CN217078457U - A mobile full house stand - Google Patents
A mobile full house stand Download PDFInfo
- Publication number
- CN217078457U CN217078457U CN202220856022.8U CN202220856022U CN217078457U CN 217078457 U CN217078457 U CN 217078457U CN 202220856022 U CN202220856022 U CN 202220856022U CN 217078457 U CN217078457 U CN 217078457U
- Authority
- CN
- China
- Prior art keywords
- upright
- support
- fixing device
- beret
- bailey beam
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000003014 reinforcing effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 27
- 238000009434 installation Methods 0.000 description 9
- 125000006850 spacer group Chemical group 0.000 description 6
- 238000009415 formwork Methods 0.000 description 3
- 230000000903 blocking effect Effects 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 238000005728 strengthening Methods 0.000 description 2
- 238000009435 building construction Methods 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 230000000087 stabilizing effect Effects 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Images
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
本申请涉及一种移动式满堂支架,其包括贝雷梁,还包括支架固定装置、移动装置以及滑轨,所述贝雷梁安装在所述移动装置上,所述支架固定装置安装在所述贝雷梁上,所述移动装置安装在滑轨上,所述移动装置可沿所述滑轨进行滑移。只需在地基上设置滑轨,再在滑轨上依次安装移动装置、贝雷梁以及支架固定装置,即可在支架固定装置上对桥梁进行施工。本申请的一种移动式满堂支架通过设置滑轨代替支架,能节省大量的支架模板,从而改善现有技术满堂支架搭建费时费力导致施工效率低的问题。
The present application relates to a mobile full house support, which includes a Bailey beam, a bracket fixing device, a moving device and a sliding rail, the Bailey beam is installed on the moving device, and the bracket fixing device is installed on the On the Bailey beam, the moving device is installed on the sliding rail, and the moving device can slide along the sliding rail. Only need to set the slide rail on the foundation, and then install the mobile device, the Bailey beam and the bracket fixing device in sequence on the sliding rail, and then the bridge can be constructed on the bracket fixing device. The mobile full-floor bracket of the present application can save a lot of bracket templates by providing slide rails instead of brackets, thereby improving the problem of low construction efficiency caused by time and labor in building full-floor brackets in the prior art.
Description
技术领域technical field
本实用新型涉及建筑施工装置的技术领域,具体涉及一种移动式满堂支架。The utility model relates to the technical field of building construction devices, in particular to a mobile full hall support.
背景技术Background technique
近年来,我国城市的桥梁不断发展,在桥梁的搭建过程中一般会采取满堂支架辅助刚架桥顶板的方式进行施工。In recent years, the bridges in my country's cities have been developing continuously. In the process of bridge construction, the construction of the roof of the rigid-frame bridge is generally carried out by means of full-house brackets.
常规满堂支架的施工方法,需要在桥下搭建模板以及支架,在支架上安装贝雷架,随后浇筑桥体混凝土,待混凝土达到强度后拆除模板及支架。The conventional construction method of full-house brackets requires the construction of formwork and brackets under the bridge, the installation of berets on the brackets, and the subsequent pouring of concrete for the bridge body. After the concrete reaches its strength, the formwork and brackets are removed.
常规的满堂支架在搭建时,一方面需要对大面积的支架软土地基进行处理,另一方面还需要耗费大量的支架进行搭建,尤其是在南方水网发达的地区,将给施工带来很大的不便,费时费力导致施工效率低。When building a conventional full house support, on the one hand, it needs to deal with a large area of support and soft soil foundation, and on the other hand, it needs to spend a lot of support to build, especially in the area with developed water network in the south, which will bring great difficulties to the construction. Big inconvenience, time-consuming and labor-intensive, resulting in low construction efficiency.
实用新型内容Utility model content
因此,本实用新型要解决的技术问题在于克服现有技术满堂支架搭建费时费力导致施工效率低的缺陷,从而提供一种移动式满堂支架。Therefore, the technical problem to be solved by the present invention is to overcome the defects of the prior art that the construction of the full house support is time-consuming and laborious, resulting in low construction efficiency, thereby providing a mobile full house support.
一种移动式满堂支架,包括贝雷梁,还包括支架固定装置、移动装置以及滑轨,所述贝雷梁安装在所述移动装置上,所述支架固定装置安装在所述贝雷梁上,所述移动装置安装在滑轨上,所述移动装置可沿所述滑轨进行滑移。A mobile full house support includes a Bailey beam, a bracket fixing device, a moving device and a slide rail, the Bailey beam is installed on the mobile device, and the bracket fixing device is installed on the Bailey beam , the moving device is installed on the sliding rail, and the moving device can slide along the sliding rail.
通过采用上述技术方案,只需在地基上设置滑轨,再在滑轨上依次安装移动装置、贝雷梁以及支架固定装置,即可在支架固定装置上对桥梁进行施工。当桥梁的一个节段施工完成后,通过移动装置带动贝雷梁以及支架固定装置移动至下一节段进行施工。本申请的一种移动式满堂支架通过设置滑轨代替支架,一方面能节省大量的支架模板,另一方面无需对大面积的地基进行处理,从而改善现有技术满堂支架搭建费时费力导致施工效率低的问题。By adopting the above technical solution, the bridge can be constructed on the support fixing device only by setting the sliding rail on the foundation, and then installing the moving device, the Bailey beam and the bracket fixing device on the sliding rail in sequence. When the construction of one section of the bridge is completed, the Bailey beam and the bracket fixing device are driven by the mobile device to move to the next section for construction. The mobile full-floor support of the present application is provided with slide rails instead of supports. On the one hand, a large number of support templates can be saved, and on the other hand, large-area foundations need not be processed, thereby improving the construction efficiency of the prior art, which is time-consuming and labor-intensive. low problem.
进一步的,所述移动装置包括支撑座以及若干滚轮,若干所述滚轮安装在所述滑轨上,所述滚轮与所述支撑座转动连接。Further, the moving device includes a support base and a plurality of rollers, a plurality of the rollers are mounted on the slide rail, and the rollers are rotatably connected to the support base.
通过采用上述技术方案,通过在支撑座上安装滚轮,滚轮沿滑轨进行滚动滑移即可带动支撑座以及安装在支撑座上的支架固定装置进行移动,从而移动至下一节段上。By adopting the above technical solution, by installing a roller on the support seat, the roller can roll and slide along the slide rail to drive the support seat and the bracket fixing device installed on the support seat to move, thereby moving to the next segment.
进一步的,所述移动装置还包括用于限制所述贝雷梁位置的挡块,所述挡块安装在所述支撑座上,所述挡块设置在所述支撑座宽度方向的两侧,所述挡块沿所述支撑座的长度方向设置,所述贝雷梁与所述挡块抵接或脱离。Further, the moving device further includes a stopper for limiting the position of the Bailey beam, the stopper is installed on the support base, and the stopper is arranged on both sides of the support base in the width direction, The blocking block is arranged along the length direction of the support base, and the Bailey beam is in contact with or disengaged from the blocking block.
通过采用上述技术方案,通过在支撑座上设置挡块,挡块对贝雷梁进行限位,从而使得贝雷梁能稳定地置于支撑座上,便于人员进行施工作业。By adopting the above technical solution, the stopper is arranged on the support seat, and the stopper limits the position of the Bailey beam, so that the Bailey beam can be stably placed on the support seat, which is convenient for personnel to carry out construction operations.
进一步的,所述支架固定装置包括支撑部件以及若干立杆底座,若干所述立杆底座间隔设置于所述贝雷梁上,所述支撑部件包括若干立杆单元以及若干用于连接所述立杆单元的横杆,若干所述立杆单元与所述立杆底座一一对应,每一个所述立杆单元包括一根主立杆以及若干根副立杆,所述主立杆安装在所述立杆底座上,若干根所述副立杆安装在所述主立杆上,所述横杆的一端安装在一个立杆单元上,所述横杆的另一端安装在另一个相邻的立杆单元上。Further, the bracket fixing device includes a support member and a plurality of vertical pole bases, and the plurality of the vertical pole bases are arranged on the Bailey beam at intervals. The horizontal bar of the pole unit, a plurality of the vertical pole units are in one-to-one correspondence with the vertical pole base, each of the vertical pole units includes a main vertical pole and several auxiliary vertical poles, and the main vertical poles are installed in the On the base of the vertical pole, a plurality of the auxiliary vertical poles are installed on the main vertical pole, one end of the horizontal pole is installed on a vertical pole unit, and the other end of the horizontal pole is installed on another adjacent pole. on the pole unit.
通过采用上述技术方案,需要安装支架固定装置时,在贝雷梁上间隔安装立杆底座,随后在立杆底座上安装主立杆以及副立杆,立杆单元的高度可通过副立杆的数量进行调节,最后在立杆单元之间安装横杆即可完成立杆的安装。By adopting the above technical solution, when the bracket fixing device needs to be installed, the vertical pole base is installed on the Bailey beam at intervals, and then the main vertical pole and the auxiliary vertical pole are installed on the vertical pole base. Adjust the number, and finally install the cross bar between the pole units to complete the installation of the pole.
进一步的,所述支撑部件还包括若干用于加固所述立杆单元的斜杆,所述立杆单元上设置有若干脚手盘,所述立杆单元上的若干脚手盘相互平行,所述斜杆的一端安装在其中一根立杆的脚手盘上,所述斜杆的另一端安装在另一根相邻立杆不等高的脚手盘上。Further, the support member also includes a plurality of inclined rods for reinforcing the vertical pole unit, a plurality of scaffolding plates are arranged on the vertical pole unit, and the several scaffolding plates on the vertical pole unit are parallel to each other, so One end of the inclined rod is installed on the scaffolding plate of one of the vertical poles, and the other end of the inclined rod is installed on the scaffolding plate of the other adjacent vertical poles with different heights.
通过采用上述技术方案,布置多根斜杆,通过多根斜杠对立杆单元进行支撑,从而加固若干立杆单元之间的连接结构强度。By adopting the above technical solution, a plurality of diagonal bars are arranged, and the vertical bar units are supported by the plurality of diagonal bars, thereby strengthening the structural strength of the connection between the plurality of vertical bar units.
进一步的,所述立杆底座包括垫块、连接螺栓以及垫板,所述垫块安装在所述贝雷梁上,所述垫板安装在所述垫块上,所述连接螺栓安装在所述垫板上,所述主立杆安装在所述连接螺栓远离所述垫块的一侧。Further, the vertical pole base includes a spacer block, a connecting bolt and a spacer plate, the spacer block is installed on the Bailey beam, the spacer plate is installed on the spacer block, and the connecting bolt is installed on the On the backing plate, the main vertical rod is installed on the side of the connecting bolt away from the backing block.
通过采用上述技术方案,将立杆底座安装在贝雷梁上,再在立杆底座上安装主立杆,便能完成主立杆的安装。By adopting the above technical solution, the installation of the main pole can be completed by installing the base of the pole on the Bailey beam, and then installing the main pole on the base of the pole.
进一步的,所述贝雷梁包括若干贝雷片以及连接件,所述贝雷片上具有阳头与阴头,一个所述贝雷片上的阳头通过所述连接件与另一所述贝雷片的阴头进行拼装。Further, the Bailey beam includes a plurality of Bailey pieces and a connecting piece, the Bailey piece has a male head and a female head, and the male head on one Bailey piece is connected to the other Bailey through the connecting piece. The female head of the film is assembled.
通过采用上述技术方案,通过连接件对多个贝雷片进行拼装即能快速完成贝雷梁的安装,贝雷梁的安装简单方便。By adopting the above technical solution, the installation of the Bailey beam can be quickly completed by assembling a plurality of Bailey sheets through the connecting piece, and the installation of the Bailey beam is simple and convenient.
本实用新型技术方案,具有如下优点:The technical scheme of the utility model has the following advantages:
1.本实用新型提供的移动式满堂支架,设置贝雷梁、支架固定装置、移动装置以及滑轨,通过移动装置带动贝雷梁以及支架固定装置在滑轨上进行滑移即可对桥梁进行施工,无需对大面积的地基进行处理,同时也无需在地基上拼接大量的支架,改善常规满堂支架搭建费时费力导致施工效率低的问题。1. The mobile full hall support provided by the utility model is provided with Bailey beam, bracket fixing device, moving device and sliding rail, and the bridge can be carried out by sliding the Bailey beam and the supporting fixing device on the sliding rail by the moving device. During construction, there is no need to deal with a large area of the foundation, and at the same time, there is no need to splicing a large number of brackets on the foundation, which improves the problem of low construction efficiency due to the time-consuming and laborious construction of conventional full-house brackets.
2.本实用新型提供的移动装置以及滑轨,结构紧凑方便,便于拼接与安装。2. The mobile device and the slide rail provided by the utility model have compact and convenient structures, and are easy to splicing and installing.
3.本实用新型提供的支架固定装置,结构简单拼装方便,通过设置立杆单元、横杆以及斜杆,横杆以及斜杆对立杆单元进行支撑和加固,强度可靠。3. The bracket fixing device provided by the utility model has a simple structure and is easy to assemble. By setting a vertical rod unit, a horizontal rod and an oblique rod, the horizontal rod and the oblique rod support and reinforce the vertical rod unit, and the strength is reliable.
附图说明Description of drawings
为了更清楚地说明本实用新型具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本实用新型的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific embodiments of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings required in the description of the specific embodiments or the prior art. Obviously, the following descriptions The accompanying drawings are some embodiments of the present invention. For those of ordinary skill in the art, other drawings can also be obtained based on these drawings without creative efforts.
图1为本实用新型一种移动式满堂支架的主视图;Fig. 1 is the front view of a kind of mobile full hall support of the utility model;
图2为图1中A部分的局部放大示意图;Fig. 2 is the partial enlarged schematic diagram of A part among Fig. 1;
图3为图1中B部分的局部放大示意图;Fig. 3 is a partial enlarged schematic view of part B in Fig. 1;
图4为图1中C部分的局部放大示意图;Fig. 4 is the partial enlarged schematic diagram of C part in Fig. 1;
图5为图1中贝雷片的正视图。FIG. 5 is a front view of the Bailey sheet of FIG. 1 .
附图标记说明:Description of reference numbers:
1、贝雷梁;11、贝雷片;111、阳头;112、阴头;12、连接件;2、支架固定装置;21、立杆底座;211、垫块;212、螺栓;213、垫板;22、支撑部件;221、立杆单元;2211、主立杆;2212、副立杆;2213、脚手盘;2214、连接销;222、横杆;223、斜杆;3、移动装置;31、支撑座;32、滚轮;33、挡块;4、滑轨。1. Bailey beam; 11. Bailey sheet; 111, male head; 112, female head; 12, connecting piece; 2, bracket fixing device; 21, pole base; 211, spacer; 212, bolt; 213, Backing plate; 22, supporting parts; 221, pole unit; 2211, main pole; 2212, auxiliary pole; 2213, scaffolding plate; 2214, connecting pin; 222, cross bar; 223, inclined pole; 3, moving device; 31, support seat; 32, roller; 33, stop; 4, slide rail.
具体实施方式Detailed ways
下面将结合附图对本实用新型的技术方案进行清楚、完整地描述,显然,所描述的实施例是本实用新型一部分实施例,而不是全部的实施例。基于本实用新型中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型保护的范围。The technical solutions of the present invention will be clearly and completely described below with reference to the accompanying drawings. Obviously, the described embodiments are a part of the embodiments of the present invention, not all of the embodiments. Based on the embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art without creative work fall within the protection scope of the present invention.
此外,下面所描述的本实用新型不同实施方式中所涉及的技术特征只要彼此之间未构成冲突就可以相互结合。In addition, the technical features involved in the different embodiments of the present invention described below can be combined with each other as long as there is no conflict with each other.
参照图1,一种移动式满堂支架,包括贝雷梁1,还包括支架固定装置2、移动装置3以及滑轨4,贝雷梁1紧固安装在移动装置3上,支架固定装置2安装在贝雷梁1上,移动装置3安装在滑轨4上,移动装置3可沿滑轨4进行滑移。Referring to Fig. 1 , a mobile full-house support includes a Bailey
参照图1和图2,具体地,滑轨4沿桥梁的长度方向设置,在本实施例中,滑轨4为两个V型导轨,两个V型导轨分别设置于桥梁宽度方向的两端,滑轨4的材料可以是工字钢。移动装置3包括支撑座31以及若干滚轮32,支撑座31大体呈长方体型,支撑座31沿桥梁的长度方向铺设,贝雷梁1安装在支撑座31上,支架固定装置2安装在贝雷梁1上,支撑座31宽度方向的两侧转动安装有滚轮32,滚轮32安装在滑轨4上进行滑移,滚轮32上开设有凹槽以配合滑轨4,移动装置3可通过操作拉力设备或千斤顶驱动其进行移动。在本实施例中,滚轮32有四个,四个滚轮32分别位于支撑座31的四个边角上对支撑座31进行支撑,在实际使用中,滚轮32的数量根据支撑座31的实际大小确定,只要能对支撑座31进行支撑即可。1 and 2, specifically, the slide rails 4 are arranged along the length direction of the bridge. In this embodiment, the slide rails 4 are two V-shaped guide rails, and the two V-shaped guide rails are respectively arranged at both ends of the bridge width direction. , the material of the slide rail 4 can be I-beam. The
在地基上设置滑轨4,再在滑轨4上依次安装移动装置3、贝雷梁1以及支架固定装置2,即可在支架固定装置2上对桥梁进行施工。当桥梁的一个节段施工完成后,通过移动装置3带动贝雷梁1以及支架固定装置2移动至下一节段进行施工。一方面能节省大量的支架模板,另一方面无需对大面积的地基进行处理,从而改善常规满堂支架搭建费时费力导致施工效率低的问题。The slide rail 4 is arranged on the foundation, and then the moving
参照图1和图5,贝雷梁1用于对支架固定装置2进行支撑,贝雷梁1具体可以通过螺栓紧固安装在移动装置3上,贝雷梁1紧固连接支架固定装置2以及移动装置3,当移动装置3在滑轨4上移动时,支架固定装置2不易发生偏移。具体地,贝雷梁1包括若干贝雷片11以及用于拼接若干贝雷片11的连接件12,贝雷片11的一端具有阳头111,贝雷片11的另一端具有阴头112,连接件12具体为螺栓212。当需要拼接贝雷片11时,将一个贝雷片11上的阳头111重叠至另一贝雷片11的阴头112,使用螺栓212对阳头111以及阴头112进行拼装即可完成安装,贝雷梁1的安装简单方便。在本实施例中,贝雷片11有五片,贝雷片11的数量可根据实际需要进行调整。1 and FIG. 5, the
回看图1和图2,相应的,移动装置3还包括用于限制贝雷梁1位置的挡块33。具体地,挡块33大体呈“L”字型,两个挡块33安装在支撑座31上,挡块33沿支撑座31的长度方向设置,挡块33设置在支撑座31宽度方向的两侧,两个挡块33相对设置。贝雷梁1的底端抵接在挡块33上。通过在支撑座31上设置挡块33,挡块33会对贝雷梁1进行限位,从而使得贝雷梁1无需通过焊接的方式便能稳定地置于支撑座31上,便于人员进行施工作业。Referring back to FIG. 1 and FIG. 2 , correspondingly, the moving
参照图1和图3,支架固定装置2用于对施工人员进行支撑以进行施工,具体地,支架固定装置2包括支撑部件22以及若干立杆底座21,若干立杆底座21间隔设置于贝雷梁1上,立杆底座21包括垫块211、连接螺栓212以及垫板213,垫块211安装在贝雷梁1上,垫块211具体焊接在贝雷梁1上,垫板213安装在垫块211上,垫板213的下部钩紧垫块211,垫板213的下部也可以与垫块211焊接,只要能实现垫板213与垫块211的安装即可。螺栓212的一端焊接安装在垫板213上,螺栓212的另一端用于铰接安装支撑部件22。1 and 3 , the
参照图1和图4,支撑部件22包括若干立杆单元221、若干用于连接立杆单元221的横杆222以及斜杆223,若干立杆单元221与立杆底座21一一对应,每一个立杆单元221包括一根主立杆2211以及若干根副立杆2212,主立杆2211的一端安装螺栓212远离垫块211的一端,副立杆2212的结构与主立杆2211相同,副立杆2212通过连接销2214依次安装在主立杆2211上,可调整主立杆2211上副立杆2212的数量从而调节支架固定装置2的高度,主立杆2211与副立杆2212的轴线重合且竖直设置,立杆单元221的安装结构为现有技术,不再赘述。1 and 4 , the
横杆222以及斜杆223用于对立杆单元221进行加固。具体地,立杆单元221上设置有若干脚手盘2213,若干脚手盘2213沿着立杆的轴线方向间隔设置,一个立杆单元221上的脚手盘2213相互平行设置。横杆222的轴线水平设置,横杆222的一端安装在一个立杆单元221的脚手盘2213上,横杆222的另一端安装在相邻立杆单元221上等高的脚手盘2213上。在本实施例中,在相邻两根主杆之间设置两个横杆222。斜杆223的轴线倾斜设置,斜杆223的一端安装在其中一个立杆单元221的脚手盘2213上,斜杆223的另一端安装在相邻立杆单元221不等高的脚手盘2213上。通过设置横杆222与斜杆223,立杆单元221、横杆222与斜杆223会形成若干三角形结构,从而达到加强稳固支架固定装置2的作用。The
需要安装支架固定装置2时,在贝雷梁1上间隔安装立杆底座21,随后在立杆底座21上安装主立杆2211以及副立杆2212,立杆单元221的高度可通过副立杆2212的数量进行调节,最后在立杆单元221之间安装横杆222以及斜杆223即可完成立杆的安装,横杆222以及斜杆223的数量可根据实际需要进行调节。When it is necessary to install the
本实用新型一种移动式满堂支架的工作原理为:在地基上安装两道滑轨4,在滑轨4上依次安装移动装置3、贝雷梁1以及支架固定装置2后,施工人员在支架固定装置2上对桥梁的一个节段进行施工,当该节段施工完成后,通过移动装置3带动贝雷梁1以及支架固定装置2在滑轨4上移动,转移至下一节段进行施工,直至桥梁的施工完成。The working principle of a mobile full hall support of the utility model is as follows: two slide rails 4 are installed on the foundation, and after the moving
显然,上述实施例仅仅是为清楚地说明所作的举例,而并非对实施方式的限定。对于所属领域的普通技术人员来说,在上述说明的基础上还可以做出其它不同形式的变化或变动。这里无需也无法对所有的实施方式予以穷举。而由此所引伸出的显而易见的变化或变动仍处于本发明创造的保护范围之中。Obviously, the above-mentioned embodiments are only examples for clear description, and are not intended to limit the implementation manner. For those of ordinary skill in the art, changes or modifications in other different forms can also be made on the basis of the above description. There is no need and cannot be exhaustive of all implementations here. And the obvious changes or changes derived from this are still within the protection scope of the present invention.
Claims (7)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220856022.8U CN217078457U (en) | 2022-04-14 | 2022-04-14 | A mobile full house stand |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202220856022.8U CN217078457U (en) | 2022-04-14 | 2022-04-14 | A mobile full house stand |
Publications (1)
Publication Number | Publication Date |
---|---|
CN217078457U true CN217078457U (en) | 2022-07-29 |
Family
ID=82500342
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202220856022.8U Expired - Fee Related CN217078457U (en) | 2022-04-14 | 2022-04-14 | A mobile full house stand |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN217078457U (en) |
-
2022
- 2022-04-14 CN CN202220856022.8U patent/CN217078457U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN111271092A (en) | Rapid construction structure and method for secondary lining of variable-section subsurface tunnel | |
CN202731297U (en) | Adjustable beam form support jacking bracket apparatus | |
CN108560428B (en) | Assembled steel bar binding jig frame group suitable for prefabricated T beams of different sizes | |
CN210684428U (en) | Deck-type arch bridge arch rib construction structure | |
CN105672638A (en) | Scaffold with supporting and sliding functions and net rack mounting method | |
CN217078457U (en) | A mobile full house stand | |
CN105019657A (en) | Building construction system | |
CN214884370U (en) | Aluminum alloy supporting beam for movable board house | |
CN217476234U (en) | Prefabricated box girder web reinforcing bar positioner | |
CN207122313U (en) | Constructing middle partition wall in tunnel template and its constructing device | |
CN211228141U (en) | A New Type of T-beam Diaphragm Construction Platform Cross Bracing | |
JP2000087314A (en) | Method and device for construction of floor slab | |
CN217618695U (en) | Jig frame for assembling pipe truss | |
CN207794582U (en) | A kind of hanging large span combination support for shuttering | |
CN111706363A (en) | A formwork trolley for pipe gallery construction | |
CN221956943U (en) | A large-span grid sliding support device | |
JP2000087315A (en) | Method and device for construction of floor slab | |
CN114856178B (en) | Large-span cantilever slab edge support formwork device and large-span cantilever slab edge support formwork method | |
CN211775743U (en) | Independent support system for post-cast strip | |
CN221810531U (en) | A cross-bracing concrete surface defect repairing device | |
CN222275763U (en) | A large-span assembled steel structure that is easy to disassemble | |
CN211689941U (en) | Hanging type construction platform for splicing steel box girder support method | |
CN221941618U (en) | Large-span net rack assembling and sliding installation device | |
CN221878800U (en) | U-shaped groove top overhanging concrete structure walking type formwork device | |
CN221167449U (en) | Movable lower hanging operation platform structure for operation of bottom surface of bridge superposed beam |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20220729 |
|
CF01 | Termination of patent right due to non-payment of annual fee |