[go: up one dir, main page]

CN217266884U - Tower anchor pier integrated pedestrian suspension bridge - Google Patents

Tower anchor pier integrated pedestrian suspension bridge Download PDF

Info

Publication number
CN217266884U
CN217266884U CN202220499532.4U CN202220499532U CN217266884U CN 217266884 U CN217266884 U CN 217266884U CN 202220499532 U CN202220499532 U CN 202220499532U CN 217266884 U CN217266884 U CN 217266884U
Authority
CN
China
Prior art keywords
anchor
tower
cable
anchor pier
pier
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202220499532.4U
Other languages
Chinese (zh)
Inventor
张姚
黄文龙
徐叶明
高毅
黄庆业
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China United Engineering Corp Ltd
Original Assignee
China United Engineering Corp Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China United Engineering Corp Ltd filed Critical China United Engineering Corp Ltd
Priority to CN202220499532.4U priority Critical patent/CN217266884U/en
Application granted granted Critical
Publication of CN217266884U publication Critical patent/CN217266884U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model provides an integrative people's suspension bridge of tower anchor pier utilizes the dead weight of the anchor tower of back-tipping and anchor pier to come balanced main push-towing rope, has saved the anchor span and the anchorage of traditional suspension bridge, has greatly reduced the engineering quantity, construction cost and the construction degree of difficulty, also can not produce too much destruction to massif natural environment. The utility model comprises a main cable, a loose cable sleeve, a loose cable strand, a sling, a main beam, a support, an anchor tower and an anchor pier; the method is characterized in that: the anchor tower is fixedly arranged on the anchor pier, the anchor tower and the anchor pier are eccentrically arranged, and the anchor tower tilts backwards relative to the anchor pier; the cable scattering sleeve is arranged at the end part of the main cable, the cable scattering sleeve scatters the end part of the main cable into a plurality of cable scattering strands, and the cable scattering strands are anchored at the upper part of the anchor tower; a support is arranged on the top surface of the anchor pier; the sling is arranged on the main cable; the main beam is suspended on the sling, and the end part of the main beam is supported on the support.

Description

Tower anchor pier integrated pedestrian suspension bridge
Technical Field
The utility model relates to an integrative people's suspension bridge of tower anchor mound relates to bridge engineering field.
Background
The pedestrian suspension bridge has the characteristics of large spanning capacity, light and elegant form, convenience in construction and the like. The bridge form has strong adaptability to complex terrains such as canyon mountainous areas and the like, and is always the main form for building bridges in high-altitude mountain scenic areas. Geological terrain conditions in mountainous areas are complex, and a conventional double-tower simply-supported suspension bridge form cannot be applied sometimes. If the Chinese patent application No. 201720438269.7 discloses an inclined tower suspension bridge, the stability and the safety performance of the suspension bridge are improved by arranging a triangular bridge tower, although the installation of anchors at two ends is omitted, the triangular bridge tower needs to be provided with at least four foundations, the amount of the triangular bridge tower is far more than the engineering amount for constructing the anchors, and when the altitude difference of mountainous areas is large and the terrain is limited, the inclined tower foundation and the inclined tower body cannot be constructed at all. If chinese patent application No. 201920632282.5 discloses a towerless suspension bridge structural system again, directly anchor the main push-towing rope in the massif through canceling the bridge tower structure to adapt to the steep topography of canyon, though the engineering volume of two bridges towers can be saved to this way, excavate the massif and carry out main push-towing rope anchor and can greatly increase the construction degree of difficulty and engineering volume, also can produce the destruction to massif natural environment.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to overcome the above-mentioned not enough that exists among the prior art, and provide a integrative people's suspension bridge of tower anchor pier that structural design is reasonable, utilize the dead weight of the anchor tower of heeling and anchor pier to come balance main cable power, saved the anchor span and the anchorage of traditional suspension bridge, greatly reduced engineering quantity, construction cost and the construction degree of difficulty, also can not produce too much destruction to massif natural environment.
The utility model provides a technical scheme that above-mentioned problem adopted is: a tower anchor pier integrated pedestrian suspension bridge comprises a main cable, a loose cable sleeve, a loose cable strand, a sling, a main beam, a support, an anchor tower and an anchor pier; the method is characterized in that: the anchor tower is fixedly arranged on the anchor pier, the anchor tower and the anchor pier are eccentrically arranged, and the anchor tower tilts backwards relative to the anchor pier; the cable scattering sleeve is arranged at the end part of the main cable, the cable scattering sleeve scatters the end part of the main cable into a plurality of cable scattering strands, and the cable scattering strands are anchored at the upper part of the anchor tower; a support is arranged on the top surface of the anchor pier; the sling is arranged on the main cable; the main beam is suspended on the sling, and the end part of the main beam is supported on the support.
The cross section of the anchor pier is a rectangular section.
The cross section of anchor tower be the rectangular section.
The utility model discloses be provided with anchor pier haunches at the combination position of anchor pier and anchor tower.
Many scattered rope strand resultant force action point be located the longitudinal axis of anchor tower.
The girder divide into a plurality of sections, hang respectively on the hoist cable, the section one end of last girder hangs on the hoist cable, the other end supports on the support.
Compared with the prior art, the utility model, have following advantage and effect: the utility model discloses utilize dead weight of anchor tower and anchor pier to come balanced main cable power, replace traditional anchor span and anchorage through setting up anchor pier and anchor tower, greatly reduced engineering quantity, construction cost and the construction degree of difficulty, also can not produce too much destruction to massif natural environment, the comparatively complicated condition of specially adapted mountain area geology topographic condition.
Drawings
Fig. 1 is a schematic structural diagram of an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail by way of examples with reference to the accompanying drawings, which are illustrative of the present invention and are not intended to limit the present invention.
The embodiment of the utility model provides an including main push-towing rope 1, loose cable cover 11, loose cable strand 12, hoist cable 2, girder 3, support 31, anchor tower 4, anchor pier 5 and anchor pier haunches 51.
The anchor piers 5 are fixedly arranged on the mountain bodies at two ends. The cross section of the anchor pier 5 is a rectangular section.
The anchor tower 4 is fixedly arranged on the anchor pier 5, the anchor tower 4 and the anchor pier 5 are eccentrically arranged, the anchor tower 4 tilts backwards relative to the anchor pier 5, and the purpose is to balance the horizontal component force of the main cable 1 by utilizing the gravity of the anchor tower 4, so that the anti-overturning moment of the anchor pier 5 and the anchor tower 4 is improved. The cross section of the anchor tower 4 is rectangular, and the width of the transverse bridge direction is the same as that of the anchor pier 5.
The anchor pier haunching 51 is arranged at the joint part of the anchor pier 5 and the anchor tower 4, and the anchor pier haunching 51 can smoothly transmit the horizontal force and the vertical force of the anchor tower 4 to the anchor pier 5, so that the connection part of the anchor tower 4 and the anchor pier 5 is not subjected to stress concentration and is damaged, and the structural stress is more reasonable.
The anchor pier 5, the anchor pier haunch 51 and the anchor tower 4 are integrally cast. The anchor tower 4 and the anchor pier 5 are preferably made of reinforced concrete, and the reinforced concrete has a self-weight and can provide enough anti-overturning moment for balancing the horizontal component force of the main cable.
When the main cable 1 is poured to the upper portion of the anchor tower 4, the main cable 1 is erected, the end portion of the main cable 1 is provided with the cable scattering sleeve 11, the cable scattering sleeve 11 scatters the end portion of the main cable 1 into a plurality of cable scattering strands 12, and the resultant action point of the cable scattering strands 12 is located on the longitudinal axis of the anchor tower 4. And anchoring the loose cable strands 12 at corresponding positions on the upper part of the anchor tower 4, pouring the residual concrete on the upper part of the anchor tower 4 to the designed elevation of the tower top after the fixation is finished, and finishing the concrete pouring of all the anchor towers 4.
After the anchor pier 5 is formed with strength by concrete, a support 31 is arranged at a corresponding position on the top surface of the anchor pier.
The sling 2 is provided with a plurality of slings which are sequentially arranged at the relevant positions of the main cable 1.
The main beam 3 is divided into a plurality of sections and is suspended at the tail end of the sling 2, one end of the last section 3 of the main beam is supported on the support 31, and all the sections are longitudinally connected into a whole after all the sections 3 of the main beam are installed, so that a complete bridge floor is formed.
In addition, it should be noted that the specific embodiments described in the present specification may be different in the components, the shapes of the components, the names of the components, and the like, and the above description is only an example of the structure of the present invention. All the equivalent changes or simple changes made according to the structure, characteristics and principle of the utility model are included in the protection scope of the utility model.

Claims (6)

1. A tower anchor pier integrated pedestrian suspension bridge comprises a main cable, a cable scattering sleeve, cable scattering strands, a sling, a main beam, a support, an anchor tower and an anchor pier; the method is characterized in that: the anchor tower is fixedly arranged on the anchor pier, the anchor tower and the anchor pier are eccentrically arranged, and the anchor tower tilts backwards relative to the anchor pier; the cable scattering sleeve is arranged at the end part of the main cable, the cable scattering sleeve scatters the end part of the main cable into a plurality of cable scattering strands, and the cable scattering strands are anchored at the upper part of the anchor tower; a support is arranged on the top surface of the anchor pier; the sling is arranged on the main cable; the main beam is suspended on the sling, and the end part of the main beam is supported on the support.
2. The tower anchor pier integrated pedestrian suspension bridge as claimed in claim 1, wherein: the cross section of the anchor pier is a rectangular section.
3. The tower anchor pier integrated pedestrian suspension bridge of claim 1, wherein: the cross section of the anchor tower is a rectangular section.
4. The tower anchor pier integrated pedestrian suspension bridge as claimed in claim 1, wherein: and an anchor pier haunches are arranged at the joint part of the anchor pier and the anchor tower.
5. The tower anchor pier integrated pedestrian suspension bridge of claim 1, wherein: the resultant force action point of the plurality of scattered cable strands is positioned on the longitudinal axis of the anchor tower.
6. The tower anchor pier integrated pedestrian suspension bridge as claimed in claim 1, wherein: the main beam is divided into a plurality of sections which are respectively hung on the slings, one end of the section of the last main beam is hung on the slings, and the other end of the section of the last main beam is supported on the support.
CN202220499532.4U 2022-03-09 2022-03-09 Tower anchor pier integrated pedestrian suspension bridge Active CN217266884U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220499532.4U CN217266884U (en) 2022-03-09 2022-03-09 Tower anchor pier integrated pedestrian suspension bridge

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220499532.4U CN217266884U (en) 2022-03-09 2022-03-09 Tower anchor pier integrated pedestrian suspension bridge

Publications (1)

Publication Number Publication Date
CN217266884U true CN217266884U (en) 2022-08-23

Family

ID=82859879

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220499532.4U Active CN217266884U (en) 2022-03-09 2022-03-09 Tower anchor pier integrated pedestrian suspension bridge

Country Status (1)

Country Link
CN (1) CN217266884U (en)

Similar Documents

Publication Publication Date Title
CN101649604B (en) Construction bracket of 1# block of inclined pull bridge and constructing method thereof
CN110820526B (en) Spatial four-cable-plane double-amplitude curved cable-stayed bridge for canyon river terrain and construction method
CN211815489U (en) Super large span flying swallow type concrete filled steel tube arch bridge with self-anchoring suspension cable system
CN210031461U (en) Towerless suspension bridge structure system
CN109750600B (en) A construction method of asymmetric cable crane
CN106012872B (en) Cable-stayed reinforcement system and construction method for continuous rigid frame bridges without back-cable
CN106958190A (en) A kind of ground anchor type single pylon cable stayed bridge structure
CN112267367B (en) Method for converting arch-first beam-later system of self-anchored steel box tied arch bridge
CN113235389A (en) Ground anchor type suspension bridge structure suitable for special terrain
CN206721647U (en) A kind of ground anchor type single pylon cable stayed bridge structure
CN115419104A (en) Cable crane combined type anchorage structure and using method thereof
CN111519530A (en) Pier head type tunnel anchor and construction method
CN217266884U (en) Tower anchor pier integrated pedestrian suspension bridge
CN218479026U (en) Pedestrian suspension bridge without side cable and anchorage
CN112048987B (en) Single-tower space cable-surface ground anchor cable-stayed bridge under limited space condition under bridge
CN201738227U (en) Ground-anchored and self-anchored hauling combined system bridge
KR102542385B1 (en) Hybrid cable pedestrian suspension bridge and contruction method thereof
CN216663755U (en) Ground anchor type suspension bridge structure suitable for special terrain
CN205954469U (en) Interior earth anchor suspension bridge
CN108330811A (en) A kind of asymmetric assembled steel cable-stayed bridge and erection method
CN212270636U (en) Self-anchored suspension bridge of main cable ground anchor
CN103485271B (en) A prestressed cable truss bridge for pedestrians in mountainous rural areas
CN207933870U (en) A kind of asymmetric assembled steel cable-stayed bridge
CN114250713B (en) Permanent-face combined mountain area upper bearing arch bridge structure and construction method thereof
CN206233119U (en) Anti-overturning hanging basket structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant