CN207829249U - Curtain wall structure - Google Patents
Curtain wall structure Download PDFInfo
- Publication number
- CN207829249U CN207829249U CN201820183533.1U CN201820183533U CN207829249U CN 207829249 U CN207829249 U CN 207829249U CN 201820183533 U CN201820183533 U CN 201820183533U CN 207829249 U CN207829249 U CN 207829249U
- Authority
- CN
- China
- Prior art keywords
- curtain
- curtain panel
- panel
- wall
- assembled
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000007789 sealing Methods 0.000 claims abstract description 9
- 238000009423 ventilation Methods 0.000 claims description 22
- 229910000831 Steel Inorganic materials 0.000 claims description 7
- 239000010959 steel Substances 0.000 claims description 7
- 238000009413 insulation Methods 0.000 abstract description 6
- 238000010586 diagram Methods 0.000 description 5
- 239000000463 material Substances 0.000 description 3
- 230000009286 beneficial effect Effects 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000002955 isolation Methods 0.000 description 2
- 239000011449 brick Substances 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 239000011150 reinforced concrete Substances 0.000 description 1
- 238000003466 welding Methods 0.000 description 1
Landscapes
- Finishing Walls (AREA)
- Load-Bearing And Curtain Walls (AREA)
Abstract
本实用新型涉及一种幕墙结构,包括:设置在建筑外墙体上的装配架;装配在装配架上的第一幕板,第一幕板内设置有在竖直方向上的中空通道;以及,装配在装配架的靠近地面端和远离地面端的第二幕板,第二幕板包括靠近外墙体侧的密封板和设置在密封板的远离外墙体侧的通气板。装配座装配在外墙体上,支承柱装配在装配座上,承重梁装配在支承柱上,然后将装配件装配在承重梁上,最后将第一幕板和第二幕板卡接装配在装配件的装配槽内,从而使第一幕板和第二幕板与外墙体之间装配牢固稳定,第一幕板和第二幕板受阳光照射而吸收热量后,热量通过中空通道流动的空气带走,从而避免热量直接传递到建筑室内,实现了对建筑进行隔热的目的,更加环保节能。
The utility model relates to a curtain wall structure, including: an assembly frame arranged on the outer wall of a building; a first curtain panel arranged on the assembly frame, a hollow channel in the vertical direction arranged in the first curtain panel; and a second curtain panel arranged on the end close to the ground and the end far from the ground of the assembly frame, the second curtain panel including a sealing plate close to the outer wall side and a vent plate arranged on the sealing plate far from the outer wall side. The assembly seat is assembled on the outer wall, the supporting column is assembled on the assembly seat, the load-bearing beam is assembled on the supporting column, and then the assembly part is assembled on the load-bearing beam, and finally the first curtain panel and the second curtain panel are clamped and assembled in the assembly groove of the assembly part, so that the first curtain panel and the second curtain panel are firmly and stably assembled with the outer wall, and after the first curtain panel and the second curtain panel absorb heat under sunlight, the heat is taken away by the air flowing in the hollow channel, so as to avoid the heat being directly transferred to the interior of the building, so as to achieve the purpose of heat insulation of the building, and be more environmentally friendly and energy-saving.
Description
技术领域technical field
本实用新型涉及幕墙技术领域,尤其涉及一种幕墙结构。The utility model relates to the technical field of curtain walls, in particular to a curtain wall structure.
背景技术Background technique
现有的建筑通常采用钢筋混凝土框架和砖墙结构,建筑的室内和室外容易通过外墙体结构传导热量,使得建筑外墙被太阳照射时容易吸收热量引起室内的温度升高。因此有必要设计一种能对建筑墙体隔热的幕墙结构。Existing buildings usually adopt reinforced concrete frame and brick wall structure. The indoor and outdoor of the building can easily conduct heat through the external wall structure, so that when the external wall of the building is irradiated by the sun, it is easy to absorb heat and cause the indoor temperature to rise. Therefore it is necessary to design a curtain wall structure that can insulate the building wall.
实用新型内容Utility model content
本实用新型提供一种幕墙结构,具有隔热效果好的优点。The utility model provides a curtain wall structure, which has the advantage of good heat insulation effect.
本实用新型提供的一种幕墙结构,包括:设置在建筑外墙体上的装配架;装配在所述装配架上的、与所述外墙体平行设置的、在竖直方向上排列的第一幕板,所述第一幕板内设置有在竖直方向上的中空通道;以及,装配在所述装配架的靠近地面端和远离地面端的、与所述第一幕板衔接设置的第二幕板,所述第二幕板包括靠近外墙体侧的密封板和设置在所述密封板的远离外墙体侧的通气板。A curtain wall structure provided by the utility model includes: an assembly frame arranged on the exterior wall of a building; a second vertically arranged assembly frame arranged parallel to the exterior wall and assembled on the assembly frame; A curtain panel, the first curtain panel is provided with a hollow channel in the vertical direction; Two curtain panels, the second curtain panel includes a sealing panel close to the outer wall body and a ventilation panel arranged on the side of the sealing panel away from the outer wall body.
实现上述方案的幕墙结构,第一幕板通过装配架固定装配在外墙体上,第一幕板之间相互衔接从而使各中空通道连接,形成空气流通通道,第二幕板装配在装配架上且设置在外墙体的靠近地面侧和远离地面侧,第二幕板与第一幕板之间衔接,第一幕板和第二幕板将外墙体密封,而空气可以通过通气板与中空通道连通,在第一幕板和第二幕板受到阳光照射时,中空通道内的空气因受热膨胀而上升,并从远离地面侧的第二幕板上的通气板流出,与此同时空气不断地从靠近地面侧的第二幕板向中空通道补偿,从而不断地将阳光照射的热量通过空气带走,避免热量直接传递到建筑的室内,实现了对建筑进行隔热的目的,更加环保节能。To realize the curtain wall structure of the above scheme, the first curtain panel is fixedly assembled on the outer wall body through the assembly frame, the first curtain panels are connected to each other so that the hollow channels are connected to form air circulation channels, and the second curtain panel is assembled on the assembly frame And it is arranged on the side close to the ground and the side away from the ground of the outer wall, the second curtain plate is connected with the first curtain plate, the first curtain plate and the second curtain plate seal the outer wall, and the air can pass through the ventilation plate and the hollow The channel is connected. When the first curtain panel and the second curtain panel are irradiated by sunlight, the air in the hollow channel rises due to thermal expansion and flows out from the ventilation panel on the second curtain panel away from the ground side. At the same time, the air continues to Compensate from the second curtain panel close to the ground to the hollow channel, so that the heat of sunlight is continuously taken away through the air, avoiding the direct transfer of heat to the interior of the building, and achieving the purpose of heat insulation for the building, which is more environmentally friendly and energy-saving .
进一步地,所述第一幕板和所述第二幕板的远离地面侧均设置有延伸壁,所述延伸壁与所述第一幕板或所述第二幕板的靠近地面侧相适配装配。Further, the side away from the ground of the first curtain panel and the second curtain panel is provided with an extension wall, and the extension wall is suitable for the side close to the ground of the first curtain panel or the second curtain panel With assembly.
实现上述方案的幕墙结构,相邻的第一幕板之间、第一幕板和第二幕板之间均通过延伸壁与中空通道插接的方式相装配,装配方便简单。To realize the curtain wall structure of the above scheme, the adjacent first curtain panels, the first curtain panel and the second curtain panel are all assembled by plugging the extension wall with the hollow channel, and the assembly is convenient and simple.
进一步地,所述通气板上开设有若干通气孔。Further, several ventilation holes are opened on the ventilation plate.
实现上述方案的幕墙结构,通气板上开设的通气孔可以使空气进入中空通道中,从而实现中空通道和外界之间的空气流通,有利于将第一幕板和第二幕板上的热量带走。To realize the curtain wall structure of the above scheme, the ventilation holes opened on the ventilation panel can allow air to enter the hollow channel, so as to realize the air circulation between the hollow channel and the outside world, which is beneficial to bring the heat from the first curtain panel and the second curtain panel Walk.
进一步地,所述通气板上设置有可通过转动打开或关闭的、相互平行且间隔排列的百叶。Further, the ventilation plate is provided with louvers that can be opened or closed by rotation, parallel to each other and arranged at intervals.
实现上述方案的幕墙结构,百叶的设置可以将通气板打开或关闭,从而实现中空通道与外界的连通或隔断。In the curtain wall structure of the above solution, the setting of the louvers can open or close the ventilation panel, so as to realize the communication or isolation of the hollow passage with the outside world.
进一步地,所述第一幕板和所述第二幕板均通过装配件固定装配在所述装配架上;所述装配件相对的两侧开设有与所述幕板边缘相适配的装配槽。Further, both the first curtain panel and the second curtain panel are fixedly mounted on the assembly frame through fittings; the opposite sides of the fittings are provided with fittings that match the edge of the curtain panel. groove.
实现上述方案的幕墙结构,第一幕板和第二幕板通过卡接方式装配在装配件上,装配方便简单。To realize the curtain wall structure of the above scheme, the first curtain panel and the second curtain panel are assembled on the assembly parts by clamping, and the assembly is convenient and simple.
进一步地,所述装配槽内设置有沿所述装配槽延伸方向间隔排列的凸起,所述第一幕板和所述第二幕板的与所述装配件相装配侧均开设有与所述凸起相嵌合的凹槽。Further, protrusions arranged at intervals along the extending direction of the fitting groove are provided in the fitting groove, and the fitting sides of the first curtain panel and the second curtain panel are provided with the fittings corresponding to the fittings. The groove in which the above-mentioned protrusion fits.
实现上述方案的幕墙结构,第一幕板和第二幕板上的凹槽与装配槽的凸起卡接装配,防止了第一幕板和第二幕板与装配件之间的滑动,装配更加稳定。To realize the curtain wall structure of the above scheme, the grooves on the first curtain panel and the second curtain panel are engaged with the protrusions of the assembly groove to prevent the sliding between the first curtain panel and the second curtain panel and the assembly parts. more stable.
进一步地,所述装配架包括:固定装配在所述外墙体上的装配座,装配在所述装配座上的、平行于所述外墙体且垂直于地面设置的支承柱,以及,装配在所述支承柱的远离所述外墙体侧的、水平设置的承重梁;所述装配件装配在所述承重梁的远离外墙体侧。Further, the assembly frame includes: an assembly seat fixedly assembled on the outer wall, a support column installed on the assembly seat parallel to the outer wall and perpendicular to the ground, and an assembly A load-bearing beam arranged horizontally on the side of the support column away from the outer wall; the fitting is assembled on the side of the load-bearing beam away from the outer wall.
实现上述方案的幕墙结构,装配架由装配座、支承柱和承重梁构成,结构简单而牢固,易于实现。To realize the curtain wall structure of the above scheme, the assembly frame is composed of an assembly seat, a support column and a load-bearing beam, and the structure is simple and firm, and it is easy to realize.
进一步地,所述支承柱和所述承重梁采用方钢管材料。Further, the support columns and the load-bearing beams are made of square steel pipes.
实现上述方案的幕墙结构,采用方钢管材料制作支承柱和承重梁,取材容易、结构简单、成本低廉、易于实现。To realize the curtain wall structure of the above scheme, square steel pipe materials are used to make support columns and load-bearing beams, which are easy to obtain materials, simple in structure, low in cost, and easy to realize.
有益效果:Beneficial effect:
1.第一幕板和第二幕板受阳光照射而吸收热量后,热量通过中空通道流动的空气带走,从而避免热量直接传递到建筑室内,实现了对建筑进行隔热的目的,更加环保节能。1. After the first curtain panel and the second curtain panel are exposed to sunlight and absorb heat, the heat is taken away by the air flowing through the hollow channel, thereby preventing the heat from being directly transferred to the building interior, achieving the purpose of heat insulation for the building, and being more environmentally friendly energy saving.
2.装配座装配在外墙体上,支承柱装配在装配座上,承重梁装配在支承柱上,然后将装配件装配在承重梁上,最后将第一幕板和第二幕板卡接装配在装配件的装配槽内,使得第一幕板和第二幕板与外墙体之间装配更加牢固稳定。2. The assembly seat is assembled on the outer wall, the support column is assembled on the assembly seat, the load-bearing beam is assembled on the support column, and then the assembly is assembled on the load-bearing beam, and finally the first curtain panel and the second curtain panel are clamped and assembled In the assembling groove of the assembling part, the assembly between the first curtain panel and the second curtain panel and the outer wall is more firm and stable.
附图说明Description of drawings
图1是本实用新型实施例的幕墙结构的示意图;Fig. 1 is the schematic diagram of the curtain wall structure of the utility model embodiment;
图2是本实用新型实施例的幕墙结构的部分结构示意图;Fig. 2 is a partial structural schematic diagram of the curtain wall structure of the utility model embodiment;
图3是本实用新型实施例的第一幕板和第二幕板的结构示意图一;Fig. 3 is a structural schematic diagram 1 of the first curtain panel and the second curtain panel according to the embodiment of the present invention;
图4是本实用新型实施例的第一幕板和第二幕板的结构示意图二;Fig. 4 is a structural schematic diagram 2 of the first curtain panel and the second curtain panel of the embodiment of the present invention;
图5是本实用新型其他实施例的幕墙结构的示意图。Fig. 5 is a schematic diagram of a curtain wall structure in another embodiment of the present invention.
附图标记:1、装配架;11、装配座;12、支承柱;13、承重梁;2、第一幕板;21、中空通道;3、第二幕板;31、密封板;32、通气板;321、通气孔;322、百叶;4、延伸壁;5、装配件;51、装配槽;52、凸起;6、凹槽;7、外墙体。Reference signs: 1, assembly frame; 11, assembly seat; 12, support column; 13, load-bearing beam; 2, first curtain panel; 21, hollow channel; 3, second curtain panel; 31, sealing plate; 32, Ventilation plate; 321, ventilation hole; 322, shutter; 4, extension wall; 5, assembly part; 51, assembly groove; 52, protrusion; 6, groove;
具体实施方式Detailed ways
下面将结合附图,对本实用新型实施例的技术方案进行描述。显然,所描述的实施例仅仅是本实用新型一部分实施例,而不是全部的实施例。基于这些实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本实用新型所要保护的范围。The technical solutions of the embodiments of the present invention will be described below in conjunction with the accompanying drawings. Apparently, the described embodiments are only some of the embodiments of the present invention, not all of them. Based on these embodiments, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present utility model.
实施例:Example:
如图1所示,本实施例涉及一种幕墙结构,包括:装配架1,第一幕板2,第二幕板3和装配件5。As shown in FIG. 1 , this embodiment relates to a curtain wall structure, including: an assembly frame 1 , a first curtain panel 2 , a second curtain panel 3 and an assembly part 5 .
如图2-3所示,装配架1设置在建筑外墙体7上;第一幕板2装配在装配架1上,与外墙体7平行设置且在竖直方向上排列,第一幕板2内设置有在竖直方向上的中空通道21;第二幕板3装配在装配架1的靠近地面端和远离地面端,并且与第一幕板2衔接设置,第二幕板3包括靠近外墙体7侧的密封板31和设置在密封板31的远离外墙体7侧的通气板32。As shown in Figure 2-3, the assembly frame 1 is set on the building exterior wall 7; the first curtain panel 2 is assembled on the assembly frame 1, arranged parallel to the exterior wall 7 and arranged in the vertical direction, the first curtain A hollow channel 21 in the vertical direction is arranged in the panel 2; the second curtain panel 3 is assembled on the end close to the ground and the end far away from the ground of the assembly frame 1, and is connected with the first curtain panel 2, and the second curtain panel 3 includes The sealing plate 31 close to the side of the outer wall 7 and the ventilation plate 32 arranged on the side of the sealing plate 31 away from the outer wall 7 .
第一幕板2通过装配架1固定装配在外墙体7上,第一幕板2之间相互衔接从而使各中空通道21连接,形成空气流通通道,第二幕板3装配在装配架1上且设置在外墙体7的靠近地面侧和远离地面侧,第二幕板3与第一幕板2之间衔接,第一幕板2和第二幕板3将外墙体7密封,而空气可以通过通气板32与中空通道21连通,在第一幕板2和第二幕板3受到阳光照射时,中空通道21内的空气因受热膨胀而上升,并从远离地面侧的第二幕板3上的通气板32流出,与此同时空气不断地从靠近地面侧的第二幕板3向中空通道21补偿,从而不断地将阳光照射的热量通过空气带走,避免热量直接传递到建筑的室内,实现了对建筑进行隔热的目的,更加环保节能。The first curtain panel 2 is fixedly assembled on the outer wall 7 through the assembly frame 1, and the first curtain panels 2 are connected to each other so that the hollow passages 21 are connected to form an air circulation channel, and the second curtain panel 3 is assembled on the assembly frame 1 And it is arranged on the side close to the ground and the side away from the ground of the outer wall body 7, the second curtain panel 3 is connected with the first curtain panel 2, the first curtain panel 2 and the second curtain panel 3 seal the outer wall body 7, and the air It can communicate with the hollow channel 21 through the ventilation plate 32. When the first curtain panel 2 and the second curtain panel 3 are irradiated by sunlight, the air in the hollow channel 21 will rise due to thermal expansion and flow from the second curtain panel far away from the ground. The ventilation panel 32 on the 3 flows out, and at the same time, the air is continuously compensated from the second curtain panel 3 near the ground to the hollow channel 21, thereby continuously taking away the heat of the sunlight through the air and avoiding the heat from being directly transferred to the building. In the interior, the purpose of heat insulation for the building is realized, which is more environmentally friendly and energy-saving.
具体地,如图3-4所示,第一幕板2和第二幕板3的远离地面侧均设置有延伸壁4,延伸壁4与第一幕板2或第二幕板3的靠近地面侧相适配装配,相邻的第一幕板2之间、第一幕板2和第二幕板3之间均通过延伸壁4与中空通道21插接的方式装配,操作方便简单。Specifically, as shown in Figures 3-4, extension walls 4 are provided on the sides away from the ground of the first curtain panel 2 and the second curtain panel 3, and the extension wall 4 is close to the first curtain panel 2 or the second curtain panel 3 The ground side is matched and assembled, and the adjacent first curtain panels 2, and between the first curtain panel 2 and the second curtain panel 3 are all assembled by inserting the extension wall 4 into the hollow channel 21, which is convenient and simple to operate.
如图2-3所示,为了使空气可以在通气板32和中空通道21之间流动,在本实施例中,通气板32上设置有可以转动的百叶322,百叶322之间相互平行、等距间隔排列,并且沿水平方向布置,通过转动百叶322可以将通气板32打开或关闭,从而实现将中空通道21与外界连通或隔离,在其他实施例中,如图5所示,通气板32上可以开设若干通气孔321,通气孔321为圆形、方形或六边形等。As shown in Figures 2-3, in order to allow air to flow between the ventilation plate 32 and the hollow channel 21, in this embodiment, the ventilation plate 32 is provided with rotatable louvers 322, and the louvers 322 are parallel to each other, etc. They are arranged at intervals and arranged along the horizontal direction. By turning the louvers 322, the ventilation plate 32 can be opened or closed, so as to realize the communication or isolation of the hollow passage 21 with the outside world. In other embodiments, as shown in FIG. 5 , the ventilation panel 32 A plurality of air holes 321 can be provided on the top, and the air holes 321 are circular, square or hexagonal.
如图2-3所示,第一幕板2和第二幕板3均通过装配件5固定装配在装配架1上,装配件5相对的两侧开设有与幕板边缘相适配的装配槽51,装配件5通过螺栓或焊接方式固定装配在装配架1上,第一幕板2或第二幕板3卡接装配在装配件5的装配槽51内;为了防止第一幕板2和第二幕板3下滑,装配槽51内设置有沿装配槽51延伸方向间隔排列的凸起52,第一幕板2和第二幕板3的与装配件5相装配侧均开设有与凸起52相嵌合的凹槽6。As shown in Figure 2-3, both the first curtain panel 2 and the second curtain panel 3 are fixedly assembled on the assembly frame 1 through the assembly part 5, and the opposite sides of the assembly part 5 are provided with fittings that match the edge of the curtain panel. Groove 51, the assembly part 5 is fixedly assembled on the assembly frame 1 by bolts or welding, and the first curtain panel 2 or the second curtain panel 3 is clamped and assembled in the assembly groove 51 of the assembly part 5; in order to prevent the first curtain panel 2 from Slide down with the second curtain panel 3, the fitting groove 51 is provided with projections 52 arranged at intervals along the extending direction of the fitting groove 51, the first curtain panel 2 and the second curtain panel 3 are equipped with fittings 5 on the matching side. The protrusion 52 fits into the groove 6 .
如图2所示,装配架1包括:装配座11、支承柱12和承重梁13,装配座11固定装配在外墙体7上,支承柱12装配在装配座11上,支承柱12平行于外墙体7且垂直于地面设置,承重梁13装配在支承柱12的远离外墙体7侧且水平设置,装配件5竖直装配在承重梁13的远离外墙体7侧,在本实施例中支承柱12和承重梁13采用方钢管材料,在其他实施例中,支承柱12和承重梁13可以采用圆钢管或槽钢或角钢材料。As shown in Figure 2, the assembly frame 1 includes: an assembly seat 11, a support column 12 and a load-bearing beam 13, the assembly seat 11 is fixedly assembled on the outer wall body 7, the support column 12 is assembled on the assembly seat 11, and the support column 12 is parallel to the outer wall body 7. The wall 7 is set vertically to the ground, the load-bearing beam 13 is assembled on the side of the support column 12 away from the outer wall 7 and is arranged horizontally, and the assembly part 5 is vertically assembled on the side of the load-bearing beam 13 away from the outer wall 7, in this embodiment The middle support column 12 and the load-bearing beam 13 are made of square steel pipes. In other embodiments, the support column 12 and the load-bearing beam 13 can be made of round steel pipes or channel steel or angle steel materials.
本实施例的幕墙结构的使用原理大致如下述:装配座11装配在外墙体7上,支承柱12装配在装配座11上,承重梁13装配在支承柱12上,然后将装配件5装配在承重梁13上,最后将第一幕板2和第二幕板3卡接装配在装配件5的装配槽51内,从而使第一幕板2和第二幕板3与外墙体7之间装配牢固稳定,第一幕板2和第二幕板3受阳光照射而吸收热量后,热量通过中空通道21流动的空气带走,从而避免热量直接传递到建筑室内,实现了对建筑进行隔热的目的,更加环保节能。The use principle of the curtain wall structure of this embodiment is roughly as follows: the assembly seat 11 is assembled on the outer wall body 7, the support column 12 is assembled on the assembly seat 11, the load-bearing beam 13 is assembled on the support column 12, and then the assembly part 5 is assembled on the On the load-bearing beam 13, the first curtain panel 2 and the second curtain panel 3 are clamped and assembled in the assembly groove 51 of the assembly part 5, so that the first curtain panel 2, the second curtain panel 3 and the outer wall body 7 The space assembly is firm and stable. After the first curtain panel 2 and the second curtain panel 3 are exposed to sunlight and absorb heat, the heat is taken away by the air flowing through the hollow channel 21, thereby preventing the heat from being directly transmitted to the building interior, and realizing the insulation of the building. The purpose of heat, more environmental protection and energy saving.
Claims (8)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820183533.1U CN207829249U (en) | 2018-02-01 | 2018-02-01 | Curtain wall structure |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201820183533.1U CN207829249U (en) | 2018-02-01 | 2018-02-01 | Curtain wall structure |
Publications (1)
Publication Number | Publication Date |
---|---|
CN207829249U true CN207829249U (en) | 2018-09-07 |
Family
ID=63396360
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201820183533.1U Expired - Fee Related CN207829249U (en) | 2018-02-01 | 2018-02-01 | Curtain wall structure |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN207829249U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284640A (en) * | 2019-07-10 | 2019-09-27 | 东阳市天杨建筑工程设计有限公司 | Building curtain wall |
-
2018
- 2018-02-01 CN CN201820183533.1U patent/CN207829249U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110284640A (en) * | 2019-07-10 | 2019-09-27 | 东阳市天杨建筑工程设计有限公司 | Building curtain wall |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US20130333310A1 (en) | Modular Structure, Modular Panel To Make Said Modular Structure And Corresponding Method To Make Said Modular Structure | |
US20090260776A1 (en) | Geothermal sleeve for building structures | |
CN105735678B (en) | Energy-saving light steel prefabricated house | |
CN105239704B (en) | A kind of multifunctional green integrates curtain wall system | |
WO2004070281A1 (en) | Solar energy system | |
CN110359738B (en) | Assembly type construction method for ecological industrial factory building | |
CN104790523A (en) | Energy-saving glass house | |
CN207829249U (en) | Curtain wall structure | |
CN201202233Y (en) | Heat collection plate curtain wall having heat insulation and heat supply functions | |
CN105910300A (en) | Included angle type solar cell panel heat collecting curtain wall and roof and ventilation air conditioner system | |
CN201485962U (en) | Buildings made of various vacuum tubes | |
TW579416B (en) | Solar energy air conditioning system | |
CN206346312U (en) | A kind of steel-structure box room | |
CN216516242U (en) | Light shell type external heat preservation photovoltaic photo-thermal integrated wall structure | |
CN205421658U (en) | Dull and stereotyped solar energy and integrated thermal -arrest roof structure of building | |
CN114482434A (en) | Hollow wallboard with through cavity, energy-saving method and application of hollow wallboard | |
WO2019180470A1 (en) | Hot air facade mounted solar panel | |
CN203660348U (en) | Resource-saving type natural ventilation power distribution room | |
CN201326252Y (en) | Heat preserving, heat supply and photovoltaic generation curtain wall with glass evacuated tube as heat preserving light transmission cover | |
CN223048272U (en) | Heat-insulating building curtain wall component and building curtain wall | |
CN216640931U (en) | Energy-saving heat-insulating light steel assembled house | |
CN212613114U (en) | An integrated energy-saving wall structure | |
KR20140063542A (en) | Total solution that double skin facade type unitized exterior finishing panel system for outer insulated method of an apartment housing | |
CN219261453U (en) | A unitized photovoltaic glass curtain wall system | |
JP2013245521A (en) | Window structure with solar heat collection unit |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20180907 |