is, the tower wall located between thetop plate 201 and thebottom plate 202 is a side wall of the accommodation compartment. - Referring to
FIG. 3 to FIG. 5 andFIG. 7 together, further, apartition plate 23, afirst side plate 24, asecond side plate 25, and athird side plate 26 that are located between thetop plate 201 and thebottom plate 202 are disposed in theaccommodation compartment 20. Thefirst side plate 24 and thesecond side plate 25 are located between thetop plate 201 and thebottom plate 202 and pass through thepartition plate 23. Thethird side plate 26 is located between thepartition plate 23 and thebottom plate 202. Thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 are disposed (on a part located between thetop plate 201 and the bottom plate 202) at intervals along a circumferential direction of thetower wall 10. In addition, thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 are all connected by using thetower wall 10 on two opposite sides to define thesealing room 21. Thepartition plate 23, thetop plate 201, and thetube wall 10 form theventilation room 22. Theexternal power portion 30 is fastened in theventilation room 22 and includes an air deflector and a centrifugal fan. - As shown in
FIG. 2 ,FIG. 3 , andFIG. 5 , specifically, thetop plate 201, thebottom plate 202, and thepartition plate 23 are approximately circular plates, and thetop plate 201, thepartition plate 23, and thebottom plate 202 are sequentially disposed, at intervals along a length direction of the tube tower in parallel, in the accommodation space defined by thetube wall 10. Two through holes (not shown in the figure) are provided on thebottom plate 202, and one of the two through holes enables the first external air duct A to be in communication with theair intake vent 121. Abaffle plate 203 is further disposed on a side that is of thebottom wall 202 and that is away from thetop plate 201. An air intake cavity is formed between thebaffle plate 203 and thebottom plate 202. Theair intake vent 121 of thecompartment door 12 is in communication with the air intake cavity, so that air flows from theair intake vent 121 into the first external air duct A through the air intake cavity. A through hole is provided on thepartition plate 23 and in communication with the first external air duct A, and the air that flows out of the first external air duct A is exhausted by using theventilation room 22 between thepartition plate 23 and thetop plate 201. The tower wall between thefirst side plate 24 and thesecond side plate 25, the tower wall between thesecond side plate 25 and thethird side plate 26, the tower wall between thethird side plate 26 and thefirst side plate 24, thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 jointly form a circumferential side wall of thesealing room 21. The first heat exchanger is fastened on thefirst side plate 24 and is located in thesealing room 21. - A cross section of the
first side plate 24 is approximately V-shaped, and thefirst side plate 24 includes a V-shapedsurface 241. Two opposite sides of thefirst side plate 24 are connected to an internal surface of thetower wall 10, and the V-shapedsurface 241 faces thetower wall 10 and acabling channel 242 is formed between the V-shapedsurface 241 and the tower wall. A cross section of thesecond side plate 25 is approximately V-shaped, and thesecond side plate 25 includes a V-shapedsurface 251. Two opposite sides of thesecond side plate 25 are connected to the internal surface of thetower wall 10, and the V-shapedsurface 251 faces thetower wall 10 and acabling channel 252 is formed between the V-shapedsurface 251 and the tower wall. Thecabling channel 242 and thechannel 252 run through thetop plate 201 and/or thebottom plate 202. Two opposite sides of thethird side plate 26 are connected to the tower wall and a cavity is formed between thethird side plate 26 and the tower wall. The cavity runs through thepartition plate 23. - Further, the
first side plate 24, thesecond side plate 25, and thethird side plate 26 are arranged in an arc shape in thesealing room 21. Thecompartment door 12 is approximately located at a center of the arc shape. A displacement faces thefirst side plate 24, thesecond side plate 25, and thethird side plate 26. Thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 are located at an arc line of a same center. Further, asupport rack 27 connected to thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 is disposed in thesealing room 21, and thesupport rack 27, thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 separate a plurality of support areas B (FIG. 2 andFIG. 4 ), configured to: accommodate and fasten a base station application device, a power supply, and the like that are of a communications base station. The plurality of support areas are arranged in an arc shape, to fully use a cylindrical space structure of the tube tower. The device is disposed in close contact with an outer wall of the first heat exchanger or with thesecond side plate 25 or with thethird side plate 26. This is more conducive to heat dissipation of the device. An internal structure of the sealing room and a design of the compartment door in this embodiment can facilitate taking and placing the device located in thesealing room 21 from thecompartment door 12, and a replacement of components of air ducts in which thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 are located, to properly arrange and use an internal space of the tube tower. - Referring to
FIG. 2 again, thecompartment door 12 includes adoor frame 123, adoor plate 124, and a sealing portion. The door frame is provided on thetower wall 10, is in communication with theaccommodation compartment 20, and is used for taking and placing the device inside the sealing room. Thedoor plate 124 may be flippable and mounted on thedoor frame 123. The sealing portion is a sealing ring disposed at a circumferential edge of the primenumber door plate 124 and a circumferential edge of thedoor frame 123. After thedoor plate 124 is closed, the sealing portion seals an area between thedoor plate 124 and thedoor frame 123. Theair intake vent 121 and theair exhaust vent 122 are disposed at two opposite ends of thedoor plate 124. Thefirst side plate 24, thesecond side plate 25, and thethird side plate 26 are arranged in an arc shape, and the plurality of support areas are arranged in an arc shape, so that the tube tower and the device are highly integrated, and a hole area of the tube tower is reduced, thereby improving a strength and reliability of the tube tower. - In this embodiment, the first heat exchanger is disposed on the
first side plate 24, and thefirst side plate 24 may be used as the housing of the first heat exchanger. Certainly, thefirst side plate 24 may be used as a support of the first heat exchanger. Theexternal power portion 30 is located in theventilation room 22 and in communication with the first external air duct A through the through hole on thepartition plate 23. Referring toFIG. 8 , after being started, theexternal power portion 30 draws the air from theair intake vent 121 into the first external air duct A, and then theexternal power portion 30 exhausts the air in theventilation room 22 out of the tube tower, to form a flow channel for external circulation heat dissipation on thesealing room 21, and an air flow direction is W in the figure. After being started, thefirst power portion 31 extracts heat in the sealing room, exhausts the heat into the first internal air duct of the first heat exchanger through the second ventilation opening 216, and then returns the heat to thesealing room 21 through thefirst ventilation opening 215, to form an air flow and circulate the air flow. In this process, the heat exhausted from thefirst power portion 31 into the first internal air duct passes through the heat exchange core and the air in the first external air duct for heat dissipation, and then returns to thesealing room 21, to form a flow channel for internal circulation heat dissipation on thesealing room 21, and an air flow direction is N in the figure, to implement both internal circulation heat dissipation and external circulation heat dissipation on thesealing room 21. - In the embodiments, the tube tower is provided with the
sealing room 21 to accommodate the base station application device and the power supply, the cabling channel, and the heat dissipation apparatus inside. This not only resolves a problem that the cabinet disposed outside the tube tower occupies an area and affects an appearance, but also saves a housing of the cabinet, and fully uses the internal space of the tube tower for properly arranging a device placement position, cabling, and heat dissipation, so that the tube tower and the cabinet are actually integrated, and an anti-theft effect of the internal device, and the like can be enhanced. - As shown in
FIG. 6 , further, the heat dissipation apparatus further includes asecond power portion 33 disposed adjacent to thefirst power portion 31 and a second heat exchanger. The second heat exchanger is disposed on thethird side plate 26 and faces away from the outside of thesealing room 21, that is, inside the cavity. The second heat exchanger includes a second internal air duct and a second external air duct C. One end of the second external air duct C is in communication with theexternal power portion 30, and the other end is in communication with theair intake vent 121 through another through hole provided on thebottom plate 202. Thesecond power portion 33 is in communication with the second internal air duct, and is configured to: form the heat in thesealing room 21 into an air flow that circularly flows, and transfer the heat of the air flow to the outside of the sealing room through the second heat exchanger, thereby further enhancing a heat dissipation effect of thesealing room 21. Thefirst power portion 31 and thesecond power portion 33 each include an air deflector and a centrifugal fan, and external air and internal heat are formed, by using the centrifugal fan, into an air flow to flow. - The
third side plate 26 may be used as a housing of the second heat exchanger, and a heat exchange core of the second heat exchanger and the housing of the heat exchanger form the second internal air duct and the second external air duct C that are isolated from each other. The second internal air duct is provided with a third ventilation opening 217 in communication with thesealing room 21 and a fourth ventilation opening 218 in communication with thesecond power portion 33. Thethird ventilation opening 217 is located at the bottom of the sealing room, and thefourth ventilation opening 218 is located at the top of the sealing room and in communication with thesecond power portion 33. After being started, theexternal power portion 30 draws air from theair intake vent 121 into the second external air duct C, and then theexternal power portion 30 exhausts the air in theventilation room 22 out of the tube tower, to perform external circulation heat dissipation on thesealing room 21. After being started, thesecond power portion 33 extracts the heat in the sealing room, exhausts the heat into the second internal air duct of the second heat exchanger through the second ventilation opening 216, and then returns the heat to thesealing room 21 through thethird ventilation opening 217, to form internal circulation heat dissipation. The device is mounted in the support area, and may be in close contact with thethird side plate 26, thereby helping remove the heat. Setting of the second heat exchanger further assists heat dissipation of the first heat exchanger, and heat dissipation of a communications device with a relatively large heat emission volume can be more efficient, thereby reducing damage to the device. - In the tube tower in this embodiment, the
first power portion 31 and thesecond power portion 33 are disposed to cooperate with the first heat exchanger and the second heat exchanger, to form two internal circulation flow channels inside the sealing room and two external circulation flow channels outside the sealing room. In addition, theexternal power portion 30, the first external air duct, and the second external air duct are cooperated to take away heat of the first heat exchanger and the second heat exchanger, to implement efficient heat dissipation. - The present utility model further provides a base station, including the tube tower, a base station application device, and a power supply. The base station application device and the power supply are mounted in the
sealing room 20. The base station application device includes a communications device, a monitoring device, and the like. Cables of the base station application device and the power supply, and an optical cable, a cable, and the like of the tube tower may extend out from the cabling channel, and be connected to an external cable or another device of the tube tower. - In the base station of the present utility model, the base station application device and components such as the power supply, the optical cable, and the cable are arranged inside the tube tower and a heat dissipation system is added to dissipate heat. The cabinet does not need to occupy an additional area, so that a design and costs of the cabinet are saved, and an occupied space of the bottom surface is reduced, an entire occupation area of the base station is reduced, and an appearance completeness of the base station is increased.
- In the foregoing preferred embodiments, the objectives, technical solutions, and advantages of the present utility model are further described in detail. It should be understood that the foregoing descriptions are merely preferred embodiments of the present utility model, but are not intended to limit the present utility model. Any modification, equivalent replacement, or improvement made without departing from the spirit and principle of the present utility model shall fall within the protection scope of the present utility model.
Claims (13)
- A tube tower, comprising a tower wall, an accommodation space and a heat dissipation apparatus that are defined by the tower wall, wherein a compartment door comprising an air intake vent and an air exhaust vent is disposed on the tower wall, the accommodation space comprises an accommodation compartment, and the accommodation compartment comprises a sealing room and a ventilation room located above the sealing room, the compartment door closes the accommodation compartment, the air exhaust vent is in communication with the ventilation room, and the air intake vent is located outside the accommodation compartment;
the heat dissipation apparatus comprises an external power portion, a first power portion, and a first heat exchanger, wherein the first power portion is located at a top of the sealing room, the first heat exchanger is disposed on a side wall of the sealing room and comprises a first internal air duct and a first external air duct isolated from the first internal air duct, the external power portion is located in the ventilation room and in communication with one end of the first external air duct, the other end of the first external air duct is in communication with the air intake vent, and after air absorbed from the air intake vent passes through the first external air duct, the external power portion exhausts the air through the air exhaust vent; and
the first power portion is configured to: form, in the sealing room, an air flow that circularly flows, and transfer heat of the air flow to an outside of the sealing room through the first internal air duct. - The tube tower according to claim 1, wherein the accommodation compartment is defined by a top plate, a bottom plate disposed opposite to the top plate, and the tower wall located between the top plate and the bottom plate, and a partition plate, a first side plate, a second side plate, and a third side plate that are located between the top plate and the bottom plate are disposed in the accommodation compartment; and the first side plate and the second side plate are located between the top plate and the bottom plate and pass through the partition plate, the third side plate is located between the partition plate and the bottom plate, the first side plate, the second side plate, and the third side plate are disposed at intervals along a circumferential direction of the tower wall, the first side plate, the second side plate, and the third side plate are all connected by using the tower wall on two opposite sides to define a side wall of the sealing room, and the partition plate, the top plate, and the tube wall form the ventilation room.
- The tube tower according to claim 2, wherein a cabling channel that runs through the top plate and the bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and the second side plate.
- The tube tower according to claim 2, wherein the heat dissipation apparatus comprises a second power portion disposed adjacent to the first power portion and a second heat exchanger, the second heat exchanger is disposed on the third side plate and faces away from the outside of the sealing room, the second heat exchanger comprises a second internal air duct and a second external air duct, one end of the second external air duct is in communication with the external power portion, the other end is in communication with the air intake vent, and the second power portion is in communication with the second internal air duct, and is configured to: form heat in the sealing room into the air flow that circularly flows, and transfer the heat of the air flow to the outside of the sealing room through the second internal air duct.
- The tube tower according to claim 4, wherein the first internal air duct is provided with a ventilation opening in communication with the sealing room and the first power portion, and the second internal air duct is provided with a ventilation opening in communication with the sealing room and the second power portion.
- The tube tower according to any one of claims 2 to 5, wherein the first side plate, the second side plate, and the third side plate are arranged in an arc shape in the sealing room, and the compartment door is located in a center position of the arc shape.
- The tube tower according to claim 6, wherein a support rack connected to the first side plate, the second side plate, and the third side plate is disposed in the sealing room, the support rack, the first side plate, the second side plate, and the third side plate separate a plurality of support areas, and the plurality of support areas are arranged in an arc shape.
- The tube tower according to claim 6, wherein the compartment door comprises a door frame, a door plate, and a sealing portion, the door frame is provided on the tower wall and in communication with the accommodation compartment, the door plate is flippable and mounted on the door frame, and the sealing portion seals an area between the door plate and the door frame.
- The tube tower according to claim 5, wherein the external power portion, the first power portion, and the second power portion each comprise an air deflector and a centrifugal fan located in the air deflector.
- The tube tower according to claim 5, wherein two through holes are provided on the bottom plate, and the two through holes respectively enable the first external air duct and the second external air duct to be in communication with the air intake vent.
- The tube tower according to claim 1, wherein the accommodation space further comprises several accommodation cavities located above the accommodation compartment.
- Abase station, comprising the tube tower according to any one of claims 1 to 11, a base station application device, and a power supply, wherein the base station application device and the power supply are mounted in the sealing room.
- The base station according to claim 12, wherein a cabling channel that runs through the top plate and a bottom plate and through which cabling passes is formed between the tower wall and each of the first side plate and a second side plate, and cabling of the base station application device and the power supply is connected to another device of the tube tower through the channel.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201721886511.3U CN208039983U (en) | 2017-12-28 | 2017-12-28 | Tower and base station |
PCT/CN2018/122752 WO2019128874A1 (en) | 2017-12-28 | 2018-12-21 | Pipe tower and base station |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3715562A1 true EP3715562A1 (en) | 2020-09-30 |
EP3715562A4 EP3715562A4 (en) | 2021-01-20 |
EP3715562B1 EP3715562B1 (en) | 2022-03-09 |
Family
ID=63955681
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP18896083.5A Active EP3715562B1 (en) | 2017-12-28 | 2018-12-21 | Pipe tower and base station |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3715562B1 (en) |
CN (1) | CN208039983U (en) |
WO (1) | WO2019128874A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11688925B2 (en) | 2020-04-10 | 2023-06-27 | Commscope Technologies Llc | Module for a cellular communications monopole |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN208039983U (en) * | 2017-12-28 | 2018-11-02 | 华为技术有限公司 | Tower and base station |
CN112739096B (en) * | 2020-12-23 | 2022-01-11 | 安徽科达自动化集团股份有限公司 | Motor controller shell structure with good heat dissipation performance |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US7363769B2 (en) * | 2005-03-09 | 2008-04-29 | Kelix Heat Transfer Systems, Llc | Electromagnetic signal transmission/reception tower and accompanying base station employing system of coaxial-flow heat exchanging structures installed in well bores to thermally control the environment housing electronic equipment within the base station |
PL2151833T3 (en) * | 2008-08-07 | 2013-08-30 | Starkstrom Geraetebau Gmbh | Transformer system |
CN102395779A (en) * | 2009-03-13 | 2012-03-28 | 湘电达尔文有限责任公司 | Method of constructing a wind turbine and bottom tower section of wind turbine |
BRPI1000005A2 (en) * | 2010-02-08 | 2018-02-14 | Mitsubishi Heavy Industries, Ltd. | Wind power generator |
CN202483209U (en) * | 2012-02-01 | 2012-10-10 | 上海正动通信技术有限公司 | Integrated power-saving device of self-ventilation air conditioning machine room and communication pipe tower |
JP5992176B2 (en) * | 2012-02-10 | 2016-09-14 | エムエイチアイ ヴェスタス オフショア ウィンド エー/エス | Wind power generator |
CN102561749A (en) * | 2012-03-20 | 2012-07-11 | 广州同方瑞风空调有限公司 | Energy-saving type integrated communication base station room |
US9782710B2 (en) * | 2015-07-01 | 2017-10-10 | General Electric Company | Multi-sided ventilation assembly for wind turbine tower access door |
CN206000230U (en) * | 2016-07-13 | 2017-03-08 | 李增珍 | A kind of single-pipe tower with ventilation and heat function |
CN206674404U (en) * | 2017-02-21 | 2017-11-24 | 华为技术有限公司 | Pipe tower and base station |
CN208039983U (en) * | 2017-12-28 | 2018-11-02 | 华为技术有限公司 | Tower and base station |
-
2017
- 2017-12-28 CN CN201721886511.3U patent/CN208039983U/en active Active
-
2018
- 2018-12-21 EP EP18896083.5A patent/EP3715562B1/en active Active
- 2018-12-21 WO PCT/CN2018/122752 patent/WO2019128874A1/en unknown
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US11688925B2 (en) | 2020-04-10 | 2023-06-27 | Commscope Technologies Llc | Module for a cellular communications monopole |
US12107320B2 (en) | 2020-04-10 | 2024-10-01 | Commscope Technologies Llc | Module for a cellular communications monopole |
Also Published As
Publication number | Publication date |
---|---|
EP3715562B1 (en) | 2022-03-09 |
WO2019128874A1 (en) | 2019-07-04 |
CN208039983U (en) | 2018-11-02 |
EP3715562A4 (en) | 2021-01-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11664572B2 (en) | Ducted antenna housing for small cell pole | |
EP3715562A1 (en) | Pipe tower and base station | |
AU2018223411B2 (en) | Tube tower and base station | |
US9484615B2 (en) | Mast arrangement radio network node and related method | |
CN215647689U (en) | Heat exchange structure of telecommunication cabinet | |
US20120100796A1 (en) | Container-type data center | |
US9872416B2 (en) | Communications product and base station system | |
CN207558874U (en) | Battery pack and with its vehicle | |
CN105762693B (en) | New box type substation | |
CN105762692B (en) | Box-type substation | |
CN207298699U (en) | Intelligent street lamp structure | |
CN104638555A (en) | Box-type substation | |
CN103493582A (en) | Base station | |
WO2014065721A1 (en) | Mast arrangement radio network node and related method | |
CN209804593U (en) | Comprehensive mercury lamp heat radiation structure | |
CN211551539U (en) | Backpack box structure of intelligent lamp post | |
CN209844822U (en) | Water-wind heat dissipation full-closed power cabinet | |
CN205491189U (en) | Indoor acer station | |
CN216085033U (en) | Battery for new energy power generation system of communication base station | |
US20250008682A1 (en) | Cooling module assembly for pole-mounted network node | |
CN204408778U (en) | A kind of outdoor use Miniature communication base station cabinet | |
CN110601007A (en) | Surrounding type integrated power supply equipment | |
CN212366632U (en) | Integrated intelligent ring main unit | |
CN210808020U (en) | Special rack of 5GBBU | |
CN218959348U (en) | Integrated wind channel of integration |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20200623 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20201217 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F03D 13/20 20160101ALI20201211BHEP Ipc: F24F 7/007 20060101ALI20201211BHEP Ipc: E04H 12/00 20060101AFI20201211BHEP Ipc: F24F 13/30 20060101ALI20201211BHEP |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F03D 13/20 20160101ALI20210927BHEP Ipc: F24F 13/30 20060101ALI20210927BHEP Ipc: F24F 7/007 20060101ALI20210927BHEP Ipc: E04H 12/00 20060101AFI20210927BHEP |
|
INTG | Intention to grant announced |
Effective date: 20211019 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1474285 Country of ref document: AT Kind code of ref document: T Effective date: 20220315 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602018032165 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220609 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220609 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1474285 Country of ref document: AT Kind code of ref document: T Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220610 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220711 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220709 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602018032165 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
26N | No opposition filed |
Effective date: 20221212 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20221231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221221 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20181221 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220309 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20241029 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20241031 Year of fee payment: 7 |