CN111822933A - Rebar cage segmented connection processing platform - Google Patents

Rebar cage segmented connection processing platform Download PDF

Info

Publication number
CN111822933A
CN111822933A CN202010502931.7A CN202010502931A CN111822933A CN 111822933 A CN111822933 A CN 111822933A CN 202010502931 A CN202010502931 A CN 202010502931A CN 111822933 A CN111822933 A CN 111822933A
Authority
CN
China
Prior art keywords
processing platform
bracket
vertical rods
vertical rod
reinforcement cage
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN202010502931.7A
Other languages
Chinese (zh)
Inventor
黄波
张天平
谯生有
陈家财
赵鹏
霍守峰
贺军
张小波
马鹏飞
胡贵富
张明
钟成松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway First Engineering Group Co Ltd
China Railway Group Ltd CREC
Fifth Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Original Assignee
China Railway First Engineering Group Co Ltd
China Railway Group Ltd CREC
Fifth Engineering Co Ltd of China Railway First Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway First Engineering Group Co Ltd, China Railway Group Ltd CREC, Fifth Engineering Co Ltd of China Railway First Engineering Group Co Ltd filed Critical China Railway First Engineering Group Co Ltd
Priority to CN202010502931.7A priority Critical patent/CN111822933A/en
Publication of CN111822933A publication Critical patent/CN111822933A/en
Pending legal-status Critical Current

Links

Images

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K37/00Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass
    • B23K37/04Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work
    • B23K37/053Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work aligning cylindrical work; Clamping devices therefor
    • B23K37/0538Auxiliary devices or processes, not specially adapted for a procedure covered by only one of the other main groups of this subclass for holding or positioning work aligning cylindrical work; Clamping devices therefor for rotating tubes, e.g. rollers

Landscapes

  • Physics & Mathematics (AREA)
  • Optics & Photonics (AREA)
  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Reinforcement Elements For Buildings (AREA)

Abstract

The invention discloses a steel reinforcement cage sectional connection processing platform, which comprises: a support; the cross beams are symmetrically and parallelly arranged above the bracket and are connected with the bracket through bracket connecting pieces; the vertical rods are oppositely arranged on the symmetrical cross beams and are positioned at two ends of the cross beams; and the rolling shafts are vertically arranged between the vertical rods on the symmetrical cross beams and are connected with the vertical rods through the rolling shaft connecting pieces. The processing platform provided by the invention does not need crane assistance, adopts a semi-automatic mode, and quickly and easily completes the overturning and butt joint of the reinforcement cage.

Description

钢筋笼分节连接加工平台Rebar cage segmented connection processing platform

技术领域technical field

本发明属于土木建筑水利水保工程中桩基施工—钻孔灌注桩相关技术领域,具体涉及一种钢筋笼分节连接加工平台。The invention belongs to the related technical field of pile foundation construction and bored cast-in-place piles in water conservancy and water conservation projects of civil engineering, and particularly relates to a steel cage segmented connection processing platform.

背景技术Background technique

目前,灌注桩钢筋笼集中在钢筋加工厂分节制作加工成型,然后在灌注桩现场进行上、下节焊接。上下节焊接主要有两种方式:一种是先将下节钢筋笼吊入孔中,使用扁担将下节钢筋笼搁置在护筒上,吊车吊起上节钢筋笼与下节钢筋笼进行立焊;另一种方式是将上下节钢筋笼在平台上进行平焊,然后再用吊车将整节钢筋笼吊入孔中。第一种方法对焊工水平要求较高,钢筋笼接头焊接质量难以保证,因此通常采用第二种方式焊接钢筋笼;现场采用平焊连接钢筋笼时,将钢筋笼放置在方木上进行焊接,焊接过程中需吊车配合翻转、对接,焊接效率低。At present, the cast-in-place pile reinforcement cages are concentrated in the steel bar processing plant, which is produced and processed in sections, and then the upper and lower sections are welded at the cast-in-place pile site. There are two main ways to weld the upper and lower sections: one is to first hoist the lower section of the steel cage into the hole, use a pole to place the lower section of the steel cage on the casing, and then lift the upper section of the steel cage and the lower section of the steel cage to stand. Welding; another way is to flat-weld the upper and lower steel cages on the platform, and then use a crane to hoist the entire steel cage into the hole. The first method requires a higher level of welders, and the welding quality of the steel cage joints is difficult to guarantee, so the second method is usually used to weld the steel cage; During the welding process, the crane needs to cooperate with turning and docking, and the welding efficiency is low.

发明内容SUMMARY OF THE INVENTION

为了解决现有技术中存在的上述问题,本发明提供了一种钢筋笼分节连接加工平台。本发明要解决的技术问题通过以下技术方案实现:In order to solve the above problems existing in the prior art, the present invention provides a steel cage segmented connection processing platform. The technical problem to be solved by the present invention is realized by the following technical solutions:

一种钢筋笼分节连接加工平台,包括:A steel cage segmented connection processing platform, comprising:

支架;bracket;

横梁,所述横梁对称且平行设置于所述支架上方,并通过支架连接件与所述支架连接;a cross beam, which is symmetrically and parallelly arranged above the bracket, and is connected to the bracket through a bracket connecting piece;

立杆,所述立杆相对设置在对称的所述横梁上,且位于所述横梁的两端;a vertical pole, the vertical pole is relatively arranged on the symmetrical beam, and is located at both ends of the beam;

滚轴,所述滚轴垂直设置在对称横梁上的所述立杆之间,并通过所述滚轴连接件与所述立杆连接。The roller is vertically arranged between the vertical rods on the symmetrical beam, and is connected with the vertical rod through the roller connecting piece.

在发明的一个实施例中,还包括万向轮,所述万向轮固定在所述支架下方。In an embodiment of the invention, it also includes a universal wheel, and the universal wheel is fixed under the bracket.

在本发明的一个实施例中,所述立杆包括第一立杆和第二立杆,所述第一立杆位于所述横梁两端,所述第二立杆相对设置在所述第一立柱之间,且所述第二立杆的高度小于所述第一立杆的高度。In an embodiment of the present invention, the vertical pole includes a first vertical pole and a second vertical pole, the first vertical pole is located at both ends of the beam, and the second vertical pole is oppositely disposed on the first vertical pole between uprights, and the height of the second upright is less than the height of the first upright.

在本发明的一个实施例中,所述第二立杆之间的距离为40~50cm。In an embodiment of the present invention, the distance between the second vertical poles is 40-50 cm.

在本发明的一个实施例中,所述第一立杆底部固定有调节板,所述横梁两端设置有空槽,所述调节板通过所述空槽调节所述横梁两端的所述第一立杆之间的距离。In an embodiment of the present invention, an adjusting plate is fixed at the bottom of the first vertical rod, and two ends of the beam are provided with hollow grooves, and the adjusting plate adjusts the first two ends of the beam through the hollow grooves. distance between poles.

在本发明的一个实施例中,所述空槽的长度为20~25cm。In an embodiment of the present invention, the length of the hollow groove is 20-25 cm.

本发明的有益效果:Beneficial effects of the present invention:

1、本发明的加工平台无需吊车辅助,采用半自动的方式,快捷、轻松的完成钢筋笼的翻转、对接;1. The processing platform of the present invention does not need the assistance of a crane, and adopts a semi-automatic method to quickly and easily complete the overturning and docking of the steel cage;

2、该加工平台方便作业人员焊接,并且可以保证钢筋笼的连接质量,且提高了钢筋笼的焊接效率;2. The processing platform is convenient for operators to weld, and can ensure the connection quality of the steel cage, and improve the welding efficiency of the steel cage;

3、该加工平台可通过调整第一立杆之间的横向间距,从而满足不同直径钢筋笼的焊接;3. The processing platform can adjust the horizontal spacing between the first vertical rods to meet the welding of steel cages of different diameters;

4、该加工平台底部设置有万向轮,在使用时可以方便钢筋笼控制搭接长度;4. The bottom of the processing platform is provided with a universal wheel, which can facilitate the control of the lap length of the steel cage during use;

5、该加工平台结构简单,易于制造,且操作方便。5. The processing platform is simple in structure, easy to manufacture and easy to operate.

以下将结合附图及实施例对本发明做进一步详细说明。The present invention will be further described in detail below with reference to the accompanying drawings and embodiments.

附图说明Description of drawings

图1为本发明的结构示意图;Fig. 1 is the structural representation of the present invention;

图2为本发明的正视结构示意图;Fig. 2 is the front view structure schematic diagram of the present invention;

图3为本发明的使用状态示意图。FIG. 3 is a schematic diagram of the use state of the present invention.

附图标记说明:Description of reference numbers:

1-支架;2-横梁;3-立杆;4-滚轴;5-支架连接件;6-滚轴连接件;7-万向轮;31-第一立杆;32-第二立杆;33-调节板;34-空槽。1-bracket; 2-beam; 3-pole; 4-roller; 5-bracket connection; 6-roller connection; 7-universal wheel; 31-first pole; 32-second pole ; 33-adjustment plate; 34-empty slot.

具体实施方式Detailed ways

下面结合具体实施例对本发明做进一步详细的描述,但本发明的实施方式不限于此。The present invention will be described in further detail below with reference to specific embodiments, but the embodiments of the present invention are not limited thereto.

请同时参见图1~图2,本发明实施例提供了一种钢筋笼分节连接加工平台,包括:支架1、横梁2、立杆3、滚轴4;其中,Please refer to FIG. 1 to FIG. 2 at the same time, an embodiment of the present invention provides a steel cage segmented connection processing platform, including: a bracket 1, a beam 2, a vertical rod 3, and a roller 4; wherein,

支架1为∠70mm等边角钢焊接而成的矩形,厚度为5mm;两个横梁2对称且平行设置在支架1的两条边的上方,并通过垂直设置于支架1和横梁2设置的六个支架连接件5与支架1的两条边固定连接,四个支架连接件5焊接在支架1的四个角上,两个支架连接件5分别焊接在支架1两条边的中间部位,保证整个加工平台的稳固;六个支架连接件5与两个横梁2焊接而成。The bracket 1 is a rectangle welded by ∠70mm equilateral angle steel, with a thickness of 5mm; the two beams 2 are symmetrically and parallel arranged above the two sides of the bracket 1, and are vertically arranged on the bracket 1 and the beam 2. The bracket connector 5 is fixedly connected to the two sides of the bracket 1, the four bracket connectors 5 are welded on the four corners of the bracket 1, and the two bracket connectors 5 are welded to the middle of the two sides of the bracket 1 respectively to ensure the entire The stability of the processing platform; six bracket connectors 5 and two beams 2 are welded.

两个横梁2和四个支架连接架5均采用∠70mm等边角钢,厚度为5mm,角钢经久耐用。The two beams 2 and the four bracket connecting frames 5 are all made of ∠70mm equilateral angle steel with a thickness of 5mm, and the angle steel is durable.

立杆3相对垂直固定在对称的横梁2上,且均位于两个横梁2的两端,用于支撑滚轴4;The vertical rods 3 are relatively vertically fixed on the symmetrical beams 2 and are located at both ends of the two beams 2 for supporting the rollers 4;

立杆3包括第一立杆31和第二立杆32,第一立杆31位于横梁2两端,且与支架连接架5一一对应;第二立杆32相对设置在第一立杆31之间,且第二立杆32的高度小于第一立杆31的高度。The vertical rod 3 includes a first vertical rod 31 and a second vertical rod 32 . The first vertical rod 31 is located at both ends of the beam 2 and corresponds to the bracket connecting frame 5 one-to-one; the second vertical rod 32 is oppositely arranged on the first vertical rod 31 and the height of the second pole 32 is smaller than the height of the first pole 31 .

进一步地,滚轴4垂直并横向设置在两个横梁2上的第一立杆31之间和第二立杆32之间,并通过滚轴连接件6分别与第一立杆31、第二立杆32焊接。Further, the rollers 4 are vertically and laterally arranged between the first vertical rods 31 and the second vertical rods 32 on the two beams 2, and are respectively connected with the first vertical rods 31 and the second vertical rods through the roller connecting piece 6. The pole 32 is welded.

其中,滚轴4由φ50mm的钢管和在钢管两端内部安装的外径为φ50mm的轴承组成;滚轴4与第一立杆31、第二立杆32共同支撑带焊接的钢筋笼,从而使钢筋笼在轴承的作用下轻松翻转,方便焊接。Among them, the roller 4 is composed of a steel pipe of φ50mm and a bearing with an outer diameter of φ50mm installed inside both ends of the steel pipe; the roller 4 and the first vertical rod 31 and the second vertical rod 32 jointly support the welded steel cage, so that The steel cage is easily turned over under the action of the bearing, which is convenient for welding.

滚轴连接件5为φ22mm的圆钢,圆钢连接两个轴承并与对应的两个第一立杆31和对应的两个第二立杆32分别焊接。The roller connecting piece 5 is a round steel with a diameter of 22 mm. The round steel connects the two bearings and is welded with the corresponding two first vertical rods 31 and the corresponding two second vertical rods 32 respectively.

进一步地,滚轴4的长度为35~45cm,以保证钢筋笼可以顺利转动。Further, the length of the roller 4 is 35-45 cm to ensure that the steel cage can rotate smoothly.

进一步地,在第一立杆31的底部焊接有调节板33,在与调节板33相对的横梁2的两端设置有空槽34,调节板33通过空槽34与横梁2螺栓连接,从而调节位于横梁2两端的第一立杆31之间的距离;当需要调节横梁2两端第一立杆31之间的距离时,只需要将调节板33移动到所需位置的空槽34上方,用螺栓将调节板33与横梁2上的空槽34固定即可,调节板33为厚度10cm的钢板,调节板33上的螺栓孔的孔径为22mm。Further, an adjustment plate 33 is welded on the bottom of the first vertical rod 31, and an empty slot 34 is provided at both ends of the beam 2 opposite to the adjustment plate 33. The adjustment plate 33 is bolted to the beam 2 through the empty slot 34, thereby adjusting The distance between the first vertical rods 31 at both ends of the beam 2; when the distance between the first vertical rods 31 at both ends of the beam 2 needs to be adjusted, it is only necessary to move the adjustment plate 33 to the top of the empty slot 34 at the desired position, The adjusting plate 33 can be fixed to the hollow groove 34 on the beam 2 with bolts. The adjusting plate 33 is a steel plate with a thickness of 10 cm, and the hole diameter of the bolt holes on the adjusting plate 33 is 22 mm.

进一步地,空槽34的长度为20~25cm,以满足不同直径的钢筋笼的焊接需要。Further, the length of the hollow groove 34 is 20-25 cm, so as to meet the welding requirements of steel cages with different diameters.

进一步地,横梁2上两个第二立杆32之间的距离为40~50cm,第二立杆32的高度可根据需要进行设定,保证待焊接的钢筋笼可以顺利转动,不会碰触到横梁2即可,本发明实施例在此不作具体限定;第二立杆32上的滚轴4用于支撑待焊接的钢筋笼。Further, the distance between the two second vertical rods 32 on the beam 2 is 40-50 cm, and the height of the second vertical rod 32 can be set as required to ensure that the steel cage to be welded can rotate smoothly without touching it. It is enough to reach the beam 2, and the embodiment of the present invention is not specifically limited here; the roller 4 on the second vertical rod 32 is used to support the reinforcement cage to be welded.

而第一立杆31上的滚轴4用于限定并保护待焊接的钢筋笼,以防止钢筋笼从加工平台上滚落;横梁2上第一立杆31之间的距离以及第一立杆31的高度根据待焊接的钢筋笼的直径来设定,本发明实施例在此不作具体限定。The rollers 4 on the first vertical rod 31 are used to limit and protect the reinforcement cage to be welded to prevent the reinforcement cage from rolling off the processing platform; the distance between the first vertical rods 31 on the beam 2 and the first vertical rod The height of 31 is set according to the diameter of the reinforcement cage to be welded, which is not specifically limited in this embodiment of the present invention.

进一步地,该加工平台还包括万向轮7,该万向轮7安装在支架1的四个角下方,从而可以使整个加工平台自由移动。Further, the processing platform also includes a universal wheel 7, and the universal wheel 7 is installed under the four corners of the bracket 1, so that the entire processing platform can move freely.

该加工平台四个一组使用,分为两个活动平台和两个固定平台,活动平台需要在支架1底部安装外向轮7,固定平台则不需要在支架1底部安装万向轮7,但是活动平台和固定平台同时使用时,需要保证所有第一立杆31上的滚轴4均在同一水平面上,同时保证所有第二立杆32上的滚轴4也均在同一水平面上。The processing platform is used in groups of four, and is divided into two movable platforms and two fixed platforms. The movable platform needs to install outward wheels 7 at the bottom of the bracket 1, and the fixed platform does not need to install the universal wheel 7 at the bottom of the bracket 1, but the movable platform needs to install the outward wheels 7 at the bottom of the bracket 1. When the platform and the fixed platform are used at the same time, it is necessary to ensure that all the rollers 4 on the first vertical rods 31 are on the same horizontal plane, and at the same time ensure that the rollers 4 on all the second vertical rods 32 are also on the same horizontal plane.

请参见图3,使用时,先将四个平台按两个固定、两个活动的顺序安置在钢筋笼焊接场地上,并将四个平台纵向调整在一条直线上,保证钢筋笼焊接的线形顺直,然后将两节待焊接的钢筋笼分别吊放在固定平台和活动平台上,拖动活动平台上的钢筋笼使焊接接头钢筋搭接长度满足要求,锁紧活动平台的万向轮将其固定,当钢筋笼一个侧面焊接完成后,通过人工拨动钢筋笼主筋,使钢筋笼翻转到另一侧面进行焊接。Please refer to Figure 3. When using, first place the four platforms on the welding site of the steel cage in the order of two fixed and two movable, and adjust the four platforms longitudinally on a straight line to ensure that the welding of the steel cage is in line. Straight, then hang the two steel cages to be welded on the fixed platform and the movable platform respectively, drag the steel cage on the movable platform to make the lap length of the welded joints meet the requirements, and lock the universal wheel of the movable platform. Fixing, when the welding of one side of the steel cage is completed, manually move the main reinforcement of the steel cage to turn the steel cage to the other side for welding.

需要说明的是,固定平台也可以使用活动平台来代替,只需要将活动平台的万向轮7锁紧即可。It should be noted that the fixed platform can also be replaced by a movable platform, and it is only necessary to lock the universal wheel 7 of the movable platform.

该钢筋笼分节连接加工平台在青岛地铁6号线富春江站路围护栏结构钻孔灌注装钢筋笼分节焊接施工中进行了应用,每根钢筋笼焊接可节约0.5小时,提供了钢筋笼加工效率和质量,方便了作业人员操作,完成连接的钢筋笼焊缝饱满要求,满足焊接规范要求,收到监理和业主的一致好评,具有显著的应用效果和推广价值。The section connection processing platform for steel cages has been applied in the sectioned welding construction of the guardrail structure of Fuchunjiang Station Road of Qingdao Metro Line 6. The welding of each steel cage can save 0.5 hours and provide a steel cage The processing efficiency and quality are convenient for operators to operate, complete the full requirements of the connected steel cage welds, meet the requirements of welding specifications, and have received unanimous praise from supervisors and owners, with significant application effects and promotion value.

本发明实施例的这种钢筋笼分节连接加工平台,可以达到以下有益效果:The steel cage of the embodiment of the present invention is connected to the processing platform in sections, and the following beneficial effects can be achieved:

1、本发明的加工平台无需吊车辅助,采用半自动的方式,快捷、轻松的完成钢筋笼的翻转、对接;1. The processing platform of the present invention does not need the assistance of a crane, and adopts a semi-automatic method to quickly and easily complete the overturning and docking of the steel cage;

2、该加工平台方便作业人员焊接,并且可以保证钢筋笼的连接质量,且提高了钢筋笼的焊接效率;2. The processing platform is convenient for operators to weld, and can ensure the connection quality of the steel cage, and improve the welding efficiency of the steel cage;

3、该加工平台可通过调整第一立杆之间的横向间距,从而满足不同直径钢筋笼的焊接;3. The processing platform can adjust the horizontal spacing between the first vertical rods to meet the welding of steel cages of different diameters;

4、该加工平台底部设置有万向轮,在使用时可以方便钢筋笼控制搭接长度;4. The bottom of the processing platform is provided with a universal wheel, which can facilitate the control of the lap length of the steel cage during use;

5、该加工平台结构简单,易于制造,且操作方便。5. The processing platform is simple in structure, easy to manufacture and easy to operate.

此外,术语“第一”、“第二”仅用于描述目的,而不能理解为指示或暗示相对重要性或者隐含指明所指示的技术特征的数量。由此,限定有“第一”、“第二”的特征可以明示或者隐含地包括一个或者更多个该特征。In addition, the terms "first" and "second" are only used for descriptive purposes, and should not be construed as indicating or implying relative importance or implying the number of indicated technical features. Thus, a feature defined as "first" or "second" may expressly or implicitly include one or more of that feature.

以上内容是结合具体的优选实施方式对本发明所作的进一步详细说明,不能认定本发明的具体实施只局限于这些说明。对于本发明所属技术领域的普通技术人员来说,在不脱离本发明构思的前提下,还可以做出若干简单推演或替换,都应当视为属于本发明的保护范围。The above content is a further detailed description of the present invention in conjunction with specific preferred embodiments, and it cannot be considered that the specific implementation of the present invention is limited to these descriptions. For those of ordinary skill in the technical field of the present invention, without departing from the concept of the present invention, some simple deductions or substitutions can be made, which should be regarded as belonging to the protection scope of the present invention.

Claims (6)

1. The utility model provides a processing platform is connected to steel reinforcement cage merogenesis which characterized in that includes:
a support;
the cross beams are symmetrically and parallelly arranged above the bracket and are connected with the bracket through bracket connecting pieces;
the vertical rods are oppositely arranged on the symmetrical cross beams and are positioned at two ends of the cross beams;
and the rolling shafts are vertically arranged between the vertical rods on the symmetrical cross beams and are connected with the vertical rods through the rolling shaft connecting pieces.
2. The reinforcement cage articulated work platform of claim 1, further comprising a universal wheel, the universal wheel being fixed below the support.
3. The steel reinforcement cage section-connecting processing platform of claim 1 or 2, wherein the vertical rods comprise a first vertical rod and a second vertical rod, the first vertical rod is located at two ends of the cross beam, the second vertical rod is oppositely arranged between the first vertical rods, and the height of the second vertical rod is smaller than that of the first vertical rod.
4. The reinforcement cage section connecting processing platform of claim 3, wherein the distance between the second vertical rods is 40-50 cm.
5. A reinforcement cage section connecting and processing platform according to claim 4, wherein an adjusting plate is fixed at the bottom of the first vertical rod, empty slots are arranged at two ends of the cross beam, and the adjusting plate adjusts the distance between the first vertical rods at the two ends of the cross beam through the empty slots.
6. The reinforcement cage section connecting processing platform of claim 5, wherein the length of the empty groove is 20-25 cm.
CN202010502931.7A 2020-06-05 2020-06-05 Rebar cage segmented connection processing platform Pending CN111822933A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202010502931.7A CN111822933A (en) 2020-06-05 2020-06-05 Rebar cage segmented connection processing platform

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202010502931.7A CN111822933A (en) 2020-06-05 2020-06-05 Rebar cage segmented connection processing platform

Publications (1)

Publication Number Publication Date
CN111822933A true CN111822933A (en) 2020-10-27

Family

ID=72897593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202010502931.7A Pending CN111822933A (en) 2020-06-05 2020-06-05 Rebar cage segmented connection processing platform

Country Status (1)

Country Link
CN (1) CN111822933A (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2060812A1 (en) * 1991-03-01 1992-09-02 Horst Klein Erection scaffolding which is movable in a lift shaft for the mounting of shaft equipment
CN104493419A (en) * 2014-12-25 2015-04-08 重庆慧团商贸有限公司 Quick-replaceable and adjustable welding roller bed
CN105773053A (en) * 2014-12-21 2016-07-20 天津右岸牵伊网络科技有限公司 Pipe fitting centering welding tool
CN106677167A (en) * 2016-12-23 2017-05-17 中国二冶集团有限公司 Pile foundation reinforcement cage spiral reinforcement machining and binding integrated construction method
CN107283115A (en) * 2017-08-17 2017-10-24 安徽卓煌机械设备有限公司 A kind of cement raw material Vertical Mill wearing layer rotates surfacing equipment
CN209349796U (en) * 2018-12-11 2019-09-06 山东鑫瑞安装工程有限公司 A kind of tank container pairing device
CN209754424U (en) * 2018-12-15 2019-12-10 福建福船一帆新能源装备制造有限公司 Hydraulic adjustable anti-deformation longitudinal joint welding roller carrier
CN212886018U (en) * 2020-06-05 2021-04-06 中铁一局集团第五工程有限公司 Rebar cage segmented connection processing platform

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CA2060812A1 (en) * 1991-03-01 1992-09-02 Horst Klein Erection scaffolding which is movable in a lift shaft for the mounting of shaft equipment
CN105773053A (en) * 2014-12-21 2016-07-20 天津右岸牵伊网络科技有限公司 Pipe fitting centering welding tool
CN104493419A (en) * 2014-12-25 2015-04-08 重庆慧团商贸有限公司 Quick-replaceable and adjustable welding roller bed
CN106677167A (en) * 2016-12-23 2017-05-17 中国二冶集团有限公司 Pile foundation reinforcement cage spiral reinforcement machining and binding integrated construction method
CN107283115A (en) * 2017-08-17 2017-10-24 安徽卓煌机械设备有限公司 A kind of cement raw material Vertical Mill wearing layer rotates surfacing equipment
CN209349796U (en) * 2018-12-11 2019-09-06 山东鑫瑞安装工程有限公司 A kind of tank container pairing device
CN209754424U (en) * 2018-12-15 2019-12-10 福建福船一帆新能源装备制造有限公司 Hydraulic adjustable anti-deformation longitudinal joint welding roller carrier
CN212886018U (en) * 2020-06-05 2021-04-06 中铁一局集团第五工程有限公司 Rebar cage segmented connection processing platform

Similar Documents

Publication Publication Date Title
CN112302028A (en) A guider that is used for double-walled steel cofferdam to transfer location
CN204747914U (en) Supporting bearing roller frame with adjustable major diameter cleaning tube group butt weld is used
CN111822933A (en) Rebar cage segmented connection processing platform
CN215249228U (en) Simple large-scale pipeline installation adjusting device
CN201908665U (en) Movable variable-cross section lining trolley
CN212886018U (en) Rebar cage segmented connection processing platform
CN203361735U (en) Sliding mode system with function of efficient adjustment
CN205742212U (en) A kind of steel pipe support structure
CN209907435U (en) Pipe rack platform truck for comprehensive pipe rack building construction
CN104045014A (en) Pole arraying frame for pole welding
CN210558975U (en) Movable welding hoisting frame
CN211840780U (en) Steel bar framework supporting device
CN105059964B (en) Tubular structure thing draws shipment method
CN201300292Y (en) Steel casing splicing operation floor
CN109356166B (en) Steel pipe pile-Larson steel sheet pile bending direct combined driving combined supporting system and construction method
CN222207226U (en) Floor deck support of a sheet truss
CN221337398U (en) Supporting device for adjusting butt joint of large-diameter steel pipes
CN222477478U (en) Hydraulic overlength double-pipe inclined throwing support mounting frame
CN213898257U (en) Portable steel form strutting arrangement
CN111960267A (en) Cantilever portal
CN216811691U (en) Go out hole and tear quick-witted bracket open suitable for major diameter shield constructs machine
CN221524286U (en) Universal adjusting bracket for steel support ground assembly
CN218145471U (en) Pile foundation reinforcement cage hoisting device for low space
CN221856231U (en) A rolling device for horizontal docking of steel cage
CN203834365U (en) Assembly device for continuous beam pier construction supporting frames

Legal Events