CN107288671B - Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod - Google Patents

Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod Download PDF

Info

Publication number
CN107288671B
CN107288671B CN201710718310.0A CN201710718310A CN107288671B CN 107288671 B CN107288671 B CN 107288671B CN 201710718310 A CN201710718310 A CN 201710718310A CN 107288671 B CN107288671 B CN 107288671B
Authority
CN
China
Prior art keywords
anchor rod
hollow
connectable
rear end
drilling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201710718310.0A
Other languages
Chinese (zh)
Other versions
CN107288671A (en
Inventor
刘少伟
支光辉
丁军
吉祥
贾后省
石国文
许莉莉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Henan University of Technology
Original Assignee
Henan University of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Henan University of Technology filed Critical Henan University of Technology
Priority to CN201710718310.0A priority Critical patent/CN107288671B/en
Publication of CN107288671A publication Critical patent/CN107288671A/en
Application granted granted Critical
Publication of CN107288671B publication Critical patent/CN107288671B/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0026Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection characterised by constructional features of the bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/003Machines for drilling anchor holes and setting anchor bolts
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D20/00Setting anchoring-bolts
    • E21D20/02Setting anchoring-bolts with provisions for grouting
    • E21D20/028Devices or accesories for injecting a grouting liquid in a bore-hole
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D21/00Anchoring-bolts for roof, floor in galleries or longwall working, or shaft-lining protection
    • E21D21/0093Accessories

Landscapes

  • Engineering & Computer Science (AREA)
  • Mining & Mineral Resources (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Geology (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

松软破碎煤岩体钻封注一体化可接长锚杆,包括同轴向由前端到后端依次设置的锚杆钻头、中空端头锚杆、第一锚杆连接件、中空可接锚杆、第二锚杆连接件和锚杆钻机转换接头;锚杆钻头的后端与中空端头锚杆的前端连接,第一锚杆连接件的前端部和后端部分别与中空端头锚杆的后端和中空可接锚杆的前端连接,第二锚杆连接件的前端部和后端部分别中空可接锚杆的后端和锚杆钻机转换接头的前端连接。本发明还公开了可接长锚杆的施工方法,本发明既能够实现对煤矿巷道松散破碎围岩的加固支护,又可以接长以适应不同的松散破碎区范围且能够适应巷道围岩的大变形,设计精巧合理,安装工艺简单,主要适用于煤矿巷道松散破碎区或软岩巷道加固工程。

Figure 201710718310

Drilling, sealing and injection integration of soft and broken coal and rock mass can be connected to long bolts, including bolt bits arranged in sequence from the front end to the rear end in the same axis, hollow end bolts, first bolt connectors, and hollow connectable bolts , the second anchor rod connector and the rocker drilling rig adapter; the rear end of the rocker drill bit is connected to the front end of the hollow end bolt, and the front end and rear end of the first anchor rod connector are respectively connected to the hollow end bolt The rear end of the second anchor rod connector is connected to the front end of the hollow anchor rod, and the front end and rear end of the second anchor rod connector are respectively connected to the front end of the hollow anchor rod adapter joint. The invention also discloses a construction method for connecting long anchor rods. The invention can not only realize the reinforcement and support of the loose and broken surrounding rocks of the coal mine roadway, but also can be extended to adapt to different ranges of loose and broken areas and can adapt to the surrounding rocks of the roadway. Large deformation, exquisite and reasonable design, simple installation process, mainly suitable for loose and broken areas of coal mine roadways or soft rock roadway reinforcement projects.

Figure 201710718310

Description

松软破碎煤岩体钻封注一体化可接长锚杆的施工方法Construction method of drilling, sealing and injecting integration of soft and broken coal and rock mass, which can be connected to long bolts

技术领域technical field

本发明属于煤矿巷道松软破碎煤岩体支护领域,特别涉及一种松软破碎煤岩体钻封注一体化可接长锚杆及其施工方法。The invention belongs to the field of support for soft and broken coal and rock masses in coal mine roadways, and in particular relates to a long anchor rod with integration of drilling, sealing and injection for soft and broken coal and rock masses and a construction method thereof.

背景技术Background technique

煤炭是我国主要能源形式,其在我国一次能源消费比例长期占据50%以上的份额。煤炭开采需要开掘一系列巷道,煤矿高产高效的重要一环就是这些巷道的有效支护。在众多的巷道之中,受采动、地质构造及成煤环境等影响,松散破碎围岩巷道占据很大比例,支护难度较大且成本较高。现有技术条件下,多采用以注浆锚杆为核心的支护方式来改变巷道松散破碎围岩的状态,使之成为完整的结构,从而具有良好的承载能力。传统的注浆锚杆结构复杂,成本较高且其长度受巷道高度与宽度的影响致使锚注长度受到限制,锚杆施工过程工艺复杂,杆体延伸率低无法适应围岩大变形,对设备及现场工作人员技术水平要求较高,因而无法在煤矿巷道松软破碎煤岩体支护方面取得广泛应用,进而导致此类巷道支护面临瓶颈问题,威胁工作人员生命安全与矿井高产高效的实现。Coal is the main form of energy in my country, and its proportion of primary energy consumption in my country has occupied more than 50% of the share for a long time. Coal mining needs to dig a series of roadways, and an important part of high production and high efficiency in coal mines is the effective support of these roadways. Among the many roadways, due to the influence of mining, geological structure and coal-forming environment, the roadways with loose and broken surrounding rocks occupy a large proportion, and the support is difficult and costly. Under the existing technical conditions, the support method with grouting bolt as the core is mostly used to change the state of the loose and broken surrounding rock of the roadway, making it a complete structure, thus having a good bearing capacity. The traditional grouting anchor has a complex structure, high cost and its length is limited by the height and width of the roadway, so the length of the anchor is limited. The technical level of on-site workers is high, so it cannot be widely used in the support of soft and broken coal and rock mass in coal mine roadways, which leads to the bottleneck problem of such roadway support, threatening the safety of staff and the realization of high production and high efficiency in mines.

发明内容Contents of the invention

为解决现有技术的不足之处,本发明提供一种结构简单、便于施工、成本低、支护牢靠、能适应围岩大变形的松软破碎煤岩体钻封注一体化可接长锚杆及其施工方法。In order to solve the deficiencies of the prior art, the present invention provides a soft and broken coal and rock body that integrates drilling, sealing and injecting, and can be connected to a long bolt with a simple structure, convenient construction, low cost, reliable support, and can adapt to large deformation of surrounding rocks. and its construction method.

为解决上述技术问题,本发明采用如下技术方案:松软破碎煤岩体钻封注一体化可接长锚杆,包括同轴向由前端到后端依次设置的锚杆钻头1、中空端头锚杆3、第一锚杆连接件4、中空可接锚杆5、第二锚杆连接件8和锚杆钻机转换接头9;锚杆钻头1的后端伸入并螺纹连接在中空端头锚杆3的前端内部,第一锚杆连接件4的前端部和后端部分别伸入并螺纹连接在中空端头锚杆3的后端内部和中空可接锚杆5的前端内部,第二锚杆连接件8的前端伸入并螺纹连接在中空可接锚杆5的后端内部,第二锚杆连接件8的后端伸入并螺纹连接在锚杆钻机转换接头9的前端内部,锚杆钻机转换接头9的后部为与锚杆钻机传动连接的六棱柱结构14,中空可接锚杆5的后端部外圆设置有外螺纹。In order to solve the above-mentioned technical problems, the present invention adopts the following technical scheme: soft and broken coal and rock mass drilling, sealing and injection integration can be connected to a long anchor rod, including a coaxial anchor drill bit 1, a hollow end anchor Rod 3, the first anchor rod connector 4, the hollow anchor rod 5, the second anchor rod connector 8 and the anchor drill adapter 9; the rear end of the anchor drill bit 1 is inserted and threaded into the hollow end anchor Inside the front end of the rod 3, the front end and the rear end of the first anchor rod connector 4 respectively extend into and are screwed into the rear end inside of the hollow end anchor rod 3 and the front end inside of the hollow connectable anchor rod 5, and the second The front end of the anchor rod connector 8 extends into and is threaded inside the rear end of the hollow connectable anchor rod 5, and the rear end of the second anchor rod connector 8 extends into and is threaded inside the front end of the rocker drill conversion joint 9, The rear portion of the rocker drill conversion joint 9 is a hexagonal prism structure 14 connected with the drive of the rocker driller, and the outer circle of the rear end of the hollow rod 5 that can be connected is provided with an external thread.

中空端头锚杆3和中空可接锚杆5的前部及后部的圆周表面上均中心对称设置有两个扳手卡槽6。Two wrench slots 6 are symmetrically arranged on the front and rear circumferential surfaces of the hollow end anchor rod 3 and the hollow connectable anchor rod 5 .

第一锚杆连接件4和第二锚杆连接件8的圆周表面上均中心对称设置有两个扳手卡接平面15。Two wrench engagement planes 15 are symmetrically arranged on the circumferential surfaces of the first anchor connecting part 4 and the second anchor connecting part 8 .

锚杆钻头1内开设有中空端头锚杆3内部连通的通孔,中空端头锚杆3的外圆周表面固定设置有螺旋排渣凸棱条2。The anchor drill bit 1 is provided with a through hole through which the hollow end anchor 3 communicates with the inside, and the outer circumferential surface of the hollow end anchor 3 is fixedly provided with a spiral slag discharge rib 2 .

松软破碎煤岩体钻封注一体化可接长锚杆的施工方法,包括以下步骤,The construction method of drilling, sealing and injecting integration of soft and broken coal and rock mass, which can be connected to a long bolt, comprises the following steps,

(a)将锚杆钻机转换接头9的六棱柱结构14插入到锚杆钻机的动力输出接口内;(a) Insert the hexagonal prism structure 14 of the rocker drill conversion joint 9 into the power output interface of the rocker drill;

(b)将锚杆钻机转换接头9与第二锚杆连接件8连接,将锚杆钻头1拧到中空端头锚杆3前端,接着使用第一锚杆连接件4将中空端头锚杆3与中空可接锚杆5组装至所需长度,然后将中空可接锚杆5的后端与第二锚杆连接件8的前端螺纹连接并拧紧;当所需钻进长度超过巷道宽度或高度时需在钻进过程中采用不断采用第一锚杆连接件4连接中空可接锚杆5以达到长度要求;(b) Connect the rocker drill conversion joint 9 with the second rocker connector 8, screw the rocker bit 1 to the front end of the hollow end anchor rod 3, and then use the first anchor rod connector 4 to connect the hollow end anchor rod 3. Assemble with the hollow connectable anchor rod 5 to the required length, then screw the rear end of the hollow connectable anchor rod 5 with the front end of the second anchor rod connector 8 and tighten; when the required drilling length exceeds the roadway width or When the height is high, it is necessary to continuously use the first anchor rod connector 4 to connect the hollow and connectable anchor rod 5 during the drilling process to meet the length requirement;

(c)锚杆钻头1对准设定的钻孔点,启动锚杆钻机,将步骤2中组装的长锚杆钻入松软破碎煤岩体至最后一节中空可接锚杆5的后部外露至设计长度后,然后取下钻机并卸下锚杆钻机转换接头9与第二锚杆连接件8;(c) Align the rock bolt bit 1 with the set drilling point, start the rock bolt machine, and drill the long anchor rod assembled in step 2 into the soft and broken coal rock mass to the rear part of the last section, which is hollow and connectable to the anchor rod 5 After being exposed to the designed length, the drilling rig is then removed and the bolter rig conversion joint 9 and the second bolt connector 8 are removed;

(d)清理整平锚固孔周围岩面后将封孔托盘7安装到中空可接锚杆5上,在中空可接锚杆5的后端部的外螺纹上拧上螺母10并压紧封孔托盘7,然后将注浆止浆阀门11与中空可接锚杆5的后端连接,注浆止浆阀门11的前端连接注浆泵连接管,接着开启注浆止浆阀门11,启动注浆泵,浆液依次由注浆止浆阀门11、中空可接锚杆5、第一锚杆连接件4、中空端头锚杆3和锚杆钻头1后注入到长锚杆的外壁与钻孔之间飞环形间隙内,封孔托盘7阻挡浆液在钻孔内外溢;(d) After cleaning and leveling the rock surface around the anchor hole, install the sealing tray 7 on the hollow connectable anchor rod 5, screw the nut 10 on the external thread of the rear end of the hollow connectable bolt 5 and press the seal tightly. Hole tray 7, then connect the grouting stop valve 11 with the rear end of the hollow anchor rod 5, connect the front end of the grouting stop valve 11 to the grouting pump connection pipe, then open the grouting stop valve 11, start the injection Grouting pump, the grout is poured into the outer wall of the long anchor and the drill hole by the grouting stop grout valve 11, the hollow connectable anchor 5, the first anchor connector 4, the hollow end anchor 3 and the anchor drill 1. In the annular gap between the holes, the sealing tray 7 prevents the slurry from overflowing inside and outside the drill hole;

(e)注浆泵连接管上设置有压力表,当压力表上的压力达到设定值后,关闭注浆止浆阀门11,拆卸注浆泵连接管和注浆泵,待浆液凝固后再取下注浆止浆阀门11,即完成长锚杆的锚固施工。(e) A pressure gauge is installed on the connecting pipe of the grouting pump. When the pressure on the pressure gauge reaches the set value, close the grouting stop valve 11, disassemble the connecting pipe and the grouting pump, and wait until the grout solidifies. Take off the grouting stop grouting valve 11, namely complete the anchoring construction of the long anchor rod.

所述的注浆止浆阀门11后端的出口端设置有具有外螺纹的注浆管接头12,注浆管接头12伸入并螺纹连接在中空可接锚杆5的后端内部。The outlet end of the rear end of the grouting stop valve 11 is provided with a grouting pipe joint 12 with an external thread, and the grouting pipe joint 12 extends into and is threaded inside the rear end of the hollow anchor rod 5 .

封孔托盘7前端固定连接有伸入到钻孔内的中空橡胶塞13,中空橡胶塞13的内径、中空端头锚杆3的外径和中空可接锚杆5的外径相等,中空橡胶塞13的外圆周呈前细后粗的圆锥形结构,中空橡胶塞13前端部的最细端的外径等于钻孔的内径。The front end of the sealing tray 7 is fixedly connected with a hollow rubber plug 13 extending into the drilled hole. The inner diameter of the hollow rubber plug 13, the outer diameter of the hollow end anchor rod 3 and the outer diameter of the hollow connectable anchor rod 5 are equal. The outer circumference of the plug 13 is a conical structure that is thinner at the front and thicker at the back, and the outer diameter of the thinnest end of the front end of the hollow rubber plug 13 is equal to the inner diameter of the drilled hole.

采用上述技术方案,本发明相对于现有技术,具有以下技术效果:Adopt above-mentioned technical scheme, the present invention has following technical effect with respect to prior art:

1、本发明中的注浆止浆阀门为可循环利用部件,相较传统注浆锚杆来说可以节省成本。1. The grouting stop valve in the present invention is a recyclable component, which can save costs compared with traditional grouting anchors.

2、本发明的长锚杆杆体包含中空端头锚杆与中空可接锚杆(,其标准长度均为1.0m,可以根据围岩松散破碎区宽度进行利用第一锚杆连接件合理组装使其较传统注浆锚杆应用范围更广,且由于采用高强、高延伸率钢材,加之接长部位高延伸率使得锚固后杆体具有良好的延伸率,从而能适应围岩的大变形。2. The long anchor rod body of the present invention includes a hollow end anchor rod and a hollow connectable anchor rod (the standard length of which is 1.0m, which can be reasonably assembled using the first anchor rod connector according to the width of the surrounding rock loose crushing area. Compared with the traditional grouting bolt, it has a wider application range, and because of the high strength and high elongation steel material, coupled with the high elongation of the extension part, the rod body has good elongation after anchoring, so that it can adapt to the large deformation of the surrounding rock.

3、本发明种的封孔托盘是在传统封孔托盘基础上加装一定长度的中空橡胶塞,在螺母压紧封孔托盘时,将中空橡胶塞压入到钻孔的孔口内,中空橡胶塞外圆周呈前细后粗的圆锥形结构,螺母顶压封孔托盘越压的紧,密封性就越强,这样可充分提高封孔效果,其解决了传统注浆锚杆封孔工艺问题。3. The sealing tray of the present invention is a hollow rubber plug of a certain length added on the basis of the traditional sealing tray. When the nut presses the sealing tray, the hollow rubber plug is pressed into the hole of the drilled hole, and the hollow rubber The outer circumference of the plug is a conical structure that is thinner at the front and thicker at the back. The tighter the nut is pressed against the sealing tray, the stronger the sealing performance will be. This can fully improve the sealing effect and solve the problem of the traditional grouting bolt sealing process.

4、本发明中的各个构件均采用螺纹连接的方式,这样不仅便于分体式制造,而且能起便于组装的效果。4. All components in the present invention are connected by threads, which not only facilitates split manufacturing, but also facilitates assembly.

5、本发明中的长锚杆既有钻杆钻孔的功能,又具有封孔管的作用,一举两得,避免了钻孔后抽出钻杆后塌孔的情况发生,一举两得,节省了锚固施工的时间,也节约了施工成本。5. The long anchor rod in the present invention not only has the function of drill pipe drilling, but also has the function of sealing pipe. time and save construction costs.

综上所述,本发明既能够实现对煤矿巷道松散破碎围岩的加固支护,又可以接长以适应不同的松散破碎区范围且能够适应巷道围岩的大变形,锚杆钻入岩体后作为注浆锚杆使用,设计精巧合理,安装工艺简单,解决了传统注浆锚杆支护施工工艺复杂、结构复杂等问题,主要适用于煤矿巷道松散破碎区或软岩巷道加固工程。In summary, the present invention can not only realize the reinforcement and support of the loose and broken surrounding rock of the coal mine roadway, but also can be extended to adapt to different loose broken area ranges and can adapt to the large deformation of the roadway surrounding rock, and the bolt can be drilled into the rock mass Afterwards, it is used as a grouting bolt. The design is exquisite and reasonable, and the installation process is simple. It solves the problems of complex construction technology and complex structure of the traditional grouting bolt support. It is mainly suitable for loose and broken areas of coal mine roadways or soft rock roadway reinforcement projects.

附图说明Description of drawings

图1是本发明的结构示意图;Fig. 1 is a structural representation of the present invention;

图2是本发明中注浆止浆阀门的立体结构示意图;Fig. 2 is the three-dimensional structure schematic diagram of the grouting stop grouting valve in the present invention;

图3是本发明中锚杆钻机转换接头的立体结构示意图;Fig. 3 is a three-dimensional structural schematic diagram of a rocker drilling rig conversion joint in the present invention;

图4是本发明中的中空端头锚杆的立体结构示意图;Fig. 4 is the schematic diagram of the three-dimensional structure of the hollow end anchor rod in the present invention;

图5是本发明中的中空可接锚杆的立体结构示意图;Fig. 5 is a schematic diagram of the three-dimensional structure of the hollow connectable anchor rod in the present invention;

图6是本发明中封孔托盘的立体结构示意图;Fig. 6 is a schematic diagram of the three-dimensional structure of the sealing tray in the present invention;

图7是本发明中锚杆钻头的结构示意图。Fig. 7 is a structural schematic diagram of the rock-bolt drill bit in the present invention.

具体实施方式Detailed ways

如图1-图7所示,本发明的松软破碎煤岩体钻封注一体化可接长锚杆,松软破碎煤岩体钻封注一体化可接长锚杆,包括同轴向由前端到后端依次设置的锚杆钻头1、中空端头锚杆3、第一锚杆连接件4、中空可接锚杆5、第二锚杆连接件8和锚杆钻机转换接头9;锚杆钻头1的后端伸入并螺纹连接在中空端头锚杆3的前端内部,第一锚杆连接件4的前端部和后端部分别伸入并螺纹连接在中空端头锚杆3的后端内部和中空可接锚杆5的前端内部,第二锚杆连接件8的前端伸入并螺纹连接在中空可接锚杆5的后端内部,第二锚杆连接件8的后端伸入并螺纹连接在锚杆钻机转换接头9的前端内部,锚杆钻机转换接头9的后部为与锚杆钻机传动连接的六棱柱结构14,中空可接锚杆5的后端部外圆设置有外螺纹。As shown in Figures 1 to 7, the soft and broken coal and rock mass drilling, sealing and injection integration of the present invention can be connected to a long anchor rod, and the soft and broken coal and rock mass drilling and sealing and injection integration can be extended. Bolt drill bit 1, hollow end bolt 3, first bolt connector 4, hollow connectable bolt 5, second bolt connector 8 and rocker drill conversion joint 9 arranged in sequence to the rear end; The rear end of the drill bit 1 extends into and is threaded inside the front end of the hollow end anchor rod 3, and the front end and the rear end of the first anchor rod connector 4 respectively extend into and thread connected to the rear end of the hollow end anchor rod 3. end inside and the front end of the hollow connectable anchor rod 5, the front end of the second anchor rod connector 8 extends into and is screwed into the rear end inside of the hollow connectable anchor rod 5, and the rear end of the second anchor rod connector 8 extends Inserted and threaded inside the front end of the rocker drill conversion joint 9, the rear part of the rocker drill conversion joint 9 is a hexagonal prism structure 14 connected with the drive of the rocker drill machine, and the outer circle of the rear end of the hollow bolt 5 can be connected With external thread.

中空端头锚杆3和中空可接锚杆5的前部及后部的圆周表面上均中心对称设置有两个扳手卡槽6。Two wrench slots 6 are symmetrically arranged on the front and rear circumferential surfaces of the hollow end anchor rod 3 and the hollow connectable anchor rod 5 .

第一锚杆连接件4和第二锚杆连接件8的圆周表面上均中心对称设置有两个扳手卡接平面15。扳手卡槽6和扳手卡接平面15均用于工人使用扳手卡住后进行轴向螺纹连接的作用。Two wrench engagement planes 15 are symmetrically arranged on the circumferential surfaces of the first anchor connecting part 4 and the second anchor connecting part 8 . Both the wrench clamping groove 6 and the wrench clamping plane 15 are used for the worker to perform axial screw connection after clamping with a wrench.

锚杆钻头1内开设有中空端头锚杆3内部连通的通孔,中空端头锚杆3的外圆周表面固定设置有螺旋排渣凸棱条2。The anchor drill bit 1 is provided with a through hole through which the hollow end anchor 3 communicates with the inside, and the outer circumferential surface of the hollow end anchor 3 is fixedly provided with a spiral slag discharge rib 2 .

本发明的松软破碎煤岩体钻封注一体化可接长锚杆的施工方法,包括以下步骤,The construction method for the integration of drilling, sealing and injection of soft and broken coal and rock mass of the present invention, which can be connected to a long anchor rod, comprises the following steps,

(a)将锚杆钻机转换接头9的六棱柱结构14插入到锚杆钻机的动力输出接口内;(a) Insert the hexagonal prism structure 14 of the rocker drill conversion joint 9 into the power output interface of the rocker drill;

(b)将锚杆钻机转换接头9与第二锚杆连接件8连接,将锚杆钻头1拧到中空端头锚杆3前端,接着使用第一锚杆连接件4将中空端头锚杆3与中空可接锚杆5组装至所需长度,然后将中空可接锚杆5的后端与第二锚杆连接件8的前端螺纹连接并拧紧;当所需钻进长度超过巷道宽度或高度时需在钻进过程中采用不断采用第一锚杆连接件4连接中空可接锚杆5以达到长度要求;(b) Connect the rocker drill conversion joint 9 with the second rocker connector 8, screw the rocker bit 1 to the front end of the hollow end anchor rod 3, and then use the first anchor rod connector 4 to connect the hollow end anchor rod 3. Assemble with the hollow connectable anchor rod 5 to the required length, then screw the rear end of the hollow connectable anchor rod 5 with the front end of the second anchor rod connector 8 and tighten; when the required drilling length exceeds the roadway width or When the height is high, it is necessary to continuously use the first anchor rod connector 4 to connect the hollow and connectable anchor rod 5 during the drilling process to meet the length requirement;

(c)锚杆钻头1对准设定的钻孔点,启动锚杆钻机,将步骤2中组装的长锚杆钻入松软破碎煤岩体至最后一节中空可接锚杆5的后部外露至设计长度后,然后取下钻机并卸下锚杆钻机转换接头9与第二锚杆连接件8;(c) Align the rock bolt bit 1 with the set drilling point, start the rock bolt machine, and drill the long anchor rod assembled in step 2 into the soft and broken coal rock mass to the rear part of the last section, which is hollow and connectable to the anchor rod 5 After being exposed to the designed length, the drilling rig is then removed and the bolter rig conversion joint 9 and the second bolt connector 8 are removed;

(d)清理整平锚固孔周围岩面后将封孔托盘7安装到中空可接锚杆5上,在中空可接锚杆5的后端部的外螺纹上拧上螺母10并压紧封孔托盘7,然后将注浆止浆阀门11与中空可接锚杆5的后端连接,注浆止浆阀门11的前端连接注浆泵连接管,接着开启注浆止浆阀门11,启动注浆泵,浆液依次由注浆止浆阀门11、中空可接锚杆5、第一锚杆连接件4、中空端头锚杆3和锚杆钻头1后注入到长锚杆的外壁与钻孔之间飞环形间隙内,封孔托盘7阻挡浆液在钻孔内外溢;(d) After cleaning and leveling the rock surface around the anchor hole, install the sealing tray 7 on the hollow connectable anchor rod 5, screw the nut 10 on the external thread of the rear end of the hollow connectable bolt 5 and press the seal tightly. Hole tray 7, then connect the grouting stop valve 11 with the rear end of the hollow anchor rod 5, connect the front end of the grouting stop valve 11 to the grouting pump connection pipe, then open the grouting stop valve 11, start the injection Grouting pump, the grout is poured into the outer wall of the long anchor and the drill hole by the grouting stop grout valve 11, the hollow connectable anchor 5, the first anchor connector 4, the hollow end anchor 3 and the anchor drill 1. In the annular gap between the holes, the sealing tray 7 prevents the slurry from overflowing inside and outside the drill hole;

(e)注浆泵连接管上设置有压力表,当压力表上的压力达到设定值后,关闭注浆止浆阀门11,拆卸注浆泵连接管和注浆泵,待浆液凝固后再取下注浆止浆阀门11,即完成长锚杆的锚固施工。(e) A pressure gauge is installed on the connecting pipe of the grouting pump. When the pressure on the pressure gauge reaches the set value, close the grouting stop valve 11, disassemble the connecting pipe and the grouting pump, and wait until the grout solidifies. Take off the grouting stop grouting valve 11, namely complete the anchoring construction of the long anchor rod.

所述的注浆止浆阀门11后端的出口端设置有具有外螺纹的注浆管接头12,注浆管接头12伸入并螺纹连接在中空可接锚杆5的后端内部。The outlet end of the rear end of the grouting stop valve 11 is provided with a grouting pipe joint 12 with an external thread, and the grouting pipe joint 12 extends into and is threaded inside the rear end of the hollow anchor rod 5 .

封孔托盘7前端固定连接有伸入到钻孔内的中空橡胶塞13,中空橡胶塞13的内径、中空端头锚杆3的外径和中空可接锚杆5的外径相等,中空橡胶塞13的外圆周呈前细后粗的圆锥形结构,中空橡胶塞13前端部的最细端的外径等于钻孔的内径。The front end of the sealing tray 7 is fixedly connected with a hollow rubber plug 13 extending into the drilled hole. The inner diameter of the hollow rubber plug 13, the outer diameter of the hollow end anchor rod 3 and the outer diameter of the hollow connectable anchor rod 5 are equal. The outer circumference of the plug 13 is a conical structure that is thinner at the front and thicker at the back, and the outer diameter of the thinnest end of the front end of the hollow rubber plug 13 is equal to the inner diameter of the drilled hole.

本实施例并非对本发明的形状、材料、结构等作任何形式上的限制,凡是依据本发明的技术实质对以上实施例所作的任何简单修改、等同变化与修饰,均属于本发明技术方案的保护范围。This embodiment does not impose any formal restrictions on the shape, material, structure, etc. of the present invention. All simple modifications, equivalent changes and modifications made to the above embodiments according to the technical essence of the present invention belong to the protection of the technical solution of the present invention. scope.

Claims (3)

1. The construction method of the soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod is characterized in that: the soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod comprises an anchor rod drill bit (1), a hollow end anchor rod (3), a first anchor rod connecting piece (4), a hollow extendable anchor rod (5), a second anchor rod connecting piece (8) and an anchor rod drilling machine adapter (9) which are coaxially and sequentially arranged from the front end to the rear end; the rear end of an anchor rod drill bit (1) stretches into and is in threaded connection with the interior of the front end of a hollow end anchor rod (3), the front end part and the rear end part of a first anchor rod connecting piece (4) respectively stretch into and are in threaded connection with the interior of the rear end of the hollow end anchor rod (3) and the interior of the front end of a hollow connectable anchor rod (5), the front end of a second anchor rod connecting piece (8) stretches into and is in threaded connection with the interior of the rear end of the hollow connectable anchor rod (5), the rear end of the second anchor rod connecting piece (8) stretches into and is in threaded connection with the interior of the front end of an anchor rod drilling machine conversion joint (9), the rear part of the anchor rod drilling machine conversion joint (9) is of a hexagonal prism structure (14) in transmission connection with an anchor rod drilling machine, and the excircle of the rear end part of the hollow connectable anchor rod (5) is provided with an external thread;
two wrench clamping grooves (6) are arranged on the circumferential surfaces of the front part and the rear part of the hollow end anchor rod (3) and the hollow connectable anchor rod (5) in a centrosymmetric manner;
two wrench clamping planes (15) are arranged on the circumferential surfaces of the first anchor rod connecting piece (4) and the second anchor rod connecting piece (8) in a centrosymmetric manner;
a through hole communicated with the interior of the hollow end anchor rod (3) is formed in the anchor rod drill bit (1), and a spiral slag-discharging convex rib (2) is fixedly arranged on the outer circumferential surface of the hollow end anchor rod (3);
the construction method comprises the following steps of,
(a) Inserting the hexagonal prism structure (14) of the conversion joint (9) of the anchor drilling machine into a power output interface of the anchor drilling machine;
(b) Connecting an adapter (9) of an anchor rod drilling machine with a second anchor rod connecting piece (8), screwing an anchor rod drill bit (1) to the front end of a hollow end anchor rod (3), assembling the hollow end anchor rod (3) and a hollow connectable anchor rod (5) to a required length by using a first anchor rod connecting piece (4), and then connecting and screwing the rear end of the hollow connectable anchor rod (5) and the front end of the second anchor rod connecting piece (8) in a threaded manner; when the required drilling length exceeds the width or the height of a roadway, a first anchor rod connecting piece (4) is continuously adopted to be connected with a hollow connectable anchor rod (5) in the drilling process so as to meet the length requirement;
(c) Aligning the anchor rod drill bit (1) to a set drilling point, starting an anchor rod drilling machine, drilling the long anchor rod assembled in the step (2) into the soft crushed coal rock body until the rear part of the last hollow connectable anchor rod (5) is exposed to the designed length, then taking down the drilling machine, and detaching the adapter (9) and the second anchor rod connecting piece (8) of the anchor rod drilling machine;
(d) Cleaning and leveling rock surfaces around an anchoring hole, installing a hole sealing tray (7) on a hollow connectable anchor rod (5), screwing a nut (10) on an external thread at the rear end part of the hollow connectable anchor rod (5) and pressing the hole sealing tray (7), then connecting a grouting stop valve (11) with the rear end of the hollow connectable anchor rod (5), connecting the front end of the grouting stop valve (11) with a grouting pump connecting pipe, then opening the grouting stop valve (11), starting a grouting pump, injecting grout into a flying ring-shaped gap between the outer wall of a long anchor rod and a drill hole after sequentially passing through the grouting stop valve (11), the hollow connectable anchor rod (5), a first anchor rod connecting piece (4), the hollow end anchor rod (3) and an anchor rod drill bit (1), and blocking the grout from overflowing inside and outside the drill hole by the hole sealing tray (7);
(e) And a pressure gauge is arranged on the grouting pump connecting pipe, when the pressure on the pressure gauge reaches a set value, the grouting stop valve (11) is closed, the grouting pump connecting pipe and the grouting pump are disassembled, and the grouting stop valve (11) is taken down after the grout is solidified, so that the anchoring construction of the long anchor rod is completed.
2. The construction method according to claim 1, characterized in that: the outlet end of the rear end of the grouting stop valve (11) is provided with a grouting pipe joint (12) with external threads, and the grouting pipe joint (12) extends into the hollow connectable anchor rod (5) and is in threaded connection with the inside of the rear end of the hollow connectable anchor rod (5).
3. The construction method according to claim 2, wherein: hole sealing tray (7) front end fixedly connected with stretches into hollow rubber stopper (13) in the drilling, and the internal diameter of hollow rubber stopper (13), the external diameter of hollow end stock (3) and the external diameter that cavity can connect stock (5) equal, and the outer circumference of hollow rubber stopper (13) is the thick conical structure in thin back in the front, and the external diameter of the thinnest end of hollow rubber stopper (13) preceding tip equals the internal diameter of drilling.
CN201710718310.0A 2017-08-21 2017-08-21 Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod Expired - Fee Related CN107288671B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710718310.0A CN107288671B (en) 2017-08-21 2017-08-21 Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710718310.0A CN107288671B (en) 2017-08-21 2017-08-21 Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod

Publications (2)

Publication Number Publication Date
CN107288671A CN107288671A (en) 2017-10-24
CN107288671B true CN107288671B (en) 2023-03-14

Family

ID=60106611

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710718310.0A Expired - Fee Related CN107288671B (en) 2017-08-21 2017-08-21 Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod

Country Status (1)

Country Link
CN (1) CN107288671B (en)

Families Citing this family (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108843357B (en) * 2018-06-22 2020-12-25 贵州大学 Double-layer rock anchor rod and construction method
CN108798734A (en) * 2018-06-22 2018-11-13 贵州大学 A kind of outer anchor pole for the double-deck anchor pole
CN110644944B (en) * 2019-08-26 2021-05-18 中煤科工集团西安研究院有限公司 Outer flat type high-pressure rotary jet grouting device and method for complex stratum under coal mine
CN110645033A (en) * 2019-10-17 2020-01-03 中铁八局集团有限公司 Device and method for deep grouting in sandy cobble stratum shield construction tunnel
CN111734462B (en) * 2020-07-31 2021-12-07 魏群 Anchor grouting structure
CN112431624A (en) * 2020-11-16 2021-03-02 河南理工大学 One-step anchor rod and supporting operation method thereof
GB2609017B (en) * 2021-07-16 2023-07-12 Hypertunnel Ip Ltd Integrated drilling injection and extraction device and method
CN113586110B (en) * 2021-07-21 2024-06-25 山西中煤担水沟煤业有限公司 Drilling device for mine soft broken surrounding rock and supporting method
CN113863298A (en) * 2021-10-08 2021-12-31 长沙理工大学 A kind of multifunctional bolt structure and setting method

Family Cites Families (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2524031A1 (en) * 1982-03-29 1983-09-30 Bertrand Jean Ground anchor for guy line - has tapped socket and threaded pin for anchor extension
CN104047625B (en) * 2013-10-11 2016-02-17 江苏鼎泰工程材料有限公司 A kind of rock mass reinforcing method of reinforcing anchor pole and applying this anchor pole
CN104747216B (en) * 2015-04-22 2017-01-11 河南理工大学 Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
US9845678B2 (en) * 2015-05-08 2017-12-19 Normet International Ltd. Locally anchored self-drilling hollow rock bolt
CN204804863U (en) * 2015-05-30 2015-11-25 高安森 From formula of boring joinable prestressing force slip casting stock
CN106337692B (en) * 2016-11-25 2018-08-24 中国矿业大学 It is a kind of be suitable for weak coal petrography from boring from anchor extensible anchor pole and its anchoring process

Also Published As

Publication number Publication date
CN107288671A (en) 2017-10-24

Similar Documents

Publication Publication Date Title
CN107288671B (en) Construction method of soft crushed coal rock mass drilling, sealing and injecting integrated extendable anchor rod
AU2017317603B2 (en) Anchoring Method Utilizing Self-Drilling and Self-Anchoring Extensible Anchor Rod Applicable to Soft and Weak Coal Rocks
CN109236337B (en) Arrow anchor rod anchored by multi-section type clamping grouting and using method thereof
CN204716272U (en) Mining Assembled slip-casting roofbolt
CN203961814U (en) Jumbolter drilling rod quick-connect machanism
CN104747216B (en) Ultra-soft cracked coal and rock mass drill and grouting integrated fractional grouting method
CN103670469B (en) A kind of expansion slip casting anchor stock
CN2926509Y (en) A grouting anchor
CN102748048A (en) Hole wall grouting anchor cable
CN210829326U (en) A only starch device for slip casting stock cable high pressure slip casting
CN115788538A (en) A Hollow Grouting-Resin Coupling Anchor Bolt with Constant Resistance and Large Deformation
CN203007953U (en) Inflatable grouting type slurry-stopping plug for hollow grouting anchor rod
CN202882965U (en) Non-resin multi-anchor rock bolt capable of stopping rotation reversely
CN207499891U (en) Reinforcing soft broken coal rock body bores the integrated extensible anchor pole of envelope note
CN201547428U (en) Three-dimensional seal tensile oil bushing connector
CN110259493B (en) Full-length anchoring self-drilling type anchor rod and anchoring method
CN201372739Y (en) Special screw thread connecting device suitable for radial expanding deformation oil casing pipe
CN111852528A (en) Sectional recoverable high-strength prestressed anchor cable and its construction method
CN102953742B (en) End-type multi-stage grout stopping plug of grouting anchor rod and use method thereof
CN108756774A (en) Quick grouting behind shaft or drift lining orifice tube
CN206503612U (en) It is a kind of be suitable for weak coal petrography from boring from anchor extensible anchor pole
CN220336931U (en) Grouting anchor rod device for tunnel construction
CN220101308U (en) Combined hollow anchor rod
CN204877360U (en) Quick hole sealing device of discharge hole water injection is taken out in utilization
CN216381450U (en) A pre-anchored hollow grouting bolt

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20230314