[go: up one dir, main page]

CN207499891U - Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note - Google Patents

Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note Download PDF

Info

Publication number
CN207499891U
CN207499891U CN201721045665.XU CN201721045665U CN207499891U CN 207499891 U CN207499891 U CN 207499891U CN 201721045665 U CN201721045665 U CN 201721045665U CN 207499891 U CN207499891 U CN 207499891U
Authority
CN
China
Prior art keywords
anchor
hollow
anchor pole
rear end
anchor rod
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201721045665.XU
Other languages
Chinese (zh)
Inventor
刘少伟
支光辉
丁军
吉祥
贾后省
石国文
许莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201721045665.XU priority Critical patent/CN207499891U/en
Application granted granted Critical
Publication of CN207499891U publication Critical patent/CN207499891U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note, including the coaxial anchor bit set gradually by front end to rear end, hollow end anchor pole, the first anchor rod connection piece, hollow connects anchor pole, the second anchor rod connection piece and jumbolter crossover sub;The rear end of anchor bit is connect with the front end of hollow end anchor pole, the front end of first anchor rod connection piece and rear end are connect respectively with the rear end of hollow end anchor pole and the hollow front end for connecing anchor pole, and the hollow rear end for connecing anchor pole is connected with the front end of jumbolter crossover sub respectively for front end and the rear end of the second anchor rod connection piece.The utility model can either realize the support reinforcement to coal mine roadway incompact fractured surrounding rock, it again can be with spreading to adapt to different loose crushing area ranges and can adapt to the large deformation of roadway surrounding rock, anchor pole uses after piercing rock mass as grouted anchor bar, deft design is reasonable, mounting process is simple, is primarily adapted for use in coal mine roadway loose crushing area or soft-rock tunnel reinforcing engineering.

Description

松软破碎煤岩体钻封注一体化可接长锚杆Drilling, sealing and injection integration of soft and broken coal and rock can be connected to long bolts

技术领域technical field

本实用新型属于煤矿巷道松软破碎煤岩体支护领域,特别涉及一种松软破碎煤岩体钻封注一体化可接长锚杆。The utility model belongs to the field of support for soft and broken coal and rock masses in coal mine roadways, in particular to a long bolt that can be connected with the integration of drilling, sealing and injection for soft and broken coal and rock masses.

背景技术Background technique

煤炭是我国主要能源形式,其在我国一次能源消费比例长期占据50%以上的份额。煤炭开采需要开掘一系列巷道,煤矿高产高效的重要一环就是这些巷道的有效支护。在众多的巷道之中,受采动、地质构造及成煤环境等影响,松散破碎围岩巷道占据很大比例,支护难度较大且成本较高。现有技术条件下,多采用以注浆锚杆为核心的支护方式来改变巷道松散破碎围岩的状态,使之成为完整的结构,从而具有良好的承载能力。传统的注浆锚杆结构复杂,成本较高且其长度受巷道高度与宽度的影响致使锚注长度受到限制,锚杆施工过程工艺复杂,杆体延伸率低无法适应围岩大变形,对设备及现场工作人员技术水平要求较高,因而无法在煤矿巷道松软破碎煤岩体支护方面取得广泛应用,进而导致此类巷道支护面临瓶颈问题,威胁工作人员生命安全与矿井高产高效的实现。Coal is the main form of energy in my country, and its proportion of primary energy consumption in my country has occupied more than 50% of the share for a long time. Coal mining needs to dig a series of roadways, and an important part of high production and high efficiency in coal mines is the effective support of these roadways. Among the many roadways, due to the influence of mining, geological structure and coal-forming environment, loose and broken surrounding rock roadways account for a large proportion, and the support is difficult and costly. Under the existing technical conditions, the support method with grouting bolt as the core is mostly used to change the state of the loose and broken surrounding rock of the roadway, making it a complete structure, so that it has a good bearing capacity. The traditional grouting bolt has complex structure, high cost, and its length is limited by the height and width of the roadway, so the length of the bolt is limited. The technical level of on-site workers is relatively high, so it cannot be widely used in the support of soft and broken coal and rock mass in coal mine roadways, which leads to the bottleneck problem of such roadway support, threatening the safety of staff and the realization of high production and high efficiency in mines.

实用新型内容Utility model content

为解决现有技术的不足之处,本实用新型提供一种结构简单、便于施工、成本低、支护牢靠、能适应围岩大变形的松软破碎煤岩体钻封注一体化可接长锚杆。In order to solve the deficiencies of the existing technology, the utility model provides a long anchor that can be connected to the integrated drilling, sealing and injecting of soft broken coal and rock mass with simple structure, convenient construction, low cost, reliable support, and can adapt to large deformation of surrounding rock. pole.

为解决上述技术问题,本实用新型采用如下技术方案:松软破碎煤岩体钻封注一体化可接长锚杆,包括同轴向由前端到后端依次设置的锚杆钻头、中空端头锚杆、第一锚杆连接件、中空可接锚杆、第二锚杆连接件和锚杆钻机转换接头;锚杆钻头的后端伸入并螺纹连接在中空端头锚杆的前端内部,第一锚杆连接件的前端部和后端部分别伸入并螺纹连接在中空端头锚杆的后端内部和中空可接锚杆的前端内部,第二锚杆连接件的前端伸入并螺纹连接在中空可接锚杆的后端内部,第二锚杆连接件的后端伸入并螺纹连接在锚杆钻机转换接头的前端内部,锚杆钻机转换接头的后部为与锚杆钻机传动连接的六棱柱结构,中空可接锚杆的后端部外圆设置有外螺纹。In order to solve the above-mentioned technical problems, the utility model adopts the following technical scheme: the soft and broken coal and rock mass is drilled, sealed and injected, and the long anchor rod can be connected, including the anchor rod drill bit and the hollow end anchor rod arranged in sequence from the front end to the rear end in the same axial direction. Rod, the first anchor rod connecting piece, the hollow connectable anchor rod, the second anchor rod connecting piece and the rocker drilling rig conversion joint; The front end and the rear end of an anchor rod connector extend into and are screwed into the rear end interior of the hollow end anchor rod and the front end interior of the hollow connectable anchor rod respectively, and the front end of the second anchor rod connector extends into and is threaded Connected inside the rear end of the hollow anchor rod, the rear end of the second anchor rod connector extends into and is screwed into the front end of the rocker drilling machine conversion joint, and the rear part of the rocker drilling machine conversion joint is for transmission with the rocker drilling machine The connected hexagonal prism structure is provided with external threads on the outer circle of the rear end of the hollow anchor rod.

中空端头锚杆和中空可接锚杆的前部及后部的圆周表面上均中心对称设置有两个扳手卡槽。Two wrench slots are symmetrically arranged on the front and rear peripheral surfaces of the hollow end anchor rod and the hollow connectable anchor rod.

第一锚杆连接件和第二锚杆连接件的圆周表面上均中心对称设置有两个扳手卡接平面。Two wrench clamping planes are symmetrically arranged on the circumferential surfaces of the first anchor rod connecting part and the second anchor rod connecting part.

锚杆钻头内开设有与中空端头锚杆内部连通的通孔,中空端头锚杆的外圆周表面固定设置有螺旋排渣凸棱条。A through hole communicating with the inside of the anchor rod with the hollow end is opened in the anchor drill bit, and a spiral slag discharge convex rib is fixedly arranged on the outer peripheral surface of the anchor rod with the hollow end.

采用上述技术方案,松软破碎煤岩体钻封注一体化可接长锚杆的施工方法,包括以下步骤:Adopting the above-mentioned technical scheme, the construction method of drilling, sealing and injecting integrated drilling, sealing and injecting of soft and broken coal and rock, which can be connected to a long bolt, includes the following steps:

(a)将锚杆钻机转换接头的六棱柱结构插入到锚杆钻机的动力输出接口内;(a) Insert the hexagonal prism structure of the rocker drill adapter into the power output interface of the rocker drill;

(b)将锚杆钻机转换接头与第二锚杆连接件连接,将锚杆钻头拧到中空端头锚杆前端,接着使用第一锚杆连接件将中空端头锚杆与中空可接锚杆组装至所需长度,然后将中空可接锚杆的后端与第二锚杆连接件的前端螺纹连接并拧紧;当所需钻进长度超过巷道宽度或高度时需在钻进过程中采用不断采用第一锚杆连接件连接中空可接锚杆以达到长度要求;(b) Connect the rocker drill adapter with the second bolt connector, screw the rocker bit to the front end of the hollow end bolt, and then use the first bolt connector to connect the hollow end bolt to the hollow connectable anchor Assemble the rod to the required length, then thread the rear end of the hollow connectable anchor rod to the front end of the second anchor rod connector and tighten it; when the required drilling length exceeds the width or height of the roadway, it needs to be used during the drilling process Continue to use the first anchor rod connecting piece to connect the hollow connectable anchor rod to meet the length requirement;

(c)锚杆钻头对准设定的钻孔点,启动锚杆钻机,将步骤(b)中组装的长锚杆钻入松软破碎煤岩体至最后一节中空可接锚杆的后部外露至设计长度后,然后取下钻机并卸下锚杆钻机转换接头与第二锚杆连接件;(c) Align the rock bolt bit with the set drilling point, start the rock bolt machine, and drill the long anchor rod assembled in step (b) into the soft and broken coal rock mass to the rear of the last hollow section where the anchor rod can be connected After being exposed to the designed length, then take down the drilling rig and remove the bolter rig conversion joint and the second bolt connector;

(d)清理整平锚固孔周围岩面后将封孔托盘安装到中空可接锚杆上,在中空可接锚杆的后端部的外螺纹上拧上螺母并压紧封孔托盘,然后将注浆止浆阀门与中空可接锚杆的后端连接,注浆止浆阀门的前端连接注浆泵连接管,接着开启注浆止浆阀门,启动注浆泵,浆液依次由注浆止浆阀门、中空可接锚杆、第一锚杆连接件、中空端头锚杆和锚杆钻头后注入到长锚杆的外壁与钻孔之间飞环形间隙内,封孔托盘阻挡浆液在钻孔内外溢;(d) After cleaning and leveling the rock surface around the anchor hole, install the sealing tray on the hollow connectable bolt, screw the nut on the external thread of the rear end of the hollow connectable bolt and press the sealing tray, and then Connect the grouting stop valve to the rear end of the hollow anchor rod, connect the front end of the grouting stop valve to the grouting pump connection pipe, then open the grouting stop valve, start the grouting pump, and the grout is sequentially pumped by the grouting stop The slurry valve, the hollow connectable anchor, the first anchor connector, the hollow end anchor and the anchor bit are injected into the annular gap between the outer wall of the long anchor and the drill hole, and the sealing tray prevents the slurry from being drilled. Hole overflow;

(e)注浆泵连接管上设置有压力表,当压力表上的压力达到设定值后,关闭注浆止浆阀门,拆卸注浆泵连接管和注浆泵,待浆液凝固后再取下注浆止浆阀门,即完成长锚杆的锚固施工。(e) There is a pressure gauge on the connecting pipe of the grouting pump. When the pressure on the pressure gauge reaches the set value, close the grouting stop valve, disassemble the connecting pipe and the grouting pump, and take it out after the grout solidifies. Lower the grouting stop grouting valve to complete the anchoring construction of the long anchor rod.

所述的注浆止浆阀门后端的出口端设置有具有外螺纹的注浆管接头,注浆管接头伸入并螺纹连接在中空可接锚杆的后端内部。The outlet end of the rear end of the grouting stop valve is provided with a grouting pipe joint with an external thread, and the grouting pipe joint extends into and is screwed into the rear end of the hollow anchor rod.

封孔托盘前端固定连接有伸入到钻孔内的中空橡胶塞,中空橡胶塞的内径、中空端头锚杆的外径和中空可接锚杆的外径相等,中空橡胶塞的外圆周呈前细后粗的圆锥形结构,中空橡胶塞前端部的最细端的外径等于钻孔的内径。The front end of the sealing tray is fixedly connected with a hollow rubber plug that extends into the drill hole. The inner diameter of the hollow rubber plug, the outer diameter of the hollow end anchor rod and the outer diameter of the hollow connectable anchor rod are equal. The outer circumference of the hollow rubber plug is in the shape of It has a conical structure with a thin front and a thick rear, and the outer diameter of the thinnest end of the front end of the hollow rubber plug is equal to the inner diameter of the drilled hole.

本实用新型相对于现有技术,具有以下技术效果:Compared with the prior art, the utility model has the following technical effects:

1、本实用新型中的注浆止浆阀门为可循环利用部件,相较传统注浆锚杆来说可以节省成本。1. The grouting stop valve in the utility model is a recyclable component, which can save costs compared with the traditional grouting anchor.

2、本实用新型的长锚杆杆体包含中空端头锚杆与中空可接锚杆(,其标准长度均为1.0m,可以根据围岩松散破碎区宽度进行利用第一锚杆连接件合理组装使其较传统注浆锚杆应用范围更广,且由于采用高强、高延伸率钢材,加之接长部位高延伸率使得锚固后杆体具有良好的延伸率,从而能适应围岩的大变形。2. The long anchor rod body of the present invention includes a hollow end anchor rod and a hollow connectable anchor rod (the standard length of which is 1.0m, which can be reasonably assembled by using the first anchor rod connector according to the width of the loose and broken area of the surrounding rock. It has a wider range of application than traditional grouting bolts, and due to the use of high-strength, high-elongation steel materials, coupled with the high elongation of the extension part, the rod body has good elongation after anchoring, so that it can adapt to large deformations of surrounding rock.

3、本实用新型种的封孔托盘是在传统封孔托盘基础上加装一定长度的中空橡胶塞,在螺母压紧封孔托盘时,将中空橡胶塞压入到钻孔的孔口内,中空橡胶塞外圆周呈前细后粗的圆锥形结构,螺母顶压封孔托盘越压的紧,密封性就越强,这样可充分提高封孔效果,其解决了传统注浆锚杆封孔工艺问题。3. The sealing tray of the utility model is a hollow rubber plug of a certain length added on the basis of the traditional sealing tray. When the nut presses the sealing tray, the hollow rubber plug is pressed into the hole of the drilled hole. The outer circumference of the rubber plug has a conical structure that is thinner at the front and thicker at the back. The tighter the nut is pressed against the sealing tray, the stronger the sealing performance will be, which can fully improve the sealing effect and solve the problem of the traditional grouting bolt sealing process. .

4、本实用新型中的各个构件均采用螺纹连接的方式,这样不仅便于分体式制造,而且能起便于组装的效果。4. Each component in the utility model adopts the method of threaded connection, which not only facilitates split-type manufacturing, but also facilitates assembly.

5、本实用新型中的长锚杆既有钻杆钻孔的功能,又具有封孔管的作用,一举两得,避免了钻孔后抽出钻杆后塌孔的情况发生,一举两得,节省了锚固施工的时间,也节约了施工成本。5. The long anchor rod in the utility model not only has the function of drill pipe drilling, but also has the function of sealing pipe, which kills two birds with one stone, avoids the collapse of the hole after pulling out the drill pipe after drilling, kills two birds with one stone, and saves anchoring construction time and save construction cost.

综上所述,本实用新型既能够实现对煤矿巷道松散破碎围岩的加固支护,又可以接长以适应不同的松散破碎区范围且能够适应巷道围岩的大变形,锚杆钻入岩体后作为注浆锚杆使用,设计精巧合理,安装工艺简单,解决了传统注浆锚杆支护施工工艺复杂、结构复杂等问题,主要适用于煤矿巷道松散破碎区或软岩巷道加固工程。In summary, the utility model can not only realize the reinforcement and support of the loose and broken surrounding rock of the coal mine roadway, but also can be extended to adapt to different loose broken area ranges and can adapt to the large deformation of the roadway surrounding rock. It is used as a grouting bolt after the body, with exquisite and reasonable design and simple installation process, which solves the problems of complex construction technology and complex structure of traditional grouting bolt support, and is mainly suitable for loose and broken areas of coal mine roadways or soft rock roadway reinforcement projects.

附图说明Description of drawings

图1是本实用新型的结构示意图;Fig. 1 is a structural representation of the utility model;

图2是本实用新型中注浆止浆阀门的立体结构示意图;Fig. 2 is a three-dimensional structural schematic diagram of a grouting stop valve in the utility model;

图3是本实用新型中锚杆钻机转换接头的立体结构示意图;Fig. 3 is a three-dimensional structural schematic diagram of the conversion joint of the rocker drilling rig in the utility model;

图4是本实用新型中的中空端头锚杆的立体结构示意图;Fig. 4 is a three-dimensional structural schematic diagram of a hollow-ended anchor rod in the utility model;

图5是本实用新型中的中空可接锚杆的立体结构示意图;Fig. 5 is a schematic diagram of the three-dimensional structure of the hollow connectable anchor rod in the utility model;

图6是本实用新型中封孔托盘的立体结构示意图;Fig. 6 is a schematic diagram of the three-dimensional structure of the sealing tray in the utility model;

图7是本实用新型中锚杆钻头的结构示意图。Fig. 7 is a structural schematic diagram of the rock bolt drill bit in the utility model.

具体实施方式Detailed ways

如图1-图7所示,本实用新型的松软破碎煤岩体钻封注一体化可接长锚杆,松软破碎煤岩体钻封注一体化可接长锚杆,包括同轴向由前端到后端依次设置的锚杆钻头1、中空端头锚杆3、第一锚杆连接件4、中空可接锚杆5、第二锚杆连接件8和锚杆钻机转换接头9;锚杆钻头1的后端伸入并螺纹连接在中空端头锚杆3的前端内部,第一锚杆连接件4的前端部和后端部分别伸入并螺纹连接在中空端头锚杆3的后端内部和中空可接锚杆5的前端内部,第二锚杆连接件8的前端伸入并螺纹连接在中空可接锚杆5的后端内部,第二锚杆连接件8的后端伸入并螺纹连接在锚杆钻机转换接头9的前端内部,锚杆钻机转换接头9的后部为与锚杆钻机传动连接的六棱柱结构14,中空可接锚杆5的后端部外圆设置有外螺纹。As shown in Figures 1 to 7, the soft and broken coal and rock mass drilling, sealing and injection integration of the utility model can be connected to a long anchor rod, and the soft and broken coal and rock mass drilling and sealing integration can be connected to a long anchor rod, including coaxial Anchor drill 1, hollow end anchor 3, first anchor connector 4, hollow connectable anchor 5, second anchor connector 8 and anchor drill conversion joint 9 arranged in sequence from the front end to the rear end; The rear end of the rod drill bit 1 extends into and is threaded inside the front end of the hollow end anchor rod 3, and the front end and the rear end of the first anchor rod connector 4 respectively extend into and be threaded on the inside of the hollow end anchor rod 3. The interior of the rear end and the interior of the front end of the hollow connectable anchor rod 5, the front end of the second anchor rod connector 8 extends into and is screwed into the rear end interior of the hollow connectable anchor rod 5, the rear end of the second anchor rod connector 8 It is inserted into and screwed into the front end of the rocker drill conversion joint 9. The rear part of the rocker drill conversion joint 9 is a hexagonal prism structure 14 connected with the drive of the rocker drill machine, and the outer circle of the rear end of the rocker rod 5 is hollow Provided with external threads.

中空端头锚杆3和中空可接锚杆5的前部及后部的圆周表面上均中心对称设置有两个扳手卡槽6。Two wrench slots 6 are symmetrically arranged on the front and rear circumferential surfaces of the hollow end anchor rod 3 and the hollow connectable anchor rod 5 .

第一锚杆连接件4和第二锚杆连接件8的圆周表面上均中心对称设置有两个扳手卡接平面15。扳手卡槽6和扳手卡接平面15均用于工人使用扳手卡住后进行轴向螺纹连接的作用。Two wrench engagement planes 15 are symmetrically arranged on the circumferential surfaces of the first anchor connecting part 4 and the second anchor connecting part 8 . Both the wrench clamping groove 6 and the wrench clamping plane 15 are used for the worker to perform axial screw connection after clamping with a wrench.

锚杆钻头1内开设有与中空端头锚杆3内部连通的通孔,中空端头锚杆3的外圆周表面固定设置有螺旋排渣凸棱条2。The anchor drill bit 1 is provided with a through hole communicating with the interior of the hollow end anchor 3 , and the outer peripheral surface of the hollow end anchor 3 is fixedly provided with a spiral slag removal rib 2 .

本实用新型的松软破碎煤岩体钻封注一体化可接长锚杆的施工方法,包括以下步骤,The construction method of the utility model for the integration of drilling, sealing and injection of the soft and broken coal and rock body, which can be connected to a long anchor rod, comprises the following steps,

(a)将锚杆钻机转换接头9的六棱柱结构14插入到锚杆钻机的动力输出接口内;(a) Insert the hexagonal prism structure 14 of the rocker drill conversion joint 9 into the power output interface of the rocker drill;

(b)将锚杆钻机转换接头9与第二锚杆连接件8连接,将锚杆钻头1拧到中空端头锚杆3前端,接着使用第一锚杆连接件4将中空端头锚杆3与中空可接锚杆5组装至所需长度,然后将中空可接锚杆5的后端与第二锚杆连接件8的前端螺纹连接并拧紧;当所需钻进长度超过巷道宽度或高度时需在钻进过程中采用不断采用第一锚杆连接件4连接中空可接锚杆5以达到长度要求;(b) Connect the rocker drill conversion joint 9 with the second rocker connector 8, screw the rocker bit 1 to the front end of the hollow end anchor rod 3, and then use the first anchor rod connector 4 to connect the hollow end anchor rod 3. Assemble with the hollow connectable anchor rod 5 to the required length, then screw the rear end of the hollow connectable anchor rod 5 with the front end of the second anchor rod connector 8 and tighten; when the required drilling length exceeds the roadway width or When the height is high, it is necessary to continuously use the first anchor rod connector 4 to connect the hollow and connectable anchor rod 5 during the drilling process to meet the length requirement;

(c)锚杆钻头1对准设定的钻孔点,启动锚杆钻机,将步骤2中组装的长锚杆钻入松软破碎煤岩体至最后一节中空可接锚杆5的后部外露至设计长度后,然后取下钻机并卸下锚杆钻机转换接头9与第二锚杆连接件8;(c) Align the rock bolt bit 1 with the set drilling point, start the rock bolt machine, and drill the long anchor rod assembled in step 2 into the soft and broken coal rock mass to the rear part of the last section, which is hollow and connectable to the anchor rod 5 After being exposed to the designed length, the drilling rig is then removed and the bolter rig conversion joint 9 and the second bolt connector 8 are removed;

(d)清理整平锚固孔周围岩面后将封孔托盘7安装到中空可接锚杆5上,在中空可接锚杆5的后端部的外螺纹上拧上螺母10并压紧封孔托盘7,然后将注浆止浆阀门11与中空可接锚杆5的后端连接,注浆止浆阀门11的前端连接注浆泵连接管,接着开启注浆止浆阀门11,启动注浆泵,浆液依次由注浆止浆阀门11、中空可接锚杆5、第一锚杆连接件4、中空端头锚杆3和锚杆钻头1后注入到长锚杆的外壁与钻孔之间飞环形间隙内,封孔托盘7阻挡浆液在钻孔内外溢;(d) After cleaning and leveling the rock surface around the anchor hole, install the sealing tray 7 on the hollow connectable anchor rod 5, screw the nut 10 on the external thread of the rear end of the hollow connectable bolt 5 and press the seal tightly. Hole tray 7, then connect the grouting stop valve 11 with the rear end of the hollow anchor rod 5, connect the front end of the grouting stop valve 11 to the grouting pump connection pipe, then open the grouting stop valve 11, start the injection Grouting pump, the grout is poured into the outer wall of the long anchor and the drill hole by the grouting stop grout valve 11, the hollow connectable anchor 5, the first anchor connector 4, the hollow end anchor 3 and the anchor drill 1. In the annular gap between the holes, the sealing tray 7 prevents the slurry from overflowing inside and outside the drill hole;

(e)注浆泵连接管上设置有压力表,当压力表上的压力达到设定值后,关闭注浆止浆阀门11,拆卸注浆泵连接管和注浆泵,待浆液凝固后再取下注浆止浆阀门11,即完成长锚杆的锚固施工。(e) A pressure gauge is installed on the connecting pipe of the grouting pump. When the pressure on the pressure gauge reaches the set value, close the grouting stop valve 11, disassemble the connecting pipe and the grouting pump, and wait until the grout solidifies. Take off the grouting stop grouting valve 11, namely complete the anchoring construction of the long anchor rod.

所述的注浆止浆阀门11后端的出口端设置有具有外螺纹的注浆管接头12,注浆管接头12伸入并螺纹连接在中空可接锚杆5的后端内部。The outlet end of the rear end of the grouting stop valve 11 is provided with a grouting pipe joint 12 with an external thread, and the grouting pipe joint 12 extends into and is threaded inside the rear end of the hollow anchor rod 5 .

封孔托盘7前端固定连接有伸入到钻孔内的中空橡胶塞13,中空橡胶塞13的内径、中空端头锚杆3的外径和中空可接锚杆5的外径相等,中空橡胶塞13的外圆周呈前细后粗的圆锥形结构,中空橡胶塞13前端部的最细端的外径等于钻孔的内径。The front end of the sealing tray 7 is fixedly connected with a hollow rubber plug 13 extending into the drilled hole. The inner diameter of the hollow rubber plug 13, the outer diameter of the hollow end anchor rod 3 and the outer diameter of the hollow connectable anchor rod 5 are equal. The outer circumference of the plug 13 is a conical structure that is thinner at the front and thicker at the back, and the outer diameter of the thinnest end of the front end of the hollow rubber plug 13 is equal to the inner diameter of the drilled hole.

本实施例并非对本实用新型的形状、材料、结构等作任何形式上的限制,凡是依据本实用新型的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本实用新型技术方案的保护范围。This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the utility model. Any simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the utility model belong to the technology of the utility model. protection scope of the program.

Claims (4)

1. reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note, it is characterised in that:Including coaxial by front end to rear end The anchor bit set gradually(1), hollow end anchor pole(3), the first anchor rod connection piece(4), hollow connect anchor pole(5), second Anchor rod connection piece(8)With jumbolter crossover sub(9);Anchor bit(1)Rear end stretch into and be threaded in hollow end Anchor pole(3)Front end inside, the first anchor rod connection piece(4)Front end and rear end be respectively protruding into and be threaded in hollow end Head anchor pole(3)Rear end inside and hollow connect anchor pole(5)Front end inside, the second anchor rod connection piece(8)Front end stretch into simultaneously It is threaded in and hollow connects anchor pole(5)Rear end inside, the second anchor rod connection piece(8)Rear end stretch into and be threaded in anchor Bar drill machine crossover sub(9)Front end inside, jumbolter crossover sub(9)Rear portion be six to be sequentially connected with jumbolter Prism structure(14), it is hollow to connect anchor pole(5)Rear end outer circle be provided with external screw thread.
2. reinforcing soft broken coal rock body according to claim 1 bores the integrated extensible anchor pole of envelope note, it is characterised in that:It is hollow End anchor pole(3)Anchor pole is connect with hollow(5)Forepart and rear portion circumferential surface on center symmetric setting there are two spanner Card slot(6).
3. reinforcing soft broken coal rock body according to claim 1 bores the integrated extensible anchor pole of envelope note, it is characterised in that:First Anchor rod connection piece(4)With the second anchor rod connection piece(8)Circumferential surface on center symmetric setting there are two spanner be clamped plane (15).
4. reinforcing soft broken coal rock body according to claim 1 bores the integrated extensible anchor pole of envelope note, it is characterised in that:Anchor pole Drill bit(1)It inside offers and hollow end anchor pole(3)The through-hole of inside connection, hollow end anchor pole(3)External peripheral surface consolidate Surely it is provided with spiral deslagging fin item(2).
CN201721045665.XU 2017-08-21 2017-08-21 Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note Active CN207499891U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201721045665.XU CN207499891U (en) 2017-08-21 2017-08-21 Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201721045665.XU CN207499891U (en) 2017-08-21 2017-08-21 Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note

Publications (1)

Publication Number Publication Date
CN207499891U true CN207499891U (en) 2018-06-15

Family

ID=62497774

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201721045665.XU Active CN207499891U (en) 2017-08-21 2017-08-21 Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note

Country Status (1)

Country Link
CN (1) CN207499891U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578078A (en) * 2018-12-26 2019-04-05 河南理工大学 Suitable for the more basic point separation indicators of reinforcing soft broken coal rock body automatic alarming and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109578078A (en) * 2018-12-26 2019-04-05 河南理工大学 Suitable for the more basic point separation indicators of reinforcing soft broken coal rock body automatic alarming and its application method
CN109578078B (en) * 2018-12-26 2023-09-05 河南理工大学 Automatic warning multi-base point detachment instrument suitable for soft and broken coal and rock mass and its application method

Similar Documents

Publication Publication Date Title
CN107288671B (en) Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod
CN103643977B (en) A kind of full anchor subregion is by pressure grouting anchor pole and using method thereof
CN205422779U (en) Side direction supports and to let pressure formula slip casting stock
AU2017317603A1 (en) Anchoring Method Utilizing Self-Drilling and Self-Anchoring Extensible Anchor Rod Applicable to Soft and Weak Coal Rocks
CN109209455B (en) Expansion shell type prestress hollow grouting anchor rod with slurry blocking plug
CN204716272U (en) Mining Assembled slip-casting roofbolt
CN104747216B (en) Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
CN203248178U (en) Downward-hole self-drilling grouting anchor rod
CN101994315B (en) Full-length bonded prestressed anchor rod and its construction method
CN103590845A (en) Impact-resistant interval grouting anchor cable and use method thereof
CN103670469B (en) A kind of expansion slip casting anchor stock
CN105422150B (en) A kind of FRP sprinkler irrigation combination bolt
CN206448830U (en) A kind of self-advancing type Hollow non-metallic screw thread reinforced resin anchor pole
CN2926509Y (en) A grouting anchor
CN205422773U (en) Novel hollow grouting anchor bolt
CN205117379U (en) Let pressure stock from advancing formula large deformation
CN106480880B (en) Recoverable soil nailing and the construction method for using recoverable soil nail
CN210829326U (en) A only starch device for slip casting stock cable high pressure slip casting
CN203230445U (en) Length-changeable self-boring type grouting anchor rod
CN115788538A (en) A Hollow Grouting-Resin Coupling Anchor Bolt with Constant Resistance and Large Deformation
CN207499891U (en) Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note
CN203584447U (en) Anti-impact interval grouting anchor cable
CN114087001A (en) Section steel prestress grouting anchor cable for internally and externally combined reinforcement of fractured surrounding rock and use method
CN204877514U (en) Modular cavity slip casting stock
CN102953742B (en) End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant