Wall element for high-rise structures and method of manufacturing the same Download PDFInfo
- Publication number
- CZ290537B6 CZ290537B6 CZ19961900A CZ190096A CZ290537B6 CZ 290537 B6 CZ290537 B6 CZ 290537B6 CZ 19961900 A CZ19961900 A CZ 19961900A CZ 190096 A CZ190096 A CZ 190096A CZ 290537 B6 CZ290537 B6 CZ 290537B6
- Authority
- CZ
- Czechia
- Prior art keywords
- wall element
- face
- reinforcement
- wall
- leveling means
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/16—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material
- E04B1/161—Structures made from masses, e.g. of concrete, cast or similarly formed in situ with or without making use of additional elements, such as permanent forms, substructures to be coated with load-bearing material with vertical and horizontal slabs, both being partially cast in situ
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/0025—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects with installation or service material, e.g. tubes for electricity or water
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/022—Means for inserting reinforcing members into the mould or for supporting them in the mould
- B28B23/024—Supporting means
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04C—STRUCTURAL ELEMENTS; BUILDING MATERIALS
- E04C2/00—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
- E04C2/44—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose
- E04C2/52—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits
- E04C2/521—Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the purpose with special adaptations for auxiliary purposes, e.g. serving for locating conduits serving for locating conduits; for ventilating, heating or cooling
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G11/00—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs
- E04G11/06—Forms, shutterings, or falsework for making walls, floors, ceilings, or roofs for walls, e.g. curved end panels for wall shutterings; filler elements for wall shutterings; shutterings for vertical ducts
- E04G11/08—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring
- E04G11/10—Forms, which are completely dismantled after setting of the concrete and re-built for next pouring of elements without beams which are mounted during erection of the shuttering to brace or couple the elements
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)
- Building Environments (AREA)
- Installation Of Indoor Wiring (AREA)
- Load-Bearing And Curtain Walls (AREA)
- Panels For Use In Building Construction (AREA)
- Finishing Walls (AREA)
- Glass Compositions (AREA)
Abstract
Description
Vynález se týká stěnového prvku pro výškové stavby, který má výšku poschodí aje prefabrikován ze stavební hmoty, která je před ztuhnutím schopná lití, aje opatřen vestavěnou výztuží. Vynález se dále týká způsobu výroby stěnového prvku, ocelového bednění k provádění tohoto způsobu, způsobu výstavby vý škových staveb při využití stěnových prvků podle vynálezu, jakož i seřizovacího ústrojí pro usazování stěnového prvku naposledy uvedeným způsobem.BACKGROUND OF THE INVENTION The present invention relates to a wall element for high-rise buildings which has a floor height and is prefabricated from a building material capable of being cast before being solidified and provided with a built-in reinforcement. The invention further relates to a method of manufacturing a wall element, a steel formwork for carrying out the method, a method of constructing high-rise structures using the wall elements according to the invention, and an adjustment device for settling the wall element in the latter manner.
Dosavadní stav technikyBACKGROUND OF THE INVENTION
Prefabrikované stěnové prvky byly až dosud používány ve větším rozsahu pro výstavbu vysokých staveb v rámci tak zvaných deskových konstrukcí. Nevýhody této konstrukce jsou všeobecně známé ajejich příčina spočívá především vtom, že prefabrikované stěnové prvky se v podstatě ukládají jen na sebe a po poschodích jeden na druhý, aniž by se mezi těmito prvky vytvořilo požadavkům stavební statiky odpovídající silově pevné spojení. Tato konstrukce byla proto do značné míry opuštěna.Prefabricated wall elements have hitherto been used to a greater extent for the construction of tall buildings within the so-called slab construction. The disadvantages of this construction are generally known, and the main reason for this is that the prefabricated wall elements are essentially laid on top of each other and upstairs one on the other, without creating a correspondingly rigid connection between them. This construction was therefore largely abandoned.
Prefabrikované stěnové prvky mohou být použity zejména pro výstavbu vnitřních stěn, protože tyto stěny nemusí mít žádnou prodyšnost. To má podstatné výhody z hlediska racionalizace, a to zejména pokud se uplatní možnost vytvořit potřebné otvory, zejména pro dveře, ale také pro úplnou elektrickou a případně sanitární instalaci v prefabrikovaných odpovídajících stěnových prvcích. K tomu mohou být využity možnosti techniky CAD/CAM. Další automatizace prefabrikace je možná nasazením ovládaných průmyslových robotů pro vkládání výztuže a případných instalačních částí, jakož i pro úpravu prostorových držáků pro otvory a podobně.In particular, prefabricated wall elements can be used for the construction of interior walls, since these walls need not have any breathability. This has substantial advantages in terms of rationalization, especially if the possibility of creating the necessary openings, especially for the door, but also for a complete electrical and possibly sanitary installation in prefabricated corresponding wall elements, is exercised. CAD / CAM techniques can be used for this. Further automation of prefabrication is possible by the use of controlled industrial robots for inserting reinforcement and possible installation parts, as well as for adjusting spatial holders for openings and the like.
Podstata vynálezuSUMMARY OF THE INVENTION
Vynález si klade za úkol vytvořit požadavkům stavební statiky odpovídající prefabrikovaný stěnový prvek, jakož i způsob jeho výroby stejně tak jako vhodný způsob pro výstavbu výškových staveb z takových stěnových prvků.SUMMARY OF THE INVENTION It is an object of the present invention to provide a prefabricated wall element corresponding to the requirements of the structural engineer, as well as a method for manufacturing it, as well as a suitable method for constructing high-rise structures from such wall elements.
Podstatu vynálezu tvoří stěnový prvek pro výškové stavby, který má výšku poschodí, je vytvořen ze stavební hmoty, která je před ztuhnutím schopná lití, aje opatřen výztuží, výztuž přesahuje přes spodní čelní plochu a přes horní čelní plochu stěnového prvku jako připojovací výztuž, okrajové pásy horní čelní plochy pro zachycení zatížení jsou rovné, a do spodní čelní plochy jsou vloženy délkově přestavitelné nivelační prostředky pro stěnový prvek, upravené ve vzájemném odstupu.SUMMARY OF THE INVENTION The present invention provides a wall element for high-rise buildings having a floor height, formed of a building material capable of being cast before being solidified and provided with reinforcement, reinforcement extending over the lower face and over the upper face of the wall element as attachment reinforcement, the upper load-receiving end faces are straight, and length-adjustable leveling means for the wall element, spaced apart from each other, are inserted into the lower face.
Takto vytvořený stěnový prvek je v oblasti všech viditelných ploch rovný a má čisté přímé hrany, zatímco výztuží, přesahující směrem dolů a směrem vzhůru je připojen staticky bezpečným způsobem na sousedící, shodně vytvořené stěnové prvky nebo na jiné prefabrikované nebo z betonu ukládaného do konstrukce na stavbě vyrobené části stavebního objektu. Mimoto poskytuje tento stěnový prvek také čistý, prakticky bez spáry vytvořený přechod ke stropu poschodí bez nákladných dodatečných prací. Stěnový prvek také není třeba omítat, aby se vyrovnaly nepravidelnosti a nepřesnosti, které jsou obvyklé u v současnosti vyráběných stěn, a/nebo aby se překryly mezery a otvory pro instalace.The wall element so formed is straight in the area of all visible surfaces and has clean straight edges, while the reinforcement extending downwards and upwards is connected in a statically safe manner to adjacent, identically formed wall elements or to other prefabricated or concrete laid in the construction site parts of the building. In addition, this wall element also provides a clean, virtually jointless transition to the floor of the floor without costly additional work. Also, the wall element does not need to be plastered to compensate for the irregularities and inaccuracies that are customary with currently manufactured walls and / or to cover gaps and openings for installations.
Nivelační prostředky především zabezpečují, že mezi spodní čelní plochou stěnového prvku a mezi jeho dosedací plochou zůstává dostatečně velká mezera, která nejen usnadňuje připojeníIn particular, the leveling means ensure that a sufficiently large gap remains between the lower face of the wall element and its bearing surface, which not only facilitates the connection
- 1 CZ 290537 B6 přesahujícího prvku na plochu vespod upraveného stavebního prvku, ale také vytváří dostatek prostoru pro zalití této přípojné oblasti například betonem ukládaným do konstrukce na stavbě, u kterého se může jednat zejména o stropní beton.However, it also provides sufficient space for embedding this connection area with, for example, concrete deposited in the structure on the construction site, which may in particular be ceiling concrete.
Pro zjednodušení manipulace se stěnovým prvkem, který' bude zpravidla odebírán prostřednictvím jeřábu z bednění a bude ukládán na místo vestavby, může mít nejméně horní čelní plocha přídavně nejméně dva ve vzájemném odstupu upravené ukotvovací prostředky pro upevnění zdvihacích prostředků.In order to simplify the handling of the wall element, which will generally be removed from the formwork by a crane and deposited at the installation site, the at least upper face may additionally have at least two spaced-apart anchoring means for securing the lifting means.
Pro vodorovné silově pevné spojení bočně navzájem sousedících stěnových prvků mohou být v oblasti bočních čelních ploch upraveny po montáži navzájem přesně protilehlé duté žlábky, které se po usazení stěnových prvků zalijí betonem.In order to provide a horizontal force-tight connection of the side wall elements adjacent to one another, precisely opposite hollow grooves can be provided in the region of the side faces after installation, which are poured with concrete after the wall elements have been seated.
Pro zjednodušení instalace mohou instalační součásti, jako zejména prázdné trubky, přesahovat přes odpovídající čelní plochy stěnových prvků.To simplify the installation, the installation components, in particular the empty tubes, may extend over the corresponding end faces of the wall elements.
Délkově přestavitelné nivelační prostředky mohou s výhodou sestávat z tyčí se závitem, které jsou na části svojí délky uloženy ve šroubové objímce, přičemž buď tyče se závitem nebo odpovídající šroubové objímky jsou pro přenos síly vloženy do spodní čelní plochy stěnového prvku.The length-adjustable leveling means may advantageously consist of threaded rods which are supported in a screw sleeve over a part of their length, with either the threaded rods or corresponding screw sleeves being inserted into the lower face of the wall element for transmission of force.
Výroba prefabrikovaných stěnových, nebo také stropních prvků v opětovně použitelných ocelových bedněních patří ke stavu techniky. Stěnový' prvek podle vy nálezu je však možné nejlépe vyrobit tak, že do stojícího otevřeného bednění se vloží, polohují a upevní ve vertikálně převrácené orientaci výztuž, nivelační prostředky a ostatní montážní pomocné prostředky, místní držáky pro otvory a/nebo tepelně izolační desky, potom se bednění uzavře a nalije se stavební hmota a případně se setřese, a po vytvrzení stavební hmoty se stěnový prvek odbední. Prostřednictvím výroby stěnového prvku ve vertikálně převrácené orientaci se vytváří jak požadovaná rovná horní čelní plocha nebo nejméně její rovné okrajové pásy, tak i s požadovanou drsností a s výhodou mírně konvexní profil spodní čelní plochy stěnového prvku. Hotový stěnový prvek musí být před montáží obrácen. To však neznamená žádné nebo nejméně nepatrné přídavné náklady, protože nezávisle na tom, zdaje stěnový prvek prefabrikován ve výrobně nebo na staveništi, je zpravidla stejně potřebný mezilehlý transport a/nebo mezilehlé uskladnění.The production of prefabricated wall or ceiling elements in reusable steel formwork is a prior art. However, the wall element according to the invention can best be produced by placing, positioning and fastening in a vertically inverted orientation reinforcement, leveling means and other mounting aids, local hole holders and / or thermal insulation boards in a standing open formwork. When the building material has cured, the wall element is removed. By producing the wall element in a vertically inverted orientation, both the desired flat top face or at least its straight edge strips, as well as the desired roughness, and preferably a slightly convex profile of the bottom face of the wall element are formed. The finished wall element must be reversed before installation. However, this entails no or at least minor additional costs, since, irrespective of whether the wall element is prefabricated in the factory or on the construction site, intermediate transport and / or intermediate storage is generally required as well.
Ocelové bednění podle vynálezu pro provádění způsobu výroby stěnového prvku má nejméně v podlaze bednících stěn průchody pro přípojnou výztuž. Dno bednění je tedy nejméně o rozměr přesahu výztuže, tedy o délku přípojné výztuže, upraveno výše než dosedací plocha ocelového bednění.The steel formwork according to the invention for carrying out the method of manufacturing a wall element has at least in the floor of the formwork walls passageways for the connection reinforcement. The formwork bottom is therefore at least one dimension of the overhang of the reinforcement, i.e. the length of the connecting reinforcement, higher than the contact surface of the steel formwork.
Podle druhu stavebního materiálu, přesněji řečeno v závislosti na jeho konzistenci, jsou průchody pružně utěsněny proti vytékání stavební hmoty.Depending on the type of building material, more precisely depending on its consistency, the passages are resiliently sealed against leakage of the building material.
Výhodná konstrukce bednění spočívá podle vynálezu v tom, že jeho podlahová plocha sestává nejméně částečně z profilů ve tvaru písmene U, upravených jako podloží, které mezi sebou mají průchody a na kterých je upevněn vždy jeden pružný těsnicí profil, přičemž oba těsnicí profily svými navzájem přivrácenými čelními plochami utěsňují průchody pro přípojnou výztuž.A preferred formwork construction according to the invention consists in that its floor surface consists at least partially of U-shaped subbase profiles having passageways therebetween and on which one elastic sealing profile is fixed, each sealing profile facing each other. they seal the passageways for the connection reinforcement with the faces.
Vynález se dále týká způsobu výstavby výškových staveb při využití stěnových prvků navrženého typu. K tomu účelu se navrhuje, že se příslušný stěnový prvek přivede do své zástavbové orientace, na každé z jeho obou velkých ploch se opatří nejméně jedním zařízením pro svislé seřizování a umístí se nad horní čelní plochou stěnového prvku spodního poschodí a spustí se do mezery mezi dvěma na této horní čelní ploše se opírajícími stropními prvky tohoto spodního poschodí, až nivelační prostředky stojí na této horní čelní ploše, takto polohovaný stěnový prvek se prostřednictvím nivelačních prostředků nasměruje v horizontáláchThe invention further relates to a method of construction of high-rise buildings using wall elements of the proposed type. For this purpose, it is proposed that the respective wall element be brought into its installation orientation, provided with at least one vertical adjustment device on each of its two large surfaces and placed above the upper front surface of the lower floor wall element and lowered into the gap between two on this upper face with supporting ceiling elements of this lower floor until the leveling means stand on this upper face, the wall element thus positioned is directed in horizontal direction by means of the leveling means
-2 CZ 290S37 B6 a prostřednictvím seřizovačích zařízení se nasměruje ve vertikálách, potom se zbývající mezera mezi spodní čelní plochou pod ním upraveného stěnového prvku a mezi čelní plochou pod ním upraveného stěnového prvku vyplní betonem ukládaným do konstrukce na stavbě a případně se setřese, a po vytvrzení se seřizovači ústrojí odstraní.It is directed vertically through the adjusting devices, then the remaining gap between the lower face of the underside wall element and the face of the underside wall element is filled with concrete deposited in the construction site and possibly shaken off, and curing is removed by the adjustment device.
Přehled obrázků na výkresechBRIEF DESCRIPTION OF THE DRAWINGS
Vynález je v dalším podrobněji vysvětlen na příkladech provedení ve spojení s výkresovou částí, kde je popsán zjednodušeně a schematicky.The invention is explained in more detail below with reference to the drawing, in which it is described in a simplified and schematic manner.
Na obr. 1 je schematicky znázorněno otevřené ocelové bednění pro výrobu stěnového prvku.Figure 1 schematically shows an open steel formwork for the production of a wall element.
Na obr. 2 je znázorněno uzavřené ocelové bednění v průběhu plnění stavebního materiálu. Na obr. 2a je znázorněn dílčí řez ocelovým bedněním rovinou podle čáry Ila-IIa na obr. 2.Fig. 2 shows closed steel formwork during the filling of building material. Fig. 2a is a partial cross-sectional view of the steel formwork taken along the line IIa-IIa in Fig. 2.
Na obr. 3 je znázorněn detail ocelového bednění pro vyobrazení jeho utěsnění.Fig. 3 shows a detail of the steel formwork to illustrate its sealing.
Na obr. 4 je znázorněn stěnový prvek po odbednění. Na obr. 5 je znázorněn řez stěnovým prvkem rovinou podle čáry V-V na obr. 4.FIG. 4 shows the wall element after the formwork has been removed. Fig. 5 is a cross-sectional view of the wall element taken along line V-V in Fig. 4;
Na obr. 5 je znázorněn řez stěnovým prvkem z obr. 4 podle čáry V-V.Fig. 5 is a cross-sectional view of the wall element of Fig. 4 taken along line V-V.
Na obr. 6 je znázorněný stěnový prvek připravený pro mezilehlé skladování nebo pro vestavbu.Fig. 6 shows a wall element ready for intermediate storage or installation.
Na obr. 7 je vyobrazen řez pro znázornění vestavné situace stěnového prvku.FIG. 7 is a cross-sectional view to illustrate the installation situation of the wall element.
Na obr. 8 je znázorněno axonometrické vyobrazení vestavné situace stěnového prvku.FIG. 8 is an axonometric representation of the installation situation of the wall element.
Na obr. 9 je znázorněn vestavěný stěnový prvek v průběhu zavádění betonu ukládaného do konstrukce na stavbě.Fig. 9 shows a built-in wall element during the introduction of concrete deposited in the structure at the construction site.
Na obr. 10 je znázorněn vestavěný stěnový prvek po dohotovení stropu poschodí včetně povlaku.Fig. 10 shows the built-in wall element after finishing the floor of the floor including the coating.
Na obr. 11 je znázorněn zjednodušený půdorysný pohled na bočně na sebe navzájem navazující stěnové prvky.FIG. 11 is a simplified plan view of side wall elements adjacent to one another.
Příklady provedení vynálezuDETAILED DESCRIPTION OF THE INVENTION
Na obr. 1 je znázorněno otevřené ocelové bednění s bednícími stěnami 1 a 2, s boční uzavírací stěnou 3, na které jsou upevněny profilové pásy 3a pro vytvoření žlábku v postranních čelních plochách pozdějšího stěnového prvku, jakož i s podlahou 4, která bude vysvětlena později. U tohoto příkladu provedení projektuje projektor 5 plán stěnového prvku na vnitřní stranu zadní bednící stěny L Do bednění jsou již vloženy výztuže 7, 8, průchozí trubka 9 a elektroinstalační krabice 10 s prázdnými trubkami 1_L Z horní průchozí trubky 11 vede dvěma vodiči symbolizovaný elektrický kabel 12, jehož funkce ještě bude vysvětlena. Obvyklé rozpěmé držáky atd. nejsou pro jednoduchost znázorněny. Instalační prázdné trubky 11 a ostatní neznázoměné vložené součásti včetně případných tepelně izolačních desek nebo prostorových držáků pro dveřní otvory, instalační šachty a podobně jsou známým způsobem dostatečně upevněny na výztuži 7, 8.FIG. 1 shows an open steel formwork with formwork walls 1 and 2, with a side closure wall 3 on which profile strips 3a are fastened to form a groove in the lateral faces of the later wall element, as well as the floor 4, which will be explained later. In this exemplary embodiment, the projector 5 projects a wall element plan on the inside of the rear formwork panel L Reinforcement 7, 8, through-pipe 9 and wiring box 10 with empty pipes 11 have already been inserted into the formwork. whose function is still to be explained. Conventional spacers etc. are not shown for simplicity. The installation empty pipes 11 and other intermediate components (not shown), including any thermal insulation boards or space holders for door openings, installation shafts and the like, are sufficiently fastened in a known manner to the reinforcement 7, 8.
Na obr. 2 je schematicky znázorněno uzavřené ocelové bednění bezprostředně před koncem plnění betonem 13. Levá boční stěna ocelového bednění není znázorněna.Figure 2 schematically illustrates closed steel formwork immediately before the end of the concrete filling 13. The left side wall of the steel formwork is not shown.
- 3 CZ 290537 B6- 3 GB 290537 B6
Na obr. 2a je znázorněna výhodná možnost upevnění elektroinstalační krabice 10 prostřednictvím elektromagnetu 14, který při napájení prostřednictvím kabelu 12 neposuvně ulpívá ne bednící stěně 2 a tak upevňuje elektroinstalační krabici 10. Napájecí napětí se před otevřením bednění odpojí. Po odstranění bednící stěny 2 se elektromagnet 14 včetně kabelu 12 odebere pro opětovné použití.FIG. 2a shows the advantageous possibility of fastening the wiring box 10 by means of an electromagnet 14 which, when supplied via cable 12, adheres non-slidably to the box 2 and thus fastens the wiring box 10. The supply voltage is disconnected before opening the formwork. After removal of the shuttering wall 2, the electromagnet 14 including the cable 12 is removed for reuse.
Na obr. 3 je znázorněno vytvoření podlahové oblasti, případně také obou bočních stěn ocelového bednění, které je upraveno tak, že část výztuže 7, 8 přesahuje jako přípojná výztuž nad hotový stěnový prvek. V detailu k tomu slouží centrální čtyřhranná trubka 41, na kterou bočně navazují profily 42, 43 ve tvaru písmene U, jejichž shodné profily 44, 45 ve tvaru písmene U jsou upraveny protilehle. Délka ramen profilů 44 a 45 ve tvaru písmene U odpovídá normalizovanému odstupu výztuží 7, 8 od odpovídajících vnějších stěnových ploch. Každý z profilů 42, 43, 44, 45 ve tvaru písmene U, které mezi sebou po dvojicích ponechávají mezeru odpovídající tloušťce výztužných tyčí, obklopuje trvale pružný těsnicí profil 46 z plastické hmoty. V příčném směru měřená tloušťka těsnicích profilů 46 je zvolena tak, že těsnicí profily 46 ve vestavěném stavu na sebe navzájem dosedají vzájemně přivrácenými plochami. Tak obklopují těsnicí profily 46 mezerami procházející výztužné tyče, ale jinak zcela utěsňují mezery.FIG. 3 shows the formation of the floor area or both sides of the steel formwork, which is arranged such that a part of the reinforcement 7, 8 extends as a connection reinforcement above the finished wall element. In detail, a central square tube 41 is used for this purpose, to which the U-shaped profiles 42, 43 are laterally connected, whose identical U-shaped profiles 44, 45 are arranged opposite each other. The length of the legs of the U-shaped profiles 44 and 45 corresponds to the normal spacing of the reinforcement 7, 8 from the corresponding outer wall surfaces. Each of the U-shaped profiles 42, 43, 44, 45, which leave a gap corresponding to the thickness of the reinforcing bars between them in pairs, surrounds a permanently resilient plastic sealing profile 46. The thickness of the sealing profiles 46 measured in the transverse direction is selected such that the sealing profiles 46, in the installed state, abut one another with faces facing each other. Thus, the sealing profiles 46 surround the reinforcing bars passing through the gaps, but otherwise completely seal the gaps.
Na obr. 4 a obr. 5 je znázorněn hotový stěnový prvek tak. jak vystupuje z ocelového bednění. Na obr. 4 je mimo jiné znázorněno, že boční čelní plochy stěnového prvku mají žlábky 20. Na obr. 5 je znázorněn s výhodou mírně vypouklý profil horní čelní plochy, která má mimoto svou přirozenou drsnost, takže je možné později vytvářet vnitřní spojení s betonem ukládaným do konstrukce na stavbě, jak bude ještě později vysvětleno. Tento prvek má některé vložené části, které byly pro jednoduchost na obr. 1 a obr. 2 vypuštěny, přičemž tyto části zjednodušují přepravu, případně mezilehlé skladování a zejména ukládání stěnového prvku na místě stavby. V detailu jsou to nahoře dva nivelační prostředky j_5, které jsou vytvořeny tyčí se závitem a na ní pevně upravenou maticí 15a, jakož i nivelačním prostředkem 16, tvořeným do betonu uloženým závitovým pouzdrem, přičemž dole je upraveno a to také ve dvojím provedení, rovněž zapuštěné závitové pouzdro pro zašroubování závěsných ok jeřábu. Mimoto jsou do stěnového prvku v oblasti jeho horního okraje uložena dvě další závitová očka 18, jejichž účel bude ještě blíže vysvětlen. Místo toho mohou být také využity krátké výztužné tyče nebo tyče se závitem, které jsou provlečeny průchozími trubičkami 9, uloženými ve stěnovém prvku viz obr. 1, nebojsou do nich zašroubovány. Dále může být část přesahující výztuže vytvořena jako uzavřený třmen 19 ve tvaru písmene U. Všechny zmíněné části jsou v obchodě běžně dostupné.4 and 5 show the finished wall element so. as it emerges from the steel formwork. FIG. 4 illustrates, inter alia, that the side faces of the wall element have grooves 20. FIG. as it will be explained later. This element has some intermediate parts which have been omitted for the sake of simplicity in FIGS. 1 and 2, which parts simplify transport or intermediate storage and in particular the placement of the wall element at the construction site. In detail, there are two leveling means 15 at the top, which are formed by a threaded rod and a nut 15a fixed thereon, and by a leveling means 16 formed by a threaded sleeve embedded in the concrete. threaded sleeve for screwing in crane lifting eyes. In addition, two further threaded loops 18 are inserted into the wall element in the region of its upper edge, the purpose of which will be explained in more detail below. Instead, short reinforcing bars or threaded bars can also be used, which are threaded through or threaded through the through tubes 9 housed in the wall element (see FIG. 1). Furthermore, the portion of the overhanging reinforcement may be formed as a closed U-shaped yoke 19. All of these parts are commercially available.
Na obr. 6 je znázorněn stěnový prvek ve srovnání s obr. 4 a obr. 5 obrácené a tím také pozdější vestavné situaci odpovídající orientaci. Všechny patrné plochy jsou rovné, stejně tak jako okrajové pásy horní čelní plochy, zachycující zatížení, takže vytváří vyrovnaný přechod k následnému poschoďovému stropu, viz také obr. 7 a další. Stěnový prvek je opatřen dvěma seřizovacími zařízeními 21 a 22, která mají shodnou konstrukci, takže v dalším bude blíže vysvětleno jen seřizovači zařízení 12. To má dva úhelníky ve tvaru písmene L, jejichž dlouhá ramena 12a, 21b jsou na jejich horních koncích spojena prostřednictvím závitové tyče 21c, zajištěné maticemi. Na spodních koncích mají dlouhá ramena 21a, 21b otvory pro průchod šroubů 18a, zasahující do objímek závitových oček 18, viz obr. 4 a obr. 5, čímž je seřizovači zařízení 21 upevněno také na svém spodním konci. Na konci odpovídajícího krátkého ramene 21 d ve tvaru písmene L, který je prostřednictvím diagonálního příčníku 21e podepřen na dlouhém ramenu 21b, je upravena výškově přestavitelná patka 25 ve tvaru tyče se závitem, která prochází závitem nebo závitovým pouzdrem v krátkém ramenu 21 d, má na horní straně plochy pro klíč a na spodní straně je ukončena v kuželové opěrné patce 26.FIG. 6 shows a wall element as opposed to FIG. 4 and FIG. All the apparent surfaces are flat, as are the load-bearing edge strips of the upper face, so as to form a balanced transition to the subsequent storey ceiling, see also Fig. 7 et seq. The wall element is provided with two adjusting devices 21 and 22 having the same construction, so that only the adjusting device 12 will be explained in more detail below. This has two L-shaped angles whose long arms 12a, 21b are connected at their upper ends by threaded bars 21c secured by nuts. At the lower ends, the long arms 21a, 21b have holes for the passage of screws 18a extending into the threaded lug sleeves 18, see Figs. 4 and 5, whereby the adjusting device 21 is also fixed at its lower end. At the end of the corresponding L-shaped short arm 21d, which is supported on the long arm 21b by a diagonal cross member 21e, a height-adjustable threaded rod 25 is provided that passes through the thread or threaded sleeve in the short arm 21d. at the top of the key surface and at the bottom is terminated in the conical support foot 26.
- 4 CZ 290537 B6- 4 GB 290537 B6
Na obr. 7 a obr. 8 je znázorněna situace v průběhu ukládání nového, prefabrikovaného stěnového prvku B na shodný, prefabrikovaný stěnový prvek A vespod upraveného poschodí. Je zde patrno, že na tento spodní stěnový prvek A hladce a téměř bez spán navazuje strop poschodí, zde v podobě částečně prefabrikovaného stropu 30 s uloženou výztuží 31. V průběhu usazování je nový stěnový prvek B nivelován prostřednictvím nivelačního prostředku 16 do vodorovné roviny. K tomu účelu má nivelační prostředek 16 tyč se závitem jako nivelační prostředek 15 s na ní uloženou maticí pro nasazení klíče. Dostatečně dlouhé přesahy výztuží 7, 8. zde jak spodního, tak i horního stěnového prvku, se přesahují, jak je to patrno z obr. 7, a mohou být v případě potřeby navzájem spojeny také prostřednictvím o sobě známých pouzder se závitem, kotvových objímek nebo podobně. Pokud je to ze stavebně statických důvodů nutné, mohou být alternativně nebo přídavně vloženy do přesahujících se třmenů 19 ve tvaru písmene U stěnových prvků A. B krátké výztužové oceli 33, jak je to patrno zejména z obr. 8. Přesahující konce elektroinstalačních prázdných trubek 11 se navzájem spojí. Stejně se postupuje s případnou neznázoměnou sanitární instalací.Figures 7 and 8 show the situation during the deposition of a new, prefabricated wall element B on the same, prefabricated wall element A underneath the modified floor. It can be seen that this lower wall element A is connected smoothly and almost without sleep by a floor ceiling, here in the form of a partially prefabricated ceiling 30 with a stiffening support 31. During settling, the new wall element B is leveled by means of leveling means 16 to a horizontal plane. For this purpose, the leveling means 16 has a threaded rod as leveling means 15 with a nut for receiving the key. Sufficiently long overhangs of the reinforcements 7, 8 here both of the lower and upper wall elements overlap, as can be seen from FIG. 7, and can also be connected to one another by means of threaded sleeves, anchor sleeves or alike. If necessary for structurally static reasons, they may alternatively or additionally be inserted into the overlapping U-shaped brackets 19 of the wall elements A. B short reinforcing steel 33, as can be seen in particular from FIG. 8. Overlapping ends of the empty conduit 11 will connect with each other. The same procedure is used with any sanitary installation (not shown).
Stěnový prvek je, jak je to znázorněno na obr. 9, nasměrován ve svislém směru prostřednictvím seřizovačích ústrojí 21, 22, z nichž seřizovači ústrojí 22 není na obrázku znázorněno. Je patrno, že krátká ramena 21 d seřizovacího ústrojí 21 mají takové rozměry, že opěrné patky 26 jsou přesně nad podpěrami 32 stropu 30 vespod upraveného poschodí. Na obr. 9 je mimoto patrno přivádění betonu 35 ukládaného do konstrukce na stavbě stropu 30 poschodí. Výztuž stropu 30 není pro jednoduchost znázorněna. Tento beton 35 ukládaný do konstrukce na stavbě také zcela vyplňuje mezilehlý prostor mezi spodním okrajem právě ukládaného stěnového prvku B a mezi horním okrajem stěnového prvku A vespod uspořádaného poschodí.The wall element is, as shown in FIG. 9, directed vertically by means of adjusting devices 21, 22, of which the adjusting device 22 is not shown in the figure. It can be seen that the short arms 21d of the adjusting device 21 have such dimensions that the support feet 26 are exactly above the supports 32 of the ceiling 30 at the bottom of the adjusted floor. In addition, FIG. 9 shows the supply of concrete 35 laid in the structure at the building of the floor 30. Ceiling reinforcement 30 is not shown for simplicity. This concrete 35 laid on the construction site also completely fills the intermediate space between the lower edge of the wall element B currently being laid and the upper edge of the wall element A below the arranged floor.
Protože horní stavební prvek B je se spodním stavebním prvkem A po vjtxrzení betonu 35 ukládaného do konstrukce na stavbě silově pevně a stavebně staticky dokonale spojen, lze potom seřizovači ústrojí 21, 22 odstranit.Since the upper building element B is rigidly and structurally perfectly coupled to the lower building element A after the insertion of the concrete 35 laid in the structure at the construction site, the adjusting device 21, 22 can then be removed.
Návazně se kuželovitá zahloubení, která zůstala po patkách 26 seřizovačích ústrojí 21. 22, vyplní betonem 36, jak je to znázorněno na obr. 10. Potom se nanese bezspárová podlaha, která obvykle sestává z tlumicí vrstvy 37 a z vlastního povlaku 38. Jak je z obr. 10 zcela jasně patrno, vytvoří se potom také hladký přechod mezi povlakem 38 a odpovídající stěnovou plochou, který' nemusí být dodatečně opracováván. Zejména překryje povlak 38 také otvory závitových oček 18 nebo průchozích trubek 9 na obr. 1 ve stěnovém prvku, které sloužily pro upevnění seřizovačích ústroj í 21, 22.Subsequently, the conical recesses remaining on the feet 26 of the adjusting devices 21, 22 are filled with concrete 36 as shown in FIG. 10. A jointless floor, which usually consists of a damping layer 37 and the actual coating 38, is then applied. 10 clearly shows that a smooth transition between the coating 38 and the corresponding wall surface is then also required, which does not have to be reworked. In particular, the coating 38 also covers the holes of the threaded eyes 18 or the through-pipes 9 in FIG. 1 in the wall element which served to fasten the adjusting devices 21, 22.
Na obr. 11 je znázorněn v řezu pohled na tři na sebe navzájem dosedající stěnové prvky, z nichž dva vytvářejí roh. Protože tyto stěnové prvky jsou vytvořeny s přesnými rozměry as rovnými plochami, s výjimkou pozdější čelní plochy, a vyjmou se z bednění s kvalitou betonu s viditelným neopracovaným povrchem, je možné je na sebe navzájem usadit prakticky beze spár a přesně lícované. Vždy navzájem protilehlé duté žlábky 20 vytvářejí uzavřené kanály. Do těchto kanálů vniká při dohotovovaném betonování odpovídajícího protilehlého poschoďového stropu beton 35 ukládaný do konstrukce na stavbě a vytváří tak po vytvrzení tak zvanou plombu, která zajišťuje silový spoj mezi stěnovými prvky ve vodorovném směru.FIG. 11 is a cross-sectional view of three abutting wall elements, two of which form a corner. Since these wall elements are designed with exact dimensions and flat surfaces, with the exception of the lateral face, and are removed from the formwork of concrete quality with a visible unworked surface, they can be stacked virtually jointlessly and precisely aligned. The opposed hollow grooves 20 each form closed channels. During the concreting of the corresponding opposed storey ceiling, these channels penetrate the concrete 35 laid in the structure on the construction site and, after curing, form a so-called seal which provides a force connection between the wall elements in a horizontal direction.
Claims (7)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19523997 | 1995-06-30 |
Publications (2)
Publication Number | Publication Date |
---|---|
CZ190096A3 CZ190096A3 (en) | 1997-03-12 |
CZ290537B6 true CZ290537B6 (en) | 2002-08-14 |
Family
ID=7765762
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CZ19961900A CZ290537B6 (en) | 1995-06-30 | 1996-06-27 | Wall element for high-rise structures and method of manufacturing the same |
CZ2002562A CZ294093B6 (en) | 1995-06-30 | 1996-06-27 | Adjusting device for positioning wall elements on a building |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CZ2002562A CZ294093B6 (en) | 1995-06-30 | 1996-06-27 | Adjusting device for positioning wall elements on a building |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0751262B1 (en) |
AT (1) | ATE257879T1 (en) |
CZ (2) | CZ290537B6 (en) |
DE (1) | DE59610890D1 (en) |
DK (1) | DK0751262T3 (en) |
PL (2) | PL181551B1 (en) |
Families Citing this family (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU8091598A (en) * | 1998-07-03 | 2000-01-24 | Christian Koppensteiner | Building element |
EP1046758A1 (en) * | 1999-04-19 | 2000-10-25 | Rolf Bless | Construction method of a slab and a wall-shuttering , prefabricated shuttering element |
WO2005019549A1 (en) * | 2003-08-20 | 2005-03-03 | Incoribe, S.L. | Building construction system |
WO2005124043A1 (en) * | 2004-06-15 | 2005-12-29 | Galcorp (Nz) International Limited | Construction elements and methods of construction |
NL2001814C2 (en) * | 2008-07-16 | 2010-01-22 | 1 2 3 Huis B V | Housing element manufacturing method for building i.e. apartment complex, involves extending vertical wall section from floor section to outside, and forming housing element with vertical and horizontal wall sections and floor section |
CN104060819B (en) * | 2013-03-19 | 2016-05-04 | 中建四局第三建筑工程有限公司 | Utilize the method for typified form construction shear wall and typified form used |
CN105133829B (en) * | 2015-09-18 | 2018-03-23 | 深圳市创兴建设股份有限公司 | Grouting wallboard formwork and the method constructed using the formwork |
CN110219459A (en) * | 2019-06-19 | 2019-09-10 | 银广厦集团有限公司 | A kind of Multicarity thin-walled steel plate concrete combined shear wall construction method |
CN115492381B (en) * | 2021-06-17 | 2024-01-26 | 中核华辰建筑工程有限公司 | Elastic leakage-proof structure of aluminum alloy template |
CN113622562B (en) * | 2021-08-19 | 2022-02-18 | 阜阳市水利建筑安装工程公司 | House building engineering adds stationary form |
CN115506534B (en) * | 2022-09-30 | 2023-09-19 | 青岛嘉枫城市建设有限公司 | Shear wall structure and building |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE2914920A1 (en) * | 1978-04-19 | 1979-10-31 | Kurt Ing Beranek | Light concrete prefabricated wall section - has horizontal reinforcing bars and protruding top batten of ceiling thickness (OE 15.7.79) |
PT70931B (en) * | 1980-03-11 | 1981-07-01 | Helio Guiod De Castro | BUILDING CONSTRUCTION SYSTEM |
DE3228342A1 (en) * | 1982-07-29 | 1984-02-09 | Friedrich 7250 Leonberg Eger | Method for constructing buildings and prefabricated building parts for carrying out the method |
DE3302821A1 (en) * | 1983-01-28 | 1984-08-02 | Klaus Dipl.-Ing. 8000 München Dahm | Concrete shuttering |
GB2207688A (en) * | 1986-08-14 | 1989-02-08 | Unan Pty Ltd | Modular building system |
US4996770B1 (en) * | 1990-01-05 | 1997-05-06 | Wilian Holding Co | Method of assembling a concrete form brace |
DE4332793C1 (en) * | 1993-09-27 | 1995-01-12 | Eberhard Schrade | Process for producing structures, and prefabricated module |
-
1996
- 1996-06-27 DK DK96110386T patent/DK0751262T3/en active
- 1996-06-27 PL PL96343311A patent/PL181551B1/en not_active IP Right Cessation
- 1996-06-27 CZ CZ19961900A patent/CZ290537B6/en not_active IP Right Cessation
- 1996-06-27 CZ CZ2002562A patent/CZ294093B6/en not_active IP Right Cessation
- 1996-06-27 DE DE59610890T patent/DE59610890D1/en not_active Expired - Fee Related
- 1996-06-27 PL PL96314995A patent/PL181672B1/en not_active IP Right Cessation
- 1996-06-27 AT AT96110386T patent/ATE257879T1/en not_active IP Right Cessation
- 1996-06-27 EP EP96110386A patent/EP0751262B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
DE59610890D1 (en) | 2004-02-19 |
EP0751262A1 (en) | 1997-01-02 |
PL181551B1 (en) | 2001-08-31 |
PL314995A1 (en) | 1997-01-06 |
PL181672B1 (en) | 2001-08-31 |
ATE257879T1 (en) | 2004-01-15 |
CZ294093B6 (en) | 2004-10-13 |
CZ190096A3 (en) | 1997-03-12 |
DK0751262T3 (en) | 2004-05-17 |
EP0751262B1 (en) | 2004-01-14 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN106285051B (en) | A kind of prefabricated toilet and its construction and installation method | |
EP3670774B1 (en) | Prefabricated bathroom and methods for constructing and installing the same | |
CN112854745A (en) | Construction process of assembled building aluminum alloy template | |
CN114108917B (en) | Height-adjustable assembly type composite floor slab construction method | |
KR101614842B1 (en) | frame system of buildings using the pc-column with overhanging beam applicable various span without increase of story-height | |
CZ290537B6 (en) | Wall element for high-rise structures and method of manufacturing the same | |
CN110670770A (en) | Combined structure and construction method of solid shear wall and laminated plate edge member | |
CN204645727U (en) | Prefabricated toilet | |
CN102230338A (en) | prefabricated toilet and construction and installation method thereof | |
CN111335192A (en) | A prefabricated subway station platform and its construction method | |
CN102230339A (en) | Prefabricated kitchen and method for constructing and installing same | |
CN102777032B (en) | Installation method of prefabricated toilet | |
DE19525082A1 (en) | Prefabricated reinforced wall elements for high bulldings | |
JP3808854B2 (en) | Partition wall support | |
JP3016633B2 (en) | Construction method of prefab toilet | |
GB2428434A (en) | Modular floor units | |
JP2002194892A (en) | Construction method of building | |
CN102777033A (en) | How to install a prefabricated kitchen | |
JP2642891B2 (en) | Non-bearing wall construction pedestal and method of constructing non-bearing wall using the pedestal | |
CN219569340U (en) | Assembled building element and building structure | |
SK283333B6 (en) | Process for the production of heat insulation panels for large panel constructions | |
JP3961116B2 (en) | Floor structure in steel-frame building | |
CN106759844B (en) | The construction method of assembling type buildings equipped with concealed beam | |
KR20240145175A (en) | Precast Concrete Method of House Using Fixing Unit | |
JP2938386B2 (en) | Construction method of formwork for residential foundation |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PD00 | Pending as of 2000-06-30 in czech republic | ||
MM4A | Patent lapsed due to non-payment of fee |
Effective date: 20080627 |