CN209469539U - The presstressed reinforcing steel connector of tower and concrete tower with it - Google Patents
The presstressed reinforcing steel connector of tower and concrete tower with it Download PDFInfo
- Publication number
- CN209469539U CN209469539U CN201822049556.6U CN201822049556U CN209469539U CN 209469539 U CN209469539 U CN 209469539U CN 201822049556 U CN201822049556 U CN 201822049556U CN 209469539 U CN209469539 U CN 209469539U
- Authority
- CN
- China
- Prior art keywords
- tower
- prestressed
- cable
- connecting column
- connector
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000004567 concrete Substances 0.000 title claims abstract description 47
- 229910001294 Reinforcing steel Inorganic materials 0.000 title abstract 4
- 210000002435 tendon Anatomy 0.000 claims description 48
- 238000004873 anchoring Methods 0.000 claims description 5
- 230000007423 decrease Effects 0.000 claims description 5
- 230000003247 decreasing effect Effects 0.000 claims description 5
- 230000002093 peripheral effect Effects 0.000 claims description 2
- 238000010276 construction Methods 0.000 abstract description 12
- 230000006641 stabilisation Effects 0.000 abstract 1
- 238000011105 stabilization Methods 0.000 abstract 1
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 34
- 235000017491 Bambusa tulda Nutrition 0.000 description 34
- 241001330002 Bambuseae Species 0.000 description 34
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 34
- 239000011425 bamboo Substances 0.000 description 34
- 239000011178 precast concrete Substances 0.000 description 3
- 230000002349 favourable effect Effects 0.000 description 2
- 238000009434 installation Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 238000010248 power generation Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000004519 manufacturing process Methods 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000009417 prefabrication Methods 0.000 description 1
- 230000002787 reinforcement Effects 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 238000005728 strengthening Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of presstressed reinforcing steel connector of tower and with its concrete tower, the presstressed reinforcing steel connector of the tower includes: interior connecting column and outer connected unit, interior connecting column is equipped with interconnecting hole, interconnecting hole is along axially through interior connecting column, outer connected unit is extended outwardly by the portion perimeter wall of interior connecting column, the axial dimension of outer connected unit is less than the axial dimension of interior connecting column, circumferentially arranged with multiple outer link slots spaced apart in outer connected unit, outer link slot is along axially through outer connected unit, outer link slot is opened wide in the side far from interior connecting column.According to the presstressed reinforcing steel connector of the tower of the utility model embodiment, concrete tower is set to be tensioned prestressed cable in advance, apply prestressing force, to resist the lateral load that tower is generated by support tower crane device, be conducive to the stabilization of tower structure, interconnecting hole and outer connecting groove structure are simple, easy for construction.
Description
Technical Field
The utility model relates to a tower section of thick bamboo field especially relates to a prestressing tendons connector of a tower section of thick bamboo and concrete tower section of thick bamboo that has it.
Background
Along with the increase of the generating efficiency of the fan, the length of the blade is longer and longer, and the height and the section size of the fan tower barrel matched with the blade are also increased continuously. The steel structure tower barrel is high in cost and difficult to transport, so that the construction requirement of the large-section high tower barrel is difficult to meet. The precast concrete tower barrel can economically build a large-scale wind generating set, so that the precast concrete tower barrel is widely concerned. Due to transportation and prefabrication, a single large section tower is often assembled on site from multiple arc-shaped pieces. And then hoisting the assembled tower barrels from bottom to top in sequence, and finally constructing the complete concrete tower barrel.
The height of the traditional tower is generally 80-120 m, and the wind power generation can generate higher power generation efficiency due to higher wind speed at high altitude, so that the height of the tower needs to be increased, and the hoisting difficulty is increased. When a tower cylinder with extremely high hoisting height is hoisted, a tower crane device with the matched height is needed to be used, and the tower crane device with extremely high height is extremely easy to be inclined in the hoisting process.
SUMMERY OF THE UTILITY MODEL
For the stability and the security of guaranteeing super high tower crane device, utility model people design out a plurality of schemes, for example adopt many to draw from ground to one side the stay cable solid on the tower crane device, for example do structural rigidity to the tower crane device again and reinforce and handle etc.. Among the various solutions, one is distinguished by stability and reliability, namely the tower crane assembly is supported on a concrete tower drum by means of a outrigger structure. However, when the tower crane device is supported by the arm-supporting structure arranged on the tower drum, more lateral loads can be generated at the supporting part of the tower drum, so that the tower drum is stressed intensively and is easy to deform, and therefore another problem is caused to extend out, and how to structurally reinforce the concrete tower drum.
For solving the concrete tower section of thick bamboo and producing the problem of extra side direction load because of supporting the tower crane device, utility model people designs out the prestressing force's in advance scheme is applyed to the prestressing cable that utilizes a concrete tower section of thick bamboo. Specifically, in the construction of a precast concrete tower drum in the prior art, after all tower drum sections are hoisted, a prestressed cable is connected to the bottom of the tower drum from the top of the tower drum. And the embodiment of the utility model provides an in, plan with prestressed cable section connection, before being connected to certain tower section with the tower crane device through holding up arm structure, pass through prestressed cable stretch-draw pretension with this tower section in advance, when treating this tower section like this and produce side direction load because of supporting the tower crane device, side direction load is difficult to let tower section warp.
The solution developed so far will face the problem of how to tension the pre-stressed cables in advance. Therefore, the utility model provides a prestressing tendons connector of a tower section of thick bamboo, the prestressing tendons connector of a tower section of thick bamboo can set up in the section of thick bamboo wall of concrete tower section of thick bamboo to connect the prestressed cable. The utility model discloses still provide one kind and have a concrete tower section of thick bamboo of prestressing tendons connector of a tower section of thick bamboo.
According to the utility model discloses the prestressing tendons connector of tower section of thick bamboo of first aspect embodiment, including interior spliced pole and external connection platform, be equipped with the interior connecting hole on the interior spliced pole, the interior connecting hole link up along the axial the interior spliced pole, the external connection platform by the part periphery wall of interior spliced pole outwards extends and forms, the axial dimension of external connection platform is less than the axial dimension of interior spliced pole, the external connection bench is equipped with a plurality of spaced apart outer connection grooves along circumference, the outer connection groove link up along the axial the external connection platform, the outer connection groove is keeping away from one side of interior spliced pole is opened.
According to the utility model discloses the prestressing tendons connector of a tower section of thick bamboo can be with two sections prestressing cable fastening connections to exert prestressing force to a concrete tower section of thick bamboo, in order to resist the concrete tower section of thick bamboo because of supporting the side direction load that the tower crane device produced, be favorable to a concrete tower section of thick bamboo stable. The inner connecting hole and the outer connecting groove are simple in structure, the two sections of prestressed cables can easily penetrate through the inner connecting hole and the outer connecting groove, and construction is convenient.
Additionally, according to the utility model discloses a prestressing tendons connector of a tower section of thick bamboo can also have following additional technical characterstic:
in some embodiments of the present invention, the inner connecting column has a diameter that gradually decreases from one end toward the other end.
In some examples of the invention, the outer connection pad is disposed adjacent to the small diameter end of the inner connection post.
In some embodiments of the present invention, the outer connecting platform is connected to two of the peripheries of the inner connecting columns, two of the outer connecting platform is located at the axial interval of the inner connecting columns, and two of the outer connecting platform is located at the outer connecting platform and corresponds to the outer connecting groove.
In some embodiments of the present invention, the inner connecting hole includes a central hole and a plurality of surrounding holes, the central hole is disposed on the central axis of the inner connecting column, and the surrounding holes surround the central hole and are spaced apart from each other.
Optionally, the hole distance between the plurality of surrounding holes and the central hole gradually decreases from one end of the inner connecting column to the other end.
In some embodiments of the present invention, the inner connecting column is cylindrical and the outer connecting platform is circular.
The utility model discloses still provide a concrete tower section of thick bamboo of prestressing tendons connector of a tower section of thick bamboo with above-mentioned embodiment.
The concrete tower drum according to the embodiment of the second aspect of the present invention comprises a tower drum body and a plurality of prestressed cables, wherein the tower drum body comprises a plurality of tower drum sections sequentially connected from bottom to top, each tower drum section is provided with a plurality of prestressed ducts which are vertically communicated, the prestressed cables are respectively arranged in the prestressed ducts, and both ends of each prestressed cable are fixed by tensioning of an anchoring device, wherein at least one prestressed cable comprises a lower cable and an upper cable, the lower end of the upper cable and the upper end of the lower cable are respectively fixed on a prestressed tendon connector by tensioning, and the prestressed tendon connector can be any one of the above embodiments,
according to the utility model discloses a concrete tower section of thick bamboo through anchor and prestressing tendons connector, can exert prestressing force to a concrete tower section of thick bamboo to offset the side direction load in the concrete tower section of thick bamboo.
Optionally, the upper section cable is anchored to the outer attachment slot and the lower section cable is anchored to the inner attachment slot.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic structural view of a concrete tower drum according to an embodiment of the present invention;
FIG. 2 is a schematic view of a tendon connector of an angular tower according to an embodiment of the present invention;
FIG. 3 is a schematic view of a tendon connector of a tower from another angle in accordance with an embodiment of the present invention;
FIG. 4 is a schematic structural view of a tendon connector of a tower at yet another angle according to an embodiment of the present disclosure;
fig. 5 is a schematic structural view of a tendon connector according to another embodiment of the present invention.
Reference numerals:
a prestressed tendon connector 100,
Inner connecting post 1, inner connecting hole 11, center hole 111, surrounding hole 112,
An outer connecting platform 2, an outer connecting groove 21, a first outer connecting platform 22, a first outer connecting groove 221, a second outer connecting platform 23, a second outer connecting groove 231,
A concrete tower tube 1000,
A tower body 200, a tower segment 10,
Tower crane device 2000, hold up arm structure 3000.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
In the description of the present invention, it is to be understood that the terms "center", "longitudinal", "lateral", "length", "width", "thickness", "upper", "lower", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like, indicate orientations or positional relationships based on those shown in the drawings, and are used only for convenience of description and simplicity of description, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and thus, should not be construed as limiting the present invention. Furthermore, a feature defined as "first" or "second" may explicitly or implicitly include one or more of that feature. In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
A concrete tower 1000 according to an embodiment of the present invention is described below with reference to the drawings.
As shown in fig. 1, according to the utility model discloses concrete tower section of thick bamboo 1000, including tower cylinder body 200 and a plurality of prestressed cable (not shown in the figure), tower cylinder body 200 includes a plurality of tower cylinder sections 10 that link to each other in proper order by going up, and every tower cylinder section 10 all is equipped with a plurality of prestressed aperture ways (not shown in the figure) that link up from top to bottom, and prestressed aperture ways in two adjacent tower cylinder sections 10 can correspond each other, and a plurality of prestressed cable establish respectively in a plurality of prestressed aperture ways, and the equal tensioning in both ends of every prestressed cable is fixed.
Specifically, a plurality of vertically penetrating prestressed ducts (not shown) are provided in each tower section 10, and the prestressed ducts in two adjacent tower sections 10 may correspond to each other, so that each prestressed cable may pass through the prestressed duct of one tower section 10, or may pass through the prestressed ducts of two or more tower sections 10 continuously. The anchoring means may tension and fix both ends of each prestressed cable, thereby prestressing the concrete tower 1000.
The tower segment 10 is a prefabricated tower, and the tower segment 10 required for constructing the concrete tower 1000 is manufactured in advance in a factory. After a plurality of prefabricated tower cylinder sections 10 are transported to a use place by a prefabricated factory, the prefabricated tower cylinder sections are sequentially upwards spliced from bottom to top to form the high tower. Because a plurality of tower sections 10 need be assembled on the spot of using, the hoist and mount of tower section 10 is high altitude construction, and the construction degree of difficulty is high, needs to use tower crane device 2000 hoist and mount operation.
The embodiment of the utility model provides a concrete tower section of thick bamboo 1000, at the in-process of hoisting by tower crane device 2000, along with the increase of the tower section of thick bamboo section of accomplishing of having hoisted, tower crane device 2000 is in order to correspondingly increase. In the prior art, the height of some concrete tower barrels can even reach more than one hundred meters, so the height required by the tower crane device is higher. For the guarantee safety in construction, the embodiment of the utility model provides a provide, to hoist the tower section 10 of accomplishing in, tower crane device 2000 is fixed on suitable tower section 10.
As shown in FIG. 1, tower crane assembly 2000 is coupled to a suitable tower section 10 via at least one arm structure 3000. In one example, tower crane assembly 2000 is provided with an arm structure 3000 at both a height of 1/3 and a height of 2/3 of concrete tower 1000, and tower crane assembly 2000 is connected to two arm structures 3000. Set up like this, can provide the holding power to tower crane device 2000 through concrete tower section of thick bamboo 1000, avoid tower crane device 2000 too high and buckle, swing etc. by a wide margin.
However, when the tower crane apparatus 2000 is connected to the concrete tower drum 1000 through the arm supporting structure 3000, a lateral load is applied to the tower section 10 through the arm supporting structure 3000, so that in order to prevent the arm supporting structure 3000 from causing the concrete tower drum 1000 to be inclined and crushed, a prestress needs to be applied to the tower section 10 which is already hoisted in advance. Thus, in the above example, the plurality of tower sections 10 of 1/3 height may be tensioned and pre-tensioned by pre-stressing cables when the concrete tower 1000 is constructed to 1/3 height. After the section of tower sections 10 is tensioned, tower crane assembly 2000 is then connected to one of the tower sections 10 via arm structure 3000. Then, when the concrete tower tube 1000 is built to 2/3, a plurality of tower tube segments 10 from 1/3 to 2/3 are tensioned and pre-tensioned through the prestressed cables, and the bottoms of the prestressed cables are connected to the prestressed cables tensioned last time, so that the continuity of the prestressed cables is realized. Of course, after the whole concrete tower tube 1000 is constructed, another whole segment of prestressed cable (no longer segmented) may be adopted to connect the tower tube from bottom to top in a tensioned manner, so as to achieve the effect of strengthening the connection.
For the prestressed cable of the sectional connection, in order to connect the upper and lower two sections of prestressed cables, the embodiment of the present invention provides a prestressed tendon connector 100. The at least one prestressed cable comprises a lower section cable and an upper section cable, and the lower end of the upper section cable and the upper end of the lower section cable are respectively fixed on the prestressed tendon connector 100 in a tensioning manner. The prestressed cable referred to herein as a segmental connection includes a lower cable and an upper cable, and for convenience of description of the structure of the tendon connector 100, the prestressed cable connected to the tendon connector 100 from below is referred to as a lower cable, and the prestressed cable connected to the tendon connector 100 from above is referred to as an upper cable. For the scheme that the prestressed cable is divided into three or more sections, the upper section cable connected with the lower prestressed tendon connector 100 is the lower section cable connected with the upper prestressed tendon connector 100. Whether the pre-stressed cable is the lower or upper cable is relative to the position of the tendon connector 100 to which it is attached.
Since the non-sectionally connected prestressed cables do not use the tendon connectors 100, the non-sectionally connected prestressed cables, which are referred to hereinafter, will not be described in detail.
A tendon connector 100 for a tower according to an embodiment of the present invention will be described with reference to fig. 1-5.
As shown in fig. 2-4, according to the utility model discloses prestressed tendon connector 100 of tower section of thick bamboo, including internal connection post 1 and external connection platform 2, be equipped with internal connection hole 11 on the internal connection post 1, internal connection hole 11 link up internal connection post 1 along the axial, external connection platform 2 is formed by the outside extension of part periphery wall of internal connection post 1, the axial dimension of external connection platform 2 is less than the axial dimension of internal connection post 1, be equipped with a plurality of spaced apart external connection grooves 21 along circumference on the external connection platform 2, external connection groove 21 link up external connection platform 2 along the axial, one side of keeping away from internal connection post 1 of external connection groove 21 is opened.
That is, one segment of the tendon connector 100 may be inserted through one end of the inner connection hole 11 and then anchored at the other end of the inner connection column 1, and the other segment of the tendon may enter the outer connection stage 2 from the open position of the outer connection groove 21 and then anchored at one end surface of the outer connection stage 2, thereby completing the connection of the two segments of the tendon.
The outer connecting grooves 21 are arranged in a plurality and spaced apart in the circumferential direction, that is, the tendon connector 100 may be connected to a plurality of segments of prestressed cables through the outer connecting platform 2, so as to improve the usability of the outer connecting platform 2. The multiple segments of prestressed cables are circumferentially spaced on the outer connecting platform 2, so that the balance of the outer connecting platform 2 is facilitated, and the influence of the multiple segments of prestressed cables on each other can be prevented. Alternatively, a plurality of inner connecting holes 11 may be provided on the inner connecting column 1, or the inner connecting holes 11 may connect to a segment of prestressed cable, or may be simultaneously matched with a plurality of segments of prestressed cable, which is not limited herein.
The outer connecting platform 2 is formed by extending part of the peripheral wall of the inner connecting column 1 outwards, that is, in the axial direction of the tower drum, the length of the inner connecting column 1 is greater than or equal to that of the outer connecting platform 2, therefore, the outer connecting platform 2 and the upper end face of the inner connecting column 1 can be on the same horizontal plane or on different horizontal planes, and the outer connecting platform 2 and the lower end face of the inner connecting column 1 can be on the same horizontal plane or on different horizontal planes. Preferably, as shown in fig. 3 and 4, the external connection platform 2 is disposed at a middle position of the internal connection column 1, and a distance from an upper end surface of the external connection platform 2 to an upper end surface of the internal connection column 1 is smaller than a distance from a lower end surface of the external connection platform 2 to a lower end surface of the internal connection column 1, so that the tendon connector 100 of the tower has a substantially cross-shaped profile, which is convenient for positioning and installation. In addition, the space at the lower end of the external connecting platform 2 is large, and the prestressed cable can be anchored at the position after penetrating through the external connecting platform 2, so that construction is facilitated.
According to the utility model discloses prestressing tendons connector 100 of a tower section of thick bamboo can be with two sections prestressing cable fastening connection to prestressing force is applyed to concrete tower section of thick bamboo 1000, with the structural strength who improves the support position, thereby offsets the side direction load that tower crane device 2000 applyed to concrete tower section of thick bamboo 1000, is favorable to concrete tower section of thick bamboo 1000 to stabilize. The inner connecting hole 11 and the outer connecting groove 21 have simple structures, two sections of prestressed cables can easily pass through the prestressed cables, and the construction is convenient.
Alternatively, the upper strand is anchored to the outer attachment slot 21 and the lower strand is anchored to the inner attachment hole 11. That is, the upper strand may enter the outer connecting block 2 from the open position of the outer connecting groove 21, and the lower end of the upper strand is anchored to the lower end of the outer connecting block 2. The lower cable needs to enter the inner connecting hole 11 from the lower end of the inner connecting column 1 and then extend out from the upper end of the inner connecting column 1, and the upper end of the lower cable is anchored at the upper end of the inner connecting column 1. It will be appreciated that the upper strand may also be anchored to the inner attachment bore 11 and the lower strand to the outer attachment bore 21, and only the attachment of the upper and lower strands to the tendon connector 100 will be described herein. For convenience of explanation, the following description is given by taking the example that the upper segment cable is anchored to the outer connecting groove 21 and the lower segment cable is anchored to the inner connecting hole 11.
In some embodiments of the present invention, the inner connecting column 1 is cylindrical, and the outer connecting platform 2 is circular. The structure of cylinder and ring is comparatively simple, and convenient the manufacturing is less with the installation, and the space that occupies simultaneously, and like this, the section of thick bamboo wall of concrete tower section of thick bamboo 1000 just can be with reserving the space of installing prestressing tendons connector 100 and establish a bit less, can guarantee the stability of concrete tower section of thick bamboo 1000 structure.
In some embodiments of the present invention, the inner connecting column 1 has a diameter gradually decreasing in a direction toward the other end. That is, in the axial direction of the inner connecting column 1, the diameter of the inner connecting column 1 may gradually decrease from bottom to top, or from top to bottom. Preferably, when the lower section cable is threaded into the inner connecting column 1 from bottom to top, the diameter of the inner connecting column 1 is gradually reduced from bottom to top, so that the diameter of the lower end of the inner connecting column 1 is larger, the larger lower end face is abutted against the inner wall of the concrete tower tube 1000, and the lower end face is more easily limited and has higher stability. In addition, the inner connecting holes 11 can be arranged slightly larger at the lower end of the inner connecting column 1, so that the lower-section cables can be conveniently inserted into the inner connecting holes 11, and the construction difficulty is simplified.
Optionally, as shown in fig. 3 and 4, the outer connecting platform 2 is adjacent to the end of the inner connecting column 1 with a small diameter, that is, the diameter of the inner connecting column 1 matched with the outer connecting platform 2 is small, which is beneficial to fixing the inner connecting column 1 and the outer connecting platform 2, and the space of the upper end surface and the lower end surface of the outer connecting platform 2 is also large, so that a large anchoring space can be obtained, and the construction is convenient.
In some embodiments of the present invention, as shown in fig. 5, two external connection platforms 2 are connected to the periphery of the internal connection column 1, the two external connection platforms 2 are spaced apart from each other along the axial direction of the internal connection column 1, and the external connection grooves 21 of the two external connection platforms 2 are correspondingly disposed. That is, the two outer connecting platforms 2 are provided, which are the first outer connecting platform 22 and the second outer connecting platform 23, respectively, and the two outer connecting platforms 2 can be located and anchored, for example, the upper cable can pass through the first outer connecting groove 221 of the first outer connecting platform 22 and then pass through the second outer connecting groove 231 of the second outer connecting platform 23, and the first outer connecting groove 221 can be used to limit the upper cable, so that the upper cables cannot be affected by each other, and the stability between the upper cables can be ensured. The second outer connecting groove 231 can be used to anchor the upper cable, and the upper cable can be more firmly fixed because the upper cable passes through the position limitation of the first outer connecting groove 221 and then passes through the anchoring of the second outer connecting groove 231.
In some embodiments of the present invention, the inner connecting hole 11 includes a central hole 111 and a plurality of surrounding holes 112, the central hole 111 is disposed on the central axis of the inner connecting column 1, and the surrounding holes 112 are disposed at intervals around the central hole 111. That is, the inner connecting hole 11 can connect a plurality of lower cables, and the lower cables are spaced apart from each other and do not affect each other. The attachment of a plurality of lower cables to the tendon connectors 100 may increase the prestress applied to the concrete tower 1000. Meanwhile, the space of the wall of the concrete tower tube 1000 can be saved, and the stability of the concrete tower tube 1000 is improved. The central hole 111 is arranged on the central axis of the inner connecting column 1, and the plurality of surrounding holes 112 are arranged around the central hole 111 at intervals, wherein the plurality of surrounding holes 112 are symmetrically arranged, so that the inner connecting column 1 is balanced after the lower-section cable is anchored, and the stability of the inner connecting column 1 can be improved.
Alternatively, the pitch between the plurality of surrounding holes 112 and the central hole 111 gradually decreases in a direction from one end of the inner connecting column 1 toward the other end. That is, the distance between the plurality of surrounding holes 112 and the central hole 111 may be gradually decreased in a direction in which the upper end of the inner connecting column 1 is directed toward the lower end, or the distance between the plurality of surrounding holes 112 and the central hole 111 may be gradually decreased in a direction in which the lower end of the inner connecting column 1 is directed toward the upper end, preferably, when the prestressed cables are penetrated from the lower end toward the upper end, and the upper end of the inner connecting column 1 is anchored, the distance between the lower end of the inner connecting column 1 and the central hole 111 is gradually decreased in a direction in which the lower end of the inner connecting column 1 is directed toward the upper end, so that the distance between the plurality of prestressed cables may be further increased when the plurality of prestressed cables are penetrated into the inner connecting column 1, thereby preventing mutual influence, and meanwhile, when the plurality of prestressed cables are anchored at the upper end of the inner connecting column 1, the cables may.
Other constructions of concrete tower cartridges 1000 according to embodiments of the present invention, such as foundations and the like, and the operation thereof, are known to those of ordinary skill in the art and will not be described in detail herein.
The specific structure of the tendon connector 100 according to an embodiment of the present invention will be described with reference to fig. 2 to 3.
As shown in fig. 2 to 3, the tendon connector 100 of the present embodiment includes an inner connection column 1 and an outer connection platform 2, the inner connection column 1 is provided with an inner connection hole 11, the inner connection hole 11 axially penetrates through the inner connection column 1, the inner connection hole 11 includes a central hole 111 and six surrounding holes 112, the central hole 111 is disposed on a central axis of the inner connection column 1, and the six surrounding holes 112 are disposed at intervals around the central hole 111. One end of the inner connecting column 1 is gradually reduced in diameter toward the other end. The outer joint platform 2 is formed by the outside extension of part periphery wall of inner connecting column 1, and the axial dimension of outer joint platform 2 is less than the axial dimension of inner connecting column 1, is equipped with ten spaced apart outer joint grooves 21 along circumference on the outer joint platform 2, and outer joint groove 21 runs through outer joint platform 2 along the axial, and outer joint groove 21 opens in the one side of keeping away from inner connecting column 1.
In the description herein, references to the description of the terms "some embodiments," "optionally" or "some examples," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims (9)
1. A prestressed tendon connector of a tower cylinder is characterized by comprising:
the inner connecting column is provided with an inner connecting hole which penetrates through the inner connecting column along the axial direction;
the outer joint platform, the outer joint platform by the outside extension of part periphery wall of in-connection post forms, the axial dimension of outer joint platform is less than the axial dimension of in-connection post, the outer joint bench is equipped with a plurality of spaced apart outer spread grooves along circumference, outer spread groove link up along the axial the outer joint platform, outer spread groove is keeping away from one side of in-connection post is opened.
2. The tendon connector of claim 1 wherein the inner connecting column has a diameter that decreases from one end toward the other end.
3. The tendon connector of claim 2, wherein the outer connector block is disposed adjacent to the smaller diameter end of the inner connector post.
4. The tendon connector of claim 1, wherein two outer connection platforms are connected to the outer periphery of the inner connection column, the two outer connection platforms are spaced apart from each other in the axial direction of the inner connection column, and the outer connection platforms are correspondingly disposed to the outer connection platforms.
5. The tendon connector of claim 1, wherein the inner connection aperture includes a central aperture disposed on a central axis of the inner connection post and a plurality of peripheral apertures spaced around the central aperture.
6. The tendon connector of claim 5, wherein the pitch between the plurality of circumferential holes and the central hole is gradually decreased from one end of the inner connecting column to the other end.
7. The tendon connector of claim 1 wherein the inner connecting post is cylindrical and the outer connecting platform is annular.
8. A concrete tower drum, comprising:
the tower comprises a tower body, wherein the tower body comprises a plurality of tower sections which are sequentially connected from bottom to top, and each tower section is provided with a plurality of vertically-through prestressed ducts;
the prestressed cables are respectively arranged in the prestressed ducts, and two ends of each prestressed cable are tensioned and fixed through anchoring devices; wherein,
at least one prestressed cable comprises a lower section cable and an upper section cable, the lower end of the upper section cable and the upper end of the lower section cable are respectively fixed on a prestressed tendon connector in a tensioning manner, and the prestressed tendon connector is the prestressed tendon connector of the tower barrel according to any one of claims 1 to 7.
9. A concrete tower according to claim 8, wherein the upper section of cable is anchored to the outer attachment slot and the lower section of cable is anchored to the inner attachment slot.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822049556.6U CN209469539U (en) | 2018-12-06 | 2018-12-06 | The presstressed reinforcing steel connector of tower and concrete tower with it |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822049556.6U CN209469539U (en) | 2018-12-06 | 2018-12-06 | The presstressed reinforcing steel connector of tower and concrete tower with it |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209469539U true CN209469539U (en) | 2019-10-08 |
Family
ID=68088237
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822049556.6U Active CN209469539U (en) | 2018-12-06 | 2018-12-06 | The presstressed reinforcing steel connector of tower and concrete tower with it |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209469539U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287895A (en) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | Prestressed reinforcement connector of tower barrel and concrete tower barrel with same |
-
2018
- 2018-12-06 CN CN201822049556.6U patent/CN209469539U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287895A (en) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | Prestressed reinforcement connector of tower barrel and concrete tower barrel with same |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20150252580A1 (en) | Tower Construction and a Method for Erecting the Tower Construction | |
US8782966B2 (en) | Base support for wind-driven power generators | |
ES2895967T3 (en) | Foundation for a windmill | |
US11384503B2 (en) | Foundation for a windmill | |
EP2738322B1 (en) | Tower structure | |
US20210222677A1 (en) | Foundation for a windmill | |
US10598154B2 (en) | Wind turbine tower | |
CN108699797A (en) | Bases for wind turbines | |
CN109790695A (en) | Pedestal for wind energy conversion system | |
JP2012533008A (en) | Telescopic tower assembly and method | |
KR20210094617A (en) | Foundation for wind turbine towers | |
ES2885020T3 (en) | Lifting method of a tethered wind turbine tower | |
EP2857614A1 (en) | Concrete tower formed with precast pieces | |
CN108397355B (en) | Pylon and wind power generating set | |
CN209469539U (en) | The presstressed reinforcing steel connector of tower and concrete tower with it | |
CN113047438B (en) | Cable net assembly, building and building construction method | |
CN209469534U (en) | Concrete tower | |
JP6569103B2 (en) | Basic structure of tower structure | |
CN111287895A (en) | Prestressed reinforcement connector of tower barrel and concrete tower barrel with same | |
CN209469537U (en) | The anchoring tower segments and concrete tower of concrete tower | |
CN216922354U (en) | Concrete tower drum | |
CN111287542A (en) | Construction method of concrete tower tube | |
CN222349635U (en) | A prestressed concrete bearing plate with adjustable stiffness | |
CN111287907B (en) | Construction method of concrete tower tube | |
CN111287908B (en) | Construction method of concrete tower tube |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211222 Address after: 200021 room 1001, 10th floor, 138 Huaihai Middle Road, Huangpu District, Shanghai Patentee after: Shanghai Fengling new energy Co.,Ltd. Address before: Room 305, building 4, Nanyou fourth industrial zone, 1124 Nanshan Avenue, Nanshan street, Nanshan District, Shenzhen, Guangdong 518000 Patentee before: SHENZHEN JINGCHUANG HEAVY INDUSTRY SPECIAL ENGINEERING Co.,Ltd. |