CN103216255B CN201310140193.6A CN201310140193A CN103216255B CN 103216255 B CN103216255 B CN 103216255B CN 201310140193 A CN201310140193 A CN 201310140193A CN 103216255 B CN103216255 B CN 103216255B
Authority
CN
China
Prior art keywords
cooling
compressed air
artificial
cold source
source subsystem
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201310140193.6A
Other languages
Chinese (zh)
Other versions
CN103216255A (en
Inventor
徐文忠
尚雅斐
刘靖
冯永华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201310140193.6A priority Critical patent/CN103216255B/en
Publication of CN103216255A publication Critical patent/CN103216255A/en
Application granted granted Critical
Publication of CN103216255B publication Critical patent/CN103216255B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Abstract

本发明公开了一种矿井用压缩空气输冷降温系统及其降温方法,它由设置在地面的空气压缩机、自然冷源子系统、人工冷源子系统以及设置在井下工作面的压缩空气喷射送风装置三部分通过压缩空气输送管道依次连接而成;其中:自然冷源子系统是由一级冷却塔和一级冷却喷淋室通过管道连接而成的用于压缩空气预冷却的水循环冷却通路;人工冷源子系统是由二级冷却塔、二级冷却喷淋室和制冷机组通过管道依次连接而成的用于压缩空气人工冷却的水循环冷却通路。本发明利用自然冷源对压缩空气进行预冷却,能够大幅度降低人工制冷设备的制冷负荷,在冬季或过度季甚至可以不运行人工制冷系统,从而大幅度降低矿井降温系统的运行费用。

The invention discloses a compressed air cooling system for mines and a cooling method thereof. The three parts of the air supply device are connected sequentially through compressed air pipelines; among them: the natural cooling source subsystem is a water circulation cooling system for compressed air pre-cooling formed by connecting the first-level cooling tower and the first-level cooling spray room through pipelines. Passage; The artificial cold source subsystem is a water circulation cooling passage for artificial cooling of compressed air formed by connecting the secondary cooling tower, the secondary cooling spray room and the refrigerating unit through pipelines in sequence. The present invention pre-cools the compressed air by a natural cooling source, which can greatly reduce the cooling load of the artificial refrigeration equipment, and even do not operate the artificial refrigeration system in winter or transitional seasons, thereby greatly reducing the operating cost of the mine cooling system.

Description

一种矿井用压缩空气输冷降温系统及其降温方法A kind of compressed air cooling system and cooling method for mine

技术领域 technical field

本发明涉及矿井降温系统,尤其涉及压缩空气输冷矿井降温系统。  The invention relates to a mine cooling system, in particular to a compressed air cooling mine cooling system. the

背景技术 Background technique

随着矿井开采深度的不断增加及开采机械化程度的不断提高,矿井热害成为制约矿井开采深度的决定性因素。对于采深超过800米的深部矿井,由于热害问题比较突出,仅靠采用增大矿井通风量等非人工制冷的技术措施,不可能从根本上达到矿井热害的控制目标。因此,目前多采用人工降温系统控制矿井的热害问题。  With the continuous increase of mine mining depth and the continuous improvement of mining mechanization, mine heat damage has become a decisive factor restricting mine mining depth. For deep mines with a mining depth of more than 800 meters, due to the serious problem of heat damage, it is impossible to fundamentally achieve the control goal of mine heat damage only by adopting non-artificial cooling technical measures such as increasing mine ventilation. Therefore, at present, artificial cooling systems are mostly used to control the heat damage of mines. the

矿井的人工降温系统通常由大型的制冷站、大型空气处理设备、冷媒输送系统及相关辅助设备组成。根据制冷机组安装地点的不同,矿井降温系统可以分为制冷机组安装在地面,制冷机组安装在井下,地面及地下同时安装制冷机组等不同类型。  The artificial cooling system of a mine usually consists of a large refrigeration station, large air handling equipment, refrigerant delivery system and related auxiliary equipment. According to the different installation locations of refrigeration units, mine cooling systems can be divided into different types such as refrigeration units installed on the ground, refrigeration units installed underground, and refrigeration units installed on the ground and underground at the same time. the

制冷机组安装在地面的矿井降温系统,按照冷媒的不同,可以分为水输冷系统和冰输冷系统两种类型。由于制冷机组及排热冷却塔均设在地面,这两种系统制冷效率比较高。但对于水输冷系统,由于水的静压问题,输水管道的底部静压可达上百公斤,常规管道和常规的空冷器均难以承受,而采用耐高压的管道和空冷设备,则会大大提高工程投资,并大幅度降低空冷器的传热效果及冷量的利用效率。若采用分级串联供冷,虽然可以解决上述问题,但由于每级换热均存在换热温差,则冷水输送至底部空冷器可能产生10℃以上的温升,因而造成大部分的冷量损耗在冷量输送过程中。对于冰输冷系统,需要实现地面制冰、片冰、地面及井下输冰、井下融冰、井下冷水输送等多种功能,系统复杂, 投资费用及运行成本高,冷量浪费大,系统启动缓慢,且系统一旦启动,则必须连续运行。  The mine cooling system in which the refrigeration unit is installed on the ground can be divided into two types: water cooling system and ice cooling system according to the different refrigerants. Since the refrigeration unit and the heat dissipation cooling tower are located on the ground, the cooling efficiency of these two systems is relatively high. But for the water cooling system, due to the static pressure of the water, the static pressure at the bottom of the water pipeline can reach hundreds of kilograms, which is difficult for conventional pipelines and conventional air coolers, and the use of high pressure resistant pipelines and air cooling equipment will The project investment is greatly increased, and the heat transfer effect of the air cooler and the utilization efficiency of cooling capacity are greatly reduced. If the cooling in stages is adopted, although the above-mentioned problems can be solved, since there is a heat transfer temperature difference in each stage of heat transfer, the temperature rise of more than 10°C may occur when the cold water is transported to the bottom air cooler, resulting in most of the cooling loss. During cold delivery. For the ice cooling system, it is necessary to realize various functions such as ground ice production, flake ice, ground and underground ice transportation, underground ice melting, and underground cold water transportation. Slow, and once the system is started, it must run continuously. the

制冷机组安装在井下的矿井降温系统,按照排热冷却塔安装位置的不同,分为井下排热系统和地面排热系统两类。井下排热系统的冷却塔一般设置在回风巷道内。由于回风巷内的温度湿度均较高(相对湿度多在90%以上),冷却能力小,冷却效果极差,从而导致制冷机组的制冷效率很低。而地面排热系统虽然解决了排热问题,但由于冷却水在制冷机组处产生较大静压,需配置耐压能力高达数百公斤的高压冷凝器的制冷机组,或在冷却水管路上设置高低压换热器。这两种措施都大幅度都降低了制冷机组的制冷效率。  The mine cooling system in which the refrigeration unit is installed underground is divided into two types: underground heat removal system and ground heat removal system according to the installation position of the heat removal cooling tower. The cooling tower of the underground heat removal system is generally set in the return air tunnel. Due to the high temperature and humidity in the return air lane (the relative humidity is mostly above 90%), the cooling capacity is small and the cooling effect is extremely poor, resulting in low cooling efficiency of the refrigeration unit. Although the ground heat removal system solves the problem of heat removal, due to the large static pressure generated by the cooling water at the refrigeration unit, it is necessary to configure a refrigeration unit with a high-pressure condenser with a pressure resistance of up to several hundred kilograms, or set a high-pressure condenser on the cooling water pipeline. Low pressure heat exchanger. Both of these measures greatly reduce the cooling efficiency of the refrigeration unit. the

地面及井下同时安装制冷机组的矿井降温系统,其实质上是两级制冷机组串联制冷。两级制冷效率低,冷损大,且需要设置冷凝器可耐高压的制冷机组及高低压换热器,系统复杂,安全性差。  The mine cooling system in which refrigeration units are installed on the ground and underground at the same time is essentially two-stage refrigeration units connected in series for refrigeration. The two-stage cooling efficiency is low, the cold loss is large, and it is necessary to set up a high-pressure refrigeration unit with a condenser and a high-low pressure heat exchanger. The system is complex and the safety is poor. the

以上三类矿井降温系统还有一个共同特点,即在需要降温的地点(采掘面、泵房等)设置空冷器。由于井下环境煤尘浓度高、湿度大、还有多种腐蚀性气体,所以空冷器具有易结尘、易腐蚀、传热效果差、防爆要求高等缺点。  The above three types of mine cooling systems also have a common feature, that is, air coolers are installed at places where cooling is required (mining face, pump room, etc.). Due to the high concentration of coal dust, high humidity, and various corrosive gases in the underground environment, the air cooler has the disadvantages of easy dust formation, easy corrosion, poor heat transfer effect, and high explosion-proof requirements. the

与本发明最接近的现有技术是在《矿业安全与环保》2004年第31卷第3期公开的“采用压气供冷的新型矿井集中空调系统”一文。在该文中公开了以下技术,即利用压缩空气作为供冷介质,直接向采掘工作面喷射制冷;系统主要由制冷机组、空压机、输气管、中间换热器和送风气等几部分组成,其主要特点是,空压机安装在地面上,制冷机组及附属设备、中间换热器等安装在井下硐室内;地面空气被地面空压机压缩后,由输气管道输送至井下中间换热器(中间换热器的低温介质为来自制冷机组的冷冻水)进行降温处理后,通过输冷管 道送至采掘工作面,在工作面上由送风器射出,形成冷风射流;冷风射流经过膨胀、卷吸、掺混等作用与工作面风流发生热交换,从而达到工作面降温的目的。该文献中公开的矿井降温系统存在如下两方面的问题:①空气被压气机压缩后,内能增加,温度升高(通常比环境温度高30℃~60℃)。导致矿井降温系统的制冷负荷和运行费用大幅度提高;②制冷机组及排热设备均设置在井下硐室内,导致系统排热困难,制冷机组运行效率降低,且必须采用防爆型设备,安全性较差,投资成本高。  The prior art closest to the present invention is the article "New Mine Centralized Air Conditioning System Using Compressed Air for Cooling" published in "Mine Safety and Environmental Protection" 2004, Volume 31, No. 3. The following technology is disclosed in this article, that is, using compressed air as a cooling medium to directly spray refrigeration to the mining face; the system is mainly composed of refrigeration units, air compressors, air pipelines, intermediate heat exchangers, and air supply. Its main feature is that the air compressor is installed on the ground, and the refrigeration unit, auxiliary equipment, and intermediate heat exchanger are installed in the underground chamber; after the ground air is compressed by the ground air compressor, it is transported to the underground intermediate heat exchange by the gas pipeline. (the low-temperature medium of the intermediate heat exchanger is chilled water from the refrigeration unit) for cooling treatment, and then sent to the mining face through the cooling pipeline, where it is ejected by the air blower on the working face to form a cold air jet; the cold air jet passes through Expansion, entrainment, mixing, etc. will exchange heat with the air flow on the working surface, so as to achieve the purpose of cooling the working surface. The mine cooling system disclosed in this document has the following two problems: ① After the air is compressed by the compressor, the internal energy increases and the temperature rises (usually 30°C to 60°C higher than the ambient temperature). The refrigeration load and operating cost of the mine cooling system have been greatly increased; ②The refrigeration unit and heat removal equipment are installed in the underground chamber, which makes it difficult for the system to discharge heat, and the operating efficiency of the refrigeration unit is reduced, and explosion-proof equipment must be used, which is relatively safe Poor, high investment cost. the

发明内容 Contents of the invention

本发明的目的是克服上述压缩空气矿井降温系统的缺点,通过技术改进,提供一种经济节能、安全高效的矿井用压缩空气输冷系统。这种降温系统是将制冷及排热设备均安装在地面上,采用人工降温与自然冷源降温相结合的制冷方式。  The object of the present invention is to overcome the shortcomings of the above-mentioned compressed air mine cooling system, and provide an economical, energy-saving, safe and efficient compressed air cooling system for mines through technical improvement. This cooling system installs both cooling and heat removal equipment on the ground, and adopts a cooling method that combines artificial cooling and natural cold source cooling. the

为达到上述目的,本发明系统由设置在地面的空气压缩机、自然冷源子系统、人工冷源子系统以及设置在井下工作面的压缩空气喷射送风装置三部分通过压缩空气输送管道依次连接而成;其中:  In order to achieve the above purpose, the system of the present invention is composed of three parts: the air compressor installed on the ground, the natural cold source subsystem, the artificial cold source subsystem, and the compressed air injection air supply device installed on the underground working face through the compressed air delivery pipeline. made; of which:

所述的自然冷源子系统是由一级冷却塔和一级冷却喷淋室通过管道连接而成的用于压缩空气预冷却的水循环冷却通路;  The natural cold source subsystem is a water circulation cooling path for compressed air pre-cooling formed by connecting the primary cooling tower and the primary cooling spray room through pipelines;

所述的人工冷源子系统是由二级冷却塔、二级冷却喷淋室和制冷机组通过管道依次连接而成的用于压缩空气人工冷却的水循环冷却通路。  The artificial cold source subsystem is a water circulation cooling path for artificial cooling of compressed air formed by sequentially connecting the secondary cooling tower, the secondary cooling spray room and the refrigerating unit through pipelines. the

利用本发明降温系统对矿井用压缩空气进行降温的方法如下:  Utilize cooling system of the present invention to carry out the method for cooling compressed air for mine as follows:

第一步:压缩空气的预冷却  Step 1: Pre-cooling of compressed air

由空气压缩机制备出来的压缩空气通过自然冷源子系统的一级冷却喷淋室,与一级冷却喷淋室内的循环冷却水进行热交换后,温度可降低至与环境空 气温度大致平衡的状态,实现压缩空气的预冷却;同时由一级冷却塔流出的冷却水,在一级冷却喷淋室内吸收压缩空气的大部分热量后,流回一级冷却塔5,实现压缩空气预冷却水的循环冷却。  The compressed air prepared by the air compressor passes through the primary cooling spray room of the natural cold source subsystem, and after heat exchange with the circulating cooling water in the primary cooling spray room, the temperature can be reduced to approximately the balance with the ambient air temperature At the same time, the cooling water flowing out of the first-level cooling tower absorbs most of the heat of the compressed air in the first-level cooling spray chamber, and then flows back to the first-level cooling tower 5 to realize pre-cooling of compressed air. Water circulation cooling. the

第二步:压缩空气的人工冷却  Step 2: Artificial cooling of compressed air

通过自然冷源子系统预冷却后的压缩空气进入人工冷源子系统的二级冷却喷淋室,与二级冷却喷淋室内的循环冷却水进行热交换,进一步冷却至要求的低温;同时,由制冷机组的蒸发器供应的循环冷冻水,进入二级冷却喷淋室吸收压缩空气的热量后,流回制冷机组,实现人工冷源冷冻水的循环冷却;由二级冷却塔流出的冷却水进入制冷机组冷凝器,吸收制冷剂释放的热量后,流回二级冷却塔,实现制冷机组冷却水的循环冷却。  The compressed air pre-cooled by the natural cold source subsystem enters the secondary cooling spray room of the artificial cold source subsystem, and exchanges heat with the circulating cooling water in the secondary cooling spray room to further cool down to the required low temperature; at the same time, The circulating chilled water supplied by the evaporator of the refrigeration unit enters the secondary cooling spray chamber to absorb the heat of the compressed air, and then flows back to the refrigeration unit to realize the circulation cooling of the artificial cold source chilled water; the cooling water flowing out of the secondary cooling tower After entering the condenser of the refrigeration unit, absorbing the heat released by the refrigerant, it flows back to the secondary cooling tower to realize the circulating cooling of the cooling water of the refrigeration unit. the

第三步:低温压缩空气的输送  The third step: delivery of low temperature compressed air

经人工冷源子系统冷却后的低温压缩空气,通过压缩空气保温管道及附件输送至井下工作面,由喷射送风口喷出,经过膨胀、卷吸及掺混作用,实现工作面的降温作用。  The low-temperature compressed air cooled by the artificial cold source subsystem is transported to the underground working face through the compressed air insulation pipe and accessories, and is ejected from the jet air supply port. After expansion, entrainment and mixing, the cooling effect of the working face is realized. the

本发明的优点是:  The advantages of the present invention are:

(1)利用自然冷源对压缩空气进行预冷却,能够大幅度降低人工制冷设备的制冷负荷,在冬季或过度季甚至可以不运行人工制冷系统(此时,二级冷却喷淋室只作为压缩空气的输送通道),从而大幅度降低矿井降温系统的运行费用。  (1) Pre-cooling the compressed air by using natural cooling sources can greatly reduce the cooling load of artificial refrigeration equipment. In winter or transitional seasons, the artificial refrigeration system may not even be operated (at this time, the secondary cooling spray room is only used for compression Air transmission channel), thus greatly reducing the operating cost of the mine cooling system. the

(2)压缩空气的人工冷却设备均设置在地面上,可采用非防爆型设备,建设费用低、制冷效率高。  (2) The artificial cooling equipment for compressed air is all installed on the ground, and non-explosion-proof equipment can be used, with low construction cost and high cooling efficiency. the

(3)压缩空气体积比热大、输冷能力强,体积流量小,所以管道断面小,投资低,便于布置和保温。  (3) The volume of compressed air has large specific heat, strong cooling capacity, and small volume flow rate, so the pipe section is small, the investment is low, and it is convenient for layout and heat preservation. the

附图说明 Description of drawings

图1是本发明实施例的示意图。  Figure 1 is a schematic diagram of an embodiment of the present invention. the

图中:1-空气压缩机,2-一级冷却塔,3-一级冷却喷淋室,4-二级冷却塔,5-制冷机组,6-二级冷却喷淋室,7a-一级冷却压缩空气输送管道,7b-二级冷却压缩空气输送管道,7c-完全冷却压缩空气保温管道,8-井筒,9-井下工作面,10-压缩空气喷射送风装置,11-工作面进风平巷。  In the figure: 1- air compressor, 2- primary cooling tower, 3- primary cooling spray room, 4- secondary cooling tower, 5- refrigeration unit, 6- secondary cooling spray room, 7a- primary Cooling compressed air delivery pipeline, 7b-secondary cooling compressed air delivery pipeline, 7c-complete cooling compressed air insulation pipeline, 8-well shaft, 9-underground working face, 10-compressed air injection air supply device, 11-working face air intake Ping Lane. the

具体实施方式 Detailed ways

下面结合附图和本发明的工作流程说明其具体实施方式。  The specific implementation manner thereof will be described below in conjunction with the accompanying drawings and the workflow of the present invention. the

如图1所示,本发明系统由设置在地面的空气压缩机1、自然冷源子系统、人工冷源子系统以及设置在井下工作面的压缩空气喷射送风装置10四部分通过压缩空气输送管道依次连接而成;其中:  As shown in Figure 1, the system of the present invention consists of an air compressor 1 arranged on the ground, a natural cold source subsystem, an artificial cold source subsystem, and a compressed air injection air supply device 10 arranged on the underground working face through compressed air. The pipelines are connected in sequence; among them:

所述的自然冷源子系统是由一级冷却塔2和一级冷却喷淋室3通过管道连接而成的压缩空气预冷却水循环冷却通路;  The natural cold source subsystem is a compressed air pre-cooling water circulation cooling passage formed by connecting the primary cooling tower 2 and the primary cooling spray room 3 through pipelines;

所述的人工冷源子系统是由二级冷却塔4、制冷机组5和二级冷却喷淋室6通过管道依次连接而成的制冷机组冷却水循环冷却通路。  The artificial cold source subsystem is a refrigeration unit cooling water circulation cooling passage formed by sequentially connecting the secondary cooling tower 4, the refrigeration unit 5 and the secondary cooling spray chamber 6 through pipelines. the

从图中可以看出:  It can be seen from the figure that:

自然冷源子系统的工艺流程为:由一级冷却塔2流出的冷却水,经供水管、循环水泵及附件进入一级冷却喷淋室3,吸收压缩空气的大部分热量后,再经回水管及附件流回一级冷却塔2,实现压缩空气预冷却水的循环冷却。  The process flow of the natural cold source subsystem is: the cooling water flowing out from the primary cooling tower 2 enters the primary cooling spray chamber 3 through the water supply pipe, circulating water pump and accessories, absorbs most of the heat of the compressed air, and then passes through the return The water pipes and accessories flow back to the primary cooling tower 2 to realize the circulating cooling of the compressed air pre-cooling water. the

人工冷源子系统的工艺流程为:由二级冷却塔4流出的冷却水,经制冷机组循环冷却水供水管、循环水泵及附件,进入制冷机组5的冷凝器,吸收制冷剂释放的热量后,再经制冷机组循环冷却水回水管及附件,流回二级冷却塔4,实现制冷机组冷却水的循环冷却;由制冷机组5的蒸发器供应的循环冷冻水, 经二级冷却喷淋室6的供水管、循环水泵及附件,进入二级冷却喷淋室6,进一步吸收压缩空气的热量后,再经二级冷却喷淋室6的回水管及附件流回制冷机组5,实现人工冷源冷冻水的循环冷却。 The process flow of the artificial cold source subsystem is: the cooling water flowing out from the secondary cooling tower 4 passes through the circulating cooling water supply pipe of the refrigeration unit, the circulating water pump and accessories, enters the condenser of the refrigeration unit 5, and absorbs the heat released by the refrigerant , and then flow back to the secondary cooling tower 4 through the circulating cooling water return pipe and accessories of the refrigeration unit to realize the circulating cooling of the cooling water of the refrigeration unit; the circulating chilled water supplied by the evaporator of the refrigeration unit 5 passes through the secondary cooling spray chamber 6, the water supply pipe, circulating water pump and accessories enter the secondary cooling spray chamber 6, and after further absorbing the heat of the compressed air, they flow back to the refrigeration unit 5 through the return pipe and accessories of the secondary cooling spray chamber 6 to realize artificial cooling. Circulating cooling of source chilled water.

从图中还可以看出,本发明系统工作时,环境空气经空气压缩机1压缩至一定压力后,由一级冷却压缩空气输送管道7a及附件,进入一级冷却喷淋室3进行预冷却;预冷却后的压缩空气由二级冷却压缩空气输送管道7b及附件进入二级冷却喷淋室6,进一步冷却至要求的低温后,再由敷设在地面上、井筒8、工作面进风平巷11内的完全冷却压缩空气保温管道7c及附件输送至井下工作面9,由喷射送风装置10喷出,经过膨胀、卷吸及掺混作用,实现工作面的降温作用。  It can also be seen from the figure that when the system of the present invention is working, the ambient air is compressed to a certain pressure by the air compressor 1, and then enters the primary cooling spray chamber 3 for pre-cooling by the primary cooling compressed air delivery pipeline 7a and accessories. The pre-cooled compressed air enters the secondary cooling spray chamber 6 through the secondary cooling compressed air delivery pipeline 7b and accessories, and after further cooling to the required low temperature, it is laid on the ground, the well shaft 8, and the air inlet level of the working face. The completely cooled compressed air insulation pipe 7c and its accessories in the lane 11 are transported to the underground working face 9, sprayed out by the jet air supply device 10, and through expansion, entrainment and mixing, the cooling effect of the working face is realized. the

Claims (1)

1.一种利用压缩空气输冷的降温系统对矿井进行降温的方法,其特征在于,所述的降温系统由设置在地面的空气压缩机、自然冷源子系统、人工冷源子系统以及设置在井下工作面的压缩空气喷射送风装置三部分通过压缩空气输送管道依次连接而成;其中:1. A method that utilizes the cooling system of compressed air to transport cold to carry out cooling to the mine, it is characterized in that, described cooling system consists of being arranged on the air compressor on the ground, natural cold source subsystem, artificial cold source subsystem and setting The three parts of the compressed air injection air supply device in the underground working face are connected sequentially through compressed air pipelines; among them: 所述的自然冷源子系统是由一级冷却塔和一级冷却喷淋室通过管道连接而成的用于压缩空气预冷却的水循环冷却通路;The natural cold source subsystem is a water circulation cooling passage for compressed air pre-cooling formed by connecting the primary cooling tower and the primary cooling spray room through pipelines; 所述的人工冷源子系统是由二级冷却塔、二级冷却喷淋室和制冷机组通过管道依次连接而成的用于压缩空气人工冷却的水循环冷却通路;The artificial cold source subsystem is a water circulation cooling path for artificial cooling of compressed air formed by connecting the secondary cooling tower, the secondary cooling spray room and the refrigerating unit sequentially through pipelines; 利用该降温系统对矿井进行降温的方法为:The method of using the cooling system to cool the mine is as follows: 第一步:压缩空气的预冷却Step 1: Pre-cooling of compressed air 由空气压缩机制备出来的压缩空气通过自然冷源子系统的一级冷却喷淋室,与一级冷却喷淋室内的循环冷却水进行热交换后,温度可降低至与环境空气温度大致平衡的状态,实现压缩空气的预冷却;同时由一级冷却塔流出的冷却水,在一级冷却喷淋室内吸收压缩空气的大部分热量后,流回一级冷却塔5,实现压缩空气预冷却水的循环冷却;The compressed air prepared by the air compressor passes through the primary cooling spray room of the natural cold source subsystem, and after heat exchange with the circulating cooling water in the primary cooling spray room, the temperature can be reduced to approximately the balance of the ambient air temperature. At the same time, the cooling water flowing out of the primary cooling tower absorbs most of the heat of the compressed air in the primary cooling spray chamber, and then flows back to the primary cooling tower 5 to realize the compressed air pre-cooling water circulating cooling; 第二步:压缩空气的人工冷却Step 2: Artificial cooling of compressed air 通过自然冷源子系统预冷却后的压缩空气进入人工冷源子系统的二级冷却喷淋室,与二级冷却喷淋室内的循环冷却水进行热交换,进一步冷却至要求的低温;同时,由制冷机组的蒸发器供应的循环冷冻水,进入二级冷却喷淋室吸收压缩空气的热量后,流回制冷机组,实现人工冷源冷冻水的循环冷却;由二级冷却塔流出的冷却水进入制冷机组冷凝器,吸收制冷剂释放的热量后,流回二级冷却塔,实现制冷机组冷却水的循环冷却;The compressed air pre-cooled by the natural cold source subsystem enters the secondary cooling spray room of the artificial cold source subsystem, and exchanges heat with the circulating cooling water in the secondary cooling spray room to further cool down to the required low temperature; at the same time, The circulating chilled water supplied by the evaporator of the refrigeration unit enters the secondary cooling spray chamber to absorb the heat of the compressed air, and then flows back to the refrigeration unit to realize the circulation cooling of the artificial cold source chilled water; the cooling water flowing out of the secondary cooling tower After entering the condenser of the refrigeration unit, absorbing the heat released by the refrigerant, it flows back to the secondary cooling tower to realize the circulating cooling of the cooling water of the refrigeration unit; 第三步:低温压缩空气的输送The third step: delivery of low temperature compressed air 经人工冷源子系统冷却后的低温压缩空气,通过压缩空气保温管道及附件输送至井下工作面,由喷射送风口喷出,经过膨胀、卷吸及掺混作用,实现工作面的降温作用。The low-temperature compressed air cooled by the artificial cold source subsystem is transported to the underground working face through the compressed air insulation pipe and accessories, and is ejected from the jet air supply port. After expansion, entrainment and mixing, the cooling effect of the working face is realized.
CN201310140193.6A 2013-04-22 2013-04-22 Compressed air cold conveying cooling system for mine and cooling method thereof Expired - Fee Related CN103216255B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201310140193.6A CN103216255B (en) 2013-04-22 2013-04-22 Compressed air cold conveying cooling system for mine and cooling method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201310140193.6A CN103216255B (en) 2013-04-22 2013-04-22 Compressed air cold conveying cooling system for mine and cooling method thereof

Publications (2)

Publication Number Publication Date
CN103216255A CN103216255A (en) 2013-07-24
CN103216255B true CN103216255B (en) 2015-03-11

Family

ID=48814370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201310140193.6A Expired - Fee Related CN103216255B (en) 2013-04-22 2013-04-22 Compressed air cold conveying cooling system for mine and cooling method thereof

Country Status (1)

Country Link
CN (1) CN103216255B (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105134280A (en) * 2015-08-18 2015-12-09 王勇 Mine underground cooling device
CN105484786A (en) * 2015-11-09 2016-04-13 北京工业大学 Mine thermal damage treatment system and method by single screw air compression refrigeration
CN106761886A (en) * 2017-01-04 2017-05-31 中国矿业大学 A kind of mine return air radiating working face Local Air-cooling System
CN107270584B (en) * 2017-07-25 2019-09-24 中南大学 A kind of distributed cooling air source heat pump system using mine low grade heat energy
CN107299840A (en) * 2017-08-14 2017-10-27 中环智创(北京)科技有限公司 The integrated system of mine cooling and heat energy utilization
CN107882564A (en) * 2017-09-30 2018-04-06 河南理工大学 A kind of crossdrift passing fault method
CN109236347A (en) * 2018-10-19 2019-01-18 湖南信息学院 A kind of mine downhole intelligent cooling device
CN110107335B (en) * 2019-06-13 2024-07-16 济南杰瑞复盛机电设备有限公司 Underground combined water ring type large-temperature-difference cooling and heating system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2674102Y (en) * 2004-01-19 2005-01-26 郎庆田 Low temp. rediation temp.-lowering system using ice in mine
CN101169040A (en) * 2006-10-23 2008-04-30 兖矿新陆建设发展有限公司 Mine working face cooling system
CN201100135Y (en) * 2007-09-27 2008-08-13 武汉星田热环境控制技术有限公司 Ice cooling temperature reduction system for mine
CN101344009A (en) * 2008-08-29 2009-01-14 中国科学院广州能源研究所 Mine Cooling System and Cooling Method
CN102116166A (en) * 2011-02-21 2011-07-06 武汉星田热环境控制技术有限公司 Vacuum ice-making, refrigeration and cooling system for mine shaft

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2674102Y (en) * 2004-01-19 2005-01-26 郎庆田 Low temp. rediation temp.-lowering system using ice in mine
CN101169040A (en) * 2006-10-23 2008-04-30 兖矿新陆建设发展有限公司 Mine working face cooling system
CN201100135Y (en) * 2007-09-27 2008-08-13 武汉星田热环境控制技术有限公司 Ice cooling temperature reduction system for mine
CN101344009A (en) * 2008-08-29 2009-01-14 中国科学院广州能源研究所 Mine Cooling System and Cooling Method
CN102116166A (en) * 2011-02-21 2011-07-06 武汉星田热环境控制技术有限公司 Vacuum ice-making, refrigeration and cooling system for mine shaft

Also Published As

Publication number Publication date
CN103216255A (en) 2013-07-24

Similar Documents

Publication Publication Date Title
CN103216255B (en) Compressed air cold conveying cooling system for mine and cooling method thereof
CN100580225C (en) Deep mining mine cooling device
CN105485800A (en) Natural cooling-mechanical refrigerating integrated air conditioner system for data center
CN103306705B (en) Mine cooling refrigeration system
CN102230651B (en) High pressure air injection-fluid power type water spraying chamber composite evaporative cooling air-conditioning unit
CN105120637A (en) Evaporative-cooling, water-cooling and air-cooling composite cooling system for data center
CN205316560U (en) Air conditioning system for data center that natural cooling and mechanical refrigeration are united
CN103410549B (en) Utilize the System and method for that residual heat of electric power plant is lowered the temperature for mine ventilation
CN106150539A (en) A liquid CO2 phase-change cooling device and method for high-temperature mining face
CN106640174A (en) Liquid CO2 cooling device and method for high-temperature mine mining face
CN101344009A (en) Mine Cooling System and Cooling Method
CN109268055A (en) A kind of shield machine construction cooling system
CN205154229U (en) Attached water film board heat exchanger heat sink of high temperature mine tunnel wall
CN203978773U (en) A kind of air compression system having from precooling function
CN202970756U (en) Mining liquid nitrogen temperature reducing device
CN105783165A (en) Cooling unit and air-cooled chiller unit with cooling unit
CN102536297A (en) Cold conveying system of mine air-conditioning and working method of cold conveying system
CN111456797A (en) Closed Circulation System and Working Method of Cooling Mine by Cooling by Surface Cooler
CN202119029U (en) High-pressure air-injection and water-injection composite type evaporation cooling air conditioning unit
CN105386785B (en) High-temperature mine tunnel wall attaches moisture film plate heat exchanger cooling system
CN205783465U (en) A kind of cooling unit and be provided with the cooling by wind of this cooling unit
CN204238970U (en) A kind of type pit cooling system based on vortex tube refrigeration
CN202149555U (en) Computer room air-conditioning system adopting double cold sources (air and soil) and fixed-point air supply mode
CN107270584B (en) A kind of distributed cooling air source heat pump system using mine low grade heat energy
CN206222797U (en) A kind of dual temperature cooling water system

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C14 Grant of patent or utility model
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20150311

Termination date: 20180422