CY1105546T1 - METHOD AND ARRANGEMENT FOR CONSTRUCTING A CONCRETE PILE IN ITS FINAL POSITION - Google Patents
METHOD AND ARRANGEMENT FOR CONSTRUCTING A CONCRETE PILE IN ITS FINAL POSITIONInfo
- Publication number
- CY1105546T1 CY1105546T1 CY20051101301T CY051101301T CY1105546T1 CY 1105546 T1 CY1105546 T1 CY 1105546T1 CY 20051101301 T CY20051101301 T CY 20051101301T CY 051101301 T CY051101301 T CY 051101301T CY 1105546 T1 CY1105546 T1 CY 1105546T1
- Authority
- CY
- Cyprus
- Prior art keywords
- concrete
- final position
- ground
- pipe
- concrete pile
- Prior art date
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
- E02D7/16—Scaffolds or supports for drivers
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/02—Improving by compacting
- E02D3/08—Improving by compacting by inserting stones or lost bodies, e.g. compaction piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D3/00—Improving or preserving soil or rock, e.g. preserving permafrost soil
- E02D3/12—Consolidating by placing solidifying or pore-filling substances in the soil
- E02D3/123—Consolidating by placing solidifying or pore-filling substances in the soil and compacting the soil
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
- E02D5/38—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
- E02D5/385—Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/02—Placing by driving
- E02D7/06—Power-driven drivers
- E02D7/14—Components for drivers inasmuch as not specially for a specific driver construction
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D7/00—Methods or apparatus for placing sheet pile bulkheads, piles, mouldpipes, or other moulds
- E02D7/18—Placing by vibrating
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Civil Engineering (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- General Engineering & Computer Science (AREA)
- Soil Sciences (AREA)
- Environmental & Geological Engineering (AREA)
- Agronomy & Crop Science (AREA)
- Piles And Underground Anchors (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
Για την κατασκευή ενός πασσάλου από μπετόν στην οριστική του θέση στο έδαφος βυθίζεται με δονήσεις στο έδαφος ένας σωλήνας (21) με ένα δονητή (18). Προς τούτο ασκείται με ένα συρματόσχοινο έλξης (15) μια στατική δύναμη πρόωσης. Ο σωλήνας (21) κλείεται στεγανά στο κάτω του άκρο με ένα εγκαθιστάμενο χαλαρά καπάκι (22) εγκλείοντας μια ταινία στεγανότητας. Μετά τη βύθιση του σωλήνα γεμίζεται ο σωλήνας (21) με μπετόν και στη συνέχεια υποβάλλεται πάλι σε δονήσεις για τη συμπύκνωση του μπετόν. Τελικά αποσύρεται ο σωλήνας (21) με χρησιμοποίηση του δονητή (18), όπου το μπετόν παραμένει στο έδαφος.For the construction of a concrete pile in its final position in the ground, a tube (21) with a vibrator (18) is sunk into the ground with vibrations. For this purpose, a static propulsive force is exerted with a traction cable (15). The tube (21) is sealed at its lower end with a loosely fitted cap (22) enclosing a sealing strip. After sinking the pipe, the pipe (21) is filled with concrete and then vibrated again to compact the concrete. Finally, the pipe (21) is withdrawn using the vibrator (18), where the concrete remains on the ground.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE10013446A DE10013446A1 (en) | 2000-03-17 | 2000-03-17 | Method and device for producing an in-situ concrete pile |
Publications (1)
Publication Number | Publication Date |
---|---|
CY1105546T1 true CY1105546T1 (en) | 2010-07-28 |
Family
ID=7635397
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CY20051101301T CY1105546T1 (en) | 2000-03-17 | 2005-10-26 | METHOD AND ARRANGEMENT FOR CONSTRUCTING A CONCRETE PILE IN ITS FINAL POSITION |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP1134319B1 (en) |
AT (1) | ATE300637T1 (en) |
CY (1) | CY1105546T1 (en) |
DE (2) | DE10013446A1 (en) |
DK (1) | DK1134319T3 (en) |
ES (1) | ES2246268T3 (en) |
Families Citing this family (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE10219862B4 (en) * | 2002-05-03 | 2005-07-14 | Bauer Spezialtiefbau Gmbh | Method and civil engineering device for producing a foundation column in a ground |
DE10310727B4 (en) * | 2003-03-12 | 2007-09-13 | Bauer Spezialtiefbau Gmbh | filling pipe |
DE102004045799B3 (en) * | 2004-09-22 | 2006-03-30 | Josef Möbius Bau-Aktiengesellschaft | Method and installation to produce concrete pillars with smaller diameters in the ground uses displacement tube filled with concrete, pushed into ground and then pulled out leaving concrete pillar in ground |
DE102005022342A1 (en) * | 2005-05-13 | 2006-11-23 | Liebherr-Werk Nenzing Gmbh, Nenzing | Method and device to produce a cast-in-place concrete full displacement pile whereby tube is driven into ground and filled with concrete using propulsive tube, removable metal tube and borng machine and then removed |
DE202006014146U1 (en) * | 2006-07-24 | 2008-05-08 | Liebherr-Werk Nenzing Gmbh, Nenzing | Device for producing a cast-in-place full displacer pile |
EP1983112B1 (en) * | 2007-04-16 | 2010-01-13 | IHC Holland IE B.V. | Pile driving installation and vibration device for such installation |
CN102444121A (en) * | 2011-10-24 | 2012-05-09 | 河南理工大学 | Starlike in-situ concrete pile construction method |
DE102015122202B4 (en) * | 2015-10-22 | 2019-03-28 | Peter Wallis | Device for introducing a column element |
NL2021375B1 (en) * | 2018-07-23 | 2020-01-30 | Ihc Holland Ie Bv | Pile installation system |
DE102019108100B3 (en) * | 2019-03-28 | 2020-03-26 | Jannes Janitschke | Pile foundation drilling rig |
IT201900012816A1 (en) | 2019-07-24 | 2021-01-24 | Geosec S R L | Self-propelled device for driving poles into the ground |
CN113338271A (en) * | 2021-05-12 | 2021-09-03 | 西安理工大学 | Concrete hollow pile pouring method and device |
CN113202087B (en) * | 2021-06-11 | 2024-10-11 | 陈清贵 | Pneumatic pushing and vibrating device |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1865652A (en) * | 1929-09-20 | 1932-07-05 | Raymond Concrete Pile Co | Method and apparatus for placing concrete in piles |
DE2619431A1 (en) * | 1976-05-03 | 1977-11-24 | Mann Gmbh & Co Fritz | On site concrete pile prodn. - has casing with releasable ram foot rammed into soil and pipe filled with setting concrete |
GB1594452A (en) * | 1976-10-27 | 1981-07-30 | Bsp Int Foundation | Impact apparatus |
CH648074A5 (en) * | 1980-07-02 | 1985-02-28 | Fietz & Leuthold Ag | Method of constructing a cast-in-place pile |
DE3612437A1 (en) * | 1986-04-12 | 1987-10-15 | Preussag Ag Bauwesen | Method of constructing concrete columns in the soil and apparatus for carrying out the method |
DE9409581U1 (en) * | 1994-06-15 | 1995-07-20 | Fa. Josef Messmann, 26871 Papenburg | Device for ramming, in particular sheet piling, with a vibrator |
DE19532931A1 (en) * | 1995-09-06 | 1997-03-13 | Karl Rainer Massarsch | Building foundation construction method |
DE19707687C1 (en) * | 1997-02-26 | 1998-10-15 | Wilhelm Dr Degen | Device for producing columns of material in the floor |
-
2000
- 2000-03-17 DE DE10013446A patent/DE10013446A1/en not_active Withdrawn
-
2001
- 2001-03-16 AT AT01106639T patent/ATE300637T1/en active
- 2001-03-16 DE DE50106844T patent/DE50106844D1/en not_active Expired - Lifetime
- 2001-03-16 EP EP01106639A patent/EP1134319B1/en not_active Expired - Lifetime
- 2001-03-16 ES ES01106639T patent/ES2246268T3/en not_active Expired - Lifetime
- 2001-03-16 DK DK01106639T patent/DK1134319T3/en active
-
2005
- 2005-10-26 CY CY20051101301T patent/CY1105546T1/en unknown
Also Published As
Publication number | Publication date |
---|---|
DE10013446A1 (en) | 2002-01-24 |
ATE300637T1 (en) | 2005-08-15 |
EP1134319B1 (en) | 2005-07-27 |
DK1134319T3 (en) | 2005-11-28 |
DE50106844D1 (en) | 2005-09-01 |
EP1134319A3 (en) | 2002-08-21 |
EP1134319A2 (en) | 2001-09-19 |
ES2246268T3 (en) | 2006-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CY1105546T1 (en) | METHOD AND ARRANGEMENT FOR CONSTRUCTING A CONCRETE PILE IN ITS FINAL POSITION | |
GB1429719A (en) | Method of securing a large-diameter tube to a casing under water | |
FR2694315B1 (en) | Method and device for driving a tube into the ground, by beating, in particular for making a foundation pile | |
DK164126C (en) | PIPE SHAPE TO A COMPOSED SPUNS ROAD | |
SE7708892L (en) | ROCK REINFORCEMENT | |
KR100509574B1 (en) | Earth pressure measurement apparatus of breast wall for road | |
EA199900231A1 (en) | METHOD OF INSTALLATION OF THE FOUNDATION FOR BUILDING OR CONSTRUCTION AND DEVICE FOR ITS APPLICATION | |
ATE162593T1 (en) | INJECTION ANCHORS FOR TUNNELS AND TRENCHES | |
JP2011168975A (en) | Seismic strengthening method and seismic strengthening structure for structure | |
KR960034591A (en) | Underground Construction Method Using Compact Grauting | |
JP3831898B2 (en) | Survey holes for underground structures and methods for creating survey holes | |
JPS61172925A (en) | Foundation for self-standing of utility pole and installing method thereof | |
DE60032717D1 (en) | Cover carrier for pile foundations | |
JPS56111725A (en) | Constructing method for strip footing by using existing concrete pile | |
JPS601451B2 (en) | Water stop mountain stop wall construction method using Benoto pile excavator | |
JPS6417924A (en) | Construction of pile with bag | |
RU2640059C1 (en) | Method of manufacturing drill-driven pile | |
GB1472853A (en) | Retaining walls | |
KR200167842Y1 (en) | Pile extracting supporter | |
JP3027561U (en) | Underground cylindrical anchor and anchor rod | |
CN104790375A (en) | Immersed tube flat-bottom valve macadam replacement construction method and flat-bottom valve device | |
KR830007977A (en) | Construction method of underground concrete wall | |
KR890005368A (en) | Tunnel support method with formwork made of synthetic resin pipe | |
NZ510321A (en) | Anchor element with hollow screw-in anchor and plug, with anchor filled with grout | |
JPS5766222A (en) | Construction of underground continuous wall |