CN2901154Y - Gasifying room burning boiler - Google Patents

Gasifying room burning boiler Download PDF

Info

Publication number
CN2901154Y
CN2901154Y CN 200620026143 CN200620026143U CN2901154Y CN 2901154 Y CN2901154 Y CN 2901154Y CN 200620026143 CN200620026143 CN 200620026143 CN 200620026143 U CN200620026143 U CN 200620026143U CN 2901154 Y CN2901154 Y CN 2901154Y
Authority
CN
China
Prior art keywords
furnace
flue
water
burning
boiler
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 200620026143
Other languages
Chinese (zh)
Inventor
崔洪清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN 200620026143 priority Critical patent/CN2901154Y/en
Application granted granted Critical
Publication of CN2901154Y publication Critical patent/CN2901154Y/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Solid-Fuel Combustion (AREA)

Abstract

The utility model provides a vaporizing chamber burning furnace comprising a furnace basement, a furnace shell, an internal furnace, and a coal-shoveling section which divide the internal furnace into a upper portion, a middle portion, and a lower portion, a fuel vaporizing section and a burning chamber burning-up section. Three wind inlets which are got into a furnace cavity from the internal furnace by a water sleeve are provided on the three sections of the internal furnace of one side of the furnace shell. A fire-grate water pipe which is longitudinally formed a certain elevation angle degrees with the internal furnace is provided on the lower portion of the middle section of the internal furnace, and pipe orifices provided on two ends of the fire-grate water pipe are communicated with a water jacket. A fire-proof belt is provided on the inside wall of the internal furnace which is provided on the upper portion of the fire-grate pipe, the burning chamber burning-up section which is provided on the lower chamber of the internal furnace is a burning-up chamber, a plurality of vertical smoke pipes are provided on the wall of the internal furnace which is provided on the middle portion of the burning chamber burning-up section,a small combustion chamber with the water jacket is provided on the top portion of the internal furnace, an upper furnace door, a middle furnace door and a lower furnace door are provided on the right side of the furnace shell. A water outlet is provided on the top-portion of the furnace, a system of water returning is connected with the upper portion of a heat-exchanger which is provided on one side of the furnace. The utility model has the advantages of that structure is compact, volume is small, no special person is needed to guard contiguously, coal is one-off shoveled, the controlling and setting of manipulation are done according to the procedure.

Description

The vaporizer combusting boiler
Technical field
The utility model relates to a kind of boiler, particularly a kind of vaporizer combusting boiler of environmental protection intelligence.
Background technology
In the market at the vertical air-furnace of usefulness, as: destructive distillation is counter burns, the type of furnaces such as double-layer grate, and the technology aging problem is more: boiler belongs to traditional grate firing, and fractional cold is big in the burner hearth, and coal combustion is incomplete, and boiler soot emission exceeds standard; Because boiler combustion is incomplete, chemistry and unburned carbon loss and flying dust, radiation loss are big, and flue gas directly runs, and heat utilization efficiency is low, and the conventional thermal efficiency is about 60%; The operation of the interrupted coal of boiler, combustion instability and have a large amount of cold airs to enter to take away heat, heat loss strengthens; Problems such as boiler combustion is unrealized and is controlled automatically, and labor intensity of operating staff is excessive, and the operating cost of oil-burning gas-fired boiler is too high, the easy oxidation rapid wear of fixed or movable cast iron grate.
Summary of the invention
For solving the problem that exists in the above-mentioned technology, the purpose of this utility model provides a kind of vaporizer combusting boiler, solves the soot emissions of traditional vertical coal-burning boiler and exceeds standard and the low problem of the thermal efficiency, reaches the rational state of coal clean burning.
For achieving the above object, technical solution of the present utility model provides a kind of vaporizer combusting boiler, include boiler foundation, shell, and form the flue of water jacket between the shell, wherein: described flue is divided into, in, following three sections: promptly throw the coal section, coal-fired gasification section and chamber combustion burning segment, on three sections of the corresponding flue of described shell one side, be respectively equipped with three air outlets that enter burner hearth through water jacket to flue simultaneously, in flue, be provided with the grate water pipe that axially is certain angle of inclination with flue in the pars infrasegmentalis, its two ends mouth of pipe is connected with water jacket, and on the corresponding position of shell, furnace bar tube dead ahead, be provided with the soil shifting opening of the corresponding furnace bar tube mouth of pipe, near above the furnace bar tube flue internal perisporium is provided with wall with refractory lining, refracto, both sides are respectively equipped with many caecum water pipes that are connected with flue and communicate with described water jacket in the furnace bar tube of wall with refractory lining, refracto bottom, flue bottom compartment combustion burning segment is a burning chamber, on the perisporium of combustion burning segment middle part, chamber flue, be furnished with many vertical smoke pipes, described many vertical smoke pipes are threaded flue, the top, top that passes to flue is located at the little combustion chamber of water jacket, the upper and lower plates of little combustion chamber is connected with shell, and a side is provided with stove water communicating pipe up and down, opposite side has exhanst gas outlet and is connected with heat exchanger, is provided with in described shell front, in, following three coal feeding holes that have fire door, igniting and hook Jiao Kou, cleaning door.
The boiler top is provided with delivery port, and system's backwater connects the heat exchanger top that is located at boiler one side, is provided with many screw thread heat exchanger smoke pipes in the heat exchanger, is equipped with in the pipe and scratches flow.Be provided with in the heat exchanger bottom communicate with water jacket advance the stove return pipe, the heat exchanger bottom is connected with water seal dust-removal and desulfurizing groove.Boiler bottom has sewage draining exit, is provided with the fire-resistant concrete of one deck on boiler foundation.
The angle of inclination of described furnace bar tube is the 5-8 degree.
Effect of the present utility model is this vaporizer combusting boiler compact conformation, and volume is little, and body auxiliary device one is installed.Do not need special messenger's on-line monitor to keep an eye on, disposable throwing coal, follow procedure control setting operation gets final product.After temperature is set, Automatic Control of Boiler, boiler force ventilation, pressurized firing, flameholding, fully, smokeless operation, it is efficient to economize on coal, and operation is not influenced by weather etc. continuously.Do not need overhead chimney, only smoke exhaust pipe is drawn outdoor getting final product.The throwing coal does not have cold air substantially when colluding Jiao and enters in the stove, can not take away heat because of cold air.Body of heater is done insulation and is handled, and reduces heat radiation.When water outlet, when the backwater appearance is smooth, the automatic burn-out of boiler, the safety of assurance boiler.This vaporizer combusting boiler is applicable to multiple uses such as drinking-water, bathing and heating.
Description of drawings
Fig. 1 is a structural representation of the present utility model;
Fig. 2 is the A-A cutaway view of Fig. 1;
Fig. 3 is a structure vertical view of the present utility model.
Among the figure:
1, base 2, return pipe 3, smoke pipe
4, outlet flue 5, exhaust opening 6, water jacket
7, communicating pipe 8, ajutage 9,11,13, fire door
10, fire grate pipe 12, soil shifting opening 14, refractory brick
15, wall with refractory lining, refracto 16, delivery port 17, sewage draining exit
18, flue 19, furnace shell 20, little smoke-box
21, dust-removal and desulfurizing groove 22, heat exchanger 23, heat exchanger smoke pipe
24, caecum water pipe
The specific embodiment
Reaching embodiment in conjunction with the accompanying drawings is illustrated vaporizer combusting boiler of the present utility model.
But the utility model vaporizer combusting boiler is the principle that adopts the backfire principle of coal and can change into gas fuel combustion under certain condition, the environment-friendly high-efficiency vertical boiler that designs and manufactures.This vaporizer combusting boiler adopts the chamber combustion technology, has improved the thermal efficiency.
This vaporizer combusting boiler structure is the flue 18 that forms water jacket 6 between boiler foundation 1, shell 19 and the shell.Described flue 18 is divided into three sections of upper, middle and lower: promptly throw coal section, coal-fired gasification section and chamber combustion burning segment, on three sections of the corresponding flue 18 of described shell 1 one sides, be respectively equipped with three air outlets 8 that enter burner hearth through water jacket 6 to flue simultaneously, be provided with the grate water pipe 10 that axially is certain angle of inclination with flue 18 in flue 18 in the pars infrasegmentalis, the angle of inclination is the 5-8 degree.Its two ends mouth of pipe is connected with water jacket, and the soil shifting opening 12 of corresponding furnace bar tube 10 mouths of pipe is housed on furnace bar tube 10 dead ahead shells 19 corresponding positions, near above the furnace bar tube 10 flue internal perisporium is provided with wall with refractory lining, refracto 15, coal is changed into gaseous state and delivered to the bottom burning segment by solid-state, reduced the furnace water cooling degree and be beneficial to fire burns and gas reforming, made aerogenesis, mixing, combustion integrative.Both sides are respectively equipped with many caecum water pipes 24 that are connected with flue and communicate with described water jacket in wall with refractory lining, refracto 15 bottom furnace bar tubes.Water is flowed in pipe can not produce subcooled boiling,, cooled off the coal-fired temperature in top, do not produce the vaporization vapour locking, make it to be difficult for coking, play the effect of good ventilation owing to leak water in the pipe.Caecum water pipe 24 plays the fire grate effect, holds the coal seam, effectively protects the space of bottom burning chamber.
Flue 18 bottom compartment combustions burning segment is a burning chamber, is furnished with many vertical threaded flues 3 on the perisporium of combustion burning segment middle part, chamber flue 18, cocks off in the pipe, cigarette, increases flue gas flow.It not only absorbs advection heat, but also absorbs a large amount of radiant heat.The top, top that threaded flue 3 passes to flue 18 is located at the little combustion chamber 20 of water jacket, the upper and lower plates of little combustion chamber 20 is connected with shell 19, and a side is provided with stove water communicating pipe 7 up and down, opposite side has exhanst gas outlet and is connected with heat exchanger 22, is provided with burnt mouthful 11 on coal feeding hole 9, igniting and hook, cleaning door 13 that three of upper, middle and lower have fire door in described shell 1 front.Little smoke-box 20 is provided in a side of the design of upper boiler water back of the body formula, has taken into full account flue gas heat and has been convenient to deashing.In order to make full use of heat energy, design heating surface heat exchanger 22 at afterbody, and in smoke pipe 23, scratched flow, make flue gas fully scratch heat release, exhaust gas temperature generally is controlled within 150-200 ℃.
Be provided with delivery port 16 at the boiler top, system's backwater is connected on heat exchanger 22 tops, is provided with many screw thread heat exchanger smoke pipes 23 in the heat exchanger 22, is equipped with in the pipe and scratches flow, and fire, flue gas are upwards flowed through fire tube 3, and water flows downward, and forms the exchange heat of maximum temperature difference.。Be provided with in heat exchanger 22 bottoms communicate with water jacket 6 advance stove return pipe 2, heat exchanger 22 bottoms are connected with water seal dust-removal and desulfurizing groove 21, make dust flow through the effect of washing one's hair of tank dilatation and water and remove, above water seal dust-removal and desulfurizing groove 21, add the liquid desulfurizing agent or in coal cinder, add sulphur-fixing agent and all can.Boiler bottom has sewage draining exit 17, is provided with the fire-resistant concrete 14 of one deck on boiler foundation 1.Fire-resistant concrete 14 increases burning chamber place, bottom temperature, and being beneficial to Lou, slag burns away.
This vaporizer combusting boiler burning structure is: the igniting of water pipe furnace grate top, wall with refractory lining, refracto 15 and on, under the effect of ventilating of the ajutage Final 8 system at middle part, make lump coal (or moulded coal) produce coal gas in combustion gasification indoor seasoning, destructive distillation, decomposition, and deliver to high temperature burning chamber under the fire grate, after ajutage 8 air distributions in bottom fully mixed, the mode of the backfire of burning elimination black smoke, gasification, pressure-fired, chamber combustion made burning fully, release heat is moved not over-emitting black exhaust to greatest extent.
Vaporizer combusting boiler of the present utility model proves through operation: its structure is the mature technology that has adopted bearing boiler, designs the little extreme misery pipe combination water back of the body formula vaporizer combusting boiler of floor space, increases back-end surfaces, makes full use of flue gas heat; The inclination water pipe furnace grate, coal is difficult for coking; Water circulates in the pipe, guarantees to ventilate; Wall with refractory lining, refracto is arranged in the furnace bar tube top, reduces the furnace water cooling degree, strengthens gas reforming; Three sections air-supplies are adjusted reasonable wind distribution according to ature of coal, make catch fire, aerogenesis, burning be more reasonable; After water temperature is set, open, blowing out controls automatically, selects ripe combustion control device for use; Dedusting and desulphurization integrated finishing, efficient, environmental protection, energy-conservation.Weak point is to still have in the short time after the blowing out a small amount of white vapour to emerge.
Adopt the vaporizer combusting boiler to solve the smoke elimination problem
The boiler over-emitting black exhaust mainly be fire coal do not have completing combustion and produce do not burn material, the way of solution is exactly to adopt the technical measures of completing combustion.We adopt the tilting water cooling tube to do grate in design, because tipping tube makes in-pipe flow moving good, do not produce the vaporization vapour locking, add that the water-cooled effect prevents coal-fired coking.Above fire grate, arrange wall with refractory lining, refracto, reduce the furnace water cooling degree and be beneficial to fire burns and gas reforming.The disposable coal amount that fills up after the upper point pyrogene merit produces coal gas (carbon monoxide) and other fugitive constituent under wall with refractory lining, refracto and reverse burning and air-supply acting in conjunction, under the c /v effect, in burning chamber's abundant chamber combustion burning, reach the purpose of smoke elimination.Facts have proved and do not arrange black smoke when boiler normally moves, reach smokeless operation.
Adopt the vaporizer combusting boiler to solve the low problem of the thermal efficiency
Above-mentioned technology solves coal-fired by the solid-state measure that becomes the combustion burning of gaseous state chamber, combustible is burnt cmpletely and emit heat, chemistry, machinery, flying dust imperfect combustion greatly descend, add the reasonable Arrangement radiation heating-surface, convection current is heated and afterbody is heated and the back-end surfaces smoke pipe in install spoiler additional, flue gas flow is strengthened, strengthen and conduct heat, and adopt reverse water inlet measure, reach the reverse exchange of maximum temperature difference, thereby reduce exhaust gas temperature greatly, maximally utilise the coal-fired heat that discharges, boiler jacket, do insulation and handle, reduce radiation loss.Reach the raising boiler thermal output, the purpose of fuel saving.
Adopt the vaporizer combusting boiler to solve grit and sulfur dioxide problem
Under forced ventilation, the soot particle that burns will be removed (or installing cyclone dust collectors additional) down by the dilatation and the water effect of washing one's hair of aft mounted water sealed tank, simultaneously on flue, add desulfurizing agent, make itself and sulfur in smoke chemical reaction (or in coal, mixing into sulphur-fixing agent) and reach the purpose of desulfurization.Water in the tank adds an amount of alkali (soda ash or caustic soda) neutralization back discharging regularly.
Traditional boiler thermal output: about 60%, heating area: 2000M 2, Coal-fired capacity 60KG/H, total coal consumption 86400KG of heating season, day maintenance man-hours 24 hours, season 6400 yuan of working hour expenses, expense amounts to 47872 yuan.The vaporizer combusting boiler thermal efficiency of the present utility model: 82%, heating area: 2000M 2, Coal-fired capacity 30KG/H, total coal consumption 43200KG of heating season, day maintenance man-hours 1 hour, season 1600 yuan of working hour expenses, expense amounts to 22336 yuan.

Claims (6)

1, a kind of vaporizer combusting boiler includes the flue that forms water jacket between boiler foundation, shell and the shell, it is characterized in that:
Described flue (18) is divided into, in, following three sections: promptly throw the coal section, coal-fired gasification section and chamber combustion burning segment, on three sections of the corresponding flue of described shell (1) one side (18), be respectively equipped with three air outlets (8) that enter burner hearth through water jacket (6) to flue simultaneously, in flue (18), be provided with the grate water pipe (10) that axially is certain angle of inclination with flue (18) in the pars infrasegmentalis, its two ends mouth of pipe is connected with water jacket, and on the corresponding position of furnace bar tube (10) dead ahead shell (19), be provided with the soil shifting opening (12) of corresponding furnace bar tube (10) mouth of pipe, near furnace bar tube (10) top flue internal perisporium is provided with wall with refractory lining, refracto (15), both sides are respectively equipped with the many caecum water pipes (24) that are connected with flue and communicate with described water jacket in the furnace bar tube of wall with refractory lining, refracto (15) bottom, flue (18) bottom compartment combustion burning segment is a burning chamber, on the perisporium of chamber combustion burning segment middle part flue (18), be furnished with many vertical smoke pipes (3), the top, top that passes to flue (18) is located at the little combustion chamber (20) of water jacket, the upper and lower plates of little combustion chamber (20) is connected with shell (19), and a side is provided with stove water communicating pipe (7) up and down, opposite side has exhanst gas outlet and is connected with heat exchanger (22), is provided with in described shell (1) front, in, following three coal feeding holes (9) that have fire door, igniting and hook Jiao Kou (11), cleaning door (13);
The boiler top is provided with delivery port (16), and the system backwater connects heat exchanger (22) top that is located at boiler one side, be provided with in heat exchanger (22) bottom communicate with water jacket advance stove return pipe (2), boiler bottom has sewage draining exit (17).
2, vaporizer combusting boiler according to claim 1 is characterized in that: the angle of inclination of described furnace bar tube (10) is the 5-8 degree.
3, vaporizer combusting boiler according to claim 1 is characterized in that: described many vertical smoke pipes (3) are threaded flue.
4, vaporizer combusting boiler according to claim 1 is characterized in that: the described fire-resistant concrete of one deck (14) that is provided with on boiler foundation (1).
5, vaporizer combusting boiler according to claim 1 is characterized in that: be provided with many screw thread heat exchanger smoke pipes (23) in the described heat exchanger (22), be equipped with in the pipe and scratch flow.
6, vaporizer combusting boiler according to claim 1 is characterized in that: described heat exchanger (22) bottom is connected with water seal dust-removal and desulfurizing groove (21).
CN 200620026143 2006-05-25 2006-05-25 Gasifying room burning boiler Expired - Fee Related CN2901154Y (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 200620026143 CN2901154Y (en) 2006-05-25 2006-05-25 Gasifying room burning boiler

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 200620026143 CN2901154Y (en) 2006-05-25 2006-05-25 Gasifying room burning boiler

Publications (1)

Publication Number Publication Date
CN2901154Y true CN2901154Y (en) 2007-05-16

Family

ID=38085318

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 200620026143 Expired - Fee Related CN2901154Y (en) 2006-05-25 2006-05-25 Gasifying room burning boiler

Country Status (1)

Country Link
CN (1) CN2901154Y (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102563856A (en) * 2011-12-05 2012-07-11 铁岭众缘环保设备制造有限公司 Fire coal reburning multi-pass environment-friendly water boiler
CN108716670A (en) * 2018-04-28 2018-10-30 王仲宇 A kind of multifunctional biomass high-temperature gasification boiler-burner
CN109578978A (en) * 2018-11-23 2019-04-05 兖矿集团有限公司 A kind of environmentally friendly coal-burning boiler and its processing method of fractional combustion

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102563856A (en) * 2011-12-05 2012-07-11 铁岭众缘环保设备制造有限公司 Fire coal reburning multi-pass environment-friendly water boiler
CN108716670A (en) * 2018-04-28 2018-10-30 王仲宇 A kind of multifunctional biomass high-temperature gasification boiler-burner
CN109578978A (en) * 2018-11-23 2019-04-05 兖矿集团有限公司 A kind of environmentally friendly coal-burning boiler and its processing method of fractional combustion

Similar Documents

Publication Publication Date Title
CN2901154Y (en) Gasifying room burning boiler
CN202630369U (en) Full automatic biomass fuel hot water boiler
CN202835457U (en) Multiple combustion type civilian heating furnace provided with internal air duct system
CN202119089U (en) Normal-pressure hot water boiler
CN201748474U (en) Air-conditioning wood/coal gasification furnace
CN206709083U (en) A kind of garbage pyrolysis gasification incinerator
CN206755182U (en) Spiral-flow type incinerator
CN201212735Y (en) Energy saving high efficient smokeless environment protecting boiler
CN205842741U (en) A kind of energy-saving coal stove
CN205137544U (en) Cooking heating stove with water pipe heat exchanger
CN204665229U (en) The horizontal coal-fired steam boiler of modified list drum
CN201954527U (en) Spiral automatic feed combustion boiler
CN201322293Y (en) Positive and reverse multi-gtate burning coal gas fired boiler
CN201081400Y (en) Indirect air-flow hot-blast stove
CN201688555U (en) Reversal-combustion type hot air boiler
CN207298909U (en) A kind of Domestic coal-fired boiler
CN201069261Y (en) A remote infrared heating pipe gas and water heating furnace
CN201513923U (en) Horizontal type counter-burning environment-protective coal-saving furnace
CN118167988A (en) Multi-time combustion biomass heating stove
CN2235069Y (en) Flash back type continuous self-combustion incinerator for life refuse
CN2264298Y (en) Hot air multifunctional boiler
CN2536955Y (en) Unpressurized energy-saving environmental protection boiler
CN101413713B (en) Phase-splitting combustion type automatic cycle briquette boiler
CN104848191B (en) The horizontal coal-fired steam boiler of modified model list drum
CN2153742Y (en) Box type coal-fired hot water, hot air stove

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
C17 Cessation of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20070516

Termination date: 20120525