CN209817999U - Device of compound coiled tubing running and fishing submersible oil electric pump - Google Patents
Device of compound coiled tubing running and fishing submersible oil electric pump Download PDFInfo
- Publication number
- CN209817999U CN209817999U CN201920211907.0U CN201920211907U CN209817999U CN 209817999 U CN209817999 U CN 209817999U CN 201920211907 U CN201920211907 U CN 201920211907U CN 209817999 U CN209817999 U CN 209817999U
- Authority
- CN
- China
- Prior art keywords
- coiled tubing
- composite coiled
- cable
- safety valve
- hydraulic control
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Laying Of Electric Cables Or Lines Outside (AREA)
Abstract
本实用新型是一种复合连续油管投捞潜油电泵的装置,包括原井套管,原井套管上坐有采油树,原井套管内壁上坐封有电缆桥塞,电缆桥塞下方设有安全阀、斜口引鞋,电缆桥塞上方设有安全阀强开工具、带孔管、电机、泵、液/电桥式通道,液/电桥式通道与原井套管的之间设有封隔器,液/电桥式通道顶部连有井下安全阀、复合连续油管,复合连续油管内的动力电缆与电机相连、液控管线与井下安全阀相连,复合连续油管顶部连有连续油管悬挂装置,采油树底部设有升高法兰,连续油管悬挂装置坐封在升高法兰内,连续油管悬挂装置连有电缆插头。操作工艺包括前序;下泵工序;提泵工序。本实用新型能够快速检泵,又不污染油层。
The utility model is a device for a composite coiled tubing fishing submersible electric pump, which comprises an original well casing, on which a Christmas tree sits, a cable bridge plug is set and sealed on the inner wall of the original well casing, and below the cable bridge plug is a Safety valve, slanted guide shoe, safety valve forced opening tool, perforated pipe, motor, pump, hydraulic/electric bridge channel are installed above the cable bridge plug, and there is a Packer, downhole safety valve and composite coiled tubing are connected to the top of the hydraulic/electric bridge channel, the power cable in the composite coiled tubing is connected to the motor, the hydraulic control pipeline is connected to the downhole safety valve, and the top of the composite coiled tubing is connected to the coiled tubing As for the suspension device, there is a raised flange at the bottom of the Christmas tree, and the coiled tubing suspension device is set and sealed in the raised flange, and the coiled tubing suspension device is connected with a cable plug. The operation process includes a pre-order; a pumping process; a pumping process. The utility model can quickly check the pump without polluting the oil layer.
Description
技术领域technical field
本实用新型涉及石油行业油气开采的领域,尤其涉及一种复合连续油管投捞潜油电泵的装置。The utility model relates to the field of oil and gas exploitation in the petroleum industry, in particular to a device for a submersible electric pump for throwing and fishing composite coiled tubing.
背景技术Background technique
现有电潜泵采油工艺技术,通常是利用每根九米多的油管把机组输送到井下。油管逐根用丝扣相连,油管下部连接潜油电泵机组,动力电缆固定在油管外壁上随油管下入,机组举升地层流体流经油管内腔到达地面。The existing electric submersible pump oil recovery technology usually utilizes oil pipes of more than nine meters each to transport the unit to the well. The oil pipes are connected with threads one by one, the lower part of the oil pipes is connected to the electric submersible pump unit, the power cable is fixed on the outer wall of the oil pipes and goes down with the oil pipes, and the unit lifts the formation fluid to flow through the inner cavity of the oil pipes to the ground.
当机组出现故障或动力电缆出现故障,提油管前,需要用压井设备泵注压井流体到井筒内,把地层压住,防止地层流体在提油管时流入井筒,避免引发环保、井涌或井喷等安全事故;然后需要拆装采油树和井口防喷器,而且是需要逐根提出油管,更换故障的机组或电缆。这种操作工艺作业时间长,费用高,污染油层,直接影响检泵后油井的产量,为此,有必要找到一种快速检泵,又不污染油层的检泵工艺技术。When the unit fails or the power cable fails, before the oil pipe is lifted, it is necessary to use the well killing equipment to pump the well killing fluid into the wellbore to press the formation to prevent the formation fluid from flowing into the wellbore when the oil pipe is lifted, so as to avoid environmental protection, well kick or Blowout and other safety accidents; then the Christmas tree and wellhead blowout preventer need to be disassembled, and the oil pipes need to be pulled out one by one to replace the faulty unit or cable. This operation process takes a long time, costs high, pollutes the oil layer, and directly affects the output of the oil well after pump inspection. Therefore, it is necessary to find a pump inspection technology that can quickly inspect the pump without polluting the oil layer.
发明内容Contents of the invention
本实用新型旨在解决现有技术的不足,而提供一种复合连续油管投捞潜油电泵的装置。The utility model aims at solving the deficiencies of the prior art, and provides a device for throwing and fishing a submersible electric pump with a composite coiled tubing.
本实用新型为实现上述目的,采用以下技术方案:In order to achieve the above object, the utility model adopts the following technical solutions:
一种复合连续油管投捞潜油电泵的装置,包括原井套管,所述原井套管上坐有采油树,所述原井套管内壁上坐封有电缆桥塞,所述电缆桥塞下方设有斜口引鞋,所述电缆桥塞和斜口引鞋之间连接有安全阀,所述电缆桥塞上方设有工具串,所述工具串从下到上设有依次连接的安全阀强开工具、带孔管、电机、泵、液/电桥式通道,所述液/电桥式通道与原井套管的内壁之间设有封隔器,所述泵上设有吸入口,所述液/电桥式通道上贯穿有出液管道和电力管道,所述液/电桥式通道顶部出液管道的出液口连有井下安全阀,所述液/电桥式通道顶部电力管道的电力出口通过第一连接卡瓦连有复合连续油管,所述复合连续油管内预制有动力电缆和液控管线,所述复合连续油管内的动力电缆通过小扁电缆与电机相连,所述复合连续油管内的液控管线与井下安全阀相连,所述复合连续油管顶部通过第二连接卡瓦连有连续油管悬挂装置,所述采油树底部设有升高法兰,所述连续油管悬挂装置坐封在升高法兰内,所述连续油管悬挂装置连有电缆插头,所述复合连续油管内液控管线与地面液控管线相连,所述原井套管上设有四通装置,所述第二连接卡瓦坐封在四通装置内。A device for a composite coiled tubing fishing submersible pump, comprising an original well casing, on which a Christmas tree is seated, a cable bridge plug is set and sealed on the inner wall of the original well casing, and a cable bridge plug is placed under the cable bridge plug. There is a slanted guide shoe, a safety valve is connected between the cable bridge plug and the slanted guide shoe, a tool string is provided above the cable bridge plug, and the tool string is provided with safety valves connected in sequence from bottom to top Forced opening tool, perforated pipe, motor, pump, hydraulic/electric bridge channel, a packer is provided between the hydraulic/electric bridge channel and the inner wall of the original well casing, and a suction port is provided on the pump, The liquid/electric bridge channel runs through a liquid outlet pipeline and an electric power pipeline. The liquid outlet of the liquid/electric bridge channel top liquid outlet is connected with a downhole safety valve. The power outlet of the pipeline is connected to the composite coiled tubing through the first connecting slip, and the power cable and the hydraulic control pipeline are prefabricated in the composite coiled tubing, and the power cable in the composite coiled tubing is connected to the motor through a small flat cable. The hydraulic control pipeline in the composite coiled tubing is connected with the downhole safety valve, the top of the composite coiled tubing is connected with a coiled tubing suspension device through the second connecting slip, the bottom of the Christmas tree is provided with a rising flange, and the coiled tubing suspension The device is set in the raised flange, the coiled tubing suspension device is connected with a cable plug, the hydraulic control pipeline in the composite coiled tubing is connected with the ground hydraulic control pipeline, and the original well casing is provided with a four-way device. The second connecting slip is set in the four-way device.
所述液控管线的尺寸为1/4寸。The size of the hydraulic control pipeline is 1/4 inch.
所述液控管线为1-2根。There are 1-2 hydraulic control pipelines.
所述安全阀为闸板式安全阀。The safety valve is a gate type safety valve.
上述复合连续油管投捞潜油电泵的装置的操作工艺,具体步骤为:The operation process of the device for the above-mentioned composite coiled tubing fishing submersible pump, the specific steps are:
S1、前序S1. Preamble
原井套管完井后,坐好采油树;After the casing of the original well is completed, sit on the Christmas tree;
S2、下泵工序S2, lower pump process
拆掉采油树压帽后,坐电缆桥塞:电缆桥塞下方安装一个斜口引鞋,在斜口引鞋和电缆桥塞之间连接一个闸板式的安全阀,不再接液控管线,根据泵的深度确定电缆桥塞的下入深度,坐电缆桥塞在原井套管的内壁上;After removing the pressure cap of the oil tree, sit on the cable bridge plug: install a slanted guide shoe under the cable bridge plug, connect a ram-type safety valve between the slanted guide shoe and the cable bridge plug, and no longer connect the hydraulic control pipeline , according to the depth of the pump, determine the running depth of the cable bridge plug, and sit the cable bridge plug on the inner wall of the original well casing;
连接工具串:工具串从下到上依次为安全阀强开工具、带孔管、电机、泵、液/电桥式通道,液/电桥式通道外设有封隔器,在液/电桥式通道的出液口上连井下安全阀;Connecting tool string: The tool string from bottom to top is forced opening tool for safety valve, perforated pipe, motor, pump, hydraulic/electrical bridge channel, and there is a packer outside the hydraulic/electrical bridge channel. The liquid outlet of the bridge channel is connected to the downhole safety valve;
安装连续油管注入器及防喷组合,复合连续油管就位,复合连续油管内预制有动力电缆和液控管线,液/电桥式通道的电力出口和复合连续油管内的动力电缆相连接,然后通过第一连接卡瓦把复合连续油管和液/电桥式通道连接在一起,动力电缆通过小扁电缆与电机相连,从复合连续油管内部引出的液控管线从下方穿越封隔器后连接在井下安全阀上;Install the coiled tubing injector and blowout prevention combination, the composite coiled tubing is in place, the power cable and hydraulic control pipeline are prefabricated in the composite coiled tubing, the power outlet of the hydraulic/electric bridge channel is connected with the power cable in the composite coiled tubing, Then the composite coiled tubing and the hydraulic/electric bridge channel are connected together through the first connecting slip, the power cable is connected to the motor through a small flat cable, and the hydraulic control pipeline drawn from the composite coiled tubing passes through the packer from below Connected to the downhole safety valve;
下连续油管:将工具串连好后,下放复合连续油管,当工具串底部的安全阀强开工具打开安全阀后,计算连续油管悬挂装置坐到采油树升高法兰的复合连续油管长度值,在井口固定住复合连续油管,截断复合连续油管,剥开复合连续油管的外皮,用第二连接卡瓦把复合连续油管、连续油管悬挂装置连接起来,将复合连续油管内的动力电缆和液控管线分别和连续油管悬挂装置上的动力电缆及液控管线相连接,坐连续油管悬挂装置到升高法兰内,吊走连续油管注入头,装好采油树压帽;Lowering the coiled tubing: After the tools are connected in series, the composite coiled tubing is lowered. When the safety valve at the bottom of the tool string is forced open and the tool opens the safety valve, calculate the length of the composite coiled tubing from the coiled tubing suspension to the rising flange of the Christmas tree. Fix the composite coiled tubing at the wellhead, cut off the composite coiled tubing, peel off the composite coiled tubing skin, connect the composite coiled tubing and the coiled tubing suspension device with the second connecting slip, and connect the power cable and the hydraulic control tube in the composite coiled tubing Connect the power cable and the hydraulic control pipeline on the coiled tubing suspension device respectively, sit on the coiled tubing suspension device to the raised flange, hoist the coiled tubing injection head, and install the Christmas tree pressure cap;
连接电缆插头到连续油管悬挂装置内的动力电缆插孔上;Connect the cable plug to the power cable jack in the coiled tubing hanger;
在采油树的升高法兰上接好地面液控管线,打压开启井下安全阀;Connect the ground hydraulic control pipeline to the raised flange of the Christmas tree, pressurize and open the downhole safety valve;
接好动力电缆及完成相关检查后,启泵生产;After connecting the power cables and completing relevant inspections, start pump production;
S3、提泵工序S3, pump lifting process
拆采油树压帽、连续油管防喷组合,注入头就位;Remove the oil tree pressure cap, coiled tubing blowout prevention combination, and put the injection head in place;
连续油管打捞工具打捞连续油管悬挂装置上的打捞头,将连续油管悬挂装置提到钻台连续油管操作窗口位置,固定住下部复合连续油管,拆掉连续油管悬挂装置,把井内的复合连续油管和地面的复合连续油管连接在一起;The coiled tubing fishing tool fishes the fishing head on the coiled tubing suspension device, lifts the coiled tubing suspension device to the position of the coiled tubing operation window on the drill floor, fixes the lower composite coiled tubing, removes the coiled tubing suspension device, and puts the composite coiled tubing and Composite coiled tubing at the surface is connected together;
起出井内的复合连续油管,直到复合连续油管外第一连接卡瓦到了钻台操作窗口;Pull out the composite coiled tubing in the well until the first connecting slip outside the composite coiled tubing reaches the operation window of the drilling floor;
把井内工具串固定在井口,断开复合连续油管,吊走连续油管注入器,然后拆解井内工具串。Fix the tool string in the well at the wellhead, disconnect the composite coiled tubing, hoist the coiled tubing injector, and then disassemble the tool string in the well.
本实用新型的有益效果是:本实用新型利用内部预制有动力电缆和液控管线的复合连续油管把潜油电泵机组输送到预定井深,复合连续油管中的动力电缆和机组的电机连接,实现电力输送,再加上工具串上的封隔器和安全工具,启泵时,地层产出流体从复合连续油管和原井套管间的环空流到地面,实现了全新的电潜泵采油模式;当井内机组或动力电缆故障时,只需要拆掉采油树压帽,安装复合连续油管作业的井口系统,然后用复合连续油管回接井内的连续油管悬挂装置,提出整改井内的复合连续油管和机组,更换故障部件,重新下到井内即可,全程不需要洗压井和拆采油树工作。The beneficial effects of the utility model are: the utility model uses the composite coiled tubing prefabricated with the power cable and the hydraulic control pipeline inside to transport the electric submersible pump unit to the predetermined well depth, and the power cable in the composite coiled tubing is connected to the motor of the unit. Realize power transmission, coupled with the packer and safety tools on the tool string, when the pump is started, the formation fluid flows from the annulus between the composite coiled tubing and the original well casing to the surface, realizing a new electric submersible pump production mode; when the unit or power cable in the well fails, it is only necessary to remove the pressure cap of the Christmas tree, install the wellhead system for the composite coiled tubing operation, and then use the composite coiled tubing to connect the coiled tubing suspension device in the well, and propose to rectify the composite coiled tubing in the well And the unit, replace the faulty parts, and go down to the well again, without cleaning and killing the well and removing the Christmas tree during the whole process.
附图说明Description of drawings
图1为本实用新型的结构示意图;Fig. 1 is the structural representation of the utility model;
图2为液/电桥式通道的结构示意图;Fig. 2 is the structural representation of liquid/electric bridge channel;
图中:1-斜口引鞋;2-安全阀;3-电缆桥塞;4-安全阀强开工具;5-带孔管;6-电机;7-吸入口;8-小扁电缆;9-泵;10-封隔器;11-液/电桥式通道;12-第一连接卡瓦;13-液控管线;14-井下安全阀;15-复合连续油管;16-第二连接卡瓦;17-四通装置;18-升高法兰;19-连续油管悬挂装置;20-采油树;21-原井套管;22-电缆插头;23-出液管道;24-电力管道;In the figure: 1-slanted guide shoe; 2-safety valve; 3-cable bridge plug; 4-safety valve forced opening tool; 5-pipe with holes; 6-motor; 7-suction port; 8-small flat cable; 9-pump; 10-packer; 11-fluid/electric bridge channel; 12-first connecting slip; 13-hydraulic control pipeline; 14-downhole safety valve; 15-composite coiled tubing; 16-second Connecting slips; 17-cross device; 18-rising flange; 19-coiled tubing suspension device; 20-Christmas tree; 21-original well casing; 22-cable plug;
以下将结合本实用新型的实施例参照附图进行详细叙述。The following will be described in detail in conjunction with the embodiments of the present invention with reference to the accompanying drawings.
具体实施方式Detailed ways
下面结合附图和实施例对本实用新型作进一步说明:Below in conjunction with accompanying drawing and embodiment the utility model is further described:
如图1至图2所示,一种复合连续油管投捞潜油电泵的装置,包括原井套管21,所述原井套管21上坐有采油树20,所述原井套管21内壁上坐封有电缆桥塞3,所述电缆桥塞3下方设有斜口引鞋1,所述电缆桥塞3和斜口引鞋1之间连接有安全阀2,所述电缆桥塞3上方设有工具串,所述工具串从下到上设有依次连接的安全阀强开工具4、带孔管5、电机6、泵9、液/电桥式通道11,所述液/电桥式通道11与原井套管21的内壁之间设有封隔器10,所述泵9上设有吸入口7,所述液/电桥式通道11上贯穿有出液管道23和电力管道24,所述液/电桥式通道11顶部出液管道23的出液口连有井下安全阀14,所述液/电桥式通道11顶部电力管道24的电力出口通过第一连接卡瓦12连有复合连续油管15,所述复合连续油管15内预制有动力电缆和液控管线13,所述复合连续油管15内的动力电缆通过小扁电缆8与电机6相连,所述复合连续油管15内的液控管线13与井下安全阀14相连,所述复合连续油管15顶部通过第二连接卡瓦16连有连续油管悬挂装置19,所述采油树20底部设有升高法兰18,所述连续油管悬挂装置19坐封在升高法兰18内,所述连续油管悬挂装置19连有电缆插头22,所述复合连续油管15内液控管线13与地面液控管线相连,所述原井套管21上设有四通装置17,所述第二连接卡瓦16坐封在四通装置17内。As shown in Figures 1 to 2, a device for a composite coiled tubing electric submersible pump includes an original well casing 21, on which a Christmas tree 20 sits, and on the inner wall of the original well casing 21 A cable bridge plug 3 is set for sealing. A slanted guide shoe 1 is provided below the cable bridge plug 3. A safety valve 2 is connected between the cable bridge plug 3 and the slanted guide shoe 1. Above the cable bridge plug 3 A tool string is provided, and the tool string is provided with a safety valve forced opening tool 4, a perforated pipe 5, a motor 6, a pump 9, a liquid/electric bridge channel 11 connected in sequence from bottom to top, and the liquid/electric bridge A packer 10 is provided between the inner wall of the original well casing 21 and the original well casing 11, the pump 9 is provided with a suction port 7, and the liquid/electric bridge channel 11 is penetrated with a liquid outlet pipeline 23 and an electric power pipeline 24 The liquid outlet of the liquid outlet pipeline 23 at the top of the liquid/electric bridge channel 11 is connected with a downhole safety valve 14, and the power outlet of the power pipeline 24 at the top of the liquid/electric bridge channel 11 is connected through the first connecting slip 12. There is a composite coiled tubing 15, the composite coiled tubing 15 is prefabricated with a power cable and a hydraulic control pipeline 13, the power cable in the composite coiled tubing 15 is connected to the motor 6 through a small flat cable 8, and the composite coiled tubing 15 The hydraulic control pipeline 13 inside is connected with the downhole safety valve 14, the top of the composite coiled tubing 15 is connected with a coiled tubing suspension device 19 through the second connecting slip 16, and the bottom of the Christmas tree 20 is provided with a raised flange 18, the The coiled tubing suspension device 19 is set and sealed in the raised flange 18, the coiled tubing suspension device 19 is connected with a cable plug 22, the hydraulic control pipeline 13 in the composite coiled tubing 15 is connected with the ground hydraulic control pipeline, and the original casing The pipe 21 is provided with a four-way device 17 , and the second connecting slip 16 is set in the four-way device 17 .
所述液控管线13的尺寸为1/4寸。The size of the hydraulic control pipeline 13 is 1/4 inch.
所述液控管线13为1-2根。The number of said liquid control pipelines 13 is 1-2.
所述安全阀2为闸板式安全阀。The safety valve 2 is a gate type safety valve.
上述复合连续油管投捞潜油电泵的装置的操作工艺,具体步骤为:The operation process of the device for the above-mentioned composite coiled tubing fishing submersible pump, the specific steps are:
S1、前序S1. Preamble
原井套管21完井后,坐好采油树20;After the original well casing 21 is completed, the Christmas tree 20 is seated;
S2、下泵工序S2, lower pump process
拆掉采油树20压帽后,坐电缆桥塞3:电缆桥塞3下方安装一个斜口引鞋1,在斜口引鞋1和电缆桥塞3之间连接一个闸板式的安全阀2,不再接液控管线,根据泵9的深度确定电缆桥塞3的下入深度,坐电缆桥塞3在原井套管21的内壁上;After removing the pressure cap of the christmas tree 20, sit on the cable bridge plug 3: install a slanted guide shoe 1 under the cable bridge plug 3, and connect a ram-type safety valve 2 between the slanted guide shoe 1 and the cable bridge plug 3, No longer connect the hydraulic control pipeline, determine the running depth of the cable bridge plug 3 according to the depth of the pump 9, and sit the cable bridge plug 3 on the inner wall of the original well casing 21;
连接工具串:工具串从下到上依次为安全阀强开工具4、带孔管5、电机6、泵9、液/电桥式通道11,液/电桥式通道11外设有封隔器10,在液/电桥式通道11的出液口上连井下安全阀14;Connecting tool string: The tool string from bottom to top is the safety valve forced opening tool 4, the perforated pipe 5, the motor 6, the pump 9, the hydraulic/electric bridge channel 11, and the hydraulic/electric bridge channel 11 is equipped with a seal device 10, connected to the downhole safety valve 14 on the liquid outlet of the liquid/electric bridge channel 11;
安装连续油管注入器及防喷组合,复合连续油管15就位,复合连续油管15内预制有动力电缆和液控管线13,液/电桥式通道11的电力出口和复合连续油管15内的动力电缆相连接,然后通过第一连接卡瓦12把复合连续油管15和液/电桥式通道11连接在一起,动力电缆通过小扁电缆8与电机6相连,从复合连续油管15内部引出的液控管线13从下方穿越封隔器10后连接在井下安全阀14上;Install the coiled tubing injector and blowout prevention combination, the composite coiled tubing 15 is in place, the power cable and the hydraulic control pipeline 13 are prefabricated in the composite coiled tubing 15, the power outlet of the hydraulic/electric bridge channel 11 and the composite coiled tubing 15 The power cable is connected, and then the composite coiled tubing 15 and the hydraulic/electric bridge channel 11 are connected together through the first connecting slip 12, the power cable is connected with the motor 6 through the small flat cable 8, and the composite coiled tubing 15 is drawn out from the inside The hydraulic control pipeline 13 passes through the packer 10 from below and is connected to the downhole safety valve 14;
下连续油管:将工具串连好后,下放复合连续油管15,当工具串底部的安全阀强开工具4打开安全阀2后,计算连续油管悬挂装置19坐到采油树升高法兰18的复合连续油管15长度值,在井口固定住复合连续油管15,截断复合连续油管15,剥开复合连续油管15的外皮,用第二连接卡瓦16把复合连续油管15、连续油管悬挂装置19连接起来,将复合连续油管15内的动力电缆和液控管线13分别和连续油管悬挂装置19上的动力电缆及液控管线13相连接,坐连续油管悬挂装置19到升高法兰18内,吊走连续油管注入头,装好采油树压帽;Lowering the coiled tubing: After the tools are connected in series, the composite coiled tubing 15 is lowered. When the safety valve at the bottom of the tool string is forced to open the tool 4 and the safety valve 2 is opened, calculate the composite continuous The value of the length of tubing 15 is to fix the composite coiled tubing 15 at the wellhead, cut off the composite coiled tubing 15, peel off the outer skin of the composite coiled tubing 15, and connect the composite coiled tubing 15 and the coiled tubing suspension device 19 with the second connecting slip 16, Connect the power cables and hydraulic control pipelines 13 in the composite coiled tubing 15 to the power cables and hydraulic control pipelines 13 on the coiled tubing suspension device 19 respectively, sit on the coiled tubing suspension device 19 into the raised flange 18, and hoist the continuous Tubing injection head, install the Christmas tree pressure cap;
连接电缆插头22到连续油管悬挂装置19内的动力电缆插孔上;Connect the cable plug 22 to the power cable jack in the coiled tubing suspension device 19;
在采油树20的升高法兰18上接好地面液控管线,打压开启井下安全阀14;Connect the ground hydraulic control pipeline on the raised flange 18 of the Christmas tree 20, pressurize and open the downhole safety valve 14;
接好动力电缆及完成相关检查后,启泵生产;After connecting the power cables and completing relevant inspections, start pump production;
S3、提泵工序S3, pump lifting process
拆采油树压帽、连续油管防喷组合,注入头就位;Remove the oil tree pressure cap, coiled tubing blowout prevention combination, and put the injection head in place;
连续油管打捞工具打捞连续油管悬挂装置19上的打捞头,将连续油管悬挂装置19提到钻台连续油管操作窗口位置,固定住下部复合连续油管15,拆掉连续油管悬挂装置19,把井内的复合连续油管15和地面的复合连续油管15连接在一起;The coiled tubing fishing tool fishes the fishing head on the coiled tubing suspension device 19, lifts the coiled tubing suspension device 19 to the position of the coiled tubing operation window on the drill floor, fixes the lower composite coiled tubing 15, removes the coiled tubing suspension device 19, and removes the coiled tubing suspension device 19 in the well. The composite coiled tubing 15 and the composite coiled tubing 15 on the ground are connected together;
起出井内的复合连续油管15,直到复合连续油管15外第一连接卡瓦12到了钻台操作窗口;Pull out the composite coiled tubing 15 in the well until the first connecting slip 12 outside the composite coiled tubing 15 arrives at the drilling floor operation window;
把井内工具串固定在井口,断开复合连续油管15,吊走连续油管注入器,然后拆解井内工具串。Fix the tool string in the well at the wellhead, disconnect the composite coiled tubing 15, hoist the coiled tubing injector, and then disassemble the tool string in the well.
本实用新型利用内部预制有动力电缆和液控管线13的复合连续油管15把潜油电泵机组输送到预定井深,复合连续油管15中的动力电缆和机组的电机6连接,实现电力输送,再加上工具串上的封隔器10和安全工具,启泵时,地层产出流体从复合连续油管15和原井套管21间的环空流到地面,实现了全新的电潜泵采油模式;当井内机组或动力电缆故障时,只需要拆掉采油树压帽,安装复合连续油管15作业的井口系统,回接立管和连续油管防喷器,释放控制管线内压力,解封井内封隔器10,然后用复合连续油管15回接井内的连续油管悬挂装置19,提出整改井内的复合连续油管15和机组,更换故障部件,重新下到井内即可,全程不需要洗压井和拆采油树20工作。The utility model uses the composite coiled tubing 15 prefabricated with the power cable and the hydraulic control pipeline 13 inside to transport the electric submersible pump unit to the predetermined well depth, and the power cable in the composite coiled tubing 15 is connected with the motor 6 of the unit to realize power transmission. Coupled with the packer 10 and safety tool on the tool string, when the pump is started, the fluid produced in the formation flows from the annular space between the composite coiled tubing 15 and the original well casing 21 to the surface, realizing a new electric submersible pump production mode ; When the unit or power cable in the well fails, it is only necessary to remove the pressure cap of the Christmas tree, install the wellhead system for the composite coiled tubing 15 operation, connect the riser and the coiled tubing blowout preventer, release the pressure in the control pipeline, and unseal the seal in the well Then use the composite coiled tubing 15 to connect back to the coiled tubing suspension device 19 in the well, propose to rectify the composite coiled tubing 15 and the unit in the well, replace the faulty parts, and go down to the well again. Christmas tree 20 works.
上面结合附图对本实用新型进行了示例性描述,显然本实用新型具体实现并不受上述方式的限制,只要采用了本实用新型的方法构思和技术方案进行的各种改进,或未经改进直接应用于其它场合的,均在本实用新型的保护范围之内。The utility model has been exemplarily described above in conjunction with the accompanying drawings. Obviously, the specific implementation of the utility model is not limited by the above-mentioned method, as long as various improvements of the method concept and technical solutions of the utility model are adopted, or directly without improvement Those applied to other occasions are all within the protection scope of the present utility model.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920211907.0U CN209817999U (en) | 2019-02-20 | 2019-02-20 | Device of compound coiled tubing running and fishing submersible oil electric pump |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201920211907.0U CN209817999U (en) | 2019-02-20 | 2019-02-20 | Device of compound coiled tubing running and fishing submersible oil electric pump |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209817999U true CN209817999U (en) | 2019-12-20 |
Family
ID=68873258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201920211907.0U Expired - Fee Related CN209817999U (en) | 2019-02-20 | 2019-02-20 | Device of compound coiled tubing running and fishing submersible oil electric pump |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209817999U (en) |
-
2019
- 2019-02-20 CN CN201920211907.0U patent/CN209817999U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7677320B2 (en) | Subsea well with electrical submersible pump above downhole safety valve | |
CN113494273A (en) | Well completion pipe string and production pipe string of electric pump oil production well and construction method of well completion pipe string and production pipe string | |
CN102777156A (en) | Fracturing method for multi-interval oil and gas wells | |
CN104343400B (en) | The controllable workover treatment equipment of no killing well and its operational method | |
CN109458153B (en) | Christmas tree device suitable for permanently placing and hanging coiled tubing production | |
CN101338658B (en) | Hermetic electric submersible pump production completion system capable of proceeding steel wire operation | |
CN205605156U (en) | Workover device is pressed in oil gas field area | |
CN216588517U (en) | Shale gas well coiled tubing unfreezes fishing system | |
CN109763787A (en) | A kind of device and its operating procedure of composite continuous oil pipe pulling submersible electric pump | |
CN209818031U (en) | Oil extraction device of canned composite continuous oil pipe conveyor unit | |
CN106401537A (en) | Well completion pipe string of underground gas storage well and well completion method | |
CN107420091B (en) | Annular pressure monitoring and controlling device for deep water oil-gas well | |
CN209817999U (en) | Device of compound coiled tubing running and fishing submersible oil electric pump | |
CN117823095A (en) | Oil production process pipe column of electric pump for casting and fishing | |
CN211230307U (en) | Continuous sand washing device and special continuous sand washing adapter | |
CN210087252U (en) | Underground continuous pipe cable separation sealing adapter | |
CN114856504B (en) | Well repair system for shallow water underwater horizontal christmas tree and operation method thereof | |
CN110529082A (en) | A kind of gas-liquid separation tubing string for offshore gas well liquid discharging gas producing | |
CN107795297A (en) | Multistage a chain of Cut Block blocking | |
CN206681706U (en) | Press bottom formula oil release device for oil well | |
CN116291324A (en) | A Wellbore Temperature and Pressure Control System and Method for Natural Gas Hydrate Exploitation | |
RU2631517C1 (en) | Method for mechanised pump operation of wells and device for its implementation | |
CN112324384B (en) | Non-well killing operation process method applying pressure control switch valve | |
CN112554835B (en) | Snubbing completion operation process method | |
CN210977421U (en) | Canned electric pump perforation combined production pipe column |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20191220 |