CN208763685U - A kind of shield machine construction cooling system - Google Patents

A kind of shield machine construction cooling system Download PDF

Info

Publication number
CN208763685U
CN208763685U CN201821744714.3U CN201821744714U CN208763685U CN 208763685 U CN208763685 U CN 208763685U CN 201821744714 U CN201821744714 U CN 201821744714U CN 208763685 U CN208763685 U CN 208763685U
Authority
CN
China
Prior art keywords
water
shield machine
cooler
machine construction
cooling system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201821744714.3U
Other languages
Chinese (zh)
Inventor
刘辉
孙成伟
金德成
李应战
罗忠
张立
占凡
严文平
周海斌
陆玉宙
刘正伟
刘洪斌
刘广
徐菁
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Two Bureau Engineering Co Ltd
Shenzhen Hongda Weiye Mechanical And Electrical Equipment Co Ltd
China Railway No 2 Engineering Group Co Ltd Chengtong Branch
China Railway Guangzhou Construction Co Ltd
Original Assignee
China Railway Two Bureau Engineering Co Ltd
Shenzhen Hongda Weiye Mechanical And Electrical Equipment Co Ltd
China Railway Guangzhou Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Two Bureau Engineering Co Ltd, Shenzhen Hongda Weiye Mechanical And Electrical Equipment Co Ltd, China Railway Guangzhou Construction Co Ltd filed Critical China Railway Two Bureau Engineering Co Ltd
Priority to CN201821744714.3U priority Critical patent/CN208763685U/en
Application granted granted Critical
Publication of CN208763685U publication Critical patent/CN208763685U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

The utility model discloses a kind of shield machine construction cooling systems, including trolley vehicle frame, water cooler, surface air cooler and cooling tower;Water cooler is arranged on trolley vehicle frame, ventilating duct is provided on trolley vehicle frame, surface air cooler is set in ventilating duct;Water cooler has freezing water outlet, freezing water return outlet, circulating outlet and is recycled back to the mouth of a river;Surface air cooler is connected between freezing water outlet and freezing water return outlet, circulating outlet and is recycled back between the mouth of a river and is connected with cooling tower.The shield machine construction cooling system of the utility model is chilled water to circulating water cooling processing using water cooler, chilled water introducing surface air cooler cools down the wind in ventilating duct, to cool down to shield machine construction environment, and recirculated water can carry out cooling down by the heat exchange with cooling tower, to which the heat of shield machine construction environment is transferred to outside, it can be relieved the damp and hot degree of construction environment, solve the problems, such as that the cooling system cooling effect of the shield machine of the prior art is poor.

Description

A kind of shield machine construction cooling system
Technical field
The utility model relates to shield machine technical fields, more particularly to a kind of shield machine construction cooling system.
Background technique
With quickly propelling for China's urbanization, Urban Rail Transit Development is swift and violent, and subway construction is like a raging fire.Shield machine It is the large-scale construction equipment in constructing metro tunnel, complete machine power is big, heat source is more, can generate a large amount of heat in the construction process Amount, in addition the humidity of the underground space forms damp and hot severe construction environment, produces a series of adverse effect.
During shield method track construction, for shield machine total installed capacity power generally all in 1400KW or so, it will in a steady stream not Disconnected real estate heat amount;The circulating chilled water of shield machine itself takes partial heat out of to tunnel outer, and considerable part heat still discharges In the construction site of shield machine.When outdoor environment temperature reaches 35 DEG C or so, the environment temperature around shield machine be can achieve 40 DEG C even 45 DEG C, under such hot environment, staff will also be constructed by manual labor, not can guarantee safe life It produces.
Currently, generalling use the method temporarily to cool down in the construction process:
1, individual protection cooling: construction personnel dresses cooling vest, cooling cap or uses common refrigerator-freezer, mineral water bottle, modeling Material bag, which is poured water, makes ice cube, is used for individual protection.
2, ice block cooling: heat is transmitted using the heat of solution and mixture of ice and water and neighbouring Air Temperature Difference of ice.Due to melting Speed of icing is slow, and heat exchange influence air range is small, and air parameter is uncontrollable, therefore can only be as interim cooling method.
3, spray sprinkler cools down: connecing high-pressure blast using sprayer and high pressure water carries out spray sprinkler operation, and then cool down.This The problem of method can make the environment of script high humidity, and humidity is higher, not can effectively solve high temperature and humidity.
4, increase air quantity cooling: main to pass through the water system of shield machine itself, out slag system in shield method tunnel construction System, ventilating system carry out most heat.Ventilation is to influence the final means of tunnel temperature, because ventilation being capable of direct shadow The temperature of construction personnel's skin sensing is rung, but ventilation volume again cannot be infinitely great, is primarily due to:
(1) increasing air quantity just will increase wind speed, on the one hand increases the pressure loss and causes to waste, another aspect wind speed is more than When 1.5-2m/s, the dust in tunnel can be blown afloat, influences the health of worker;
(2) power of blower and air quantity are three cubed relationships, and air quantity increases power of fan and becomes larger therewith;
(3) after air quantity reaches corresponding numerical value, it is further added by air quantity, the effect of cooling but gradually weakens, at this time can be significant The factor of cooling is intake air temperature, rather than air inflow.
In conclusion the cooling effect of the cool-down method of existing shield machine construction process is all extremely limited, and pass through increasing The method of Wind Volume can also significantly increase power and cause energy consumption, or even influence the health of construction personnel, therefore, more next More need that a kind of structure is simple, low energy consumption, the shield machine construction cooling system of good cooling effect.
Utility model content
Based on this, the purpose of the utility model is to provide a kind of structures simply, low energy consumption, the shield of good cooling effect Machine construction cooling system.
A kind of shield machine construction cooling system, including trolley vehicle frame, water cooler, surface air cooler and cooling tower;
The water cooler is arranged on the trolley vehicle frame, ventilating duct is provided on the trolley vehicle frame, the table is cold Device is set in the ventilating duct;
The water cooler has freezing water outlet, freezing water return outlet, circulating outlet and is recycled back to the mouth of a river;The freezing It is connected with the surface air cooler between water outlet and the freezing water return outlet, the circulating outlet and being recycled back between the mouth of a river connects There is the cooling tower.
The shield machine construction cooling system of the utility model is cold by setting water cooler, surface air cooler and cooling tower, utilization Water dispenser group is chilled water to circulating water cooling processing, and chilled water introducing surface air cooler cools down the wind in ventilating duct, thus Cool down to shield machine construction environment, and recirculated water can carry out cooling down by the heat exchange with cooling tower, thus The heat of shield machine construction environment is transferred to outside, the damp and hot degree of construction environment can be relieved, solve existing skill The problem of the cooling system cooling effect difference of the shield machine of art.
It is further preferred that air supply tube and booster fan are additionally provided in the ventilating duct, the air supply tube and pressurization wind Machine is located at the two sides of the surface air cooler.The air supply tube can drain into wind in ventilating duct;The booster fan can be with For pressurizeing to the wind in ventilating duct, accelerates the circulation of wind, to improve the heat exchange of wind and surface air cooler, can obviously drop The temperature of low wind.
It is further preferred that the air supply tube is canvas air supply tube.Canvas air supply tube has structure is simple, facilitates installation etc. Feature.
It is further preferred that the water cooler and the surface air cooler are located at trolley vehicle frame tail portion;The trolley vehicle Multiple wheels are provided on frame.The water cooler and the surface air cooler are set to trolley vehicle frame tail portion, facilitate installation And it is not take up the construction space of shield machine front.
It is further preferred that the surface air cooler be it is multiple, multiple surface air coolers be connected in series and along the ventilating duct according to Secondary setting.By the way that multiple surface air coolers are arranged, the heat transfer effect with wind in ventilating duct can be improved, reduce the temperature of wind.
It is further preferred that the water cooler includes evaporator, compressor and condenser interconnected, the evaporation Device has the freezing water outlet and the freezing water return outlet, and the condenser is with the circulating outlet and described is recycled back to The mouth of a river.By the evaporator, compressor and condenser, recirculated water is freezed at chilled water, to be transported to surface air cooler to wind Cool down.
It is further preferred that the water cooler further includes filter and expansion valve, the condenser is successively through the mistake Filter and the expansion valve are connect with the evaporator.The filter can be flowed into evaporator to from the condenser Condensed water is filtered;The expansion valve makes the liquid refrigerant of medium temperature high pressure pass through its wet steaming of the throttling as low-temp low-pressure Vapour, then refrigerant absorbs heat in the evaporator and reaches refrigeration effect.
It is further preferred that the shield machine construction cooling system further includes freezing back water pump, the freezing back water pump is solid Due on the trolley vehicle frame, the surface air cooler is connect through the freezing back water pump with the freezing water return outlet of the evaporator.Institute Stating freezing back water pump can be withdrawn into the chilled water after exchanging heat in surface air cooler in the evaporator of the water cooler.
It is further preferred that the shield machine construction cooling system further includes cooling force (forcing) pump, the cooling force (forcing) pump is solid Due on the trolley vehicle frame, the circulating outlet of the condenser is connect through the cooling force (forcing) pump with the cooling tower.Institute Stating cooling force (forcing) pump can will cool down in the suction of the recirculated water in the condenser cooling tower.
Compared with the existing technology, the shield machine construction cooling system of the utility model passes through setting water cooler, surface air cooler And cooling tower, it is chilled water to circulating water cooling processing using water cooler, chilled water is introduced into surface air cooler in ventilating duct Wind is cooled down, to cool down to shield machine construction environment, and recirculated water can by the heat exchange with cooling tower into Row cooling down can be relieved the damp and hot journey of construction environment so that the heat of shield machine construction environment is transferred to outside Degree, solves the problems, such as that the cooling system cooling effect of the shield machine of the prior art is poor.The shield machine construction of the utility model drops Warm system has the characteristics that structure is simple, low energy consumption, good cooling effect.
In order to better understand and implement, according to the present invention will be described in detail below with reference to the accompanying drawings.
Detailed description of the invention
Fig. 1 is the structural schematic diagram of the shield machine construction cooling system preferred structure of the utility model.
Fig. 2 is the side view of the shield machine construction cooling system preferred structure of the utility model.
Fig. 3 is the shield machine construction cooling system preferred structure connection schematic diagram of the utility model.
Fig. 4 is the main view of water cooler.
Fig. 5 is the side view of water cooler.
Fig. 6 is the effect diagram of the shield machine construction cooling system a certain embodiment cooling front and back of the utility model.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc. Positional terms are defined relative to each construction shown in the drawings, they are opposite concepts.Therefore, it is possible to can root Correspondingly changed according to different location locating for it, different use states.So also should not be by these or others side Position term is construed to restricted term.
Please refer to Fig. 1-Fig. 3.Fig. 1 is the structural representation of the shield machine construction cooling system preferred structure of the utility model Figure.Fig. 2 is the side view of the shield machine construction cooling system preferred structure of the utility model.Fig. 3 is the shield of the utility model Machine construction cooling system preferred structure connection schematic diagram.
The shield machine construction cooling system of the utility model, including trolley vehicle frame 1, water cooler 2, surface air cooler 3 and cooling Tower 4.The water cooler 2 is arranged on the trolley vehicle frame 1, and ventilating duct, the surface air cooler are provided on the trolley vehicle frame 1 3 are set in the ventilating duct.
The water cooler 2 has freezing water outlet, freezing water return outlet, circulating outlet and is recycled back to the mouth of a river;It is described cold Freeze between water outlet and the freezing water return outlet and be connected with the surface air cooler 3, the circulating outlet and is recycled back between the mouth of a river It is connected with the cooling tower 4.
Specifically, the water cooler 2 and the surface air cooler 3 are located at 1 tail portion of trolley vehicle frame.By the water cooler 2 and the surface air cooler 3 be set to 1 tail portion of trolley vehicle frame, facilitate installation and be not take up the construction space of shield machine front.Institute It states and is provided with multiple wheels on trolley vehicle frame 1.
Further referring to Fig. 4 and Fig. 5.Fig. 4 is the main view of water cooler.Fig. 5 is the side view of water cooler.
The embodiment of the present invention water cooler 2 includes evaporator 21 interconnected, compressor 22 and condenser 23, described Evaporator 21 has the freezing water outlet and the freezing water return outlet, and the condenser 23 has the circulating outlet and institute It states and is recycled back to the mouth of a river.By the evaporator 21, compressor 22 and condenser 23, recirculated water is freezed at chilled water, thus defeated Surface air cooler 3 is sent to cool down to wind.
Preferably, the water cooler 2 further includes filter 24 and expansion valve 25, and the condenser 23 is successively through the mistake Filter 24 and the expansion valve 25 are connect with the evaporator 21.The filter 24 can be flowed into from the condenser 23 Condensed water in evaporator 21 is filtered;The expansion valve 25 makes the liquid refrigerant of medium temperature high pressure become low by its throttling The moist steam of warm low pressure, then refrigerant absorbs heat in the evaporator 21 and reaches refrigeration effect.
The shield machine construction cooling system further includes freezing back water pump 9, and the freezing back water pump 9 is fixed on the trolley On vehicle frame 1, the surface air cooler 3 is connect through the freezing back water pump 9 with the freezing water return outlet of the evaporator 21.It is described to freeze back Chilled water after exchanging heat in surface air cooler 3 can be withdrawn into the evaporator 21 of the water cooler 2 by water pump 9.
The shield machine construction cooling system further includes cooling force (forcing) pump 5, and the cooling force (forcing) pump 5 is fixed on the trolley On vehicle frame 1, the circulating outlet of the condenser 23 is connect through the cooling force (forcing) pump 5 with the cooling tower 4.The cooling adds Recirculated water in condenser 23 can be pumped into the cooling tower 4 and cool down by press pump 5.
Preferably, air supply tube 6 and booster fan 7, the air supply tube 6 and booster fan 7 are additionally provided in the ventilating duct It is located at the two sides of the surface air cooler 3.The air supply tube 6 can drain into wind in ventilating duct;The booster fan 7 can be with For pressurizeing to the wind in ventilating duct, accelerate the circulation of wind, so that the heat exchange of wind Yu surface air cooler 3 is improved, it can be obvious Reduce the temperature of wind.
The ventilating duct can make full use of the original supply air system of shield machine to be configured.The embodiment of the present invention air-supply Pipe 6 is preferably set to canvas air supply tube.Canvas air supply tube has the characteristics that structure is simple, facilitates installation.
It is further preferred that the surface air cooler 3 be it is multiple, multiple surface air coolers 3 are connected in series and along the ventilating ducts It sets gradually.By the way that multiple surface air coolers 3 are arranged, the heat transfer effect with wind in ventilating duct can be improved, reduce the temperature of wind.
The embodiment of the present invention shield machine construction cooling system is preferably provided with distance host control cabinet 8, described remote Journey host control cabinet 8 is fixed on the trolley vehicle frame 1, and the distance host control cabinet 8 is connect with 2 signal of water cooler It is run with controlling the water cooler 2.The distance host control cabinet 8 can carry out the operation of the water cooler 2 automatic Control.
Since the model of shield machine, service life, soil layer construction are different, the environment temperature of different regions also has difference Different, therefore, the shield machine construction cooling system of the utility model should follow design principle below:
Ventilation volume can be calculated according to personnel, electric welding, gas dilution, exhaust gas dilution, minimum air quantity etc..Ventilation system Cooling capacity=thermal power heat production+dregs agitation friction heat production-outer loop water-cooled-is slagged tap heat dissipation.It can be according to refrigerating capacity and peace Holding position makes nonstandardization design to the water cooler.Surface air cooler is designed according to air quantity, wind pressure and refrigeration cooling capacity.
It should be pointed out that the cooling tower 4 of the shield machine construction cooling system of the utility model can be existing with shield machine Cooling circulating water system share, in this way, enforcement difficulty can be substantially reduced, reduce the cost of implementation.
The thermodynamical equilibrium that the shield machine construction cooling system of the utility model can balance each other according to heat production and heat dissipation is former Reason carries out nonstandardized technique design to each portion, and the final goal of design can make the workspace sendible temperature of shield machine reach 28 DEG C or so.
Referring to Fig. 6, Fig. 6 is the effect of the shield machine construction cooling system a certain embodiment cooling front and back of the utility model Schematic diagram.
It will be appreciated from fig. 6 that the mean temperature before pipe sheet assembling platform and connecting bridge cooling is 35 DEG C;Pipe sheet assembling platform and company Mean temperature after connecing bridge cooling is 28 DEG C;Minimum temperature after the cooling of pipe sheet assembling platform is up to 25.5 DEG C.
The requirement for being 28 DEG C according to constructing tunnel temperature as defined in middle iron " railway tunnel construction specification ", this embodiment result Fully meet design requirement and construction requirement.
Therefore, the high temperature that the shield machine construction cooling system of the utility model solves in tunneling shield work progress is asked Topic, provides a pleasant working environment for construction personnel, provides guarantee for safety in production.
Compared with the existing technology, the shield machine construction cooling system of the utility model passes through setting water cooler, surface air cooler And cooling tower, it is chilled water to circulating water cooling processing using water cooler, chilled water is introduced into surface air cooler in ventilating duct Wind is cooled down, to cool down to shield machine construction environment, and recirculated water can by the heat exchange with cooling tower into Row cooling down can be relieved the damp and hot journey of construction environment so that the heat of shield machine construction environment is transferred to outside Degree, solves the problems, such as that the cooling system cooling effect of the shield machine of the prior art is poor.The shield machine construction of the utility model drops Warm system has the characteristics that structure is simple, low energy consumption, good cooling effect.
Above-described embodiments merely represent several embodiments of the utility model, the description thereof is more specific and detailed, But it cannot be understood as the limitations to utility model patent range.It should be pointed out that for the common skill of this field For art personnel, without departing from the concept of the premise utility, various modifications and improvements can be made, these are belonged to The protection scope of the utility model.

Claims (9)

1. a kind of shield machine construction cooling system, it is characterised in that: including trolley vehicle frame, water cooler, surface air cooler and cooling tower;
The water cooler is arranged on the trolley vehicle frame, ventilating duct is provided on the trolley vehicle frame, the surface air cooler is set It is placed in the ventilating duct;
The water cooler has freezing water outlet, freezing water return outlet, circulating outlet and is recycled back to the mouth of a river;The freezing water outlet Mouthful the surface air cooler is connected between the freezing water return outlet, the circulating outlet and being recycled back between the mouth of a river connects State cooling tower.
2. shield machine construction cooling system according to claim 1, it is characterised in that: be additionally provided with and send in the ventilating duct Air hose and booster fan, the air supply tube and booster fan are located at the two sides of the surface air cooler.
3. shield machine construction cooling system according to claim 2, it is characterised in that: the air supply tube is canvas air-supply Pipe.
4. shield machine construction cooling system according to claim 2, it is characterised in that: the water cooler and the table are cold Device is located at trolley vehicle frame tail portion;Multiple wheels are provided on the trolley vehicle frame.
5. shield machine construction cooling system according to claim 2, it is characterised in that: the surface air cooler be it is multiple, it is multiple The surface air cooler is connected in series and sets gradually along the ventilating duct.
6. shield machine construction cooling system according to claim 1-5, it is characterised in that: the water cooler packet Evaporator, compressor and condenser interconnected are included, the evaporator has the freezing water outlet and the freezing return water Mouthful, the condenser has the circulating outlet and described is recycled back to the mouth of a river.
7. shield machine construction cooling system according to claim 6, it is characterised in that: the water cooler further includes filtering Device and expansion valve, the condenser are successively connect through the filter and the expansion valve with the evaporator.
8. shield machine construction cooling system according to claim 6, it is characterised in that: the shield machine construction cooling system It further include freezing back water pump, the freezing back water pump is fixed on the trolley vehicle frame, and the surface air cooler is through the freezing return water Pump is connect with the freezing water return outlet of the evaporator.
9. shield machine construction cooling system according to claim 6, it is characterised in that: the shield machine construction cooling system It further include cooling force (forcing) pump, the cooling force (forcing) pump is fixed on the trolley vehicle frame, the circulating outlet warp of the condenser The cooling force (forcing) pump is connect with the cooling tower.
CN201821744714.3U 2018-10-26 2018-10-26 A kind of shield machine construction cooling system Active CN208763685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201821744714.3U CN208763685U (en) 2018-10-26 2018-10-26 A kind of shield machine construction cooling system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201821744714.3U CN208763685U (en) 2018-10-26 2018-10-26 A kind of shield machine construction cooling system

Publications (1)

Publication Number Publication Date
CN208763685U true CN208763685U (en) 2019-04-19

Family

ID=66136573

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201821744714.3U Active CN208763685U (en) 2018-10-26 2018-10-26 A kind of shield machine construction cooling system

Country Status (1)

Country Link
CN (1) CN208763685U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109268055A (en) * 2018-10-26 2019-01-25 中铁广州建设有限公司 A kind of shield machine construction cooling system
CN112096441A (en) * 2020-10-12 2020-12-18 中铁十六局集团有限公司 Tunnel shield construction temperature control device and use method thereof
CN112593949A (en) * 2020-12-28 2021-04-02 广州市盾建地下工程有限公司 Shield machine and cooling system thereof

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109268055A (en) * 2018-10-26 2019-01-25 中铁广州建设有限公司 A kind of shield machine construction cooling system
CN112096441A (en) * 2020-10-12 2020-12-18 中铁十六局集团有限公司 Tunnel shield construction temperature control device and use method thereof
CN112593949A (en) * 2020-12-28 2021-04-02 广州市盾建地下工程有限公司 Shield machine and cooling system thereof

Similar Documents

Publication Publication Date Title
CN104566724B (en) It is applied to the ventilation and air conditioning system of Environmental Control System of Metro
CN205655422U (en) Phase transition heat transfer and compression refrigeration combined cooling system
CN208763685U (en) A kind of shield machine construction cooling system
CN109268055A (en) A kind of shield machine construction cooling system
CN106524410A (en) Diagnosis method for actual efficiency of central air conditioner cooling water unit
CN103216255B (en) Compressed air cold conveying cooling system for mine and cooling method thereof
CN103410549B (en) Utilize the System and method for that residual heat of electric power plant is lowered the temperature for mine ventilation
CN110006192A (en) Residual heat of air compressor recycles refrigeration system and method
CN206018882U (en) A kind of pair of low-temperature receiver Novel back plate heat pipe refrigerated air-conditioning system
CN103411355A (en) Evaporation-condensation separation type cold and heat collecting tri-integrated refrigeration station
CN203395994U (en) Refrigeration system used for engine room
JPH06207755A (en) Pneumatic refrigeration cycle device
CN108167968A (en) Full liquid cooling aircraft ground well ground air conditioner unit
CN206191977U (en) Evaporation -condensation does not have oily hot and cold water unit
CN205593128U (en) A high -efficient energy supply system for indoor skifield
CN206475796U (en) A kind of agricultural product controlled atmosphere transportation management system
CN107906628A (en) A kind of multi-duct air conditioning outdoor unit
CN207201210U (en) A kind of modularization centralized cold source system
CN113847666B (en) Air Conditioning System
CN210892079U (en) Subway station air conditioner high-efficiency heat extraction system combined with air duct
CN211314269U (en) Air cooling device for secondary ventilation cooling of shield machine
CN210892050U (en) Subway station air conditioner high-efficiency heat extraction system combined with exhaust duct
CN207962971U (en) Full liquid cooling aircraft ground well ground air conditioner unit
CN218915199U (en) Compression refrigeration and solution dehumidification coupled subway shield environment air conditioning system
JP3244912U (en) Shield machine construction cooling system