EP2366863B1 - Tunnel formwork including a framework for reinforcing the structure thereof - Google Patents
Tunnel formwork including a framework for reinforcing the structure thereof Download PDFInfo
- Publication number
- EP2366863B1 EP2366863B1 EP11158790.3A EP11158790A EP2366863B1 EP 2366863 B1 EP2366863 B1 EP 2366863B1 EP 11158790 A EP11158790 A EP 11158790A EP 2366863 B1 EP2366863 B1 EP 2366863B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- wall
- shutter box
- tunnel
- jamb
- walls
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000003014 reinforcing effect Effects 0.000 title claims description 11
- 238000009415 formwork Methods 0.000 title 1
- 238000004519 manufacturing process Methods 0.000 claims description 11
- 238000004873 anchoring Methods 0.000 claims description 10
- 239000000463 material Substances 0.000 claims description 4
- 238000000465 moulding Methods 0.000 claims 1
- 238000010276 construction Methods 0.000 description 9
- 230000002787 reinforcement Effects 0.000 description 6
- 230000000694 effects Effects 0.000 description 4
- 239000011230 binding agent Substances 0.000 description 3
- 229910000831 Steel Inorganic materials 0.000 description 2
- 239000002131 composite material Substances 0.000 description 2
- 239000004794 expanded polystyrene Substances 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- 239000011324 bead Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 230000000295 complement effect Effects 0.000 description 1
- 239000004567 concrete Substances 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 239000011810 insulating material Substances 0.000 description 1
- 238000009413 insulation Methods 0.000 description 1
- 239000012212 insulator Substances 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000002184 metal Substances 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 229920006327 polystyrene foam Polymers 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 238000007711 solidification Methods 0.000 description 1
- 230000008023 solidification Effects 0.000 description 1
- 238000004804 winding Methods 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B9/00—Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
- E06B9/02—Shutters, movable grilles, or other safety closing devices, e.g. against burglary
- E06B9/08—Roll-type closures
- E06B9/11—Roller shutters
- E06B9/17—Parts or details of roller shutters, e.g. suspension devices, shutter boxes, wicket doors, ventilation openings
- E06B9/17007—Shutter boxes; Details or component parts thereof
-
- E—FIXED CONSTRUCTIONS
- E06—DOORS, WINDOWS, SHUTTERS, OR ROLLER BLINDS IN GENERAL; LADDERS
- E06B—FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES OR LIKE ENCLOSURES IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
- E06B9/00—Screening or protective devices for wall or similar openings, with or without operating or securing mechanisms; Closures of similar construction
- E06B9/02—Shutters, movable grilles, or other safety closing devices, e.g. against burglary
- E06B9/08—Roll-type closures
- E06B9/11—Roller shutters
- E06B9/17—Parts or details of roller shutters, e.g. suspension devices, shutter boxes, wicket doors, ventilation openings
- E06B9/17007—Shutter boxes; Details or component parts thereof
- E06B9/17015—Shutter boxes; Details or component parts thereof made of at most two pieces; Front opening details
Definitions
- the present invention relates to a tunnel box intended to be implanted at the top of a table receiving a frame of a window, a door.
- a tunnel box is intended to accommodate a roller shutter mechanism able to slide vis-Ã -vis the frame a blind apron window, the door.
- a tunnel box usually comes up, as it appears on the Fig. 1 , in the form of a prismatic-looking CT part which is intended to be integrated into a masonry of a building under construction, above a table T delimiting the frame of a window or of a door.
- Such a tunnel trunk CT is often constituted by a molded envelope comprising a longitudinal recess E in the form of a tunnel opening into each of its ends and whose lower part is open to accommodate a shutter mechanism M held between two cheeks J1, J2 lateral closure of the recess, and which is shown schematically here by a center line.
- the envelope of the tunnel trunk CT is thus delimited by a wall of vault V and by two walls of jamb B, of which only one is visible on this Fig. 1 , and between which is formed the recess E.
- the tunnel box is delivered with its rolling shutter mechanism which is held via the two cheeks closing the lateral ends of the tunnel box. Heels extend, in principle, perpendicular to the cheeks in their lower part to serve as seating tunnel trunk when rests at its ends on the building elements. Each bead is held by its edges in two rails constituting two sections respectively overlapping the two legs on which it also bears on the masonry.
- the tunnel box is put in place at the top of the board, then secured, by pouring a binder such as mortar at the back of the cheeks and pouring a lintel on the top of the tunnel box. It can still be fixed under a lintel deposited above the table.
- a frame for an opening for example a door, a window, is fixed in the wall frame.
- This frame can be fixed off the wall by means of sealing tabs integral with the two side walls of the wall frame and the lower wall thereof.
- the thickness available between the wall and the frame is intended to receive insulation.
- the opening is fixed on the integral hinges of the frame.
- a tunnel box consisting of four walls assembled at right angles one after the other. Each wall is formed of an extruded profile.
- a bracket is fixed externally on the top wall to connect the tunnel box with a lintel.
- a U-shaped reinforcing plate made of steel, is fixed in the tunnel box, perpendicular to its walls to stiffen it. Its upper wing is extended by a lug which passes through the upper wall, and a hole in the part of the bracket in contact with said upper wall. The end of the pin is then folded.
- the applicant has sought a solution so that the tunnel box, which must withstand the horizontal forces transmitted by the connecting rail under the effect of the action of the wind on the opening, can withstand this effort by deforming as little as possible.
- tunnel box By reinforcing the structure of the tunnel box, the connection between the upper cross member of a frame capable of being fixed to the end of a jamb, for example by means of a connecting rail, is strengthened.
- tunnel box being specified that the tunnel box is intended to be secured to the upper part of a reception table of a frame of a window, a door. Thanks to this rigid connection, this upper crossbar and therefore the frame face the action of the wind by deforming well below acceptable standards.
- the structure of the tunnel box is homogeneously stiffened in transverse planes thereto. This solution is very effective because it can oppose the action of the wind whose direction is perpendicular to the window, the door.
- each arch comprises an intermediate branch disposed at the arch wall of the tunnel box, preferably extended respectively on both sides by two branches respectively disposed at the jamb walls.
- each arch comprises an intermediate branch disposed at the arch wall of the tunnel box, advantageously extended by one edge by a single branch disposed at a jamb wall.
- This arch is suitable for connecting a jamb wall, the one that supports the upper cross member of the frame, with the arch wall of the tunnel box.
- the tunnel box can be of the type with one or two walls of jamb.
- each arch includes an anchor tab to a lintel.
- This anchor reinforces the connection of the tunnel box with the lintel.
- This may be of the cast type in which case the anchor tab is embedded in it. It can also be of the reported type, in which case the anchor is fixed against him.
- a support wall of the anchor lug extends perpendicularly the intermediate branch in its upper part.
- the anchoring lug consists of a part having in side view an L-shaped geometry comprising a seat wall on the support wall, extended by a connecting wall to the lintel, the support wall and the seat wall being capable of being joined by a connecting means.
- the anchoring lug is secured to the hoop and the projecting portion of the anchor lug is secured to the lintel.
- the connecting means comprises notches and corresponding tenons.
- the anchoring tab is integrated in the structure of the arch.
- the hoop and the anchor are made of one and the same piece.
- the support wall is only partially connected to the intermediate branch, making it possible to fold the free portion of this support wall to form a connecting wall.
- the reinforcement comprises reinforcing rods arranged longitudinally in the arch wall and / or in the jamb walls of the tunnel box to reduce the strain under stress of these walls.
- the rods pass through holes provided in the branches of the rollbars so that forces applied on the jamb walls are uniformly distributed over the entire length of the tunnel box.
- the tunnel box 100 presented on the Fig. 3 , is intended to be integrated in a masonry of a building under construction, above a table T delimiting the installation frame of a window or a door. It is in the form of a part of prismatic appearance which is traversed longitudinally by a recess E intended to accommodate a roller shutter mechanism M comprising a winding drum O around which can be rolled, unwound an apron occultation of the window, of the door.
- the recess E thus opens into each of the ends of the tunnel box and also opens into its lower part over its entire length to accommodate the shutter mechanism and to intervene for maintenance, if necessary.
- the tunnel box 100 presented on the Figs. 2 and 3 , consists of a section delimited by a vault wall V, extended by two jamb walls B1 and B2 (visible distinctly on the Fig. 2 ) constituting the front face and the rear face of the tunnel box.
- the recess E is delimited between these walls.
- the profile is made of an insulating material from a thermal point of view. In an advantageous mode of manufacture, it is made of expanded polystyrene. It is preferably formed of a monolithic block, in one piece.
- each cheek consists of a closure wall of a lateral end and a flange arranged perpendicularly and whose geometry matches the outlet of the recess E through said lateral end.
- the shutter mechanism M is held between these two cheeks.
- two profiles 320 and 340 are respectively mounted on the free edges of the two legs B1 and B2. Their ends thus rest on the building elements thus protecting the jambs. Moreover, the presence of these two sections makes it possible to stiffen the free edges of the two legs whose thickness is relatively small.
- Each profile 320, 340 has a U-shaped section adapted to overlap the free edge of the corresponding leg.
- a groove 322, 342 longitudinally hollow the inner branch of each section to receive a side edge of a heel 300 for closing locally the recess E and more precisely the area of the recess located vertically above the building elements.
- the heel 300 is thus disposed in the extension of the lower part of each cheek being held laterally in the two profiles 320 and 340. It consists of an independent piece prismatic appearance or an extension of the cheek forming with she a monobloc piece.
- a connecting rail 400 overlaps the free edge of a jamb and here the leg B2 to connect the tunnel box to the upper rail TS of a frame D of door window.
- This arrangement allows, by linking these two components to limit the deformation of the frame under the action of the wind on the opening ov, held closed in the frame.
- the direction of the wind symbolized by the arrow F tends to bend the upper rail TS which is not normally anchored to the wall.
- the connecting rail 400 covers the section 340. This profile, which increases the stiffness of the leg, however, in an embodiment not shown, be absent. It is useful to remember that a wind speed exceeding 120 km / h can exert a differential pressure on a window, a door, which can reach 800 Pa.
- the connecting rail 400 consists of a section section U comprising an intermediate branch 410 extended by two lateral branches 420, 430.
- the distance separating the two lateral branches 420 and 430 is such that they are in contact with the inner and outer faces of the leg B2, when the connecting section overlaps said leg.
- the intermediate branch constitutes a support plate intended to be secured to the upper cross member TS of the frame D.
- This intermediate branch 410 extends below the side branches 420, 430, to provide significant rigidity to the connecting rail in a parallel plane at its intermediate branch, that is to say in the direction of the wind, in order to limit as much as possible the deformation of the upper crossbar TS.
- the height position of the connecting rail 400 on the free edge of the leg B2 can be adjusted so that the support plate 410 of the connecting rail 400 can be brought into contact with the upper face of the upper rail TS in order to to be solidarized.
- This support plate 410 is preferably fixed by screwing on the upper cross member TS.
- the support plate 410 is fixed by clipping in a retaining profile 440 secured to the upper cross member TS.
- This retaining profile 440 comprises a seat wall bordered laterally by two retaining clips of the support plate.
- the lateral branch of the connecting rail 400 intended to be turned towards the inside of the tunnel box, that is to say the branch 420, is provided with a slideway 422 provided for housing a side edge of a closing plate PF of the recess in its portion opening between the heels.
- This closure plate is commonly called soffit.
- the slideway 422 consists of two parallel ridges projecting perpendicularly from said branch 420.
- the connecting rail 400 is made of a material having a high rigidity such as steel or a composite material.
- an anchor tab 450 is fixed on one end of the connecting rail 400.
- the other end of the connecting rail is also provided with such an anchor tab 450.
- the anchoring lugs are intended to be sealed on the wall wall P to hold, by its ends, the connecting rail to increase its maintenance and thereby increase the rigidity of the frame with which it is associated.
- Each anchor tab presents on this Fig. 5 a Z-shaped cross section comprising a first fixing wall in the end of the connecting rail, a second intermediate wall and a third fixing wall on the wall wall.
- the support plate 410 of the connecting rail 400 is hollow so that it can receive a stiffening blade 412 to further improve its rigidity in a transverse plane.
- This connecting rail 400 and its accessories are elements of the state of the art which are useful for understanding invention.
- tunnel box 100 incorporates a frame 500 capable of increasing its rigidity in a transverse direction to reduce the deformation of the jamb wall which supports the connecting rail 400 relative to the complementary part of the tunnel box.
- This armature 500 comprises a plurality of arches 510 arranged regularly in the tunnel box and in transverse planes thereto. Each arch 510 is integrated inside the walls of vault V and jamb B1 and B2 which constitute the tunnel box.
- the hoop 510 presents on the Fig. 8 U-shaped geometry returned, comprising an intermediate branch 512, respectively extended on either side by two branches 514 and 516 arranged parallel to one another and oriented in the same direction.
- the intermediate branch 512 of the arch is intended to be placed at the level of the arch wall of the tunnel box while the branches 514 and 516 are intended to be placed at its jamb walls.
- the branches are also arranged in the same plane. Their thickness is almost constant. The width of these branches is greater than their thickness to give the arch a great
- the hoop is preferably made of metal or a composite material to give it a great stiffness compared to its footprint.
- the hoop is also preferably made in one piece to increase its rigidity.
- the arches are intended to be placed at regular intervals in the tunnel trunk manufacturing mold, so that they are integrated into its walls at the end of its manufacture. Passages 520 pass through the arch so that the molded material can pass through during the manufacture of the tunnel box and thus ensure a homogeneous structure to the tunnel box.
- the thickness of the vault wall V, jamb walls B1, B2 of the tunnel box is greater than the width of the branches of the arch.
- the hoop 510 may be secured to an anchor lug 530 with a lintel.
- a support wall 522 of the anchoring tab perpendicularly extends the intermediate branch 512 in its upper part. It is traversed by notches 524.
- the anchoring tab 530 consists of a part having in side view an L-shaped geometry comprising a wall 532 of seat on the support wall 522, extended by a connecting wall 534 with the lintel. Studs 536 are arranged under the seat wall 532 to cooperate by hooking with the notches 524 so that said anchoring tab can be made integral with the arch 510, as suggested by the arrow F1.
- the anchor lug 530 is secured to the lintel by pouring concrete the connecting wall 534 or by fixing this connecting wall on one face of the lintel. For this purpose, holes pass through said connecting wall.
- the hoop 510 presented with reference to the Fig. 8 and which has no support wall 522, illustrates the state of the art which is useful for understanding the invention.
- the anchoring tab 530 is integrated into the structure of the arch 510. Its support wall 522 is only partially connected to the intermediate branch 512, so that it is possible to fold the free part of this wall of support to form a connecting wall 534, as suggested by the arrow F2.
- the hoop 510 affects an inverted L-shaped geometry comprising an intermediate branch 512 connected to a single branch 514 intended to reinforce the jamb wall which supports the connecting rail.
- This connecting rail can then be secured to the lintel to further reduce the deformation of the frame under the effect of wind.
- This rail is suitable to be integrated in the construction of a tunnel box of the type comprising an arch wall and a single wall jamb.
- a lintel L was cast above the tunnel box 100 and the connecting wall 534 of the anchor tab 530 is embedded therein.
- a protective Ep coating is applied to the wall of the tunnel box which faces outwards. Plaster pl presented in the form of plates is still deposited against the inner wall of the wall P over an insulator Is and so as to mask the tunnel box 100.
- the reinforcement 500 of the tunnel box 100 further includes reinforcement rods 550 arranged longitudinally in the arch wall V and / or in the jamb walls B1, B2 to reduce the stress strain of these walls.
- the reinforcing rods 550 advantageously cross holes 552 provided in the branches of the hoops 510 so that forces applied to the jamb walls are uniformly distributed over the entire length of the tunnel box.
- the jamb walls B1, B2, then maintain their flatness.
- the trunk tunnel of the invention is advantageously used with a connecting rail adapted to overlap the free edge of a leg constituting it so that the connecting rail can be secured to the top rail of a frame to stiffen it. It can, however, be used without this connecting rail benefiting from the advantages of its rigid structure.
- the tunnel box of the invention has a reinforced structure compared to an earlier tunnel box.
- the tunnel box of the invention makes it possible to strengthen the connection of the upper cross member of the frame with the wall wall. It facilitates the compliance of the window and the door with the EN 12210 and EN 12211 standards relating to the wind-permissible deformations of such closing devices.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Operating, Guiding And Securing Of Roll- Type Closing Members (AREA)
- Wing Frames And Configurations (AREA)
- Reinforcement Elements For Buildings (AREA)
Description
La présente invention concerne un coffre-tunnel destiné à être implanté au sommet d'un tableau de réception d'un dormant d'une fenêtre, d'une porte.The present invention relates to a tunnel box intended to be implanted at the top of a table receiving a frame of a window, a door.
Rappelons qu'un coffre-tunnel est destiné à accueillir un mécanisme de volet roulant apte à faire glisser en vis-à -vis du dormant un tablier d'occultation de la fenêtre, de la porte.Recall that a tunnel box is intended to accommodate a roller shutter mechanism able to slide vis-à -vis the frame a blind apron window, the door.
Un coffre-tunnel se présente généralement, comme cela apparaît sur la
Un tel coffre-tunnel CT est souvent constitué d'une enveloppe moulée comportant un évidement E longitudinal en forme de tunnel débouchant dans chacune de ses extrémités et dont la partie inférieure est ouverte pour permettre d'y loger un mécanisme M de volet roulant tenu entre deux joues J1, J2 de fermeture latérale de l'évidement, et qui est représenté ici schématiquement par un trait d'axe. L'enveloppe du coffre-tunnel CT est ainsi délimitée par une paroi de voûte V et par deux parois de jambage B, dont une seule est visible sur cette
Généralement, le coffre-tunnel est livré avec son mécanisme de volet roulant qui est tenu par l'intermédiaire des deux joues fermant les extrémités latérales du coffre-tunnel. Des talons prolongent, en principe, perpendiculairement les joues dans leur partie basse pour servir d'assise au coffre-tunnel lorsqu'il repose par ses extrémités sur les éléments de construction. Chaque talon est tenu par ses bords dans deux glissières constitutives de deux profilés chevauchant respectivement les deux jambages sur lesquels il prend également appui sur la maçonnerie.Generally, the tunnel box is delivered with its rolling shutter mechanism which is held via the two cheeks closing the lateral ends of the tunnel box. Heels extend, in principle, perpendicular to the cheeks in their lower part to serve as seating tunnel trunk when rests at its ends on the building elements. Each bead is held by its edges in two rails constituting two sections respectively overlapping the two legs on which it also bears on the masonry.
Le coffre-tunnel est mis en place au dessus du tableau, puis solidarisé, par le coulage d'un liant tel que du mortier à l'arrière des joues et par le coulage d'un linteau sur le dessus du coffre-tunnel. On peut encore le fixer sous un linteau déposé au-dessus du tableau.The tunnel box is put in place at the top of the board, then secured, by pouring a binder such as mortar at the back of the cheeks and pouring a lintel on the top of the tunnel box. It can still be fixed under a lintel deposited above the table.
Un dormant pour un ouvrant, par exemple une porte, une fenêtre, est fixé dans l'encadrement mural. Ce dormant peut être fixé en déport du mur par l'intermédiaire de pattes de scellement solidaires des deux parois latérales de l'encadrement mural et de la paroi basse de celui-ci. L'épaisseur disponible entre le mur et le dormant est destinée à recevoir un isolant. L'ouvrant est fixé sur les gonds solidaires du dormant.A frame for an opening, for example a door, a window, is fixed in the wall frame. This frame can be fixed off the wall by means of sealing tabs integral with the two side walls of the wall frame and the lower wall thereof. The thickness available between the wall and the frame is intended to receive insulation. The opening is fixed on the integral hinges of the frame.
Dans la demande de brevet français n°
On connait aussi à la lecture du brevet
On connaît encore à la lecture du brevet
Dans la présente invention, le demandeur a cherché une solution pour que le coffre-tunnel, qui doit supporter les efforts horizontaux transmis par ce rail de liaison sous l'effet de l'action du vent sur l'ouvrant, puisse résister à cet effort en se déformant le moins possible.In the present invention, the applicant has sought a solution so that the tunnel box, which must withstand the horizontal forces transmitted by the connecting rail under the effect of the action of the wind on the opening, can withstand this effort by deforming as little as possible.
A cet effet, est proposé un coffre-tunnel destiné à réceptionner un mécanisme de fermeture à volet roulant selon les caractéristiques de la revendication 1.For this purpose, there is provided a tunnel box for receiving a shutter closure mechanism according to the features of
En renforçant la structure du coffre-tunnel, on renforce la liaison entre la traverse supérieure d'un dormant susceptible d'être fixée à l'extrémité d'un jambage, par exemple à l'aide d'un rail de liaison, et le coffre-tunnel, étant précisé que le coffre-tunnel est destiné à être rendu solidaire de la partie supérieure d'un tableau de réception d'un dormant d'une fenêtre, d'une porte. Grâce à cette liaison rigide, cette traverse supérieure et par conséquent le dormant affrontent l'action du vent en se déformant bien en deçà des normes acceptables.By reinforcing the structure of the tunnel box, the connection between the upper cross member of a frame capable of being fixed to the end of a jamb, for example by means of a connecting rail, is strengthened. tunnel box, being specified that the tunnel box is intended to be secured to the upper part of a reception table of a frame of a window, a door. Thanks to this rigid connection, this upper crossbar and therefore the frame face the action of the wind by deforming well below acceptable standards.
En reliant à intervalles réguliers la paroi de voûte avec la ou les parois de jambage, on rigidifie de manière homogène la structure du coffre-tunnel dans des plans transversaux à celui-ci. Cette solution est fort efficace, car elle peut s'opposer à l'action du vent dont la direction est perpendiculaire à la fenêtre, la porte.By connecting the vault wall at regular intervals with the jamb wall or walls, the structure of the tunnel box is homogeneously stiffened in transverse planes thereto. This solution is very effective because it can oppose the action of the wind whose direction is perpendicular to the window, the door.
Selon une caractéristique de l'invention, chaque arceau comprend une branche intermédiaire disposée au niveau de la paroi de voûte du coffre-tunnel, avantageusement prolongée respectivement de part et d'autre par deux branches disposées respectivement au niveau des parois de jambage.According to a feature of the invention, each arch comprises an intermediate branch disposed at the arch wall of the tunnel box, preferably extended respectively on both sides by two branches respectively disposed at the jamb walls.
La liaison de chaque paroi de jambage avec la paroi de voûte est ainsi rigidifiée.The connection of each jamb wall with the arch wall is thus stiffened.
Selon une caractéristique de l'invention, chaque arceau comprend une branche intermédiaire disposée au niveau de la paroi de voûte du coffre-tunnel, avantageusement prolongée d'un bord par une seule branche disposée au niveau d'une paroi de jambage.According to a feature of the invention, each arch comprises an intermediate branch disposed at the arch wall of the tunnel box, advantageously extended by one edge by a single branch disposed at a jamb wall.
Cet arceau convient pour relier une paroi de jambage, celle qui supporte la traverse supérieure du dormant, avec la paroi de voûte du coffre-tunnel. Le coffre-tunnel peut être du type à une ou deux parois de jambage.This arch is suitable for connecting a jamb wall, the one that supports the upper cross member of the frame, with the arch wall of the tunnel box. The tunnel box can be of the type with one or two walls of jamb.
Selon une caractéristique de l'invention, chaque arceau comprend une patte d'ancrage à un linteau.According to a feature of the invention, each arch includes an anchor tab to a lintel.
Cette patte d'ancrage renforce la liaison du coffre-tunnel avec le linteau. Celui-ci peut être du type coulé auquel cas la patte d'ancrage est noyée dans celui-ci. Il peut aussi être du type rapporté, auquel cas la patte d'ancrage est fixée contre lui.This anchor reinforces the connection of the tunnel box with the lintel. This may be of the cast type in which case the anchor tab is embedded in it. It can also be of the reported type, in which case the anchor is fixed against him.
Selon une caractéristique de l'invention, une paroi de support de la patte d'ancrage prolonge perpendiculairement la branche intermédiaire dans sa partie haute.According to a feature of the invention, a support wall of the anchor lug extends perpendicularly the intermediate branch in its upper part.
Selon une caractéristique additionnelle, la patte d'ancrage est constituée d'une pièce présentant en vue latérale une géométrie en L comprenant une paroi d'assise sur la paroi de support, prolongée par une paroi de liaison au linteau, la paroi de support et la paroi d'assise étant susceptibles d'être réunies par un moyen de liaison.According to an additional feature, the anchoring lug consists of a part having in side view an L-shaped geometry comprising a seat wall on the support wall, extended by a connecting wall to the lintel, the support wall and the seat wall being capable of being joined by a connecting means.
On solidarise la patte d'ancrage sur l'arceau, puis la partie saillante de la patte d'ancrage est solidarisée avec le linteau.The anchoring lug is secured to the hoop and the projecting portion of the anchor lug is secured to the lintel.
Selon une caractéristique de l'invention, le moyen de liaison comprend des encoches et des tenons correspondants.According to one characteristic of the invention, the connecting means comprises notches and corresponding tenons.
Selon une caractéristique alternative de l'invention, la patte d'ancrage est intégrée à la structure de l'arceau.According to an alternative characteristic of the invention, the anchoring tab is integrated in the structure of the arch.
L'arceau et la patte d'ancrage sont constitués d'une seule et même pièce.The hoop and the anchor are made of one and the same piece.
Selon une caractéristique de l'invention, la paroi de support n'est reliée que partiellement à la branche intermédiaire, permettant de replier la partie libre de cette paroi de support pour former une paroi de liaison.According to one characteristic of the invention, the support wall is only partially connected to the intermediate branch, making it possible to fold the free portion of this support wall to form a connecting wall.
Selon une caractéristique additionnelle de l'invention, l'armature comprend des tiges de renfort disposées longitudinalement dans la paroi de voûte et/ou dans les parois de jambage du coffre-tunnel pour réduire la déformation sous contrainte de ces parois.According to an additional feature of the invention, the reinforcement comprises reinforcing rods arranged longitudinally in the arch wall and / or in the jamb walls of the tunnel box to reduce the strain under stress of these walls.
Ces tiges réduisent essentiellement les déformations longitudinales sous contraintes des parois de jambage.These rods essentially reduce the longitudinal strains under stress of the jamb walls.
Selon une caractéristique additionnelle de l'invention, les tiges traversent des trous prévus dans les branches des arceaux pour que des efforts appliqués sur les parois de jambage soient uniformément répartis sur toute la longueur du coffre-tunnel.According to an additional feature of the invention, the rods pass through holes provided in the branches of the rollbars so that forces applied on the jamb walls are uniformly distributed over the entire length of the tunnel box.
Ces composants qui sont intégrés pendant la fabrication du coffre-tunnel engendrent un surcoût relativement réduit à ce dernier.These components that are integrated during the manufacture of the tunnel box generate a relatively small additional cost to the latter.
Les caractéristiques de l'invention mentionnées ci-dessus, ainsi que d'autres, apparaîtront plus clairement à la lecture de la description suivante d'un exemple de réalisation, ladite description étant faite en relation avec les dessins joints, parmi lesquels:
- la
Fig. 1 représente une vue de face d'un coffre-tunnel intégré de manière connue à la construction d'un mur, au-dessus du tableau d'encadrement d'une fenêtre, - la
Fig. 2 représente une vue en coupe transversale d'un coffre-tunnel connu tenu sur des éléments de construction d'une maçonnerie, le coffre-tunnel est pourvu d'un rail de liaison avec une traverse supérieure et incorpore une armature de renforcement de sa structure, - la
Fig. 3 représente une vue longitudinale d'un coffre-tunnel connu reposant par ses extrémités sur des éléments de construction d'une maçonnerie, - la
Fig. 4 représente une vue d'extrémité d'un rail de liaison pour un coffre-tunnel selon l'invention, - la
Fig. 5 représente une vue en perspective d'un rail de liaison et d'une patte d'ancrage de son extrémité dans une paroi murale, - la
Fig. 6 représente une vue d'extrémité d'une variante de réalisation d'un rail de liaison pour un coffre-tunnel, - la
Fig. 7 représente une vue en perspective d'un coffre-tunnel incorporant une armature de renforcement de sa structure selon l'invention, - la
Fig. 8 représente une vue en perspective d'un arceau constitutif d'une armature pour un coffre-tunnel connu, - la
Fig. 9 représente une vue en perspective d'une première variante de réalisation d'un arceau constitutif d'une armature pour un coffre-tunnel selon l'invention, - la
Fig. 10 représente une vue en perspective d'une seconde variante de réalisation d'un arceau constitutif d'une armature pour un coffre-tunnel selon l'invention, - la
Fig. 11 représente une vue en perspective d'une troisième variante de réalisation d'un arceau constitutif d'une armature pour un coffre-tunnel selon l'invention et, - la
Fig. 12 représente une vue en coupe transversale d'un coffre-tunnel intégré à une construction d'un mur, au-dessus d'un tableau d'encadrement d'une fenêtre, un linteau recouvrant la paroi de voûte du coffre-tunnel selon l'invention.
- the
Fig. 1 represents a front view of a tunnel box integrated in a known manner to the construction of a wall, above the frame of a window, - the
Fig. 2 represents a cross-sectional view of a known tunnel box held on building elements of a masonry, the tunnel box is provided with a connecting rail with an upper rail and incorporates a reinforcing reinforcement of its structure, - the
Fig. 3 represents a longitudinal view of a known tunnel vault resting at its ends on building elements of a masonry, - the
Fig. 4 represents an end view of a connecting rail for a tunnel box according to the invention, - the
Fig. 5 represents a perspective view of a connecting rail and an anchor tab of its end in a wall wall, - the
Fig. 6 represents an end view of an alternative embodiment of a connecting rail for a tunnel box, - the
Fig. 7 represents a perspective view of a tunnel box incorporating a reinforcing reinforcement of its structure according to the invention, - the
Fig. 8 represents a perspective view of a hoop constituting an armature for a known tunnel box, - the
Fig. 9 represents a perspective view of a first variant embodiment of a hoop constituting an armature for a tunnel box according to the invention, - the
Fig. 10 represents a perspective view of a second variant embodiment of a hoop constituting an armature for a tunnel box according to the invention, - the
Fig. 11 represents a perspective view of a third embodiment of a hoop constituting an armature for a tunnel box according to the invention and, - the
Fig. 12 represents a cross-sectional view of a tunnel box integrated into a wall construction, above a window frame, a lintel covering the tunnel wall of the tunnel box according to invention.
Le coffre-tunnel 100, présenté sur la
Le coffre-tunnel 100, présenté sur les
Sur la
Pour asseoir chacune des extrémités du coffre-tunnel sur des éléments de construction de la paroi murale P, deux profilés 320 et 340, visibles distinctement sur la
Chaque profilé 320, 340 présente une section en U adaptée à chevaucher le bord libre du jambage correspondant. Une rainure 322, 342 creuse longitudinalement la branche intérieure de chaque profilé pour recevoir un chant latéral d'un talon 300 destiné à fermer localement l'évidement E et plus précisément la zone de l'évidement située à l'aplomb des éléments de construction.Each
Ce placement du talon est distinctement visible sur cette
Sur la
Sur la vue en détail de la
La branche intermédiaire constitue une plaque d'appui destinée à être solidarisée avec la traverse supérieure TS du dormant D. Cette branche intermédiaire 410 se prolonge en deçà des branches latérales 420, 430, pour procurer une rigidité importante au rail de liaison dans un plan parallèle à sa branche intermédiaire, c'est-à -dire dans la direction du vent, afin de limiter au maximum la déformation de la traverse supérieure TS.The intermediate branch constitutes a support plate intended to be secured to the upper cross member TS of the frame D. This
La position en hauteur du rail de liaison 400 sur le bord libre du jambage B2 peut être ajustée pour que la plaque d'appui 410 du rail de liaison 400 puisse être mise en contact avec la face supérieure de la traverse supérieure TS afin d'y être solidarisée. Cette plaque d'appui 410 est fixée, de préférence, par vissage sur la traverse supérieure TS.The height position of the connecting
Dans une variante de réalisation montrée sur la
Sur la
La glissière 422 est constituée de deux arêtes parallèles qui font saillie perpendiculairement de ladite branche 420.The
Le rail de liaison 400 est fabriqué dans un matériau présentant une rigidité élevée comme de l'acier ou un matériau composite.The connecting
Sur la
Les pattes d'ancrage sont destinées à être scellées sur la paroi murale P pour tenir, par ses bouts, ce rail de liaison afin d'accroître son maintien et par ce fait accroître la rigidité du dormant auquel il est associé. Chaque patte d'ancrage présente sur cette
Dans la variante de réalisation présentée sur la
Ce rail de liaison 400 et ses accessoires sont des éléments de l'état de la technique qui sont utiles à la compréhension d'invention.This connecting
Sur les
Cette armature 500 comprend une pluralité d'arceaux 510 disposés régulièrement dans le coffre-tunnel et dans des plans transversaux à celui-ci. Chaque arceau 510 est intégré à l'intérieur des parois de voute V et de jambage B1 et B2 qui constituent le coffre-tunnel.This
L'arceau 510 présente sur la
rigidité dans un plan tangent à celles-ci. L'arceau est de préférence fabriqué en métal ou dans un matériau composite pour lui procurer une grande raideur au regard de son encombrement. L'arceau est également de préférence fabriqué d'un seul tenant pour accroître sa rigidité. Les arceaux sont destinés à être placés à intervalles réguliers dans le moule de fabrication du coffre-tunnel, si bien qu'ils sont intégrés dans ses parois à l'issue de sa fabrication. Des passages 520 traversent l'arceau pour que la matière moulée puisse les traverser pendant la fabrication du coffre-tunnel et ainsi garantir une structure homogène au coffre-tunnel. Dans le même but, et comme cela apparaît sur la
On obtient de la sorte un coffre-tunnel dont les parois de jambage fléchissent moins lorsque l'on tente de les écarter ou de les rapprocher, lorsqu'on le compare à un coffre-tunnel conventionnel issu du même procédé de fabrication. La tenu du rail de liaison est réalisée plus fermement par le coffre-tunnel et il en résulte une moindre déformation du dormant.In this way, a tunnel box is obtained, the jamb walls of which flex less when attempting to move them apart or closer together, when compared to a conventional tunnel box from the same manufacturing process. The holding of the connecting rail is made more firmly by the tunnel box and results in less deformation of the frame.
Grâce à la présence des ces arceaux, il est apparu intéressant de pouvoir accroître l'ancrage du coffre-tunnel avec le linteau qui le surplombe pour lier davantage le dormant avec le linteau. De manière traditionnelle, on peut couler un linteau au dessus d'un coffre-tunnel préalablement assis de chaque côté d'éléments de maçonnerie délimitant latéralement le tableau. Des rainures longitudinales R sont prévues, sur la
Sur la
L'arceau 510 présenté en référence à la
Dans sa version présentée sur la
Sur la
Sur la
Sur les
Le coffre-tunnel de l'invention est avantageusement utilisé avec un rail de liaison adapté pour chevaucher le bord libre d'un jambage qui le constitue afin que ce rail de liaison puisse être solidarisé sur la traverse supérieure d'un dormant pour la rigidifier. Il peut cependant être utilisé sans ce rail de liaison en bénéficiant des avantages de sa structure rigidifiée.The trunk tunnel of the invention is advantageously used with a connecting rail adapted to overlap the free edge of a leg constituting it so that the connecting rail can be secured to the top rail of a frame to stiffen it. It can, however, be used without this connecting rail benefiting from the advantages of its rigid structure.
Le coffre-tunnel de l'invention présente une structure renforcée par rapport à un coffre-tunnel antérieur.The tunnel box of the invention has a reinforced structure compared to an earlier tunnel box.
Il est avantageusement associé à la partie haute d'un dormant pour le renforcer, en la reliant avec la paroi murale pour réduire la déformation du dormant sous l'effet de l'action du vent.It is advantageously associated with the upper part of a frame to strengthen it, connecting it with the wall to reduce the deformation of the frame under the effect of the action of the wind.
Le coffre-tunnel de l'invention permet de renforcer la liaison de la traverse supérieure du dormant avec la paroi murale. Il facilite la mise en conformité de la fenêtre, de la porte avec les normes EN 12210 et EN 12211 se rapportant aux déformations admissibles au vent de tels dispositifs de fermeture.The tunnel box of the invention makes it possible to strengthen the connection of the upper cross member of the frame with the wall wall. It facilitates the compliance of the window and the door with the EN 12210 and EN 12211 standards relating to the wind-permissible deformations of such closing devices.
Son coût de fabrication est intéressant, au regard des avantages qu'il procure.Its manufacturing cost is interesting, considering the benefits it provides.
Claims (6)
- Shutter box (100) intended to house a roller-shutter closure mechanism (M), the shutter box being designed to be anchored above a reveal (T) delimiting the casing in which a window or door fixed frame is fitted, the shutter box comprising a tunnel-crown wall (V) extended by at least one jamb wall (B1, B2), the shutter box being made all from the same material that is thermally insulating, the shutter box incorporating a reinforcing framework (500) designed to stiffen the structure thereof, the reinforcing framework comprising a plurality of arches (510) incorporated by over-moulding into the walls of the shutter box in transverse planes thereof, the passages (520) passing through each arch (510) so that the moulded material can pass through these passages as the shutter box is being manufactured, so as to incorporate them into the structure of the shutter box (100) once manufacture thereof is complete, each arch comprising an intermediate leg (512) positioned in the region of the tunnel-crown wall (V) of the shutter box, a support wall (522) extending the said intermediate leg at right angles at its top, characterized in that the support wall (522) is partially connected to the said intermediate leg so that the free part of this support wall can be bent up to form a connecting wall (534) for connecting with a lintel, or in that the shutter box comprises an anchor bracket (530) for anchoring to a lintel and the support wall has passing through it cutouts (524) that are designed to collaborate with corresponding tenons (536) belonging to the anchor bracket (530).
- Shutter box (100) according to Claim 1, characterized in that the anchor bracket (530) is made from a component which in side view has an L-shaped geometry comprising a seating wall (532) for seating along the support wall (522), extended by a connecting wall (534) for connecting to the lintel (L), the tenons (536) being positioned under the seating wall (532).
- Shutter box (100) according to Claim 1 or 2, characterized in that the intermediate leg (512) is extended respectively on each side by two legs (514 and 516) arranged respectively in the region of the jamb walls (B1, B2).
- Shutter box (100) according to Claim 1 or 2, characterized in that the intermediate leg (512) is extended on one edge by a single leg (514) positioned in the region of a jamb wall.
- Shutter box (100) according to any one of the preceding claims, characterized in that the reinforcing framework (500) comprises reinforcing rods (550) positioned longitudinally in the tunnel-crown wall (V) and/or in the jamb walls (B1, B2) so as to reduce stress-induced deformation of these walls.
- Shutter box (100) according to Claim 5, characterized in that the rods (550) pass through the holes (552) provided in the legs of the arches (510) so that loads applied to the jamb walls are uniformly distributed over the entire length of the shutter box.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1051988A FR2957627B1 (en) | 2010-03-19 | 2010-03-19 | TUNNEL BOX INCORPORATING A REINFORCING REINFORCEMENT OF ITS STRUCTURE |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2366863A1 EP2366863A1 (en) | 2011-09-21 |
EP2366863B1 true EP2366863B1 (en) | 2015-10-28 |
Family
ID=43500378
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP11158790.3A Active EP2366863B1 (en) | 2010-03-19 | 2011-03-18 | Tunnel formwork including a framework for reinforcing the structure thereof |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2366863B1 (en) |
ES (1) | ES2561666T3 (en) |
FR (1) | FR2957627B1 (en) |
PT (1) | PT2366863E (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR2999220B1 (en) * | 2012-12-07 | 2015-08-07 | Soprofen | SHUTTER BOX ASSEMBLY WITH THERMAL INSULATING MATERIAL SAFETY BOX |
FR3005678B1 (en) * | 2013-05-15 | 2015-05-22 | Fixolite Sa | ARMATURE FOR TRUNK CHEST |
FR3023573B1 (en) * | 2014-07-08 | 2021-05-07 | Fixolite Sa | FIXING INTERFACE FOR SHUTTER BOX |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3709490C2 (en) * | 1986-03-22 | 1999-01-21 | Augsburger Ver Ziegelwerke | Prefabricated roller shutter box with adjoining brick blocks |
DE10034533A1 (en) * | 2000-07-15 | 2002-01-24 | Beck Bernd | Stiffening element for insertion into roller shutter boxes made of hard plastic foam consists of a plastic material |
DE20311385U1 (en) * | 2003-02-18 | 2004-04-01 | Führer, Josef | Rolling shutter box is assembled out of several identical blocks which consist of a thermal insulation material and are provided on their outer periphery with dovetail profiling |
DE10347717B4 (en) * | 2003-06-25 | 2016-12-29 | Beck & Heun Gmbh | A roller shutter case |
FR2895438B1 (en) * | 2005-12-27 | 2009-07-17 | Eveno Sas Soc Par Actions Simp | TUNNEL SHUTTER FOR ROLLING SHUTTER AND METHOD FOR MANUFACTURING THE SAME |
DE102006038401A1 (en) * | 2006-08-15 | 2008-02-21 | Exte-Extrudertechnik Gmbh | Roller shutter box for use on e.g. window frame, has lintel-fastening unit sustaining in outer side of box in assigned frame-fastening unit, where frame-fastening unit has screw-connected strip |
US20090126922A1 (en) | 2007-10-29 | 2009-05-21 | Jan Vetrovec | Heat transfer device |
-
2010
- 2010-03-19 FR FR1051988A patent/FR2957627B1/en active Active
-
2011
- 2011-03-18 PT PT111587903T patent/PT2366863E/en unknown
- 2011-03-18 ES ES11158790.3T patent/ES2561666T3/en active Active
- 2011-03-18 EP EP11158790.3A patent/EP2366863B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP2366863A1 (en) | 2011-09-21 |
FR2957627B1 (en) | 2013-12-06 |
FR2957627A1 (en) | 2011-09-23 |
PT2366863E (en) | 2015-11-26 |
ES2561666T3 (en) | 2016-02-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2580417B1 (en) | Door assembly | |
EP1741872B1 (en) | Roller shutter system | |
EP3242980B1 (en) | Improved module forming a thermal bridge breaker for externally insulated buildings | |
EP2366863B1 (en) | Tunnel formwork including a framework for reinforcing the structure thereof | |
EP2580419B1 (en) | Fire resistant door assembly comprising one or two door leafs | |
EP1994252B1 (en) | Roller shutter installation in a building opening, half a combination unit for such an installation, and method for installing the roller shutter. | |
FR2992017A1 (en) | Tunnel box for receiving roller-shutter mechanism of window of door, has mounting leg retained in groove formed outside jamb wall and/or in top wall, and including anchoring leg with lintel and anchoring unit with door frame of joinery | |
WO2012010773A1 (en) | Insulating formwork block | |
FR2927645A1 (en) | Elongated combined coffer-tunnel for roller blind of e.g. building window, has front and rear parts integrated at level of their sections of wall by aliasing system that assures locking of front and rear parts in plane transversal to wall | |
FR2957965A1 (en) | Tilting garage door for use in garage utilized as e.g. wash-house, has cold bridge breaking unit placed on level of main panel of peripheral structure and frame, where peripheral structure surrounds main panel | |
EP2740877B1 (en) | Roller shutter lintel assembly with a lintel made of a thermally insulating material | |
FR2951492A1 (en) | Roller shutter box body for use on upper crosspiece of joinery work sash of e.g. door, of house, has metal profile covering limited portion of side face of groove and face portion, so as to obtain partial interior lining of groove | |
EP2108777B1 (en) | Casing for a rolling shutter | |
EP2947257B1 (en) | Roller shutter box provided with a receiving bore for a means for connection between a door lintel and frame | |
FR2952963A1 (en) | TUNNEL CHEST WITH CONNECTING RAIL FOR A DORMANT. | |
EP2325432B1 (en) | Roller shutter casing body and casing including such a body | |
EP2949856B1 (en) | Tunnel box provided with a receiving groove for an attachment bracket and including a reinforcement frame | |
EP2899327B1 (en) | Insulating construction element and method for manufacturing same | |
EP1972750B1 (en) | Roller blind guiderail | |
FR3007440A1 (en) | COFFRANT BLOCK INCLUDING A FRAME FRAME | |
FR2952962A1 (en) | Tunnel case for use on table to receive traveling shutter closing mechanism to install window during building construction, has jambs provided with connection rail for overlapping free edge of each jamb to integrate jambs on cross-member | |
FR3063760A1 (en) | INSTALLATION OF SLIDING WINDOW FOR BUILDING | |
FR3018532A1 (en) | LINTEAU ACCESSORY | |
FR3024487A1 (en) | CARPENTRY STRUCTURE COMPRISING A DORMANT AND A SHUTTER BOX | |
WO2023131756A1 (en) | Insulating frame for receiving joinery |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20120326 |
|
17Q | First examination report despatched |
Effective date: 20141022 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20150515 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 758050 Country of ref document: AT Kind code of ref document: T Effective date: 20151115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
REG | Reference to a national code |
Ref country code: PT Ref legal event code: SC4A Free format text: AVAILABILITY OF NATIONAL TRANSLATION Effective date: 20151110 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602011020941 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2561666 Country of ref document: ES Kind code of ref document: T3 Effective date: 20160229 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 758050 Country of ref document: AT Kind code of ref document: T Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160228 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160128 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160129 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602011020941 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20160729 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20160318 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20160318 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160318 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160318 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20160331 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20110318 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20151028 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240320 Year of fee payment: 14 Ref country code: PT Payment date: 20240307 Year of fee payment: 14 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20240329 Year of fee payment: 14 Ref country code: FR Payment date: 20240322 Year of fee payment: 14 |
|