CN206448346U - A kind of integrated bathroom water-proof chassis and combinations thereof mould - Google Patents
A kind of integrated bathroom water-proof chassis and combinations thereof mould Download PDFInfo
- Publication number
- CN206448346U CN206448346U CN201720142586.4U CN201720142586U CN206448346U CN 206448346 U CN206448346 U CN 206448346U CN 201720142586 U CN201720142586 U CN 201720142586U CN 206448346 U CN206448346 U CN 206448346U
- Authority
- CN
- China
- Prior art keywords
- guiding region
- integrated bathroom
- shower area
- chassis
- side wall
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 239000000463 material Substances 0.000 claims description 4
- 239000002131 composite material Substances 0.000 claims description 3
- 230000002787 reinforcement Effects 0.000 claims description 3
- 238000009434 installation Methods 0.000 abstract description 11
- 238000011900 installation process Methods 0.000 abstract description 4
- 230000015572 biosynthetic process Effects 0.000 abstract description 3
- 230000008595 infiltration Effects 0.000 description 3
- 238000001764 infiltration Methods 0.000 description 3
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 3
- 238000000465 moulding Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
Classifications
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02A—TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
- Y02A30/00—Adapting or protecting infrastructure or their operation
- Y02A30/60—Planning or developing urban green infrastructure
Landscapes
- Residential Or Office Buildings (AREA)
Abstract
The utility model discloses a kind of integrated bathroom water-proof chassis and combinations thereof mould, include the body of a rectangle tabular, it is arranged on the surrounding top surface of body and perpendicular to the side wall of body, the shape of top surface and side wall the formation groove of body, the guiding region and shower area for being split to form the top surface of body by an arc cut-off rule, guiding region and shower area are configured to:Shower area is set with plane-parallel, guiding region is obliquely installed horizontal by certain angle, guiding region and shower area are seamlessly connected by arc cut-off rule, are opened in the ground small opening on guiding region, and guiding region is gradually tilted from high to low by the gradient at edge to closely small opening.The utility model, because chassis surrounding band is fluted, therefore some installation fittings are coordinated to realize blind dress location and installation in integrated bathroom wallboard installation process, installation is set to be more prone to convenient, the time needed for installing is greatly reduced, and the integrated bathroom assembly and disassembly assembled using this chassis is more convenient.
Description
Technical field
The utility model is related to integrated bathroom, and in particular to a kind of integrated bathroom water-proof chassis and combinations thereof mould.
Background technology
The idea of development of traditional single bathroom has been broken in the appearance of integrated bathroom, and sanitary and balneal room is carried out into integrated design,
And then sanitaryware centralization is produced, make space layout more science practical.Integrated bathroom just deduction spatial art it is new general
Read, it collects six big features in an innovative way:Layout optimizes, installs and simplify, operate intelligent, use cost minimum
Change, bathroom process entertainment orientation, Aided design are personalized, are integrated so integrated bathroom is exactly integrated cultural, function and space
Product.
But integrated bathroom product in the market, the problem of generally existing chassis water-proof function is poor, this is due to bottom
Disk uses demountable structure, chassis and framed side wallboard junction easily have the shortcomings that it is poorly sealed, easily seep water, and at present
Also there is the problem of installing inconvenient in the integrated bathroom chassis of in the market.
In summary, need that a kind of disassembly and assembly structure is simple at present, draining efficiently, can effectively solve the new of seepage problem
Integrated bathroom chassis.
Utility model content
Technical problem to be solved in the utility model is the chassis dismounting inconvenience of existing integrated bathroom, and that easily seeps water asks
Topic.
In order to solve the above-mentioned technical problem, the technical scheme that the utility model is used is to provide a kind of integrated bathroom waterproof
Chassis, including:
The body of one rectangle tabular,
It is arranged on the surrounding top surface of the body and perpendicular to the side wall of the body, the top surface of the body and described
The shape of side wall formation groove,
The guiding region and shower area for being split to form the top surface of the body by an arc cut-off rule, the guiding region and
Shower area is configured to:The shower area is set with plane-parallel, and the guiding region tilts horizontal by certain angle and set
Put, the guiding region and shower area are seamlessly connected by arc cut-off rule,
The ground small opening on the guiding region is opened in, the guiding region is by edge to the gradient close to described ground small opening by height
Gradually tilted to low.
In such scheme, latticed reinforcement is covered with the bottom surface of the body.
In such scheme, a side wall of the described ground small opening close to the body.
In such scheme, the material of the body is SMC composites.
In such scheme, the body is once molding formed using assembling die.
The utility model additionally provides a kind of assembling die for making above-mentioned integrated bathroom water-proof chassis, including die cavity,
The die cavity makes the body and the side wall of a variety of different length sizes respectively.
The utility model, coordinates because chassis surrounding band is fluted, therefore in integrated bathroom wallboard installation process
Installation fitting can realize blind dress location and installation, and the technical requirements of assembly crewman are reduced in assembling, are more prone to installation
It is convenient, standardized work is realized, the time needed for installing, and the integrated bathroom dress assembled using this chassis is greatly reduced
It is more convenient with dismounting, and thoroughly prevented leak and infiltration phenomenon, save the special place to Traditional bathroom building structure, waterproof
Reason.
Brief description of the drawings
Fig. 1 is top view of the present utility model;
Fig. 2 is stereogram of the present utility model;
Fig. 3 is upward view of the present utility model;
Fig. 4 is the sectional view in Fig. 1 along B-B faces;
Fig. 5 is the sectional view in Fig. 1 along C-C faces;
Fig. 6 is the enlarged drawing of part A in Fig. 4;
Fig. 7 is the enlarged drawing of G parts in Fig. 4.
Embodiment
The utility model is described in detail with reference to Figure of description.
As shown in Figures 1 to 7, a kind of integrated bathroom water-proof chassis that the utility model is provided, including a rectangular slab
The body 1 of shape, the top surface surrounding of body 1 is integrally formed and is vertically provided with side wall 2, and top surface and side wall 2 the formation groove of body 1
8 shape, therefore coordinate some installation fittings to realize bathroom wallboard in integrated bathroom wallboard installation process, groove 8
Blind dress location and installation,
The material of body 1 is preferably SMC composites, and the top surface of body 1 is integrally formed provided with an arc cut-off rule 5,
And the top surface of body 1 is divided into guiding region 4 and the two parts of shower area 6, and guiding region 4 and shower area 6 by arc cut-off rule 5
It is seamlessly connected by arc cut-off rule 5, shower area 6 is set with plane-parallel, guiding region 4 is tilted horizontal by certain angle
Set, and a ground small opening 3 is offered on guiding region 4, ground small opening 3 is close to a side wall 2 of body 1, and guiding region 4 is by edge
The gradient to closely small opening 3 is gradually tilted from high to low, and body 1 is once molding formed using assembling die, water meeting when using
Floor drain hole 3 is flowed into along the gradient, has thoroughly prevented leak and infiltration phenomenon.
It is covered with latticed reinforcement 7 on the bottom surface of body 1, to strengthen the intensity of body 1.
The utility model additionally provides a kind of assembling die for making above-mentioned integrated bathroom water-proof chassis, including die cavity,
Assembling die have it is multiple can be with the module of dismountable, therefore can be combined into can in the die cavity of different length size, die cavity
Matchingly accommodate and make respectively the body and the side wall of a variety of different length sizes, and preferably a set of combination die
Tool can make 24 kinds of various sizes of chassis.
The utility model, coordinates because chassis surrounding band is fluted, therefore in integrated bathroom wallboard installation process
Installation fitting can realize blind dress location and installation, and the technical requirements of assembly crewman are reduced in assembling, are more prone to installation
It is convenient, standardized work is realized, the time needed for installing, and the integrated bathroom dress assembled using this chassis is greatly reduced
It is more convenient with dismounting, and thoroughly prevented leak and infiltration phenomenon, save the special place to Traditional bathroom building structure, waterproof
Reason.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn that under enlightenment of the present utility model
The structure change made, it is every that there is same or like technical scheme with the utility model, each fall within guarantor of the present utility model
Within the scope of shield.
Claims (6)
1. a kind of integrated bathroom water-proof chassis, it is characterised in that including:
The body of one rectangle tabular,
It is arranged on the surrounding top surface of the body and perpendicular to the side wall of the body, the top surface of the body and the side wall
The shape of groove is formed,
The guiding region and shower area for being split to form the top surface of the body by an arc cut-off rule, the guiding region and shower
Area is configured to:The shower area is set with plane-parallel, and the guiding region is obliquely installed horizontal by certain angle, institute
Guiding region and shower area is stated to be seamlessly connected by arc cut-off rule,
Be opened in the ground small opening on the guiding region, the guiding region by edge to the gradient close to described ground small opening from high to low
Gradually tilt.
2. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that be covered with the bottom surface of the body latticed
Reinforcement.
3. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that described ground small opening close to the body one
Individual side wall.
4. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that the material of the body is SMC composite woods
Material.
5. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that the body uses mould of assembling die
It is molded.
6. a kind of assembling die for making the integrated bathroom water-proof chassis as described in claim 1 to 5 any one, its feature exists
In including die cavity, the die cavity can make the body and the side wall of a variety of different length sizes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720142586.4U CN206448346U (en) | 2017-02-16 | 2017-02-16 | A kind of integrated bathroom water-proof chassis and combinations thereof mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720142586.4U CN206448346U (en) | 2017-02-16 | 2017-02-16 | A kind of integrated bathroom water-proof chassis and combinations thereof mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206448346U true CN206448346U (en) | 2017-08-29 |
Family
ID=59665359
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720142586.4U Expired - Fee Related CN206448346U (en) | 2017-02-16 | 2017-02-16 | A kind of integrated bathroom water-proof chassis and combinations thereof mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206448346U (en) |
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109106260A (en) * | 2018-08-31 | 2019-01-01 | 宁波联城住工科技有限公司 | Glass reinforced plastic bathroom chassis and its manufacturing method |
CN109750867A (en) * | 2017-11-06 | 2019-05-14 | 北京好生活住工科技发展有限公司 | Bathroom water-proof drainage chassis system |
CN111655096A (en) * | 2018-01-25 | 2020-09-11 | 柯勒米拉有限公司 | Sanitary ware comprising a hollow shell and a filling material arranged in the shell |
CN111962646A (en) * | 2020-09-14 | 2020-11-20 | 浙江亚厦装饰股份有限公司 | Take slope drainage device with double folds |
CN112240083A (en) * | 2019-07-17 | 2021-01-19 | 天津达因建材有限公司 | Toilet chassis |
-
2017
- 2017-02-16 CN CN201720142586.4U patent/CN206448346U/en not_active Expired - Fee Related
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109750867A (en) * | 2017-11-06 | 2019-05-14 | 北京好生活住工科技发展有限公司 | Bathroom water-proof drainage chassis system |
CN111655096A (en) * | 2018-01-25 | 2020-09-11 | 柯勒米拉有限公司 | Sanitary ware comprising a hollow shell and a filling material arranged in the shell |
CN111655096B (en) * | 2018-01-25 | 2023-08-29 | 柯勒米拉有限公司 | Sanitary ware comprising a hollow shell and a filling material arranged in the shell |
CN109106260A (en) * | 2018-08-31 | 2019-01-01 | 宁波联城住工科技有限公司 | Glass reinforced plastic bathroom chassis and its manufacturing method |
CN112240083A (en) * | 2019-07-17 | 2021-01-19 | 天津达因建材有限公司 | Toilet chassis |
CN111962646A (en) * | 2020-09-14 | 2020-11-20 | 浙江亚厦装饰股份有限公司 | Take slope drainage device with double folds |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN206448346U (en) | A kind of integrated bathroom water-proof chassis and combinations thereof mould | |
CN105370060B (en) | A kind of integral bathroom water-proof chassis of moulding by casting | |
CN203701649U (en) | Sunshine room | |
CN205743083U (en) | A kind of variable-sized assembly type water-proof chassis mould, water-proof chassis and waterproof compartment | |
CN205171922U (en) | Box of split type waterproof end | |
CN111827484A (en) | Whole bathroom of assembled convenient to installation | |
CN108634837A (en) | A kind of water-proof chassis of integral bathroom | |
CN205063051U (en) | End box on ground between whole bathroom | |
CN206859747U (en) | Integrated toilet | |
CN210263926U (en) | Combined built-in box | |
CN201521117U (en) | Wall plate function modularized toilet | |
CN205224660U (en) | Wood type of moulding container formula bathroom | |
CN214423879U (en) | Waterproof chassis structure for integral toilet | |
CN207260429U (en) | A kind of building construction New-type EPS wall body module | |
CN108104585A (en) | A kind of membrane structure canopy of the heavens apical cap | |
CN207794313U (en) | A kind of embedded module building structure | |
CN209603371U (en) | Heat preservation decoration integrative clear-water concrete precast facade hanging plate and its production mould | |
CN201840389U (en) | Shower tray structure | |
CN110847639A (en) | Mounting structure of assembled bathroom base plate | |
CN216466139U (en) | A mold for producing high stability and leak-proof shower room bottom basin | |
CN204940650U (en) | A kind of module unit type dome structure | |
CN215859291U (en) | Prefabricated concrete integrated bathroom structure | |
CN205025269U (en) | Integral window wrap | |
CN209391829U (en) | A kind of pedestal of shower house | |
CN208934088U (en) | A kind of threading structure floor drain component |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
TR01 | Transfer of patent right |
Effective date of registration: 20180104 Address after: 101300 Road 1 in Ma Po Town, Beijing City, No. 1 Patentee after: One day residence product technology Co., Ltd. Address before: No. 65, No. 101399, white road, Juyuan industrial area, Ma Pozhen, Shunyi District, Beijing Patentee before: Zhuang Yilang |
|
TR01 | Transfer of patent right | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170829 Termination date: 20210216 |
|
CF01 | Termination of patent right due to non-payment of annual fee |