EP0501140A1 - Erecting scaffold moveable along an elevator shaft for erecting shaft equipment - Google Patents

Erecting scaffold moveable along an elevator shaft for erecting shaft equipment Download PDF

Info

Publication number
EP0501140A1
EP0501140A1 EP92101056A EP92101056A EP0501140A1 EP 0501140 A1 EP0501140 A1 EP 0501140A1 EP 92101056 A EP92101056 A EP 92101056A EP 92101056 A EP92101056 A EP 92101056A EP 0501140 A1 EP0501140 A1 EP 0501140A1
Authority
EP
European Patent Office
Prior art keywords
assembly scaffold
scaffold according
shaft
movable assembly
working
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP92101056A
Other languages
German (de)
French (fr)
Other versions
EP0501140B1 (en
Inventor
Horst Klein
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inventio AG
Original Assignee
Inventio AG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inventio AG filed Critical Inventio AG
Publication of EP0501140A1 publication Critical patent/EP0501140A1/en
Application granted granted Critical
Publication of EP0501140B1 publication Critical patent/EP0501140B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66BELEVATORS; ESCALATORS OR MOVING WALKWAYS
    • B66B19/00Mining-hoist operation

Definitions

  • the invention relates to a movable scaffolding in an elevator shaft for mounting shaft equipment, consisting of a hoist cable for the vertical lifting of a cabin support frame, on which working levels are arranged at the lower end and at the upper end.
  • a disadvantage of the known device is that a mechanically complex yoke which is adaptable to the shaft cross section is necessary and must have means for resting on the upper edge of the shaft.
  • Another A disadvantage of the known device is that the precise alignment of the guide rails is made more difficult by the suspended rail track.
  • Another disadvantage is that the supporting frame serving as the work platform is already guided by the guide rails to be fastened and aligned, which in turn complicates the assembly work.
  • the invention seeks to remedy this.
  • the invention as characterized in the claims, solves the problem of avoiding the disadvantages of the known assembly method and the known device and of specifying a device for assembling shaft equipment with which extensive rationalization of the assembly work is possible, in particular with large delivery heights.
  • the advantages achieved by the invention are essentially to be seen in the fact that different assembly work can be carried out at different levels at the same time, that the assembly work can be started even before the building is completed, which is particularly important in the case of climbing construction that the The support frame receiving the working planes is guided by means of already mounted and aligned guide rails and that the safety gear arranged on the support frame and interacting with the speed limiter can thus already be used as a safety device during the assembly work of the guide rails.
  • 1 to 6, 1 designates an elevator shaft, which extends over several floors 2 and is comprised of shaft walls 3, in which an assembly scaffold with a first working level 4, with a second working level 5, with a third working level 6 and with for mounting shaft equipment a fourth working level 7 is moved in the vertical direction.
  • the first working level 4 is arranged at the lower end and the second working level 5 at the upper end of a car support frame 8, which is provided for receiving the elevator car after the assembly work. Above the support frame 8, the mounting frame continues with the third working level 6 and ends with the fourth working level 7.
  • a suspension tube 9, a lower deflection roller 10 arranged at the upper end of the suspension tube 9 and one arranged on a shaft support 11 serve as suspension of the support frame 8 upper pulley 12, which are connected via a 3: 1 suspended cable 13 of a lifting cable 14 anchored to the supporting frame 8. 15 denotes the fixed cable point on the upper deflection roller 12.
  • the shaft support 11 resting on support angles 16 arranged in the elevator shaft 1 carries a speed limiter 17 and a cable pull with cable drum 18 and is covered by a protective structure 19.
  • the cable with cable drum 18 serves as shown in Fig. 1 for the material transport.
  • a cable 20 is diverted to the working point via a jib crane 21 arranged at the upper end of the suspension tube 9.
  • the working levels 4; accessible via ladders 22 and access hatches 23; 5; 6; 7 are secured with railings 24 and folding barriers, not shown.
  • Fig. 1 shows how on the third and fourth working level 6; 7 counterweight guide rails 25 are mounted. It is not shown how parts of manhole covers are assembled and electrical installations are carried out simultaneously from all working levels.
  • the cabin support frame 8 is guided by means of an upper roller guide 26 and a lower roller guide 27 along a cabin guide rail 28 which extends beyond the second working level 5.
  • a rail limit switch (not shown) with a switch roller running on the end face of the rail, which actuates a work contact for controlling the hoisting cable 14. As soon as the switch roller leaves the rail, the hoist cable 14 switches off without the upper roller guide 26 being moved beyond the end of the rail.
  • FIG. 2 shows the cabin support frame 8 consisting of hanging iron 29, a lower cross member 30 and an upper cross member 31 Limiter rope 33 of the speed limiter 17 together, excess speeds of the mounting frame in the downward direction being avoided.
  • Beams 34, a floor 35 with railings 24 and struts 36 made of flat steel, applied to the lower crossbeam 30 form the first working level 4.
  • Corner post angles 37 are mounted on end plates, not shown, of the beams 34, which the upper working levels 5; 6; 7 wear.
  • Tensioning ropes 38 and bandages 39 are provided for bracing the assembly scaffold.
  • a lower part 40 of the hanging tube 9, which is provided with a fork-shaped end, is connected to the upper crossbar 31 via an intermediate piece (not shown).
  • crane screwing plates 42 and the lower deflection roller 10 are arranged. With 46 already installed landing doors are designated.
  • a first arm 43 is hinged at one end to the crane screw plates 42.
  • a second arm 44 is articulated, which carries at the outer end a crane pulley 45 which derives the cable 20.
  • Locking bolts (not shown) are provided on the joints for different working positions.
  • the jib crane 21 is dimensioned so that all fixing points of the guide rails can be reached.
  • FIGS. 5 and 6 show a telescopic boom 47 as a further embodiment variant of the jib crane 21, which is arranged on the hanging tube 9 at the working height of the uppermost working level 7.
  • a telescopic arm 48 is articulated at one end to a support 49 arranged on the hanging tube 9.
  • the telescopic arm 48 is supported by a hydraulic jack 50 acting on the lower end of the support 49.
  • a holder 51 is articulated, on which, for example, the guide rail 25 to be mounted is clamped in the center.
  • pivot points are referred to, at which the telescopic arm 48, support 49, hydraulic jack 50 and holder 51 are articulated together. Furthermore, an arrangement of the support 49 on the shaft door side is provided.
  • guide rails are pulled up to a few centimeters above the assembly height by means of a cable 18 and then clamped to the holder 51.
  • the telescopic arm 48 is then lowered by means of a hydraulic jack 50 until the guide rail has reached its end position. After the butt plate and fastening bracket have been screwed on, the assembled guide rail is detached from the holder 51 and cable 20.
  • hanging irons stabilized by bandage pieces and extending over the entire height of the assembly frame are provided, which are connected by means of a lower cross member and an upper cross member.
  • the lower roller guide and the safety gear are mounted on the lower crossbar and the upper roller guide is mounted on an intermediate crossbar at the height of the supporting frame.
  • the jib crane and two rope pulleys are arranged on the upper crossbar.
  • the mounting frame, which is independent of the cabin support frame, is suspended in a 4: 1 ratio.

Landscapes

  • Movable Scaffolding (AREA)
  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)
  • Types And Forms Of Lifts (AREA)
  • Load-Engaging Elements For Cranes (AREA)
  • Ladders (AREA)
  • Micro-Organisms Or Cultivation Processes Thereof (AREA)
  • Cage And Drive Apparatuses For Elevators (AREA)
  • Jib Cranes (AREA)

Abstract

To erect shaft equipment, an erecting scaffold with a first working plane (4), a second working plane (5), a third working plane (6) and a fourth working plane (7) is moved in the vertical direction. The first working plane (4) is arranged at the bottom end and the second working plane (5) is arranged at the top end of a car supporting frame (8) which is provided for accommodating the elevator car after the erecting work. Above the supporting frame (8), the erecting scaffold continues with the third working plane (6) and ends with the fourth working plane (7). Serving as suspension for the supporting frame (8) are a suspension tube (9), a bottom deflection pulley (10) arranged at the top end of the suspension tube (9), and a top deflection pulley (12) arranged on a shaft girder (11), which are connected via a rope (13), hung in a ratio of 3:1, of lifting rope tackle (14) anchored to the supporting frame (8). The shaft girder (11) carries a speed limiter (17) as well as rope tackle with rope drum (18) which serves to transport material. Here, a hauling rope (20) is diverted at the working point via a jib crane (21) arranged at the top end of the suspension tube (9). The working planes (4; 5; 6; 7), which can be reached via ladders (22) and trapdoors, are protected with railings (24) and hinged barriers. <IMAGE>

Description

Die Erfindung betrifft ein in einem Aufzugsschacht verfahrbares Montagegerüst zur Montage von Schachtausrüstung, bestehend aus einem Hubseilzug für den vertikalen Verhub eines Kabinentragrahmens, an dem am unteren Ende und am oberen Ende Arbeitsebenen angeordnet sind.The invention relates to a movable scaffolding in an elevator shaft for mounting shaft equipment, consisting of a hoist cable for the vertical lifting of a cabin support frame, on which working levels are arranged at the lower end and at the upper end.

Aus der Patentschrift US-A 3 851 736 ist ein Montageverfahren und eine Vorrichtung bekannt, bei dem und bei der die für den höchsten Schachtabschnitt vorgesehenen Führungsschienen im Aufzugsschacht an einem mit Haken versehenen Joch aufgehängt und mittels einer Förderwinde um eine Führungsschienenlänge hochzogen werden. Dann werden an den unteren Enden der aufgehängten Führungsschienen die Führungsschienen für den zweithöchsten Schachtabschnitt aufgehängt und wiederum um eine Führungsschienenlänge hochgezogen. Dieser Vorgang wird so oft wiederholt, bis der Schienenstrang für die Aufzugskabine und das Gegengewicht über die gesamte Schachthöhe reicht. Nachdem das Joch am oberen Schachtende befestigt worden ist, werden die Führungsschienen des untersten Schachtabschnittes mit der Schachtwand verbunden und der Tragrahmen der künftigen Aufzugskabine in den Aufzugsschacht eingesetzt. Die höher gelegenen Führungsschienen werden anschliessend von dem als Arbeitsplattform dienenden und von der Förderwinde angetriebenen Tragrahmen aus mit der Schachtwand verbunden.From the US-A 3 851 736 an assembly method and a device is known in which and in which the guide rails provided for the highest shaft section are suspended in the elevator shaft from a yoke provided with hooks and are pulled up by a guide rail length by means of a conveyor winch. Then the guide rails for the second highest shaft section are suspended from the lower ends of the suspended guide rails and again pulled up by one guide rail length. This process is repeated until the rail track for the elevator car and the counterweight extends over the entire height of the shaft. After the yoke has been attached to the upper end of the shaft, the guide rails of the lowest shaft section are connected to the shaft wall and the support frame of the future elevator car is inserted into the elevator shaft. The higher-lying guide rails are then connected to the shaft wall from the support frame, which serves as a working platform and is driven by the conveyor winch.

Ein Nachteil der bekannten Einrichtung liegt darin, dass ein mechanisch aufwendiges, an den Schachtquerschnitt anpassbares Joch notwendig ist, das Mittel zur Auflage auf dem oberen Schachtrand aufweisen muss. Ein weiterer Nachteil der bekannten Einrichtung liegt darin, dass das genaue Ausrichten der Führungsschienen durch den aufgehängten Schienenstrang erschwert wird. Ein weiterer Nachteil liegt darin, dass der als Arbeitsplattform dienende Tragrahmen bereits von den zu befestigenden und auszurichtenden Führungsschienen geführt wird, was wiederum die Montagearbeiten erschwert.A disadvantage of the known device is that a mechanically complex yoke which is adaptable to the shaft cross section is necessary and must have means for resting on the upper edge of the shaft. Another A disadvantage of the known device is that the precise alignment of the guide rails is made more difficult by the suspended rail track. Another disadvantage is that the supporting frame serving as the work platform is already guided by the guide rails to be fastened and aligned, which in turn complicates the assembly work.

Hier will die Erfindung Abhilfe schaffen. Die Erfindung, wie sie in den Ansprüchen gekennzeichnet ist, löst die Aufgabe, die Nachteile des bekannten Montageverfahrens und der bekannten Vorrichtung zu vermeiden und eine Einrichtung zur Montage von Schachtausrüstung anzugeben, mit der insbesondere bei grossen Förderhöhen eine weitgehende Rationalisierung der Montagearbeiten möglich ist.The invention seeks to remedy this. The invention, as characterized in the claims, solves the problem of avoiding the disadvantages of the known assembly method and the known device and of specifying a device for assembling shaft equipment with which extensive rationalization of the assembly work is possible, in particular with large delivery heights.

Die durch die Erfindung erreichten Vorteile sind im wesentlichen darin zu sehen, dass gleichzeitig verschiedene Montagearbeiten auf verschiedenen Ebenen ausgeführt werden können, dass mit den Montagearbeiten bereits vor der Fertigstellung des Gebäudes im Rohbau begonnen werden kann, was insbesondere bei Kletterbauweise von Bedeutung ist, dass die Führung des die Arbeitsebenen aufnehmenden Tragrahmens mittels bereits montierter und ausgerichteter Führungsschienen erfolgt und dass dadurch die am Tragrahmen angeordnete und mit dem Geschwindigkeitsbegrenzer zusammenwirkende Fangvorrichtung bereits während den Montagearbeiten der Führungsschienen als Sicherheitseinrichtung verwendet werden kann.The advantages achieved by the invention are essentially to be seen in the fact that different assembly work can be carried out at different levels at the same time, that the assembly work can be started even before the building is completed, which is particularly important in the case of climbing construction that the The support frame receiving the working planes is guided by means of already mounted and aligned guide rails and that the safety gear arranged on the support frame and interacting with the speed limiter can thus already be used as a safety device during the assembly work of the guide rails.

Im folgenden wird die Erfindung anhand von lediglich einen Ausführungsweg darstellenden Zeichnungen näher erläutert. Es zeigen:

Fig. 1
Eine schematische Darstellung eines erfindungsgemässen in einem Aufzugsschacht verfahrbaren Montagegerüstes,
Fig. 2
Einzelheiten des Montagegerüstes gemäss Fig. 1,
Fig. 3
Einzelheiten einer Gerüstaufhängung,
Fig. 4
eine Aufsicht der obersten Arbeitsebene des Montagegerüstes,
Fig. 5
einen Teleskopausleger zur Positionierung von Führungsschienen und
Fig. 6
Einzelheiten des Teleskopauslegers gemäss Fig. 5.
The invention is explained in more detail below with the aid of drawings which illustrate only one embodiment. Show it:
Fig. 1
1 shows a schematic representation of an assembly scaffold that can be moved in an elevator shaft,
Fig. 2
1 of the scaffolding,
Fig. 3
Details of scaffolding suspension,
Fig. 4
a supervision of the top working level of the assembly scaffold,
Fig. 5
a telescopic boom for positioning guide rails and
Fig. 6
Details of the telescopic boom according to FIG. 5.

In den Fig. 1 bis 6 ist mit 1 ein über mehrere Stockwerke 2 reichender von Schachtwänden 3 umfasster Aufzugsschacht bezeichnet, in dem zur Montage von Schachtausrüstung ein Montagegerüst mit einer ersten Arbeitsebene 4, mit einer zweiten Arbeitsebene 5, mit einer dritten Arbeitsebene 6 und mit einer vierten Arbeitsebene 7 in vertikaler Richtung verfahren wird. Die erste Arbeitsebene 4 ist am unteren Ende und die zweite Arbeitsebene 5 am oberen Ende eines Kabinentragrahmens 8 angeordnet, der nach den Montagearbeiten zur Aufnahme der Aufzugskabine vorgesehen ist. Oberhalb des Tragrahmens 8 setzt sich das Montagegerüst mit der dritten Arbeitsebene 6 fort und endet mit der vierten Arbeitsebene 7. Als Aufhängung des Tragrahmens 8 dient ein Hängerohr 9, eine am oberen Ende des Hängerohrs 9 angeordnete untere Umlenkrolle 10 und eine an einem Schachtträger 11 angeordnete obere Umlenkrolle 12, die über ein 3:1 gehängtes Seil 13 eines am Tragrahmen 8 verankerten Hubseilzuges 14 verbunden sind. 15 bezeichnet den Seilfestpunkt an der oberen Umlenkrolle 12. Der an im Aufzugsschacht 1 angeordneten Auflagewinkeln 16 aufliegende Schachtträger 11 trägt einen Geschwindigkeitsbegrenzer 17 sowie einen Seilzug mit Seiltrommel 18 und wird von einem Schutzgerüst 19 abgedeckt. Der Seilzug mit Seiltrommel 18 dient wie in Fig. 1 dargestellt dem Materialtransport. Dabei wird ein Seilzugseil 20 über einen am oberen Ende des Hängerohrs 9 angeordneten Auslegerkran 21 an den Arbeitspunkt abgeleitet. Die über Leitern 22 und Durchstiegsklappen 23 erreichbaren Arbeitsebenen 4; 5; 6; 7 sind mit Geländern 24 und nicht dargestellten Klappschranken gesichert.1 to 6, 1 designates an elevator shaft, which extends over several floors 2 and is comprised of shaft walls 3, in which an assembly scaffold with a first working level 4, with a second working level 5, with a third working level 6 and with for mounting shaft equipment a fourth working level 7 is moved in the vertical direction. The first working level 4 is arranged at the lower end and the second working level 5 at the upper end of a car support frame 8, which is provided for receiving the elevator car after the assembly work. Above the support frame 8, the mounting frame continues with the third working level 6 and ends with the fourth working level 7. A suspension tube 9, a lower deflection roller 10 arranged at the upper end of the suspension tube 9 and one arranged on a shaft support 11 serve as suspension of the support frame 8 upper pulley 12, which are connected via a 3: 1 suspended cable 13 of a lifting cable 14 anchored to the supporting frame 8. 15 denotes the fixed cable point on the upper deflection roller 12. The shaft support 11 resting on support angles 16 arranged in the elevator shaft 1 carries a speed limiter 17 and a cable pull with cable drum 18 and is covered by a protective structure 19. The cable with cable drum 18 serves as shown in Fig. 1 for the material transport. A cable 20 is diverted to the working point via a jib crane 21 arranged at the upper end of the suspension tube 9. The working levels 4; accessible via ladders 22 and access hatches 23; 5; 6; 7 are secured with railings 24 and folding barriers, not shown.

Fig. 1 zeigt, wie auf der dritten und vierten Arbeitsebene 6; 7 Gegengewichtsführungsschienen 25 montiert werden. Nicht dargestellt ist, wie gleichzeitig von sämtlichen Arbeitsebenen aus Teile von Schachtabschlüssen montiert und Elektroinstallationen durchgeführt werden. Der Kabinentragrahmen 8 wird mittels einer oberen Rollenführung 26 und einer unteren Rollenführung 27 entlang einer bereits bis über die zweite Arbeitsebene 5 hinausreichenden Kabinenführungsschiene 28 geführt. An der oberen Rollenführung 26 ist ein nicht dargestellter Schienenendschalter mit einer auf der Schienenstirnfläche laufender Schalterrolle angeordnet, die einen Arbeitskontakt für die Steuerung des Hubseilzuges 14 betätigt. Sobald die Schalterrolle die Schiene verlässt, schaltet der Hubseilzug 14 ab, ohne dass dabei die obere Rollenführung 26 über das Schienenende hinaus bewegt wird.Fig. 1 shows how on the third and fourth working level 6; 7 counterweight guide rails 25 are mounted. It is not shown how parts of manhole covers are assembled and electrical installations are carried out simultaneously from all working levels. The cabin support frame 8 is guided by means of an upper roller guide 26 and a lower roller guide 27 along a cabin guide rail 28 which extends beyond the second working level 5. Arranged on the upper roller guide 26 is a rail limit switch (not shown) with a switch roller running on the end face of the rail, which actuates a work contact for controlling the hoisting cable 14. As soon as the switch roller leaves the rail, the hoist cable 14 switches off without the upper roller guide 26 being moved beyond the end of the rail.

Fig. 2 zeigt den aus Hängeeisen 29, einer Untertraverse 30 und einer Obertraverse 31 bestehenden Kabinenentragrahmen 8. Eine an der Untertraverse 30 angeordnete Fangvorrichtung 32 arbeitet über ein nicht dargestelltes Gestänge mit einem Begrenzerseil 33 des Geschwindigkeitsbegrenzers 17 zusammen, wobei Übergeschwindigkeiten des Montagegerüstes in Abwärtsrichtung vermieden werden. Auf die Untertraverse 30 aufgebrachte Träger 34, ein Boden 35 mit Geländer 24 und Streben 36 aus Flachstahl bilden die erste Arbeitsebene 4. An nicht dargestellten Stirnplatten der Träger 34 werden Eckstielwinkel 37 montiert, die die oberen Arbeitsebenen 5; 6; 7 tragen. Zur Aussteifung des Montagegerüstes sind Spannseile 38 und Verbände 39 vorgesehen. Ein mit einem gabelförmigen Ende versehenes Unterteil 40 des Hängerohrs 9 ist über ein nicht dargestelltes Zwischenstück mit der Obertraverse 31 verbunden. Am oberen Ende eines Oberteils 41 des Hängerohrs 9 sind Krananschraubplatten 42 und die untere Umlenkrolle 10 angeordnet. Mit 46 sind bereits montierte Schachttüren bezeichnet.2 shows the cabin support frame 8 consisting of hanging iron 29, a lower cross member 30 and an upper cross member 31 Limiter rope 33 of the speed limiter 17 together, excess speeds of the mounting frame in the downward direction being avoided. Beams 34, a floor 35 with railings 24 and struts 36 made of flat steel, applied to the lower crossbeam 30 form the first working level 4. Corner post angles 37 are mounted on end plates, not shown, of the beams 34, which the upper working levels 5; 6; 7 wear. Tensioning ropes 38 and bandages 39 are provided for bracing the assembly scaffold. A lower part 40 of the hanging tube 9, which is provided with a fork-shaped end, is connected to the upper crossbar 31 via an intermediate piece (not shown). At the upper end of an upper part 41 of the hanging tube 9, crane screwing plates 42 and the lower deflection roller 10 are arranged. With 46 already installed landing doors are designated.

In Fig. 4 sind Einzelheiten des Auslegerkrans 21 dargestellt. Ein erster Arm 43 ist einenends an den Krananschraubplatten 42 angelenkt. Am anderen Ende des ersten Arms 43 ist ein zweiter Arm 44 angelenkt, der am äusseren Ende eine das Seilzugseil 20 ableitende Kranrolle 45 trägt. An den Gelenken sind nicht dargestellte Rastbolzen für verschiedene Arbeitspositionen vorgesehen. Der Auslegerkran 21 ist so bemessen, dass sämtliche Fixierpunkte der Führungsschienen erreichbar sind.4 details of the jib crane 21 are shown. A first arm 43 is hinged at one end to the crane screw plates 42. At the other end of the first arm 43, a second arm 44 is articulated, which carries at the outer end a crane pulley 45 which derives the cable 20. Locking bolts (not shown) are provided on the joints for different working positions. The jib crane 21 is dimensioned so that all fixing points of the guide rails can be reached.

In Fig. 5 und Fig. 6 ist als weitere Ausführungsvariante des Auslegerkrans 21 ein Teleskopausleger 47 dargestellt, der in Arbeitshöhe der obersten Arbeitsebene 7 am Hängerohr 9 angeordnet ist. Ein Teleskoparm 48 steht einenends in gelenkiger Verbindung mit einem am Hängerohr 9 angeordneten Träger 49. Der Teleskoparm 48 wird von einem am unteren Ende des Trägers 49 angreifenden hydraulischen Heber 50 gestützt. Am schachtseitigen Ende des Teleskoparms 48 ist ein Halter 51 angelenkt, an dem beispielsweise die zu montierende Führungsschiene 25 mittig festgeklemmt wird.FIGS. 5 and 6 show a telescopic boom 47 as a further embodiment variant of the jib crane 21, which is arranged on the hanging tube 9 at the working height of the uppermost working level 7. A telescopic arm 48 is articulated at one end to a support 49 arranged on the hanging tube 9. The telescopic arm 48 is supported by a hydraulic jack 50 acting on the lower end of the support 49. At the shaft-side end of the telescopic arm 48, a holder 51 is articulated, on which, for example, the guide rail 25 to be mounted is clamped in the center.

Mit 52 sind Drehpunkte bezeichnet, an denen Teleskoparm 48, Träger 49, hydraulischer Heber 50 und Halter 51 gelenkig miteinander verbunden sind. Im weiteren ist eine schachttürseitige Anordnung des Trägers 49 vorgesehen. Bei den Montagearbeiten werden beispielsweise Führungsschienen mittels Seilzug 18 bis auf wenige Zentimeter oberhalb Montagehöhe gezogen und dann am Halter 51 festgeklemmt. Anschliessend wird der Teleskoparm 48 mittels hydraulischem Heber 50 soweit abgesenkt, bis die Führungsschiene ihre Endlage erreicht hat. Nach dem Verschrauben von Stosslasche und Befestigungsbügel wird die montierte Führungsschiene vom Halter 51 und Seilzugseil 20 gelöst.With 52 pivot points are referred to, at which the telescopic arm 48, support 49, hydraulic jack 50 and holder 51 are articulated together. Furthermore, an arrangement of the support 49 on the shaft door side is provided. During the assembly work, for example, guide rails are pulled up to a few centimeters above the assembly height by means of a cable 18 and then clamped to the holder 51. The telescopic arm 48 is then lowered by means of a hydraulic jack 50 until the guide rail has reached its end position. After the butt plate and fastening bracket have been screwed on, the assembled guide rail is detached from the holder 51 and cable 20.

In einer weiteren Ausführungsvariante sind anstelle des Kabinentragrahmens 8 und des Hängerohrs 9 sich über die gesamte Montagegerüsthöhe erstreckende durch Verbandstücke stabilisierte Hängeeisen vorgesehen, die mittels einer Untertraverse und einer Obertraverse verbunden sind. Dabei wird an der Untertraverse die untere Rollenführung und die Fangvorrichtung und an einer auf Tragrahmenhöhe angeordneten Zwischentraverse die obere Rollenführung montiert. Der Auslegerkran und zwei Seilrollen sind an der Obertraverse angeordnet. Das vom Kabinentragrahmen unabhängige Montagegerüst ist im Verhältnis 4:1 aufgehängt.In a further embodiment variant, instead of the cabin support frame 8 and the hanging tube 9, hanging irons stabilized by bandage pieces and extending over the entire height of the assembly frame are provided, which are connected by means of a lower cross member and an upper cross member. The lower roller guide and the safety gear are mounted on the lower crossbar and the upper roller guide is mounted on an intermediate crossbar at the height of the supporting frame. The jib crane and two rope pulleys are arranged on the upper crossbar. The mounting frame, which is independent of the cabin support frame, is suspended in a 4: 1 ratio.

Claims (12)

In einem Aufzugsschacht verfahrbares Montagegerüst zur Montage von Schachtausrüstung, bestehend aus einem Hubseilzug (14) für den vertikalen Verhub eines Kabinentragrahmens (8), an dem am unteren Ende und am oberen Ende Arbeitsebenen (4; 5) angeordnet sind,
dadurch gekennzeichnet,
dass oberhalb des oberen Tragrahmenendes weitere vom Kabinentragrahmen (8) getragene Arbeitsebenen (6; 7) angeordnet sind, von denen aus dem Kabinentragrahmen (8) vorauseilend Kabinenführungsschienen (28) montierbar sind, sodass der Kabinentragrahmen (8) an den fertig montierten Kabinenführungsschienen (28) mittels den üblichen Rollenführungen (26; 27) geführt und mittels der üblichen Fangvorrichtung (32) gesichert wird.
Assembly scaffold movable in an elevator shaft for assembling shaft equipment, consisting of a hoist cable (14) for the vertical lifting of a cabin support frame (8), on which working levels (4; 5) are arranged at the lower end and at the upper end,
characterized,
that further working levels (6; 7) carried by the cabin support frame (8) are arranged above the upper end of the support frame, from which cabin guide rails (28) can be mounted in advance from the cabin support frame (8), so that the cabin support frame (8) is attached to the fully assembled cabin guide rails (28 ) guided by means of the usual roller guides (26; 27) and secured by means of the usual safety device (32).
Verfahrbares Montagegerüst nach Anspruch 1,
dadurch gekennzeichnet,
dass an einer Obertraverse (31) des Kabinentragrahmens (8) ein über die oberste Arbeitsebene (7) hinausragendes Hängerohr (9) angreift.
Movable assembly scaffold according to claim 1,
characterized,
that a hanging tube (9) which projects beyond the uppermost working level (7) engages on an upper crossbar (31) of the cabin support frame (8).
Verfahrbares Montagegerüst nach Anspruch 2,
dadurch gekennzeichnet,
dass das Hängerohr (9) zweistückig aus einem Unterteil (40) mit gabelförmigem Ende und einem Oberteil (41) mit Krananschraubplatten (42) und einer unteren Umlenkrolle (10) aufgebaut ist.
Movable assembly scaffold according to claim 2,
characterized,
that the hanging tube (9) is constructed in two parts from a lower part (40) with a fork-shaped end and an upper part (41) with crane screw-on plates (42) and a lower deflection roller (10).
Verfahrbares Montagegerüst nach Anspruch 1,
dadurch gekennzeichnet,
dass für den vertikalen Verhub des Montagegerüstes eine aus einer oberen an einem Schachtträger (11) angeordneten Umlenkrolle (12), aus einem Seil (13), aus der unteren Umlenkrolle (10) und aus dem Hubseilzug (14) bestehende Aufhängung mit einem Verhältnis von 3:1 vorgesehen ist.
Movable assembly scaffold according to claim 1,
characterized,
that for the vertical lifting of the mounting frame, a suspension consisting of an upper deflecting roller (12) arranged on a shaft support (11), a rope (13), a lower deflecting roller (10) and a hoisting cable (14) with a ratio of 3: 1 is provided.
Verfahrbares Montagegerüst nach Anspruch 4,
dadurch gekennzeichnet,
dass der einen Seilzug mit Seiltrommel (18) und einen Geschwindigkeitsbegrenzer (17) tragende Schachtträger (11) auf im Aufzugsschacht (1) angeordneten Auflagewinkeln (16) angeordnet ist.
Movable assembly scaffold according to claim 4,
characterized,
that the shaft support (11) carrying a cable pull with cable drum (18) and a speed limiter (17) is arranged on support angles (16) arranged in the elevator shaft (1).
Verfahrbares Montagegerüst nach Anspruch 1,
dadurch gekennzeichnet,
dass auf der Untertraverse (30) Träger (34) aufgelegt sind, an denen Arbeitsebenen (5; 6; 7) tragende Eckstielwinkel (37) angreifen.
Movable assembly scaffold according to claim 1,
characterized,
that supports (34) are placed on the lower crossbeam (30), on which work plane angles (5; 6; 7) engage corner post angles (37).
Verfahrbares Montagegerüst nach Anspruch 6,
dadurch gekennzeichnet,
dass zur Aussteifung des Montagegerüstes die Eckstielwinkel (37) mittels Verbänden (39) und Spannseilen (38) verbunden sind.
Movable assembly scaffold according to claim 6,
characterized,
that the corner bracket angles (37) are connected by means of bandages (39) and tensioning cables (38) to stiffen the assembly scaffold.
Verfahrbares Montagegerüst nach Anspruch 1,
dadurch gekennzeichnet,
dass die mittels Geländern (24) und Streben (36) gesicherten Arbeitsebenen (4; 5; 6; 7) über Leitern (22) und Durchstiegsklappen (23) erreichbar sind.
Movable assembly scaffold according to claim 1,
characterized,
that the working levels (4; 5; 6; 7) secured by railings (24) and struts (36) can be reached via ladders (22) and access hatches (23).
Verfahrbares Montagegerüst nach Anspruch 2,
dadurch gekennzeichnet,
dass am Hängerohr (9) ein Auslegerkran (21) mit einer Kranrolle (45) angeordnet ist, an der ein Seilzugseil (20) des für den Materialtransport bestimmten Seilzugs mit Seiltrommel (18) an den Arbeitspunkt abgeleitet wird.
Movable assembly scaffold according to claim 2,
characterized,
that a jib crane (21) with a crane roller (45) is arranged on the hanging tube (9), on which a cable rope (20) of the cable pull with cable drum (18) intended for material transport is derived to the working point.
Verfahrbares Montagegerüst nach Anspruch 9,
dadurch gekennzeichnet,
dass der Auslegerkran (21) einen ersten an den Krananschraubplatten (42) angelenkten Arm (43) und einen zweiten am ersten Arm (43) angelenkten Arm (44) aufweist, die mittels Rastbolzen in der Arbeitsposition gehalten werden.
Movable assembly scaffold according to claim 9,
characterized,
that the jib crane (21) has a first arm (43) articulated on the crane screw plates (42) and a second arm (44) articulated on the first arm (43), which are held in the working position by means of locking bolts.
Verfahrbares Montagegerüst nach Anspruch 2,
dadurch gekennzeichnet,
dass am Hängerohr (9) ein Teleskopausleger (47) mit einem Teleskoparm (48), einem Träger (49), einem hydraulischen Heber (50) und einem Halter (51) angeordnet ist.
Movable assembly scaffold according to claim 2,
characterized,
that a telescopic boom (47) with a telescopic arm (48), a carrier (49), a hydraulic jack (50) and a holder (51) is arranged on the hanging tube (9).
Verfahrbares Montagegerüst nach Anspruch 1,
dadurch gekennzeichnet,
dass das Montagegerüst anstelle des Kabinentragrahmens (8) und Hängerohrs (9) sich über die Gerüsthöhe hinaus erstreckende Hängeeisen aufweist, die mittels einer Untertraverse und einer Obertraverse verbunden sind, wobei an der Untertraverse Fangvorrichtung und Rollenführung und an der Obertraverse Auslegerkran und Umlenkrollen angeordnet sind.
Movable assembly scaffold according to claim 1,
characterized,
that the assembly scaffolding instead of the cabin support frame (8) and hanging tube (9) has hanging irons which extend beyond the scaffolding height and are connected by means of a lower crossbar and an upper crossbar, safety gear and roller guide being arranged on the lower crossbar and jib crane and deflecting rollers being arranged on the upper crossbar.
EP92101056A 1991-03-01 1992-01-23 Erecting scaffold moveable along an elevator shaft for erecting shaft equipment Expired - Lifetime EP0501140B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
CH629/91 1991-03-01
CH62991 1991-03-01

Publications (2)

Publication Number Publication Date
EP0501140A1 true EP0501140A1 (en) 1992-09-02
EP0501140B1 EP0501140B1 (en) 1995-03-29

Family

ID=4191465

Family Applications (1)

Application Number Title Priority Date Filing Date
EP92101056A Expired - Lifetime EP0501140B1 (en) 1991-03-01 1992-01-23 Erecting scaffold moveable along an elevator shaft for erecting shaft equipment

Country Status (10)

Country Link
US (1) US5230404A (en)
EP (1) EP0501140B1 (en)
JP (1) JP3202055B2 (en)
AT (1) ATE120428T1 (en)
CA (1) CA2060812A1 (en)
DE (1) DE59201741D1 (en)
ES (1) ES2073192T3 (en)
HK (1) HK125996A (en)
RU (1) RU2124053C1 (en)
ZA (1) ZA92710B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110785370A (en) * 2017-06-26 2020-02-11 因温特奥股份公司 Lift equipment
CN111255217A (en) * 2020-03-27 2020-06-09 中建二局第二建筑工程有限公司 Elevator shaft shaping operation platform and operation method thereof
CN111648588A (en) * 2020-07-03 2020-09-11 东莞兴成超越实业有限公司 Elevator frock work platform

Families Citing this family (44)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5553686A (en) * 1994-12-13 1996-09-10 Otis Elevator Company Installation of elevator rails in a hoistway
AU1520897A (en) * 1996-12-31 1998-07-31 Woon Lee, David Method of installing elevator cable and rail
FI109291B (en) * 1997-03-07 2002-06-28 Kone Corp Method and apparatus for installing a lift
CN1102908C (en) * 1997-03-07 2003-03-12 通力股份公司 Procedure and apparatus for installation of elevator
SG108300A1 (en) * 2001-06-27 2005-01-28 Inventio Ag Installing frame for installation of shaft equipment, installing lift with installing frame and method of installation of shaft equipment
US6668980B2 (en) * 2001-07-06 2003-12-30 Thyssen Elevator Capital Corp. Elevator car isolation system and method
US20040154870A1 (en) * 2003-01-28 2004-08-12 Patrick Bass Self-climbing elevator machine comprising a punched rail assembly
US20070256899A1 (en) * 2003-09-29 2007-11-08 Hughes Fanielle Method For Mounting A Car Drive Machine, Especially For Elevators Without Any Machine Room And Elevator Obtained
WO2006087598A1 (en) * 2005-02-18 2006-08-24 Otis Elevator Company Roof railing for an elevator car adapted to be collapsed with a handle actuating all sides at the same time
WO2007027172A1 (en) * 2005-08-30 2007-03-08 Otis Elevator Company Method and device for transporting an elevator car drive machine
US8291568B2 (en) * 2008-11-28 2012-10-23 Kone Corporation Method of installing an elevator
US8141683B1 (en) 2009-04-30 2012-03-27 Wurtec Elevator Products & Services Expandable platform
FI121666B (en) * 2009-05-28 2011-02-28 Kone Corp A method of installing a lift hoisting rope
WO2011052053A1 (en) * 2009-10-28 2011-05-05 三菱電機株式会社 Emergency stop device for elevators
CN102080446B (en) * 2011-02-18 2012-04-18 中国水利水电第七工程局成都水电建设工程有限公司 Lifting platform for shaft construction
CN102849562B (en) * 2011-06-30 2015-09-02 五冶集团上海有限公司 A kind of method improving installation precision of derrick inside elevator barrel
CN102817553A (en) * 2012-08-31 2012-12-12 江苏振东港口机械制造有限公司 Ladder rail system of crane
EP2746211A1 (en) * 2012-12-19 2014-06-25 Inventio AG Maintenance method for a lift
EP2746210A1 (en) * 2012-12-19 2014-06-25 Inventio AG Installation method for a lift
JP5798138B2 (en) * 2013-02-06 2015-10-21 信和株式会社 Material transport lift
WO2015126863A2 (en) 2014-02-21 2015-08-27 Wurtec Elevator Products & Services False car device
US10024488B2 (en) * 2014-10-06 2018-07-17 Wurtec, Incorporated Three-beam construction apparatus
DK3032097T3 (en) * 2014-12-11 2017-12-04 Siemens Ag Wind turbine tower with a lift system
CN104528500B (en) * 2014-12-29 2019-05-14 中国建筑股份有限公司 Double tabletop is without scaffold elevator installing method
CN107207208B (en) * 2015-02-05 2020-05-15 奥的斯电梯公司 Vehicle and method for elevator system installation
US10053874B2 (en) 2015-02-18 2018-08-21 Tarsco Construction Corporation Adjustable scaffolding
EP3093262B1 (en) * 2015-05-12 2018-10-31 KONE Corporation An arrangement and a method for parallel transport and installation of elevator components
CN104973515B (en) * 2015-07-05 2017-03-08 范志甫 A multi-section safety operating room for a crane and its operating method
CN105952132A (en) * 2016-06-20 2016-09-21 北京天润建设有限公司 Elevator shaft lifting platform
US20180237269A1 (en) * 2017-02-17 2018-08-23 Otis Elevator Company Ropeless elevator system modular installation
CN107724661B (en) * 2017-05-05 2020-02-14 民族建设集团有限公司 Shear force wall well structure construction can hang formula of moving automatic rising platform
EP3412618B1 (en) * 2017-06-09 2020-12-30 KONE Corporation Method
CN107178203A (en) * 2017-06-29 2017-09-19 中铁十六局集团城市建设发展有限公司 A kind of planar dimension and adjustable for height operating platform
JP3216078U (en) * 2018-02-21 2018-05-10 株式会社Pgs Memory card
CN108756194B (en) * 2018-08-03 2023-07-21 宁波北理汽车科技股份有限公司 Telescopic scaffold for installing elevator shaft frame and method thereof
CN109972813A (en) * 2019-04-29 2019-07-05 北京天恒建设集团有限公司 Integrated form integral construction plateform system in a kind of elevator
EP3766819B1 (en) * 2019-07-16 2023-06-07 KONE Corporation A method and an arrangement for installing elevator guide rails into an elevator shaft
CN111661767A (en) * 2020-05-29 2020-09-15 许伟虎 Reinforcement type hoist and mount instrument for building
CN111822933A (en) * 2020-06-05 2020-10-27 中铁一局集团第五工程有限公司 Processing platform is connected in steel reinforcement cage merogenesis
CN112125238B (en) * 2020-08-05 2021-11-30 中石化宁波工程有限公司 Construction and installation method of steel beam in shaft
IT202100025607A1 (en) * 2021-10-07 2023-04-07 Fiorenzo Sartor CONSTRUCTION HOISTS AND PROCEDURE FOR THE PREPARATION OF A CONSTRUCTION HOIST
CN114197848B (en) * 2021-11-25 2023-04-07 中建八局第二建设有限公司 Novel elevator well promotion formula bracing operation steel platform
CN114439213A (en) * 2021-12-23 2022-05-06 华北冶建工程建设有限公司 Shaft operation platform device and construction method thereof
CN116201344A (en) * 2023-01-06 2023-06-02 华森天奥(重庆)机电有限公司 Lifting construction platform for mounting steel structure of elevator in well

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3851736A (en) * 1973-03-20 1974-12-03 Westinghouse Electric Corp Apparatus and method for installing elevator hoistway equipment
US4345671A (en) * 1980-03-12 1982-08-24 Westinghouse Electric Corp. Apparatus and method for installing elevator guide rails
WO1989004807A1 (en) * 1987-11-27 1989-06-01 Otis Elevator Company Method for installing a lift or load elevator inside a building, assembly jigs used therefor, lift or load elevator thus obtained

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1495075A (en) * 1966-09-07 1967-09-15 Kopalnia Wegla Kamiennego Device placed under an extraction cage and allowing very long props, rails and tubes to be lowered into a well
US5065843A (en) * 1990-05-16 1991-11-19 Otis Elevator Company Method for installing elevator system components

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3851736A (en) * 1973-03-20 1974-12-03 Westinghouse Electric Corp Apparatus and method for installing elevator hoistway equipment
US4345671A (en) * 1980-03-12 1982-08-24 Westinghouse Electric Corp. Apparatus and method for installing elevator guide rails
WO1989004807A1 (en) * 1987-11-27 1989-06-01 Otis Elevator Company Method for installing a lift or load elevator inside a building, assembly jigs used therefor, lift or load elevator thus obtained

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110785370A (en) * 2017-06-26 2020-02-11 因温特奥股份公司 Lift equipment
CN110785370B (en) * 2017-06-26 2021-07-13 因温特奥股份公司 Lift equipment
US12234127B2 (en) 2017-06-26 2025-02-25 Inventio Ag Elevator system
CN111255217A (en) * 2020-03-27 2020-06-09 中建二局第二建筑工程有限公司 Elevator shaft shaping operation platform and operation method thereof
CN111648588A (en) * 2020-07-03 2020-09-11 东莞兴成超越实业有限公司 Elevator frock work platform

Also Published As

Publication number Publication date
US5230404A (en) 1993-07-27
RU2124053C1 (en) 1998-12-27
ATE120428T1 (en) 1995-04-15
CA2060812A1 (en) 1992-09-02
ES2073192T3 (en) 1995-08-01
JPH04317977A (en) 1992-11-09
HK125996A (en) 1996-07-19
DE59201741D1 (en) 1995-05-04
ZA92710B (en) 1992-10-28
JP3202055B2 (en) 2001-08-27
EP0501140B1 (en) 1995-03-29

Similar Documents

Publication Publication Date Title
EP0501140B1 (en) Erecting scaffold moveable along an elevator shaft for erecting shaft equipment
EP3548413B1 (en) Lift facility and method for erecting a lift facility
DE68903630T2 (en) ASSEMBLY METHOD FOR AN ELEVATOR AND SUCH AN ELEVATOR.
DE69107509T2 (en) Working platform of an elevator shaft.
DE69805257T2 (en) METHOD AND APPARATUS FOR INSTALLING AN ELEVATOR
EP3691985A1 (en) Method for constructing an elevator system having increasing usable lifting height
EP3725726B1 (en) Method for changing the delivery height of an elevator installation by means of a sliding shuttering
EP1224142A1 (en) Cable elevator
EP4172096B1 (en) Method for installing an elevator installation and elevator installation
EP4222097A1 (en) Elevator system
EP0767134A2 (en) Elevator system and its building method
EP0444307A1 (en) Stage-lowering apparatus
DE602004005796T2 (en) Elevator with reduced shaft head and pit, even without machine room
EP0384112B1 (en) Tower crane, preferably a crane rotating at the top of the tower
EP0626339A1 (en) Overhead crane with a working platform construction, in particular for aircraft maintenance
EP0010620A1 (en) Hoist for a facade
DE4224631C2 (en) Method and device for driving towers, chimneys, shafts or the like by means of a working platform
DE10154171A1 (en) Hydraulic lift (elevator) modernizing process involves dismantling drive and cable, fitting counterweight with pulley and pulley drive unit, diverting pulley and fixing devices
DE19714848A1 (en) Suspended gondola lifting and lowering system
EP1245522A1 (en) Procedure for mounting a drive unit in an elevator shaft
DE4221915A1 (en) Tower crane with self assembly design - has rotating base of tower with boom on height adjustable platform hauled up tower and secured
DE3545965C2 (en)
EP0152562A2 (en) Crane with telescopic tower
EP0003982B2 (en) Hanging scaffold for walls with recessed parts
EP4406900A1 (en) Method for mounting a lift assembly in a lift shaft without a frame

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE CH DE ES FR GB IT LI

17P Request for examination filed

Effective date: 19930218

17Q First examination report despatched

Effective date: 19940616

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): AT BE CH DE ES FR GB IT LI

REF Corresponds to:

Ref document number: 120428

Country of ref document: AT

Date of ref document: 19950415

Kind code of ref document: T

REF Corresponds to:

Ref document number: 59201741

Country of ref document: DE

Date of ref document: 19950504

ET Fr: translation filed
GBT Gb: translation of ep patent filed (gb section 77(6)(a)/1977)

Effective date: 19950428

ITF It: translation for a ep patent filed
REG Reference to a national code

Ref country code: ES

Ref legal event code: FG2A

Ref document number: 2073192

Country of ref document: ES

Kind code of ref document: T3

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 19951229

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: AT

Payment date: 19960104

Year of fee payment: 5

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: ES

Payment date: 19960112

Year of fee payment: 5

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed
PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: CH

Payment date: 19960418

Year of fee payment: 5

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: AT

Effective date: 19970123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: ES

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 19970124

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: LI

Effective date: 19970131

Ref country code: CH

Effective date: 19970131

Ref country code: BE

Effective date: 19970131

BERE Be: lapsed

Owner name: INVENTIO A.G.

Effective date: 19970131

REG Reference to a national code

Ref country code: CH

Ref legal event code: PL

REG Reference to a national code

Ref country code: ES

Ref legal event code: FD2A

Effective date: 19990201

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: GB

Payment date: 19991213

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: DE

Payment date: 19991217

Year of fee payment: 9

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: FR

Payment date: 19991221

Year of fee payment: 9

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010123

GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20010123

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20010928

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20011101

REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.

Effective date: 20050123