[go: up one dir, main page]

CN107795297A - Multistage a chain of Cut Block blocking - Google Patents

Multistage a chain of Cut Block blocking Download PDF

Info

Publication number
CN107795297A
CN107795297A CN201610801034.XA CN201610801034A CN107795297A CN 107795297 A CN107795297 A CN 107795297A CN 201610801034 A CN201610801034 A CN 201610801034A CN 107795297 A CN107795297 A CN 107795297A
Authority
CN
China
Prior art keywords
hollow
sealing ball
connecting rod
sliding sleeve
ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201610801034.XA
Other languages
Chinese (zh)
Inventor
陈晓新
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201610801034.XA priority Critical patent/CN107795297A/en
Publication of CN107795297A publication Critical patent/CN107795297A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B34/00Valve arrangements for boreholes or wells
    • E21B34/06Valve arrangements for boreholes or wells in wells
    • E21B34/14Valve arrangements for boreholes or wells in wells operated by movement of tools, e.g. sleeve valves operated by pistons or wire line tools
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21BEARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
    • E21B43/00Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
    • E21B43/25Methods for stimulating production
    • E21B43/26Methods for stimulating production by forming crevices or fractures

Landscapes

  • Life Sciences & Earth Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Geology (AREA)
  • Mining & Mineral Resources (AREA)
  • Physics & Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Fluid Mechanics (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Earth Drilling (AREA)

Abstract

The invention provides a kind of new " multistage a chain of Cut Block blocking " device, including:Top hollow base blocking, the hollow pressure transmission connecting rod in top;Middle part hollow base blocking, the hollow pressure transmission connecting rod in middle part;Bottom solid seat blocking;And one group of shear pin composition.The present invention is put on ground;Underground is fallen into oil pipe or sleeve pipe, reaches underground sliding sleeve position.High angle well section or net horizontal section when;Completion fluid or mud are pumped by ground, " multistage a chain of Cut Block blocking " is pushed into underground sliding sleeve position;Then, ground is suppressed, and opens underground sliding sleeve.Without steel wire operation;It is sent into without cable;Without continuous oil pipe operation;Without hydraulic control lines operation outside oil pipe, one time input " multistage a chain of Cut Block blocking " is continuously finished and is turned on and off multiple sliding sleeves, saves rig time.It can also substitute steel wire, cable can not reach, can not the High angle well section of operation, net horizontal section be continuously finished and be turned on and off multiple sliding sleeves, save cost.It is turned on and off after multiple sliding sleeves terminate, oil gas normally produces in oil pipe, saves cost;Depth of setting and oil gas well yield are unrestricted.

Description

多级连环剪切座封球Multi-stage chain shear seat seal ball

技术领域technical field

本发明涉及油气井完井作业;压裂作业和固井井下工具技术领域,尤其是涉及一种多级连环剪切座封球装置。The invention relates to the technical fields of oil and gas well completion operations, fracturing operations and cementing downhole tools, in particular to a multi-stage serial shearing seat sealing ball device.

背景技术Background technique

一百多年来,完井(well completion)是在石油开采中,裸眼井钻达设计井深后,使井底和油层以一定结构连通起来的工艺,是钻井工作最后一个重要环节,又是采油工程的开端,与以后采油、注水及整个油气田的开发紧密相连。而油井完井质量的好坏直接影响到油井的生产能力和经济寿命,甚至关系到整个油田能否得到合理的开发。For more than 100 years, well completion (well completion) is the process of connecting the bottom of the well with the oil layer in a certain structure after the open-hole well is drilled to the designed depth in oil production. The beginning of the project is closely connected with the subsequent oil recovery, water injection and the development of the entire oil and gas field. The quality of oil well completion directly affects the production capacity and economic life of the oil well, and even relates to whether the entire oil field can be developed reasonably.

在现代广泛应用的完井管柱上,为了有效分层开采,提高产量,还要安装滑套;原来的滑套需要下入钢丝井下滑套开关工具;或电缆井下滑套开关工具;或连续油管井下滑套开关工具进行开启或关闭。On the completion strings widely used in modern times, in order to effectively mine in layers and increase production, sliding sleeves must be installed; the original sliding sleeve needs to be lowered into a wire well sliding sleeve switching tool; or a cable well sliding sleeve switching tool; or continuous The tubing well slides the sleeve switch tool to open or close.

因此,滑套相关配套设备得以广泛应用,而井下滑套开关工具就是开关滑套过程中广泛应用的工具之一。Therefore, the related supporting equipment of the sliding sleeve can be widely used, and the downhole sliding sleeve opening and closing tool is one of the widely used tools in the process of opening and closing the sliding sleeve.

目前国内外的井下滑套开关工具主要有两种形式:At present, there are two main forms of downhole sleeve switch tools at home and abroad:

第一种是通过钢丝或电缆,下入钢丝井下滑套开关工具。该作业的弊端是需要钢丝绞车和柴油机动力单元,要有地面钢丝防喷器;钢丝防喷管;钢丝防喷盒;高压软管,等等地面设备;还有井下滑套开关工具;加重杆;机械震击器或液压震击器;万向节;钢丝绳帽,增加了工作量。The first is to go down into the steel wire downhole sliding sleeve switch tool by steel wire or cable. The disadvantage of this operation is that a wire winch and a diesel engine power unit are required, as well as a ground wire blowout preventer; a wire blowout preventer; a wire blowout preventer box; ; Mechanical jars or hydraulic jars; universal joints; wire rope caps, increasing the workload.

第二种连续油管作业;下入连续油管井下液压滑套开关工具。该作业的弊端是需要连续油管;柴油机动力单元,要有地面鹅颈动力单元;连续油管防喷器;地面泵;高压软管,等等地面设备;还有井下滑套开关工具;液压脱手工具;液压震击器;加重杆;液压加速器;单流阀;连续油管接头;增加了工作量。在开启、关闭过程中,还要开泵正循环,配合连续油管上提、下压。The second type of coiled tubing operation: downhole hydraulic sliding sleeve switch tool for running into coiled tubing. The disadvantage of this operation is that coiled tubing is required; diesel engine power unit must have ground gooseneck power unit; coiled tubing blowout preventer; surface pump; ; hydraulic jar; weighted rod; hydraulic accelerator; check valve; coiled tubing joint; increased workload. In the process of opening and closing, the pump should also be turned on for positive circulation, and the coiled tubing should be lifted and pressed down.

同时由于作业设备的提升能力限制和滑套开启的信号显示要求,滑套开启和关闭有时会存在困难。At the same time, due to the limitation of the lifting capacity of the operating equipment and the signal display requirements for the opening of the sliding sleeve, it is sometimes difficult to open and close the sliding sleeve.

发明内容Contents of the invention

本发明的目的在于提供一种多级连环剪切座封球装置,一次投入,能够开启多级滑套,且能保证井筒的油气生产。The purpose of the present invention is to provide a multi-stage serial shearing seat sealing ball device, which can open multi-stage sliding sleeves and ensure the oil and gas production of the wellbore with one input.

本发明提供的一种多级连环剪切座封球装置,包括:上部空心座封球、空心传压连杆;中部空心座封球、空心传压连杆;下部座封球;以及一组剪切销钉组成。;The present invention provides a multi-stage chain shearing seat sealing device, comprising: an upper hollow seat sealing ball, a hollow pressure transmission connecting rod; a middle hollow seat sealing ball, a hollow pressure transmission connecting rod; a lower seat sealing ball; and a set of Shear pin composition. ;

上部的空心座封球包括空心座封球和空心传压连杆和销钉孔,所述装置都由可溶材料组成;The upper hollow sealing ball includes a hollow sealing ball, a hollow pressure transmission connecting rod and a pin hole, and the devices are all composed of soluble materials;

中部的空心座封球包括空心座封球和空心传压连杆和销钉孔,所述装置都由可溶金属材料制成;The hollow sealing ball in the middle includes a hollow sealing ball, a hollow pressure transmission connecting rod and a pin hole, and the devices are all made of soluble metal materials;

下部座封球的上端有销钉孔,所述空心座封球的空心传压连杆与剪切销钉配合连接;所述装置都由可溶金属材料制成;The upper end of the lower sealing ball has a pin hole, and the hollow pressure transmission connecting rod of the hollow sealing ball is connected with the shear pin; the devices are all made of soluble metal materials;

本发明下入油井或天然气井时,全部滑套处于开启状态。上部的空心座封球卡在第一滑套内衬套的限位部,地面加压,关闭第一滑套。When the present invention is lowered into an oil well or a natural gas well, all sliding sleeves are in an open state. The upper hollow seat sealing ball is stuck in the limit part of the inner bush of the first sliding sleeve, and the ground is pressurized to close the first sliding sleeve.

继续加压,剪切上部的空心座封球的空心传压连杆底部的销钉。中部的空心座封球下行,卡在第二滑套内衬套的限位部,地面加压,关闭第二滑套。Continue to pressurize, shear the pin at the bottom of the hollow pressure transmission connecting rod of the hollow seat seal ball on the top. The hollow seat sealing ball in the middle goes down and is stuck in the limit part of the inner bush of the second sliding sleeve, and the ground is pressurized to close the second sliding sleeve.

继续加压,剪切中部的空心座封球的空心传压连杆底部的销钉。下部座封球继续下行,到达第三滑套内衬套的限位部,地面加压,关闭第三滑套。Continue to pressurize, shear the pin at the bottom of the hollow pressure transmission connecting rod of the hollow seat seal ball in the middle. The lower seating ball continues to descend until it reaches the limit portion of the inner bushing of the third sliding sleeve, and the ground is pressurized to close the third sliding sleeve.

进一步地,所述多级连环剪切座封球采用可溶金属制成。Further, the multi-stage chain shear seating ball is made of soluble metal.

多级连环剪切座封球在经过2-10天,溶解在井液中,能最大程度地保证井筒的通径,且不会存在残留碎片,能有效保证油气井的洁净和通畅。After 2-10 days, the multi-stage chain shearing sealing ball will dissolve in the well fluid, which can ensure the diameter of the wellbore to the greatest extent, and there will be no residual debris, which can effectively ensure the cleanliness and smoothness of the oil and gas well.

与现有的技术相比,本发明提供的一种多级连环剪切座封球装置具有以下优点:Compared with the existing technology, the multi-stage chain shearing and sealing ball device provided by the present invention has the following advantages:

1、随在井口投入,在油管内落入滑套,在水平井段,由泵送完井液辅助送入滑套,一趟下入,作业一趟连续完成,节省了时间;1. With the input at the wellhead, it falls into the sliding sleeve in the tubing, and in the horizontal well section, it is assisted by pumping completion fluid into the sliding sleeve. It is lowered in one trip, and the operation is completed continuously in one trip, saving time;

2、无需更换井下滑套开关工具,不会对地层污染;2. There is no need to replace the downhole sliding sleeve switch tool, and it will not pollute the formation;

3、关闭滑套结束后,油管内保持原通径,方便了以后的修井作业。3. After closing the sliding sleeve, the original diameter of the tubing remains, which facilitates subsequent workover operations.

4、无需额外的大量地面设备,节省了成本;4. There is no need for a large number of additional ground equipment, which saves costs;

5、下入深度和油气井流量均无限制。5. There are no restrictions on the depth of entry and the flow rate of oil and gas wells.

附图说明Description of drawings

为了更清楚地说明本发明具体实施方式或现有技术中的技术方案,下面将对具体实施方式或现有技术描述中所需要使用的附图作简单地介绍,显而易见地,下面描述中的附图是本发明的一些实施方式,对于本领域普通技术人员来讲,在不付出创造性劳动的前提下,还可以根据这些附图获得其他的附图。In order to more clearly illustrate the specific implementation of the present invention or the technical solutions in the prior art, the following will briefly introduce the accompanying drawings that need to be used in the specific implementation or description of the prior art. Obviously, the accompanying drawings in the following description The drawings show some implementations of the present invention, and those skilled in the art can obtain other drawings based on these drawings without any creative work.

图1为本发明刚下入井前(也是下入第一滑套中)时的结构示意图;Fig. 1 is the structural representation when the present invention is just lowered into the well (also lowered in the first sliding sleeve);

图2为本发明中开启第一滑套后(留在第一滑套中)的结构示意图;Fig. 2 is a schematic structural view after opening the first sliding sleeve (staying in the first sliding sleeve) in the present invention;

图3为本发明下入第二滑套时的结构示意图;Fig. 3 is the structural representation when the present invention is lowered into the second sliding sleeve;

图4为本发明内开启第二滑套后(留在第二滑套中)的结构示意图;Fig. 4 is a schematic structural view of opening the second sliding sleeve (staying in the second sliding sleeve) in the present invention;

图5为本发明下入第三滑套后(留在第三滑套中)的结构示意图;Fig. 5 is a schematic structural view of the present invention after entering the third sliding sleeve (staying in the third sliding sleeve);

图6为本发明的剪切销钉(留在第一滑套中),及液压打开第一滑套后,剪切销钉被剪断后,残留在第一滑套中销钉结构示意图Fig. 6 is the shear pin of the present invention (stayed in the first sliding sleeve), and after the hydraulic pressure opens the first sliding sleeve, after the shear pin is cut off, the structural schematic diagram of the pin remaining in the first sliding sleeve

图7为本发明的剪切销钉(留在第二滑套中);及液压打开第二滑套后,剪切销钉被剪断后,残留在第二滑套中销钉结构示意图Fig. 7 is the shearing pin of the present invention (staying in the second sliding sleeve); and after the hydraulic pressure opens the second sliding sleeve, after the shearing pin is cut off, the structural schematic diagram of the pin remaining in the second sliding sleeve

附图标记:Reference signs:

1-上部空心座封球; 2-中部空心座封球;1-The upper hollow seat seals the ball; 2-The middle hollow seat seals the ball;

3-下部实心座封球; 4-上部剪切销钉;3-The lower solid seat seal ball; 4-The upper shear pin;

5-下部剪切销钉;5 - lower shear pin;

11-上部空心传压连杆; 21-下部空心传压连杆11-upper hollow pressure transmission connecting rod; 21-lower hollow pressure transmission connecting rod

具体实施方式Detailed ways

下面将结合附图对本发明的技术方案进行清楚、完整地描述,显然,所描述的实施例是本发明一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有做出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。The technical solutions of the present invention will be clearly and completely described below in conjunction with the accompanying drawings. Apparently, the described embodiments are some of the embodiments of the present invention, but not all of them. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.

在本发明的描述中,需要说明的是,术语“中心”、“上”、“下”、“左”、“右”、“竖直”、“水平”、“内”、“外”等指示的方位或位置关系为基于附图所示的方位或位置关系,仅是为了便于描述本发明和简化描述,而不是指示或暗示所指的装置或元件必须具有特定的方位、以特定的方位构造和操作,因此不能理解为对本发明的限制。此外,术语“第一”、“第二”、“第三”仅用于描述目的,而不能理解为指示或暗示相对重要性。In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer" etc. The indicated orientation or positional relationship is based on the orientation or positional relationship shown in the drawings, and is only for the convenience of describing the present invention and simplifying the description, rather than indicating or implying that the referred device or element must have a specific orientation, or in a specific orientation. construction and operation, therefore, should not be construed as limiting the invention. In addition, the terms "first", "second", and "third" are used for descriptive purposes only, and should not be construed as indicating or implying relative importance.

在本发明的描述中,需要说明的是,除非另有明确的规定和限定,术语“安装”、“相连”、“连接”应做广义理解,例如,可以是固定连接,也可以是可拆卸连接,或一体地连接;可以是机械连接,也可以是电连接;可以是直接相连,也可以通过中间媒介间接相连,可以是两个元件内部的连通。对于本领域的普通技术人员而言,可以具体情况理解上述术语在本发明中的具体含义。In the description of the present invention, it should be noted that unless otherwise specified and limited, the terms "installation", "connection" and "connection" should be understood in a broad sense, for example, it can be a fixed connection or a detachable connection. Connected, or integrally connected; it can be mechanically connected or electrically connected; it can be directly connected or indirectly connected through an intermediary, and it can be the internal communication of two components. Those of ordinary skill in the art can understand the specific meanings of the above terms in the present invention in specific situations.

图1为本发明刚下入井中多级连环剪切座封球时的结构示意图;图2为本发明中多级连环剪切座封球液压打开第一滑套后,剪切销钉后(留在第一滑套中)的结构示意图;图3为本发明中多级连环剪切座封球下入第二滑套时的结构示意图;图4为本发明多级连环剪切座封球液压打开第二滑套后,剪切销钉后(留在第二滑套中)的结构示意图;图5为本发明中内多级连环剪切座封球下入第三滑套后(留在第三滑套中)的结构示意图。Fig. 1 is the structural schematic view of the multi-stage chain shear seat seal ball when the present invention has just been lowered into the well; Fig. 2 is after the first sliding sleeve is hydraulically opened by the multi-stage chain shear seat seal ball in the present invention, after shearing the pin (leave in the first sliding sleeve); Fig. 3 is a schematic structural view of the multi-stage chain shearing seat seal ball in the present invention when it is lowered into the second sliding sleeve; Fig. 4 is a hydraulic pressure diagram of the multi-stage chain shear seat seal ball of the present invention After opening the second sliding sleeve, the structural schematic diagram after shearing the pin (staying in the second sliding sleeve); Fig. Schematic diagram of the structure of the three sliding sleeves).

如图1所示,本发明提供了一种新型“多级连环剪切座封球”装置,包括:上部空心座封球、上部空心传压连杆;中部空心座封球、中部空心传压连杆;下部实心座封球;以及一组剪切销钉组成。As shown in Figure 1, the present invention provides a new type of "multi-stage chain shearing seat sealing ball" device, including: the upper hollow seat sealing ball, the upper hollow pressure transmission connecting rod; the middle hollow seat sealing ball, the middle hollow pressure transmission The connecting rod; the lower solid seat ball; and a set of shear pins.

上部空心座封球1、空心传压连杆11的下端安装有下接头12,空心传压连杆11的下部侧壁开设有镙纹孔13,所述镙纹孔13与剪切销钉4紧密配合;镙纹孔13与中部空心座封球2、中部空心传压连杆21的上端安装有上接头22;中部空心传压连杆21的上部侧壁开设有镙纹孔23,所述镙纹孔13与剪切销钉4紧密配合,共同连接上部空心座封球1、空心传压连杆11和中部空心座封球2、中部空心传压连杆21。The upper hollow seat seal ball 1, the lower end of the hollow pressure transmission connecting rod 11 is equipped with a lower joint 12, and the lower side wall of the hollow pressure transmission connecting rod 11 is provided with a threaded hole 13, and the threaded hole 13 is closely connected with the shear pin 4. Cooperate; the upper joint 22 is installed on the upper end of the hollow seat sealing ball 2 with the screw hole 13 and the middle hollow pressure transmission connecting rod 21; the upper side wall of the middle hollow pressure transmission connecting rod 21 is provided with a screw groove 23. The pits 13 are closely matched with the shear pins 4 to jointly connect the upper hollow seat sealing ball 1 , the hollow pressure transmission connecting rod 11 and the middle hollow seat sealing ball 2 and the middle hollow pressure transmission connecting rod 21 .

所述上部空心座封球1,与井下第一滑套滑套可紧密契合;地面加压打开井下第一滑套。The upper hollow seat sealing ball 1 can closely fit with the sliding sleeve of the first downhole sliding sleeve; the ground pressurizes to open the first downhole sliding sleeve.

所述中部空心座封球2,与井下第二滑套滑套可紧密契合;地面加压打开井下第二滑套。The hollow seat sealing ball 2 in the middle can closely fit with the sliding sleeve of the second downhole sliding sleeve; the second downhole sliding sleeve can be opened by pressurization on the ground.

所述下部实心座封球3,与井下第三滑套滑套可紧密契合;地面加压打开井下第三滑套。The lower solid seat sealing ball 3 can closely fit with the sliding sleeve of the third downhole sliding sleeve; the third downhole sliding sleeve can be opened by pressurization on the ground.

本实施例中,本发明下入油井或天然气井时,上部空心座封球1卡在第一滑套内衬套中,开启第一滑套的循环孔,保证本发明最初下入油井或天然气井时,第一滑套的循环孔处于封堵状态。继续加压,剪切断上部剪切销钉4后,中部空心座封球和下部实心座封球继续下入第二滑套中。中部空心座封球2卡在第二滑套内衬套中,继续加压,开启第二滑套的循环孔,保证本发明最初下入油井或天然气井时,第二滑套的循环孔处于封堵状态。In this embodiment, when the present invention is lowered into an oil well or a natural gas well, the upper hollow seat ball 1 is stuck in the inner liner of the first sliding sleeve, and the circulation hole of the first sliding sleeve is opened to ensure that the present invention is initially lowered into the oil well or natural gas well. During the well, the circulation hole of the first sliding sleeve is in a blocked state. Continue to pressurize, after shearing the upper shear pin 4, the middle hollow seat sealing ball and the lower solid seat sealing ball continue to be lowered into the second sliding sleeve. The hollow seat ball 2 in the middle is stuck in the inner liner of the second sliding sleeve, pressurization is continued, and the circulation hole of the second sliding sleeve is opened to ensure that when the present invention is initially lowered into an oil well or a natural gas well, the circulation hole of the second sliding sleeve is at blocked state.

继续加压,剪切断下部剪切销钉5后,下部实心座封球3继续下入第三滑套中。Continue to pressurize, after shearing the lower shearing pin 5, the lower solid seat sealing ball 3 continues to be lowered into the third sliding sleeve.

与现有的技术相比,本发明提供的一种新型打开井下滑套装置具有以下优点:Compared with the existing technology, a novel device for opening downhole sliding sleeves provided by the present invention has the following advantages:

1、地面投入;连续完成,节省了时间;1. Ground input; continuous completion, saving time;

2、无需钢丝地面设备、无需钢丝井下工具;无需钢丝井下作业,不会对地层污染;2. No need for steel wire ground equipment, no need for steel wire downhole tools; no need for steel wire downhole operations, and will not pollute the formation;

3、无需电缆地面设备、无需电缆井下工具;无需电缆井下作业,不会对地层污染;3. No need for cable ground equipment, no need for cable downhole tools; no need for cable downhole operations, and will not pollute the formation;

4、无需连续油管地面设备、无需连续油管井下工具;无需连续油管井下作业,不会对地层污染;4. No need for coiled tubing surface equipment, no need for coiled tubing downhole tools; no need for coiled tubing downhole operations, and will not pollute the formation;

5、无需液压控制管线的地面控制柜;无需油管外液压控制管线作业;5. Ground control cabinet without hydraulic control pipeline; no hydraulic control pipeline operation outside oil pipe;

6、作业结束后,油管内保持全通径,方便了以后的修井作业,节省了成本;6. After the operation is completed, the tubing remains full-bore, which facilitates subsequent workover operations and saves costs;

7、下入数量、下入深度还可继续调整,增加级数。7. The number and depth of running can be adjusted continuously to increase the number of stages.

8、所述多级连环剪切座封球采用可溶金属制成(剪切销钉除外)。8. The multi-stage chain shearing seat sealing ball is made of soluble metal (except the shearing pin).

9、多级连环剪切座封球1,2,3在经过2-15天,溶解在井液中,能最大程度地保证井筒的全通径,通径保持与外套管的通径一致,且不会存在残留碎片,能有效保证油气井的洁净和通畅。9. After 2-15 days, the multi-stage chain shearing sealing balls 1, 2, and 3 are dissolved in the well fluid, which can ensure the full diameter of the wellbore to the greatest extent, and the diameter remains consistent with the diameter of the outer casing. And there will be no residual debris, which can effectively ensure the cleanliness and smoothness of oil and gas wells.

本发明的工作原理如下:The working principle of the present invention is as follows:

本实施例中,多级连环剪切座封球从地面投入;上部空心座封球、上部空心传压连杆卡住第一滑套的内衬套;地面加压;向下打开第一滑套。地面继续加压(升高地面压力);直到剪切销钉4被剪切断;释放图3部分的中部空心球座2;图2部分的上部空心座封球1、上部空心传压连杆11及剪切断的部分剪切销钉41留在上部空心传压连杆11的螺纹孔13中。In this embodiment, the multi-stage chain shearing seat sealing ball is thrown from the ground; the upper hollow seat sealing ball and the upper hollow pressure transmission connecting rod clamp the inner bushing of the first sliding sleeve; the ground is pressurized; the first sliding sleeve is opened downward. set. Continue to pressurize the ground (increase the ground pressure); until the shear pin 4 is sheared off; release the hollow ball seat 2 in the middle part of Figure 3; the upper hollow seat sealing ball 1 and the upper hollow pressure transmission connecting rod 11 in Figure 2 And the part shearing pin 41 that shears off stays in the threaded hole 13 of upper hollow pressure transmission connecting rod 11.

中部空心球座2及下部实心座封球3;继续下行;中部空心球座2卡住第二滑套的内衬套;地面加压;向下打开第二滑套。地面继续加压(升高地面压力);直到剪切销钉5被剪切断;释放图5的下部实心座封球3;图3部分的中部空心座封球2、中部空心传压连杆21及剪切断的部分剪切销钉51留在中部空心传压连杆21的螺纹孔25中。The middle hollow ball seat 2 and the lower solid seat seal the ball 3; continue to descend; the middle hollow ball seat 2 blocks the inner bushing of the second sliding sleeve; pressurize the ground; open the second sliding sleeve downward. Continue to pressurize the ground (raise the ground pressure); until the shear pin 5 is cut off; release the lower solid seat ball 3 in Figure 5; the middle hollow seat ball 2 and the middle hollow pressure transmission connecting rod 21 in Figure 3 And the part shearing pin 51 that shears off stays in the threaded hole 25 of central hollow pressure transmission connecting rod 21.

下部实心座封球3;继续下行;卡住第三滑套的内衬套;地面加压;向下打开第二滑套。Bottom solid seat seal ball 3; continue to descend; block the inner liner of the third sliding sleeve; pressurize the ground; open the second sliding sleeve downwards.

达到打开第一滑套、第二滑套、第三滑套,开启三个不同的油藏;或三个不同的气层或水层的生产或压裂作业的目的;压裂作业结束的2-10天后,全部溶解在井液中,地层油气流入滑套。To achieve the purpose of opening the first sliding sleeve, the second sliding sleeve, and the third sliding sleeve, and opening three different oil reservoirs; or the production or fracturing operations of three different gas layers or water layers; - After 10 days, all dissolved in the well fluid, formation oil and gas flows into the sliding sleeve.

最后应说明的是:以上各实施例仅用以说明本发明的技术方案,而非对其限制;尽管参照前述各实施例对本发明进行了详细的说明,本领域的普通技术人员应当理解:其依然可以对前述各实施例所记载的技术方案进行修改,或者对其中部分或者全部技术特征进行等同替换;而这些修改或者替换,并不使相应技术方案的本质脱离本发明各实施例技术方案的范围。Finally, it should be noted that: the above embodiments are only used to illustrate the technical solutions of the present invention, rather than limiting them; although the present invention has been described in detail with reference to the foregoing embodiments, those of ordinary skill in the art should understand that: It is still possible to modify the technical solutions described in the foregoing embodiments, or perform equivalent replacements for some or all of the technical features; and these modifications or replacements do not make the essence of the corresponding technical solutions deviate from the technical solutions of the various embodiments of the present invention. scope.

Claims (9)

1.一种多级连环剪切座封球装置,其特征在于,包括:上部空心座封球、中部空心座封球、下部座封球;以及一组剪切销钉组成。1. A multi-stage chain shearing ball sealing device, characterized in that it comprises: an upper hollow sealing ball, a middle hollow sealing ball, a lower sealing ball; and a set of shearing pins. 上部的空心座封球的下端安装有空心传压连杆和销钉孔,中部的空心座封球的下端安装有空心传压连杆和销钉孔,下部座封球的上端有销钉孔,所述空心座封球的空心传压连杆与剪切销钉配合连接。The lower end of the upper hollow seat sealing ball is equipped with a hollow pressure transmission connecting rod and a pin hole, the lower end of the hollow seat sealing ball in the middle is equipped with a hollow pressure transmission connecting rod and a pin hole, and the upper end of the lower seat sealing ball has a pin hole. The hollow pressure transmission connecting rod of the hollow seat sealing ball is connected with the shear pin. 所述上部的空心座封球包括空心座封球和空心传压连杆和销钉孔,所述装置都由可溶材料组成;The upper hollow sealing ball includes a hollow sealing ball, a hollow pressure transmission connecting rod and a pin hole, and the devices are all composed of soluble materials; 所述中部的空心座封球包括空心座封球和空心传压连杆和销钉孔,所述装置都由可溶金属材料制成。The hollow sealing ball in the middle includes a hollow sealing ball, a hollow pressure transmission connecting rod and a pin hole, and the devices are all made of soluble metal materials. 2.根据权利要求1所述的多级连环剪切座封球装置,其特征在于,所述上部的空心座封球采用可溶金属制成。2. The multi-stage chain shearing sealing ball device according to claim 1, characterized in that the upper hollow sealing ball is made of soluble metal. 3.根据权利要求1或2所述的多级连环剪切座封球装置,其特征在于,所述可溶球包括多个外径从大到小的空心球组成的结构。3. The multi-stage chain shearing and sealing ball device according to claim 1 or 2, characterized in that the soluble ball comprises a structure composed of a plurality of hollow balls with outer diameters ranging from large to small. 4.根据权利要求3所述的多级连环剪切座封球装置,其特征在于,所述上部的空心座封球外径;大于所述中部的空心座封球外径;所述中部的空心座封球大于下部座封球外径。4. The multi-stage chain shearing seat sealing ball device according to claim 3, characterized in that, the outer diameter of the hollow seat sealing ball in the upper part is larger than the outer diameter of the hollow seat sealing ball in the middle part; The hollow seating ball is larger than the outer diameter of the lower seating ball. 5.根据权利要求4所述的多级连环剪切座封球装置,其特征在于,所述空心传压连杆与所述剪切销钉相配合的螺纹。5 . The multi-stage chain shearing seat sealing ball device according to claim 4 , characterized in that, the hollow pressure transmission connecting rod has a thread matched with the shearing pin. 6 . 6.根据权利要求5所述的多级连环剪切座封球装置,其特征在于,所述下部座封球上部连杆为实心。6. The multi-stage chain shearing sealing ball device according to claim 5, characterized in that, the upper connecting rod of the lower sealing ball is solid. 7.根据权利要求6所述的多级连环剪切座封球装置,其特征在于,所述下部座封球上部连杆与所述剪切销钉相配合的螺纹。7. The multi-stage chain shearing and sealing ball device according to claim 6, characterized in that the upper connecting rod of the lower sealing ball is threaded with the shearing pin. 8.根据权利要求1所述的多级连环剪切座封球装置,其特征在于,所述空心传压连杆为圆环状;下端有内台阶;加工带螺纹的销钉孔。8. The multi-stage chain shear seat sealing device according to claim 1, characterized in that the hollow pressure transmission connecting rod is in the shape of a ring; the lower end has an inner step; and a threaded pin hole is processed. 9.根据权利要求1所述的多级连环剪切座封球装置,其特征在于,所述下端有内台阶内侧周向设置有限位台阶。9. The multi-stage chain shearing seat sealing ball device according to claim 1, characterized in that, the lower end has an inner step and a limiting step is arranged on the inner side of the circumferential direction.
CN201610801034.XA 2016-09-02 2016-09-02 Multistage a chain of Cut Block blocking Pending CN107795297A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201610801034.XA CN107795297A (en) 2016-09-02 2016-09-02 Multistage a chain of Cut Block blocking

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201610801034.XA CN107795297A (en) 2016-09-02 2016-09-02 Multistage a chain of Cut Block blocking

Publications (1)

Publication Number Publication Date
CN107795297A true CN107795297A (en) 2018-03-13

Family

ID=61529811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201610801034.XA Pending CN107795297A (en) 2016-09-02 2016-09-02 Multistage a chain of Cut Block blocking

Country Status (1)

Country Link
CN (1) CN107795297A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN115704316A (en) * 2021-08-12 2023-02-17 中国石油化工股份有限公司 Throwing rod type pipe inspection device and application thereof

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110017133A (en) * 2019-05-23 2019-07-16 广州海洋地质调查局 A kind of test of horizontal well production profile and shutoff method and device
CN110206531A (en) * 2019-05-23 2019-09-06 广州海洋地质调查局 A kind of oil pipe of horizontal well production profile test method and device
CN110206531B (en) * 2019-05-23 2024-04-09 广州海洋地质调查局 Method and device for testing output profile of horizontal well oil pipe
CN110017133B (en) * 2019-05-23 2024-05-10 广州海洋地质调查局 Method and device for testing output profile of horizontal well and plugging water
CN115704316A (en) * 2021-08-12 2023-02-17 中国石油化工股份有限公司 Throwing rod type pipe inspection device and application thereof

Similar Documents

Publication Publication Date Title
CN204703876U (en) Bridge type concentric separate injection pipe column
CN105804680A (en) Under-pressure well repairing working device and method of oil-gas field
CN104563872B (en) Blockage resisting self-filling-type float collar
CN205445548U (en) Outer sliding sleeve type hydraulic oil drain device
CN107795297A (en) Multistage a chain of Cut Block blocking
CN103388469A (en) Filling tool
CN111425148A (en) Casing pipe column applying toe end sliding sleeve to full-bore sliding sleeve and using method of casing pipe column
CN205605156U (en) Workover device is pressed in oil gas field area
CN110617057A (en) Full-pipe type underground testing pipe column and testing method thereof
CN106401537A (en) Well completion pipe string of underground gas storage well and well completion method
CN207004498U (en) Infinite stages switching sliding sleeve fracturing tool
CN206409212U (en) Multistage chain of rings Cut Block blocking device
CN205778740U (en) A kind of seesaw type sliding sleeve opener and etc. diameter through sleeve sliding sleeve
CN110513070B (en) Flap type downhole oil pipe hydraulic control blowout preventer
CN204941345U (en) A kind of radial well transfer with packing function
CN210087252U (en) Underground continuous pipe cable separation sealing adapter
GB2588029A (en) Annular controlled safety valve system and method
CN115434665B (en) Shaft switching tool free of well killing and underground operation and process method
CN206360677U (en) A downhole blowout preventer
CN116816308A (en) Oil-free pipe paraffin removal lifting device for small-bore shale oil well
CN113445954B (en) Pump-down circulating oil pipe hydraulic control environmental protection blowout prevention device
CN204851208U (en) Sliding sleeve packer staged fracturing device
CN110566450B (en) Hydraulic control blowout prevention device for oil pipe under pump
CN110318712B (en) Underground hydraulic motor special for oil extraction
CN202249947U (en) Subsurface safety valve

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20180313

WD01 Invention patent application deemed withdrawn after publication