CN211034952U - Maintenance hanging bracket for substation equipment - Google Patents
Maintenance hanging bracket for substation equipment Download PDFInfo
- Publication number
- CN211034952U CN211034952U CN201921449429.3U CN201921449429U CN211034952U CN 211034952 U CN211034952 U CN 211034952U CN 201921449429 U CN201921449429 U CN 201921449429U CN 211034952 U CN211034952 U CN 211034952U
- Authority
- CN
- China
- Prior art keywords
- top beam
- slider
- hole
- hanger plate
- hanger
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000012423 maintenance Methods 0.000 title claims abstract description 15
- 230000009466 transformation Effects 0.000 claims description 11
- 238000000034 method Methods 0.000 abstract description 7
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000008569 process Effects 0.000 description 2
- 230000006866 deterioration Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000006872 improvement Effects 0.000 description 1
- 230000001131 transforming effect Effects 0.000 description 1
Images
Landscapes
- Load-Engaging Elements For Cranes (AREA)
Abstract
The utility model belongs to the field of substation equipment maintenance, in particular to a maintenance hanging bracket for substation equipment, which comprises a top beam, supports arranged at two sides of the top beam, a slide seat which is positioned at one side of the top beam and is fixedly connected with the supports, and a base which is sleeved outside the top beam and is in sliding connection with the top beam, wherein one side of the slide seat, which is far away from the top beam, is fixedly provided with a connecting shaft; because in the slider embedding through-hole to with through-hole sliding connection, the lifting hook can remove to suitable position along the through-hole through the slider, then carry out zonulae occludens with slider and hanger plate through external bolt, make things convenient for people's lifting device's size to come to adjust the position between the lifting hook as required, reduce the cost of labor, and because connecting piece symmetric distribution is in the both sides of hanger plate, the connecting seat can be fixed in the four corners that carries on of hanger plate through the lifting rope, make the hanger plate difficult rocking at the hoist and mount in-process, reduce the potential safety hazard.
Description
Technical Field
The utility model relates to a substation equipment maintains the field, especially relates to a substation equipment is with maintaining gallows.
Background
The power transformation equipment is power equipment for transforming voltage, receiving and distributing electric energy, controlling electric power flow direction and adjusting voltage in a power system, and is characterized in that a transformer of the power equipment is used for connecting power grids of voltages of all levels, maintenance is combined with equipment maintenance, technical management measures are carried out according to a preset plan or corresponding technical condition in order to prevent equipment performance deterioration or reduce equipment failure probability, and when the power transformation equipment is maintained through a hanging bracket, a plurality of hanging hooks are matched and installed according to the size of the equipment, so that when objects with different sizes are hung, the hanging hooks are detached and installed along with the hanging bracket, labor cost and time are increased, and the hanging bracket is pulled through a rope, so that the equipment is easy to shake in the lifting process, and the risk of rope unhooking exists.
In order to solve the problem, the application provides a maintenance hanging bracket for power transformation equipment.
SUMMERY OF THE UTILITY MODEL
Objects of the invention
For solving the technical problem who exists among the background art, the utility model provides a substation equipment is with maintaining gallows has and adjusts the characteristics of steady hoist and mount to the lifting hook position in real time.
(II) technical scheme
In order to solve the problems, the utility model provides a maintenance hanger for power transformation equipment, which comprises a top beam, brackets arranged at two sides of the top beam, a base which is positioned at one side of the brackets far away from the top beam and is fixedly connected with the brackets, and a sliding seat sleeved outside the top beam and connected with the top beam in a sliding manner, wherein a connecting shaft is fixedly arranged on one side of the sliding seat far away from the top beam, two connecting seats are symmetrically sleeved outside the connecting shaft, and is fixedly connected with the connecting seat, a lifting rope is sleeved outside the connecting seat and is fixedly connected with the lifting rope, the two ends of the lifting rope face the same direction, and is fixedly connected with the same hanging plate, the outer side wall of the hanging plate is sequentially provided with a chute and a through hole, a slide block is arranged in the through hole, and is connected with the sliding block in a sliding way, and one side of the sliding block is provided with a lifting hook which is fixedly connected with the lifting hook.
Preferably, the support with the base is triangle-shaped structure, and is equipped with a plurality of dead levers in proper order, and with dead lever fixed connection.
Preferably, the direction of one side of the top beam far away from the sliding seat is the same as that of one side of the support, and the connecting shaft is coated on the outer side wall of the top beam.
Preferably, a connecting piece is welded at the joint of the lifting plate and the lifting rope, and the connecting piece is fixedly connected with the lifting rope.
Preferably, the connecting pieces are symmetrically distributed on two sides of the hanging plate.
Preferably, the sliding block is embedded into the through hole and attached to the inner wall of the through hole.
Preferably, the sliding block is of an I-shaped structure, and two sides of the sliding block are located in the sliding groove and attached to the inner wall of the sliding groove.
The above technical scheme of the utility model has following profitable technological effect:
promote the lifting hook, because in the slider embedding through-hole, and with through-hole sliding connection, the lifting hook can remove to suitable position along the through-hole through the slider, then carry out zonulae occludens with slider and hanger plate through external bolt, make things convenient for people's lifting device's size as required to come to adjust the position between the lifting hook, reduce the cost of labor, and because connecting piece symmetric distribution is in the both sides of hanger plate, the connecting seat can be fixed in the four corners of carrying out of hanger plate through the lifting rope, make the hanger plate be difficult for rocking at hoist and mount in-process, reduce the potential safety hazard.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is a side view of the present invention;
FIG. 3 is a schematic structural view of the present invention between the connecting shaft and the hanging plate;
fig. 4 is a schematic structural view between the hanging plate and the sliding block of the present invention.
Reference numerals:
1. a top beam; 2. a slide base; 3. a connecting shaft; 4. a lifting rope; 5. a connecting member; 6. a support; 7. a hanger plate; 8. a hook; 9. a connecting seat; 10. a chute; 11. a slider; 12. a base; 13. fixing the rod; 14. and a through hole.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more apparent, the present invention will be described in detail with reference to the accompanying drawings. It should be understood that the description is intended to be illustrative only and is not intended to limit the scope of the present invention. Moreover, in the following description, descriptions of well-known structures and techniques are omitted so as to not unnecessarily obscure the concepts of the present invention.
As shown in fig. 1-4, the utility model provides a maintenance hanger for power transformation equipment, which comprises a top beam 1, brackets 6 mounted on both sides of the top beam 1, a base 12 located on one side of the brackets 6 far from the top beam 1 and fixedly connected with the brackets 6, and a sliding seat 2 which is sleeved outside the top beam 1 and is connected with the top beam 1 in a sliding way, a connecting shaft 3 is fixedly arranged on one side of the sliding seat 2 far away from the top beam 1, two connecting seats 9 are symmetrically sleeved outside the connecting shaft 3, and is fixedly connected with a connecting seat 9, a lifting rope 4 is sleeved outside the connecting seat 9 and is fixedly connected with the lifting rope 4, the two ends of the lifting rope 4 face the same direction, and is fixedly connected with the same hanging plate 7, the outer side wall of the hanging plate 7 is sequentially provided with a chute 10 and a through hole 14, a slide block 11 is arranged in the through hole 14, and is connected with the slide block 11 in a sliding way, and one side of the slide block 11 is provided with a lifting hook 8 and is fixedly connected with the lifting hook 8.
As shown in fig. 2, the bracket 6 and the base 12 are in a triangular structure, and a plurality of fixing rods 13 are sequentially arranged and fixedly connected with the fixing rods 13.
As shown in fig. 1, the sliding base 2 and the bracket 6 face the same direction from the top beam 1, and the connecting shaft 3 covers the outer side wall of the top beam 1.
The utility model discloses in, because in the slider 11 embedding through-hole 14, and with 14 sliding connection of through-hole, promote lifting hook 8, lifting hook 8 can remove to suitable position along through-hole 14 through slider 11, then carry out zonulae occludens with slider 11 and hanger plate 7 through external bolt, make things convenient for people to come to adjust the position between lifting hook 8 as required lifting device's size, reduce the cost of labor, and because 5 symmetric distribution of connecting piece are in the both sides of hanger plate 7, connecting seat 9 can be fixed in the four corners of carrying out of hanger plate 7 through lifting rope 4, make hanger plate 7 be difficult for rocking at the hoist and mount in-process, reduce the potential safety hazard.
Fig. 3 is a schematic structural view between the middle connecting shaft 3 and the hanging plate 7 of the present invention;
as shown in fig. 3, a connecting member 5 is welded at the joint of the hanger plate 7 and the lifting rope 4, and the connecting member 5 is fixedly connected with the lifting rope 4.
As shown in fig. 3, the connecting members 5 are symmetrically arranged on both sides of the hanger plate 7.
In this embodiment, it should be noted that, because the connecting pieces 5 are arranged between the hanging plate 7 and the hanging rope 4, and the connecting pieces 5 are symmetrically distributed on two sides of the hanging plate 7, the connecting seat 9 can fix four corners of the hanging plate 7 through the hanging rope 4, so that the hanging plate 7 is not easy to shake in the hoisting process, and the potential safety hazard is reduced.
Figure 4 is a schematic structural view between the hanger plate 7 and the slide block 11 in the present invention,
as shown in fig. 4, the slider 11 is fitted into the through hole 14 and attached to the inner wall of the through hole 14.
As shown in fig. 4, the sliding block 11 is an i-shaped structure, and two sides of the sliding block 11 are located in the sliding groove 10 and attached to the inner wall of the sliding groove 10.
In this embodiment, it should be noted that because the slider 11 is embedded in the through hole 14, and the slider 11 is an i-shaped structure, the lifting hook 8 can move to a proper position along the through hole 14 through the slider 11, so that people can adjust the position between the lifting hooks 8 according to the size of the lifting device needed.
The utility model discloses a theory of operation and use flow: because in the slider 11 embedding through-hole 14, and with 14 sliding connection of through-hole, promote lifting hook 8, lifting hook 8 can remove to suitable position along through-hole 14 through slider 11, then carry out zonulae occludens with slider 11 and hanger plate 7 through external bolt, make things convenient for people to come to adjust the position between lifting hook 8 as required lifting device's size, reduce the cost of labor, be connected equipment through haulage rope and lifting hook 8, then lift by crane the operation, because be equipped with connecting piece 5 between hanger plate 7 and the lifting rope 4, and connecting piece 5 symmetric distribution is in the both sides of hanger plate 7, connecting seat 9 can be fixed in the four corners of carrying out of hanger plate 7 through hanger rope 4, make hanger plate 7 difficult rocking at the hoist and mount in-process, reduce the potential safety hazard.
It is to be understood that the above-described embodiments of the present invention are merely illustrative of or explaining the principles of the invention and are not to be construed as limiting the invention. Therefore, any modification, equivalent replacement, improvement and the like made without departing from the spirit and scope of the present invention should be included in the protection scope of the present invention. Further, it is intended that the appended claims cover all such variations and modifications as fall within the scope and boundaries of the appended claims or the equivalents of such scope and boundaries.
Claims (7)
1. The utility model provides a substation equipment is with maintaining gallows, includes back timber (1), installs support (6) in back timber (1) both sides is located support (6) are kept away from one side of back timber (1), and with support (6) fixed connection's base (12), and the cover is established outside back timber (1), and with back timber (1) sliding connection's slide (2), its characterized in that, slide (2) keep away from one side of back timber (1) is fixed and is equipped with connecting axle (3), connecting axle (3) outer symmetry cover is equipped with two connecting seats (9), and with connecting seat (9) fixed connection, the overcoat of connecting seat (9) is equipped with lifting rope (4), and with lifting rope (4) fixed connection, just the both ends orientation of lifting rope (4) is the same to with same hanger plate (7) fixed connection, spout (10) and through-hole (14) have been seted up in proper order to the lateral wall of hanger plate (7), be equipped with slider (11) in through-hole (14), and with slider (11) sliding connection, one side of slider (11) is equipped with lifting hook (8), and with lifting hook (8) fixed connection.
2. The maintenance hanger for the power transformation equipment as recited in claim 1, wherein the support (6) and the base (12) are in a triangular structure, and a plurality of fixing rods (13) are sequentially arranged and fixedly connected with the fixing rods (13).
3. The maintenance hanging bracket for the power transformation equipment as claimed in claim 1, wherein the sliding base (2) and the bracket (6) face the same direction at the side far away from the top beam (1), and the connecting shaft (3) covers the outer side wall of the top beam (1).
4. The maintenance hanger for the power transformation equipment as recited in claim 1, wherein a connecting piece (5) is welded at the joint of the hanger plate (7) and the lifting rope (4), and the connecting piece (5) is fixedly connected with the lifting rope (4).
5. A maintenance hanger for a transformation device according to claim 4, characterized in that said connectors (5) are symmetrically distributed on both sides of said hanger plate (7).
6. The maintenance hanger for the power transformation equipment as recited in claim 1, characterized in that the slider (11) is embedded in the through hole (14) and attached to the inner wall of the through hole (14).
7. The maintenance hanger for the power transformation equipment as recited in claim 1, wherein the sliding block (11) is an I-shaped structure, and two sides of the sliding block (11) are located in the sliding groove (10) and attached to the inner wall of the sliding groove (10).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921449429.3U CN211034952U (en) | 2019-09-03 | 2019-09-03 | Maintenance hanging bracket for substation equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201921449429.3U CN211034952U (en) | 2019-09-03 | 2019-09-03 | Maintenance hanging bracket for substation equipment |
Publications (1)
Publication Number | Publication Date |
---|---|
CN211034952U true CN211034952U (en) | 2020-07-17 |
Family
ID=71542314
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201921449429.3U Expired - Fee Related CN211034952U (en) | 2019-09-03 | 2019-09-03 | Maintenance hanging bracket for substation equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN211034952U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114291649A (en) * | 2022-01-21 | 2022-04-08 | 湘西同富电力建设有限公司 | Building engineering power line stringing device |
-
2019
- 2019-09-03 CN CN201921449429.3U patent/CN211034952U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114291649A (en) * | 2022-01-21 | 2022-04-08 | 湘西同富电力建设有限公司 | Building engineering power line stringing device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201821226U (en) | Lifting device of large synchronous motor | |
CN211034952U (en) | Maintenance hanging bracket for substation equipment | |
CN106276602B (en) | A kind of across high ferro Business Line beam body hangs method | |
CN203205772U (en) | Overhead ground wire lifter | |
CN102795553B (en) | Locomotive pre-wiring frame lifting system | |
CN204597302U (en) | A kind of regulator cubicle erecting device | |
CN201176365Y (en) | Light-duty adjustable hanger | |
CN202429865U (en) | Lift for mounting and demounting integral components of photoelectric radars | |
CN105197812B (en) | The transformer station's multi-functional carrying equipment lifted by crane using magnetic hanging loop | |
CN103318745A (en) | Lightweight special-purposed spreader and mounting method thereof | |
CN203159036U (en) | Line-shaped lifting appliance | |
CN203112332U (en) | Eccentric lifting device for dome | |
CN206969995U (en) | A kind of suspender of nuclear power plant nuclear island main equipment | |
CN208883427U (en) | A kind of killer switch inspection trolley | |
CN203699783U (en) | Hanging bracket fixed with wire pole | |
CN108502700A (en) | Engine rooms of wind power generators suspender | |
CN103803397A (en) | Hanger for mounting universal shaft of vertical mill and application method of hanger | |
CN108390291A (en) | A kind of outdoor voltage transformer maintenance special hoisting bar | |
CN201932843U (en) | Self-balancing insulation spreader for grid maintenance | |
CN108128693A (en) | Multifunctional hanging tool and hanging method | |
CN204230714U (en) | Circuit breaker bulk migration system | |
CN209116858U (en) | A kind of Quick-attachable cooling tower filler support device | |
CN203101704U (en) | Transmission line protection device | |
CN207877077U (en) | A kind of electromagnetic lifter magnet hanging beam | |
CN206878354U (en) | A kind of movable switch cubicle hoisting platform |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20200717 |