[go: up one dir, main page]

CN210112850U - High-rise escape is with laying slope slide structure fast - Google Patents

High-rise escape is with laying slope slide structure fast Download PDF

Info

Publication number
CN210112850U
CN210112850U CN201920321962.5U CN201920321962U CN210112850U CN 210112850 U CN210112850 U CN 210112850U CN 201920321962 U CN201920321962 U CN 201920321962U CN 210112850 U CN210112850 U CN 210112850U
Authority
CN
China
Prior art keywords
rise
cloth
traction
sets
slide
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201920321962.5U
Other languages
Chinese (zh)
Inventor
仲志国
张岩
李婧
冯玉全
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanyang Normal University
Original Assignee
Nanyang Normal University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanyang Normal University filed Critical Nanyang Normal University
Priority to CN201920321962.5U priority Critical patent/CN210112850U/en
Application granted granted Critical
Publication of CN210112850U publication Critical patent/CN210112850U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model provides a high-rise escape rapid laying inclined slideway structure, which comprises a slideway rolling mechanism arranged at the top of a high-rise building, a traction mechanism arranged at the bottom of the high-rise building, far away from the ground of the high-rise building and connected with the slideway rolling mechanism, and a plurality of fixed modules arranged on the side wall surface of the high-rise building and positioned at an outlet; the utility model discloses can be when meetting the crisis, through the mode that stranded personnel and lifesaving personnel cooperation were adjusted, directly place the window department at the floor that stranded personnel correspond with the mouth of fleing to flee fast through escape device.

Description

一种高层逃生用快速铺设倾斜滑道结构A rapid laying inclined slideway structure for high-rise escape

技术领域technical field

本实用新型涉及高层逃生设备技术领域,具体涉及一种高层逃生用快速铺设倾斜滑道结构。The utility model relates to the technical field of high-rise escape equipment, in particular to a fast-laying inclined slideway structure for high-rise escape.

背景技术Background technique

随着社会的发展,城市中的高层建筑也越来越多,其能够给城市争取较大的发展空间,但高层建筑也带来了很多安全问题,无论是发生火灾、地震或恐怖袭击,如何能将被困在高层建筑内的被困人员从高层建筑内解救至地面,是一直困扰人们的问题,现有的高层逃生设备要么设置在顶层,要么设置在某一楼层,但由于自然灾害正在发生,越快逃离高层建筑越能保证其安全,因此需要一种能够在遇到危机时,通过调节的方式,将逃生口直接放置在被困人员对应的楼层或窗口处,从而通过进行逃生装置进行快速逃生。With the development of society, there are more and more high-rise buildings in cities, which can give the city more space for development, but high-rise buildings also bring many safety problems, whether it is a fire, an earthquake or a terrorist attack. Being able to rescue trapped people trapped in high-rise buildings from high-rise buildings to the ground is a problem that has always plagued people. The existing high-rise escape equipment is either installed on the top floor or on a certain floor, but due to natural disasters The faster the escape from the high-rise building, the safer it can be ensured. Therefore, in the event of a crisis, it is necessary to adjust the way to place the escape port directly on the floor or window corresponding to the trapped person, so that the escape device can be adjusted by Make a quick escape.

实用新型内容Utility model content

有鉴于此,本实用新型提供一种高层逃生用快速铺设倾斜滑道结构,能够在遇到危机时,通过被困人员与救生人员配合调节的方式,将逃生口直接放置在被困人员对应的楼层的窗口处,从而通过逃生装置进行快速逃生。In view of this, the present invention provides a fast-laying inclined slideway structure for high-rise escape, which can directly place the escape port on the corresponding trapped person by adjusting the trapped person and the life-saving personnel in the event of a crisis. At the window of the floor, you can quickly escape through the escape device.

为解决上述问题,本实用新型提供一种高层逃生用快速铺设倾斜滑道结构,包括设置在高层顶部的滑道收卷机构,设置在高层底部且远离高层地面上并与所述滑道收卷机构相连接的牵拉机构,以及设置在高层侧面墙面上且位于出口处的多个固定模块;In order to solve the above problems, the present utility model provides a rapid laying inclined slideway structure for high-rise escape, including a slideway winding mechanism arranged at the top of the high-rise, arranged at the bottom of the high-rise away from the ground of the high-rise, and rolled up with the slideway. a pulling mechanism connected with the mechanism, and a plurality of fixing modules arranged on the side wall of the high-rise and located at the exit;

所述滑道收卷机构包括收卷基座,设置在所述收卷基座上的两支撑架,设置在两所述支撑架之间的收卷转轴,设置在所述收卷转轴上的滑道模块,设置在所述收卷基座上用于防护收卷转轴、滑道模块和两支撑架的防护罩,以及设置在所述防护罩侧面用于与所述滑道模块相配合的锁紧模块。The slide rewinding mechanism includes a rewinding base, two support frames arranged on the rewinding base, a rewinding shaft arranged between the two support frames, and a rewinding shaft arranged on the rewinding shaft. A slideway module, a protective cover arranged on the rewinding base for protecting the rewinding rotating shaft, the slideway module and the two support frames, and a protective cover arranged on the side of the protective cover for matching with the slideway module Lock the module.

所述滑道模块包括一端固定在所述收卷转轴上,另一端缠绕在收卷转轴上且末端穿过防护罩侧壁与牵拉机构相配合的布滑道,设置在所述布滑道表面的若干加强绳索,设置在所述布滑道外表面且与所述固定模块相配合的多个挂环,设置在所述布滑道上的多个开口,一边与所述开口固定连接,剩余各边与开口通过拉链相连接的第一布盖,设置在所述开口处且与所述第一布盖相配合的第二布盖,所述第二布盖通过拉链设置在所述开口周侧,所述布滑道端部设置与牵拉机构相配合的横杆。The slideway module includes a cloth slideway, one end of which is fixed on the winding shaft, the other end is wound on the winding shaft, and the end passes through the side wall of the protective cover and is matched with the pulling mechanism, and is arranged on the cloth slideway. A plurality of reinforcing ropes on the surface, a plurality of hanging rings arranged on the outer surface of the cloth slideway and matched with the fixing module, a plurality of openings arranged on the cloth slideway, one side is fixedly connected with the opening, and the remaining A first cloth cover whose edge and opening are connected by a zipper, a second cloth cover arranged at the opening and matched with the first cloth cover, and the second cloth cover is arranged on the peripheral side of the opening through a zipper , the end of the cloth slideway is provided with a cross bar matched with the pulling mechanism.

所述锁紧模块包括设置在所述防护罩上且用于布滑道通过的仓口,通过扭力弹簧与所述仓口上部相连接的仓门,设置在所述仓门下部且与所述防护罩相配合的锁紧销孔,设置在所述锁紧销孔内的锁紧销,设置在所述防护罩内壁上且与所述锁紧销孔相配合的锁紧导管,设置在所述锁紧导管内的解锁杆,设置在所述解锁杆前端的导向块,套设在所述解锁杆上且一端与锁紧导管相连接,另一端与所述导向块相连接的复位弹簧。The locking module includes a warehouse opening arranged on the protective cover and used for the cloth slideway to pass through, and a warehouse door connected to the upper part of the warehouse opening through a torsion spring, arranged at the lower part of the warehouse door and connected to the warehouse door. The locking pin hole matched with the protective cover, the locking pin arranged in the locking pin hole, and the locking conduit arranged on the inner wall of the protective cover and matched with the locking pin hole are arranged in the The unlocking rod in the locking guide tube is a guide block arranged at the front end of the unlocking rod, and is sleeved on the unlocking rod and has one end connected to the locking guide tube and a return spring connected to the guide block at the other end.

所述固定模块包括设置在高层侧面墙面上且与多个所述挂环相配合的多个登山扣,设置在所述高层侧面墙面上用于警示的报警单元。The fixing module includes a plurality of carabiners arranged on the side wall of the high-rise and matched with a plurality of the hanging rings, and an alarm unit arranged on the side wall of the high-rise for warning.

所述牵拉机构包括设置在高层地面上的牵拉仓,设置在所述牵拉仓内的牵拉电机,设置在所述牵拉电机输出轴上的收卷轮,缠绕设置在所述收卷轮上的牵拉绳,所述牵拉绳端部与所述横杆相连接,设置在所述牵拉仓上的盖板,设置在所述盖板上且朝向高层方向的牵拉槽,设置在所述牵拉槽两侧的多个牵拉定位环。The pulling mechanism includes a pulling bin arranged on the high-rise ground, a pulling motor arranged in the pulling bin, a winding wheel arranged on the output shaft of the pulling motor, wound around the winding wheel. The pulling rope on the reel, the end of the pulling rope is connected with the cross bar, the cover plate arranged on the pulling bin, the pulling groove arranged on the cover plate and facing the high-rise direction , a plurality of pulling positioning rings arranged on both sides of the pulling groove.

所述盖板上还设置有逃生气垫。An escape air cushion is also arranged on the cover plate.

所述横杆两端设置定位圆环。Positioning rings are arranged at both ends of the horizontal bar.

所述报警单元为报警灯或彩带或彩色气球。The alarm unit is an alarm light or a ribbon or a colored balloon.

本实用新型针对现有技术中逃生装置设置在顶层或某一层,从而造成到达逃生点时需要耗费很时间,同时也可能会面临很多危险以及可能面对危险无法到达逃生点的现象,采用在高层顶部设置滑道收卷机构,并在地面设置牵拉机构,从而能够构建自上而下逃生结构,能够在遇到危机时,通过楼层位置的调节,直接将逃生口直接放置在被困人员对应的楼层或窗口处,从而通过进行逃生装置进行快速逃生。The utility model aims at the phenomenon that the escape device is arranged on the top layer or a certain layer in the prior art, so it takes a long time to reach the escape point, and at the same time, it may face many dangers and may fail to reach the escape point in the face of danger. The top of the high-rise is equipped with a chute winding mechanism and a pulling mechanism on the ground, so that a top-down escape structure can be constructed. When a crisis occurs, the escape port can be directly placed on the trapped person by adjusting the floor position. The corresponding floor or window, so as to quickly escape by using the escape device.

另外,采用的滑道收卷机构包括设置在顶层的收卷基座,其能够对布滑道上端进行固定,而设置的两支撑架能够对收卷转轴进行固定,优选的通过滚子轴承进行固定,当然还可通过铜套进行连接,确保在牵拉时能够提供稳定的转动,从而能够使得布滑道快速从顶层拉到地面,而设置的防护罩能够对布滑道进行保护避免其被自然进行侵蚀,而设置的锁紧模块能够对布滑道进行保护,避免其随意拖出;而采用的滑道模块采用的布滑道的方式一方面能够便于收卷,另一方面逃生人员进入布滑道后由于人体重力的作用,使得其在受压位置形成凹陷面,能够减缓下落的速度,避免常规较为硬质滑道下滑速度不可控的现象,为了确保结构的稳定性,在布滑道表面设置若干加强绳索,当然还可直接编制在布滑道内部的加强网,另外,采用的布滑道优选阻燃材料编制,当然还可直接在防滑罩内设置水池,使得布滑道时刻为湿润等,可在发生火灾时进行稳定救助,另外,为了确保针对不同楼层人员的救助,在布滑道上设置多个开口,并在其上设置两层布盖的方式来确保其不会因为受到逃生者的压力而爆开的现象,确保了安全性,而采用拉锁进行密封的方式,可以在布滑道内部或外部均能进行开启或密封,使得单人或误操作时,能够进行挽救,避免开启后无法密封的现象,而且设置的多个挂环,能够与设置在高层侧面上的多个登山扣相配合卡紧,以此来确保对某一楼层进行固定,而设置在高层侧面墙面上的报警单元,其采用常见的太阳灯即可,如常规的太阳能路灯,能够通过日常光照的方式,为其提供稳定的能量,同时设置的报警灯数量每层至少有两个,能够确保至少有一个能够正常进行工作。In addition, the adopted chute winding mechanism includes a winding base arranged on the top layer, which can fix the upper end of the cloth chute, and the two supporting frames provided can fix the winding shaft, preferably through roller bearings. Fixed, of course, it can also be connected by a copper sleeve to ensure stable rotation when pulling, so that the cloth slide can be quickly pulled from the top layer to the ground, and the protective cover can protect the cloth slide from being Erosion is carried out naturally, and the locking module provided can protect the cloth slideway and prevent it from being dragged out at will; and the cloth slideway adopted by the slideway module can be used to facilitate winding on the one hand, and escape personnel to enter on the other hand. After the slideway is laid, due to the action of human gravity, it forms a concave surface at the pressure position, which can slow down the falling speed and avoid the phenomenon that the sliding speed of conventional relatively hard slides is uncontrollable. Several reinforcing ropes are arranged on the surface of the track, and of course, reinforcement nets can be directly woven inside the cloth slideway. In addition, the cloth slideway used is preferably made of flame-retardant materials. Of course, a pool can also be set directly in the anti-skid cover, so that the cloth slideway can be used at all times. In addition, in order to ensure the rescue of people on different floors, multiple openings are set on the cloth slideway, and two layers of cloth covers are set on it to ensure that it will not be caused by The phenomenon of being burst open by the pressure of the escapee ensures safety, and the zipper is used for sealing, which can be opened or sealed inside or outside the cloth slide, so that it can be rescued by a single person or by mistake. , to avoid the phenomenon that it cannot be sealed after opening, and the multiple hanging rings set can be matched with the multiple carabiners set on the side of the high-rise, so as to ensure that a certain floor is fixed, and set on the side of the high-rise The alarm unit on the wall can use common sun lights, such as conventional solar street lights, which can provide stable energy through daily lighting. Make sure at least one is working properly.

另外,采用的锁紧模块包括设置在防护罩上且用于布滑道通过的仓口,其上端通过扭力弹簧与设置在其上的仓门活动连接,当然还可采用弹性橡胶套的方式,能够在锁紧销退出锁紧销孔后使得仓门向上开启,从而利于布滑道拉出,而设置解锁杆的方式,能够避免被人随意从外部开启,要通过牵拉将锁紧销从锁紧销孔内顶出进而实现开启,使得仓门开启,在使用完毕后,通过工作人员将防滑罩取下,通过摇把或者手盘使得布滑道进行复位,并在复位完毕将防护罩复位,然后将锁紧销插入锁紧销孔实现仓门的闭锁;另外,在牵拉完毕后,由被困楼层将对应挂环进行锁紧后,通过报警单元提示下方人员配合进行拉紧定位,并设置完毕逃生气垫后,通过喊话或警示灯照射或挥动彩带的方式提醒可以进行逃生。In addition, the adopted locking module includes a warehouse opening arranged on the protective cover and used for the cloth slideway to pass through, the upper end of which is movably connected with the warehouse door set on it through a torsion spring, and of course, an elastic rubber sleeve can also be used, After the locking pin exits the locking pin hole, the warehouse door can be opened upwards, which is convenient for the cloth slide to be pulled out, and the way of setting the unlocking lever can avoid being opened from the outside at will, by pulling the locking pin from the outside. The locking pin hole is pushed out to realize opening, so that the warehouse door is opened. After use, the anti-skid cover is removed by the staff, and the cloth slideway is reset by the crank or the handle, and the protective cover is reset after the reset is completed. Reset, and then insert the locking pin into the locking pin hole to lock the warehouse door; in addition, after the pulling is completed, after the corresponding hanging ring is locked by the trapped floor, the alarm unit will prompt the personnel below to cooperate to tighten the positioning. , and after setting the escape air cushion, remind you that you can escape by shouting or illuminating the warning light or waving the ribbon.

另外,采用的牵拉机构包括设置在高层地面上的牵拉仓,能够在其中设置牵拉电机,并在牵拉电机的输出轴上设置收卷轮,然后在收卷轮上设置与横杆相连接的牵拉绳,使得牵拉绳沿着牵拉槽向高层侧面进行铺设形成直角走线,避免直接从高层至牵拉电机之间设置牵拉绳而造成大风天气造成牵拉绳舞动,而造成损坏的现象。In addition, the adopted pulling mechanism includes a pulling bin set on the high-rise ground, where a pulling motor can be set, and a winding wheel is set on the output shaft of the pulling motor, and then a cross bar is set on the winding wheel. The connected pulling ropes allow the pulling ropes to be laid along the pulling grooves to the side of the high-rise to form a right-angle line, so as to avoid setting the pulling ropes directly from the high-rise to the pulling motor and causing the pulling ropes to dance due to strong winds. cause damage.

附图说明Description of drawings

图1为本实用新型的整体结构示意图;Fig. 1 is the overall structure schematic diagram of the present utility model;

图2为本实用新型逃生时的结构示意图;Fig. 2 is the structural representation when the utility model escapes;

图3为本实用新型滑道收卷机构的侧面结构示意图;Fig. 3 is the side structure schematic diagram of the slideway winding mechanism of the utility model;

图4为本实用新型滑道收卷机构的内部结构示意图;4 is a schematic diagram of the internal structure of the slideway winding mechanism of the present invention;

图5为本实用新型滑道收卷机构的正面结构示意图;Fig. 5 is the front structure schematic diagram of the slideway winding mechanism of the utility model;

图6为本实用新型牵拉机构的俯视结构示意图;Fig. 6 is the top-view structure schematic diagram of the pulling mechanism of the utility model;

图7为本实用新型的布滑道的局部结构示意图;Fig. 7 is the partial structure schematic diagram of the cloth slideway of the present invention;

图8为本实用新型A处的结构放大示意图。FIG. 8 is an enlarged schematic view of the structure at A of the present invention.

具体实施方式Detailed ways

为使本实用新型实施例的目的、技术方案和优点更加清楚,下面将结合本实用新型实施例的附图1-8,对本实用新型实施例的技术方案进行清楚、完整地描述。显然,所描述的实施例是本实用新型的一部分实施例,而不是全部的实施例。基于所描述的本实用新型的实施例,本领域普通技术人员所获得的所有其他实施例,都属于本实用新型保护的范围。In order to make the purposes, technical solutions and advantages of the embodiments of the present invention more clear, the technical solutions of the embodiments of the present invention will be clearly and completely described below with reference to the accompanying drawings 1-8 of the embodiments of the present invention. Obviously, the described embodiments are some, but not all, embodiments of the present invention. Based on the described embodiments of the present invention, all other embodiments obtained by those of ordinary skill in the art fall within the protection scope of the present invention.

实施例一Example 1

如图1-6所示:一种高层逃生用快速铺设倾斜滑道结构,包括设置在高层1顶部的滑道收卷机构,设置在高层底部且远离高层地面上并与所述滑道收卷机构相连接的牵拉机构,以及设置在高层侧面墙面上且位于出口处的多个固定模块;As shown in Figure 1-6: A rapid laying inclined slideway structure for high-rise escape, including a slideway winding mechanism arranged at the top of the high-rise 1, arranged at the bottom of the high-rise and away from the high-rise ground, and wound with the slideway a pulling mechanism connected with the mechanism, and a plurality of fixing modules arranged on the side wall of the high-rise and located at the exit;

所述滑道收卷机构包括收卷基座2,设置在所述收卷基座上的两支撑架3,设置在两所述支撑架3之间的收卷转轴15,设置在所述收卷转轴15上的滑道模块,设置在所述收卷基座2上用于防护收卷转轴、滑道模块和两支撑架的防护罩4,以及设置在所述防护罩4侧面用于与所述滑道模块相配合的锁紧模块。The slide rewinding mechanism includes a rewinding base 2, two support frames 3 arranged on the rewinding base, and a rewinding shaft 15 arranged between the two support frames 3, which is arranged on the rewinding base 3. The slideway module on the reeling shaft 15 is arranged on the rewinding base 2 for protecting the rewinding reeling shaft, the slideway module and the protective cover 4 of the two support frames, and is arranged on the side of the protective cover 4 for connecting with The sliding module is matched with the locking module.

所述滑道模块包括一端固定在所述收卷转轴15上,另一端缠绕在收卷转轴上且末端穿过防护罩侧壁与牵拉机构相配合的布滑道6,设置在所述布滑道6表面的若干加强绳索31,设置在所述布滑道外表面且与所述固定模块相配合的多个挂环27,设置在所述布滑道上的多个开口29,一边与所述开口固定连接,剩余各边与开口通过拉链相连接的第一布盖30,设置在所述开口处且与所述第一布盖相配合的第二布盖28,所述第二布盖28通过拉链设置在所述开口29周侧,所述布滑道6端部设置与牵拉机构相配合的横杆7。The slideway module includes a cloth slideway 6, one end of which is fixed on the winding shaft 15, the other end is wound on the winding shaft, and the end passes through the side wall of the protective cover and is matched with the pulling mechanism. A plurality of reinforcing ropes 31 on the surface of the slideway 6, a plurality of hanging rings 27 arranged on the outer surface of the cloth slideway and matched with the fixing module, and a plurality of openings 29 arranged on the cloth slideway, one side is connected with the said cloth slideway. The opening is fixedly connected, and the first cloth cover 30 whose remaining sides are connected with the opening through a zipper, and the second cloth cover 28 arranged at the opening and matched with the first cloth cover, the second cloth cover 28 The zipper is arranged on the peripheral side of the opening 29, and the end of the cloth slideway 6 is arranged with a cross bar 7 which is matched with the pulling mechanism.

所述锁紧模块包括设置在所述防护罩上且用于布滑道通过的仓口17,通过扭力弹簧23与所述仓口17上部相连接的仓门16,设置在所述仓门下部且与所述防护罩相配合的锁紧销孔19,设置在所述锁紧销孔内的锁紧销18,设置在所述防护罩4内壁上且与所述锁紧销孔相配合的锁紧导管20,设置在所述锁紧导管内的解锁杆32,设置在所述解锁杆前端的导向块22,套设在所述解锁杆上且一端与锁紧导管相连接,另一端与所述导向块22相连接的复位弹簧21。The locking module includes a warehouse opening 17 arranged on the protective cover and used for the cloth slideway to pass through, and a warehouse door 16 connected to the upper part of the warehouse opening 17 by a torsion spring 23, which is arranged at the lower part of the warehouse door. And the locking pin hole 19 matched with the protective cover, the locking pin 18 arranged in the locking pin hole, and the locking pin 18 arranged on the inner wall of the protective cover 4 and matched with the locking pin hole. The locking conduit 20, the unlocking rod 32 arranged in the locking conduit, the guide block 22 arranged at the front end of the unlocking lever, are sleeved on the unlocking lever and one end is connected with the locking conduit, and the other end is connected with the locking conduit. The guide block 22 is connected to the return spring 21 .

所述固定模块包括设置在高层侧面墙面上且与多个所述挂环相配合的多个登山扣9,设置在所述高层侧面墙面上用于警示的报警单元8。The fixing module includes a plurality of carabiners 9 arranged on the side wall of the high-rise and matched with the plurality of the hanging rings, and an alarm unit 8 arranged on the side wall of the high-rise for warning.

所述牵拉机构包括设置在高层地面上的牵拉仓13,设置在所述牵拉仓13内的牵拉电机14,设置在所述牵拉电机输出轴上的收卷轮12,缠绕设置在所述收卷轮上的牵拉绳10,所述牵拉绳端部与所述横杆7相连接,设置在所述牵拉仓上的盖板11,设置在所述盖板11上且朝向高层方向的牵拉槽24,设置在所述牵拉槽两侧的多个牵拉定位环25。The pulling mechanism includes a pulling bin 13 arranged on the high-rise ground, a pulling motor 14 arranged in the pulling bin 13, a winding wheel 12 arranged on the output shaft of the pulling motor, and a winding set. The pulling rope 10 on the winding wheel, the end of the pulling rope is connected with the cross bar 7, and the cover plate 11 arranged on the pulling bin is arranged on the cover plate 11 And the pulling groove 24 facing the high-rise direction is provided with a plurality of pulling positioning rings 25 on both sides of the pulling groove.

所述盖板11上还设置有逃生气垫26。An escape air cushion 26 is also provided on the cover plate 11 .

该实施例中采用的牵拉电机为常规的220KV电机即可,当然还可采用380KV电机,由于其为常规技术此处不再赘述其用法;另外,采用的报警单元优选的采用报警灯,当然还可设置成气球,或者布条等,能够使得救援人员在下面,清楚观察到有人呼救即可;另外,采用的牵拉绳为常规的钢丝绳或耐腐蚀尼龙绳索,能够在使用时及时将布滑道及时拉出。The traction motor used in this embodiment can be a conventional 220KV motor. Of course, a 380KV motor can also be used. Since it is a conventional technology, its usage will not be repeated here; It can also be set as a balloon, or cloth strip, etc., so that the rescuers can clearly observe someone calling for help. In addition, the traction rope used is a conventional steel wire rope or a corrosion-resistant nylon rope, which can be used to remove the cloth in time. The slide is pulled out in time.

实施例二:其与实施例一的区别在于:所述横杆7两端设置定位圆环33。Embodiment 2: The difference from Embodiment 1 is that positioning rings 33 are provided at both ends of the cross bar 7 .

该实施例中采用在横杆端部设置定位圆环的方式结合绳索与牵拉定位环进行配合,当然还可设置定位孔或腰型槽,来保证固定的效果。In this embodiment, a positioning ring is arranged at the end of the cross bar to cooperate with the rope and the pulling positioning ring. Of course, positioning holes or waist-shaped grooves can also be arranged to ensure the fixing effect.

以上所述是本实用新型的优选实施方式,应当指出,对于本技术领域的普通技术人员来说,在不脱离本实用新型所述原理的前提下,还可以作出若干改进和润饰,这些改进和润饰也应视为本实用新型的保护范围。The above are the preferred embodiments of the present invention. It should be pointed out that for those skilled in the art, without departing from the principles of the present invention, several improvements and modifications can be made. These improvements and Retouching should also be regarded as the protection scope of the present invention.

Claims (8)

1. The utility model provides a high-rise escape is with laying slope slide structure fast which characterized in that: the device comprises a slideway rolling mechanism arranged at the top of a high-rise building, a traction mechanism arranged at the bottom of the high-rise building, far away from the ground of the high-rise building and connected with the slideway rolling mechanism, and a plurality of fixing modules arranged on the side wall surface of the high-rise building and positioned at an outlet;
slide winding mechanism includes the rolling base, sets up two support frames on the rolling base set up two rolling pivot between the support frame sets up epaxial slide module of rolling sets up the last protection casing that is used for protecting rolling pivot, slide module and two support frames of rolling base, and set up the protection casing side be used for with slide module matched with locking module.
2. The high-rise escape rapid-lay inclined ramp structure of claim 1, wherein: the slide module includes that one end is fixed in the rolling pivot, other end winding is in the rolling pivot and the end passes protection casing lateral wall and traction mechanism matched with cloth slide, sets up a plurality of enhancement ropes on cloth slide surface set up cloth slide surface and with a plurality of links of fixed module matched with set up a plurality of openings on the cloth slide, on one side with opening fixed connection, remaining each limit passes through the first cloth lid that the zip fastener is connected with the opening, sets up the opening part and with first cloth lid matched with second cloth lid, the second cloth lid passes through the zip fastener setting and is in opening week side, cloth slide tip sets up the horizontal pole with traction mechanism matched with.
3. The high-rise escape rapid-laying inclined ramp structure of claim 2, wherein: the locking module is including setting up just be used for cloth slide to pass through the bin mouth on the safety cover, through torque spring with the bin gate that bin mouth upper portion is connected sets up bin gate lower part and with safety cover matched with locking pinhole sets up the fitting pin in the fitting pin hole sets up on the protection cover inner wall and with fitting pin hole matched with locking pipe sets up unlocking lever in the locking pipe sets up the guide block of unlocking lever front end is established the cover is established on the unlocking lever and one end is connected with the locking pipe, the other end with reset spring that the guide block is connected.
4. A rapid-laying inclined ramp structure for high-rise escape according to claim 3, wherein: the fixed module is in including setting up on high-rise side wall and with a plurality of link matched with a plurality of climbing buckles, the setting is in the alarm unit who is used for the warning on the high-rise side wall.
5. The high-rise escape rapid-laying inclined ramp structure of claim 4, wherein: the traction mechanism comprises a traction bin arranged on the ground of a high layer, a traction motor arranged in the traction bin, a winding wheel arranged on an output shaft of the traction motor, a traction rope wound on the winding wheel, wherein the end part of the traction rope is connected with the cross rod, a cover plate arranged on the traction bin, a traction groove arranged on the cover plate and facing the direction of the high layer, and a plurality of traction positioning rings arranged on two sides of the traction groove.
6. The high-rise escape rapid-laying inclined ramp structure of claim 5, wherein: and the cover plate is also provided with an escape air cushion.
7. The high-rise escape rapid-laying inclined ramp structure of claim 6, wherein: and positioning circular rings are arranged at two ends of the cross rod.
8. The high-rise escape rapid-lay inclined ramp structure of claim 7, wherein: the alarm unit is an alarm lamp or a colored ribbon or a colored balloon.
CN201920321962.5U 2019-03-14 2019-03-14 High-rise escape is with laying slope slide structure fast Expired - Fee Related CN210112850U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201920321962.5U CN210112850U (en) 2019-03-14 2019-03-14 High-rise escape is with laying slope slide structure fast

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201920321962.5U CN210112850U (en) 2019-03-14 2019-03-14 High-rise escape is with laying slope slide structure fast

Publications (1)

Publication Number Publication Date
CN210112850U true CN210112850U (en) 2020-02-25

Family

ID=69579128

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201920321962.5U Expired - Fee Related CN210112850U (en) 2019-03-14 2019-03-14 High-rise escape is with laying slope slide structure fast

Country Status (1)

Country Link
CN (1) CN210112850U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112516473A (en) * 2020-12-21 2021-03-19 南京夏之雨商贸有限公司 Intelligent building provided with escape slideway

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112516473A (en) * 2020-12-21 2021-03-19 南京夏之雨商贸有限公司 Intelligent building provided with escape slideway

Similar Documents

Publication Publication Date Title
CN202724498U (en) Inclined slide type tunnel form escape device for high-rise building
KR100701790B1 (en) Fire suppression and rescue equipment for high-rise buildings
CN201855512U (en) High-rise fire and earthquake escape device
CN102120064A (en) Telescopic type emergency escaping device for high-rise buildings
CN210112850U (en) High-rise escape is with laying slope slide structure fast
CN213450215U (en) Outdoor emergency ladder of formula aluminum alloy folded form is climbed to two
CN203998530U (en) A kind of high building personnel are escape system fast and safely
CN101940818A (en) Emergent escape system of multi-level flexible slides in high-rise building
WO2022228202A1 (en) Reciprocating high-rise escape slow descending device
KR20070015237A (en) Driving device for fire suppression and life-saving elevator in high-rise building
CN220011791U (en) Elevator car with fire escape window
CN201760004U (en) High-altitude building falling rescue device
CN117188801A (en) High-altitude anti-falling mesh setting device based on compressed gas instantaneous release
CN201988073U (en) Electroless operation high-rise fire-proof escape compartment with storeyed outlet windows, rails, speed reducer and safe landing point
CN204502160U (en) A kind of device for rescuing from storied house
US2629531A (en) Emergency fire escape system
CN212439743U (en) Barrier-free escape device
CN208650738U (en) A kind of corridor fire-fighting escape device
WO2021056221A1 (en) Life-saving door used for self-rescue and escape of high-rise fire family
CN214074744U (en) Rope releasing equipment with fire extinguishing and rescuing functions
CN201137429Y (en) Multifunctional safety window
CN201807101U (en) High building fire escape clothes stand
CN105169576A (en) High-rise fire alarm escaping device
RU75685U1 (en) WINDOW SILL WITH THE INSTALLED DEVICE FOR EMERGENCY EVACUATION OF PEOPLE FROM ALTITUDE BUILDINGS
CN109646826B (en) A complete set of device and method for emergency escape and aerial work in distributed high-rise buildings

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20200225

CF01 Termination of patent right due to non-payment of annual fee