[go: up one dir, main page]

EP3144445A1 - Landing support system, landing system, bracket - Google Patents

Landing support system, landing system, bracket Download PDF

Info

Publication number
EP3144445A1
EP3144445A1 EP16188999.3A EP16188999A EP3144445A1 EP 3144445 A1 EP3144445 A1 EP 3144445A1 EP 16188999 A EP16188999 A EP 16188999A EP 3144445 A1 EP3144445 A1 EP 3144445A1
Authority
EP
European Patent Office
Prior art keywords
fastening
console
belt
recess
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP16188999.3A
Other languages
German (de)
French (fr)
Other versions
EP3144445B1 (en
Inventor
Bernd Stadelmaier
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zech Hochbau AG
Original Assignee
BAM Deutschland AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by BAM Deutschland AG filed Critical BAM Deutschland AG
Publication of EP3144445A1 publication Critical patent/EP3144445A1/en
Application granted granted Critical
Publication of EP3144445B1 publication Critical patent/EP3144445B1/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F11/00Stairways, ramps, or like structures; Balustrades; Handrails
    • E04F11/02Stairways; Layouts thereof
    • E04F11/022Stairways; Layouts thereof characterised by the supporting structure
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/62Insulation or other protection; Elements or use of specified material therefor
    • E04B1/74Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls
    • E04B1/82Heat, sound or noise insulation, absorption, or reflection; Other building methods affording favourable thermal or acoustical conditions, e.g. accumulating of heat within walls specifically with respect to sound only
    • E04B2001/8254Soundproof supporting of building elements, e.g. stairs, floor slabs or beams, on a structure

Definitions

  • the invention relates to a pedestal storage system for prefabricated platforms, with at least one shaft wall, which carries at least one fastening component, and with at least one attachable to the fastening component / console bracket for storage of a laid on the console / launched Fertigteilpodests.
  • the invention relates to a platform system with at least one precast platform and with the above-mentioned Podestlagersystem.
  • staircase construction it is known to prefabricated platforms, especially main and intermediate platforms, of prefabricated stairs monolithically connected to shaft walls, in particular stairwell walls, which are made of reinforced concrete.
  • reverse bending connections are used which have at least one cast concrete in the steel rod as a fastening component, which initially protrudes only slightly from the stairwell and is pre-bent after the manufacture of the stairwell. Concrete is then poured around the steel bar to form the main or intermediate platform.
  • main or intermediate platforms are to be used as visible parts, these are built for manufacturing reasons as precast and later embedded in the stairwell.
  • consoles are by means of return bends later on the Staircase wall concreted and serve there as a support for the precast concrete platforms.
  • the consoles must be created in small parts with high reinforcement and concrete work either floor by floor after placing the respective precast concrete steps.
  • the invention is therefore an object of the invention to provide a pedestal storage system, a pedestal system and a console that allow easy production and installation of precast concrete pedestal, especially a precast stairs.
  • the object underlying the invention is achieved with a pedestal storage system with the features of claim 1 and by a console with the features of claim 11.
  • the Podestlagersystem invention has the advantage that the console can be made in advance and also arranged as a prefabricated on the stairwell wall. As a result, on the one hand a quick installation of the console in the construction of a precast concrete staircase is guaranteed, and on the other hand, a variety of such consoles cost, yet in the best quality away from the site under advantageous conditions that ensure high security and resilience of each console, are made.
  • the Podestlagersystem invention is characterized in that the prefabricated console has a T-shaped or L-shaped steel beam, which has a fastening strap for attachment to the integrated into the shaft wall fastening member and a perpendicular to the mounting strap carrier belt, and that the steel beam to Forming the prefabricated console is cast in such a way with concrete, that the fastening strap protrudes from the concrete casting and the concrete casting has a bearing surface for supporting the precast concrete platform.
  • the support surface is thus provided as usual by concrete pouring available.
  • a steel girder comprising two straps oriented perpendicular to each other, one strap being designed as a fastening strap for attachment to the staircase wall and the other strap as a carrier strap for substantially receiving the bearing forces of the landing.
  • the fastening strap protrudes from the concrete casting, it can simply be connected to the fastening component in the staircase wall.
  • the console is therefore a total of prefabricated or manufactured and can be mounted on the shaft wall on site, so that can be dispensed with a subsequent Einbeton Schl.
  • the fastening belt and the fastening component can be connected or connected to one another mechanically by a further fastening means.
  • the fastening means is a fastening screw.
  • the fastening belt has at least one screw opening
  • the fastening component is formed as arranged in the shaft wall sleeve rod having at one end a threaded bushing with an internal thread for a guided through the screw hole of the fastening belt / feasible fastening screw having.
  • the sleeve rod thus ends on the side facing the console side surface of the shaft wall, so that the fastening screw in the sleeve rod or in the internal thread can be screwed.
  • the stairwell has an opening in which the sleeve rod rests with the internal thread, and which is accessible from the outside.
  • the bracket can thus be attached to the fastening component in a simple manner in that the fastening screw is inserted through the screw opening and into the internal thread and screwed thereto.
  • the screw opening of the fastening belt is expediently located on a concrete-free section of the steel carrier or the fastening belt.
  • the concrete casting has at least one recess at least in the area of the at least one screw opening.
  • the recess ensures that the screw can be inserted into the screw opening and bolted to the socket rod.
  • the screw can be passed through the screw hole before the concrete is cast in and subsequently held captive on the console by the concrete casting.
  • the recess in the region of the screw opening then ensures that a tool can be brought to the screw in order to screw it firmly into the internal thread.
  • the recess remains free afterwards, so that the screw connection can be released again at any time.
  • the recess after tightening the screw that is filled with screwed into the threaded bushing mounting screw, is filled with a filler.
  • a filler is used as the filler.
  • other fillers for filling the recess are conceivable.
  • the at least one screw opening and thus also the recess at the intended arrangement of the console on the shaft wall above so that a filling of the recess with concrete or other at least initially flowable filler after attaching the console to the shaft wall is easily possible.
  • the recess is formed trough-shaped, so that the still flowable filler is securely held in the recess and can harden there.
  • the shaft wall has a recess into which the console, in particular the fastening belt at least partially used / inserted.
  • the recess simplifies the arrangement of the fastening belt and thus of the console on the shaft wall.
  • the contour of the depression corresponds to the shape of the console, in particular that of the fastening belt.
  • the recess also offers the possibility that the console is positively supported on the shaft wall in the loading direction.
  • a mounting template is present, which is adapted on the one hand to the recess and on the other hand to the console to ensure a safe and advantageously backlash-free or almost play-free seat of the console on the shaft wall.
  • the installation template is provided only for creating the recess in the shaft wall, wherein the template has in particular for receiving a plurality of threaded bushes a plurality of openings to align and orient in the recess to each other, so that the arrangement of the threaded bushes following the arrangement of a plurality of screw openings corresponds to the console or the mounting strap and thus an advantageous mounting of the console is ensured on the shaft wall.
  • the installation template is preferably removed before mounting the console on the shaft wall.
  • the fastening belt is slidably disposed in the recess at least in height.
  • the position and optionally alignment of the console can be adapted to the shaft wall, for example, to compensate for manufacturing or manufacturing tolerances or to compensate.
  • a suitable orientation of the console is possible in particular a plurality of mounting bushes arranged in the recess, so that a plurality, each guided by a screw hole in the mounting strap fixing screws with one of the threaded bushes screwed / screwed.
  • the at least one screw opening is formed as a slot opening.
  • manufacturing tolerances can be compensated for or compensated for in a simple manner during assembly, and secure fastening of the bracket to the shaft wall can be achieved.
  • the fastening belt has a plurality of screw openings, which are spaced from each other, and through which a screw is passed / passed through to be screwed into the shaft wall in a corresponding internal thread of a respective sleeve rod.
  • the one or more socket rods are in particular curved to ensure maximum load capacity.
  • the respective sleeve rod is arranged in accordance with the intended arrangement in such a way that the end having the internal thread is aligned at least substantially perpendicular to the other end of the sleeve rod, the other end of the sleeve member facing down in the well wall in accordance with the intended arrangement.
  • the recess has at least one insertion bevel for the console, in particular for the fastening belt. Due to the insertion be the console or the fastening strap or the installation template is automatically aligned in the recess. In addition, it is ensured by the insertion that a simple insertion of the fastening belt is ensured in the depression.
  • all side surfaces of the recess are formed as an insertion bevel or have an insertion, so that through the recess also an automatic centering of the mounting material or the console with respect to the at least one lying in the recess area fastening component, in particular with respect to the threaded bushing is aligned , If the installation template used only for the preparation of the recess and for aligning the threaded bushes and removed before attaching the console again, the insertion also serves as Entschalungsschräge, which allows easy removal of the installation template.
  • the recess has a particular horizontally oriented support surface on which the console is at least laid on the mounting strap / placed.
  • the horizontal bearing surface allows the previously mentioned edition of the console or the fastening belt in the loading direction, so that it is positively supported on the shaft wall, whereby the capacity of the pedestal storage system is increased.
  • the console with the fastening belt is displaceable up to the support surface in the recess, so that the loading forces are actually transmitted positively in the shaft wall. Due to the screw connection, essentially only the tilting out of the console from the depression is then prevented.
  • the or the screw openings on the fastening belt are preferably spaced apart as far as possible from the lower edge of the fastening belt which can be placed / laid on the support surface, so that the greatest possible leverage is achieved.
  • the load requirements are reduced to the screw, which in comparison to consoles, which are held solely by screw on a wall, smaller sized and reduced in number screw suffice.
  • the fastening belt has on the side facing away from the carrier belt at least one holding projection, which is inserted / inserted into a complementary formed in the shaft wall.
  • the fastening belt thus has on its side facing the shaft wall / zuwendbaren side on a retaining projection which is insertable into a complementary receiving the shaft wall.
  • the at least one receptacle and / or the at least one projection have a wedge-shaped longitudinal section in order to ensure easy insertion and centering relative to one another.
  • the retaining projection is designed as a holding web, which extends over the entire length of the fastening belt, so that even high forces can be transmitted from the console via the fastening belt in the shaft wall.
  • the steel beam has at least one stiffening rib which connects the fastening belt with the carrier belt, and / or at least one stiffening strap which at least partially surrounds the carrier belt.
  • the stiffening rib stabilizes the steel girder and increases its load capacity.
  • the steel beam has a plurality of uniformly spaced apart arranged stiffening ribs, which in particular extend in a wedge shape from the fastening belt to the carrier belt.
  • the stiffening ribs are in accordance with the arrangement of the console on the shaft wall below the carrier belt to ensure maximum load capacity of the console.
  • the at least one stiffening bar also serves to stabilize the steel beam and the concrete casting.
  • a plurality of stiffening brackets are arranged on the steel beam parallel to each other.
  • the stiffening strap completely or almost completely surround the carrier belt at a distance from the carrier belt so that the carrier belt lies in a loop of the stiffening strap.
  • the stiffening bar is surrounded by the concrete pouring in the prefabricated console.
  • the stiffening bracket projects in sections from the concrete casting, so that the mounting bracket is partially accessible to the prefabricated console.
  • the one or more stiffening brackets serves to enable a horizontal reinforcement to be inserted between them.
  • the carrier belt and / or the at least one stiffening rib each have at least one perforation filled with concrete from the concrete casting.
  • the concrete-filled breakthrough increases the overall stability and strength of the console.
  • the combination of concreting and steel beams ensures a positive fit, so that a high load-bearing capacity and safety is provided.
  • the pedestal system according to the invention with the features of claim 13 is characterized by at least one pedestal and the storage system according to the invention.
  • the so designed pedestal system is easy to install on site and inexpensive to manufacture. Further Advantages and preferred features emerge in particular from the previously described and from the claims.
  • the pedestal has a receiving recess for receiving the prefabricated console, wherein the receiving recess is formed at least substantially complementary to the concrete casting of the prefabricated console. Due to the complementary design of concrete casting and exception recessing in particular the advantage is achieved that even if one of the screw or all screw should not hold and the console rests on the support surface of the depression, tilt the console while a bit, but not from the Well out, so that the pedestal continues to be held securely. Due to the complementary formation of concrete casting and receiving recess, the concrete casting in the receiving recess can not be pivoted or only slightly pivoted before the concrete casting canted in the receiving recess and prevents further rotation of the console. In particular, it is provided that the concrete casting has a square or rectangular cross-section in order to ensure a secure tilting when loosening the screw / -en.
  • the prefabricated console according to the invention with the features of claim 15 is characterized in that it comprises a steel beam having a fastening belt for attachment to a fastening member of a shaft wall and a perpendicular to the fastening belt aligned carrier belt, and that the steel beam is so cast with concrete in that the fastening strap protrudes from the concrete casting and the concrete casting has a bearing surface for supporting a precast platform.
  • FIGS. 1A to 1C show in different views of a podium storage system 1 a steel beam 2, which has a fastening belt 3 and a carrier belt 4.
  • the carrier belt 4 is aligned perpendicular to the fastening belt 3 and in particular formed integrally with the fastening belt 3. This results in a T-shaped cross-section of the steel beam 2.
  • an L-shaped cross section is conceivable.
  • FIG. 1A shows a steel beam 2 in a perspective plan view.
  • FIG. 1B shows the steel beam in a plan view perpendicular to the mounting strap 3 and
  • Figure 1C shows a plan view perpendicular to the carrier belt 4th
  • the fastening belt 3 has above the Stromgurts 4 more at the same height or at the same distance to the Stromgurt 4 distributed screw holes 5, which are each formed as a slot opening, wherein the slot openings extend with their long side perpendicular to the carrier belt 4.
  • the fastening belt 3 also has a plurality of distributed stiffening ribs 6, which extend in a wedge shape from the fastening belt 3 to the carrier belt 4, as well as in Figure 1A seen.
  • four screw holes 5 and four stiffening ribs 6 are present. Of course, however, depending on the application more or less screw holes 5 and / or stiffening ribs 6 are formed.
  • the carrier belt 4 is provided with a plurality of distributed apertures 7, which in the present case are circular Openings are formed and their function will be discussed later.
  • the stiffening ribs 6 each have an opening 8, which is also formed as a circular opening.
  • FIGS. 2A and 2B show the steel beam 2 of the pedestal storage system 1 in a sectional view along the line AA FIG. 1B ,
  • the steel beam 2 is now provided with a concrete casting 9 or with a concrete layer which surrounds the carrier belt 4.
  • the concrete casting 9 has a substantially rectangular outer cross-section or a block-like shape whose height H corresponds to the height of the fastening belt 3, and whose width B is wider than the carrier belt 4, so that it also has its free end face Concrete casting 9 is surrounded. How out FIG. 2 it can be seen, the concrete casting 9 also penetrates the openings 7, whereby a particularly firm positive fit of the concrete casting 9 is achieved on the carrier belt 4. Likewise, the concrete casting 9 penetrates the openings 8 of the stiffening ribs 6.
  • the concrete casting 9 has two recesses which extend along the fastening belt 3 over two respective screw openings 5, so that the screw openings 5 are also freely accessible from the side of the carrier belt 4.
  • the recesses 10 extend in the present embodiment except for the carrier belt 4, wherein according to an alternative embodiment can also be provided that the concrete casting 9 extends over the carrier belt 4 completely, but spaced from the screw holes 5, the recesses 10 so far less deep and not formed reaching to the support element 4.
  • the concrete casting 9 forms, together with the steel girder 2, a bracket 11 for the podium storage system 1, which serves to store a finished part platform, in particular an intermediate landing or a main landing of a precast staircase.
  • the concrete casting 9 has on its upper side 12 on a flat support surface 13 for the precast concrete pedestal, which extends parallel to the carrier belt 4 and beyond.
  • the concrete casting 9 thus substantially encloses the carrier belt 4, while the fastening belt 3 projects from the concrete casting 9 and is substantially free of it. Only on the side of the carrier belt 4, the concrete casting reaches up to the side surface of the fastening belt 3 zoom.
  • the console 11 can be prefabricated delivered to the site and so far away from a construction site, where it is to be used for mounting a precast stairs, are made. This results in advantageous manufacturing conditions for the console 11, which can thus be prefabricated as mass-produced under optimal and repeatable conditions and delivered to the installation site.
  • FIG. 3 shows in a perspective exploded view of the pedestal storage system 1 with a console 11 constructed as described above and a shaft wall 12, for example, staircase wall to which the console 11 is to be mounted for storage a landing.
  • the shaft wall 12 has a recess 13 which extends horizontally over the shaft wall 12, wherein the recess 13 has a height h which is greater than the height H of the fastening belt 3.
  • a plurality of curved sleeve rods 14 are embedded or embedded in concrete , which each have a threaded bush 15 with an internal thread 16 at its free end.
  • the threaded bushings 15 are flush with the bottom 17 of the recess 13 so that they do not protrude above it.
  • the other end of the respective sleeve rod 14 is curved by approximately 90 ° down in the shaft wall 12 aligned.
  • the sleeve rods 14 are arranged distributed such that the internal thread 16 spaced from each other at a height that their arrangement corresponds to the arrangement of the screw holes 5 in the fastening belt 3 to each other, so then when the console 11 in the recess with the fastening belt. 3 is used in accordance with the arrows 18 or was, the screw holes 5 are aligned with the internal threads 16.
  • FIGS. 4A and 4B each show in a cross-sectional view of the assembly of the pedestal storage system. 1
  • FIG. 4A shows the Podestlagersystem 1 in an exploded view or the assembly of the items
  • FIG. 4B shows the assembled pod storage system 1.
  • FIG. 4A how out FIG. 4A can be seen, the recess 13 at its upper side edge an insertion bevel 19 and at its lower side edge on a horizontal support surface 20.
  • the fastening belt 3 positively placed or placed, whereby the load capacity of the Podestlagersystems 1 is increased.
  • a mounting template 21 is arranged or is that allows a simple fitting of the console 11 in the recess 13.
  • the installation template 21 has an outer contour corresponding to the depression 13, so that it can be inserted into the depression 13 with a precise fit.
  • the installation template 21 openings, which are arranged according to the threaded bushes to each other.
  • the installation template 21 On its side facing the bracket 11, the installation template 21 has a recess 22, which is designed to receive the console 11, in particular the fastening belt 3, in regions.
  • the installation template 21 is designed such that it receives the console 11 at least substantially free of play and can be pre-assembled at this.
  • the console 11 is then preferably used together with the installation template 21 in the recess 13, wherein the insertion bevel 19 ensures easy insertion and at the same time accomplishes an alignment of the bracket 11 with respect to the internal thread 16, so that in the connection the screw openings 5 are aligned with the internal threads 16 , By forming the screw openings 5 as slot openings, manufacturing and assembly tolerances can be compensated in a simple manner.
  • the installation template 21 is preferably conical, so that it can be easily turned off and reused. At the in FIG. 3 1, the installation template 21 is preferably used in the production of the shaft wall 12 initially for aligning the sleeve rods 14 and removed before inserting the console 11 again.
  • the above-mentioned openings in the installation template 21 are preferably designed to receive the threaded bushings in regions, in particular radially backlash-free or almost free of play, in order to align them in the manufacture of the shaft wall according to the arrangement of the screw openings 5.
  • FIG. 4B shows, as already mentioned, the mounted podium storage system 1 with a console 11 and previously removed installation template 21, wherein the console 11 is inserted into the recess 13 of the shaft wall 12.
  • a fastening screw 23 is guided for fastening the bracket 11 to the shaft wall 12 so that its screw head rests against the fastening belt 3 and its threaded shaft is screwed into the internal thread 16 or is screwed.
  • the recesses 10 are preferably subsequently filled with a filling compound 24, wherein preferably the same concrete mixture is used as the filling material, which was also used to produce the concrete casting 9.
  • the pedestal 25 can now finally be placed on the console 11 directly or with the interposition of a damping element 26, as indicated by arrows in FIG. 4B indicated.
  • the Podestlagersystem 1 forms together with the precast platform 25 a pedestal system, especially for precast stairs. Conveniently, the pedestal system on more of the consoles and several of the precast podiums.
  • this preferably has a receiving recess 27 for receiving the console 11, in particular the concrete casting 9.
  • the exceptional recess 27 is formed complementary to the concrete casting 9, so that the receiving recess 27 has a rectangular cross-section.
  • the console 11 is then in the receiving recess 27 preferably at least substantially free of play.
  • the console 11 in the recess 13 can only be pivoted so far by the weight force of the pedestal 25 until the concrete casting 9 canted in the receiving recess 27. Falling through the precast platform 25 is thus not possible because the weight is still transmitted through the console 11 on the support surface 20 in the shaft wall 12.
  • a mortar composition 28 is used, which closes the gap between the bracket 11 and the side edges of the recess 13.
  • the hold of the bracket 11 in the recess 13 is further increased, in particular concealed concrete areas of the fastening belt 3 and the fire protection improved.
  • the support surface 20 is formed to support the console 11 in this case.
  • the fastening belt 3 on its side facing away from the carrier belt 4 side has a retaining projection 29 which is formed substantially complementary with a receptacle 30 in the shaft wall 12 so that the Befest Trentsgurt 3 with the retaining projection 29 in the receptacle 30 is inserted or inserted, as in FIG. 4B shown.
  • At least the receptacle 30 is wedge-shaped, so that the holding projection 29 is easy to insert and centered by the receptacle 30 and fixed in a form-fitting manner.
  • This can be dispensed with the support surface 20, which is then ultimately formed by the retaining projection 29.
  • can be dispensed with the recess 13 and the console 11 are also arranged on a flat side wall of the shaft wall 12.
  • the concrete casting 9 also preferably encloses the upper and lower edges and side edges of the fastening belt 3, so that only the side of the shaft wall 12 facing the retaining projection 29 is concrete-cast-free.
  • FIGS. 5A and 5B show a further embodiment of the bracket 11, without the concrete casting 9.
  • the steel beam 2 is L-shaped, and that in addition to the stiffening ribs 6 a plurality of stiffening brackets 31 are arranged on the steel beam 2.
  • FIG. 5A shows a side view of the console 11, in which the course of the stiffening bracket 31 is clearly visible.
  • the respective stiffening bracket 31 almost completely surrounds the carrier belt 4 and is arranged substantially at a distance therefrom.
  • the stiffening bracket 31 is almost annular.
  • one end of the stiffening strap 31 is assigned to the fastening strap 3, so that a first section 32 of the stiffening strap 31 extends parallel to the carrier strap 4 and at a distance from it.
  • An adjoining second section 33 of the stiffening bracket 31 runs perpendicular to the section 32 and parallel to the fastening belt 3, so that the section 33 extends beyond the carrier belt 4 also.
  • the section 33 is adjoined by a further section 34, which in turn runs parallel to the carrier section 4 in the direction of the fastening belt 3.
  • the section 34 ends before the fastening belt 3 and merges into a section 35 which extends perpendicular to the support section 4 parallel to the fastening belt 3 and ends at the underside of the carrier belt 4.
  • the carrier belt 4 is almost completely in the present rectangular loop of the respective stiffening bracket 31.
  • the stiffening bracket 31 may also have, for example, a circular, triangular or oval course.
  • FIG. 5B shows a perspective view of the console 11 with the plurality of stiffening ribs arranged thereon 6 and stiffening brackets 31.
  • the stiffening bracket 31 the horizontal reinforcement is expediently inserted.
  • the stiffening brackets 31 may also be present on a T-shaped steel beam 2, as shown in the preceding embodiments.
  • the pedestal storage system 1 expediently has a multiplicity of consoles 11 which can be attached to at least two opposite or angular shaft walls 12 in the manner described above. This makes it possible to mount a precast staircase in a short time in a staircase by first attaching the consoles 11 for an intermediate or main platform of the stairs to the shaft walls 12, as described above, and then the intermediate or main platform on the consoles 11th is hung up. Subsequently, one or more additional consoles 11 are arranged and fixed to the shaft wall 12 for the intermediate intermediate or main platform, and then placed the intermediate or main platform on the attached brackets 11.
  • the prefabricated consoles 11 Due to the prefabricated consoles 11, these can be mounted in a short time on the shaft wall 12, whereby a quick installation of the stairs is possible.
  • the respective shaft wall 12 can be created in one go, there is no floor-wise structure of the shaft wall necessary.
  • the respective consoles 11 are mounted in tiers.
  • To speed up the construction process for example by means of a Hubsteigers after completion of a stairwell core assembly of the consoles 11 and the pedestals done.
  • the displacement of the precast platforms can take place in parallel to the displacement of the precast staircases.
  • the use of a crane to move the elements is reduced to less than a day per staircase in a standard multi-storey apartment building.
  • building construction cranes no longer have to be designed for the heaviest component, namely the staircases.

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Connection Of Plates (AREA)
  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)

Abstract

Die Erfindung betrifft ein Podestlagersystem (1) für Fertigteilpodeste, mit wenigstens einer Schachtwand (12), die wenigstens ein Befestigungsbauteil trägt, und mit wenigstens einer an dem Befestigungsbauteil befestigbaren/befestigten Konsole (11) zur Lagerung eines auf die Konsole (11) auflegbaren/aufgelegten Fertigteilpodests (25). Es ist vorgesehen, dass die vorgefertigte Konsole (11) einen T-förmigen oder L-förmigen Stahlträger (2) aufweist, der einen Befestigungsgurt (3) zum Befestigen an dem in die Schachtwand (12) integrierten Befestigungsbauteil und einen insbesondere senkrecht dazu ausgerichteten Trägergurt (4) aufweist, und dass der Stahlträger (2) derart mit Beton zum Bilden der vorgefertigten Konsole (11) umgossen ist, dass der Befestigungsgurt (3) von dem Betonguss (9) vorsteht und der Betonguss (9) eine Auflageoberfläche (13) zur Auflage des Fertiteilpodests (25) aufweist.The invention relates to a pedestal storage system (1) for prefabricated platforms, having at least one shaft wall (12) carrying at least one fastening component, and having at least one bracket (11) attachable to the fastening component for supporting a bracket (11) launched precast platforms (25). It is envisaged that the prefabricated console (11) has a T-shaped or L-shaped steel girder (2), which has a fastening belt (3) for fastening to the fastening component integrated in the shaft wall (12) and a carrier belt aligned in particular perpendicular thereto (4), and that the steel girder (2) is encapsulated with concrete to form the prefabricated bracket (11) such that the fastening strap (3) protrudes from the concrete casting (9) and the concrete casting (9) has a support surface (13). to the edition of the Fertiteilpodests (25).

Description

Die Erfindung betrifft ein Podestlagersystem für Fertigteilpodeste, mit wenigstens einer Schachtwand, die wenigstens ein Befestigungsbauteil trägt, und mit wenigstens einer an dem Befestigungsbauteil befestigbaren /befestigten Konsole zur Lagerung eines auf die Konsole auflegbaren/aufgelegten Fertigteilpodests.The invention relates to a pedestal storage system for prefabricated platforms, with at least one shaft wall, which carries at least one fastening component, and with at least one attachable to the fastening component / console bracket for storage of a laid on the console / launched Fertigteilpodests.

Weiterhin betrifft die Erfindung ein Podestsystem mit wenigstens einem Fertigteilpodest und mit dem oben genannten Podestlagersystem.Furthermore, the invention relates to a platform system with at least one precast platform and with the above-mentioned Podestlagersystem.

Im Treppenbau ist es bekannt, Fertigteilpodeste, insbesondere Haupt- und Zwischenpodeste, von Fertigteiltreppen monolithisch an Schachtwände, insbesondere Treppenhauswände, die aus Stahlbeton gefertigt sind, anzuschließen. Üblicherweise werden dazu Rückbiegeanschlüsse verwendet, die mindestens einen im Beton vergossenen Stahlstab als Befestigungsbauteil aufweisen, der von der Treppenhauswand zunächst nur geringfügig vorsteht und nach der Fertigung der Treppenhauswand von dieser vorgebogen wird. Im Anschluss wird Beton um den Stahlstab herumgegossen, um das Haupt- oder Zwischenpodest zu bilden.In staircase construction, it is known to prefabricated platforms, especially main and intermediate platforms, of prefabricated stairs monolithically connected to shaft walls, in particular stairwell walls, which are made of reinforced concrete. Usually, reverse bending connections are used which have at least one cast concrete in the steel rod as a fastening component, which initially protrudes only slightly from the stairwell and is pre-bent after the manufacture of the stairwell. Concrete is then poured around the steel bar to form the main or intermediate platform.

Auch ist es bekannt, auf diese Weise eine Konsole an der Treppenhauswand zu fertigen, was jedoch fertigungstechnisch und zeittechnisch einen hohen Aufwand bedeutet. Durch im Nachgang herzustellende Konsolen besteht außerdem die Gefahr, dass eine einzubauende Bewehrungsführung kleingliedrig ausgebildet werden muss, zumal auch hier Anforderungen im Hinblick auf Expositionsklassen und Brandschutz einzuhalten sind. Darüber hinaus ist es nur mit hohem Aufwand möglich, die Betonage im Nachgang vorzusehen.It is also known to manufacture in this way a console on the stairwell, but this means production and time technology a lot of effort. By subsequently manufactured consoles, there is also the danger that a reinforcement system to be installed must be designed in a low-limbed manner, especially since requirements with regard to exposure classes and fire protection must also be observed here. In addition, it is only possible with great effort to provide the concreting in the wake.

Sofern die Haupt- beziehungsweise Zwischenpodeste als Sichtteile verwendet werden sollen, werden diese aus fertigungstechnischen Gründen als Fertigteil gebaut und später in den Treppenhausschacht eingelassen. Zur Anordnung und Lagerung der Zwischen- oder Hauptpodeste werden Konsolen mittels Rückbiegeanschlüssen nachträglich an der Treppenhauswand anbetoniert und dienen dort als Auflager für die Fertigteilpodeste. Die Konsolen müssen dabei kleinteilig mit hohem Bewehrungs- und Betonageaufwand entweder Etage für Etage nach dem Auflegen der jeweiligen Fertigteilpodeste erstellt werden.If the main or intermediate platforms are to be used as visible parts, these are built for manufacturing reasons as precast and later embedded in the stairwell. For arrangement and storage of the intermediate or main platforms consoles are by means of return bends later on the Staircase wall concreted and serve there as a support for the precast concrete platforms. The consoles must be created in small parts with high reinforcement and concrete work either floor by floor after placing the respective precast concrete steps.

Der Erfindung liegt daher die Aufgabe zugrunde, ein Podestlagersystem, ein Podestsystem sowie eine Konsole zu schaffen, die eine einfache Herstellung und Montage eines Fertigteilpodests, insbesondere einer Fertigteiltreppe erlauben.The invention is therefore an object of the invention to provide a pedestal storage system, a pedestal system and a console that allow easy production and installation of precast concrete pedestal, especially a precast stairs.

Die der Erfindung zugrundeliegende Aufgabe wird mit einem Podestlagersystem mit den Merkmalen des Anspruchs 1 sowie durch eine Konsole mit den Merkmalen des Anspruchs 11 gelöst. Das erfindungsgemäße Podestlagersystem hat den Vorteil, dass die Konsole vorab gefertigt und ebenfalls als Fertigbauteil an der Treppenhauswand angeordnet werden kann. Dadurch ist einerseits eine schnelle Montage der Konsole beim Bau insbesondere einer Fertigteiltreppe gewährleistet, und andererseits kann eine Vielzahl derartiger Konsolen kostengünstig und dennoch in bester Qualität entfernt von der Baustelle unter vorteilhaften Bedingungen, die eine hohe Sicherheit und Belastbarkeit jeder Konsole gewährleisten, gefertigt werden.The object underlying the invention is achieved with a pedestal storage system with the features of claim 1 and by a console with the features of claim 11. The Podestlagersystem invention has the advantage that the console can be made in advance and also arranged as a prefabricated on the stairwell wall. As a result, on the one hand a quick installation of the console in the construction of a precast concrete staircase is guaranteed, and on the other hand, a variety of such consoles cost, yet in the best quality away from the site under advantageous conditions that ensure high security and resilience of each console, are made.

Das erfindungsgemäße Podestlagersystem zeichnet sich dadurch aus, dass die vorgefertigte Konsole einen T-förmigen oder L-förmigen Stahlträger aufweist, der einen Befestigungsgurt zur Befestigung an dem in die Schachtwand integrierten Befestigungsbauteil und einen senkrecht zu dem Befestigungsgurt ausgerichteten Trägergurt aufweist, und dass der Stahlträger zum Bilden der vorgefertigten Konsole derart mit Beton umgossen ist, dass der Befestigungsgurt von dem Betonguss vorsteht und der Betonguss eine Auflagefläche zur Auflage des Fertigteilpodests aufweist. Die Auflagefläche wird also wie bisher üblich durch Betonguss zur Verfügung gestellt. In dem Betonguss integriert ist jedoch ein Stahlträger, der zwei Gurte aufweist, die senkrecht zueinander ausgerichtet sind, wobei der eine Gurt als Befestigungsgurt zur Befestigung an der Treppenhauswand und der andere Gurt als Trägergurt zur wesentlichen Aufnahme der Lagerkräfte des Treppenpodests ausgebildet ist. Durch das Umgießen des Stahlträgers mit dem Beton wird die Konsole vorgefertigt, sodass der Betonguss bereits vor der Montage der Konsole an einer Schachtwand an dem Stahlträger vorhanden ist, und durch die Befestigung der Konsole an der Schachtwand an dieser angeordnet wird. Die Konsole wird also vorgefertigt beziehungsweise vormontiert und als bereits den Betonguss aufweisendes Fertigbauteil an der Schachtwand befestigt. Die Auflagefläche des Betonguss liegt dabei insbesondere parallel zu dem Trägergurt, um eine vorteilhafte Kraftübertragung zu gewährleisten. Dadurch, dass der Befestigungsgurt von dem Betonguss vorsteht, ist dieser einfach mit dem Befestigungsbauteil in der Treppenhauswand verbindbar. Die Konsole ist somit insgesamt vorab fertigbar bzw. gefertigt und vor Ort an der Schachtwand montierbar, sodass auf ein nachträgliches Einbetonieren des Stahlträgers verzichtet werden kann. Insbesondere sind der Befestigungsgurt und das Befestigungsbauteil mechanisch durch ein weiteres Befestigungsmittel miteinander verbindbar beziehungsweise verbunden. Insbesondere handelt es sich bei dem Befestigungsmittel um eine Befestigungsschraube.The Podestlagersystem invention is characterized in that the prefabricated console has a T-shaped or L-shaped steel beam, which has a fastening strap for attachment to the integrated into the shaft wall fastening member and a perpendicular to the mounting strap carrier belt, and that the steel beam to Forming the prefabricated console is cast in such a way with concrete, that the fastening strap protrudes from the concrete casting and the concrete casting has a bearing surface for supporting the precast concrete platform. The support surface is thus provided as usual by concrete pouring available. Integrated in the concrete casting, however, is a steel girder comprising two straps oriented perpendicular to each other, one strap being designed as a fastening strap for attachment to the staircase wall and the other strap as a carrier strap for substantially receiving the bearing forces of the landing. By pouring the steel beam with the concrete, the console is prefabricated so that the concrete casting is already present on a shaft wall on the steel girder prior to assembly of the console, and is arranged by attaching the console to the shaft wall thereto. The console is therefore prefabricated or preassembled and attached as already the concrete casting exhibiting finished component to the shaft wall. The bearing surface of the concrete casting is in particular parallel to the carrier belt to ensure a favorable power transmission. Due to the fact that the fastening strap protrudes from the concrete casting, it can simply be connected to the fastening component in the staircase wall. The console is therefore a total of prefabricated or manufactured and can be mounted on the shaft wall on site, so that can be dispensed with a subsequent Einbetonieren the steel beam. In particular, the fastening belt and the fastening component can be connected or connected to one another mechanically by a further fastening means. In particular, the fastening means is a fastening screw.

Gemäß einer bevorzugten Weiterbildung der Erfindung ist vorgesehen, dass der Befestigungsgurt wenigstens eine Schraubenöffnung aufweist, und dass das Befestigungsbauteil als in der Schachtwand angeordneter Muffenstab ausgebildet ist, der an einem Ende eine Gewindebuchse mit einem Innengewinde für eine durch die Schraubenöffnung des Befestigungsgurtes geführte/führbare Befestigungsschraube aufweist. Der Muffenstab endet somit an der der Konsole zugewandten Seitenfläche der Schachtwand, sodass die Befestigungsschraube in dem Muffenstab beziehungsweise in das Innengewinde einschraubbar ist. Die Treppenhauswand weist insofern eine Öffnung auf, in welcher der Muffenstab mit dem Innengewinde einliegt, und die von außen zugängig ist. Die Konsole kann somit auf einfache Art und Weise an dem Befestigungsbauteil dadurch befestigt werden, dass die Befestigungsschraube durch die Schraubenöffnung und in das Innengewinde eingeführt und damit verschraubt wird. Die Schraubenöffnung des Befestigungsgurts befindet sich insofern zweckmäßigerweise an einem betonfreien Abschnitt des Stahlträgers beziehungsweise des Befestigungsgurts.According to a preferred embodiment of the invention, it is provided that the fastening belt has at least one screw opening, and that the fastening component is formed as arranged in the shaft wall sleeve rod having at one end a threaded bushing with an internal thread for a guided through the screw hole of the fastening belt / feasible fastening screw having. The sleeve rod thus ends on the side facing the console side surface of the shaft wall, so that the fastening screw in the sleeve rod or in the internal thread can be screwed. The stairwell has an opening in which the sleeve rod rests with the internal thread, and which is accessible from the outside. The bracket can thus be attached to the fastening component in a simple manner in that the fastening screw is inserted through the screw opening and into the internal thread and screwed thereto. The screw opening of the fastening belt is expediently located on a concrete-free section of the steel carrier or the fastening belt.

Gemäß einer bevorzugten Weiterbildung der Erfindung ist vorgesehen, dass der Betonguss wenigsten eine Aussparung zumindest im Bereich der wenigstens einen Schraubenöffnung aufweist. Durch die Aussparung wird gewährleistet, dass die Schraube in die Schraubenöffnung eingeführt und mit dem Muffenstab verschraubt werden kann. Alternativ kann die Schraube bereits vor dem Einbetonieren der Konsole durch die Schraubenöffnung geführt werden und durch den Betonguss im Anschluss unverlierbar an der Konsole gehalten sein. Durch die Aussparung im Bereich der Schraubenöffnung wird dann gewährleistet, dass ein Werkzeug an die Schraube herangeführt werden kann, um diese in das Innengewinde fest einzuschrauben.According to a preferred development of the invention, it is provided that the concrete casting has at least one recess at least in the area of the at least one screw opening. The recess ensures that the screw can be inserted into the screw opening and bolted to the socket rod. Alternatively, the screw can be passed through the screw hole before the concrete is cast in and subsequently held captive on the console by the concrete casting. The recess in the region of the screw opening then ensures that a tool can be brought to the screw in order to screw it firmly into the internal thread.

Gemäß einer ersten Ausführungsform bleibt die Aussparung im Anschluss frei, sodass die Schraubverbindung jederzeit auch wieder gelöst werden kann. Bevorzugt ist jedoch vorgesehen, dass die Aussparung nach dem Festziehen der Schraubverbindung, also mit in die Gewindebuchse eingeschraubter Befestigungsschraube, mit einem Füllstoff aufgefüllt wird. Dadurch wird die Auflagefläche der Betonage für das Treppenpodest vergrößert, die Schraube gesichert und der Brandschutz verbessert. Als Füllstoff wird insbesondere Beton verwendet. Jedoch sind auch andere Füllstoffe zum Auffüllen der Aussparung denkbar. Zweckmäßigerweise liegt die wenigstens eine Schraubenöffnung und damit auch die Aussparung bei bestimmungsgemäßer Anordnung der Konsole an der Schachtwand oben, sodass ein Auffüllen der Aussparung mit Beton oder einem anderen zumindest zunächst fließfähigen Füllstoff nach der Befestigung der Konsole an der Schachtwand problemlos möglich ist. Insbesondere ist die Aussparung wannenförmig ausgebildet, sodass der noch fließfähige Füllstoff sicher in der Aussparung gehalten ist und dort aushärten kann.According to a first embodiment, the recess remains free afterwards, so that the screw connection can be released again at any time. However, it is preferably provided that the recess after tightening the screw, that is filled with screwed into the threaded bushing mounting screw, is filled with a filler. As a result, the contact surface of the concrete for the landing is increased, secured the screw and improves fire safety. In particular, concrete is used as the filler. However, other fillers for filling the recess are conceivable. Conveniently, the at least one screw opening and thus also the recess at the intended arrangement of the console on the shaft wall above, so that a filling of the recess with concrete or other at least initially flowable filler after attaching the console to the shaft wall is easily possible. In particular, the recess is formed trough-shaped, so that the still flowable filler is securely held in the recess and can harden there.

Gemäß einer bevorzugten Weiterbildung der Erfindung ist vorgesehen, dass die Schachtwand eine Vertiefung aufweist, in welche die Konsole, insbesondere der Befestigungsgurt zumindest bereichsweise einsetzbar/eingesetzt ist. Durch die Vertiefung wird die Anordnung des Befestigungsgurts und damit der Konsole an der Schachtwand vereinfacht. Insbesondere wenn die Kontur der Vertiefung der Form der Konsole, insbesondere der des Befestigungsgurts entspricht. Darüber hinaus bietet die Vertiefung auch die Möglichkeit, dass die Konsole formschlüssig an der Schachtwand in Belastungsrichtung abstützbar ist. Insbesonders ist eine Einbauschablone vorhanden, welche einerseits an die Vertiefung und andererseits an die Konsole angepasst ist, um einen sicheren und vorteilhafterweise spielfreien oder nahezu spielfreien Sitz der Konsole an der Schachtwand zu gewährleisten. Alternativ ist die Einbauschablone nur zum Erstellen der Vertiefung in der Schachtwand vorgesehen, wobei die Schablone insbesondere zur Aufnahme mehrerer Gewindebuchsen mehrere Öffnungen aufweist, um diese in der Vertiefung zueinander auszurichten und zu orientieren, so dass die Anordnung der Gewindebuchsen im Anschluss der Anordnung von mehreren Schraubenöffnungen an der Konsole beziehungsweise dem Befestigungsgurt entspricht und damit eine vorteilhafte Montage der Konsole an der Schachtwand gewährleistet ist. Vor der Befestigung der Konsole an der Schachtwand wird die Einbauschablone bevorzugt entfernt.According to a preferred embodiment of the invention, it is provided that the shaft wall has a recess into which the console, in particular the fastening belt at least partially used / inserted. The recess simplifies the arrangement of the fastening belt and thus of the console on the shaft wall. In particular, when the contour of the depression corresponds to the shape of the console, in particular that of the fastening belt. In addition, the recess also offers the possibility that the console is positively supported on the shaft wall in the loading direction. In particular, a mounting template is present, which is adapted on the one hand to the recess and on the other hand to the console to ensure a safe and advantageously backlash-free or almost play-free seat of the console on the shaft wall. Alternatively, the installation template is provided only for creating the recess in the shaft wall, wherein the template has in particular for receiving a plurality of threaded bushes a plurality of openings to align and orient in the recess to each other, so that the arrangement of the threaded bushes following the arrangement of a plurality of screw openings corresponds to the console or the mounting strap and thus an advantageous mounting of the console is ensured on the shaft wall. Before mounting the console on the shaft wall, the installation template is preferably removed.

Gemäß einer bevorzugten Weiterbildung der Erfindung ist vorgesehen, dass der Befestigungsgurt in der Vertiefung zumindest in der Höhe verschiebbar angeordnet ist. Dadurch lässt sich die Position und gegebenenfalls Ausrichtung der Konsole an der Schachtwand anpassen, um beispielsweise Fertigungs- oder Herstellungstoleranzen auszugleichen beziehungsweise zu kompensieren. Insbesondere ist dabei eine passende Ausrichtung der Konsole an insbesondere mehrere in der Vertiefung angeordnete Befestigungsbuchsen möglich, so dass mehrere, durch jeweils eine Schraubenöffnung in den Befestigungsgurt geführte Befestigungsschrauben mit jeweils einer der Gewindebuchsen verschraubbar/verschraubt ist.According to a preferred embodiment of the invention it is provided that the fastening belt is slidably disposed in the recess at least in height. As a result, the position and optionally alignment of the console can be adapted to the shaft wall, for example, to compensate for manufacturing or manufacturing tolerances or to compensate. In particular, a suitable orientation of the console is possible in particular a plurality of mounting bushes arranged in the recess, so that a plurality, each guided by a screw hole in the mounting strap fixing screws with one of the threaded bushes screwed / screwed.

Weiterhin ist bevorzugt vorgesehen, dass die wenigstens eine Schraubenöffnung als Langlochöffnung ausgebildet ist. Dadurch können bei der Montage auf einfache Art und Weise Fertigungstoleranzen ausgeglichen beziehungsweise kompensiert und eine sichere Befestigung der Konsole an der Schachtwand geleistet werden. Besonders bevorzugt ist vorgesehen, dass der Befestigungsgurt mehrere Schraubenöffnungen aufweist, die beabstandet zueinander angeordnet sind, und durch welche jeweils eine Schraube hindurchführbar/hindurchgeführt ist, um in der Schachtwand in ein entsprechendes Innengewinde eines jeweiligen Muffenstabs eingeschraubt zu werden. Der oder die Muffenstäbe sind insbesondere gekrümmt ausgebildet, um eine maximale Belastbarkeit zu gewährleisten. Der jeweilige Muffenstab ist bei bestimmungsgemäßer Anordnung dabei derart angeordnet, dass das das Innengewinde aufweisende Ende zumindest im Wesentlichen senkrecht zu dem anderen Ende des Muffenstabs ausgerichtet ist, wobei das andere Ende des Muffenstabs bei bestimmungsgemäßer Anordnung in der Schachtwand nach unten weist.Furthermore, it is preferably provided that the at least one screw opening is formed as a slot opening. As a result, manufacturing tolerances can be compensated for or compensated for in a simple manner during assembly, and secure fastening of the bracket to the shaft wall can be achieved. Particularly preferably it is provided that the fastening belt has a plurality of screw openings, which are spaced from each other, and through which a screw is passed / passed through to be screwed into the shaft wall in a corresponding internal thread of a respective sleeve rod. The one or more socket rods are in particular curved to ensure maximum load capacity. The respective sleeve rod is arranged in accordance with the intended arrangement in such a way that the end having the internal thread is aligned at least substantially perpendicular to the other end of the sleeve rod, the other end of the sleeve member facing down in the well wall in accordance with the intended arrangement.

Gemäß einer bevorzugten Weiterbildung ist vorgesehen, dass die Vertiefung wenigstens eine Einführschräge für die Konsole, insbesondere für den Befestigungsgurt aufweist. Durch die Einführschräge wird die Konsole beziehungsweise der Befestigungsgurt oder auch die Einbauschablone automatisch in der Vertiefung ausgerichtet. Darüber hinaus wird durch die Einführschräge gewährleistet, dass ein einfaches Einsetzen des Befestigungsgurtes in die Vertiefung gewährleistet ist. Besonders bevorzugt sind alle Seitenflächen der Vertiefung als Einführschräge ausgebildet oder weisen eine Einführschräge auf, sodass durch die Vertiefung außerdem eine automatische Zentrierung des Befestigungsgutes beziehungsweise der Konsole in Bezug auf das wenigstens eine im Bereich der Vertiefung liegende Befestigungsbauteil, insbesondere in Bezug auf die Gewindebuchse ausgerichtet wird. Wird die Einbauschablone lediglich zur Herstellung der Vertiefung und zur Ausrichtung der Gewindebuchsen verwendet und vor Befestigung der Konsole wieder entfernt, dient die Einführschräge außerdem als Entschalungsschräge, die ein Einfaches Entfernen der Einbauschablone erlaubt.According to a preferred embodiment, it is provided that the recess has at least one insertion bevel for the console, in particular for the fastening belt. Due to the insertion be the console or the fastening strap or the installation template is automatically aligned in the recess. In addition, it is ensured by the insertion that a simple insertion of the fastening belt is ensured in the depression. Particularly preferably, all side surfaces of the recess are formed as an insertion bevel or have an insertion, so that through the recess also an automatic centering of the mounting material or the console with respect to the at least one lying in the recess area fastening component, in particular with respect to the threaded bushing is aligned , If the installation template used only for the preparation of the recess and for aligning the threaded bushes and removed before attaching the console again, the insertion also serves as Entschalungsschräge, which allows easy removal of the installation template.

Weiterhin ist bevorzugt vorgesehen, dass die Vertiefung eine insbesondere horizontal ausgerichtete Tragfläche aufweist, auf welcher die Konsole zumindest mit dem Befestigungsgurt auflegbar/aufgelegt ist. Die waagerecht ausgerichtete Tragfläche ermöglicht die zuvor bereits genannte Auflage der Konsole beziehungsweise des Befestigungsgurtes in Belastungsrichtung, sodass dieser formschlüssig an der Schachtwand gestützt ist, wodurch die Belastbarkeit des Podestlagersystems erhöht ist. Insbesondere bei der Ausbildung der Schraubenöffnung als Langlochöffnung ist dabei gewährleistet, dass die Konsole mit dem Befestigungsgurt bis auf die Tragfläche in der Vertiefung verschiebbar ist, so dass die Belastungskräfte auch tatsächlich formschlüssig in die Schachtwand übertragen werden. Durch die Schraubverbindung wird dann im Wesentlichen nur noch das Herauskippen der Konsole aus der Vertiefung verhindert. Hierzu ist die oder sind die Schraubenöffnungen an dem Befestigungsgurt vorzugsweise möglichst weit beabstandet zu der auf der Tragfläche auflegbaren/aufgelegten Unterkante des Befestigungsgurtes ausgebildet/angeordnet, so dass eine größtmögliche Hebelwirkung erzielt wird. Dadurch, dass die Konsole auf der Tragfläche aufliegt, werden die Belastungsanforderungen an die Schraubverbindungen verringert, wodurch im Vergleich zu Konsolen, die allein durch Schraubverbindungen an einer Wand gehalten sind, kleiner dimensionierte und in ihrer Anzahl reduzierte Schraubverbindungen ausreichen.Furthermore, it is preferably provided that the recess has a particular horizontally oriented support surface on which the console is at least laid on the mounting strap / placed. The horizontal bearing surface allows the previously mentioned edition of the console or the fastening belt in the loading direction, so that it is positively supported on the shaft wall, whereby the capacity of the pedestal storage system is increased. In particular, in the formation of the screw hole as a slot opening it is ensured that the console with the fastening belt is displaceable up to the support surface in the recess, so that the loading forces are actually transmitted positively in the shaft wall. Due to the screw connection, essentially only the tilting out of the console from the depression is then prevented. For this purpose, the or the screw openings on the fastening belt are preferably spaced apart as far as possible from the lower edge of the fastening belt which can be placed / laid on the support surface, so that the greatest possible leverage is achieved. The fact that the console rests on the support surface, the load requirements are reduced to the screw, which in comparison to consoles, which are held solely by screw on a wall, smaller sized and reduced in number screw suffice.

Gemäß einer weiteren Ausführungsform der Erfindung ist bevorzugt vorgesehen, dass der Befestigungsgurt auf der von dem Trägergurt abgewandten Seite wenigstens einen Haltevorsprung aufweist, der in eine komplementär dazu ausgebildete Aufnahme in der Schachtwand einschiebbar/eingeschoben ist. Der Befestigungsgurt weist somit auf seiner der Schachtwand zugewandeten/zuwendbaren Seite einen Haltvorsprung auf, der in eine dazu komplementärer Aufnahme der Schachtwand einschiebbar ist. Dadurch wird die vorbeschriebene formschlüssige Verbindung von Befestigungsgurt und Schachtwand erreicht, ohne dass dazu der Befestigungsgurt als solcher in eine Vertiefung der Schachtwand eingelegt/eingesetzt werden muss. In dieser Ausführungsform kann die Schachtwand vielmehr eine ebene Oberfläche aufweisen mit einer oder mehreren Aufnahmen, in welche entsprechend eine oder mehrere Haltevorsprünge einsteckbar sind. Es ist vorgesehen, dass die wenigstens eine Aufnahme und/oder der wenigstens eine Vorsprung einen keilförmigen Längsschnitt aufweisen, um ein einfaches Einführen und Zentrieren zueinander zu gewährleisten. Darüber hinaus wird durch die Keilform erreicht, dass eine im Wesentlichen spielfreie Verbindung zwischen Haltevorsprung und Aufnahme herstellbar ist, die eine entsprechend im Wesentlichen spielfreie Befestigung/Anordnung der Konsole an der Schachtwand gewährleistet. Besonders bevorzugt ist vorgesehen, dass der Haltvorsprung als Haltesteg ausgebildet ist, der sich über die gesamte Länge des Befestigungsgurtes erstreckt, so dass auch hohe Kräfte von der Konsole über den Befestigungsgurt in die Schachtwand übertragen werden können.According to a further embodiment of the invention, it is preferably provided that the fastening belt has on the side facing away from the carrier belt at least one holding projection, which is inserted / inserted into a complementary formed in the shaft wall. The fastening belt thus has on its side facing the shaft wall / zuwendbaren side on a retaining projection which is insertable into a complementary receiving the shaft wall. As a result, the above-described positive connection of fastening belt and shaft wall is achieved, without the need for the fastening belt inserted as such in a recess of the shaft wall / must be used. In this embodiment, the shaft wall can rather have a flat surface with one or more receptacles into which one or more retaining projections can be inserted. It is provided that the at least one receptacle and / or the at least one projection have a wedge-shaped longitudinal section in order to ensure easy insertion and centering relative to one another. In addition, it is achieved by the wedge shape that a substantially play-free connection between retaining projection and receptacle can be produced, which ensures a corresponding substantially backlash-free attachment / arrangement of the console on the shaft wall. Particularly preferred provided that the retaining projection is designed as a holding web, which extends over the entire length of the fastening belt, so that even high forces can be transmitted from the console via the fastening belt in the shaft wall.

Gemäß einer bevorzugten Weiterbildung der Erfindung ist außerdem vorgesehen, dass der Stahlträger wenigstens eine Versteifungsrippe die den Befestigungsgurt mit dem Trägergurt verbindet, und/oder wenigstens einen Versteifungsbügel, der den Trägergurt zumindest teilweise umläuft, aufweist. Durch die Versteifungsrippe wird der Stahlträger stabilisiert und seine Belastbarkeit erhöht. Insbesondere ist vorgesehen, dass der Stahlträger mehrere gleichmäßig beanstandet zueinander angeordnete Versteifungsrippen aufweist, die insbesondere keilförmig von dem Befestigungsgurt zu dem Trägergurt verlaufen. Insbesondere ist vorgesehen, dass die Versteifungsrippen bei bestimmungsgemäßer Anordnung der Konsole an der Schachtwand unterhalb des Trägergurtes liegen, um eine maximale Belastbarkeit der Konsole zu gewährleisten. Der wenigstens eine Versteifungsbügel dient ebenfalls zur Stabilisierung des Stahlträgers sowie des Betonguss. Bevorzugt sind mehrere Versteifungsbügel an dem Stahlträger parallel zueinander angeordnet. Insbesondere ist vorgesehen, dass der/die Versteifungsbügel den Trägergurt vollständig oder nahezu vollständig mit Abstand zum Trägergurt umlaufen, sodass der Trägergurt in einer Schlaufe des Versteifungsbügels liegt. Wie die Versteifungsrippe ist auch der Versteifungsbügel von dem Betonguss in der vorgefertigten Konsole umgeben. Optional ist dabei vorgesehen, dass der Versteifungsbügel abschnittsweise von dem Betonguss vorsteht, sodass der Befestigungsbügel abschnittsweise auch an der vorgefertigten Konsole zugängig ist. Insbesondere dient der eine oder die mehreren Versteifungsbügel dazu, dass zwischen diese eine horizontale Bewehrung eingeschoben werden kann beziehungsweise wird.According to a preferred embodiment of the invention it is also provided that the steel beam has at least one stiffening rib which connects the fastening belt with the carrier belt, and / or at least one stiffening strap which at least partially surrounds the carrier belt. The stiffening rib stabilizes the steel girder and increases its load capacity. In particular, it is provided that the steel beam has a plurality of uniformly spaced apart arranged stiffening ribs, which in particular extend in a wedge shape from the fastening belt to the carrier belt. In particular, it is provided that the stiffening ribs are in accordance with the arrangement of the console on the shaft wall below the carrier belt to ensure maximum load capacity of the console. The at least one stiffening bar also serves to stabilize the steel beam and the concrete casting. Preferably, a plurality of stiffening brackets are arranged on the steel beam parallel to each other. In particular, it is provided that the stiffening strap completely or almost completely surround the carrier belt at a distance from the carrier belt so that the carrier belt lies in a loop of the stiffening strap. Like the stiffening rib, the stiffening bar is surrounded by the concrete pouring in the prefabricated console. Optionally, it is provided that the stiffening bracket projects in sections from the concrete casting, so that the mounting bracket is partially accessible to the prefabricated console. In particular, the one or more stiffening brackets serves to enable a horizontal reinforcement to be inserted between them.

Weiterhin ist bevorzugt vorgesehen, dass der Trägergurt und/oder die wenigstens eine Versteifungsrippe jeweils wenigstens einen mit Beton vom Betonguss gefüllten Durchbruch aufweisen. Durch den betongefüllten Durchbruch werden die Stabilität und die Belastbarkeit der Konsole insgesamt erhöht. Darüber hinaus ist der Zusammenschluss aus Betonage und Stahlträger formschlüssig gewährleistet, sodass eine hohe Tragfähigkeit und Sicherheit geboten wird.Furthermore, it is preferably provided that the carrier belt and / or the at least one stiffening rib each have at least one perforation filled with concrete from the concrete casting. The concrete-filled breakthrough increases the overall stability and strength of the console. In addition, the combination of concreting and steel beams ensures a positive fit, so that a high load-bearing capacity and safety is provided.

Das erfindungsgemäße Podestsystem mit den Merkmalen des Anspruchs 13 zeichnet sich durch wenigstens ein Podest und das erfindungsgemäße Lagersystem aus. Das so gestaltete Podestsystem ist einfach vor Ort montierbar und kostengünstig in der Herstellung. Weitere Vorteile und bevorzugte Merkmale ergeben sich insbesondere aus dem zuvor Beschriebenen sowie aus den Ansprüchen.The pedestal system according to the invention with the features of claim 13 is characterized by at least one pedestal and the storage system according to the invention. The so designed pedestal system is easy to install on site and inexpensive to manufacture. Further Advantages and preferred features emerge in particular from the previously described and from the claims.

Insbesondere ist vorgesehen, dass das Podest eine Aufnahmeaussparung zur Aufnahme der vorgefertigten Konsole aufweist, wobei die Aufnahmeaussparung zumindest im Wesentlichen komplementär zu dem Betonguss der vorgefertigten Konsole ausgebildet ist. Durch die komplementäre Ausbildung von Betonguss und Ausnahmeaussparung wird insbesondere der Vorteil erreicht, dass auch dann, wenn eine der Schraubverbindungen oder alle Schraubverbindungen nicht halten sollten und die Konsole auf der Tragfläche der Vertiefung aufliegt, die Konsole zwar ein Stück weit verkippen, jedoch nicht aus der Vertiefung heraustreten kann, sodass das Podest auch weiterhin sicher gehalten ist. Durch die komplementäre Ausbildung von Betonguss und Aufnahmeaussparung kann der Betonguss in der Aufnahmeaussparung nicht oder nur wenig verschwenkt werden, bevor der Betonguss in der Aufnahmeaussparung verkantet und ein weiteres Verdrehen der Konsole verhindert. Insbesondere ist vorgesehen, dass der Betonguss einen quadratischen oder rechteckförmigen Querschnitt aufweist, um ein sicheres Verkanten beim Lösen der Schraubverbindung/-en zu gewährleisten.In particular, it is provided that the pedestal has a receiving recess for receiving the prefabricated console, wherein the receiving recess is formed at least substantially complementary to the concrete casting of the prefabricated console. Due to the complementary design of concrete casting and exception recessing in particular the advantage is achieved that even if one of the screw or all screw should not hold and the console rests on the support surface of the depression, tilt the console while a bit, but not from the Well out, so that the pedestal continues to be held securely. Due to the complementary formation of concrete casting and receiving recess, the concrete casting in the receiving recess can not be pivoted or only slightly pivoted before the concrete casting canted in the receiving recess and prevents further rotation of the console. In particular, it is provided that the concrete casting has a square or rectangular cross-section in order to ensure a secure tilting when loosening the screw / -en.

Die erfindungsgemäße vorgefertigte Konsole mit den Merkmalen des Anspruchs 15 zeichnet sich dadurch aus, dass sie einen Stahlträger aufweist, der einen Befestigungsgurt zur Befestigung an einem Befestigungsbauteil einer Schachtwand und einen senkrecht zu dem Befestigungsgurt ausgerichteten Trägergurt aufweist, und dass der Stahlträger derart mit Beton umgossen ist, dass der Befestigungsgurt von dem Betonguss vorsteht und der Betonguss eine Auflagefläche zur Auflage eines Fertigteilpodests aufweist. Es ergeben sich hierdurch die bereits zuvor genannten Vorteile. Weitere bevorzugte Merkmale und Vorteile ergeben sich insbesondere aus dem zuvor Beschriebenen sowie aus den Ansprüchen.The prefabricated console according to the invention with the features of claim 15 is characterized in that it comprises a steel beam having a fastening belt for attachment to a fastening member of a shaft wall and a perpendicular to the fastening belt aligned carrier belt, and that the steel beam is so cast with concrete in that the fastening strap protrudes from the concrete casting and the concrete casting has a bearing surface for supporting a precast platform. This results in the already mentioned advantages. Further preferred features and advantages emerge in particular from the previously described and from the claims.

Im Folgenden sollen die Erfindung und ihre Vorteile anhand von einem Ausführungsbeispiel näher erläutert. Dazu zeigen

Figuren 1A bis 1C
einen Stahlträger einer Konsole für ein Podestlagersystem in unterschiedlichen Ansichten,
Figuren 2A und 2B
den mit Betonguss versehenen Stahlträger der Konsole in unterschiedlichen Darstellungen,
Figur 3
ein Podestlagersystem mit der Konsole in einer vereinfachten perspektivischen Darstellung,
Figuren 4A und 4B
das Podestlagersystem in unterschiedlichen Montageschritten in jeweils einer Querschnittsdarstellung, und
Figuren 5A und 5B
die Konsole gemäß einem weiteren Ausführungsbeispiel.
In the following, the invention and its advantages will be explained in more detail with reference to an exemplary embodiment. Show this
FIGS. 1A to 1C
a steel girder of a console for a podium storage system in different views,
FIGS. 2A and 2B
the concreted steel beams of the console in different representations,
FIG. 3
a pedestal storage system with the console in a simplified perspective view,
FIGS. 4A and 4B
the Podestlagersystem in different assembly steps in each case a cross-sectional view, and
FIGS. 5A and 5B
the console according to another embodiment.

Figuren 1A bis 1C zeigen in unterschiedlichen Ansichten eines Podestlagersystems 1 einen Stahlträger 2, der einen Befestigungsgurt 3 und einen Trägergurt 4 aufweist. Der Trägergurt 4 ist dabei senkrecht zu dem Befestigungsgurt 3 ausgerichtet und insbesondere einstückig mit dem Befestigungsgurt 3 ausgebildet. Dabei ergibt sich ein T-förmiger Querschnitt des Stahlträgers 2. Alternativ ist auch ein L-förmiger Querschnitt denkbar. FIGS. 1A to 1C show in different views of a podium storage system 1 a steel beam 2, which has a fastening belt 3 and a carrier belt 4. The carrier belt 4 is aligned perpendicular to the fastening belt 3 and in particular formed integrally with the fastening belt 3. This results in a T-shaped cross-section of the steel beam 2. Alternatively, an L-shaped cross section is conceivable.

Figur 1A zeigt einen Stahlträger 2 in einer perspektivischen Draufsicht. Figur 1B zeigt den Stahlträger in einer Draufsicht senkrecht auf den Befestigungsgurt 3 und Figur 1C zeigt eine Draufsicht senkrecht auf den Trägergurt 4. Figure 1A shows a steel beam 2 in a perspective plan view. FIG. 1B shows the steel beam in a plan view perpendicular to the mounting strap 3 and Figure 1C shows a plan view perpendicular to the carrier belt 4th

Der Befestigungsgurt 3 weist oberhalb des Trägergurts 4 mehrere auf gleicher Höhe beziehungsweise in gleichem Abstand zu dem Trägergurt 4 verteilt angeordnete Schraubenöffnungen 5 auf, die jeweils als Langlochöffnung ausgebildet sind, wobei sich die Langlochöffnungen mit ihrer langen Seite senkrecht zu dem Trägergurt 4 erstrecken. Auf der den Schraubenöffnungen 5 angewandten Seite beziehungsweise unterhalb des Trägergurts 4 weist der Befestigungsgurt 3 außerdem mehrere verteilt angeordnete Versteifungsrippen 6 auf, welche sich keilförmig von dem Befestigungsgurt 3 zu dem Trägergurt 4 erstrecken, wie auch in Figur 1A ersichtlich. Vorliegend sind vier Schraubenöffnungen 5 und vier Versteifungsrippen 6 vorhanden. Selbstverständlich können jedoch auch je nach Anwendungsfall mehr oder weniger Schraubenöffnungen 5 und/oder Versteifungsrippen 6 ausgebildet werden.The fastening belt 3 has above the Trägergurts 4 more at the same height or at the same distance to the Trägergurt 4 distributed screw holes 5, which are each formed as a slot opening, wherein the slot openings extend with their long side perpendicular to the carrier belt 4. On the screw openings 5 applied side or below the carrier belt 4, the fastening belt 3 also has a plurality of distributed stiffening ribs 6, which extend in a wedge shape from the fastening belt 3 to the carrier belt 4, as well as in Figure 1A seen. In the present case, four screw holes 5 and four stiffening ribs 6 are present. Of course, however, depending on the application more or less screw holes 5 and / or stiffening ribs 6 are formed.

Weiterhin ist insbesondere aus Figuren 1A und 1C ersichtlich, dass der Trägergurt 4 mit mehreren verteilt angeordneten Durchbrüchen 7 versehen ist, die vorliegend als kreisförmige Öffnungen ausgebildet sind und auf deren Funktion später näher eingegangen werden soll. Wie außerdem in Figuren 1A und 1B durch gestrichelte Linien gezeigt, weisen auch die Versteifungsrippen 6 jeweils einen Durchbruch 8 auf, der ebenfalls als kreisförmige Öffnung ausgebildet ist.Furthermore, in particular FIGS. 1A and 1C it can be seen that the carrier belt 4 is provided with a plurality of distributed apertures 7, which in the present case are circular Openings are formed and their function will be discussed later. As well as in Figures 1A and 1B shown by dashed lines, the stiffening ribs 6 each have an opening 8, which is also formed as a circular opening.

Figuren 2A und 2B zeigen den Stahlträger 2 des Podestlagersystems 1 in einer Schnittdarstellung gemäß der Linie A-A aus Figur 1B. FIGS. 2A and 2B show the steel beam 2 of the pedestal storage system 1 in a sectional view along the line AA FIG. 1B ,

Der Stahlträger 2 ist nunmehr mit einem Betonguss 9 beziehungsweise mit einer Betonage versehen, welche den Trägergurt 4 umfängt. Dabei weist der Betonguss 9 einen im Wesentlichen rechteckigen Außenquerschnitt beziehungsweise eine blockartige Form auf, dessen/deren Höhe H der Höhe des Befestigungsgurts 3 entspricht, und dessen/deren Breite B breiter ist als der Trägergurt 4, sodass dieser an seiner freien Stirnseite ebenfalls von dem Betonguss 9 umgeben ist. Wie aus Figur 2 ersichtlich, durchdringt dabei der Betonguss 9 auch die Durchbrüche 7, wodurch ein besonders fester formschlüssiger Halt des Betonguss 9 an dem Trägergurt 4 erreicht wird. Ebenso durchdringt der Betonguss 9 die Durchbrüche 8 der Versteifungsrippen 6.The steel beam 2 is now provided with a concrete casting 9 or with a concrete layer which surrounds the carrier belt 4. In this case, the concrete casting 9 has a substantially rectangular outer cross-section or a block-like shape whose height H corresponds to the height of the fastening belt 3, and whose width B is wider than the carrier belt 4, so that it also has its free end face Concrete casting 9 is surrounded. How out FIG. 2 it can be seen, the concrete casting 9 also penetrates the openings 7, whereby a particularly firm positive fit of the concrete casting 9 is achieved on the carrier belt 4. Likewise, the concrete casting 9 penetrates the openings 8 of the stiffening ribs 6.

Wie insbesondere aus Figur 2B ersichtlich, weist der Betonguss 9 zwei Aussparungen auf, die sich entlang des Befestigungsgurtes 3 über jeweils zwei der Schraubenöffnungen 5 hinweg erstrecken, sodass die Schraubenöffnungen 5 auch von der Seite des Trägergurts 4 aus frei zugängig sind. Die Aussparungen 10 erstrecken sich dabei in dem vorliegenden Ausführungsbeispiel bis auf den Trägergurt 4, wobei gemäß einem alternativen Ausführungsbeispiel auch vorgesehen sein kann, dass sich der Betonguss 9 über den Trägergurt 4 vollständig, jedoch beabstandet zu den Schraubenöffnungen 5 erstreckt, die Aussparungen 10 insofern weniger tief und nicht bis zu dem Trägerelement 4 reichend ausgebildet sind.As in particular from FIG. 2B As can be seen, the concrete casting 9 has two recesses which extend along the fastening belt 3 over two respective screw openings 5, so that the screw openings 5 are also freely accessible from the side of the carrier belt 4. The recesses 10 extend in the present embodiment except for the carrier belt 4, wherein according to an alternative embodiment can also be provided that the concrete casting 9 extends over the carrier belt 4 completely, but spaced from the screw holes 5, the recesses 10 so far less deep and not formed reaching to the support element 4.

Der Betonguss 9 bildet zusammen mit dem Stahlträger 2 eine Konsole 11 für das Podestlagersystem 1, die dazu dient, ein Fertigteilpodest, insbesondere ein Zwischenpodest oder ein Hauptpodest einer Fertigteiltreppe zu lagern. Der Betonguss 9 weist dabei an ihrer Oberseite 12 eine ebene Auflagefläche 13 für das Fertigteilpodest auf, die sich parallel zu dem Trägergurt 4 und über diesen hinaus erstreckt. Der Betonguss 9 umschließt somit im Wesentlichen den Trägergurt 4, während der Befestigungsgurt 3 von dem Betonguss 9 vorsteht und im Wesentlichen frei von diesem ist. Nur auf der Seite des Trägergurts 4 reicht der Betonguss bis an die Seitenfläche des Befestigungsgurtes 3 heran.The concrete casting 9 forms, together with the steel girder 2, a bracket 11 for the podium storage system 1, which serves to store a finished part platform, in particular an intermediate landing or a main landing of a precast staircase. The concrete casting 9 has on its upper side 12 on a flat support surface 13 for the precast concrete pedestal, which extends parallel to the carrier belt 4 and beyond. The concrete casting 9 thus substantially encloses the carrier belt 4, while the fastening belt 3 projects from the concrete casting 9 and is substantially free of it. Only on the side of the carrier belt 4, the concrete casting reaches up to the side surface of the fastening belt 3 zoom.

Die Konsole 11 kann vorgefertigt an der Baustelle geliefert und insoweit entfernt von einer Baustelle, an welcher sie zur Montage einer Fertigteiltreppe genutzt werden soll, gefertigt werden. Dadurch ergeben sich vorteilhafte Herstellungsbedingungen für die Konsole 11, die insofern unter optimalen und wiederholbaren Bedingungen als Massenware vorgefertigt und an den Montageort angeliefert werden kann.The console 11 can be prefabricated delivered to the site and so far away from a construction site, where it is to be used for mounting a precast stairs, are made. This results in advantageous manufacturing conditions for the console 11, which can thus be prefabricated as mass-produced under optimal and repeatable conditions and delivered to the installation site.

Figur 3 zeigt in einer perspektivischen Explosionsdarstellung das Podestlagersystem 1 mit einer wie zuvor beschrieben ausgebildeten Konsole 11 und einer Schachtwand 12, beispielsweise Treppenhauswand, an welcher die Konsole 11 zur Lagerung eine Treppenpodests befestigt werden soll. FIG. 3 shows in a perspective exploded view of the pedestal storage system 1 with a console 11 constructed as described above and a shaft wall 12, for example, staircase wall to which the console 11 is to be mounted for storage a landing.

Die Schachtwand 12 weist eine Vertiefung 13 auf, die sich horizontal über die Schachtwand 12 erstreckt, wobei die Vertiefung 13 eine Höhe h aufweist, die größer ist als die Höhe H des Befestigungsgurtes 3. In der Schachtwand 12 sind mehrere gekrümmte Muffenstäbe 14 eingelassen beziehungsweise einbetoniert, die an ihrem freien Ende jeweils eine Gewindebuchse 15 mit einem Innengewinde 16 aufweisen. Die Gewindebuchsen 15 schließen bündig mit dem Boden 17 der Vertiefung 13 ab, sodass sie nicht darüber vorstehen. Das andere Ende des jeweiligen Muffenstabs 14 ist um etwa 90° gekrümmt nach unten in der Schachtwand 12 ausgerichtet. Die Muffenstäbe 14 sind dabei derart verteilt angeordnet, dass die Innengewinde 16 derart beabstandet zueinander auf einer Höhe liegen, dass ihre Anordnung der Anordnung der Schraubenöffnungen 5 in dem Befestigungsgurt 3 zueinander entspricht, sodass dann, wenn die Konsole 11 in die Vertiefung mit dem Befestigungsgurt 3 gemäß der Pfeile 18 eingesetzt wird oder wurde, die Schraubenöffnungen 5 fluchtend zu den Innengewinden 16 liegen.The shaft wall 12 has a recess 13 which extends horizontally over the shaft wall 12, wherein the recess 13 has a height h which is greater than the height H of the fastening belt 3. In the shaft wall 12 a plurality of curved sleeve rods 14 are embedded or embedded in concrete , which each have a threaded bush 15 with an internal thread 16 at its free end. The threaded bushings 15 are flush with the bottom 17 of the recess 13 so that they do not protrude above it. The other end of the respective sleeve rod 14 is curved by approximately 90 ° down in the shaft wall 12 aligned. The sleeve rods 14 are arranged distributed such that the internal thread 16 spaced from each other at a height that their arrangement corresponds to the arrangement of the screw holes 5 in the fastening belt 3 to each other, so then when the console 11 in the recess with the fastening belt. 3 is used in accordance with the arrows 18 or was, the screw holes 5 are aligned with the internal threads 16.

Figuren 4A und 4B zeigen jeweils in einer Querschnittsdarstellung die Montage des Podestlagersystems 1. Figur 4A zeigt das Podestlagersystem 1 in einer Explosionsdarstellung beziehungsweise das Zusammenfügen der Einzelteile, und Figur 4B zeigt das fertig montierte Podestlagersystem 1. FIGS. 4A and 4B each show in a cross-sectional view of the assembly of the pedestal storage system. 1 FIG. 4A shows the Podestlagersystem 1 in an exploded view or the assembly of the items, and FIG. 4B shows the assembled pod storage system 1.

Wie aus Figur 4A ersichtlich, weist die Vertiefung 13 an ihrer oberen Seitenflanke eine Einführschräge 19 und an ihrer unteren Seitenflanke eine horizontale Auflagefläche 20 auf. An der Auflagefläche 20 ist gemäß einem ersten Ausführungsbeispiel, wie in Figur 3 gezeigt, der Befestigungsgurt 3 formschlüssig aufsetzbar oder aufgesetzt, wodurch die Belastbarkeit des Podestlagersystems 1 erhöht wird. Alternativ ist vorgesehen, wie in dem Ausführungsbeispiel von Figuren 4A und 4B gezeigt, dass zwischen der Konsole 11 und der Schachtwand 12 eine Einbauschablone 21 angeordnet wird oder ist, die ein einfaches Einpassen der Konsole 11 in die Vertiefung 13 erlaubt. Dazu weist die Einbauschablone 21 eine der Vertiefung 13 entsprechende Außenkontur auf, sodass sie passgenau in die Vertiefung 13 einsetzbar ist. Dabei weist die Einbauschablone 21 Öffnungen auf, die entsprechend der Gewindebuchsen zueinander angeordnet sind. An ihrer der Konsole 11 zugewandten Seite weist die Einbauschablone 21 eine Vertiefung 22 auf, die zur bereichsweisen Aufnahme der Konsole 11, insbesondere des Befestigungsgurtes 3 ausgebildet ist. Insbesondere ist die Einbauschablone 21 derart ausgebildet, dass sie die Konsole 11 zumindest im Wesentlichen spielfrei aufnimmt und an dieser vormontiert werden kann. Die Konsole 11 wird dann bevorzugt zusammen mit der Einbauschablone 21 in die Vertiefung 13 eingesetzt, wobei die Einführschräge 19 ein einfaches Einführen gewährleistet und gleichzeitig eine Ausrichtung der Konsole 11 bezüglich der Innengewinde 16 bewerkstelligt, sodass im Anschluss die Schraubenöffnungen 5 fluchtend zu den Innengewinden 16 liegen. Durch die Ausbildung der Schraubenöffnungen 5 als Langlochöffnungen, können dabei auf einfache Art und Weise Fertigungs- und Montagetoleranzen ausgeglichen werden. Die Einbauschablone 21 ist vorzugsweise konisch ausgebildet, sodass sie einfach ausgeschalt und wiederverwendet werden kann. Bei dem in Figur 3 gezeigten Ausführungsbeispiel wird die Einbauschablone 21 bevorzugt bei der Fertigung der Schachtwand 12 zunächst zur Ausrichtung der Muffenstäbe 14 genutzt und vor Einsetzen der Konsole 11 wieder entfernt. Dazu sind die oben genannten Öffnungen in der Einbauschablone 21 vorzugsweise dazu ausgebildet, die Gewindebuchsen bereichsweise, insbesondere radial spielfrei oder nahezu spielfrei aufzunehmen, um sie bei der Herstellung der Schachtwand entsprechend der Anordnung der Schraubenöffnungen 5 auszurichten.How out FIG. 4A can be seen, the recess 13 at its upper side edge an insertion bevel 19 and at its lower side edge on a horizontal support surface 20. On the support surface 20 is according to a first embodiment, as in FIG. 3 shown, the fastening belt 3 positively placed or placed, whereby the load capacity of the Podestlagersystems 1 is increased. Alternatively, it is provided as in the embodiment of FIGS. 4A and 4B shown that between the bracket 11 and the shaft wall 12, a mounting template 21 is arranged or is that allows a simple fitting of the console 11 in the recess 13. For this purpose, the installation template 21 has an outer contour corresponding to the depression 13, so that it can be inserted into the depression 13 with a precise fit. In this case, the installation template 21 openings, which are arranged according to the threaded bushes to each other. On its side facing the bracket 11, the installation template 21 has a recess 22, which is designed to receive the console 11, in particular the fastening belt 3, in regions. In particular, the installation template 21 is designed such that it receives the console 11 at least substantially free of play and can be pre-assembled at this. The console 11 is then preferably used together with the installation template 21 in the recess 13, wherein the insertion bevel 19 ensures easy insertion and at the same time accomplishes an alignment of the bracket 11 with respect to the internal thread 16, so that in the connection the screw openings 5 are aligned with the internal threads 16 , By forming the screw openings 5 as slot openings, manufacturing and assembly tolerances can be compensated in a simple manner. The installation template 21 is preferably conical, so that it can be easily turned off and reused. At the in FIG. 3 1, the installation template 21 is preferably used in the production of the shaft wall 12 initially for aligning the sleeve rods 14 and removed before inserting the console 11 again. For this purpose, the above-mentioned openings in the installation template 21 are preferably designed to receive the threaded bushings in regions, in particular radially backlash-free or almost free of play, in order to align them in the manufacture of the shaft wall according to the arrangement of the screw openings 5.

Figur 4B zeigt, wie bereits erwähnt, das montierte Podestlagersystem 1 mit der einen Konsole 11 und zuvor entfernter Einbauschablone 21, wobei die Konsole 11 in die Vertiefung 13 der Schachtwand 12 eingesetzt ist. Durch jede Schraubenöffnung 5 wird zur Befestigung der Konsole 11 an der Schachtwand 12 eine Befestigungsschraube 23 geführt, sodass ihr Schraubenkopf an dem Befestigungsgurt 3 anliegt und ihr Gewindeschaft in das Innengewinde 16 eingeschraubt wird beziehungsweise eingeschraubt ist. Sobald alle Schrauben 23 fest angezogen sind, werden die Aussparungen 10 bevorzugt nachträglich mit einer Füllmasse 24 aufgefüllt, wobei als Füllmasse bevorzugt die gleiche Betonmischung verwendet wird, die auch zur Herstellung des Betonguss 9 verwendet wurde. Durch das nachträgliche Vergießen der Aussparungen 10 wird erreicht, dass die Schrauben 23 sicher gehalten und ein nachträgliches Lösen der Schrauben 23 verhindert ist. Darüber hinaus wird durch das Auffüllen der Aussparungen 10 die Auflagefläche 13 für ein zu tragendes Fertigteilpodest 25, insbesondere Haupt- oder Zwischenpodest der Fertigteiltreppe, vergrößert. Das Podest 25 kann nun abschließend auf die Konsole 11 direkt oder unter Zwischenschaltung eines Dämpfungselements 26 aufgelegt werden, wie durch Pfeile in Figur 4B angedeutet. Das Podestlagersystem 1 bildet zusammen mit dem Fertigteilpodest 25 ein Podestsystem, insbesondere für Fertigteiltreppen. Zweckmäßigerweise weist das Podestsystem mehrere der Konsolen und mehrere der Fertigteilpodeste auf. FIG. 4B shows, as already mentioned, the mounted podium storage system 1 with a console 11 and previously removed installation template 21, wherein the console 11 is inserted into the recess 13 of the shaft wall 12. Through each screw hole 5, a fastening screw 23 is guided for fastening the bracket 11 to the shaft wall 12 so that its screw head rests against the fastening belt 3 and its threaded shaft is screwed into the internal thread 16 or is screwed. Once all the screws 23 are tightened, the recesses 10 are preferably subsequently filled with a filling compound 24, wherein preferably the same concrete mixture is used as the filling material, which was also used to produce the concrete casting 9. By the subsequent casting of the Recesses 10 is achieved that the screws 23 held securely and subsequent loosening of the screws 23 is prevented. In addition, by the filling of the recesses 10, the support surface 13 for a finished precast platform to be supported 25, in particular main or intermediate platform of the precast stairs, increased. The pedestal 25 can now finally be placed on the console 11 directly or with the interposition of a damping element 26, as indicated by arrows in FIG. 4B indicated. The Podestlagersystem 1 forms together with the precast platform 25 a pedestal system, especially for precast stairs. Conveniently, the pedestal system on more of the consoles and several of the precast podiums.

Wie in Figur 4B ersichtlich, die das Fertigteilpodest 25 zeigt, weist dieses bevorzugt eine Aufnahmeaussparung 27 zur Aufnahme der Konsole 11, insbesondere des Betonguss 9 auf. Dabei ist die Ausnahmeaussparung 27 komplementär zu dem Betonguss 9 ausgebildet, so dass die Aufnahmeaussparung 27 einen rechteckförmigen Querschnitt aufweist. Die Konsole 11 liegt dann in der Aufnahmeaussparung 27 bevorzugt zumindest im Wesentlichen spielfrei ein. In dem Fall, in welchem die Befestigungsschrauben 23 derart beschädigt werden sollten, dass die Schraubverbindungen gelöst werden, wird durch Gewichtskraft des Podests 25 die Konsole 11 in der Vertiefung 13 nur derart weit verschwenkt werden können, bis der Betonguss 9 in der Aufnahmeaussparung 27 verkantet. Ein Durchfallen des Fertigteilpodests 25 ist somit nicht möglich, weil die Gewichtskraft auch weiterhin durch die Konsole 11 auf die Trägfläche 20 in die Schachtwand 12 übertragen wird.As in FIG. 4B can be seen, showing the precast platform 25, this preferably has a receiving recess 27 for receiving the console 11, in particular the concrete casting 9. In this case, the exceptional recess 27 is formed complementary to the concrete casting 9, so that the receiving recess 27 has a rectangular cross-section. The console 11 is then in the receiving recess 27 preferably at least substantially free of play. In the case in which the fastening screws 23 should be damaged in such a way that the screw connections are loosened, the console 11 in the recess 13 can only be pivoted so far by the weight force of the pedestal 25 until the concrete casting 9 canted in the receiving recess 27. Falling through the precast platform 25 is thus not possible because the weight is still transmitted through the console 11 on the support surface 20 in the shaft wall 12.

Bevorzugt ist außerdem vorgesehen, dass oberhalb und unterhalb der Konsole 11 im Bereich der Vertiefung 13 jeweils eine Mörtelmasse 28 eingesetzt wird, die die Lücke zwischen Konsole 11 und den Seitenrändern der Vertiefung 13 schließt. Dadurch wird der Halt der Konsole 11 in der Vertiefung 13 weiter erhöht, insbesondere betonfreie Bereiche des Befestigungsgurtes 3 verdeckt und der Brandschutz verbessert. Durch die an der Unterseite der Konsole 11 vorgesehene Mörtelmasse 28 wird in diesem Fall die Tragfläche 20 zur Auflage für die Konsole 11 gebildet.Preferably, it is also provided that above and below the console 11 in the region of the recess 13 in each case a mortar composition 28 is used, which closes the gap between the bracket 11 and the side edges of the recess 13. As a result, the hold of the bracket 11 in the recess 13 is further increased, in particular concealed concrete areas of the fastening belt 3 and the fire protection improved. By provided on the underside of the console 11 mortar mass 28, the support surface 20 is formed to support the console 11 in this case.

Alternativ oder zusätzlich zum Vorsehen der Vertiefung 13 ist vorgesehen, hier nur gestrichelt dargestellt, dass der Befestigungsgurt 3 auf seiner von dem Trägergurt 4 abgewandten Seite einen Haltevorsprung 29 aufweist, der im Wesentlichen komplementär mit einer Aufnahme 30 in der Schachtwand 12 ausgebildet ist, sodass der Befestigungsgurt 3 mit dem Haltevorsprung 29 in die Aufnahme 30 einschiebbar ist beziehungsweise eingeschoben ist, wie in Figur 4B gezeigt.Alternatively, or in addition to providing the recess 13 is provided, shown here only by dashed lines, that the fastening belt 3 on its side facing away from the carrier belt 4 side has a retaining projection 29 which is formed substantially complementary with a receptacle 30 in the shaft wall 12 so that the Befestigungsgurt 3 with the retaining projection 29 in the receptacle 30 is inserted or inserted, as in FIG. 4B shown.

Vorzugsweise ist zumindest die Aufnahme 30 keilförmig ausgebildet, so dass der Haltevorsprung 29 leicht einführbar und durch die Aufnahme 30 zentrierbar und festlegbar formschlüssig festlegbar ist. Damit kann auf die Tragfläche 20 verzichtet werden, wobei diese dann letztendlich durch den Haltevorsprung 29 gebildet wird. In jedem Fall kann dabei auf die Vertiefung 13 verzichtet und die Konsole 11 auch an einer flachen Seitenwand der Schachtwand 12 angeordnet werden. In dem Fall umschließt der Betonguss 9 bevorzugt auch die Ober- und Unterkante sowie Seitenkanten des Befestigungsgurtes 3, so dass lediglich die der Schachtwand 12 zugewandte Seite mit dem Haltevorsprung 29 Betonguss-frei ist.Preferably, at least the receptacle 30 is wedge-shaped, so that the holding projection 29 is easy to insert and centered by the receptacle 30 and fixed in a form-fitting manner. This can be dispensed with the support surface 20, which is then ultimately formed by the retaining projection 29. In any case, can be dispensed with the recess 13 and the console 11 are also arranged on a flat side wall of the shaft wall 12. In the case, the concrete casting 9 also preferably encloses the upper and lower edges and side edges of the fastening belt 3, so that only the side of the shaft wall 12 facing the retaining projection 29 is concrete-cast-free.

Figuren 5A und 5B zeigen ein weiteres Ausführungsbeispiel der Konsole 11, ohne den Betonguss 9. Gemäß dem weiteren Ausführungsbeispiel ist vorgesehen, dass der Stahlträger 2 L-förmig ausgebildet ist, und dass zusätzlich zu den Versteifungsrippen 6 mehrere Versteifungsbügel 31 an dem Stahlträger 2 angeordnet sind. FIGS. 5A and 5B show a further embodiment of the bracket 11, without the concrete casting 9. According to the further embodiment, it is provided that the steel beam 2 is L-shaped, and that in addition to the stiffening ribs 6 a plurality of stiffening brackets 31 are arranged on the steel beam 2.

Figur 5A zeigt eine Seitenansicht der Konsole 11, in welcher der Verlauf der Versteifungsbügel 31 gut zu erkennen ist. Der jeweilige Versteifungsbügel 31 umgibt den Trägergurt 4 nahezu vollständig und ist im Wesentlichen beabstandet zu diesem angeordnet. Der Versteifungsbügel 31 verläuft nahezu ringförmig. Vorliegend ist ein Ende des Versteifungsbügels 31 dem Befestigungsgurt 3 zugeordnet, sodass ein erster Abschnitt 32 des Versteifungsbügels 31 sich parallel zu dem Trägergurt 4 und beabstandet hierzu erstreckt. Ein sich daran anschließender zweiter Abschnitt 33 des Versteifungsbügels 31 verläuft senkrecht zu dem Abschnitt 32 und parallel zu dem Befestigungsgurt 3, sodass sich der Abschnitt 33 über den Trägergurt 4 hinaus erstreckt. An den Abschnitt 33 schließt sich ein weiterer Abschnitt 34 an, der wiederum parallel zu dem Trägerabschnitt 4 in Richtung des Befestigungsgurts 3 verläuft. Der Abschnitt 34 endet jedoch vor dem Befestigungsgurt 3 und geht in einen Abschnitt 35 über, welcher sich senkrecht zum Trägerabschnitt 4 parallel zum Befestigungsgurt 3 erstreckt und an der Unterseite des Trägergurts 4 endet. Damit liegt der Trägergurt 4 nahezu vollständig in der vorliegend rechtwinkligen Schlaufe des jeweiligen Versteifungsbügels 31. Alternativ zu der rechtwinkligen Ausführungsform der Schlaufe kann der Versteifungsbügel 31 auch beispielsweise einen kreisförmigen, dreieckförmigen oder ovalen Verlauf aufweisen. FIG. 5A shows a side view of the console 11, in which the course of the stiffening bracket 31 is clearly visible. The respective stiffening bracket 31 almost completely surrounds the carrier belt 4 and is arranged substantially at a distance therefrom. The stiffening bracket 31 is almost annular. In the present case, one end of the stiffening strap 31 is assigned to the fastening strap 3, so that a first section 32 of the stiffening strap 31 extends parallel to the carrier strap 4 and at a distance from it. An adjoining second section 33 of the stiffening bracket 31 runs perpendicular to the section 32 and parallel to the fastening belt 3, so that the section 33 extends beyond the carrier belt 4 also. The section 33 is adjoined by a further section 34, which in turn runs parallel to the carrier section 4 in the direction of the fastening belt 3. The section 34, however, ends before the fastening belt 3 and merges into a section 35 which extends perpendicular to the support section 4 parallel to the fastening belt 3 and ends at the underside of the carrier belt 4. Thus, the carrier belt 4 is almost completely in the present rectangular loop of the respective stiffening bracket 31. As an alternative to the right-angled embodiment of the loop, the stiffening bracket 31 may also have, for example, a circular, triangular or oval course.

Figur 5B zeigt eine perspektivische Darstellung der Konsole 11 mit den mehreren daran angeordneten Versteifungsrippen 6 und Versteifungsbügeln 31. Durch die zusätzlichen Versteifungsbügel 31 wird die Verbindung zwischen dem Stahlträger 2 und dem Betonguss 9, der in Figuren 5A und 5B nicht gezeigt ist, verbessert. In die Versteifungsbügel 31 wird zweckmäßigerweise die horizontale Bewehrung eingeschoben. Selbstverständlich können gemäß einem weiteren Ausführungsbeispiel die Versteifungsbügel 31 auch an einem T-förmigen Stahlträger 2, wie in den vorhergehenden Ausführungsbeispielen gezeigt, vorhanden sein. FIG. 5B shows a perspective view of the console 11 with the plurality of stiffening ribs arranged thereon 6 and stiffening brackets 31. By the additional stiffening bracket 31, the connection between the steel beam 2 and the concrete casting 9, the in FIGS. 5A and 5B not shown, improved. In the stiffening bracket 31, the horizontal reinforcement is expediently inserted. Of course, according to a further embodiment, the stiffening brackets 31 may also be present on a T-shaped steel beam 2, as shown in the preceding embodiments.

Durch das hier vorgestellte Podestlagersystem 1 wird die Montage von Fertigtreppen deutlich vereinfacht. Das Podestlagersystem 1 weist zweckmäßigerweise ein Vielzahl der Konsolen 11 auf, die an zumindest zwei einander gegenüberliegenden oder in einem Winkel zueinander stehenden Schachtwänden 12 auf die zuvor beschriebene Art und Weise angebracht werden können. Hierdurch wird es möglich, eine Fertigteiltreppe in kurzer Zeit in einem Treppenhaus zu montieren, indem zunächst die Konsolen 11 für ein Zwischen- oder Hauptpodest der Treppe an den Schachtwänden 12, wie zuvor beschrieben, befestigt und anschließend das Zwischen- oder Hauptpodest auf die Konsolen 11 aufgelegt wird. Anschließend werden für das darüber liegende Zwischen- oder Hauptpodest eine oder mehrere weitere Konsolen 11 an der Schachtwand 12 angeordnet und befestigt, und anschließend das Zwischen- oder Hauptpodest auf die befestigten Konsolen 11 aufgelegt.Due to the Podestlagersystem 1 presented here, the installation of prefabricated stairs is significantly simplified. The pedestal storage system 1 expediently has a multiplicity of consoles 11 which can be attached to at least two opposite or angular shaft walls 12 in the manner described above. This makes it possible to mount a precast staircase in a short time in a staircase by first attaching the consoles 11 for an intermediate or main platform of the stairs to the shaft walls 12, as described above, and then the intermediate or main platform on the consoles 11th is hung up. Subsequently, one or more additional consoles 11 are arranged and fixed to the shaft wall 12 for the intermediate intermediate or main platform, and then placed the intermediate or main platform on the attached brackets 11.

Aufgrund der vorgefertigten Konsolen 11 können diese in kurzer Zeit an der Schachtwand 12 angebracht werden, wodurch eine schnelle Montage der Treppe möglich ist. Die jeweilige Schachtwand 12 kann dabei in einem Zug erstellt werden, es ist kein etagenweiser Aufbau der Schachtwand notwendig. Stattdessen werden etagenweise die jeweiligen Konsolen 11 angebracht. Zur Beschleunigung des Bauablaufs kann beispielsweise mittels eines Hubsteigers nach Fertigstellung eines Treppenhauskerns die Montage der Konsolen 11 und der Podeste erfolgen. Das Versetzen der Fertigteilpodeste kann parallel zu dem Versetzen der Fertigteiltreppenläufe erfolgen. Der Einsatz eines Kranes für das Versetzen der Elemente wird pro Treppenhaus bei einem normalen Geschosswohnungsbau auf weniger als einen Tag reduziert. Darüber hinaus müssen Hochbaukrane nicht mehr auf das schwerste Bauteil, nämlich die Treppenläufe, ausgelegt sein. Stattdessen kann durch kurze Autokraneinsätze die Vorhaltung von größeren und damit kostenintensiven Turmdrehkränen auf leichtere und damit günstigere Turmdrehkräne reduziert werden. Insgesamt werden also durch die Vorfertigung und Vormontage der Konsolen 11 des Podestlagersystems 1 die Bauabläufe beschleunigt. Ebenso werden die Qualität der einzelnen Bauelemente und letztendlich auch die Arbeitssicherheit durch die vorteilhafte Gestaltung des Podestlagersystems 1 erhöht.Due to the prefabricated consoles 11, these can be mounted in a short time on the shaft wall 12, whereby a quick installation of the stairs is possible. The respective shaft wall 12 can be created in one go, there is no floor-wise structure of the shaft wall necessary. Instead, the respective consoles 11 are mounted in tiers. To speed up the construction process, for example by means of a Hubsteigers after completion of a stairwell core assembly of the consoles 11 and the pedestals done. The displacement of the precast platforms can take place in parallel to the displacement of the precast staircases. The use of a crane to move the elements is reduced to less than a day per staircase in a standard multi-storey apartment building. In addition, building construction cranes no longer have to be designed for the heaviest component, namely the staircases. Instead, the provision of larger and thus costly tower cranes can be reduced to lighter and thus cheaper tower cranes by short car crane inserts. Overall, therefore, the prefabrication and pre-assembly of the brackets 11 of the pedestal storage system 1 speeds up the construction process. Likewise, the quality of the individual components and ultimately the work safety are increased by the advantageous design of the pedestal storage system 1.

Claims (15)

Podestlagersystem (1) für Fertigteilpodeste, mit wenigstens einer Schachtwand (12), die wenigstens ein Befestigungsbauteil trägt, und mit wenigstens einer an dem Befestigungsbauteil befestigbaren/befestigten Konsole (11) zur Lagerung eines auf die Konsole (11) auflegbaren/aufgelegten Fertigteilpodests (25), dadurch gekennzeichnet, dass die vorgefertigte Konsole (11) einen T-förmigen oder L-förmigen Stahlträger (2) aufweist, der einen Befestigungsgurt (3) zum Befestigen an dem in die Schachtwand (12) integrierten Befestigungsbauteil und einen insbesondere senkrecht dazu ausgerichteten Trägergurt (4) aufweist, und dass der Stahlträger (2) derart mit Beton zum Bilden der vorgefertigten Konsole (11) umgossen ist, dass der Befestigungsgurt (3) von dem Betonguss (9) vorsteht und der Betonguss (9) eine Auflageoberfläche (13) zur Auflage des Fertiteilpodests (25) aufweist.Pedestal storage system (1) for prefabricated platforms, with at least one shaft wall (12) carrying at least one fastening component, and with at least one attachable to the fastening component / console (11) for supporting a on the console (11) auflegbaren / launched prefabricated platform (25 ), characterized in that the prefabricated console (11) has a T-shaped or L-shaped steel girder (2), which has a fastening belt (3) for fastening to the fastening element integrated in the shaft wall (12) and an in particular perpendicular thereto Carrier belt (4), and in that the steel girder (2) is encapsulated with concrete to form the prefabricated console (11) such that the fastening belt (3) protrudes from the concrete casting (9) and the concrete casting (9) has a supporting surface (13 ) to rest the Fertiteilpodests (25). Podestlagersystem nach Anspruch 1, dadurch gekennzeichnet, dass der Befestigungsgurt (3) wenigstens eine Schraubenöffnung (5) aufweist, und dass das Befestigungsbauteil als in der Schachtwand (12) angeordneter Muffenstab (14) ausgebildet ist, der an einem Ende eine Gewindebuchse (15) mit einem Innengewinde (16) für eine durch die Schraubenöffnung (5) des Befestigungsgurtes (3) führbare/geführte Befestigungsschraube (23) des Podestlagersystems (1) aufweist.Podestlagersystem according to claim 1, characterized in that the fastening belt (3) has at least one screw opening (5), and that the fastening component as in the shaft wall (12) arranged sleeve rod (14) is formed, which at one end a threaded bushing (15). having an internal thread (16) for a through the screw hole (5) of the fastening belt (3) guided / guided fastening screw (23) of the pedestal storage system (1). Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Betonguss (9) wenigstens eine Aussparung (10) zumindest im Bereich der wenigstens einen Schraubenöffnung (5) aufweist.Podestlagersystem according to any one of the preceding claims, characterized in that the concrete casting (9) has at least one recess (10) at least in the region of at least one screw opening (5). Podestlagersystem nach Anspruch 3, dadurch gekennzeichnet, dass die Aussparung (10) mit in die Gewindebuchse (15) eingeschraubter Befestigungsschraube (23) mit einem Füllstoff (24), insbesondere Beton, gefüllt ist.Podestlagersystem according to claim 3, characterized in that the recess (10) into the threaded bushing (15) screwed fastening screw (23) with a filler (24), in particular concrete, is filled. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Schachtwand (12) eine Vertiefung (13) aufweist, in welcher der Befestigungsgurt (3) zumindest bereichsweise einsetzbar/eingesetzt ist.Podestlagersystem according to any one of the preceding claims, characterized in that the shaft wall (12) has a recess (13) in which the fastening belt (3) at least partially used / inserted. Podestlagersystem nach Anspruch 5, dadurch gekennzeichnet, dass der Befestigungsgurt (3) in der Vertiefung (13) zumindest in der Höhe verschiebbar angeordnet ist.Podestlagersystem according to claim 5, characterized in that the fastening belt (3) is arranged displaceably in the recess (13) at least in height. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die wenigstens eine Schraubenöffnung (5) als Langlochöffnung ausgebildet ist.Podestlagersystem according to any one of the preceding claims, characterized in that the at least one screw opening (5) is designed as a slot opening. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Vertiefung (13) wenigstens eine Einführschräge (19) aufweist.Podestlagersystem according to any one of the preceding claims, characterized in that the recess (13) has at least one insertion bevel (19). Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass die Vertiefung (13) eine insbesondere horizontal ausgerichtete Tragfläche (20) aufweist, auf welcher die Konsole (11) zumindest mit dem Befestigungsgurt (3) auflegbar/aufgelegt ist.Podestlagersystem according to any one of the preceding claims, characterized in that the recess (13) has a particular horizontally oriented support surface (20) on which the console (11) at least with the fastening belt (3) can be placed / placed. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Befestigungsgurt (3) auf seiner von dem Trägergurt (4) abgewandten Seite wenigstens einen Haltevorsprung (29) aufweist, der in eine komplementär dazu ausgebildete Aufnahme (30) in der Schachtwand (12) einschiebbar/eingeschoben ist.Podestlagersystem according to any one of the preceding claims, characterized in that the fastening belt (3) on its side remote from the carrier belt (4) side at least one retaining projection (29) which in a complementary thereto formed receptacle (30) in the shaft wall (12) inserted / inserted. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Stahlträger (2) wenigstens eine Versteifungsrippe (6), die den Befestigungsgurt (3) mit dem Trägergurt (4) verbindet, und/oder wenigstens einen Versteifungsbügel (31), der den Trägergurt (2) zumindest teilweise umläuft, aufweist.Podlaglagerersystem according to any one of the preceding claims, characterized in that the steel beam (2) at least one stiffening rib (6) which connects the fastening belt (3) with the carrier belt (4), and / or at least one stiffening strap (31), the carrier belt (2) at least partially revolves. Podestlagersystem nach einem der vorhergehenden Ansprüche, dadurch gekennzeichnet, dass der Trägergurt (4) und/oder die wenigstens eine Versteifungsrippe (6) wenigstens einen mit Beton des Betonguss (9) gefüllten Durchbruch (7,8) aufweisen.Podestlagersystem according to any one of the preceding claims, characterized in that the carrier belt (4) and / or the at least one stiffening rib (6) at least one with concrete of the concrete casting (9) filled breakthrough (7,8). Podestsystem für den Fertigteilbau, mit wenigstens einem Fertigteilpodest und mit einem Podestlagerystem (1) nach einem der Ansprüche 1 bis 12.Pedestal system for prefabricated construction, with at least one precast platform and with a pedestal storage system (1) according to one of claims 1 to 12. Podestsystem nach Anspruch 13, dadurch gekennzeichnet, dass das Fertigteilpodest (25) eine Aufnahmeaussparung (27) zur Aufnahme der vorgefertigten Konsole (11) aufweist, wobei die Aufnahmeaussparung (27) zumindest im Wesentlichen komplementär zu dem Betonguss (9) der vorgefertigten Konsole (11) ausgebildet ist.Pedestal system according to claim 13, characterized in that the finished part platform (25) has a receiving recess (27) for receiving the prefabricated console (11), wherein the receiving recess (27) at least substantially complementary to the concrete casting (9) of the prefabricated console (11 ) is trained. Vorgefertigte Konsole (11) für ein Podestlagersystem (1), insbesondere nach einem der Ansprüche 1 bis 12, mit einem Stahlträger (2), der einen Befestigungsgurt zur Befestigung an einem Befestigungsbauteil in einer Schachtwand (12) und einen senkrecht zu dem Befestigungsgurt (3) ausgerichteten Trägergurt (4) aufweist, wobei der Stahlträger (2) derart mit Beton umgossen ist, dass der Befestigungsgurt (3) von dem Betonguss (9) vorsteht und der Betonguss (9) eine Auflageoberfläche (13) zur Auflage eines Fertigteilpodests aufweist.Prefabricated console (11) for a pedestal storage system (1), in particular according to one of claims 1 to 12, with a steel support (2) having a fastening belt for attachment to a fastening component in a shaft wall (12) and a flange perpendicular to the fastening belt (3 ), wherein the steel support (2) is cast around with concrete in such a way that the fastening belt (3) protrudes from the concrete casting (9) and the concrete casting (9) has a bearing surface (13) for supporting a precast concrete platform.
EP16188999.3A 2015-09-15 2016-09-15 Platform support system, platform system, console Active EP3144445B1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE202015104896.3U DE202015104896U1 (en) 2015-09-15 2015-09-15 Podium storage system, pedestal system, console

Publications (2)

Publication Number Publication Date
EP3144445A1 true EP3144445A1 (en) 2017-03-22
EP3144445B1 EP3144445B1 (en) 2020-01-01

Family

ID=54707234

Family Applications (1)

Application Number Title Priority Date Filing Date
EP16188999.3A Active EP3144445B1 (en) 2015-09-15 2016-09-15 Platform support system, platform system, console

Country Status (2)

Country Link
EP (1) EP3144445B1 (en)
DE (1) DE202015104896U1 (en)

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1960982A1 (en) * 1968-12-05 1970-06-25 Jaemsae Lauri Albert Olavi Connection of the end of a landing element with a wall surface
DE3201230A1 (en) * 1982-01-16 1983-07-28 Arbeitskreis Vorgefertigte Massivbauelemente e.V., 5300 Bonn Stairway landing as a prefabricated concrete compound unit
US4893442A (en) * 1985-11-13 1990-01-16 Duraflite, Inc. Stairway apparatus and method of manufacture
JPH09328876A (en) * 1996-06-07 1997-12-22 Fujiki Komuten:Kk Built-up stair

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE1960982A1 (en) * 1968-12-05 1970-06-25 Jaemsae Lauri Albert Olavi Connection of the end of a landing element with a wall surface
DE3201230A1 (en) * 1982-01-16 1983-07-28 Arbeitskreis Vorgefertigte Massivbauelemente e.V., 5300 Bonn Stairway landing as a prefabricated concrete compound unit
US4893442A (en) * 1985-11-13 1990-01-16 Duraflite, Inc. Stairway apparatus and method of manufacture
JPH09328876A (en) * 1996-06-07 1997-12-22 Fujiki Komuten:Kk Built-up stair

Also Published As

Publication number Publication date
DE202015104896U1 (en) 2015-11-10
EP3144445B1 (en) 2020-01-01

Similar Documents

Publication Publication Date Title
EP2776637B1 (en) Foundation for a wind motor
EP3150779B1 (en) Assembly of formwork and graduated anchoring system
EP4497945A2 (en) Foundation for a wind turbine
EP4036338B1 (en) Device for the subsequent thermal insulation, force-transmitting connection of a second load-bearing building element to a first load-bearing construction element and construction with such a device
WO2011006674A2 (en) Method and device for subsequently attaching a protruding outer part to an existing load-bearing building part
DE9409626U1 (en) Balcony construction
EP3144445B1 (en) Platform support system, platform system, console
DE10007450A1 (en) Mounting bracket system and method for fastening a prefabricated component to a building part using the mounting bracket system
DE4344344C2 (en) Chimney with several chimney elements which are rigidly connected to one another by connecting arrangements
WO2003006758A1 (en) Connector element and method for connecting a prefabricated concrete piece with a section of a building
EP1063361B1 (en) Mounting jig and process of mounting a prefabricated element on a building part
DE102015115564A1 (en) Podium storage system, pedestal system, console
AT15902U1 (en) HOLDING DEVICE FOR FIXING EASY ELEMENTS
DE4234701C2 (en) Connecting part
EP1101883A1 (en) Device for the execution of a reinforcement connection between a concrete construction element and a connected construction element
AT504064A1 (en) PADDING DEVICE FOR A COMPLETED COMPONENT
EP0593017A1 (en) Connection element
DE3512901A1 (en) Column foot
DE102017113047B4 (en) Anchoring device for attaching a side bracket of a support beam
EP4248017A1 (en) Foundation for a tower of a transmitting station or for overhead-line construction
EP0645501A1 (en) Method for the production of prefabricated moduls for the construction of buildings and prefabricated modul
WO2022106357A1 (en) Foundation for a tower of a transmitting station or for overhead-line construction
DE4230836A1 (en) Connector for linking walls and floors of pre-fabricated buildings - uses tie rod, one end of which is embedded in floor section and other adjustably connected to upper section of wall unit
EP2360318A2 (en) Method for building a foundation for an offshore structure
DE20003008U1 (en) Mounting bracket system

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION HAS BEEN PUBLISHED

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

AX Request for extension of the european patent

Extension state: BA ME

RAP1 Party data changed (applicant data changed or rights of an application transferred)

Owner name: BAM DEUTSCHLAND AG

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

17P Request for examination filed

Effective date: 20170922

RBV Designated contracting states (corrected)

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

RIC1 Information provided on ipc code assigned before grant

Ipc: E04F 11/022 20060101AFI20190619BHEP

Ipc: E04B 1/82 20060101ALN20190619BHEP

Ipc: E04B 1/04 20060101ALN20190619BHEP

INTG Intention to grant announced

Effective date: 20190709

GRAJ Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted

Free format text: ORIGINAL CODE: EPIDOSDIGR1

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE

GRAR Information related to intention to grant a patent recorded

Free format text: ORIGINAL CODE: EPIDOSNIGR71

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: GRANT OF PATENT IS INTENDED

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE PATENT HAS BEEN GRANTED

INTC Intention to grant announced (deleted)
RIC1 Information provided on ipc code assigned before grant

Ipc: E04B 1/82 20060101ALN20191118BHEP

Ipc: E04F 11/022 20060101AFI20191118BHEP

Ipc: E04B 1/04 20060101ALN20191118BHEP

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR

INTG Intention to grant announced

Effective date: 20191125

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

Free format text: NOT ENGLISH

REG Reference to a national code

Ref country code: CH

Ref legal event code: EP

Ref country code: AT

Ref legal event code: REF

Ref document number: 1219938

Country of ref document: AT

Kind code of ref document: T

Effective date: 20200115

REG Reference to a national code

Ref country code: DE

Ref legal event code: R096

Ref document number: 502016008213

Country of ref document: DE

REG Reference to a national code

Ref country code: IE

Ref legal event code: FG4D

Free format text: LANGUAGE OF EP DOCUMENT: GERMAN

REG Reference to a national code

Ref country code: CH

Ref legal event code: NV

Representative=s name: OFFICE ERNEST T. FREYLINGER S.A., CH

Ref country code: CH

Ref legal event code: NV

Representative=s name: FLASCHEL, ERWIN, DE

REG Reference to a national code

Ref country code: NL

Ref legal event code: FP

REG Reference to a national code

Ref country code: LT

Ref legal event code: MG4D

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: PT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200527

Ref country code: CZ

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: RS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: NO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200401

Ref country code: FI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BG

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200401

Ref country code: GR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200402

Ref country code: SE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: LV

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: HR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: IS

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200501

REG Reference to a national code

Ref country code: DE

Ref legal event code: R097

Ref document number: 502016008213

Country of ref document: DE

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: DK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: SM

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: EE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: SK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: RO

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20201002

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: PL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: SI

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MC

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LU

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20200915

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: TR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: MT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: CY

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: MK

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

Ref country code: AL

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20200101

REG Reference to a national code

Ref country code: BE

Ref legal event code: PD

Owner name: PEIKKO GROUP OY; FI

Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), ASSIGNMENT; FORMER OWNER NAME: ZECH HOCHBAU AG

Effective date: 20220729

Ref country code: BE

Ref legal event code: HC

Owner name: ZECH HOCHBAU AG; DE

Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), CHANGE OF OWNER(S) NAME; FORMER OWNER NAME: BAM DEUTSCHLAND AG

Effective date: 20220729

REG Reference to a national code

Ref country code: GB

Ref legal event code: 732E

Free format text: REGISTERED BETWEEN 20220929 AND 20221005

P01 Opt-out of the competence of the unified patent court (upc) registered

Effective date: 20230519

REG Reference to a national code

Ref country code: AT

Ref legal event code: PC

Ref document number: 1219938

Country of ref document: AT

Kind code of ref document: T

Owner name: PEIKKO GROUP OY, FI

Effective date: 20230517

Ref country code: AT

Ref legal event code: HC

Ref document number: 1219938

Country of ref document: AT

Kind code of ref document: T

Owner name: PEIKKO GROUP OY, FI

Effective date: 20230516

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 20240919

Year of fee payment: 9

Ref country code: IE

Payment date: 20240916

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 20240918

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20240916

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 20240916

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20240916

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 20240918

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 20241001

Year of fee payment: 9