[go: up one dir, main page]

CN217078457U - A mobile full house stand - Google Patents

A mobile full house stand Download PDF

Info

Publication number
CN217078457U
CN217078457U CN202220856022.8U CN202220856022U CN217078457U CN 217078457 U CN217078457 U CN 217078457U CN 202220856022 U CN202220856022 U CN 202220856022U CN 217078457 U CN217078457 U CN 217078457U
Authority
CN
China
Prior art keywords
upright
support
fixing device
beret
bailey beam
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202220856022.8U
Other languages
Chinese (zh)
Inventor
李凤松
郝贤德
胡松涛
贺宏波
赵龙飞
吴正义
尹正
汪建群
张文龙
李隆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hunan University of Science and Technology
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Original Assignee
Hunan University of Science and Technology
Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hunan University of Science and Technology, Third Engineering Co Ltd of Shanghai Civil Engineering Co Ltd of CREC filed Critical Hunan University of Science and Technology
Priority to CN202220856022.8U priority Critical patent/CN217078457U/en
Application granted granted Critical
Publication of CN217078457U publication Critical patent/CN217078457U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

本申请涉及一种移动式满堂支架,其包括贝雷梁,还包括支架固定装置、移动装置以及滑轨,所述贝雷梁安装在所述移动装置上,所述支架固定装置安装在所述贝雷梁上,所述移动装置安装在滑轨上,所述移动装置可沿所述滑轨进行滑移。只需在地基上设置滑轨,再在滑轨上依次安装移动装置、贝雷梁以及支架固定装置,即可在支架固定装置上对桥梁进行施工。本申请的一种移动式满堂支架通过设置滑轨代替支架,能节省大量的支架模板,从而改善现有技术满堂支架搭建费时费力导致施工效率低的问题。

Figure 202220856022

The present application relates to a mobile full house support, which includes a Bailey beam, a bracket fixing device, a moving device and a sliding rail, the Bailey beam is installed on the moving device, and the bracket fixing device is installed on the On the Bailey beam, the moving device is installed on the sliding rail, and the moving device can slide along the sliding rail. Only need to set the slide rail on the foundation, and then install the mobile device, the Bailey beam and the bracket fixing device in sequence on the sliding rail, and then the bridge can be constructed on the bracket fixing device. The mobile full-floor bracket of the present application can save a lot of bracket templates by providing slide rails instead of brackets, thereby improving the problem of low construction efficiency caused by time and labor in building full-floor brackets in the prior art.

Figure 202220856022

Description

一种移动式满堂支架A mobile full house stand

技术领域technical field

本实用新型涉及建筑施工装置的技术领域,具体涉及一种移动式满堂支架。The utility model relates to the technical field of building construction devices, in particular to a mobile full hall support.

背景技术Background technique

近年来,我国城市的桥梁不断发展,在桥梁的搭建过程中一般会采取满堂支架辅助刚架桥顶板的方式进行施工。In recent years, the bridges in my country's cities have been developing continuously. In the process of bridge construction, the construction of the roof of the rigid-frame bridge is generally carried out by means of full-house brackets.

常规满堂支架的施工方法,需要在桥下搭建模板以及支架,在支架上安装贝雷架,随后浇筑桥体混凝土,待混凝土达到强度后拆除模板及支架。The conventional construction method of full-house brackets requires the construction of formwork and brackets under the bridge, the installation of berets on the brackets, and the subsequent pouring of concrete for the bridge body. After the concrete reaches its strength, the formwork and brackets are removed.

常规的满堂支架在搭建时,一方面需要对大面积的支架软土地基进行处理,另一方面还需要耗费大量的支架进行搭建,尤其是在南方水网发达的地区,将给施工带来很大的不便,费时费力导致施工效率低。When building a conventional full house support, on the one hand, it needs to deal with a large area of support and soft soil foundation, and on the other hand, it needs to spend a lot of support to build, especially in the area with developed water network in the south, which will bring great difficulties to the construction. Big inconvenience, time-consuming and labor-intensive, resulting in low construction efficiency.

实用新型内容Utility model content

因此,本实用新型要解决的技术问题在于克服现有技术满堂支架搭建费时费力导致施工效率低的缺陷,从而提供一种移动式满堂支架。Therefore, the technical problem to be solved by the present invention is to overcome the defects of the prior art that the construction of the full house support is time-consuming and laborious, resulting in low construction efficiency, thereby providing a mobile full house support.

一种移动式满堂支架,包括贝雷梁,还包括支架固定装置、移动装置以及滑轨,所述贝雷梁安装在所述移动装置上,所述支架固定装置安装在所述贝雷梁上,所述移动装置安装在滑轨上,所述移动装置可沿所述滑轨进行滑移。A mobile full house support includes a Bailey beam, a bracket fixing device, a moving device and a slide rail, the Bailey beam is installed on the mobile device, and the bracket fixing device is installed on the Bailey beam , the moving device is installed on the sliding rail, and the moving device can slide along the sliding rail.

通过采用上述技术方案,只需在地基上设置滑轨,再在滑轨上依次安装移动装置、贝雷梁以及支架固定装置,即可在支架固定装置上对桥梁进行施工。当桥梁的一个节段施工完成后,通过移动装置带动贝雷梁以及支架固定装置移动至下一节段进行施工。本申请的一种移动式满堂支架通过设置滑轨代替支架,一方面能节省大量的支架模板,另一方面无需对大面积的地基进行处理,从而改善现有技术满堂支架搭建费时费力导致施工效率低的问题。By adopting the above technical solution, the bridge can be constructed on the support fixing device only by setting the sliding rail on the foundation, and then installing the moving device, the Bailey beam and the bracket fixing device on the sliding rail in sequence. When the construction of one section of the bridge is completed, the Bailey beam and the bracket fixing device are driven by the mobile device to move to the next section for construction. The mobile full-floor support of the present application is provided with slide rails instead of supports. On the one hand, a large number of support templates can be saved, and on the other hand, large-area foundations need not be processed, thereby improving the construction efficiency of the prior art, which is time-consuming and labor-intensive. low problem.

进一步的,所述移动装置包括支撑座以及若干滚轮,若干所述滚轮安装在所述滑轨上,所述滚轮与所述支撑座转动连接。Further, the moving device includes a support base and a plurality of rollers, a plurality of the rollers are mounted on the slide rail, and the rollers are rotatably connected to the support base.

通过采用上述技术方案,通过在支撑座上安装滚轮,滚轮沿滑轨进行滚动滑移即可带动支撑座以及安装在支撑座上的支架固定装置进行移动,从而移动至下一节段上。By adopting the above technical solution, by installing a roller on the support seat, the roller can roll and slide along the slide rail to drive the support seat and the bracket fixing device installed on the support seat to move, thereby moving to the next segment.

进一步的,所述移动装置还包括用于限制所述贝雷梁位置的挡块,所述挡块安装在所述支撑座上,所述挡块设置在所述支撑座宽度方向的两侧,所述挡块沿所述支撑座的长度方向设置,所述贝雷梁与所述挡块抵接或脱离。Further, the moving device further includes a stopper for limiting the position of the Bailey beam, the stopper is installed on the support base, and the stopper is arranged on both sides of the support base in the width direction, The blocking block is arranged along the length direction of the support base, and the Bailey beam is in contact with or disengaged from the blocking block.

通过采用上述技术方案,通过在支撑座上设置挡块,挡块对贝雷梁进行限位,从而使得贝雷梁能稳定地置于支撑座上,便于人员进行施工作业。By adopting the above technical solution, the stopper is arranged on the support seat, and the stopper limits the position of the Bailey beam, so that the Bailey beam can be stably placed on the support seat, which is convenient for personnel to carry out construction operations.

进一步的,所述支架固定装置包括支撑部件以及若干立杆底座,若干所述立杆底座间隔设置于所述贝雷梁上,所述支撑部件包括若干立杆单元以及若干用于连接所述立杆单元的横杆,若干所述立杆单元与所述立杆底座一一对应,每一个所述立杆单元包括一根主立杆以及若干根副立杆,所述主立杆安装在所述立杆底座上,若干根所述副立杆安装在所述主立杆上,所述横杆的一端安装在一个立杆单元上,所述横杆的另一端安装在另一个相邻的立杆单元上。Further, the bracket fixing device includes a support member and a plurality of vertical pole bases, and the plurality of the vertical pole bases are arranged on the Bailey beam at intervals. The horizontal bar of the pole unit, a plurality of the vertical pole units are in one-to-one correspondence with the vertical pole base, each of the vertical pole units includes a main vertical pole and several auxiliary vertical poles, and the main vertical poles are installed in the On the base of the vertical pole, a plurality of the auxiliary vertical poles are installed on the main vertical pole, one end of the horizontal pole is installed on a vertical pole unit, and the other end of the horizontal pole is installed on another adjacent pole. on the pole unit.

通过采用上述技术方案,需要安装支架固定装置时,在贝雷梁上间隔安装立杆底座,随后在立杆底座上安装主立杆以及副立杆,立杆单元的高度可通过副立杆的数量进行调节,最后在立杆单元之间安装横杆即可完成立杆的安装。By adopting the above technical solution, when the bracket fixing device needs to be installed, the vertical pole base is installed on the Bailey beam at intervals, and then the main vertical pole and the auxiliary vertical pole are installed on the vertical pole base. Adjust the number, and finally install the cross bar between the pole units to complete the installation of the pole.

进一步的,所述支撑部件还包括若干用于加固所述立杆单元的斜杆,所述立杆单元上设置有若干脚手盘,所述立杆单元上的若干脚手盘相互平行,所述斜杆的一端安装在其中一根立杆的脚手盘上,所述斜杆的另一端安装在另一根相邻立杆不等高的脚手盘上。Further, the support member also includes a plurality of inclined rods for reinforcing the vertical pole unit, a plurality of scaffolding plates are arranged on the vertical pole unit, and the several scaffolding plates on the vertical pole unit are parallel to each other, so One end of the inclined rod is installed on the scaffolding plate of one of the vertical poles, and the other end of the inclined rod is installed on the scaffolding plate of the other adjacent vertical poles with different heights.

通过采用上述技术方案,布置多根斜杆,通过多根斜杠对立杆单元进行支撑,从而加固若干立杆单元之间的连接结构强度。By adopting the above technical solution, a plurality of diagonal bars are arranged, and the vertical bar units are supported by the plurality of diagonal bars, thereby strengthening the structural strength of the connection between the plurality of vertical bar units.

进一步的,所述立杆底座包括垫块、连接螺栓以及垫板,所述垫块安装在所述贝雷梁上,所述垫板安装在所述垫块上,所述连接螺栓安装在所述垫板上,所述主立杆安装在所述连接螺栓远离所述垫块的一侧。Further, the vertical pole base includes a spacer block, a connecting bolt and a spacer plate, the spacer block is installed on the Bailey beam, the spacer plate is installed on the spacer block, and the connecting bolt is installed on the On the backing plate, the main vertical rod is installed on the side of the connecting bolt away from the backing block.

通过采用上述技术方案,将立杆底座安装在贝雷梁上,再在立杆底座上安装主立杆,便能完成主立杆的安装。By adopting the above technical solution, the installation of the main pole can be completed by installing the base of the pole on the Bailey beam, and then installing the main pole on the base of the pole.

进一步的,所述贝雷梁包括若干贝雷片以及连接件,所述贝雷片上具有阳头与阴头,一个所述贝雷片上的阳头通过所述连接件与另一所述贝雷片的阴头进行拼装。Further, the Bailey beam includes a plurality of Bailey pieces and a connecting piece, the Bailey piece has a male head and a female head, and the male head on one Bailey piece is connected to the other Bailey through the connecting piece. The female head of the film is assembled.

通过采用上述技术方案,通过连接件对多个贝雷片进行拼装即能快速完成贝雷梁的安装,贝雷梁的安装简单方便。By adopting the above technical solution, the installation of the Bailey beam can be quickly completed by assembling a plurality of Bailey sheets through the connecting piece, and the installation of the Bailey beam is simple and convenient.

本实用新型技术方案,具有如下优点:The technical scheme of the utility model has the following advantages:

1.本实用新型提供的移动式满堂支架,设置贝雷梁、支架固定装置、移动装置以及滑轨,通过移动装置带动贝雷梁以及支架固定装置在滑轨上进行滑移即可对桥梁进行施工,无需对大面积的地基进行处理,同时也无需在地基上拼接大量的支架,改善常规满堂支架搭建费时费力导致施工效率低的问题。1. The mobile full hall support provided by the utility model is provided with Bailey beam, bracket fixing device, moving device and sliding rail, and the bridge can be carried out by sliding the Bailey beam and the supporting fixing device on the sliding rail by the moving device. During construction, there is no need to deal with a large area of the foundation, and at the same time, there is no need to splicing a large number of brackets on the foundation, which improves the problem of low construction efficiency due to the time-consuming and laborious construction of conventional full-house brackets.

2.本实用新型提供的移动装置以及滑轨,结构紧凑方便,便于拼接与安装。2. The mobile device and the slide rail provided by the utility model have compact and convenient structures, and are easy to splicing and installing.

3.本实用新型提供的支架固定装置,结构简单拼装方便,通过设置立杆单元、横杆以及斜杆,横杆以及斜杆对立杆单元进行支撑和加固,强度可靠。3. The bracket fixing device provided by the utility model has a simple structure and is easy to assemble. By setting a vertical rod unit, a horizontal rod and an oblique rod, the horizontal rod and the oblique rod support and reinforce the vertical rod unit, and the strength is reliable.

附图说明Description of drawings

为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings required in the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.

图1为本实用新型一种移动式满堂支架的主视图;Fig. 1 is the front view of a kind of mobile full hall support of the utility model;

图2为图1中A部分的局部放大示意图;Fig. 2 is the partial enlarged schematic diagram of A part among Fig. 1;

图3为图1中B部分的局部放大示意图;Fig. 3 is a partial enlarged schematic view of part B in Fig. 1;

图4为图1中C部分的局部放大示意图;Fig. 4 is the partial enlarged schematic diagram of C part in Fig. 1;

图5为图1中贝雷片的正视图。FIG. 5 is a front view of the Bailey sheet of FIG. 1 .

附图标记说明:Description of reference numbers:

1、贝雷梁;11、贝雷片;111、阳头;112、阴头;12、连接件;2、支架固定装置;21、立杆底座;211、垫块;212、螺栓;213、垫板;22、支撑部件;221、立杆单元;2211、主立杆;2212、副立杆;2213、脚手盘;2214、连接销;222、横杆;223、斜杆;3、移动装置;31、支撑座;32、滚轮;33、挡块;4、滑轨。1. Bailey beam; 11. Bailey sheet; 111, male head; 112, female head; 12, connecting piece; 2, bracket fixing device; 21, pole base; 211, spacer; 212, bolt; 213, Backing plate; 22, supporting parts; 221, pole unit; 2211, main pole; 2212, auxiliary pole; 2213, scaffolding plate; 2214, connecting pin; 222, cross bar; 223, inclined pole; 3, moving device; 31, support seat; 32, roller; 33, stop; 4, slide rail.

具体实施方式Detailed ways

下面将结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.

此外,下面所描述的本实用新型不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as there is no conflict with each other.

参照图1,一种移动式满堂支架,包括贝雷梁1,还包括支架固定装置2、移动装置3以及滑轨4,贝雷梁1紧固安装在移动装置3上,支架固定装置2安装在贝雷梁1上,移动装置3安装在滑轨4上,移动装置3可沿滑轨4进行滑移。Referring to Fig. 1 , a mobile full-house support includes a Bailey beam 1, a bracket fixing device 2, a mobile device 3 and a slide rail 4, the Bailey beam 1 is fastened and installed on the mobile device 3, and the bracket fixing device 2 is installed On the Bailey beam 1 , the moving device 3 is installed on the sliding rail 4 , and the moving device 3 can slide along the sliding rail 4 .

参照图1和图2,具体地,滑轨4沿桥梁的长度方向设置,在本实施例中,滑轨4为两个V型导轨,两个V型导轨分别设置于桥梁宽度方向的两端,滑轨4的材料可以是工字钢。移动装置3包括支撑座31以及若干滚轮32,支撑座31大体呈长方体型,支撑座31沿桥梁的长度方向铺设,贝雷梁1安装在支撑座31上,支架固定装置2安装在贝雷梁1上,支撑座31宽度方向的两侧转动安装有滚轮32,滚轮32安装在滑轨4上进行滑移,滚轮32上开设有凹槽以配合滑轨4,移动装置3可通过操作拉力设备或千斤顶驱动其进行移动。在本实施例中,滚轮32有四个,四个滚轮32分别位于支撑座31的四个边角上对支撑座31进行支撑,在实际使用中,滚轮32的数量根据支撑座31的实际大小确定,只要能对支撑座31进行支撑即可。1 and 2, specifically, the slide rails 4 are arranged along the length direction of the bridge. In this embodiment, the slide rails 4 are two V-shaped guide rails, and the two V-shaped guide rails are respectively arranged at both ends of the bridge width direction. , the material of the slide rail 4 can be I-beam. The mobile device 3 includes a support base 31 and a number of rollers 32. The support base 31 is generally in the shape of a cuboid, the support base 31 is laid along the length direction of the bridge, the Bailey beam 1 is installed on the support seat 31, and the bracket fixing device 2 is installed on the Bailey beam. 1, both sides of the support base 31 in the width direction are rotatably installed with rollers 32, the rollers 32 are mounted on the slide rail 4 for sliding, and the roller 32 is provided with a groove to match the slide rail 4, and the mobile device 3 can be operated by operating the pulling device. Or the jack drives it to move. In this embodiment, there are four rollers 32 , and the four rollers 32 are respectively located on the four corners of the support seat 31 to support the support seat 31 . In actual use, the number of rollers 32 is based on the actual size of the support seat 31 . Determine, as long as the support base 31 can be supported.

在地基上设置滑轨4,再在滑轨4上依次安装移动装置3、贝雷梁1以及支架固定装置2,即可在支架固定装置2上对桥梁进行施工。当桥梁的一个节段施工完成后,通过移动装置3带动贝雷梁1以及支架固定装置2移动至下一节段进行施工。一方面能节省大量的支架模板,另一方面无需对大面积的地基进行处理,从而改善常规满堂支架搭建费时费力导致施工效率低的问题。The slide rail 4 is arranged on the foundation, and then the moving device 3 , the Bailey beam 1 and the bracket fixing device 2 are sequentially installed on the sliding rail 4 , so that the bridge can be constructed on the bracket fixing device 2 . When the construction of one section of the bridge is completed, the Bailey beam 1 and the bracket fixing device 2 are driven by the moving device 3 to move to the next section for construction. On the one hand, it can save a lot of support formwork, and on the other hand, it does not need to deal with a large area of the foundation, so as to improve the problem of low construction efficiency due to the time-consuming and laborious construction of conventional full-floor supports.

参照图1和图5,贝雷梁1用于对支架固定装置2进行支撑,贝雷梁1具体可以通过螺栓紧固安装在移动装置3上,贝雷梁1紧固连接支架固定装置2以及移动装置3,当移动装置3在滑轨4上移动时,支架固定装置2不易发生偏移。具体地,贝雷梁1包括若干贝雷片11以及用于拼接若干贝雷片11的连接件12,贝雷片11的一端具有阳头111,贝雷片11的另一端具有阴头112,连接件12具体为螺栓212。当需要拼接贝雷片11时,将一个贝雷片11上的阳头111重叠至另一贝雷片11的阴头112,使用螺栓212对阳头111以及阴头112进行拼装即可完成安装,贝雷梁1的安装简单方便。在本实施例中,贝雷片11有五片,贝雷片11的数量可根据实际需要进行调整。1 and FIG. 5, the Bailey beam 1 is used to support the bracket fixing device 2, the Bailey beam 1 can be installed on the mobile device 3 by bolts, and the Bailey beam 1 is fastened and connected to the bracket fixing device 2 and For the mobile device 3, when the mobile device 3 moves on the slide rail 4, the bracket fixing device 2 is not easily displaced. Specifically, the Bailey beam 1 includes a plurality of Bailey sheets 11 and a connector 12 for splicing the plurality of Bailey sheets 11. One end of the Bailey sheet 11 has a male head 111, and the other end of the Bailey sheet 11 has a female head 112. The connecting piece 12 is specifically a bolt 212 . When the beret 11 needs to be spliced, the male head 111 on one beret 11 is overlapped to the female head 112 of the other beret 11, and the male head 111 and the female head 112 are assembled with bolts 212 to complete the installation. , the installation of Bailey beam 1 is simple and convenient. In this embodiment, there are five beret sheets 11, and the number of beret sheets 11 can be adjusted according to actual needs.

回看图1和图2,相应的,移动装置3还包括用于限制贝雷梁1位置的挡块33。具体地,挡块33大体呈“L”字型,两个挡块33安装在支撑座31上,挡块33沿支撑座31的长度方向设置,挡块33设置在支撑座31宽度方向的两侧,两个挡块33相对设置。贝雷梁1的底端抵接在挡块33上。通过在支撑座31上设置挡块33,挡块33会对贝雷梁1进行限位,从而使得贝雷梁1无需通过焊接的方式便能稳定地置于支撑座31上,便于人员进行施工作业。Referring back to FIG. 1 and FIG. 2 , correspondingly, the moving device 3 further includes a stopper 33 for limiting the position of the Bailey beam 1 . Specifically, the block 33 is generally in the shape of an “L”, two blocks 33 are installed on the support base 31 , the blocks 33 are arranged along the length direction of the support base 31 , and the blocks 33 are arranged at two width directions of the support base 31 . On the side, two stoppers 33 are arranged opposite to each other. The bottom end of the Bailey beam 1 abuts on the stopper 33 . By setting the stopper 33 on the support base 31, the stopper 33 will limit the position of the Bailey beam 1, so that the Bailey beam 1 can be stably placed on the support base 31 without welding, which is convenient for personnel to carry out construction Operation.

参照图1和图3,支架固定装置2用于对施工人员进行支撑以进行施工,具体地,支架固定装置2包括支撑部件22以及若干立杆底座21,若干立杆底座21间隔设置于贝雷梁1上,立杆底座21包括垫块211、连接螺栓212以及垫板213,垫块211安装在贝雷梁1上,垫块211具体焊接在贝雷梁1上,垫板213安装在垫块211上,垫板213的下部钩紧垫块211,垫板213的下部也可以与垫块211焊接,只要能实现垫板213与垫块211的安装即可。螺栓212的一端焊接安装在垫板213上,螺栓212的另一端用于铰接安装支撑部件22。1 and 3 , the bracket fixing device 2 is used to support the construction personnel for construction. Specifically, the bracket fixing device 2 includes a supporting member 22 and a plurality of vertical pole bases 21, and the plurality of vertical pole bases 21 are arranged at intervals in Bailey. On the beam 1, the pole base 21 includes a pad 211, a connecting bolt 212 and a pad 213. The pad 211 is installed on the Bailey beam 1, the pad 211 is specifically welded on the Bailey beam 1, and the pad 213 is installed on the pad On the block 211 , the lower part of the backing plate 213 is hooked tightly to the backing block 211 , and the lower part of the backing plate 213 can also be welded with the backing block 211 , as long as the backing plate 213 and the backing block 211 can be installed. One end of the bolt 212 is welded and installed on the backing plate 213 , and the other end of the bolt 212 is used for hingedly installing the support member 22 .

参照图1和图4,支撑部件22包括若干立杆单元221、若干用于连接立杆单元221的横杆222以及斜杆223,若干立杆单元221与立杆底座21一一对应,每一个立杆单元221包括一根主立杆2211以及若干根副立杆2212,主立杆2211的一端安装螺栓212远离垫块211的一端,副立杆2212的结构与主立杆2211相同,副立杆2212通过连接销2214依次安装在主立杆2211上,可调整主立杆2211上副立杆2212的数量从而调节支架固定装置2的高度,主立杆2211与副立杆2212的轴线重合且竖直设置,立杆单元221的安装结构为现有技术,不再赘述。1 and 4 , the support member 22 includes a plurality of vertical rod units 221, a plurality of horizontal rods 222 for connecting the vertical rod units 221, and a diagonal rod 223, and the plurality of vertical rod units 221 correspond to the vertical rod bases 21 one-to-one. The pole unit 221 includes a main pole 2211 and several auxiliary poles 2212. One end of the main pole 2211 is installed with a bolt 212 away from the end of the pad 211. The structure of the auxiliary pole 2212 is the same as that of the main pole 2211. The rods 2212 are sequentially installed on the main pole 2211 through the connecting pins 2214, and the number of the auxiliary poles 2212 on the main pole 2211 can be adjusted to adjust the height of the bracket fixing device 2. The axes of the main pole 2211 and the auxiliary pole 2212 are coincident and Vertically arranged, the installation structure of the pole unit 221 is in the prior art and will not be described again.

横杆222以及斜杆223用于对立杆单元221进行加固。具体地,立杆单元221上设置有若干脚手盘2213,若干脚手盘2213沿着立杆的轴线方向间隔设置,一个立杆单元221上的脚手盘2213相互平行设置。横杆222的轴线水平设置,横杆222的一端安装在一个立杆单元221的脚手盘2213上,横杆222的另一端安装在相邻立杆单元221上等高的脚手盘2213上。在本实施例中,在相邻两根主杆之间设置两个横杆222。斜杆223的轴线倾斜设置,斜杆223的一端安装在其中一个立杆单元221的脚手盘2213上,斜杆223的另一端安装在相邻立杆单元221不等高的脚手盘2213上。通过设置横杆222与斜杆223,立杆单元221、横杆222与斜杆223会形成若干三角形结构,从而达到加强稳固支架固定装置2的作用。The horizontal bar 222 and the oblique bar 223 are used to reinforce the vertical bar unit 221 . Specifically, the pole unit 221 is provided with a number of scaffolding plates 2213, the scaffolding plates 2213 are arranged at intervals along the axis direction of the pole, and the scaffolding plates 2213 on one pole unit 221 are arranged parallel to each other. The axis of the horizontal bar 222 is set horizontally, one end of the horizontal bar 222 is installed on the scaffolding plate 2213 of a vertical pole unit 221, and the other end of the horizontal bar 222 is installed on the scaffolding plate 2213 of the same height on the adjacent vertical pole unit 221 . In this embodiment, two transverse bars 222 are arranged between two adjacent main bars. The axis of the inclined rod 223 is set obliquely, one end of the inclined rod 223 is installed on the scaffolding plate 2213 of one of the vertical pole units 221, and the other end of the inclined rod 223 is installed on the scaffolding plate 2213 of the adjacent vertical pole unit 221 with different heights superior. By arranging the horizontal bar 222 and the oblique bar 223 , the vertical bar unit 221 , the horizontal bar 222 and the oblique bar 223 will form several triangular structures, so as to achieve the effect of strengthening and stabilizing the bracket fixing device 2 .

需要安装支架固定装置2时,在贝雷梁1上间隔安装立杆底座21,随后在立杆底座21上安装主立杆2211以及副立杆2212,立杆单元221的高度可通过副立杆2212的数量进行调节,最后在立杆单元221之间安装横杆222以及斜杆223即可完成立杆的安装,横杆222以及斜杆223的数量可根据实际需要进行调节。When it is necessary to install the bracket fixing device 2, install the pole base 21 on the Bailey beam 1 at intervals, and then install the main pole 2211 and the auxiliary pole 2212 on the pole base 21. The height of the pole unit 221 can be determined by the auxiliary pole The number of 2212 can be adjusted. Finally, the installation of the vertical pole can be completed by installing the horizontal bar 222 and the diagonal bar 223 between the vertical pole units 221. The number of the horizontal bar 222 and the diagonal bar 223 can be adjusted according to actual needs.

本实用新型一种移动式满堂支架的工作原理为:在地基上安装两道滑轨4,在滑轨4上依次安装移动装置3、贝雷梁1以及支架固定装置2后,施工人员在支架固定装置2上对桥梁的一个节段进行施工,当该节段施工完成后,通过移动装置3带动贝雷梁1以及支架固定装置2在滑轨4上移动,转移至下一节段进行施工,直至桥梁的施工完成。The working principle of a mobile full hall support of the utility model is as follows: two slide rails 4 are installed on the foundation, and after the moving device 3, the Bailey beam 1 and the support fixing device 2 are sequentially installed on the slide rails 4, the construction personnel are placed on the support A section of the bridge is constructed on the fixing device 2. When the construction of the section is completed, the Bailey beam 1 and the bracket fixing device 2 are driven by the moving device 3 to move on the slide rail 4, and then transferred to the next section for construction. , until the construction of the bridge is completed.

显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Obviously, the above-mentioned embodiments are only examples for clear description, and are not intended to limit the implementation manner. For those of ordinary skill in the art, changes or modifications in other different forms can also be made on the basis of the above description. There is no need and cannot be exhaustive of all implementations here. And the obvious changes or changes derived from this are still within the protection scope of the present invention.

Claims (7)

1. The utility model provides a portable full hall support sets up in needs building the bridge below, including bei lei roof beam (1), its characterized in that still includes support fixing device (2), mobile device (3) and slide rail (4), bei lei roof beam (1) fastening is in on the mobile device (3), install support fixing device (2) on bei lei roof beam (1), mobile device (3) are installed on slide rail (4), mobile device (3) can be followed slide rail (4) slide.
2. A mobile hall stand according to claim 1, characterised in that the moving means (3) comprise a support (31) and a plurality of rollers (32), the plurality of rollers (32) being mounted on the sliding track (4), the rollers (32) being rotatably connected to the support (31).
3. The movable full hall support according to claim 2, wherein the moving device (3) further comprises a stopper (33) for limiting the position of the beret beam (1), the stopper (33) is mounted on the support base (31), the stopper (33) is arranged on both sides of the support base (31) in the width direction, the stopper (33) is arranged along the length direction of the support base (31), and the beret beam (1) is abutted against or separated from the stopper (33).
4. A mobile full hall support according to any one of claims 1-3, wherein the support fixing device (2) comprises a support member (22) and a plurality of upright bases (21), a plurality of upright bases (21) are arranged on the bailey beam (1) at intervals, the support member (22) comprises a plurality of upright units (221) and a plurality of crossbars (222) for connecting the upright units (221), a plurality of upright units (221) are in one-to-one correspondence with the upright bases (21), each upright unit (221) comprises a main upright (2211) and a plurality of auxiliary uprights (2212), the main upright (2211) is mounted on the upright base (21), a plurality of auxiliary uprights (2212) are mounted on the main upright (2211), one end of the crossbars (222) is mounted on one upright unit (221), the other end of the cross bar (222) is arranged on the other adjacent upright rod unit (221).
5. The movable full hall support according to claim 4, wherein the supporting part (22) further comprises a plurality of diagonal rods (223) for reinforcing the vertical rod units (221), a plurality of scaffold disks (2213) are arranged on the vertical rod units (221), the scaffold disks (2213) on the vertical rod units (221) are parallel to each other, one end of each diagonal rod (223) is installed on the scaffold disk (2213) of one vertical rod, and the other end of each diagonal rod (223) is installed on the scaffold disk (2213) of another adjacent vertical rod with unequal height.
6. The movable full hall bracket as claimed in claim 4, wherein the upright base (21) comprises a cushion block (211), a connecting bolt (212) and a backing plate (213), the cushion block (211) is fixedly connected to the Bailey beam (1), the backing plate (213) is installed on the cushion block (211), the connecting bolt (212) is installed on the backing plate (213), and the main upright (2211) is installed on one side of the connecting bolt (212) far away from the cushion block (211).
7. A mobile full hall support according to claim 1, characterised in that the beret beam (1) comprises a plurality of beret segments (11) and connecting pieces (12), the beret segments (11) are provided with male heads (111) and female heads (112), the male head (111) of one beret segment (11) is assembled with the female head (112) of another beret segment (11) through the connecting pieces (12).
CN202220856022.8U 2022-04-14 2022-04-14 A mobile full house stand Expired - Fee Related CN217078457U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202220856022.8U CN217078457U (en) 2022-04-14 2022-04-14 A mobile full house stand

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202220856022.8U CN217078457U (en) 2022-04-14 2022-04-14 A mobile full house stand

Publications (1)

Publication Number Publication Date
CN217078457U true CN217078457U (en) 2022-07-29

Family

ID=82500342

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202220856022.8U Expired - Fee Related CN217078457U (en) 2022-04-14 2022-04-14 A mobile full house stand

Country Status (1)

Country Link
CN (1) CN217078457U (en)

Similar Documents

Publication Publication Date Title
CN111271092A (en) Rapid construction structure and method for secondary lining of variable-section subsurface tunnel
CN202731297U (en) Adjustable beam form support jacking bracket apparatus
CN108560428B (en) Assembled steel bar binding jig frame group suitable for prefabricated T beams of different sizes
CN210684428U (en) Deck-type arch bridge arch rib construction structure
CN105672638A (en) Scaffold with supporting and sliding functions and net rack mounting method
CN217078457U (en) A mobile full house stand
CN105019657A (en) Building construction system
CN214884370U (en) Aluminum alloy supporting beam for movable board house
CN217476234U (en) Prefabricated box girder web reinforcing bar positioner
CN207122313U (en) Constructing middle partition wall in tunnel template and its constructing device
CN211228141U (en) A New Type of T-beam Diaphragm Construction Platform Cross Bracing
JP2000087314A (en) Method and device for construction of floor slab
CN217618695U (en) Jig frame for assembling pipe truss
CN207794582U (en) A kind of hanging large span combination support for shuttering
CN111706363A (en) A formwork trolley for pipe gallery construction
CN221956943U (en) A large-span grid sliding support device
JP2000087315A (en) Method and device for construction of floor slab
CN114856178B (en) Large-span cantilever slab edge support formwork device and large-span cantilever slab edge support formwork method
CN211775743U (en) Independent support system for post-cast strip
CN221810531U (en) A cross-bracing concrete surface defect repairing device
CN222275763U (en) A large-span assembled steel structure that is easy to disassemble
CN211689941U (en) Hanging type construction platform for splicing steel box girder support method
CN221941618U (en) Large-span net rack assembling and sliding installation device
CN221878800U (en) U-shaped groove top overhanging concrete structure walking type formwork device
CN221167449U (en) Movable lower hanging operation platform structure for operation of bottom surface of bridge superposed beam

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20220729

CF01 Termination of patent right due to non-payment of annual fee