EP2267242B1 - Swap bracket - Google Patents
Swap bracket Download PDFInfo
- Publication number
- EP2267242B1 EP2267242B1 EP10005547.4A EP10005547A EP2267242B1 EP 2267242 B1 EP2267242 B1 EP 2267242B1 EP 10005547 A EP10005547 A EP 10005547A EP 2267242 B1 EP2267242 B1 EP 2267242B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- scaffold
- limb
- supporting means
- bracket
- long
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 230000008878 coupling Effects 0.000 claims description 24
- 238000010168 coupling process Methods 0.000 claims description 24
- 238000005859 coupling reaction Methods 0.000 claims description 24
- 125000006850 spacer group Chemical group 0.000 claims description 8
- 239000000725 suspension Substances 0.000 description 41
- 238000011161 development Methods 0.000 description 6
- 230000018109 developmental process Effects 0.000 description 6
- 239000000463 material Substances 0.000 description 5
- 238000005553 drilling Methods 0.000 description 3
- 238000010276 construction Methods 0.000 description 2
- 238000009413 insulation Methods 0.000 description 2
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000003203 everyday effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 239000003973 paint Substances 0.000 description 1
- 239000011505 plaster Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G5/00—Component parts or accessories for scaffolds
- E04G5/06—Consoles; Brackets
- E04G5/061—Consoles; Brackets specially adapted for attachment to scaffolds
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G1/00—Scaffolds primarily resting on the ground
- E04G1/15—Scaffolds primarily resting on the ground essentially comprising special means for supporting or forming platforms; Platforms
- E04G2001/158—Platforms supported by spigots which engage through holes in the platform
Definitions
- the invention relates to a scaffold console or a scaffold console extension according to the preamble of patent claim 1.
- the scaffolding specialist In the area of scaffolding, the scaffolding specialist often has the task of expanding existing working levels in the form of scaffolding floor coverings in their available working width and in this way making additional stand space available for craftsmen working on the scaffolding.
- materials that may be applied to a building facade must be attached, which must be accommodated in an intermediate space between the erected scaffolding, in particular the working levels attached to it, and the house facade.
- the scaffolding elements for example the vertical styles and the scaffolding floor coverings, and the facade when setting up the scaffolding, so that the materials to be attached can be easily installed on the entire facade surface and on the facade side of the Scaffold can be guided past the scaffold.
- scaffolding extension brackets are known from the prior art, which can be arranged in the level of a scaffolding floor covering in the area between the house facade and the scaffolding, in order to compensate for such a variation in the distance between the facade and the scaffolding.
- the DE 199 26 592 B4 an expandable console, which enables the extension or retraction of a console base via feed element brackets, so that it can be adjusted if the distance from the working level to the facade needs to be changed.
- the US 6,126,127 Shows a console that provides a boom by means of a folding mechanism, on which an additional floor covering can be arranged, which widens the console and brings the working level closer to a house facade.
- brackets from the prior art are complicated and complex in construction and have to be assembled in a complex manner, so that a considerable effort has to be made, for example in order to Passing thermal insulation to be applied to a building facade to dismantle the scaffold bracket.
- moving parts in scaffolding are always disadvantageous because they can become dirty or stick in the presence of paint, plaster, mortar or similar materials, making their operation difficult or impossible.
- a generic scaffold console has become known, in which a scaffold support bracket with a long first leg and a short second leg is provided in cross section as a right-angled triangle. Depending on the arrangement of one of these legs and attachment to a vertical wooden pole, a wider support for scaffolding boards or a narrower support for scaffolding boards is created.
- the scaffold support bracket is supported in each case with a tip arranged at the respective end of the leg in a notch in the vertical wooden rod, so that there are different heights for the scaffold boards with steps.
- a scaffold console which is foldable and comprises a long first leg and a short second leg. This scaffold console can be plugged onto a scaffold pole.
- a scaffold console for widening a covering of a scaffold supported by uprights comprising a first suspension element, a second suspension element and a console covering that can be placed on the suspension element, the two suspension elements in each case as an angle with a are formed first short leg and a second long leg, these two legs are at a right angle to each other, the two suspension means can be fixed either with the first short leg or the second long leg on the uprights of the scaffold, the console covering the horizontally oriented leg of the suspension element can be placed as an extension of a working level, the scaffolding console comprising a coupling which can be attached either to the short leg or the long leg of the suspension element, the scaffolding console also being suitable for coupling either on the ku or on the long side.
- the object of the invention is therefore to provide a scaffold console which consists of fewer individual parts and is therefore more rationally manufactured and can be handled better.
- a scaffold console for widening a covering of a scaffold supported by stands, it is provided that this comprises a first suspension element, a second suspension element and a bracket covering that can be placed on the suspension element, the two suspension elements each being designed as an angle with a first short leg and a second long leg, these two legs being at a right angle to one another, wherein the two suspension elements can each be fixed with the first short arm or the second long arm to the uprights of the scaffold and the console covering can be placed on the horizontally oriented arms of the suspension element.
- a scaffold console designed in this way offers the possibility of placing the console covering on the side of the long leg in the case of an enlarged work surface extension, and of providing the short leg for attachment to a stand of the scaffold. If a smaller work surface extension is required, i.e. during or after a material has been applied to a facade, the suspension element can be rotated accordingly and attached to the stand with its long leg, so that a smaller bracket covering can be placed on the short leg.
- the scaffold console comprises a coupling, which can optionally be attached to the short leg or the long leg of the suspension element.
- Such a coupling is used for simple attachment of the scaffold console to the scaffold frame, so that when the leg attached to the frame is changed, only the coupling has to be opened and not a dismantling of the complete console has taken place.
- This is particularly advantageous if a system of scaffolding frames is used, in which the floor coverings and / or frame parts that have been put on perform safety functions, and thus must not be easily removed or even removed when the scaffold is set up.
- the coupling can be connected to the suspension element by means of at least one bolt and a spring pin.
- the scaffold bracket provides that the short leg and the long leg of the suspension element are connected by a strut, the strut running in particular between free ends of the legs, opposite their point of intersection. This creates additional stability.
- a further embodiment of the scaffold console is characterized in that the short leg and the long leg of the suspension element are connected by two struts, which provides further stability without restricting the functionality.
- the coupling comprises a pin, with which the coupling can be optionally inserted into the short leg or the long leg of the suspension means in a corner region of the suspension element is, the legs are outside the corner area and open with openings to the corner area.
- suspension element can be attached to a scaffolding system with rosette-like connecting means, as is known from the prior art ("plettac contour” system, "assco futuro” system).
- the coupling comprises a receptacle with which the coupling optionally engages around the short leg or the long leg of the suspension element, in particular in a U-shape.
- a coupling is provided which is independent of the scaffolding system and which on the one hand holds the suspension element by means of the receptacle and on the other hand can be fastened to the scaffolding system for example by means of clamps.
- the legs for fastening the coupling each have in particular a bore, the bore or the bores being in particular at equal distances from the inner ends of the legs.
- the coupling can act on such bores regardless of the orientation of the suspension element, and / or securing means can be carried out.
- the invention further comprises a further development of Scaffold console, in which a spacer is arranged on each leg, with which the leg can be supported relative to the stand of the scaffold, as a result of which a secure hold and a flat working surface is achieved.
- the long leg has a length which corresponds to a multiple of a length of the short leg, the long leg being in particular twice as long as the short leg.
- the console covering can be formed from components in a predetermined grid dimension, so that standardized parts can be used.
- console covering can be fastened to the suspension means in the manner of a conventional scaffolding covering.
- An embodiment of the scaffold console according to the invention is characterized in that the console covering for the long leg comprises two console boards and that the console covering for the short leg comprises a console board.
- the short leg could be designed with a corresponding offset in its attachment to the scaffold frame, so that the floor covering which has become superfluous due to the change of the horizontal leg used as a support can be stored under the floor covering placed on the short leg.
- FIG. 1 a scaffold console 1 according to the invention on a scaffold frame 2.
- the console 1 comprises a suspension element 3, which is shown schematically here in two different assembly positions. It is understood that the mounting position of the narrow console covering, which is shown in the lower area in the present case, is also used as an extension of a working level in actual use, and is not to be provided between two working levels.
- the suspension element 3 has a short leg 4 and a long leg 5, which can each be fastened to a vertical style 8 with a coupling 7 in accordance with the required width of the console covering 6.
- the console covering of the wide worktop extension comprises two console boards 6a and 6b, of which only one is used in the case of the narrow worktop extension, and the second one is either to be accommodated elsewhere, or, with a suitably designed suspension element 3 (not shown here), under the suspension element used can be arranged as a stack.
- FIG. 2 shows a version of the suspension element 3 according to the invention in a side view.
- the short leg 4 is here via a strut 21 at its end facing away from the crossing point connected to the opposite end of the long leg 5.
- Both legs have locking pins on which a floor covering can be placed in accordance with a design known from the prior art, so that the pins engage in corresponding holes in the covering.
- Both wood coverings with appropriate fittings and common aluminum coverings or the like are provided as covering materials.
- the legs further include spacers 23 at their outer ends, which rest against the vertical style 8 when the leg is mounted and support the leg.
- the spacers can have a shape on their contact surface with the vertical style which is adapted to the shape of the vertical style in order to additionally provide a lateral fixation.
- a coupling 7 is arranged on the short leg 4, which is fastened to a vertical style 8 (not shown here) with a clamp 24, preferably a screw terminal.
- the coupling 7 also has a U-shaped profile receptacle 25 for the short leg 4, the receptacle 25 also being able to accommodate the long leg in its dimension.
- the short leg 4 is inserted into the receptacle 25 in such a way that bores in the leg are made to coincide with corresponding bores in the receptacle 25.
- Corresponding bores 26 are shown in the long leg 5.
- the spacing of the bores from the crossing point of the legs 4 & 5 is preferably identical, but can also be offset by the thickness of a console board if the console boards are stacked on the short leg.
- the pins 22 are to be made longer in order to ensure safety.
- the bores 26 are suitable for the passage of bolts 27 which are secured by spring pins 28.
- the console boards 6a and 6b are removed in a first step. Then the worker releases the bolts 27 from the level below the extension and thereby releases the short leg 4 for removal from the receptacle 25. The worker now turns the removed part such that the long leg 5 is now inserted into the receptacle 25 and the bolts 27 can be inserted into the bores 26 in the long leg. In this way, the short leg 4 is now in a horizontal position and the long leg 5 lies with its spacer 23 on the vertical style 8. Then the console covering is replaced by attaching the console board and the work surface extension is reduced.
- the components are designed to be lightweight so that a scaffold erector can easily handle them on their own, thus ensuring uncomplicated conversion.
- FIG. 3 and Figure 4 show the corresponding further views of the suspension element 3 of the Figure 2 . They are provided with corresponding reference numerals, reference being made to the explanation made above.
- FIG. 5 shows a side view of a suspension element 3a according to the invention, which is provided for mounting on modular scaffolding systems with rosettes.
- the vertical style 8a (shown in dashed lines) comprises a rosette 51, as is known from the prior art.
- the coupling 7a partially engages around the rosette with a mouth 52 which has a receptacle for a securing wedge 53 in the vertical direction.
- a pin 54 is attached to the mouth 52, the diameter of which is adapted to the inside diameter of the profiles which form the short leg 4a and the long leg 5a.
- the legs 4a and 5a do not intersect at one point in the present case but end beforehand in order to enable the pin 54 to be inserted into both legs mutually.
- the legs 4a and 5a are over two struts 55 and 56 connected, which provides the necessary stability.
- the legs also include spacers 23a, which bear against the vertical style, depending on the state of assembly.
- the legs 4a and 5a and the pin 54 have a matching bore 57 through which a securing bolt 58 can be passed.
- the bolt 58 itself can in turn be secured through a further bore 59 by a spring pin.
- the version of the suspension element 3a shown is designed for scaffolding floors with hanging means, for example in the form of U-profiles, as a result of which no locking pins are required.
- Figure 6 shows the second mounting position of the device according to Fig. 5 .
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Movable Scaffolding (AREA)
- Ladders (AREA)
Description
Die Erfindung betrifft eine Gerüstkonsole bzw. eine Gerüstkonsolenerweiterung nach dem Oberbegriff des Patentanspruchs 1.The invention relates to a scaffold console or a scaffold console extension according to the preamble of patent claim 1.
Im Bereich des Gerüstbaus stellt sich dem Gerüstbaufachmann oftmals die Aufgabe, bestehende Arbeitsebenen in Form von Gerüstbodenbelägen in ihrer zur Verfügung stehenden Arbeitsbreite zu erweitern und auf diese Weise zusätzliche Standfläche für auf dem Gerüst arbeitende Handwerker zur Verfügung zu stellen. Gleichzeitig gilt es zu beachten, dass insbesondere im Bereich von Fassadenarbeiten, hier vorzugsweise bei Fassadendämmungen, eventuell auf einer Gebäudefassade auftragende Materialien angebracht werden, welche in einem Zwischenraum zwischen dem errichteten Gerüst insbesondere den darauf angebrachten Arbeitsebenen, und der Hausfassade untergebracht werden müssen. Hierzu ist es entsprechend notwendig, beim Aufbau des Gerüsts vor einer Fassade einen ausreichenden Abstand zwischen den Gerüstelementen, beispielsweise den Vertikalstilen und den Gerüstbodenbelägen, und der Fassade einzuhalten, damit die anzubringenden Materialien an der kompletten Fassadenfläche problemlos montiert werden, und auf der fassadenseitigen Seite des Gerüsts an dem Gerüst vorbei geführt werden können.In the area of scaffolding, the scaffolding specialist often has the task of expanding existing working levels in the form of scaffolding floor coverings in their available working width and in this way making additional stand space available for craftsmen working on the scaffolding. At the same time, it should be noted that, particularly in the area of facade work, here preferably for facade insulation, materials that may be applied to a building facade must be attached, which must be accommodated in an intermediate space between the erected scaffolding, in particular the working levels attached to it, and the house facade. For this purpose, it is correspondingly necessary to maintain a sufficient distance between the scaffolding elements, for example the vertical styles and the scaffolding floor coverings, and the facade when setting up the scaffolding, so that the materials to be attached can be easily installed on the entire facade surface and on the facade side of the Scaffold can be guided past the scaffold.
Problematisch stellt sich hierbei oft die vor einer derartigen Bearbeitung einer Fassade erforderliche Vorbereitung der Fassade und des Gerüsts dar, da hierbei ein vergrößerter Abstand zwischen den Arbeitsflächen bzw. Standflächen der Handwerker, also den entsprechenden Gerüstböden und der Fassade vorgehalten werden muss. Hieraus ergeben sich insbesondere Sicherheitsrisiken, da durch eventuell notwendige zu große Abstände der erforderliche Absturzschutz nicht gewährleistet werden kann. Nach den jeweils gültigen Vorschriften ist beim Gerüstbau stets darauf zu achten, dass eine maximale vorgegebene Spaltbreite zwischen einer Gebäudefassade und dem Gerüst nicht überschritten wird, um das Risiko von herunterfallenden Gegenständen oder gar abstürzenden Personen zu minimieren bis auszuschließen.Often, the preparation of the facade and the scaffolding required before machining a facade in this way is problematic, since here there is an increased distance between the work surfaces or standing surfaces of the craftsmen, that is to say the corresponding ones Scaffolding floors and the facade must be kept. This results in particular security risks, since the necessary fall protection cannot be guaranteed if the gaps are too large. According to the applicable regulations, it must always be ensured that the maximum gap between a building facade and the scaffolding is not exceeded in order to minimize or to eliminate the risk of falling objects or even falling people.
Zu diesem Zweck sind aus dem Stand der Technik Gerüsterweiterungskonsolen, welche in der Ebene eines Gerüstbodenbelags im Bereich zwischen der Hausfassade und dem Gerüst angeordnet werden können, bekannt, um eine derartige Variation des Abstand zwischen Fassade und Gerüst zu kompensieren. Beispielsweise zeigt die
Nachteilig an den Konsolen aus dem Stand der Technik ist, dass diese kompliziert und aufwendig im Aufbau sind und aufwendig montiert werden müssen, so dass eine erhebliche Anstrengung unternommen werden muss, um beispielsweise beim Vorbeiführen einer aufzubringenden Wärmedämmung an einer Gebäudefassade die Gerüstkonsole zu demontieren. Zusätzlich sind im Gerüstbau bewegliche Teile stets unvorteilhaft, da diese in Gegenwart von Farben, Putz, Mörtel oder ähnlichen Materialien verschmutzen oder verkleben können, und somit deren Bedienung erschwert oder unmöglich wird. ZusätzlichA disadvantage of the brackets from the prior art is that they are complicated and complex in construction and have to be assembled in a complex manner, so that a considerable effort has to be made, for example in order to Passing thermal insulation to be applied to a building facade to dismantle the scaffold bracket. In addition, moving parts in scaffolding are always disadvantageous because they can become dirty or stick in the presence of paint, plaster, mortar or similar materials, making their operation difficult or impossible. In addition
können derartige Mechaniken im rauen Alltag des Gerüstbaus auf der Baustelle deformiert werden, so dass sie verklemmen oder verkeilen.Such mechanics can be deformed in the rough everyday work of scaffolding on the construction site, so that they jam or wedge.
Aus dem Dokument
Weiterhin ist aus dem Dokument
Aus dem Dokument
Aufgabe der Erfindung ist daher, eine Gerüstkonsole zur Verfügung zu stellen, welche aus weniger Einzelteilen besteht und damit rationeller gefertigt ist und besser gehandhabt werden kann.The object of the invention is therefore to provide a scaffold console which consists of fewer individual parts and is therefore more rationally manufactured and can be handled better.
Diese Aufgabe wird durch eine Gerüstkonsole ausgehend vom Oberbegriff des Patentanspruchs 1 durch die kennzeichnenden Merkmale des Patentanspruchs gelöst. Vorteilhafte Weiterbildungen sowie zweckmäßige Ausgestaltungen sind in den abhängigen Patentansprüchen angegeben.This object is achieved by a scaffold console based on the preamble of claim 1 by the characterizing features of the claim. Advantageous further developments and expedient refinements are specified in the dependent claims.
Ausgehend von einer Gerüstkonsole zur Verbreiterung eines von Ständern getragenen Belags eines Gerüsts ist es vorgesehen, dass diese ein erstes Tragmittel, ein zweites Tragmittel und einen auf die Tragmittel auflegbaren Konsolenbelag umfasst, wobei die beiden Tragmittel jeweils als Winkel mit einem ersten kurzen Schenkel und einem zweiten langen Schenkel ausgebildet sind, wobei diese beiden Schenkel in einem rechten Winkel zueinander stehen, wobei die beiden Tragmittel jeweils wahlweise mit dem ersten kurzen Schenkel oder dem zweiten langen Schenkel an den Ständern des Gerüsts fixierbar sind und wobei der Konsolenbelag auf die waagrecht orientierten Schenkel der Tragmittel auflegbar ist.Starting from a scaffold console for widening a covering of a scaffold supported by stands, it is provided that that this comprises a first suspension element, a second suspension element and a bracket covering that can be placed on the suspension element, the two suspension elements each being designed as an angle with a first short leg and a second long leg, these two legs being at a right angle to one another, wherein the two suspension elements can each be fixed with the first short arm or the second long arm to the uprights of the scaffold and the console covering can be placed on the horizontally oriented arms of the suspension element.
Eine auf diese Weise ausgebildete Gerüstkonsole bietet die Möglichkeit, im Bedarfsfall einer vergrößerten Arbeitsflächenerweiterung den Konsolenbelag auf der Seite des langen Schenkels aufzulegen, und den kurzen Schenkel zur Befestigung an einem Ständer des Gerüsts vorzusehen. Im Bedarfsfall einer kleineren Arbeitsflächenerweiterungen, also während oder nach erfolgter Aufbringung eines Materials auf einer Fassade, kann das Tragmittel entsprechend gedreht, und mit seinem langen Schenkel an dem Ständer befestigt werden, so dass auf dem kurzen Schenkel ein verkleinerter Konsolenbelag auflegbar ist.A scaffold console designed in this way offers the possibility of placing the console covering on the side of the long leg in the case of an enlarged work surface extension, and of providing the short leg for attachment to a stand of the scaffold. If a smaller work surface extension is required, i.e. during or after a material has been applied to a facade, the suspension element can be rotated accordingly and attached to the stand with its long leg, so that a smaller bracket covering can be placed on the short leg.
Weiterhin umfasst die Gerüstkonsole eine Kupplung, welche wahlweise an dem kurzen Schenkel oder dem langen Schenkel des Tragmittels befestigbar ist.Furthermore, the scaffold console comprises a coupling, which can optionally be attached to the short leg or the long leg of the suspension element.
Eine derartige Kupplung dient zur einfachen Befestigung der Gerüstkonsole am Gerüstrahmen, so dass beim Wechsel des am Rahmen befestigten Schenkel nur die Kupplung geöffnet werden muss, und nicht eine Demontage der kompletten Konsole zu erfolgen hat. Dies bildet insbesondere dann einen Vorteil, wenn ein System von Gerüstrahmen verwendet wird, bei welchem aufgelegte Bodenbeläge und/oder aufgebaute Rahmenteile Sicherungsfunktionen erfüllen, und somit nicht ohne weiteres bei aufgebauten Gerüst gelöst oder gar entfernt werden dürfen.Such a coupling is used for simple attachment of the scaffold console to the scaffold frame, so that when the leg attached to the frame is changed, only the coupling has to be opened and not a dismantling of the complete console has taken place. This is particularly advantageous if a system of scaffolding frames is used, in which the floor coverings and / or frame parts that have been put on perform safety functions, and thus must not be easily removed or even removed when the scaffold is set up.
Erfindungsgemäß ist es vorgesehen, dass die Kupplung mittels wenigstens eines Bolzens und eines Federstifts mit dem Tragmittel verbindbar ist.According to the invention, it is provided that the coupling can be connected to the suspension element by means of at least one bolt and a spring pin.
Auf diese Weise ist eine Sicherung gegen versehentliches herausrutschten gegeben.This provides protection against accidental slipping out.
Eine vorteilhafte Weiterbildung der Gerüstkonsole sieht vor, dass der kurze Schenkel und der lange Schenkel des Tragmittels durch eine Strebe verbunden sind, wobei die Strebe insbesondere zwischen freien Enden der Schenkel, gegenüber deren Kreuzungspunkt verläuft. Dies erzeugt zusätzliche Stabilität.An advantageous development of the scaffold bracket provides that the short leg and the long leg of the suspension element are connected by a strut, the strut running in particular between free ends of the legs, opposite their point of intersection. This creates additional stability.
Eine weitere Ausgestaltung der Gerüstkonsole ist dadurch gekennzeichnet, dass der kurze Schenkel und der lange Schenkel des Tragmittels durch zwei Streben verbunden sind, was weitere Stabilität bereitstellt, ohne die Funktionalität einzuschränken.A further embodiment of the scaffold console is characterized in that the short leg and the long leg of the suspension element are connected by two struts, which provides further stability without restricting the functionality.
In einer Variation der erfindungsgemäßen Gerüstkonsole umfasst die Kupplung einen Stift, mit welchem die Kupplung in einem Eckbereich des Tragmittels wahlweise in den kurzen Schenkel oder den langen Schenkel des Tragmittels einsteckbar ist, wobei die Schenkel außerhalb des Eckbereichs liegen und sich mit Öffnungen zu dem Eckbereich hin öffnen.In a variation of the scaffold console according to the invention, the coupling comprises a pin, with which the coupling can be optionally inserted into the short leg or the long leg of the suspension means in a corner region of the suspension element is, the legs are outside the corner area and open with openings to the corner area.
Auf diese Weise ist das Tragmittel an ein Gerüstsystem mit rosettenartigen Verbindungsmitteln, wie es aus dem Stand der Technik bekannt ist (System "plettac contur", System "assco futuro"), anbringbar.In this way, the suspension element can be attached to a scaffolding system with rosette-like connecting means, as is known from the prior art ("plettac contur" system, "assco futuro" system).
In einer weiteren Variation der erfindungsgemäßen Gerüstkonsole ist vorgesehen, dass die Kupplung eine Aufnahme umfasst, mit welcher die Kupplung wahlweise den kurzen Schenkel oder den langen Schenkel des Tragmittels insbesondere U-förmig umgreift.In a further variation of the scaffold console according to the invention, it is provided that the coupling comprises a receptacle with which the coupling optionally engages around the short leg or the long leg of the suspension element, in particular in a U-shape.
Hierbei wird eine von dem Gerüstsystem unabhängige Kupplung bereitgestellt, welche einerseits mittels der Aufnahme das Tragmittel hält, und andererseits beispielsweise mittels Klemmschellen am Gerüstsystem befestigbar ist.In this case, a coupling is provided which is independent of the scaffolding system and which on the one hand holds the suspension element by means of the receptacle and on the other hand can be fastened to the scaffolding system for example by means of clamps.
In einer Weiterbildung der Gerüstkonsole ist diese dadurch gekennzeichnet, dass die Schenkel zur Befestigung der Kupplung jeweils insbesondere eine Bohrung aufweisen, wobei die Bohrung bzw. die Bohrungen zu inneren Enden der Schenkel insbesondere gleiche Abstände aufweisen.In a further development of the scaffold console, this is characterized in that the legs for fastening the coupling each have in particular a bore, the bore or the bores being in particular at equal distances from the inner ends of the legs.
An derartigen Bohrungen kann die Kupplung unabhängig von der Ausrichtung des Tragmittels angreifen, und/oder es können Sicherungsmittel durchgeführt werden.The coupling can act on such bores regardless of the orientation of the suspension element, and / or securing means can be carried out.
Weiterhin umfasst die Erfindung eine Weiterbildung der Gerüstkonsole, bei welcher an jedem Schenkel ein Abstandhalter angeordnet ist, mit welchem der Schenkel gegenüber dem Ständer des Gerüsts abstützbar ist, wodurch ein sicherer Halt und eine ebene Arbeitsfläche erreicht wird.The invention further comprises a further development of Scaffold console, in which a spacer is arranged on each leg, with which the leg can be supported relative to the stand of the scaffold, as a result of which a secure hold and a flat working surface is achieved.
Eine Weiterbildung der Gerüstkonsole zeigt, dass der lange Schenkel eine Länge aufweist, welche einem Vielfachen einer Länge des kurzen Schenkels entspricht, wobei der lange Schenkel insbesondere doppelt so lang ist wie der kurze Schenkel.A further development of the scaffold console shows that the long leg has a length which corresponds to a multiple of a length of the short leg, the long leg being in particular twice as long as the short leg.
Auf diese Weise kann der Konsolenbelag aus Bestandteilen in einem vorgegebenen Rastermaß ausgebildet werden, so dass standardisierte Teile eingesetzt werden können.In this way, the console covering can be formed from components in a predetermined grid dimension, so that standardized parts can be used.
Eine Weiterbildung der erfindungsgemäßen Gerüstkonsole ist dadurch gegeben, dass der Konsolenbelag an den Tragmitteln nach Art eines herkömmlichen Gerüstbelags befestigbar ist.A further development of the scaffold console according to the invention is given in that the console covering can be fastened to the suspension means in the manner of a conventional scaffolding covering.
Hierbei kommen sowohl die bewährten zapfenartigen Raststifte, welche in entsprechende Lochführungen im Konsolenbelag eingreifen, zum Einsatz, als auch beispielsweise U-förmige Eigenhängemittel in Form kompletter U-Schienen oder einzelner Krallen. Weitere Ausgestaltungen von Befestigungsmittels für Gerüstbeläge sind ebenfalls denkbar.Both the tried-and-tested pin-like locking pins, which engage in corresponding hole guides in the console covering, are used, as are U-shaped self-hanging devices in the form of complete U-rails or individual claws. Further configurations of fasteners for scaffolding coverings are also conceivable.
Eine Ausgestaltung der erfindungsgemäßen Gerüstkonsole ist dadurch gekennzeichnet, dass der Konsolenbelag für den langen Schenkel zwei Konsolenbretter umfasst und dass der Konsolenbelag für den kurzen Schenkel ein Konsolenbrett umfasst.An embodiment of the scaffold console according to the invention is characterized in that the console covering for the long leg comprises two console boards and that the console covering for the short leg comprises a console board.
Der kurze Schenkel könnte hierbei entsprechend versetzt in seiner Befestigung am Gerüstrahmen ausgebildet seien, derart dass der, durch den Wechsel des als Auflage genutzten horizontalen Schenkels überflüssig gewordene Bodenbelag unter den, auf dem kurzen Schenkel aufgelegten Bodenbelag lagerbar ist.The short leg could be designed with a corresponding offset in its attachment to the scaffold frame, so that the floor covering which has become superfluous due to the change of the horizontal leg used as a support can be stored under the floor covering placed on the short leg.
Wie erfindungsgemäße Gerüstkonsole soll anhand des folgenden exemplarischen Ausführungsbeispiels näher erläutert werden.How the scaffold console according to the invention will be explained in more detail using the following exemplary embodiment.
Hierbei zeigen:
- Fig. 1
- Eine schematische Darstellung der beiden Montagezustände eines erfindungsgemäßen Tragmittels mit Konsolenbelag.
- Fig. 2
- Eine Seitenansicht einer Ausführung eines erfindungsgemäßen Tragmittels.
- Fig. 3
- Eine Draufsicht einer Ausführung eines erfindungsgemäßen Tragmittels.
- Fig. 4
- Eine Frontsicht einer Ausführung eines erfindungsgemäßen Tragmittels.
- Fig. 5
- Eine Seitenansicht einer weiteren Ausführung eines erfindungsgemäßen Tragmittels in Montageposition des breiten Konsolenbelags.
- Fig. 6
- Eine Seitenansicht einer weiteren Ausführung eines erfindungsgemäßen Tragmittels in Montageposition des schmalen Konsolenbelags.
- Fig. 1
- A schematic representation of the two assembly states of a suspension element according to the invention with a console covering.
- Fig. 2
- A side view of an embodiment of a suspension element according to the invention.
- Fig. 3
- A top view of an embodiment of a suspension element according to the invention.
- Fig. 4
- A front view of an embodiment of a suspension element according to the invention.
- Fig. 5
- A side view of another embodiment of a suspension element according to the invention in the mounting position of the wide bracket covering.
- Fig. 6
- A side view of another embodiment of a suspension element according to the invention in the mounting position of the narrow console covering.
Im Einzelnen zeigt
Das Tragmittel 3 weißt einen kurzen Schenkel 4 und einen langen Schenkel 5 auf, welche entsprechend der benötigten Breite des Konsolenbelags 6 jeweils mit einer Kupplung 7 an einem Vertikalstil 8 befestigbar sind. Der Konsolenbelag der breiten Arbeitsflächenerweiterung umfasst zwei Konsolenbretter 6a und 6b, von denen im Fall der schmalen Arbeitsflächenerweiterung nur eines eingesetzt wird, und das Zweite entweder an anderer Stelle unterzubringen ist, oder bei entsprechend ausgebildetem Tragmittel 3 (hier nicht dargestellt), unter dem genutzten Tragmittel als Stapel angeordnet werden kann.The
Die Schenkel umfassen weiterhin an Ihren äußeren Enden Abstandshalter 23, welche bei Montage des Schenkels am Vertikalstil 8 daran anliegen und den Schenkel abstützen. Die Abstandshalter können an ihrer Kontaktfläche mit dem Vertikalstil eine Formgebung aufweisen, welche der Form des Vertikalstils angepasst ist, um zusätzlich eine seitliche Fixierung bereitzustellen.The legs further include
In der gezeigten Darstellung ist am kurzen Schenkel 4 eine Kupplung 7 angeordnet, welche mit einer Schelle 24, vorzugsweise eine Schraubklemme an einem Vertikalstil 8 (hier nicht dargestellt) befestigt ist.In the illustration shown, a
Die Kupplung 7 weist weiterhin eine U-förmige Profilaufnahme 25 für den kurzen Schenkel 4 auf, wobei die Aufnahme 25 in Ihrer Dimension auch den langen Schenkel aufnehmen kann. Der kurze Schenkel 4 ist in die Aufnahme 25 eingesetzt derart angeordnet, dass Bohrungen im Schenkel mit korrespondierenden Bohrungen in der Aufnahme 25 in Deckung gebracht werden. Entsprechende Bohrungen 26 sind im langen Schenkel 5 dargestellt. Der Abstand der Bohrungen vom Kreuzungspunkt der Schenkel 4 & 5 ist vorzugsweise identisch ausgebildet, kann aber auch im Fall des Vorsehens einer Stapelung der Konsolenbretter auf dem kurzen Schenkel, entsprechend um die Dicke eines Konsolenbretts versetzt ausgebildet sein. Hierbei sind die Zapfen 22 länger auszubilden, um die Sicherheit zu gewährleisten.The
Die Bohrungen 26 sind zur Durchführung von Bolzen 27 geeignet, welche durch Federstifte 28 gesichert werden. Muss nun im Einsatz der erfindungsgemäßen Gerüstkonsole 3 die Breite der Arbeitsflächenerweiterung geändert werden, so werden in einem ersten Schritt die Konsolenbretter 6a und 6b entnommen. Danach löst der Arbeiter von der unterhalb der Erweiterung liegenden Ebene die Bolzen 27 und gibt dadurch den kurzen Schenkel 4 zur Entnahme aus der Aufnahme 25 frei. Der Arbeiter dreht nun das entnommene Teil derart, dass nunmehr der lange Schenkel 5 in die Aufnahme 25 eingefügt wird, und die Bolzen 27 in die Bohrungen 26 im langen Schenkel einsteckbar sind. Auf diese Weise ist nunmehr der kurze Schenkel 4 in einer horizontalen Position und der lange Schenkel 5 liegt mit seinem Abstandshalter 23 an dem Vertikalstil 8 an. Anschließend wird der Konsolenbelag durch das Anbringen des Konsolenbretts wieder aufgelegt und die Arbeitsflächenerweiterung ist verkleinert. Die Bestandteile sind entsprechend leichtgewichtig ausgebildet, dass ein Gerüstbauer sie problemlos alleine handhaben kann, und somit ein unkomplizierter Umbau gewährleistet ist.The
Am Maul 52 ist ein Stift 54 befestigt, welcher in seinem Durchmesser an den Innendurchmesser der Profile angepasst ist, welche den kurzen Schenkel 4a und den langen Schenkel 5a bilden. Die Schenkel 4a und 5a kreuzen sich im vorliegenden Fall nicht in einem Punkt sondern enden vorher, um ein wechselseitiges Einstecken des Stifts 54 in beide Schenkel zu ermöglichen. Die Schenkel 4a und 5a sind über zwei Streben 55 und 56 verbunden, was die notwendige Stabilität bereitstellt. Die Schenkel umfassen ebenfalls Abstandshalter 23a, welche am Vertikalstil, je nach Montagezustand anliegen.A
Die Schenkel 4a und 5a sowie der Stift 54 weisen eine übereinstimmende Bohrung 57 auf, durch welche ein Sicherungsbolzen 58 geführt werden kann. Der Bolzen 58 selbst kann durch eine weitere Bohrung 59 wiederum durch einen Federstift gesichert werden.The
Die dargestellte Fassung des Tragmittels 3a ist für Gerüstböden mit Einhängemitteln, beispielsweise in Form von U-Profilen ausgebildet, wodurch keine Rastzapfen benötigt werden.The version of the
Die Erfindung ist jedoch nicht auf die dargestellten Ausführungsbeispiele beschränkt, sondern umfasst vielmehr alle diejenigen Ausgestaltungen, welche vom erfindungswesentlichen Gedanken gebrauch machen.However, the invention is not limited to the exemplary embodiments shown, but rather encompasses all those configurations which make use of the idea essential to the invention.
- 11
- GerüstkonsoleScaffold console
- 22nd
- GerüstrahmenScaffolding
- 33rd
- TragmittelSuspension means
- 3a3a
- TragmittelSuspension means
- 44th
- kurzer Schenkelshort leg
- 4a4a
- kurzer Schenkelshort leg
- 55
- langer Schenkellong leg
- 5a5a
- langer Schenkellong leg
- 66
- KonsolenbelagConsole covering
- 6a6a
- KonsolenbrettConsole board
- 6b6b
- KonsolenbrettConsole board
- 77
- Kupplungclutch
- 7a7a
- Kupplungclutch
- 88th
- VertikalstilVertical style
- 8a8a
- VertikalstilVertical style
- 2121
- Strebestrut
- 2222
- RastzapfenLocking pin
- 2323
- AbstandshalterSpacers
- 23a23a
- AbstandshalterSpacers
- 2424th
- Schelleclamp
- 2525th
- Aufnahmeadmission
- 2626
- Bohrungdrilling
- 2727
- Bolzenbolt
- 2828
- FederstiftSpring pin
- 5151
- Rosetterosette
- 5252
- MaulMouth
- 5353
- Keilwedge
- 5454
- Stiftpen
- 5555
- Strebestrut
- 5656
- Strebestrut
- 5757
- Bohrungdrilling
- 5858
- Bolzenbolt
- 5959
- Bohrungdrilling
Claims (10)
- Scaffold bracket (1) for the purposes of widening a decking, which is supported by uprights, of a scaffold, comprising a first supporting means (3), a second supporting means (3a) and a bracket decking (6) which can be placed on the supporting means (3, 3a), wherein the two supporting means (3, 3a) are each configured as angles with a first short limb (4, 4a) and a second long limb (5, 5a), wherein said two limbs (4, 4a; 5, 5a) are at a right angle with respect to each other, wherein the two supporting means (3, 3a) can be fixed to the uprights (8, 8a) of the scaffold in each case either with the first short limb (4, 4a) or the second long limb (5, 5a), wherein the bracket decking (6) can be placed on the horizontally oriented limbs (4, 4a; 5, 5a) of the supporting means (3, 3a) as an extension of a working plane, wherein the scaffold bracket (1) comprises a coupling (7) which can be fastened either to the short limb (4, 4a) or the long limb (5, 5a) of the supporting means, characterized in that the coupling (7) can be connected to the supporting means (3, 3a) by means of at least one bolt (27; 58) and a spring pin (28).
- Scaffold bracket according to Claim 1, characterized in that the short limb (4, 4a) and the long limb (5, 5a) of the supporting means (3, 3a) are connected by a strut (21), wherein the strut (21) in particular extends between free ends of the limbs (4, 4a; 5, 5a).
- Scaffold bracket according to Claim 1, characterized in that the short limb (4, 4a) and the long limb (5, 5a) of the supporting means (3, 3a) are connected by two struts.
- Scaffold bracket according to one of the preceding claims, characterized in that the coupling (7) comprises a pin (54), by means of which the coupling (7) can be plugged, in a corner region of the supporting means (3a), either into the short limb (4a) or the long limb (5a) of the supporting means (3a), wherein the limbs (4a; 5a) lie outside the corner region and open with openings in the direction of the corner region.
- Scaffold bracket according to one of Claims 1 to 3, characterized in that the coupling (7) comprises a receptacle (25), by means of which the coupling (7) engages, in particular in a U-shaped manner, around either the short limb (4) or the long limb (5) of the supporting means (3).
- Scaffold bracket according to one of the preceding claims, characterized in that, for the purposes of fastening the coupling (7), the limbs (4, 4a; 5, 5a) each in particular have a bore (26; 57), wherein the bore (26; 57) or the bores (26; 57) in particular have the same spacings with respect to inner ends of the limbs (4, 4a; 5, 5a).
- Scaffold bracket according to one of the preceding claims, characterized in that a spacer (23; 23a) is arranged on each limb (4, 4a; 5, 5a), by means of which the limb (4, 4a; 5, 5a) can be supported in relation to the upright of the scaffold.
- Scaffold bracket according to one of the preceding claims, characterized in that the long limb (5, 5a) has a length which corresponds to a multiple of the length of the short limb (4, 4a), wherein the long limb (5, 5a) is in particular twice as long as the short limb (4, 4a).
- Scaffold bracket according to one of the preceding claims, characterized in that the bracket decking (6) can be fastened in the manner of a conventional scaffold decking to the supporting means (3, 3a).
- Scaffold bracket according to one of the preceding claims, characterized in that the bracket decking (6) for the long limb (5, 5a) comprises two bracket boards, and in that the bracket decking (6) for the short limb (4, 4a) comprises one bracket board.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE102009030838A DE102009030838A1 (en) | 2009-06-26 | 2009-06-26 | Scaffold change console |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2267242A2 EP2267242A2 (en) | 2010-12-29 |
EP2267242A3 EP2267242A3 (en) | 2012-08-22 |
EP2267242B1 true EP2267242B1 (en) | 2020-03-25 |
Family
ID=42983275
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10005547.4A Active EP2267242B1 (en) | 2009-06-26 | 2010-05-28 | Swap bracket |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP2267242B1 (en) |
DE (1) | DE102009030838A1 (en) |
DK (1) | DK2267242T3 (en) |
ES (1) | ES2797482T3 (en) |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102014220241B4 (en) * | 2014-10-07 | 2021-01-07 | Kurt Krieg | Scaffolding |
DE202014104909U1 (en) | 2014-10-15 | 2016-01-18 | Altrad Plettac Assco Gmbh | Console and scaffolding |
DE102015100485A1 (en) * | 2015-01-14 | 2016-07-14 | Wilhelm Layher Verwaltungs-Gmbh | Scaffolding element, in particular for a scaffolding |
CA3019900C (en) | 2016-03-07 | 2023-09-26 | Safway Services, Llc | Adjustable platform extension bracket for work platform systems and related methods |
RS60260B1 (en) * | 2017-08-16 | 2020-06-30 | Tobler Ag | Scaffold with bracket |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US347659A (en) * | 1886-08-17 | speingeb | ||
FR1153349A (en) * | 1955-11-15 | 1958-03-05 | Acrow Eng Ltd | scaffolding |
DE29912557U1 (en) * | 1999-07-17 | 1999-10-07 | Wilhelm Layher Vermögensverwaltungs-GmbH, 74363 Güglingen | Console device for scaffolding |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CH378517A (en) * | 1960-07-06 | 1964-06-15 | Pfenniger Walter | Scaffolding bracket |
FR2721961B1 (en) * | 1994-06-29 | 1996-09-06 | Goubaud Michel | SCAFFOLDING CONSOLE |
DE19926592B4 (en) | 1998-09-09 | 2005-08-18 | Dietrich, Stephan, Dipl.-Ing. (FH) | Adjustable console for a scaffolding |
US6126127A (en) | 1998-10-15 | 2000-10-03 | Redev Management Corporation | Bracket assembly |
-
2009
- 2009-06-26 DE DE102009030838A patent/DE102009030838A1/en not_active Ceased
-
2010
- 2010-05-28 DK DK10005547.4T patent/DK2267242T3/en active
- 2010-05-28 ES ES10005547T patent/ES2797482T3/en active Active
- 2010-05-28 EP EP10005547.4A patent/EP2267242B1/en active Active
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US347659A (en) * | 1886-08-17 | speingeb | ||
FR1153349A (en) * | 1955-11-15 | 1958-03-05 | Acrow Eng Ltd | scaffolding |
DE29912557U1 (en) * | 1999-07-17 | 1999-10-07 | Wilhelm Layher Vermögensverwaltungs-GmbH, 74363 Güglingen | Console device for scaffolding |
Also Published As
Publication number | Publication date |
---|---|
EP2267242A3 (en) | 2012-08-22 |
EP2267242A2 (en) | 2010-12-29 |
DK2267242T3 (en) | 2020-06-29 |
ES2797482T3 (en) | 2020-12-02 |
DE102009030838A1 (en) | 2010-12-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2685111B1 (en) | Clamp piece for a detachable connection of two profile pieces | |
DE2704398B2 (en) | Framework that can be assembled from uprights and bars | |
WO2002103136A2 (en) | Dismountable scaffolding | |
EP2267242B1 (en) | Swap bracket | |
DE102010022415B4 (en) | Mounting tab for suspended ceilings | |
EP1338723B1 (en) | Mounting device for a temporary scaffolding safety rail | |
CH716837A1 (en) | Wind bandage and furniture kit. | |
DE2624518A1 (en) | SUPPORT DEVICE, IN PARTICULAR FOR BEARING SHELLING EQUIPMENT IN CONCRETE CONSTRUCTION | |
DE202023105830U1 (en) | Device for attaching fall protection to scaffolding | |
DE102021004490A1 (en) | Modular scaffolding and modular scaffolding bars for such | |
DE102010035330B4 (en) | Device for fastening a drill stand for a drilling machine | |
EP2949833B1 (en) | Fastening element for railings for detachable attachment to a frame element, frame element, assembly of a railing and a fixing element and method for fixing and for securing a fastening element | |
DE3108020A1 (en) | "PROTECTIVE DEVICE FOR METAL FRAME" | |
DE102007019876B4 (en) | Device for mounting and processing prefabricated components | |
DE3401906A1 (en) | Apparatus for the suspended fastening of a scaffold element | |
EP1362150B1 (en) | Scaffolding frame for a system scaffold | |
DE102013000105A1 (en) | Device for preventing crashes | |
EP2189594B1 (en) | Railing protection device, railing protection assembly and crash guard | |
DE19755762A1 (en) | Security grating for doors and windows | |
DE102014222247A1 (en) | Side railing for a scaffold tower | |
EP3839172B1 (en) | Railing post for a front railing, front railing for temporarily preventing falls from a new scaffolding level, scaffold for building, repair and/or assembly work and method for constructing a scaffold | |
DE9310107U1 (en) | Plasterer tripod | |
DE102019117190B4 (en) | Device for the front end of a trench shoring unit | |
EP2275625A2 (en) | Scaffolding structure for main scaffolding and secondary scaffolding, particularly a scaffolding stairway | |
DE19946929A1 (en) | Device to connect two adjacent parts of system scaffolding for erections with non-rectangular bases; has connection elements for scaffolding elements with connection piece having connection heads |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME RS |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME RS |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 5/06 20060101AFI20120716BHEP |
|
17P | Request for examination filed |
Effective date: 20130108 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170412 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 502010016543 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: E04G0005060000 Ipc: E04G0001150000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E04G 1/15 20060101AFI20191003BHEP Ipc: E04G 5/06 20060101ALI20191003BHEP |
|
INTG | Intention to grant announced |
Effective date: 20191018 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1248734 Country of ref document: AT Kind code of ref document: T Effective date: 20200415 Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502010016543 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: KELLER AND PARTNER PATENTANWAELTE AG, CH |
|
REG | Reference to a national code |
Ref country code: FI Ref legal event code: FGE |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 Effective date: 20200622 |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200625 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200626 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PFA Owner name: ALTRAD PLETTAC ASSCO GMBH, DE Free format text: FORMER OWNER: ALTRAD PLETTAC ASSCO GMBH, DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200818 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200725 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2797482 Country of ref document: ES Kind code of ref document: T3 Effective date: 20201202 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502010016543 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
26N | No opposition filed |
Effective date: 20210112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200528 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 20210519 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20210525 Year of fee payment: 12 Ref country code: FI Payment date: 20210520 Year of fee payment: 12 Ref country code: NL Payment date: 20210519 Year of fee payment: 12 Ref country code: CZ Payment date: 20210527 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20210521 Year of fee payment: 12 Ref country code: CH Payment date: 20210519 Year of fee payment: 12 Ref country code: BE Payment date: 20210519 Year of fee payment: 12 Ref country code: AT Payment date: 20210520 Year of fee payment: 12 Ref country code: SE Payment date: 20210519 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20210721 Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200325 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20220531 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20220601 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 1248734 Country of ref document: AT Kind code of ref document: T Effective date: 20220528 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220529 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220528 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220528 Ref country code: CZ Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220528 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220528 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220601 |
|
P01 | Opt-out of the competence of the unified patent court (upc) registered |
Effective date: 20230526 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230728 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220529 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240522 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240517 Year of fee payment: 15 |