CN220790363U - Rain shed mounting structure of all-glass curtain wall - Google Patents
Rain shed mounting structure of all-glass curtain wall Download PDFInfo
- Publication number
- CN220790363U CN220790363U CN202322407837.5U CN202322407837U CN220790363U CN 220790363 U CN220790363 U CN 220790363U CN 202322407837 U CN202322407837 U CN 202322407837U CN 220790363 U CN220790363 U CN 220790363U
- Authority
- CN
- China
- Prior art keywords
- curtain wall
- glass curtain
- clamping plate
- plate
- fixing plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Landscapes
- Load-Bearing And Curtain Walls (AREA)
Abstract
The utility model provides a rain shed mounting structure of an all-glass curtain wall, which belongs to the technical field of curtain wall engineering construction and comprises the following components: the first clamping plate is vertically arranged; the second clamping plate and the first clamping plate are separated and are oppositely arranged at two sides of the glass curtain wall, and the second clamping plate passes through the glass curtain wall through a first fastener and then is connected with the first clamping plate; the first fixing plate and the second fixing plate are arranged at intervals and horizontally arranged on the outer end face of the second clamping plate, the first fixing plate and the second fixing plate are used for clamping and fixing one end of the awning body, and the first fixing plate penetrates through the awning body through a second fastener and then is connected with the second fixing plate; the first clamping plate and the second clamping plate are clamped on two sides of the glass curtain wall, the first fixing plate and the second fixing plate of the second clamping plate clamp the fixed awning body, the awning body is connected with the glass curtain wall, the occupied area of the first clamping plate and the second clamping plate on the glass curtain wall is small, and the neat and attractive appearance of the outer vertical face of the glass curtain wall is guaranteed.
Description
Technical Field
The utility model relates to the technical field of curtain wall engineering construction, in particular to a canopy mounting structure of an all-glass curtain wall.
Background
The full glass curtain wall is used as an outer wall of a building, and a awning is generally required to be horizontally and fixedly arranged above an entrance of the curtain wall and used as a building structure for shielding rain, keeping out wind or preventing falling objects from injuring passersby.
When the awning in the prior art is installed on the glass curtain wall, the steel structure keels are required to be fixed on the glass curtain wall, and the glass awning is fixed through the steel structure keels.
However, the overall structure of the steel structure keels in the prior art is large, which can block the view of the building and influence the permeability and the beauty of the glass.
Disclosure of Invention
Therefore, the technical problem to be solved by the utility model is to overcome the defect of large integral structure of the steel structure keels in the prior art, thereby providing the canopy installation structure of the all-glass curtain wall.
In order to solve the technical problems, the utility model provides a canopy mounting structure of an all-glass curtain wall, comprising: the first clamping plate is vertically arranged;
the second clamping plates are separated from the first clamping plates and are oppositely arranged at two sides of the glass curtain wall, and the second clamping plates penetrate through the glass curtain wall through first fasteners and are connected with the first clamping plates;
the first fixed plate and the second fixed plate that the interval set up, the level sets up on the outer terminal surface of second grip block, and first fixed plate and second fixed plate are used for the fixed one end of canopy body of centre gripping, and first fixed plate passes the canopy body after being connected with the second fixed plate through the second fastener.
Preferably, a buffer member is arranged between the first fixing plate, the second fixing plate and the opposite surface of the canopy body.
Preferably, a buffer member is arranged between the first clamping plate, the second clamping plate and the opposite surface of the canopy body.
Preferably, the cushioning member is a rubber gasket.
Preferably, the second fixing plate is provided with a threaded hole, and the second fastener is in threaded connection with the threaded hole.
Preferably, the first clamping plate is provided with a threaded hole for connection with the first fastener.
Preferably, the first fastener and the second fastener are countersunk bolts.
The technical scheme of the utility model has the following advantages:
1. according to the awning mounting structure of the all-glass curtain wall, the first clamping plates and the second clamping plates are clamped on two sides of the glass curtain wall, the first fixing plates and the second fixing plates of the second clamping plates are used for clamping and fixing the awning body, connection of the awning body and the glass curtain wall is achieved, occupied areas of the first clamping plates and the second clamping plates on the glass curtain wall are small, and the tidy and attractive appearance of the outer vertical face of the glass curtain wall is guaranteed.
2. According to the awning mounting structure of the all-glass curtain wall, the buffer piece is arranged between the second fixing plate and the opposite surface of the awning body, so that the awning body is prevented from being damaged by the second fixing plate.
3. According to the awning mounting structure of the all-glass curtain wall, the threaded holes are formed in the second fixing plate, and the second fastening piece only needs to penetrate through the awning body and then is in direct threaded connection with the second fixing plate, so that the mounting efficiency is improved.
Drawings
In order to more clearly illustrate the embodiments of the present utility model or the technical solutions in the prior art, the drawings that are needed in the description of the embodiments or the prior art will be briefly described, and it is obvious that the drawings in the description below are some embodiments of the present utility model, and other drawings can be obtained according to the drawings without inventive effort for a person skilled in the art.
Fig. 1 is a front view of a canopy installation structure of an all-glass curtain wall provided in an embodiment of the present utility model;
FIG. 2 is a right side view of the first clamping plate of FIG. 1;
fig. 3 is a right side view of the second clamping plate of fig. 1.
Reference numerals illustrate:
1. a first clamping plate; 2. a second clamping plate; 3. glass curtain wall; 4. a first fixing plate; 5. a second fixing plate; 6. a rain shed body.
Detailed Description
The following description of the embodiments of the present utility model will be made apparent and fully in view of the accompanying drawings, in which some, but not all embodiments of the utility model are shown. All other embodiments, which can be made by those skilled in the art based on the embodiments of the utility model without making any inventive effort, are intended to be within the scope of the utility model.
In the description of the present utility model, it should be noted that the directions or positional relationships indicated by the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, are merely for convenience of describing the present utility model and simplifying the description, and do not indicate or imply that the devices or elements referred to must have a specific orientation, be configured and operated in a specific orientation, and thus should not be construed as limiting the present utility model. Furthermore, the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present utility model, it should be noted that, unless explicitly specified and limited otherwise, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be either fixedly connected, detachably connected, or integrally connected, for example; can be mechanically or electrically connected; can be directly connected or indirectly connected through an intermediate medium, and can be communication between two elements. The specific meaning of the above terms in the present utility model can be understood by those of ordinary skill in the art according to the specific circumstances.
In addition, the technical features of the different embodiments of the present utility model described below may be combined with each other as long as they do not collide with each other.
The canopy mounting structure of full glass curtain wall that this embodiment provided for the top installation of the position of full glass curtain wall door is fixed glass canopy.
As shown in fig. 1, a specific implementation manner of a canopy installation structure of an all-glass curtain wall provided in this embodiment includes: the first clamping plate 1 and the second clamping plate 2 are vertically arranged on the inner side of the glass curtain wall 3; the second clamping plate 2 is vertically arranged on the outer side of the glass curtain wall 3, and the first clamping plate 1 and the second clamping plate 2 are separated. The second clamping plate 2 passes through the glass curtain wall 3 through a first fastener and then is connected with the first clamping plate 1; the first fixing plate 4 and the second fixing plate 5 are arranged at intervals, and one end of the awning body 6 can be placed between the intervals. The first fixing plate 4 and the second fixing plate 5 are horizontally disposed on the outer end surface of the second clamping plate 2. The first fixing plate 4 passes through the awning body 6 through a second fastener and then is connected with the second fixing plate 5. The first clamping plate 1 and the second clamping plate 2 are clamped on two sides of the glass curtain wall 3, the first fixing plate 4 and the second fixing plate 5 of the second clamping plate 2 clamp and fix the awning body 6, connection of the awning body 6 and the glass curtain wall 3 is achieved, the occupied area of the first clamping plate 1 and the second clamping plate 2 on the glass curtain wall 3 is small, and the neatness and attractiveness of the outer vertical face of the glass curtain wall 3 are guaranteed. Specifically, the first clamping plate 1, the second clamping plate 2, the first fixing plate 4 and the second fixing plate 5 may be metal plates, and the first fixing plate 4 and the second fixing plate 5 may be respectively connected with the second clamping plate 2 through welding. The second clamping plate 2, the first fixing plate 4 and the second fixing plate 5 may be integrally formed, or may be made of other materials, for example, integrally formed polymer materials.
As shown in fig. 1, for one implementation manner of the canopy installation structure of the all-glass curtain wall provided in this embodiment, a buffer member is disposed between opposite surfaces of the first fixing plate 4, the second fixing plate 5 and the canopy body 6, so as to avoid damage to the canopy body 6 caused by the first fixing plate 4 and the second fixing plate 5. In addition, as an alternative embodiment, the clamping and fixing of the canopy body 6 may be realized without providing a buffer. In addition, as an alternative embodiment, silicone sealant is provided between the opposite surfaces of the first fixing plate 4, the second fixing plate 5 and the canopy body 6.
As shown in fig. 1, in one implementation manner of the canopy installation structure of the all-glass curtain wall provided in this embodiment, a buffer member is disposed between opposite surfaces of the first clamping plate 1, the second clamping plate 2 and the canopy body 6, so that damage to the glass curtain wall can be reduced. In addition, as an alternative embodiment, no buffer is provided between the first fixing plate 4 and the canopy body 6. In addition, as an alternative embodiment, silicone sealant is provided between the facing surfaces of the first clamping plate 1, the second clamping plate 2 and the canopy body 6.
As shown in fig. 1, in one implementation manner of the canopy installation structure of the all-glass curtain wall provided by this embodiment, the buffer member is a rubber gasket, and the rubber gasket has good compactness and good corrosion resistance. In addition, as an alternative embodiment, the buffer member may also be provided as a silicone pad.
As shown in fig. 1 and 3, in one implementation manner of the canopy installation structure of the all-glass curtain wall provided in this embodiment, the second fixing plate 5 is provided with a threaded hole, and the canopy body 6 is provided with a through hole for avoiding the second fastener. During installation, the second fastening piece only needs to penetrate through the first fixing plate 4 and the awning body 6 and then is in threaded connection with the threaded hole, so that the installation efficiency is improved. In addition, as an alternative embodiment, the second fixing plate 5 is not provided with a threaded hole, and the second fastener is connected with the nut after passing through the first fixing plate 4, the canopy body 6 and the second fixing plate 5.
As shown in fig. 1 and 2, in one implementation manner of the canopy installation structure of the all-glass curtain wall provided in this embodiment, a threaded hole for connecting with a first fastener is provided on a first clamping plate 1, and a through hole for avoiding the first fastener is provided on a glass curtain wall 3. During installation, the first fastener only needs to penetrate through the second clamping plate 2 and the glass curtain wall 3 and then is in threaded connection with the threaded hole, so that the installation efficiency is improved. In addition, as an alternative embodiment, the first clamping plate 1 is not provided with a threaded hole, and the first fastener is connected with the nut after passing through the first clamping plate 1, the glass curtain wall 3 and the second clamping plate 2.
As shown in fig. 1, in one implementation manner of the canopy installation structure of the all-glass curtain wall provided by this embodiment, the first fastener and the second fastener are countersunk bolts, and the countersunk bolts have fewer exposed parts, so that the overall aesthetic degree is improved. In addition, as an alternative embodiment, the first fastener, the second fastener is a hexagon bolt, or the like.
Canopy mounting structure of full glass curtain wall: the first clamping plate 1 is arranged on the inner side of the glass curtain wall 3, and the second clamping plate 2 is arranged on the outer side opposite to the first clamping plate and fixedly connected with the first clamping plate through a first fastener. One end of the awning body 6 is clamped by the first fixing plate 4 and the second fixing plate 5, a buffer piece is arranged on the opposite surfaces of the first fixing plate 4, the second fixing plate 5 and the glass awning, and then the second fixing piece penetrates through the first fixing plate 4 and the awning body 6 and then is connected with the second fixing plate 5.
Working principle of canopy mounting structure of all-glass curtain wall: the first clamping plate 1 and the second clamping plate 2 are clamped and fixed on the glass curtain wall 3, and then the first fixing plate 4 and the second fixing plate 5 clamp the rain shed body 6, so that the other end of the rain shed body 6 is overhanging. Compared with the traditional installation structure, the size is reduced, and the neatness and the attractiveness of the glass curtain wall 3 are ensured.
It is apparent that the above examples are given by way of illustration only and are not limiting of the embodiments. Other variations or modifications of the above teachings will be apparent to those of ordinary skill in the art. It is not necessary here nor is it exhaustive of all embodiments. And obvious variations or modifications thereof are contemplated as falling within the scope of the present utility model.
Claims (7)
1. The utility model provides a canopy mounting structure of full glass curtain wall which characterized in that includes:
the clamping device comprises a first clamping plate (1), wherein the first clamping plate (1) is vertically arranged;
the second clamping plates (2) are separated from the first clamping plates (1) and are oppositely arranged on two sides of the glass curtain wall (3), and the second clamping plates (2) penetrate through the glass curtain wall (3) through first fasteners and then are connected with the first clamping plates (1);
the first fixed plate (4) and the second fixed plate (5) that the interval set up, the level sets up on the outer terminal surface of second grip block (2), first fixed plate (4) and second fixed plate (5) are used for the one end of the fixed canopy body of centre gripping (6), first fixed plate (4) pass through the second fastener after canopy body (6) with second fixed plate (5) are connected.
2. The canopy mounting structure of an all-glass curtain wall according to claim 1, wherein buffer members are respectively arranged between the first fixing plate (4), the second fixing plate (5) and the opposite surfaces of the canopy body (6).
3. The canopy mounting structure of an all-glass curtain wall according to claim 2, wherein buffer members are respectively arranged between the opposite surfaces of the first clamping plate (1), the second clamping plate (2) and the glass curtain wall (3).
4. The structure for installing a canopy of an all-glass curtain wall according to claim 3, wherein the buffer member is a rubber gasket.
5. The canopy installation structure of the all-glass curtain wall according to claim 1, wherein the second fixing plate (5) is provided with a threaded hole, and the second fastener is in threaded connection with the threaded hole.
6. The canopy installation structure of the all-glass curtain wall according to any one of claims 1 to 5, wherein the first clamping plate (1) is provided with a threaded hole for connection with the first fastener.
7. The structure of claim 6, wherein the first and second fasteners are countersunk bolts.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322407837.5U CN220790363U (en) | 2023-09-05 | 2023-09-05 | Rain shed mounting structure of all-glass curtain wall |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202322407837.5U CN220790363U (en) | 2023-09-05 | 2023-09-05 | Rain shed mounting structure of all-glass curtain wall |
Publications (1)
Publication Number | Publication Date |
---|---|
CN220790363U true CN220790363U (en) | 2024-04-16 |
Family
ID=90662162
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202322407837.5U Active CN220790363U (en) | 2023-09-05 | 2023-09-05 | Rain shed mounting structure of all-glass curtain wall |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN220790363U (en) |
-
2023
- 2023-09-05 CN CN202322407837.5U patent/CN220790363U/en active Active
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US9473066B2 (en) | Mounting assemblies for solar panel systems and methods for using the same | |
CN106357205B (en) | Sloping roof waterproof photovoltaic module installation device | |
CN113958070B (en) | Photovoltaic building integrated integral roof | |
CN220790363U (en) | Rain shed mounting structure of all-glass curtain wall | |
CN206517343U (en) | Sloped roof water proof type photovoltaic module erecting device | |
CN216475560U (en) | Membrane structure building leans on wall waterproof construction | |
CN214531581U (en) | Buckle of BIPV system installation photovoltaic module | |
CN215420156U (en) | Novel building integral type waterproof photovoltaic support | |
CN213233962U (en) | Exhibition room furred ceiling structural system | |
CN210693832U (en) | Ground photovoltaic support | |
CN210459784U (en) | Clamp for building roof | |
CN216446592U (en) | Prevent assembly room of wind husky | |
CN216973879U (en) | Flashing assembly on metal composite board wall surface door and window | |
CN214090507U (en) | Reinforced decorative glass curtain wall | |
CN217000544U (en) | Photovoltaic support for color steel tile roof | |
CN220469221U (en) | Wind pressure resistant ceiling mounting structure | |
CN217158965U (en) | Anti-aging device for building electrical equipment | |
CN212984302U (en) | Decorate curtain with stabilize mounting structure | |
CN215594542U (en) | Install in canopy structure of curtain system | |
CN221263674U (en) | Assembled photovoltaic bracket system | |
CN221481153U (en) | Spring pin beam connection structure for exposed frame large glass | |
CN221799559U (en) | A kind of thermal insulation rare earth energy-saving glass door and window | |
CN217581815U (en) | Aluminium alloy door is with preventing wind accessory | |
CN210033141U (en) | Seamless mounting structure of metal door and window | |
CN219247750U (en) | M-shaped BIPV drainage bracket with fixing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant |