CN209469537U - The anchoring tower segments and concrete tower of concrete tower - Google Patents
The anchoring tower segments and concrete tower of concrete tower Download PDFInfo
- Publication number
- CN209469537U CN209469537U CN201822049081.0U CN201822049081U CN209469537U CN 209469537 U CN209469537 U CN 209469537U CN 201822049081 U CN201822049081 U CN 201822049081U CN 209469537 U CN209469537 U CN 209469537U
- Authority
- CN
- China
- Prior art keywords
- tower
- section
- anchoring
- prestressed
- duct
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/72—Wind turbines with rotation axis in wind direction
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E10/00—Energy generation through renewable energy sources
- Y02E10/70—Wind energy
- Y02E10/728—Onshore wind turbines
Landscapes
- Bridges Or Land Bridges (AREA)
Abstract
The utility model discloses a kind of anchoring tower segments of concrete tower and concrete towers, wherein anchoring tower segments are annular, it includes barrel and interior convex edge, at the top of interior convex edge connecting cylinder wall, interior convex edge is extended internally by the part internal perisporium of barrel, it anchors tower segments and is equipped with multiple first prestressed pore passages and multiple second prestressed pore passages, first prestressed pore passage is circumferentially spaced to be arranged and is each provided in barrel, first prestressed pore passage extends upwardly to top surface from barrel bottom surface, the circumferentially spaced setting of second prestressed pore passage, second prestressed pore passage is at least partially disposed in interior convex edge, the lower end of second prestressed pore passage is connected to the first adjacent prestressed pore passage to constitute the branch of the first prestressed pore passage, or second prestressed pore passage lower end extend to barrel bottom surface and mutually indepedent with the first prestressed pore passage.The interior convex edge of the utility model anchoring tower segments can increase local load performance, and can support tower crane device in hoisting process prevents from turning on one's side.
Description
Technical Field
The utility model belongs to the technical field of wind power generation, specifically an anchor tower section of thick bamboo and a concrete tower section of thick bamboo of a concrete tower section of thick bamboo.
Background
Along with the increase of the generating efficiency of the fan, the length of the blade is longer and longer, and the height and the section size of the fan tower barrel matched with the blade are also increased continuously. The steel structure tower barrel is high in cost and difficult to transport, so that the construction requirement of the large-section high tower barrel is difficult to meet. The precast concrete tower barrel can economically build a large-scale wind generating set, so that the precast concrete tower barrel is widely concerned. Due to transportation and prefabrication, a single large section tower is often assembled on site from multiple arc-shaped pieces. And then hoisting the assembled tower barrels from bottom to top in sequence, and finally constructing the complete concrete tower barrel.
The height of the traditional tower is generally 80-120 m, and the wind power generation can generate higher power generation efficiency due to higher wind speed at high altitude, so that the height of the tower needs to be increased, and the hoisting difficulty is increased. When a tower cylinder with extremely high hoisting height is hoisted, a tower crane device with the matched height is needed to be used, and the tower crane device with extremely high height is extremely easy to be inclined in the hoisting process. In order to increase the stability of tower crane device, when one or more concrete tower section of thick bamboo was built and is accomplished, utilize to hold up arm bearing structure and link together concrete tower section of thick bamboo and tower crane device to realize the support of concrete tower section of thick bamboo to the tower crane device, thereby avoid the tower crane device to turn on one's side. However, in the prior art, when the tower crane device is supported by the connecting device arranged on the tower drum, the supporting part of the tower drum generates more lateral loads, so that the tower drum is stressed intensively and is easy to deform, and the structure is required to be strengthened.
SUMMERY OF THE UTILITY MODEL
The utility model discloses aim at solving one of the technical problem that exists among the prior art at least. Therefore, the utility model provides an anchor tower section of thick bamboo of a concrete tower section of thick bamboo, the local pressure-bearing capacity of the anchor tower section of thick bamboo anchor end of a concrete tower section of thick bamboo is big, and is difficult damaged, easily construction.
The utility model discloses still aim at providing the concrete tower section of thick bamboo of the anchor tower section of thick bamboo including above-mentioned concrete tower section of thick bamboo.
According to the embodiment of the present invention, the anchoring tower cylinder section of the concrete tower cylinder is annular, the anchoring tower cylinder section includes a cylinder wall and an inner convex edge, the inner convex edge is connected to the top of the cylinder wall, and the inner convex edge is formed by inward extension of a part of the inner peripheral wall of the cylinder wall, wherein the anchoring tower cylinder section is provided with a plurality of first prestressed ducts and a plurality of second prestressed ducts, and the plurality of first prestressed ducts are arranged at intervals in the circumferential direction, each first prestressed duct is arranged in the cylinder wall, each first prestressed duct extends upward from the bottom surface of the cylinder wall to the top surface of the cylinder wall, and the plurality of second prestressed ducts are arranged at intervals in the circumferential direction, and each second prestressed duct is at least partially arranged in the inner convex edge; the lower end of the second prestressed duct is communicated with the adjacent first prestressed duct to form a branch of the first prestressed duct, or the lower end of the second prestressed duct extends to the bottom surface of the cylinder wall and is independent of the first prestressed duct.
According to the anchoring tower barrel section of the concrete tower barrel, the inner convex edge formed on the barrel wall can be used as a supporting platform during anchoring and is provided with the anchoring device, the anchoring device does not need to be arranged in the barrel wall, and the pouring space of reinforced concrete in the barrel wall is not occupied; and when the anchoring tower barrel section or the tower barrel section on the anchoring tower barrel section is prefabricated, a construction space does not need to be reserved in advance, and the construction is simple. The inner convex edge can increase the local bearing capacity of the anchoring tower cylinder section, increase the local strength, enable the anchoring tower cylinder section to bear more load stress, and increase the safety factor during construction after anchoring the anchoring tower cylinder section. And reinforcing steel bar ropes are respectively added in the first prestressed duct and the second prestressed duct for anchoring, so that the stability of the anchoring tower barrel section can be enhanced, and the connection with other tower barrel sections is increased.
According to the utility model discloses an anchor tower section of thick bamboo of concrete tower section of thick bamboo works as the second prestressed aperture way with first prestressed aperture way is independent each other, every the second prestressed aperture way all with the setting of staggering of first prestressed aperture way in week.
According to the utility model discloses an anchor tower section of thick bamboo of concrete tower section of thick bamboo, first prestressed duct is the even number, the quantity of second prestressed duct does half, per two of the quantity of first prestressed duct is equipped with one between the first prestressed duct the second prestressed duct.
According to the utility model discloses an anchor tower section of thick bamboo of concrete tower section of thick bamboo, in ascending orientation the thickness on protruding edge increases gradually.
According to the utility model discloses an anchor tower section of thick bamboo of concrete tower section of thick bamboo, the interior protruding edge is closed loop shape, the perpendicular cross-section on interior protruding edge is triangle-shaped.
According to the utility model discloses an anchor tower bobbin section of concrete tower section of thick bamboo, section of thick bamboo wall is by including the three-section from bottom to top: the wall thickness of the equal-thickness section is uniform; a transition section connected above the equal thickness section, the transition section extending obliquely in an upward direction toward a central axis of the anchoring tower barrel section; the connecting section is connected above the transition section, and the inner convex edge is connected to the inner peripheral wall of the connecting section.
According to the utility model discloses further embodiment, contained angle less than or equal to 30 degrees between the extending direction of changeover portion and the vertical line.
According to a further embodiment of the present invention, the radial dimension of the inner convex edge is 1-2 times the radial dimension of the cylinder wall.
According to the utility model discloses a concrete tower section of thick bamboo, include: the tower cylinder sections are sequentially connected from bottom to top, each tower cylinder section is provided with a plurality of prestress pore passages which are communicated up and down, at least one tower cylinder section is the anchoring tower cylinder section, the tower cylinder section above the anchoring tower cylinder section is connected to the cylinder wall of the anchoring tower cylinder section, and the number of the prestress pore passages of the tower cylinder section above the anchoring tower cylinder section is equal to the number of the first prestress pore passages on the anchoring tower cylinder section; the prestressed cables are respectively arranged in the prestressed ducts, the bottom end of each prestressed cable is fixed to the bottom of the concrete tower barrel, part of the top of each prestressed cable penetrates through the first prestressed duct and then is fixed to the top of the concrete tower barrel, and part of the top of each prestressed cable penetrates through the second prestressed duct and then is anchored to the anchoring tower barrel section through an anchoring device.
According to the utility model discloses a concrete tower section of thick bamboo sets up anchor tower section of thick bamboo on the whole tower section of thick bamboo, can be with the upper portion anchor end anchor of the prestressed cable that passes from second prestressed duct on anchor tower section of thick bamboo, increases the prestressing force that this tower section of thick bamboo corresponds and the load that the part can bear, can set up connecting device support tower crane device on the anchor tower section of thick bamboo, increases tower crane device's stability, prevents that tower crane device from turning on one's side. The prestressed cable that passes in the first prestressed duct can be connected anchor tower section and other tower sections, further increases the prestressing force of whole tower section of thick bamboo, improves the security of concrete tower section of thick bamboo construction, increases the stability and the intensity of a tower section of thick bamboo.
According to the utility model discloses a concrete tower section of thick bamboo, every the tower section of thick bamboo is prefabricated tower section of thick bamboo section, and is a plurality of the tower section of thick bamboo is assembled to connect and is formed.
Additional aspects and advantages of the invention will be set forth in part in the description which follows and, in part, will be obvious from the description, or may be learned by practice of the invention.
Drawings
The above and/or additional aspects and advantages of the present invention will become apparent and readily appreciated from the following description of the embodiments, taken in conjunction with the accompanying drawings of which:
fig. 1 is a schematic longitudinal sectional structure diagram of a concrete tower tube according to an embodiment of the present invention.
Fig. 2 is a schematic view of a transverse section structure of an anchoring tower tube section through an inner convex edge according to an embodiment of the present invention.
Fig. 3 is a schematic cross-sectional view of a junction tower section according to an embodiment of the present invention.
Fig. 4 is a schematic longitudinal sectional view of a concrete tower according to another embodiment of the present invention.
Fig. 5 is a schematic view of a transverse section of an anchoring tower tube section through an inner convex edge according to another embodiment of the present invention.
Fig. 6 is in an embodiment of the utility model a concrete tower section of thick bamboo is in the support schematic diagram to the tower crane device of hoist and mount construction in-process.
Reference numerals:
anchoring the tower section 100;
a cylinder wall 10;
an inner convex edge 20;
a first pre-stressed duct 30;
a second pre-stressed duct 40;
a tower section 200; engaging the tower section 210;
a pre-stressed duct 50; a third pre-stressed duct 51;
an anchoring device 60;
a concrete tower tube 300; a tower base 310;
a tower crane apparatus 400; a tower crane foundation 410; a tower crane main body 420; a longitudinal truss 421; a horizontal truss 422;
an armrest support structure 500.
Detailed Description
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary only for the purpose of explaining the present invention, and should not be construed as limiting the present invention.
An anchoring tower section 100 of an embodiment of the present invention is described below with reference to fig. 1-6.
According to the utility model discloses anchor tower section of thick bamboo 100 of concrete tower section of thick bamboo, as shown in FIG. 1, FIG. 2, anchor tower section of thick bamboo 100 is the annular, and annular anchor tower section of thick bamboo 100 can reduce building consumptive material, reduce cost under the sufficient condition of support intensity and stress tolerance.
As shown in fig. 1, 2, 4 and 5, the anchoring tower segment 100 includes a wall 10 and an inner ledge 20, the inner ledge 20 is connected to the top of the wall 10, and the inner ledge 20 is formed by a portion of the inner peripheral wall of the wall 10 extending inwardly. The inner ledge 20 here increases the local strength of the top of the anchored barrel section 100, increasing the local stress tolerance.
As shown in fig. 2 and 5, the anchoring tower segment 100 is provided with a plurality of first pre-stressed ducts 30 and a plurality of second pre-stressed ducts 40, the plurality of first pre-stressed ducts 30 are circumferentially spaced apart, each first pre-stressed duct 30 is disposed in the wall 10, and each first pre-stressed duct 30 extends upward from the bottom surface of the wall 10 to the top surface of the wall 10. The first prestressed duct 30 is directly connected to the wall 10 of the anchoring tower segment 100, and when the prestressed cables are additionally arranged in the first prestressed duct 30, the wall 10 has sufficient load stress bearing performance.
A plurality of second pre-stressed ducts 40 are circumferentially spaced apart, and each second pre-stressed duct 40 is at least partially disposed in the inner flange 20, wherein, as shown in fig. 4 and 5, the lower ends of at least some of the second pre-stressed ducts 40 communicate with the adjacent first pre-stressed ducts 30 to form branches of the first pre-stressed ducts 30. It is shown here that the part of the second pre-stressed duct 40 in the wall 10 can be made common to the first pre-stressed duct 30.
In other embodiments, as shown in fig. 1 and 2, the lower end of the second pre-stressed duct 40 extends to the bottom surface of the barrel wall 10 and is independent from the first pre-stressed duct 30. Here, the second pre-stressed duct 40 and the first pre-stressed duct 30 are two independent ducts, and the two ducts do not intersect.
The second prestressed duct 40 may be respectively directly connected to the wall 10 and the inner ledge 20 of the anchoring tower segment 100, and when a prestressed cable is additionally installed in the second prestressed duct 40, the connection between the wall 10 and the inner ledge 20 may be enhanced, and the inner ledge 20 may be anchored, so that a construction space does not need to be reserved in advance when the top of the wall 10 is anchored.
It should be added here that the annular anchoring tower cylinder section 100 of the embodiment of the present invention may be formed by splicing a plurality of prefabricated tower pieces, or may be formed by building a pouring form at a construction site. The manner in which the anchor drum segment 100 is formed is not limited herein. Meanwhile, the ring shape herein includes not only a circular ring shape but also a polygonal ring shape such as a quadrangle, a hexagon, and the like.
In some embodiments of the present invention, as shown in fig. 2, when the second pre-stressed duct 40 is independent from the first pre-stressed duct 30, each second pre-stressed duct 40 is circumferentially staggered from the first pre-stressed duct 30. The two staggered pore canals can be respectively added with prestressed cables, so that more prestress can be applied to the anchoring tower cylinder section 100, the deformation resistance of the anchoring tower cylinder section 100 is improved, and the two staggered pore canals can also reduce the consumable material of the cylinder wall 10.
Accordingly, in some embodiments of the present invention, as shown in fig. 5, when the second pre-stressed duct 40 is formed as a branch of the first pre-stressed duct 30, the first pre-stressed duct 30 with the branch and the first pre-stressed duct 30 without the branch are arranged in a staggered manner. The second prestressed duct 40 required to be arranged for anchoring the tower cylinder section 100 is saved while sufficient side load force is formed.
Alternatively, the second pre-stressed ducts 40 are uniformly circumferentially spaced, and the first pre-stressed ducts 30 are uniformly circumferentially spaced. Easy processing and more uniform material consumption at each position. Of course, in some embodiments of the present invention, the first pre-stressed ducts 30 and the second pre-stressed ducts 40 may be unevenly distributed.
Alternatively, as shown in fig. 2, there are an even number of the first pre-stressed ducts 30, the number of the second pre-stressed ducts 40 is half of the number of the first pre-stressed ducts 30, and one second pre-stressed duct 40 is disposed between every two first pre-stressed ducts 30. Namely, two first pre-stressed ducts 30 and one second pre-stressed duct 40 are arranged at intervals in the circumferential direction on the top transverse section of the cylinder wall 10 and the inner flange 20. Therefore, the number of practical prestressed cables is saved while the prestress applied to the anchoring tower cylinder section 100 is ensured, and the construction cost of the anchoring tower cylinder section 100 is reduced.
Of course, the utility model discloses first prestressing force pore canal 30 also can be odd number, and the quantity of second prestressing force pore canal 40 is the same with the quantity of first prestressing force pore canal 30, and first prestressing force pore canal 30 and second prestressing force pore canal 40 interval evenly set up.
Optionally, the first pre-stressed ducts 30 in the wall 10 below the inner ledge 20 and the part of the second pre-stressed ducts 40 in the wall 10 are parallel to each other, thereby facilitating both the machining of the inner ledge 20 and the future addition of pre-stressed cables.
In some embodiments of the present invention, as shown in fig. 1, the thickness of the inwardly protruding rim 20 increases gradually in an upward direction. Therefore, a platform with a large area is formed at the top of the inner convex edge 20, and the prestressed cable is convenient to anchor.
Optionally, the gradually thickened inner flange 20 is consistent with the extension direction of the second prestressed duct 40 in the inner flange 20. The wall of the second prestressed duct 40 in the inner flange 20 is parallel to the inner wall of the inner flange 20. The prestressed cable is ensured not to damage the inner convex edge 20 when passing through the second prestressed duct 40.
Optionally, the inner flange 20 is in a closed ring shape, and the vertical section of the inner flange 20 is triangular, so that the local pressure-bearing capacity of the inner flange 20 is increased.
In some embodiments of the present invention, the cylinder wall 10 includes three sections from bottom to top: equal thickness section, transition section, linkage segment. Wherein the wall thickness of the equal-thickness section is uniform; the transition section is connected above the equal-thickness section, and the transition section extends obliquely in the upward direction toward the central axis of the anchoring tower cylinder section 100; the connecting section is connected above the transition section, and the inner convex edge 20 is connected on the inner peripheral wall of the connecting section. The cylinder walls 10 with different thicknesses not only meet the bearing requirements of all places, but also save materials. The transition section at the upper part makes it easier to pour concrete when machining the cylinder wall 10.
Optionally, an angle between the extending direction of the transition section and the vertical line is less than or equal to 30 degrees. The included angle determines the distance that the inner flange 20 extends into the inner cavity of the anchoring tower cylinder section 100, and if the included angle is larger than 30 degrees, the distance that the inner flange 20 extends into the inner cavity of the anchoring tower cylinder section 100 is too large, and the space of the inner cavity of the anchoring tower cylinder section 100 is occupied.
Optionally, the radial dimension of the inner ledge 20 is 1-2 times the radial dimension of the barrel wall 10. This multiple further defines the distance that the inner ledge 20 extends beyond the cartridge wall 10 and into the lumenal space. If the inner flange 20 is too thin, the second prestressed duct 40 therein easily punctures the inner flange 20, so that the inner flange 20 is easily broken, and if the inner flange 20 is too thick, the inner cavity of the anchoring tower cylinder section 100 needs to reserve more space, which wastes materials and space.
Optionally, the lower edge of the inner ledge 20 is provided on the transition section and the upper edge of the inner ledge 20 is provided on the connecting section, so that a more stable connection is formed between the inner ledge 20 and the cylinder wall 10. The extension direction of the inner convex edge 20 may be the same as the extension direction of the transition section, so that the processing of the cylinder wall 10 and the inner convex edge 20 is facilitated, and the transition of the second prestressed duct 40 is more natural.
Optionally, an inner ledge 20 is integrally formed on the cartridge wall 10. Construction is convenient, the wholeness is good.
A concrete tower 300 according to an embodiment of the present invention is described below with reference to fig. 1-6.
According to the utility model discloses a concrete tower section of thick bamboo 300, include: a plurality of tower sections 200 and a plurality of prestressing cables (not shown), at least one of the plurality of tower sections 200 being an anchoring tower section 100.
Specifically, as shown in fig. 1, a plurality of tower sections 200 are sequentially connected from bottom to top, and each tower section 200 is provided with a plurality of prestress ducts 50 which are vertically through. Each tower cylinder section 200 can be inserted with a prestressed cable to strengthen the bearing performance of the tower cylinder section; in case two tower segments 200 share one prestressed cable, the connection between the tower segments 200 may also be increased.
The pre-stressed duct 50 of the anchoring tower segment 100 comprises a first pre-stressed duct 30 and a second pre-stressed duct 40, and the tower segment 200 above the anchoring tower segment 100 is connected to the wall 10 of the anchoring tower segment 100. The anchored tower segment 100 provides support for the tower segment 200 above it.
Here, the anchoring drum segment 100 and the drum segment 200 thereon are at the junction, the inner ledge 20 of the anchoring drum segment 100 protruding in radial direction from the inner wall of the upper drum segment 200.
As shown in FIGS. 2 and 3, the number of pre-stressed apertures 50 of the tower segment 200 above the anchored tower segment 100 is equal to the number of first pre-stressed apertures 30 of the anchored tower segment 100.
For convenience of description, hereinafter, the tower segment 200 connected to the anchoring tower segment 100 is defined as a jointed tower segment 210, and the pre-stressed duct 50 in the jointed tower segment 210 is defined as a third pre-stressed duct 51. When the number of the third pre-stressed ducts 51 is the same as that of the first pre-stressed ducts 30, and when the anchoring tower cylinder section 100 is connected with the joint tower cylinder section 210, after pre-stressed cables penetrate through the two ducts, the pre-stressed cables in the first pre-stressed duct 30 can penetrate upwards into one third pre-stressed duct 51, so that the anchoring tower cylinder section 100 is connected with the joint tower cylinder section 210 more tightly, more pre-stress is applied to the concrete tower cylinder 300, and the concrete tower cylinder 300 is firmer after being formed.
The plurality of prestressed cables are respectively arranged in the plurality of prestressed ducts 50, the bottom end of each prestressed cable is fixed at the bottom of the concrete tower tube 300, the top of part of the prestressed cables is fixed at the top of the concrete tower tube 300, and the top of part of the prestressed cables passes through the second prestressed duct 40 and then is anchored on the anchoring tower tube section 100 through the anchoring device 60.
The prestressed cables with different heights are added in different construction stages, so that the safety of the concrete tower tube 300 in different construction stages can be ensured.
The top anchor of prestressed cable is in concrete tower section 300's different positions department, the bottom of prestressed cable is all started from concrete tower section 300's bottom, consequently, tower section 200 and the anchor tower section 100 of bottom have more prestressed cable, the whole bearing capacity of multiplicable bottom tower section 200, make concrete tower section 300's bottom more stable, be difficult for collapsing, in addition, increase between anchor tower section 100 and tower crane device 400 and hold up arm bearing structure 500 and form the connection after, the support to tower crane device 400 can be multiplicable, prevent that tower crane device 400 that the body of the tower is higher from turning on one's side at the in-process of hoist and mount tower section 200, the ability of the excellent local load-bearing of anchor tower section 200, be enough to support tower crane device 400.
After the concrete tower tube 300 is built, the tower crane device 400 and the supporting structure 500 of the supporting arm are removed, the concrete tower tube 300 does not bear side loads any more, and the prestressed cables anchored on the inner convex edges 20 are convenient to remove after later construction is finished.
The prestressed cable anchored at the top of the concrete tower tube 300 can ensure that the concrete tower tube 300 is not inclined, so that the whole structure is more stable.
The anchoring device 60 is provided on the inner flange 20 of the anchoring tower section 100 to anchor the prestressed cable extending from the second prestressed duct 40. The anchoring device 60 does not need to be arranged in the cylinder wall 10, and does not occupy the pouring space of the reinforced concrete in the cylinder wall 10; when the anchoring tower cylinder section 100 or the tower cylinder section 200 thereon is prefabricated or built, a construction space does not need to be reserved for the anchoring device 60 in advance, and construction is simple.
In some embodiments of the present invention, each tower section 200 is a prefabricated tower section, and the plurality of tower sections 200 are assembled and connected to form the prefabricated tower section. The tower cylinder section 200 comprises an anchoring tower cylinder section 100, the anchoring tower cylinder section 100 is a special tower cylinder section 200, the anchoring tower cylinder section 100 solves a series of problems caused by the fact that an anchoring device 60 is required to be arranged at a joint of the conventional tower cylinder section 200, if a construction space is required to be reserved, the positioning is accurate, material supplementing is required, and the arrangement space of internal concrete and reinforcing steel bars is occupied.
The prefabricated tower cylinder section 200 can be prefabricated in real time before being hoisted, and the inconvenience of transportation in the course is avoided. The prefabricated tower sections 200 are sequentially hoisted, connected and anchored from bottom to top until the whole concrete tower 300 is completely constructed. Where anchoring of concrete tower drum 300 is desired, i.e., where support for tower crane apparatus 400 is desired, anchoring drum segments 100 having inwardly projecting rims 20 are used in place of conventional engagement drum segments 210.
Alternatively, as shown in fig. 1, 2, 3, 4 and 5, the third pre-stressed duct 51 of the joint cylinder section 210 is arranged corresponding to the first pre-stressed duct 30 of the anchoring cylinder section 100, so as to facilitate the alignment of the pre-stressed ducts 50 of the two cylinder sections 200.
To better understand the solution of the embodiment of the present invention, the structure of the anchoring tower tube section 100 and the concrete tower tube 300 according to an embodiment of the present invention will be described below with reference to fig. 1 to 6.
As shown in fig. 1 and 2, the anchoring tower cylinder section 100 of the present embodiment includes three sections of cylinder walls 10 with different thicknesses and an inner ledge 20 connected to the top of the cylinder walls 10. Wherein, section of thick bamboo wall 10 includes from bottom to top: uniform wall thickness section, transition section and connecting section. The transition section extends obliquely in an upward direction towards the central axis of the anchoring tower section 100, and the included angle between the extending direction of the transition section and the vertical line is 30 degrees. The connecting section is connected above the transition section, the inner convex edge 20 is connected on the inner peripheral wall of the connecting section, and the thickness of the inner convex edge 20 is gradually increased in the direction in which the inner convex edge 20 is consistent with the extending direction of the transition section.
A first prestressed duct 30 extends in the axial direction in the cylinder wall 10. On the closed-loop radial section of the cylinder wall 10, the first pre-stressed ducts 30 are arranged at regular intervals in the circumferential direction, and the first pre-stressed ducts 30 are close to the outer wall of the cylinder wall 10. The first pre-stressed ducts 30 extend through the bottom and top surfaces of the cartridge wall 10.
Second prestressed ducts 40 are provided in the cylinder wall 10 and the inner flange 20. As shown in fig. 1 and 2, the second prestressed duct 40 is parallel to the first prestressed duct 30 in the wall 10 and extends in the same direction; the portion of the second pre-stressing channel 40 in the inner flange 20 extends upward and protrudes from the top surface of the inner flange 20.
As shown in fig. 4 and 5, the second pre-stressed duct 40 is shared by the first pre-stressed duct 30 adjacent to the second pre-stressed duct 40 in the wall 10, and the part of the second pre-stressed duct 40 in the inner flange 20 extends upward and protrudes from the top surface of the inner flange 20.
As shown in fig. 2, the second pre-stressed duct 40 is disposed between two first pre-stressed ducts 30, and one second pre-stressed duct 40 is disposed every other first pre-stressed duct 30.
As shown in FIG. 5, the second pre-stressed ducts 40 are arranged adjacent to one of the first pre-stressed ducts 30, and the portion of the second pre-stressed duct 40 located in the wall 10 communicates with the adjacent first pre-stressed duct 30, and one second pre-stressed duct 40 communicates with one first pre-stressed duct 30 every other first pre-stressed duct 30.
It should be added here that, the concrete tower drum 300 of the embodiment of the present invention may be a tower drum for wind power generation, a tower drum for thermal power generation, and a tower drum for chemical field application, and is not limited here.
As shown in fig. 1 and 3, the concrete tower drum 300 of the present embodiment includes two prefabricated tower drum sections 200 and a plurality of prestressed cables, and one of the two tower drum sections 200 is an anchoring tower drum section 100.
Tower section 200, which is connected to anchor tower section 100, is a jointed tower section 210. The joint cylinder section 210 is provided with third pre-stressed ducts 51 corresponding to the first pre-stressed ducts 30 of the anchoring cylinder section 100 in position and in the same number. A plurality of prestressed cables are respectively drawn into the first prestressed duct 30 and the third prestressed duct 51 to communicate with each other. The periphery of the inner wall of the engagement tower section 210 falls on the inner ledge 20, and the inner ledge 20 protrudes from the inner wall of the engagement tower section 210.
The second prestressed duct 40 is also provided with a prestressed cable.
The bottom ends of the prestressed cables in the first prestressed duct 30 and the second prestressed duct 40 are fixed to the bottom of the concrete tower 300. After the first prestressed duct 30 and the third prestressed duct 51 are aligned, the top of the prestressed cable in each prestressed duct 50 is fixed to the top of the concrete tower 300; the top of the prestressed cable in the second prestressed duct 40 passes through the second prestressed duct 40 and is anchored to the inner flange 20 by the anchoring device 60.
The construction method of the concrete tower drum 300 according to an embodiment of the present invention is described below with reference to fig. 6, and the supporting function of the concrete tower drum 300 on the tower crane apparatus 400 during the hoisting construction is explained.
S1: building a tower crane foundation 410 and a tower foundation 310 on the ground;
s2: a tower crane main body 420 is installed on a tower crane foundation 410, the tower crane main body 420 comprises a longitudinal truss 421 and a horizontal truss 422, the longitudinal truss 421 is vertically fixed on the tower crane foundation 410, the horizontal truss 422 is horizontally arranged and connected to the longitudinal truss 421, a crane capable of sliding along the horizontal truss 422 is arranged on the horizontal truss 422, and the longitudinal truss 421 is installed to reach a first preset height;
s3: hoisting the prefabricated member to a tower drum foundation 310 by using a crane to form an annular tower drum section 200, wherein the tower drum section 200 is positioned on one horizontal side of a tower crane main body 420, the prefabricated member is annular or flaky, when the prefabricated member is flaky, a plurality of prefabricated members are hoisted to form an annular shape, and the central axis of the tower drum section 200 is vertically arranged;
s4: after each tower cylinder section 200 is hoisted, another tower cylinder section 200 is hoisted upwards until a tower cylinder main body 120 is formed; wherein, at least one tower section 200 is for holding up arm tower section, holds up and is connected with between arm tower section and the longitudinal truss 421 and holds up arm bearing structure 500: wherein,
in step S4, after each crane jib tower section is hoisted, the crane jib support structure 500 is installed first, and then another tower section 200 is hoisted above the crane jib tower section; the supporting arm tower barrel section can be an anchoring tower barrel section 100 or a joint tower barrel section 210 connected with the anchoring tower barrel section 100, and an anchoring device 60 for fixing a prestressed cable is arranged on the anchoring tower barrel section 100; after each anchoring tower drum section 100 is hoisted, the prestressed cables are stretched and fixed between the anchoring device 60 and the tower drum foundation 310, and then the other tower drum section 200 is hoisted upwards.
S5: after the entire concrete tower drum 300 is hoisted, the tower crane apparatus 400 and the outrigger support structure 500 are removed, as well as the pre-stressed cables anchored to the anchored tower drum section 100.
Because the tower crane device 400 is higher, in the hoisting process, the supporting arm supporting structure 500 is installed to be connected with the tower crane device 400 every time the concrete tower barrel 300 with a certain distance is built, and the tower barrel section 200 provided with the supporting arm supporting structure 500 is the anchoring tower barrel section 100 or the joint tower barrel section 210 adjacent to the anchoring tower barrel section 100, so that a larger lateral load can be borne, and the stability of the tower crane device 400 in the hoisting process is ensured.
In the description of the present invention, it is to be understood that the terms "thickness", "upper", "lower", "vertical", "top", "bottom", "inner", "outer", "axial", "radial", "circumferential", and the like, indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are used merely for convenience of description and for simplicity of description, and do not indicate or imply that the device or element so referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Furthermore, features defined as "first," "second," and "third" may explicitly or implicitly include one or more of the features for distinguishing between descriptive features, non-sequential, and non-trivial.
In the description of the present invention, "a plurality" means two or more unless otherwise specified.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted" and "connected" are to be interpreted broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; either mechanically or electrically. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Two tower sections 200 are shown in fig. 1 for illustrative purposes, but it is obvious to those skilled in the art after reading the above technical solutions that the solution can be applied to three or more tower sections 200, which also falls within the protection scope of the present invention.
The connection between the anchoring tower section of the concrete tower drum and the tower section 200 of the concrete tower drum, as well as the operations of pre-stressing cables, anchoring and the like according to the embodiments of the present invention are known to those skilled in the art and will not be described in detail herein.
In the description herein, references to the description of the terms "one embodiment," "some embodiments," "a specific embodiment," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
While embodiments of the present invention have been shown and described, it will be understood by those of ordinary skill in the art that: various changes, modifications, substitutions and alterations can be made to the embodiments without departing from the principles and spirit of the invention, the scope of which is defined by the claims and their equivalents.
Claims (10)
1. An anchoring tower barrel section of a concrete tower barrel is characterized in that the anchoring tower barrel section is annular, the anchoring tower barrel section comprises a barrel wall and an inner convex edge, the inner convex edge is connected with the top of the barrel wall, the inner convex edge is formed by inwards extending partial inner peripheral walls of the barrel wall, wherein,
a plurality of first prestressed ducts and a plurality of second prestressed ducts are arranged on the anchoring tower section, and
the first prestressed ducts are circumferentially spaced, each first prestressed duct is arranged in the cylinder wall, and each first prestressed duct extends upwards from the bottom surface of the cylinder wall to the top surface of the cylinder wall, and
the second prestressed ducts are arranged at intervals along the circumferential direction, and each second prestressed duct is at least partially arranged in the inner convex edge; wherein,
the lower end of the second prestressed duct is communicated with the adjacent first prestressed duct to form a branch of the first prestressed duct, or the lower end of the second prestressed duct extends to the bottom surface of the cylinder wall and is independent of the first prestressed duct.
2. A concrete drum segment as claimed in claim 1, wherein each of the second pre-stressed ducts is circumferentially offset from the first pre-stressed duct when the second pre-stressed duct is independent from the first pre-stressed duct.
3. A concrete drum anchoring segment as claimed in claim 1, wherein the number of said first pre-stressed ducts is an even number, the number of said second pre-stressed ducts is half the number of said first pre-stressed ducts, and one said second pre-stressed duct is provided between every two said first pre-stressed ducts.
4. An anchoring tower segment for a concrete tower according to claim 1, wherein the thickness of the inner ledge increases gradually in an upward direction.
5. An anchoring tower segment for a concrete tower drum according to claim 4, wherein the inner ledge is closed loop shaped and has a triangular vertical cross-section.
6. An anchoring tower drum section for a concrete tower drum according to claim 1, characterized in that said drum wall comprises, from bottom to top, three sections:
the wall thickness of the equal-thickness section is uniform;
a transition section connected above the equal thickness section, the transition section extending obliquely in an upward direction toward a central axis of the anchoring tower barrel section;
the connecting section is connected above the transition section, and the inner convex edge is connected to the inner peripheral wall of the connecting section.
7. An anchoring tower segment for a concrete tower according to claim 6, wherein the transition section extends at an angle of 30 degrees or less from vertical.
8. An anchoring tower drum section for a concrete tower drum according to claim 6, wherein the radial dimension of the inner ledge is 1-2 times the radial dimension of the drum wall.
9. A concrete tower drum, comprising:
a plurality of tower barrel sections which are sequentially connected from bottom to top, wherein each tower barrel section is provided with a plurality of prestress pore passages which are communicated from top to bottom, at least one tower barrel section is an anchoring tower barrel section according to any one of claims 1 to 8, the tower barrel section above the anchoring tower barrel section is connected to the barrel wall of the anchoring tower barrel section, and the number of the prestress pore passages of the tower barrel section above the anchoring tower barrel section is equal to the number of the first prestress pore passages on the anchoring tower barrel section;
the prestressed cables are respectively arranged in the prestressed ducts, the bottom end of each prestressed cable is fixed to the bottom of the concrete tower barrel, part of the top of each prestressed cable penetrates through the first prestressed duct and then is fixed to the top of the concrete tower barrel, and part of the top of each prestressed cable penetrates through the second prestressed duct and then is anchored to the anchoring tower barrel section through an anchoring device.
10. A concrete tower drum according to claim 9, wherein each tower drum section is a prefabricated tower drum section, and a plurality of the tower drum sections are assembled and connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822049081.0U CN209469537U (en) | 2018-12-06 | 2018-12-06 | The anchoring tower segments and concrete tower of concrete tower |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201822049081.0U CN209469537U (en) | 2018-12-06 | 2018-12-06 | The anchoring tower segments and concrete tower of concrete tower |
Publications (1)
Publication Number | Publication Date |
---|---|
CN209469537U true CN209469537U (en) | 2019-10-08 |
Family
ID=68088925
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201822049081.0U Active CN209469537U (en) | 2018-12-06 | 2018-12-06 | The anchoring tower segments and concrete tower of concrete tower |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN209469537U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287899A (en) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | Anchoring tower barrel section of concrete tower barrel and concrete tower barrel |
-
2018
- 2018-12-06 CN CN201822049081.0U patent/CN209469537U/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111287899A (en) * | 2018-12-06 | 2020-06-16 | 深圳京创重工特种工程有限公司 | Anchoring tower barrel section of concrete tower barrel and concrete tower barrel |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US8555600B2 (en) | Method for mounting in sections an annular tower for wind power generator, heliostatic power generator or chimney composed from three concrete segments or more | |
EP2215320B1 (en) | Segmented concrete tower for wind power generators and method of erecting thereof | |
EP1474579B1 (en) | Wind turbine | |
US20190136566A1 (en) | Hybrid concrete - composite tower for a wind turbine and method of manufacturing | |
CA2823814C (en) | Mounting assembly and method to erect in sections an annular tower for wind or heliostatic power generators in an energy farm | |
CN114351751A (en) | A lightweight prefabricated wind power structure foundation and its assembly method | |
CN111287538A (en) | Tower drum | |
CN209469537U (en) | The anchoring tower segments and concrete tower of concrete tower | |
CN209469534U (en) | Concrete tower | |
CN205936983U (en) | A external prestress concrete tower section of thick bamboo | |
CN110657071B (en) | Precast concrete fan tower barrel, tower barrel component and connecting method | |
CN110395494B (en) | Split type storage tank and assembly method thereof | |
CN111287899A (en) | Anchoring tower barrel section of concrete tower barrel and concrete tower barrel | |
CN211116420U (en) | Precast concrete fan tower section of thick bamboo and tower section of thick bamboo component | |
CN209469539U (en) | The presstressed reinforcing steel connector of tower and concrete tower with it | |
CN111287459B (en) | Construction method of anchoring tower barrel section | |
CN111287908B (en) | Construction method of concrete tower tube | |
CN111287457B (en) | Construction method of anchoring tower barrel section | |
CN209779668U (en) | Two unification pile foundations of heliostat stand and basis | |
CN210317607U (en) | Prefabricated tower section of thick bamboo section and tower section of thick bamboo that has it | |
CN106545471A (en) | The construction construction method of tower | |
CN220769631U (en) | Prefabricated concrete double-truss fan lifting base | |
CN111287542A (en) | Construction method of concrete tower | |
CN214783872U (en) | Prefabricated tubular pile convenient to hoist and mount | |
CN111287458B (en) | Construction method of anchoring tower barrel section |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20211214 Address after: 200021 room 1001, 10th floor, 138 Huaihai Middle Road, Huangpu District, Shanghai Patentee after: Shanghai Fengling new energy Co.,Ltd. Address before: Room 305, building 4, Nanyou fourth industrial zone, 1124 Nanshan Avenue, Nanshan street, Nanshan District, Shenzhen, Guangdong 518000 Patentee before: SHENZHEN JINGCHUANG HEAVY INDUSTRY SPECIAL ENGINEERING Co.,Ltd. |
|
TR01 | Transfer of patent right |