[go: up one dir, main page]

CN211872455U - A road structure for theme park and theme park - Google Patents

A road structure for theme park and theme park Download PDF

Info

Publication number
CN211872455U
CN211872455U CN201921884272.7U CN201921884272U CN211872455U CN 211872455 U CN211872455 U CN 211872455U CN 201921884272 U CN201921884272 U CN 201921884272U CN 211872455 U CN211872455 U CN 211872455U
Authority
CN
China
Prior art keywords
road
layer
theme park
road structure
theme
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201921884272.7U
Other languages
Chinese (zh)
Inventor
王双
李坚
文红光
肖锋华
曾小敏
唐新林
蒋焕松
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shenzhen Overseas Chinese City Cultural Tourism Technology Group Co ltd
Original Assignee
Shenzhen Overseas Chinese City Cultural Tourism Technology Group Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shenzhen Overseas Chinese City Cultural Tourism Technology Group Co ltd filed Critical Shenzhen Overseas Chinese City Cultural Tourism Technology Group Co ltd
Priority to CN201921884272.7U priority Critical patent/CN211872455U/en
Application granted granted Critical
Publication of CN211872455U publication Critical patent/CN211872455U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

本实用新型公开了一种用于主题公园的道路结构及主题公园,其中,所述用于主题公园的道路结构包括:依次设置的第一道路、平缘石及第二道路,所述平缘石与第一道路和/或第二道路之间预留有伸缩缝隙,所述伸缩缝隙内填充有密度大于等于第一预设值,柔性大于等于第二预设值的嵌实层。基于上述结构,本实用新型所提供的用于主题公园的道路结构,利用平缘石连接第一道路及第二道路,使第一道路、平缘石与第二道路的顶面皆平齐,改善了现有技术中主题公园道路结构不利于无障碍通行的问题。

Figure 201921884272

The utility model discloses a road structure for a theme park and a theme park, wherein the road structure for the theme park comprises: a first road, a flat edge stone and a second road arranged in sequence, the flat edge stone and the An expansion gap is reserved between the first road and/or the second road, and the expansion gap is filled with an embedded layer with a density greater than or equal to a first preset value and a flexibility greater than or equal to a second preset value. Based on the above structure, in the road structure for theme parks provided by the present invention, the first road and the second road are connected by the flat edge stone, so that the top surfaces of the first road, the flat edge stone and the second road are all flush, which improves the In the prior art, the theme park road structure is not conducive to barrier-free passage.

Figure 201921884272

Description

一种用于主题公园的道路结构及主题公园A road structure for theme park and theme park

技术领域technical field

本实用新型涉及道路结构技术领域,尤其涉及的是一种用于主题公园的道路结构及主题公园。The utility model relates to the technical field of road structures, in particular to a road structure used for theme parks and a theme park.

背景技术Background technique

主题公园(theme park),是根据某个特定的主题,采用现代科学技术和多层次活动设置方式,集诸多娱乐活动、休闲要素和服务接待设施于一体的现代旅游目的地。A theme park is a modern tourist destination that integrates many entertainment activities, leisure elements and service reception facilities according to a specific theme, using modern science and technology and multi-level activity setting methods.

主题公园是为了满足旅游者多样化休闲娱乐需求和选择而建造的一种具有创意性活动方式的现代旅游场所。它是根据特定的主题创意,主要以文化复制、文化移植、文化陈列以及高新技术等手段、以虚拟环境塑造与园林环境为载体来迎合消费者的好奇心、以主题情节贯穿整个游乐项目的休闲娱乐活动空间。A theme park is a modern tourism place with creative activities, built to meet the diverse leisure and entertainment needs and choices of tourists. It is based on a specific theme creativity, mainly by means of cultural reproduction, cultural transplantation, cultural display and high-tech, using virtual environment shaping and garden environment as the carrier to cater to the curiosity of consumers, and the theme plot runs through the leisure of the entire amusement project. Recreational space.

主题公园的建设是一个比博物馆、科技馆、规划馆还要复杂的课题,需要考虑的方方面面的软环境设计和硬实施;人体工程学和人物心理学等环境学。The construction of a theme park is a more complex subject than museums, science and technology museums, and planning museums. It needs to consider all aspects of soft environment design and hard implementation; environmental studies such as ergonomics and character psychology.

主题公园内的机动车道不同于除特殊情况外专供机动车行驶的市政机动车道,一般指承载力满足消防车、货运车辆等通行的道路,既可以用于车辆通行,也可以用于行人通行。The motor vehicle lanes in the theme park are different from the municipal motor vehicle lanes, which are exclusively used for motor vehicles except in special circumstances. Generally, they refer to roads with a bearing capacity that meets the passage of fire engines and freight vehicles. They can be used for both vehicles and pedestrians. .

立缘石(侧石)【vertical curb】指的是顶面高出路面的路缘石,有标定车行道范围和纵向引导排险路面水的作用。Vertical curb refers to the curb whose top surface is higher than the road surface, and has the function of calibrating the range of the roadway and longitudinally guiding the road water for risk removal.

现有主题公园内的道路结构多使用立缘石无缝衔接机动车道与沥青道路,这种结构的缺陷在于:不利于无障碍通行;对于主题公园这种人员密集型的场所,是否能够无障碍通行尤其重要。The road structures in the existing theme parks mostly use standing edge stones to seamlessly connect the motor vehicle lanes and asphalt roads. The defects of this structure are: it is not conducive to barrier-free passage; whether it is possible for barrier-free passage in crowded places such as theme parks Especially important.

可见,现有技术还有待于改进和发展。It can be seen that the existing technology still needs to be improved and developed.

实用新型内容Utility model content

鉴于上述现有技术的不足,本实用新型的目的在于提供一种用于主题公园的道路结构及主题公园,旨在改善现有技术中主题公园道路结构不利于无障碍通行的问题。In view of the above-mentioned deficiencies of the prior art, the purpose of the present invention is to provide a road structure for a theme park and a theme park, aiming to improve the problem that the theme park road structure is not conducive to barrier-free passage in the prior art.

本实用新型的技术方案如下:The technical scheme of the present utility model is as follows:

一种用于主题公园的道路结构,其包括:依次设置的第一道路、平缘石及第二道路,所述平缘石与第一道路和/或第二道路之间预留有伸缩缝隙;所述伸缩缝隙内设置有密度大于等于第一预设值,柔性大于等于第二预设值的嵌实层。A road structure for a theme park, comprising: a first road, a kerb and a second road arranged in sequence, and an expansion gap is reserved between the kerb and the first road and/or the second road; the An embedded layer with a density greater than or equal to a first preset value and a flexibility greater than or equal to a second preset value is arranged in the expansion and contraction gap.

在进一步地优选方案中,所述嵌实层的上方设置有密封胶层,所述密封胶层的高度不高于平缘石的上端面高度。In a further preferred solution, a sealant layer is arranged above the embedding layer, and the height of the sealant layer is not higher than the height of the upper end face of the flat edge stone.

在进一步地优选方案中,所述密封胶层与嵌实层之间设置有泡沫棒。In a further preferred solution, a foam rod is arranged between the sealant layer and the embedding layer.

在进一步地优选方案中,所述泡沫棒呈圆柱形,且泡沫棒的直径为伸缩缝隙宽度的1.5倍至2倍。In a further preferred solution, the foam rod is cylindrical, and the diameter of the foam rod is 1.5 times to 2 times the width of the expansion gap.

在进一步地优选方案中,所述用于主题公园的道路结构还包括:水泥砂浆层,所述水泥砂浆层设置于所述嵌实层及平缘石的下方。In a further preferred solution, the road structure for the theme park further comprises: a cement mortar layer, and the cement mortar layer is arranged below the embedded layer and the flat edge stone.

在进一步地优选方案中,所述用于主题公园的道路结构还包括:第一混凝土层,所述第一混凝土层设置于所述水泥砂浆层下方。In a further preferred solution, the road structure for the theme park further comprises: a first concrete layer, and the first concrete layer is arranged below the cement mortar layer.

在进一步地优选方案中,所述第一道路包括由上至下依次设置的第二混凝土层及第一碎石基层,所述第二混凝土层中部设置有若干第一钢筋。In a further preferred solution, the first road includes a second concrete layer and a first crushed stone base layer arranged in sequence from top to bottom, and a number of first steel bars are arranged in the middle of the second concrete layer.

在进一步地优选方案中,所述第二混凝土层中部还设置有若干第二钢筋,所述第二钢筋与所述第一钢筋相垂直。In a further preferred solution, a plurality of second reinforcing bars are further arranged in the middle of the second concrete layer, and the second reinforcing bars are perpendicular to the first reinforcing bars.

在进一步地优选方案中,所述第二道路包括由上至下依次设置的细粒式沥青混凝土层、改性沥青粘层、粗粒式沥青混凝土层、乳化沥青透层、第二碎石基层及水稳基层。In a further preferred solution, the second road includes a fine-grained asphalt concrete layer, a modified asphalt sticky layer, a coarse-grained asphalt concrete layer, an emulsified asphalt permeable layer, and a second gravel base layer, which are arranged in sequence from top to bottom. and water stable base.

在进一步地优选方案中,所述用于主题公园的道路结构还包括:第一混凝土层,所述第一混凝土层的第一端内置于所述第一碎石基层,第二端内置于所述水稳基层。In a further preferred solution, the road structure for the theme park further comprises: a first concrete layer, a first end of the first concrete layer is built into the first gravel base layer, and a second end is built into the first concrete layer. The water stabilized base.

在进一步地优选方案中,所述第一碎石基层面向水稳基层的一侧设置有第一斜面,所述水稳基层设置有与所述第一斜面相贴合的第二斜面。In a further preferred solution, a side of the first crushed stone base layer facing the water stabilization base layer is provided with a first inclined surface, and the water stabilization base layer is provided with a second inclined surface fitted with the first inclined surface.

在进一步地优选方案中,所述第一碎石基层与水稳基层下端设置有夯实基层,所述夯实基层设置有与所述第一斜面相贴合的第三斜面。In a further preferred solution, a compacted base is provided at the lower ends of the first crushed stone base and the water stabilization base, and the compacted base is provided with a third inclined surface that fits with the first inclined surface.

一种主题公园,其包括如上所述的用于主题公园的道路结构。由此,所述的主题公园可具有上述道路结构的所有特征及优点,不再赘述。A theme park includes the road structure for a theme park as described above. Therefore, the theme park can have all the features and advantages of the above-mentioned road structure, which will not be repeated.

与现有技术相比,本实用新型提供的用于主题公园的道路结构,包括:依次设置的第一道路、平缘石及第二道路,所述平缘石与第一道路和/或第二道路之间预留有伸缩缝隙,所述伸缩缝隙内填充有密度大于等于第一预设值,柔性大于等于第二预设值的嵌实层。基于上述结构,本实用新型所提供的用于主题公园的道路结构,利用平缘石连接第一道路及第二道路,使第一道路、平缘石与第二道路的顶面皆平齐,改善了现有技术中主题公园道路结构不利于无障碍通行的问题。Compared with the prior art, the road structure for theme parks provided by the present invention includes: a first road, a flat edge and a second road arranged in sequence, and the flat edge is connected to the first road and/or the second road. An expansion gap is reserved therebetween, and the expansion gap is filled with an embedded layer with a density greater than or equal to a first preset value and a flexibility greater than or equal to a second preset value. Based on the above structure, in the road structure for theme parks provided by the present invention, the first road and the second road are connected by the flat edge stone, so that the top surfaces of the first road, the flat edge stone and the second road are all flush, which improves the In the prior art, the road structure of theme parks is not conducive to barrier-free passage.

附图说明Description of drawings

图1是本实用新型优选实施例用于主题公园的道路结构的立体图。FIG. 1 is a perspective view of a road structure used in a theme park according to a preferred embodiment of the present invention.

图2是本实用新型优选实施例用于主题公园的道路结构的剖面图。2 is a cross-sectional view of a road structure used in a theme park according to a preferred embodiment of the present invention.

图3是图2中局部A的放大图。FIG. 3 is an enlarged view of part A in FIG. 2 .

具体实施方式Detailed ways

本实用新型提供一种用于主题公园的道路结构及主题公园,为使本实用新型的目的、技术方案及效果更加清楚、明确,以下参照附图并举实例对本实用新型进一步详细说明。应当理解,此处所描述的具体实施例仅仅用以解释本实用新型,并不用于限定本实用新型。The present utility model provides a road structure and a theme park for theme parks. In order to make the purpose, technical solutions and effects of the present utility model clearer and clearer, the present utility model is further described in detail below with reference to the accompanying drawings and examples. It should be understood that the specific embodiments described herein are only used to explain the present invention, and are not intended to limit the present invention.

本实用新型提供了一种用于主题公园的道路结构,如图1及图2所示,其包括:依次排布的第一道路200、平缘石300及第二道路100。平缘石300(flush curb,又叫平齐路牙)指的是顶面与路面平齐的路缘石,具有标定路面范围、整齐路容、保护路面边缘的作用,现有技术中的平缘石300的利用场景通常为:采用两侧明沟排水时,常设置平缘石300,以利排水,也方便施工中的碾压作业,可见现有技术中的平缘石300与本申请作用并不相同。在具体实施时,平缘石300可以根据景观效果要求选择需要的宽度和颜色,避免两种路面直接连接无过渡段的情况。当其中任何一种路面破坏需要修补时,由于有平缘石300的分隔,破损修复工作不会导致另一侧路面受损。优选第一道路200为机动车道,第二道路100为沥青道路。The present invention provides a road structure for a theme park, as shown in FIG. 1 and FIG. 2 , which includes: a first road 200 , a flat edge stone 300 and a second road 100 arranged in sequence. Flush curb 300 (flush curb, also known as flush curb) refers to a curb whose top surface is flush with the road surface. The usage scenario of the water tank is usually: when using open ditches on both sides for drainage, the flat edge stone 300 is often set to facilitate drainage and also facilitate the rolling operation during construction. During specific implementation, the width and color of the flat edge stone 300 can be selected according to the requirements of the landscape effect, so as to avoid the situation that the two road surfaces are directly connected without a transition section. When any one of the pavement damages needs to be repaired, the damage repair work will not cause damage to the other side of the pavement due to the separation of the flush stones 300 . Preferably, the first road 200 is a motor vehicle road, and the second road 100 is an asphalt road.

此外,本实用新型中用于主题公园的道路结构还设置有至少一个伸缩缝隙400,所述伸缩缝隙400设置在平缘石300与第一道路200和/或第二道路100之间,也就是说:平缘石300与第一道路200之间设置有伸缩缝隙400,和/或平缘石300与第二道路100之间设置有伸缩缝隙400。In addition, the road structure used for the theme park in the present invention is also provided with at least one expansion gap 400, and the expansion gap 400 is arranged between the flat edge stone 300 and the first road 200 and/or the second road 100, that is to say : A telescopic gap 400 is provided between the flat edge stone 300 and the first road 200 , and/or a telescopic gap 400 is provided between the flat edge stone 300 and the second road 100 .

所述伸缩缝隙400内设置有嵌实层810,且嵌实层810的密度大于等于第一预设值,柔性大于等于第二预设值;优选所述嵌实层810通过在伸缩缝隙400内填充致密材料(比如沥青麻丝)形成。若将平缘石300直接无缝连接在第一道路200及第二道路100之间,则容易因道路与平缘石300材料不同(不使用平缘石300则会因第一道路200与第二道路100材料不同发生同样甚至更严重的问题),容易导致使用一段时间后,道路与平缘石300的接口处(具体为:第一道路200与平缘石300的接口处,和/或第二道路100与平缘石300的接口处)发生变形或开裂现象,影响使用及美观。在设置嵌实层810后,至少在平缘石与一侧的道路之间做了软处理,缓和了不同材料之间的碰撞,也为道路的变形余留出了一定的空间,减少了一侧道路变形对平缘石或另一侧道路的冲击。The expansion gap 400 is provided with an embedded layer 810, and the density of the embedded layer 810 is greater than or equal to the first preset value, and the flexibility is greater than or equal to the second preset value; preferably, the embedded layer 810 passes through the expansion gap 400. Filled with dense material (such as pitch hemp) is formed. If the flat edge stone 300 is directly and seamlessly connected between the first road 200 and the second road 100, it is easy to cause the road and the flat edge stone 300 to have different materials (if the flat edge stone 300 is not used, the first road 200 and the second road 100 may be The same or even more serious problems may occur due to different materials), which may easily lead to the interface between the road and the edge stone 300 after a period of use (specifically: the interface between the first road 200 and the edge stone 300, and/or the second road 100 and the edge. The interface of the flat edge stone 300) is deformed or cracked, which affects the use and appearance. After setting the embedded layer 810, at least a soft treatment is done between the edge stone and the road on one side, which alleviates the collision between different materials, and also leaves a certain space for the deformation of the road, reducing one side of the road. The impact of road deformation on the curb or the other side of the road.

可以理解的是,本实用新型并不需要对第一预设值和第二预设值做具体限定,该两个数值可以根据平缘石的材料、伸缩缝隙侧方道路的结构层次、成分等参数进行适应性调整。对于下文中出现具体参数的实例而言,使用沥青麻丝作为致密材料即可,而沥青麻丝的密度及柔性度是众所周知的,所以很显然,本实用新型所公开的技术方案对于本领域人员是清楚完整可实现的,且本领域技术人员在不付出创造性劳动的情况下,可根据本实用新型提供的实施例进行适应性调整,这些调整所得方案皆属于本实用新型地保护范围。It can be understood that the present invention does not need to specifically limit the first preset value and the second preset value, and the two values can be based on parameters such as the material of the flat edge stone, the structural level and composition of the road on the side of the expansion gap. Make adaptive adjustments. For the examples with specific parameters in the following, it is sufficient to use pitch hemp wire as the dense material, and the density and flexibility of pitch hemp wire are well known, so it is obvious that the technical solution disclosed by the present invention is useful to those skilled in the art. It is clear, complete and achievable, and those skilled in the art can make adaptive adjustments according to the embodiments provided by the present invention without creative work, and the solutions obtained from these adjustments all belong to the protection scope of the present invention.

作为本实用新型地优选实施例,所述嵌实层810的上方设置有密封胶层830,所述密封胶层830的高度不高于平缘石300的上端面高度。如沥青麻丝等致密材料通常不适于直接裸露在表面,一则容易因浸水造成嵌实层810损坏,二则容易因过水影响地基稳定性,三则影响路面美观;而密封胶层830的设置有效地解决了上述问题。不难理解的是,除密封胶层830的设置方式外,还可通过其他方式进行密封,这些技术方案皆属于本实用新型的保护范围。As a preferred embodiment of the present invention, a sealant layer 830 is disposed above the embedding layer 810 , and the height of the sealant layer 830 is not higher than the height of the upper end surface of the flat edge stone 300 . Dense materials such as asphalt and hemp are usually not suitable for being directly exposed on the surface. First, the embedded layer 810 is easily damaged due to water immersion. Second, it is easy to affect the stability of the foundation due to excessive water. The setup effectively solves the above problem. It is not difficult to understand that, in addition to the arrangement of the sealant layer 830 , other methods can also be used for sealing, and these technical solutions all belong to the protection scope of the present invention.

在具体实施时,密封胶优选为耐候密封胶,耐侯密封胶具有优异的耐候性能,经过人工加速气候老化测试,密封胶的各项理化性能无明显变化。使用时用挤胶枪将胶从密封胶筒中挤到需要密封的接缝中,密封胶在室温下吸收空气中的水分,固化成弹性体,形成有效密封。基于耐候密封胶的特性,可以得知,选用耐候密封胶不仅便于缝隙的密封,而且耐候密封胶的固化需要一定的时间,在密封胶层830固化前,工作人员可以及时对密封胶层830的平整度进行修整,保证密封后道路结构的使用舒适性及美观性。In the specific implementation, the sealant is preferably a weather-resistant sealant. The weather-resistant sealant has excellent weather resistance. After the artificial accelerated weathering test, the physical and chemical properties of the sealant have no obvious changes. When in use, the glue is squeezed from the sealant barrel to the seam to be sealed with a glue gun. The sealant absorbs the moisture in the air at room temperature and solidifies into an elastomer to form an effective seal. Based on the characteristics of the weather-resistant sealant, it can be known that the selection of the weather-resistant sealant not only facilitates the sealing of the gap, but also requires a certain time for the curing of the weather-resistant sealant. The flatness is trimmed to ensure the comfort and aesthetics of the road structure after sealing.

所述密封胶层830的表面颜色根据路面色彩进行适应性调整,本实用新型对此不作具体限定。The surface color of the sealant layer 830 is adaptively adjusted according to the road surface color, which is not specifically limited in the present invention.

作为上述优选实施例地改进,所述密封胶层830与嵌实层810之间设置有泡沫棒820。泡沫棒820的主要作用在于保证密封胶层830仅与伸缩间隙左右两侧的侧壁粘接,避免与嵌实层810的顶面粘接导致受力不均匀而开裂。As an improvement of the above preferred embodiment, a foam rod 820 is arranged between the sealant layer 830 and the embedding layer 810 . The main function of the foam rod 820 is to ensure that the sealant layer 830 is only bonded to the side walls on the left and right sides of the expansion gap, and to avoid cracking due to uneven stress caused by bonding with the top surface of the embedded layer 810 .

进一步地,所述泡沫棒820呈圆柱形,且泡沫棒820的直径为伸缩缝隙400宽度的1.5倍至2倍;泡沫棒820的直径大于伸缩缝隙400的宽度,可以保证基本完全隔绝密封胶层830与嵌实层810,而泡沫棒820呈圆柱形,则利用泡沫可压缩及圆形易滑入的特性,提高泡沫棒820的安装方便性。Further, the foam rod 820 is cylindrical, and the diameter of the foam rod 820 is 1.5 times to 2 times the width of the expansion gap 400; the diameter of the foam rod 820 is larger than the width of the expansion gap 400, which can ensure that the sealant layer is basically completely isolated 830 and the embedded layer 810, and the foam rod 820 is cylindrical, the characteristics of the foam being compressible and round and easy to slide in are used to improve the installation convenience of the foam rod 820.

根据本实用新型地另一方面,为防止路牙在可能承受机动车荷载的情况下发生不均匀沉降的问题,本实用新型在所述平缘石300及嵌实层810下方设置有第一混凝土层600,具体所述第一混凝土层600为C15混凝土,宽度为350mm,厚度为100mm。According to another aspect of the present invention, in order to prevent the problem of uneven settlement of the curb when it may bear the load of the motor vehicle, the present invention is provided with a first concrete layer under the flat edge stone 300 and the embedded layer 810 600. Specifically, the first concrete layer 600 is C15 concrete, with a width of 350mm and a thickness of 100mm.

进一步地,为保证平缘石300稳定不发生偏移,本实用新型在第一混凝土层600与平缘石300之间用水泥砂浆做柔性连接,形成水泥砂浆层500,具体所述水泥砂浆层500为20mm厚1:3水泥砂浆。Further, in order to ensure that the flat edge stone 300 is stable and does not shift, the present invention uses cement mortar to make a flexible connection between the first concrete layer 600 and the flat edge stone 300 to form a cement mortar layer 500. Specifically, the cement mortar layer 500 is: 20mm thick 1:3 cement mortar.

根据本实用新型地另一方面,如图1及图2所示,所述第一道路200包括由上至下依次设置的第二混凝土层210及第一碎石基层220,所述第二混凝土层210中部设置有若干第一钢筋211,如图3所示。优选其中,第二混凝土层210为220mm厚C30混凝土铺装层,第一钢筋211的设置可在一定程度提高第一道路200的强度。第一碎石基层220为300mm厚级配碎石基层。According to another aspect of the present invention, as shown in FIG. 1 and FIG. 2 , the first road 200 includes a second concrete layer 210 and a first crushed stone base layer 220 arranged in sequence from top to bottom. A number of first reinforcing bars 211 are arranged in the middle of the layer 210 , as shown in FIG. 3 . Preferably, the second concrete layer 210 is a 220 mm thick C30 concrete pavement layer, and the arrangement of the first reinforcing bars 211 can improve the strength of the first road 200 to a certain extent. The first crushed stone base 220 is a graded crushed stone base with a thickness of 300 mm.

进一步地,所述第二混凝土层210中部还设置有若干第二钢筋212,如图3所示,所述第二钢筋212与所述第一钢筋211相垂直;第一钢筋211与第二钢筋212以不同方向排布(优选所有的钢筋设置高度相同),进一步提高了第一道路200的强度。Further, a plurality of second steel bars 212 are also arranged in the middle of the second concrete layer 210. As shown in FIG. 3, the second steel bars 212 are perpendicular to the first steel bars 211; the first steel bars 211 and the second steel bars are perpendicular to each other. 212 are arranged in different directions (preferably, all the reinforcing bars are arranged at the same height), which further improves the strength of the first road 200 .

较佳地是,如图1及图2所示,所述第二道路100包括由上至下依次设置的细粒式沥青混凝土层110、改性沥青粘层(为薄薄的一层,粘接于110和120之间)、粗粒式沥青混凝土层120、乳化沥青透层(薄薄的一层,位于120与130之间)、第二碎石基层130及水稳基层140。优选其中细粒式沥青混凝土层为40mm厚细粒式沥青砼(AC-13),粗粒式沥青混凝土层为60mm厚粗粒式沥青砼(AC-20C),第二碎石基层为190mm厚水泥稳定级配碎石基层,水稳基层为180mm厚水稳基层;与之适配的,所述平缘石300尺寸为150*300*1000mm。Preferably, as shown in FIG. 1 and FIG. 2 , the second road 100 includes a fine-grained asphalt concrete layer 110 and a modified asphalt adhesive layer (a thin layer, adhesive layer) arranged in sequence from top to bottom. connected between 110 and 120 ), a coarse-grained asphalt concrete layer 120 , an emulsified asphalt permeable layer (a thin layer, located between 120 and 130 ), a second crushed stone base 130 and a water-stabilized base 140 . Preferably, the fine-grained asphalt concrete layer is 40mm thick fine-grained asphalt concrete (AC-13), the coarse-grained asphalt concrete layer is 60mm thick coarse-grained asphalt concrete (AC-20C), and the second gravel base layer is 190mm thick The cement-stabilized graded crushed stone base, the water-stabilized base is 180mm thick, and the size of the flat edge stone 300 is 150*300*1000mm.

进一步地,所述第一碎石基层220面向水稳基层的一侧设置有第一斜面,所述水稳基层设置有与所述第一斜面相贴合的第二斜面。第一斜面与第二斜面的设置,可以将第一道路200上所受的压力通过第一碎石基层220有效分解至水稳基层。Further, a side of the first crushed stone base layer 220 facing the water stabilization base layer is provided with a first inclined surface, and the water stabilization base layer is provided with a second inclined surface fitted with the first inclined surface. The arrangement of the first inclined surface and the second inclined surface can effectively decompose the pressure on the first road 200 to the water stable base through the first crushed stone base 220 .

同理,所述第一碎石基层220与水稳基层下端设置有夯实基层700,所述夯实基层700设置有与所述第一斜面相贴合的第三斜面,优选夯实基层700为典型的素土夯实(压实度大于等于95%)。在第一道路200为机动车道的情况下,第一道路200所受到的压力通常是远大于第二道路100的,所以将压力分解至水稳基层及夯实基层700,可以有效提高第一道路200的使用寿命。Similarly, the first crushed stone base 220 and the lower end of the water stabilization base are provided with a compacted base 700, and the compacted base 700 is provided with a third inclined surface that fits with the first inclined surface. Preferably, the compacted base 700 is a typical one. Plain soil compaction (the degree of compaction is greater than or equal to 95%). In the case where the first road 200 is a motor vehicle lane, the pressure on the first road 200 is usually much greater than that on the second road 100 . Therefore, decomposing the pressure to the water-stabilized base and the compacted base 700 can effectively improve the first road 200 . service life.

根据本实用新型地另一方面,本实用新型在伸缩缝隙400两侧的面上设置有倒角,如图1至图3所示的结构中,由于伸缩缝隙设置在第一道路200与平缘石300之间,所以第一道路200与平缘石300设置倒角(未标示,图示于图3中)。倒角的设置可以有效防止刮伤事件的发生。According to another aspect of the present invention, the present invention is provided with chamfers on both sides of the expansion gap 400. In the structure shown in FIG. 1 to FIG. 3, since the expansion gap is set between the first road 200 and the flat edge stone 300, so the first road 200 and the flat edge stone 300 are provided with a chamfer (not marked, shown in FIG. 3). The setting of the chamfer can effectively prevent the occurrence of scratches.

应当理解的是,本实用新型的应用不限于上述的举例,对本领域普通技术人员来说,可以根据上述说明加以改进或变换,所有这些改进和变换都应属于本实用新型所附权利要求的保护范围。It should be understood that the application of the present invention is not limited to the above-mentioned examples. For those of ordinary skill in the art, improvements or transformations can be made according to the above descriptions. All these improvements and transformations should belong to the protection of the appended claims of the present invention. scope.

Claims (13)

1. A roadway structure for a theme park, comprising: the road comprises a first road, a flat stone and a second road which are sequentially arranged, wherein a telescopic gap is reserved between the flat stone and the first road and/or the second road; and an embedded layer with the density more than or equal to a first preset value and the flexibility more than or equal to a second preset value is arranged in the telescopic gap.
2. The road structure for theme parks as claimed in claim 1, wherein a sealant layer is provided above the infill layer, and a height of the sealant layer is not higher than a height of an upper end surface of the flat curb.
3. A road structure for theme parks as claimed in claim 2, characterized in that a foam bar is arranged between the sealant layer and the infill layer.
4. The road structure for theme parks as claimed in claim 3, wherein the foam rod is cylindrical and has a diameter of 1.5 to 2 times the width of the expansion gap.
5. The road structure for theme park as claimed in claim 1, further comprising: and the cement mortar layer is arranged below the embedded layer and the flat kerbs.
6. The road structure for theme park as claimed in claim 5, further comprising: and the first concrete layer is arranged below the cement mortar layer.
7. The road structure of claim 1, wherein the first road comprises a second concrete layer and a first gravel base layer sequentially arranged from top to bottom, and the second concrete layer is provided with a plurality of first steel bars in the middle.
8. The road structure of claim 7, wherein the second concrete layer is further provided with a plurality of second reinforcing bars at a middle portion thereof, and the second reinforcing bars are perpendicular to the first reinforcing bars.
9. The road structure for a theme park as set forth in claim 7, wherein the second road comprises a fine asphalt concrete layer, a modified asphalt binder layer, a coarse asphalt concrete layer, an emulsified asphalt permeable layer, a second crushed stone base layer and a cement base layer, which are arranged in this order from top to bottom.
10. The road structure for theme park as claimed in claim 9, further comprising: the cement concrete base course comprises a first concrete layer, wherein the first end of the first concrete layer is arranged in the first gravel base course, and the second end of the first concrete layer is arranged in the cement base course.
11. The roadway structure for a theme park as set forth in claim 9, wherein a side of the first crushed stone base layer facing the cement base layer is provided with a first slope, and the cement base layer is provided with a second slope which is in abutment with the first slope.
12. The road structure for a theme park as set forth in claim 11, wherein the first crushed stone base layer and the stabilized water base layer are provided at lower ends thereof with a rammed base layer, and the rammed base layer is provided with a third inclined surface which is fitted to the first inclined surface.
13. A theme park comprising the road structure for a theme park as set forth in any one of claims 1 to 12.
CN201921884272.7U 2019-11-04 2019-11-04 A road structure for theme park and theme park Expired - Fee Related CN211872455U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201921884272.7U CN211872455U (en) 2019-11-04 2019-11-04 A road structure for theme park and theme park

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201921884272.7U CN211872455U (en) 2019-11-04 2019-11-04 A road structure for theme park and theme park

Publications (1)

Publication Number Publication Date
CN211872455U true CN211872455U (en) 2020-11-06

Family

ID=73240997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201921884272.7U Expired - Fee Related CN211872455U (en) 2019-11-04 2019-11-04 A road structure for theme park and theme park

Country Status (1)

Country Link
CN (1) CN211872455U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846969A (en) * 2019-11-04 2020-02-28 深圳华侨城文化旅游科技集团有限公司 A road structure for theme park and theme park

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110846969A (en) * 2019-11-04 2020-02-28 深圳华侨城文化旅游科技集团有限公司 A road structure for theme park and theme park

Similar Documents

Publication Publication Date Title
CN204401444U (en) A kind of high embankment filled soil end of the bridge anti-settling structure
CN103088752A (en) Construction method of bridge seamless type expansion joint
CN105040554A (en) Garden path structure and paving construction technology thereof
CN108547195B (en) Drainage asphalt pavement structure and construction method
CN111074715A (en) A kind of crack-resistant subgrade pavement structure and construction method thereof
CN209227320U (en) A kind of permeable tile work pavement structure that solid cement concrete layer is set
CN208649826U (en) The pervious asphalt road of Collapsible Loess District
CN106087639A (en) A kind of highway, Irish bridge structure and Irish bridge construction method
CN211872455U (en) A road structure for theme park and theme park
CN107237232B (en) high-durability cement concrete pavement expansion joint structure and construction method thereof
CN104631268A (en) Concrete road pavement structure
CN204780512U (en) Durable asphalt roads of prevention of seepage
CN214992786U (en) Municipal administration road design road surface domatic structure
CN207062670U (en) A kind of asphalt roads
CN111764219B (en) Water permeable pavement structure and water permeable pavement method
CN105603846A (en) Dual-layer glass fiber concrete pavement structure applicable to city roads
CN210341528U (en) Gardens brick road surface structure that permeates water
CN110846969A (en) A road structure for theme park and theme park
CN206721596U (en) A kind of pavement structure of permeable road
CN111304989A (en) Stable ecological permeable pavement and manufacturing method thereof
RU84857U1 (en) HIGHWAY
CN105155387A (en) Garden road structure
CN205856961U (en) A kind of high-mechanic block-stone pavement structure being applicable to very heavy traffic
CN205839503U (en) A kind of block-stone pavement structure being applicable to heavy traffic
CN106996063A (en) A kind of pavement structure of permeable road

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201106

CF01 Termination of patent right due to non-payment of annual fee