[go: up one dir, main page]

CN203205772U - Overhead ground wire lifter - Google Patents

Overhead ground wire lifter Download PDF

Info

Publication number
CN203205772U
CN203205772U CN 201320227039 CN201320227039U CN203205772U CN 203205772 U CN203205772 U CN 203205772U CN 201320227039 CN201320227039 CN 201320227039 CN 201320227039 U CN201320227039 U CN 201320227039U CN 203205772 U CN203205772 U CN 203205772U
Authority
CN
China
Prior art keywords
lifting
overhead ground
ground wire
lifter
hoop
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN 201320227039
Other languages
Chinese (zh)
Inventor
李辉
孙裕尧
李国忠
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Original Assignee
State Grid Corp of China SGCC
State Grid Hebei Electric Power Co Ltd
Baoding Power Supply Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by State Grid Corp of China SGCC, State Grid Hebei Electric Power Co Ltd, Baoding Power Supply Co Ltd filed Critical State Grid Corp of China SGCC
Priority to CN 201320227039 priority Critical patent/CN203205772U/en
Application granted granted Critical
Publication of CN203205772U publication Critical patent/CN203205772U/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Images

Landscapes

  • Electric Cable Installation (AREA)

Abstract

The utility model discloses an overhead ground wire lifter which is a lifting device for maintaining wire clamps of 110kV cement pole-supported overhead ground wires. The lifter comprises a hoop for fastening the lifter on a cement pole, a lifting mechanism for lifting an overhead ground wire, and a hoist mechanism for controlling the lifting mechanism to move up and down. The hoop is connected to a mounting base of the hoist mechanism by a bracket. A hoist part of the hoist mechanism is connected to the lifting mechanism. With the lifter, the work efficiency can be improved by 200%, and less workers are needed. The lifter avoids the hidden dangers that the overhead ground wire falls off, the operators are injured or fall from heights and the like, all of which are caused by such reasons as lack of physical strength or misoperations of operators. Thus safety of the operators can be ensured, and the level of on-site standardized operation is improved.

Description

架空地线提升器Overhead Ground Wire Riser

技术领域 technical field

本实用新型涉及一种用于维修110kV水泥杆架空地线线夹的起重装置。 The utility model relates to a hoisting device used for maintaining a 110kV cement pole overhead ground wire clamp.

背景技术 Background technique

110kV水泥杆架空地线的悬垂线夹打开进行检查;更换连接金具、连接螺栓及地线悬垂线夹等作业时, 由于没有支点进行起重,所以实际作业中都是由作业人员在杆上利用脚扣选好作业位置后,用肩膀扛起架空地线,将架空地线的重力转移至作业人员的肩膀上进行起重。这种作业方法对垂直档距较小的档距还可以进行(架空地线重量不超过100kg,一般在平原地区),但是对垂直档距较大的档距(架空地线重量大于100kg,特别是在山区),由于重量太大,超过作业人员的承受能力而无法进行作业,同时人力肩扛对作业人员的身体素质、操作技能要求高(作业人员要会巧劲),也极不利于人身安全。 Open the suspension clamp of the 110kV cement pole overhead ground wire for inspection; when replacing the connecting fittings, connecting bolts and ground wire suspension clamps, etc., since there is no fulcrum for lifting, the actual operation is performed by the operator on the pole. After the foot button has selected the working position, use the shoulder to carry the overhead ground wire, and transfer the gravity of the overhead ground wire to the shoulders of the operator for lifting. This method of operation can also be carried out for smaller vertical spans (the weight of the overhead ground wire does not exceed 100kg, generally in plain areas), but for larger vertical spans (the weight of the overhead ground wire is greater than 100kg, especially It is located in a mountainous area), because the weight is too large, which exceeds the ability of the operator to carry out the operation. At the same time, the human shoulder load requires high physical fitness and operational skills of the operator (operators must be skillful), which is also extremely harmful to personal safety. .

实用新型内容 Utility model content

本实用新型要解决的技术问题是提供一种结构简单、操作安全方便、可提高工作效率的架空地线提升器。 The technical problem to be solved by the utility model is to provide an overhead ground wire lifter with simple structure, safe and convenient operation, and improved work efficiency.

为解决上述技术问题,本实用新型采用的技术方案为:一种架空地线提升器,包括将提升器固定于水泥杆上的抱箍、用于提拉架空地线的提升机构和控制提升机构升降的起重机构;所述抱箍通过托架与起重机构的固定座相连接,所述起重机构的起重件与提升机构相连接。 In order to solve the above technical problems, the technical solution adopted by the utility model is: an overhead ground wire lifter, including a hoop for fixing the lifter on the cement pole, a lifting mechanism for lifting the overhead ground wire, and a control lifting mechanism Lifting lifting mechanism; the hoop is connected with the fixed seat of the lifting mechanism through a bracket, and the lifting piece of the lifting mechanism is connected with the lifting mechanism.

所述起重机构为螺旋起重器;所述托架与螺旋起重器的底座相连接。 The lifting mechanism is a screw jack; the bracket is connected with the base of the screw jack.

所述螺旋起重器的起重件为螺杆,所述提升机构与螺杆相连接。 The lifting part of the screw jack is a screw rod, and the lifting mechanism is connected with the screw rod.

所述提升机构由水平的连接架和设于连接架底部的提线钩子组成。 The lifting mechanism is composed of a horizontal connecting frame and a wire-handling hook arranged at the bottom of the connecting frame.

所述提线钩子为两个,对称设于连接架上。 There are two thread-lifting hooks, which are symmetrically arranged on the connecting frame.

所述托架位于抱箍的箍板上。 The bracket is located on the hoop plate of the hoop.

采用上述技术方案取得的技术进步为:使用本实用新型可将工作效率提高2倍,同时减少用工人数;避免了作业人员由于体力不支或作业失误等原因造成架空地线掉落等危险隐患,保证了作业人员人身的安全;还提高了现场标准化作业水平。 The technical progress obtained by adopting the above technical scheme is: the utility model can increase the working efficiency by 2 times, and reduce the number of workers; It not only improves the personal safety of operators, but also improves the level of on-site standardized operations.

附图说明 Description of drawings

图1所示为本实用新型的结构示意图; Shown in Fig. 1 is the structural representation of the utility model;

其中,1、抱箍,2、底座,3、提线钩子,4、托架,5、螺杆,6、连接架,7、手柄。 Wherein, 1. hoop, 2. base, 3. wire lifting hook, 4. bracket, 5. screw rod, 6. connecting frame, 7. handle.

具体实施方式 Detailed ways

由图1所示可知,架空地线提升器,包括将提升器固定于水泥杆上的抱箍1、用于提拉架空地线的提升机构和控制提升机构升降的起重机构;所述抱箍1通过托架4与起重机构的固定座相连接,所述起重机构的起重件与提升机构相连接。所述起重机构为螺旋起重器;所述提升机构由水平的连接架6和设于连接架6底部的提线钩子3组成。所述托架4位于抱箍1的箍板上;所述托架4与螺旋起重器的底座2相连接;所述螺旋起重器的起重件包括螺杆5,所述提升机构的连接架6与螺杆5相连接;所述提线钩子3为两个,对称设于连接架6的两端。 As can be seen from Figure 1, the overhead ground wire lifter includes a hoop 1 for fixing the lifter on the cement pole, a hoisting mechanism for pulling the overhead ground wire and a hoisting mechanism for controlling the lifting of the hoisting mechanism; The hoop 1 is connected to the fixed seat of the lifting mechanism through the bracket 4, and the lifting member of the lifting mechanism is connected to the lifting mechanism. The lifting mechanism is a screw jack; the lifting mechanism is composed of a horizontal connecting frame 6 and a wire-lifting hook 3 arranged at the bottom of the connecting frame 6 . The bracket 4 is located on the hoop plate of the hoop 1; the bracket 4 is connected with the base 2 of the screw jack; the lifting part of the screw jack includes a screw rod 5, and the connection of the lifting mechanism The frame 6 is connected with the screw rod 5; there are two thread-lifting hooks 3, which are symmetrically arranged at both ends of the connecting frame 6.

本实用新型中,抱箍1是用来将整个提升器固定在电线杆上的,因此抱箍1采用普通的电线杆抱箍即可。起重机构用来提升悬垂的架空地线,提升机构相当于连接其中机构和架空地线的部件。将起重机构的固定座固定到抱箍1上,为了便于固定,两者之间通过固定在箍板上的托架4来实现连接。最常用的起重机构就是螺旋起重器,托架4与螺旋起重器的底座2相连接。本实用新型中采用的螺旋起重器包括螺杆5、底座2和手柄7。本实用新型中重物是架空地线,螺杆5不能和直接与架空地线相连接,因此设置了提升机构。提升机构包括水平设置的连接架6和提拉架空地线的提线钩子3。螺杆5和连接架6相连接,再通过提线钩子3以达到连接架空地线的目的。转动手柄7控制控制螺杆5的升降,从而控制悬垂的架空地线的升降。由于整个装置是固定在电线杆上的,手柄7的活动范围不能过大,不能超过180°,因此手柄7需要通过棘轮轴承来控制螺杆5的升降。 In the utility model, the hoop 1 is used to fix the whole lifter on the utility pole, so the hoop 1 can adopt a common utility pole hoop. The lifting mechanism is used to lift the suspended overhead ground wire, and the lifting mechanism is equivalent to the part connecting the mechanism and the overhead ground wire. The fixing seat of the lifting mechanism is fixed on the hoop 1, and in order to facilitate fixing, the connection between the two is realized through the bracket 4 fixed on the hoop plate. The most commonly used lifting mechanism is exactly a screw jack, and the bracket 4 is connected with the base 2 of the screw jack. The screw jack that adopts among the utility model comprises screw rod 5, base 2 and handle 7. The heavy object in the utility model is an overhead ground wire, and the screw rod 5 cannot be directly connected with the overhead ground wire, so a lifting mechanism is provided. The lifting mechanism includes a connecting frame 6 arranged horizontally and a wire lifting hook 3 for lifting the overhead ground wire. The screw rod 5 is connected with the connecting frame 6, and then passes through the wire lifting hook 3 to achieve the purpose of connecting the overhead ground wire. Turn the handle 7 to control the lifting of the control screw 5, thereby controlling the lifting of the suspended overhead ground wire. Because the whole device is fixed on the utility pole, the range of motion of the handle 7 cannot be too large, and cannot exceed 180 °, so the handle 7 needs to control the lifting of the screw rod 5 by the ratchet bearing.

本实用新型的使用方法为:工作人员带着本实用新型攀爬到预定的电线杆上,到达预定位置后,将本实用新型通过抱箍1固定在电线杆。在固定抱箍1的同时,也要兼顾提线钩子3与架空地线之间的距离,以使其能够接触到架空地线为准。将整个装置固定好后,扳动螺旋起重器的手柄7,使螺杆5向上移动,进而带动连接架6上升,同时提线钩子3也上升,这样,提线钩子3就能提着悬垂的架空地线上升。当架空地线的全部重量都转移至提线钩子3时,工作人员就可以进行检修作业了。 The usage method of the utility model is as follows: the staff climbs to the predetermined utility pole with the utility model, and after reaching the predetermined position, the utility model is fixed on the utility pole by the hoop 1 . While fixing the hoop 1, the distance between the wire lifting hook 3 and the overhead ground wire should also be taken into account so that it can touch the overhead ground wire. After the whole device is fixed, pull the handle 7 of the screw jack to make the screw rod 5 move upwards, and then drive the connecting frame 6 to rise, and at the same time, the thread lifting hook 3 also rises, so that the thread lifting hook 3 can lift the hanging The overhead ground wire rises. When the full weight of the overhead ground wire has been transferred to the wire lifting hook 3, the staff can carry out maintenance work.

利用架空地线提升器进行作业,可以将工作效率提高2倍,同时减少用工人数;可以避免作业人员由于体力不支或作业失误等原因造成架空地线掉落、工作人员受伤或高空坠落等危险,保证作业安;还可以提高现场标准化作业水平。 Using the overhead ground wire lifter to work can increase the work efficiency by 2 times and reduce the number of workers; it can avoid the danger of the overhead ground wire falling, the staff being injured or falling from high altitude due to lack of physical strength or operation errors, etc. Ensure the safety of the operation; it can also improve the level of on-site standardized operations.

本实用新型适用于110kV水泥杆上用DJ-2451型避雷线悬垂吊架悬吊架空地线的输电线路上。 The utility model is suitable for a transmission line on a 110kV cement pole using a DJ-2451 type lightning protection wire suspension hanger to suspend an overhead ground wire.

本实用新型中起重机构和提升机构可以根据实情情况选择合适的装置来实现,只要实现相应的功能即可。本领域技术人员根据本实用新型的功能描述完全可以选择自己适用的工具和装置,不必局限于本文件中提供的设备。  In the utility model, the hoisting mechanism and the hoisting mechanism can be realized by selecting suitable devices according to the actual situation, as long as the corresponding functions are realized. Those skilled in the art can completely choose their own suitable tools and devices according to the functional description of the utility model, and need not be limited to the equipment provided in this document. the

Claims (6)

1.一种架空地线提升器,其特征在于包括将提升器固定于水泥杆上的抱箍(1)、用于提拉架空地线的提升机构和控制提升机构升降的起重机构;所述抱箍(1)通过托架(4)与起重机构的固定座相连接,所述起重机构的起重件与提升机构相连接。 1. An overhead ground wire lifter, characterized in that it comprises a hoop (1) for fixing the lifter on the cement pole, a hoisting mechanism for lifting the overhead ground wire and a hoisting mechanism for controlling the lifting of the hoisting mechanism; The hoop (1) is connected to the fixed seat of the lifting mechanism through the bracket (4), and the lifting piece of the lifting mechanism is connected to the lifting mechanism. 2.根据权利要求1所述的架空地线提升器,其特征在于所述起重机构为螺旋起重器;所述托架(4)与螺旋起重器的底座(2)相连接。 2. The overhead ground wire lifter according to claim 1, characterized in that the lifting mechanism is a screw jack; the bracket (4) is connected to the base (2) of the screw jack. 3.根据权利要求2所述的架空地线提升器,其特征在于所述螺旋起重器的起重件为螺杆(5),所述提升机构与螺杆(5)相连接。 3. The overhead ground wire lifter according to claim 2, characterized in that the lifting member of the screw jack is a screw rod (5), and the lifting mechanism is connected with the screw rod (5). 4.根据权利要求1所述的架空地线提升器,其特征在于所述提升机构由水平的连接架(6)和设于连接架(6)底部的提线钩子(3)组成。 4. The overhead ground wire lifter according to claim 1, characterized in that the lifting mechanism is composed of a horizontal connecting frame (6) and a wire lifting hook (3) arranged at the bottom of the connecting frame (6). 5.根据权利要求4所述的架空地线提升器,其特征在于所述提线钩子(3)为两个,对称设于连接架(6)上。 5. The overhead ground wire lifter according to claim 4, characterized in that there are two wire lifting hooks (3), which are symmetrically arranged on the connecting frame (6). 6.根据权利要求1所述的架空地线提升器,其特征在于所述托架(4)位于抱箍(1)的箍板上。 6. The overhead ground wire lifter according to claim 1, characterized in that the bracket (4) is located on the hoop plate of the hoop (1).
CN 201320227039 2013-04-28 2013-04-28 Overhead ground wire lifter Expired - Fee Related CN203205772U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 201320227039 CN203205772U (en) 2013-04-28 2013-04-28 Overhead ground wire lifter

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 201320227039 CN203205772U (en) 2013-04-28 2013-04-28 Overhead ground wire lifter

Publications (1)

Publication Number Publication Date
CN203205772U true CN203205772U (en) 2013-09-18

Family

ID=49149840

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 201320227039 Expired - Fee Related CN203205772U (en) 2013-04-28 2013-04-28 Overhead ground wire lifter

Country Status (1)

Country Link
CN (1) CN203205772U (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928865A (en) * 2014-04-10 2014-07-16 国家电网公司 Manual wire lifter for wire construction
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN105262005A (en) * 2015-11-05 2016-01-20 国家电网公司 Auxiliary supporting device for pole overhead ground wire and OPGW optical cable
CN105305314A (en) * 2015-12-09 2016-02-03 国网四川省电力公司达州供电公司 Distribution network straightway line lifting device
CN106786314A (en) * 2016-12-22 2017-05-31 国网河北省电力公司衡水供电分公司 A kind of cement pole ground wire resetting means
CN112018660A (en) * 2020-09-07 2020-12-01 余小芝 Rod frame lifting type power equipment installation and maintenance device with safety mechanism

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN103928865A (en) * 2014-04-10 2014-07-16 国家电网公司 Manual wire lifter for wire construction
CN104505771A (en) * 2014-12-31 2015-04-08 国家电网公司 Overhead ground wire lifter
CN105262005A (en) * 2015-11-05 2016-01-20 国家电网公司 Auxiliary supporting device for pole overhead ground wire and OPGW optical cable
CN105262005B (en) * 2015-11-05 2018-01-02 国家电网公司 For electric pole aerial earth wire and the auxiliary support apparatus of OPGW optical cables
CN105305314A (en) * 2015-12-09 2016-02-03 国网四川省电力公司达州供电公司 Distribution network straightway line lifting device
CN106786314A (en) * 2016-12-22 2017-05-31 国网河北省电力公司衡水供电分公司 A kind of cement pole ground wire resetting means
CN112018660A (en) * 2020-09-07 2020-12-01 余小芝 Rod frame lifting type power equipment installation and maintenance device with safety mechanism

Similar Documents

Publication Publication Date Title
CN203205772U (en) Overhead ground wire lifter
CN203807094U (en) Screw lifting device
CN202474703U (en) Overhead ground wire lifting mechanism
CN201369521Y (en) Bottom-upward pulley
CN203474231U (en) Steel bar tower safety hoisting device
CN204237458U (en) The laborsaving lifting utensil of a kind of electrical equipment
CN201997018U (en) Safety belt hanging device
CN203598387U (en) Auxiliary device used for aloft work
CN202405695U (en) Lifting tool for overhead ground wire of steel pipe pole
CN202441045U (en) Rail-type electric attached lifting scaffold
CN210003199U (en) general type steelframe cat ladder climbing equipment
CN201611741U (en) Lifting device used for power equipment
CN206542116U (en) One kind is used for power tool transmission lever on 10kV bars
CN204416900U (en) A kind of transformer bushing lifting device
CN205087828U (en) Simple and easy lifting device of 35kV circuit breaker
CN205348817U (en) Safety belt pendant
CN103615189B (en) Rope ladder connecting structure for aerial cable
CN202657877U (en) Circuit equipment construction lifting frame
CN209127874U (en) A concrete pole hoisting tool
CN201932843U (en) Self-balancing insulation spreader for grid maintenance
CN208166424U (en) 35kV disconnecting switch simple and easy hoisting tool
CN205873722U (en) Large -scale balance is hung suitable for building
CN208659136U (en) Platform with glass is auxiliary hangs conversion equipment
CN205901172U (en) A hanger device for near pole maintenance corridor of power transmission line
CN104362541A (en) High-altitude power circuit outgoing assisting device

Legal Events

Date Code Title Description
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20130918

Termination date: 20180428