EP1118185B1 - Communication system for radio-contolled driving - Google Patents
Communication system for radio-contolled driving Download PDFInfo
- Publication number
- EP1118185B1 EP1118185B1 EP99959193A EP99959193A EP1118185B1 EP 1118185 B1 EP1118185 B1 EP 1118185B1 EP 99959193 A EP99959193 A EP 99959193A EP 99959193 A EP99959193 A EP 99959193A EP 1118185 B1 EP1118185 B1 EP 1118185B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- radio
- route
- communication system
- gateway computer
- vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L3/00—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal
- B61L3/02—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control
- B61L3/08—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically
- B61L3/12—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves
- B61L3/125—Devices along the route for controlling devices on the vehicle or train, e.g. to release brake or to operate a warning signal at selected places along the route, e.g. intermittent control simultaneous mechanical and electrical control controlling electrically using magnetic or electrostatic induction; using radio waves using short-range radio transmission
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/20—Trackside control of safe travel of vehicle or train, e.g. braking curve calculation
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L11/00—Operation of points from the vehicle or by the passage of the vehicle
- B61L11/08—Operation of points from the vehicle or by the passage of the vehicle using electrical or magnetic interaction between vehicle and track
- B61L2011/086—German radio based operations, called "Funkfahrbetrieb" [FFB]
Definitions
- the invention relates to a communication system for radio operation according to the preamble of claim 1 and is applicable, for example, for rail services.
- Control of rail operations is often done using punctiform or linear train control.
- punctiform train control z. B. at stationary Route facilities Information from and to the passing vehicle Vehicles transmitted.
- linear Train control is a quasi-constant transmission of information from the route to the vehicles and vice versa possible.
- Information transmission has already been proposed to be carried out by radio (inter alia known as radio train interference - FZB).
- the data to be transmitted provided by signal boxes or control centers, which also the complete control of the route facilities (level crossings, Turnouts, station facilities), taking the current Location of one or more trains as the most important Information is processed.
- a communication device is known from DE 197 21 246, with which with only a single transmission channel both the data from decentralized control devices as well as the data of central services transmitted to a train can be. To do this, all this data is provided to a central gateway computer. This causes then the data transfer to the vehicle. By using it a central gateway computer assigned to the train it is possible to transmit all data in the multiplex, without the move of the train by changing into one new route area a new transmission route between train and central rail services got to.
- This method enables the multiplexing of several logical ones Connections from a vehicle via a physical Radio channel to a landline gateway that the Connections to any endpoints within the fixed network can pass on.
- the invention has for its object a communication system to create for the radio driving operation, which with simple Means reliable traffic through effective Communication paths with only one radio transmission channel between vehicles and possibly several track elements and the effort for system setup, system update and system maintenance minimized.
- a particular advantage of the invention is that a only mobile device on the vehicle is sufficient to Communicate with multiple track elements simultaneously can by the radio connections for data transmission from the vehicles to the track elements in places, d. H. where there is a high density of track elements is present, not manufactured directly, but via one Gateway computers are conveyed. The price of this is that for communication with n route elements (n + 1) radio communications required are. Without multiplexing this requires n radio communications.
- n route elements n + 1
- the gateway functionality during radio operation double-track or multi-track routes consists of the Communication with level crossings generally via the gateway computer to convey. This is the only way that two or multiple trains communicate with the level crossing at the same time. Without a gateway computer, this would have to be done one after the other can lead to operational disabilities.
- Another advantage of the method is that immediate stop instructions, from the radio control center if required be sent to the vehicles by radio, in areas with high track element density via the multiplex channel can be transmitted immediately. This also applies for high-priority data sent to all receiving entities of the multiplex channel can be sent by radio.
- Figure 1 illustrates the mechanism using an example of a Section consisting of two switches W1, W2 and a level crossing BÜ.
- a gateway computer FBS After the first connection request from vehicle F to one of these three track elements (e.g. to the level crossing level crossing) via a gateway computer FBS every additional connection request has been realized from the vehicle F to another route element W1, W2 via the same physical connection to the gateway computer FBS "multiplexed" and relayed from there to the desired one Track element W1 or W2 or level crossing.
- connection to the route elements W1, W2 or BÜ can be optimized in this way. So would have to be without multiplexing the three communications carried out one after the other become. Multiplexing enables communication phases of the individual Communications take place largely overlapping in time.
- multiplexing is via Gateway computer completely transparent; i.e. it is not visible the way the connection is conveyed.
- the telegrams differ at the interface to the safe Do not use telegrams directly (without the detour via the gateway computer) to a route element become.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Mobile Radio Communication Systems (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Electric Propulsion And Braking For Vehicles (AREA)
- Input Circuits Of Receivers And Coupling Of Receivers And Audio Equipment (AREA)
- Lubrication Of Internal Combustion Engines (AREA)
Abstract
Description
Die Erfindung betrifft ein Kommunikationssystem für den Funk-Fahrbetrieb nach dem Oberbegriff des Patentanspruches 1 und ist anwendbar beispielsweise für Bahndienste.The invention relates to a communication system for radio operation according to the preamble of claim 1 and is applicable, for example, for rail services.
Die Steuerung des Bahnbetriebs geschieht häufig unter Verwendung der punkt- oder linienförmigen Zugbeeinflussung. Bei der punktförmigen Zugbeeinflussung werden z. B. an ortsfesten Streckeneinrichtungen Informationen von und an die vorüberfahrenden Fahrzeuge übermittelt. Bei der moderneren linienförmigen Zugbeeinflussung ist eine quasi ständige Informationsübermittlung von der Strecke an die Fahrzeuge und umgekehrt möglich. Es wurde bereits vorgeschlagen, die Informationsübermittlung per Funk vorzunehmen (u. a. bekannt als Funkzugbeeinflussung - FZB). Die zu übermittelnden Daten werden von Stellwerken oder Leitstellen bereitgestellt, die auch die gesamte Steuerung der Streckeneinrichtungen (Bahnübergänge, Weichen, Bahnhofseinrichtungen) übernehmen, wobei der augenblickliche Aufenthaltsort eines bzw. mehrerer Züge als wichtigste Information verarbeitet wird.Control of rail operations is often done using punctiform or linear train control. In the punctiform train control z. B. at stationary Route facilities Information from and to the passing vehicle Vehicles transmitted. With the more modern linear Train control is a quasi-constant transmission of information from the route to the vehicles and vice versa possible. Information transmission has already been proposed to be carried out by radio (inter alia known as radio train interference - FZB). The data to be transmitted provided by signal boxes or control centers, which also the complete control of the route facilities (level crossings, Turnouts, station facilities), taking the current Location of one or more trains as the most important Information is processed.
Bekannt ist hierfür aus der DE 197 21 246 eine Kommunikationseinrichtung, mit welcher mit nur einem einzigen Übertragungskanal sowohl die Daten von dezentralen Steuereinrichtungen als auch die Daten zentraler Dienste an einen Zug übermittelt werden können. Dazu ist vorgesehen, alle diese Daten einem zentralen Gatewayrechner zuzuführen. Dieser veranlasst dann die Datenübermittlung an das Fahrzeug. Durch die Verwendung eines zentralen Gatewayrechners, der dem Zug zugeordnet ist, ist es möglich, sämtliche Daten im Multiplex zu übertragen, ohne dass beim Vorrücken des Zuges durch Wechsel in einen neuen Streckenbereich eine neue Übertragungsstrecke zwischen dem Zug und den zentralen Bahndiensten aufgebaut werden muss.For this purpose, a communication device is known from DE 197 21 246, with which with only a single transmission channel both the data from decentralized control devices as well as the data of central services transmitted to a train can be. To do this, all this data is provided to a central gateway computer. This causes then the data transfer to the vehicle. By using it a central gateway computer assigned to the train it is possible to transmit all data in the multiplex, without the move of the train by changing into one new route area a new transmission route between train and central rail services got to.
Weiterhin wird für eine funkgestützte, linienförmige Zugbeeinflussung zur Vermeidung langer Kommunikationswege in der DE 198 32 594 ein optimiertes Kommunikationssystem beschrieben, welches neben den ortsfesten zentralen Diensten und den ortsfesten dezentralen Steuerstellen in dem Verkehrsnetz ein oder mehrere dezentrale Gatewayrechner aufweist. Die Kommunikation zwischen den mobilen Instanzen und den ortsfesten Instanzen wird über die Gatewayrechner realisiert, indem für die mobilen Instanzen, die mit den Gatewayrechnern kommunizieren, im Gatewayrechner und in den ortsfesten Instanzen je eine Stellvertreterinstanz und für die ortsfesten Instanzen, die mit den Gatewayrechnern kommunizieren, im Gatewayrechner direkt oder über mindestens einen Informationsserver indirekt Stellvertreterinstanzen eingerichtet werden. Über ein Updateverfahren zwischen den Stellvertreterinstanzen im Gatewayrechner und den ortsfesten Instanzen direkt oder zwischen Gatewayrechner und Informationsserver werden die Stellvertreterinformationen im Gatewayrechner und in den ortsfesten Instanzen aktualisiert.Furthermore, for radio-based, linear train control to avoid long communication paths in the DE 198 32 594 describes an optimized communication system, which in addition to the fixed central services and the fixed, decentralized control points in the transport network or has several decentralized gateway computers. The communication between the mobile instances and the fixed instances is realized via the gateway computer by for the mobile entities that communicate with the gateway computers, each in the gateway computer and in the fixed instances a deputy and for the fixed instances, that communicate with the gateway computers in the gateway computer directly or indirectly via at least one information server Substitute instances can be set up. Via an update procedure between the proxy instances in the gateway computer and the fixed instances directly or between gateway computers and information server become the proxy information in the gateway computer and in the stationary Instances updated.
Dieses Verfahren ermöglicht das Multiplexen mehrerer logischer Verbindungen von einem Fahrzeug über einen physikalischen Funkkanal zu einem festnetzseitigen Gateway, das die Verbindungen zu beliebigen Endpunkten innerhalb des Festnetzes weitervermitteln kann. This method enables the multiplexing of several logical ones Connections from a vehicle via a physical Radio channel to a landline gateway that the Connections to any endpoints within the fixed network can pass on.
Funkgestützte Systeme zur linienförmigen Zugbeeinflussung erfordern wegen ihrer zentralen Einrichtungen indessen einen hohen technischen, insbesondere rechentechnischen Aufwand.Require radio-based systems for linear train control because of their central facilities high technical, especially computational effort.
Es ist deshalb unter dem Begriff "Funk-Fahrbetrieb (FFB)" ein weiteres Betriebsverfahren entwickelt worden, welches die Funktionen "Fahrwegeinstellung" und "Fahrwegsicherung" auf dem Fahrzeug, und nicht wie bisher zentralisiert im Streckennetz, realisiert. Der Befehl zur Betätigung einer Streckeneinrichtung (Weiche, Bahnübergang etc.) erfolgt hierbei per Funk durch das Fahrzeug selbst. Eine Verbindung zu zentralen Einrichtungen erfolgt höchstens noch hinsichtlich zentraler Dispositionsaufgaben (Fahrwegzuteilung, Fahrplanüberwachung, Notinformationen u. ä.). Ein Problem stellt dabei die beschränkte Ressource an Funkkanälen vom Fahrzeug zur Strecke und die zugehörigen langen Verbindungsaufbauzeiten (20-25 sec. inklusive Aufbau der Sicherungsschicht) dar. Abhängig von der Fahrzeuggeschwindigkeit und der Dichte von Fahrwegelementen, die das Fahrzeug einstellen und sichern muss, müssen mehrere Funkkommunikationen gleichzeitig vom Fahrzeug durchgeführt werden. Der vorgesehene Funkstandard für Bahn-Anwendungen stellt pro Endgerät nur einen Funkanal für die Datenkommunikation zur Verfügung. Selbst wenn zwei mobile Funk-Endgeräte auf dem Fahrzeug verwendet werden, kann es zu Engpässen kommen.It is therefore under the term "radio driving operation (FFB)" further operating procedures have been developed which the Functions "Route setting" and "Route protection" on the vehicle, and not centralized in the route network as before, realized. The command to operate a route facility (Switch, level crossing, etc.) is done by Radio through the vehicle itself. A connection to central At most, facilities are still central Disposition tasks (route allocation, schedule monitoring, Emergency information and ä.). One problem is the limited one Resource on radio channels from the vehicle to the route and the associated long connection setup times (20-25 sec. including the structure of the data link layer). Depends the vehicle speed and the density of track elements, that the vehicle must set and secure multiple radio communications from the vehicle at the same time be performed. The intended radio standard for railway applications provides only one radio channel for each device Data communication available. Even if two mobile Radio end devices can be used on the vehicle, too Bottlenecks come.
Der Erfindung liegt die Aufgabe zugrunde, ein Kommunikationssystem für den Funk-Fahrbetrieb zu schaffen, welches mit einfachen Mitteln einen zuverlässigen Datenverkehr über effektive Kommunikationswege mit nur einem Funkübertragungskanal zwischen Fahrzeugen und ggf. mehreren Fahrwegelementen ermöglicht und den Aufwand für die Systemeinrichtung, Systemaktualisierung und Systemwartung minimiert. The invention has for its object a communication system to create for the radio driving operation, which with simple Means reliable traffic through effective Communication paths with only one radio transmission channel between vehicles and possibly several track elements and the effort for system setup, system update and system maintenance minimized.
Diese Aufgabe wird erfindungsgemäß gelöst durch die Merkmale im kennzeichnenden Teil des Anspruches 1 in Verbindung mit den Merkmalen im Oberbegriff. Zweckmäßige Ausgestaltung der Erfindung sind in den Unteransprüchen enthalten.According to the invention, this object is achieved by the features in the characterizing part of claim 1 in conjunction with the characteristics in the generic term. Appropriate design of the Invention are contained in the subclaims.
Ein besonderer Vorteil der Erfindung besteht darin, dass ein einziges mobiles Endgerät auf dem Fahrzeug ausreicht, um gleichzeitig mit mehreren Fahrwegelementen kommunizieren zu können, indem die funktechnischen Verbindungen zur Datenübertragung von den Fahrzeugen zu den Fahrwegelementen stellenweise, d. h. dort, wo eine hohe Dichte von Fahrwegelementen vorhanden ist, nicht direkt hergestellt, sondern über einen Gatewayrechner vermittelt werden. Der Preis hierfür ist, dass für die Kommunikation mit n Fahrwegelementen (n+1) Funkkommunikationen erforderlich sind. Ohne Multiplexing sind hierfür n Funkkommunikationen erforderlich. Eine weitere Anwendung der Gateway-Funktionalität beim Funkfahrbetrieb auf zweigleisigen oder mehrgleisigen Strecken besteht darin, die Kommunikation mit Bahnübergängen generell über den Gatewayrechner zu vermitteln. Nur so ist es möglich, dass zwei oder mehrere Züge gleichzeitig mit dem Bahnübergang kommunizieren. Ohne Gatewayrechner müsste dies nacheinander erfolgen und kann zu betrieblichen Behinderungen führen.A particular advantage of the invention is that a only mobile device on the vehicle is sufficient to Communicate with multiple track elements simultaneously can by the radio connections for data transmission from the vehicles to the track elements in places, d. H. where there is a high density of track elements is present, not manufactured directly, but via one Gateway computers are conveyed. The price of this is that for communication with n route elements (n + 1) radio communications required are. Without multiplexing this requires n radio communications. Another application the gateway functionality during radio operation double-track or multi-track routes consists of the Communication with level crossings generally via the gateway computer to convey. This is the only way that two or multiple trains communicate with the level crossing at the same time. Without a gateway computer, this would have to be done one after the other can lead to operational disabilities.
Die Kommunikationscharakteristik des Funkfahrbetriebs mit schnell wechselnden, kurzen Kommunikationen ist völlig verschieden von der der Funkzugbeeinflussung. Letztere ist dadurch geprägt, dass jeder Zug eine permanente Verbindung zu einer Zentrale besitzt. Das Kommunikationsmuster ist also quasi statisch. Hierfür ist die verbindungsorientierte Kommunikation der Funkzugbeeinflussung ideal geeignet, die vergleichsweise langen Verbindungsaufbauzeiten fallen nicht ins Gewicht. Dies gilt für den Funkfahrbetrieb nicht. Mit der vorliegenden Erfindung ist nun ein Weg geschaffen worden, mittels Teilelementen, wie sie - in anderer Funktionsweise - auf die Funkzugbeeinflussung verwendet werden, zu einer individuellen Datenübertragung zwischen den Zügen und den orstfesten Stellelementen auf Streckenabschnitten mit hoher Dichte von Fahrwegelementen zu kommen.The communication characteristics of radio operation with rapidly changing, short communications is completely different of the radio train influence. The latter is thereby shaped that every train has a permanent connection to it has a headquarters. So the communication pattern is quasi static. This is connection-oriented communication the radio train control ideally suited, the comparatively long connection times are not an issue Weight. This does not apply to radio operation. With the present invention a way has now been created by means of sub-elements as they - in a different mode of operation - on the radio train influencing used to an individual Data transmission between the trains and the stationary ones Control elements on high-density sections to come from track elements.
Ein weiterer Vorteil des Verfahrens besteht darin, dass Soforthaltanweisungen, die bei Bedarf von der Funkfahrbetriebzentrale per Funk an die Fahrzeuge geschickt werden, in Bereichen mit hoher Fahrwegelementdichte über den Multiplex-Kanal sofort übermittelt werden können. Dies gilt ebenfalls für hochpriore Daten, die an alle empfangsseitigen Instanzen des Multiplexkanals per Funk geschickt werden.Another advantage of the method is that immediate stop instructions, from the radio control center if required be sent to the vehicles by radio, in areas with high track element density via the multiplex channel can be transmitted immediately. This also applies for high-priority data sent to all receiving entities of the multiplex channel can be sent by radio.
Die Erfindung soll nachstehend an Hand von einem zumindest teilweise in der Figur dargestellten Ausführungsbeispiel näher beschrieben werden. Es zeigt:
- Figur 1
- eine Variante einer Multiplexverbindung vom Fahrzeug zu einem Gatewayrechner und die Weitervermittlung zu Fahrwegelementen.
- Figure 1
- a variant of a multiplex connection from the vehicle to a gateway computer and the transfer to route elements.
Figur 1 veranschaulicht den Mechanismus an einem Beispiel eines Streckenabschnitts, bestehend aus zwei Weichen W1, W2 und einem Bahnübergang BÜ. Nachdem die erste Verbindungsanforderung vom Fahrzeug F zu einem dieser drei Fahrwegelemente (z. B. zum Bahnübergang BÜ) über einen Gatewayrechner FBS realisiert wurde, wird jede weitere Verbindungsanforderung vom Fahrzeug F an ein anderes Fahrwegelement W1, W2 über dieselbe physikalische Verbindung an den Gatewayrechner FBS "gemultiplext" und von dort weitervermittelt an das gewünschte Fahrwegelement W1 oder W2 oder BÜ.Figure 1 illustrates the mechanism using an example of a Section consisting of two switches W1, W2 and a level crossing BÜ. After the first connection request from vehicle F to one of these three track elements (e.g. to the level crossing level crossing) via a gateway computer FBS every additional connection request has been realized from the vehicle F to another route element W1, W2 via the same physical connection to the gateway computer FBS "multiplexed" and relayed from there to the desired one Track element W1 or W2 or level crossing.
Der Verbindungsaufbau zu den Fahrwegelementen W1, W2 oder BÜ kann auf diese Weise optimiert werden. So müssten ohne Multiplexing die drei Kommunikationen nacheinander durchgeführt werden. Mit Multiplexing können Kommunikationsphasen der einzelnen Kommunikationen weitgehend zeitlich überlappend stattfinden.The connection to the route elements W1, W2 or BÜ can be optimized in this way. So would have to be without multiplexing the three communications carried out one after the other become. Multiplexing enables communication phases of the individual Communications take place largely overlapping in time.
Jede Kommunikation besteht aus den drei folgenden Zeitanteilen:
Hierbei bedeuten:
- mtm:
- mobile to mobile call (von einem Mobile zu einem anderen)
- moc:
- mobile originated call (vom Mobile ins ISDN-Festnetz)
- mtc:
- mobile terminated call (vom ISDN-Festnetz zum Mobile)
- mtm:
- mobile to mobile call (from one mobile to another)
- moc:
- mobile originated call (from mobile to ISDN landline)
- mtc:
- mobile terminated call (from ISDN landline to mobile)
Die gesamte Kommunikationsdauer beträgt also:
Für die Funk-Fahrbetrieb-Anwendung ist das Multiplexen via Gatewayrechner völlig transparent; d.h. es ist nicht sichtbar, über welchen Weg die Verbindung vermittelt wird. Die Telegramme unterscheiden sich an der Schnittstelle zur sicheren Anwendung nicht von Telegrammen, die direkt (ohne den Umweg über den Gatewayrechner) an ein Fahrwegelement vermittelt werden.For the radio driving operation application, multiplexing is via Gateway computer completely transparent; i.e. it is not visible the way the connection is conveyed. The telegrams differ at the interface to the safe Do not use telegrams directly (without the detour via the gateway computer) to a route element become.
Die Erfindung ist nicht beschränkt auf die hier dargestellten Ausführungsbeispiele. Vielmehr ist es möglich, durch Kombination und Modifikation der Mittel und Merkmale weitere Ausführungsvarianten zu realisieren, ohne den Rahmen der Erfindung zu verlassen.The invention is not limited to those shown here Embodiments. Rather, it is possible through combination and modification of the means and features of further design variants to realize without the scope of the invention to leave.
Claims (4)
- Communication system for radio travel operations for making radio transmission between vehicles (F) and route elements (W1, W2, LC) of a route network, characterized in that a gateway computer (FBS) is provided for mediating the radio link between the vehicle (F) and the route elements (W1, W2, LC) in the route network, and in that a multiplex channel is present for forming a radio link between a vehicle (F) and the gateway computer (FBS).
- Communication system for radio travel operations according to Claim 1, characterized in that the vehicles and the route elements (W1, W2, LC) are equipped with radio terminals, but the latter are alternatively also equipped with line-bound communications terminals.
- Communication system for radio travel operations according to Claim 1, characterized in that the vehicles (F) are trains and the route elements (W1, W2, LC) are railway switches (W1, W2), track locks, key locks, block or level crossings (LC).
- Communication system for radio travel operations according to one of the preceding claims, characterized in that the gateway computer (FBS) is provided for simultaneous communication between a plurality of trains (F) and a route element (W1, W2, LC) as necessary.
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19847292 | 1998-10-07 | ||
DE19847292A DE19847292A1 (en) | 1998-10-07 | 1998-10-07 | Communication system for radio operation |
PCT/DE1999/003239 WO2000021243A2 (en) | 1998-10-07 | 1999-09-30 | Communication system for radio-travel operations |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1118185A2 EP1118185A2 (en) | 2001-07-25 |
EP1118185B1 true EP1118185B1 (en) | 2004-11-17 |
Family
ID=7884403
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP99959193A Expired - Lifetime EP1118185B1 (en) | 1998-10-07 | 1999-09-30 | Communication system for radio-contolled driving |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP1118185B1 (en) |
AT (1) | ATE282916T1 (en) |
DE (2) | DE19847292A1 (en) |
WO (1) | WO2000021243A2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2577160C2 (en) * | 2010-08-18 | 2016-03-10 | Сименс Акциенгезелльшафт | Key lock and device with key lock |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10048995A1 (en) * | 2000-09-27 | 2002-06-06 | Trend Network Ag | Transmitting information from static computer to vehicle computer involves radiating information in defined area around stopping point, receiving on vehicle while in transmission area |
DE102005042218B4 (en) * | 2005-09-05 | 2012-07-26 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Railway collision warning device |
DE102008020700A1 (en) | 2008-04-24 | 2009-11-05 | Deutsches Zentrum für Luft- und Raumfahrt e.V. | Train collision warning device for warning of collision danger between rail-bound vehicle and e.g. construction crews, has mobile unit determining collision danger between vehicle and person based on travel information in radio signals |
WO2013041448A1 (en) | 2011-09-19 | 2013-03-28 | Solvay Sa | Removal of low molecular weight organic compounds from inorganic halide solutions |
Family Cites Families (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19721246C2 (en) * | 1997-05-14 | 2003-12-24 | Siemens Ag | Communication device for radio-based railway services |
DE19832594C2 (en) * | 1998-07-09 | 2002-10-24 | Siemens Ag | Optimized communication system for radio-based traffic services |
-
1998
- 1998-10-07 DE DE19847292A patent/DE19847292A1/en not_active Withdrawn
-
1999
- 1999-09-30 DE DE59911109T patent/DE59911109D1/en not_active Expired - Lifetime
- 1999-09-30 EP EP99959193A patent/EP1118185B1/en not_active Expired - Lifetime
- 1999-09-30 WO PCT/DE1999/003239 patent/WO2000021243A2/en active IP Right Grant
- 1999-09-30 AT AT99959193T patent/ATE282916T1/en not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2577160C2 (en) * | 2010-08-18 | 2016-03-10 | Сименс Акциенгезелльшафт | Key lock and device with key lock |
Also Published As
Publication number | Publication date |
---|---|
ATE282916T1 (en) | 2004-12-15 |
WO2000021243A2 (en) | 2000-04-13 |
DE59911109D1 (en) | 2004-12-23 |
EP1118185A2 (en) | 2001-07-25 |
WO2000021243A3 (en) | 2000-07-06 |
DE19847292A1 (en) | 2000-04-13 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1094962B1 (en) | Optimized communication method for radio-assisted traffic services | |
DE19509696C2 (en) | Procedure for mutual contact between trains and facility for carrying out the procedure | |
DE102008045050A1 (en) | Method for automatic train control in European train control system track, involves using identical procedures for formation of telegrams to control balises for point-like automatic train control and wireless-based automatic train control | |
WO2015128148A1 (en) | Method and arrangement for operating radio-influenced rail-bound vehicles | |
EP1674371A1 (en) | Method and apparatus for railway signalling | |
EP1118185B1 (en) | Communication system for radio-contolled driving | |
DE19721246C2 (en) | Communication device for radio-based railway services | |
EP1510430B1 (en) | Process of flexible responsibility allocation for control centers | |
WO2011042321A1 (en) | Method and device for operating a section of railway track | |
EP0979765B1 (en) | Method for transmitting the counting value from a counting point to a central evaluation device | |
DE1176698B (en) | Train protection system with linear signal transmission between train and track | |
DE102020100643B4 (en) | SYSTEM FOR OPTIMIZED LINE NETWORK USE IN LOCAL PUBLIC TRANSPORT AND RESULTING PROCEDURES | |
EP1118522B1 (en) | Distance security method for trains | |
EP1396413B1 (en) | Method for operating assistance of track elements | |
DE102004062987A1 (en) | Train controlling and securing method, involves blocking virtual blocks after clearing following train for other trains and issuing dis-positive drive assignment by host computer or dispatcher that is connected via cellular radio network | |
EP3778345A1 (en) | Method for operating a vehicle and rail operation device | |
DE4406721C2 (en) | Procedure for the safe operation of a route | |
DE29818350U1 (en) | Communication system for radio operation | |
DE19526158C2 (en) | Train protection system | |
DE19927023A1 (en) | Method of setting call times in railway radio-drive mode reliably prevents unwanted operational disturbances caused by different reaction times of the different types of track elements | |
WO2007048443A1 (en) | Communication system | |
DE102004042308B4 (en) | Communication system e.g. for track-borne traffic systems, has device for physical and/or time-wise selection of communication channel | |
EP3842318A1 (en) | Method for data transmission within a rail-mounted traffic system, data transmission system, rail-mounted traffic system comprising a data transmission system and use of communication units on field elements | |
DE19814242A1 (en) | Data communications system for spatially structured drive system with several drive regions for magnetic bearing track vehicles | |
WO1996016855A1 (en) | System for linear data transmission |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20010322 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17Q | First examination report despatched |
Effective date: 20030721 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RTI1 | Title (correction) |
Free format text: COMMUNICATION SYSTEM FOR RADIO-CONTOLLED DRIVING |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041117 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 20041117 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041117 Ref country code: GB Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041117 Ref country code: FR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041117 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20041117 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
REF | Corresponds to: |
Ref document number: 59911109 Country of ref document: DE Date of ref document: 20041223 Kind code of ref document: P |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
RIN2 | Information on inventor provided after grant (corrected) |
Inventor name: THOM, MARC Inventor name: KENDELBACHER, DETLEF Inventor name: WATZLAWIK, GUENTER Inventor name: HOFESTAEDT, HOLM |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050217 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050217 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050228 |
|
NLT2 | Nl: modifications (of names), taken from the european patent patent bulletin |
Owner name: SIEMENS AKTIENGESELLSCHAFT |
|
NLV1 | Nl: lapsed or annulled due to failure to fulfill the requirements of art. 29p and 29m of the patents act | ||
GBV | Gb: ep patent (uk) treated as always having been void in accordance with gb section 77(7)/1977 [no translation filed] |
Effective date: 20041117 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050930 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050930 |
|
26N | No opposition filed |
Effective date: 20050818 |
|
EN | Fr: translation not filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
BERE | Be: lapsed |
Owner name: *THOM MARC Effective date: 20050930 Owner name: *KENDELBACHER DETLEF Effective date: 20050930 Owner name: *WATZLAWIK GUNTER Effective date: 20050930 Owner name: *SIEMENS A.G. Effective date: 20050930 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050417 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20101119 Year of fee payment: 12 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 59911109 Country of ref document: DE Effective date: 20120403 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120403 |