[go: up one dir, main page]

CN206448346U - A kind of integrated bathroom water-proof chassis and combinations thereof mould - Google Patents

A kind of integrated bathroom water-proof chassis and combinations thereof mould Download PDF

Info

Publication number
CN206448346U
CN206448346U CN201720142586.4U CN201720142586U CN206448346U CN 206448346 U CN206448346 U CN 206448346U CN 201720142586 U CN201720142586 U CN 201720142586U CN 206448346 U CN206448346 U CN 206448346U
Authority
CN
China
Prior art keywords
guiding region
integrated bathroom
shower area
chassis
side wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201720142586.4U
Other languages
Chinese (zh)
Inventor
庄艺朗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
One Day Residence Product Technology Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201720142586.4U priority Critical patent/CN206448346U/en
Application granted granted Critical
Publication of CN206448346U publication Critical patent/CN206448346U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/60Planning or developing urban green infrastructure

Landscapes

  • Residential Or Office Buildings (AREA)

Abstract

The utility model discloses a kind of integrated bathroom water-proof chassis and combinations thereof mould, include the body of a rectangle tabular, it is arranged on the surrounding top surface of body and perpendicular to the side wall of body, the shape of top surface and side wall the formation groove of body, the guiding region and shower area for being split to form the top surface of body by an arc cut-off rule, guiding region and shower area are configured to:Shower area is set with plane-parallel, guiding region is obliquely installed horizontal by certain angle, guiding region and shower area are seamlessly connected by arc cut-off rule, are opened in the ground small opening on guiding region, and guiding region is gradually tilted from high to low by the gradient at edge to closely small opening.The utility model, because chassis surrounding band is fluted, therefore some installation fittings are coordinated to realize blind dress location and installation in integrated bathroom wallboard installation process, installation is set to be more prone to convenient, the time needed for installing is greatly reduced, and the integrated bathroom assembly and disassembly assembled using this chassis is more convenient.

Description

A kind of integrated bathroom water-proof chassis and combinations thereof mould
Technical field
The utility model is related to integrated bathroom, and in particular to a kind of integrated bathroom water-proof chassis and combinations thereof mould.
Background technology
The idea of development of traditional single bathroom has been broken in the appearance of integrated bathroom, and sanitary and balneal room is carried out into integrated design, And then sanitaryware centralization is produced, make space layout more science practical.Integrated bathroom just deduction spatial art it is new general Read, it collects six big features in an innovative way:Layout optimizes, installs and simplify, operate intelligent, use cost minimum Change, bathroom process entertainment orientation, Aided design are personalized, are integrated so integrated bathroom is exactly integrated cultural, function and space Product.
But integrated bathroom product in the market, the problem of generally existing chassis water-proof function is poor, this is due to bottom Disk uses demountable structure, chassis and framed side wallboard junction easily have the shortcomings that it is poorly sealed, easily seep water, and at present Also there is the problem of installing inconvenient in the integrated bathroom chassis of in the market.
In summary, need that a kind of disassembly and assembly structure is simple at present, draining efficiently, can effectively solve the new of seepage problem Integrated bathroom chassis.
Utility model content
Technical problem to be solved in the utility model is the chassis dismounting inconvenience of existing integrated bathroom, and that easily seeps water asks Topic.
In order to solve the above-mentioned technical problem, the technical scheme that the utility model is used is to provide a kind of integrated bathroom waterproof Chassis, including:
The body of one rectangle tabular,
It is arranged on the surrounding top surface of the body and perpendicular to the side wall of the body, the top surface of the body and described The shape of side wall formation groove,
The guiding region and shower area for being split to form the top surface of the body by an arc cut-off rule, the guiding region and Shower area is configured to:The shower area is set with plane-parallel, and the guiding region tilts horizontal by certain angle and set Put, the guiding region and shower area are seamlessly connected by arc cut-off rule,
The ground small opening on the guiding region is opened in, the guiding region is by edge to the gradient close to described ground small opening by height Gradually tilted to low.
In such scheme, latticed reinforcement is covered with the bottom surface of the body.
In such scheme, a side wall of the described ground small opening close to the body.
In such scheme, the material of the body is SMC composites.
In such scheme, the body is once molding formed using assembling die.
The utility model additionally provides a kind of assembling die for making above-mentioned integrated bathroom water-proof chassis, including die cavity, The die cavity makes the body and the side wall of a variety of different length sizes respectively.
The utility model, coordinates because chassis surrounding band is fluted, therefore in integrated bathroom wallboard installation process Installation fitting can realize blind dress location and installation, and the technical requirements of assembly crewman are reduced in assembling, are more prone to installation It is convenient, standardized work is realized, the time needed for installing, and the integrated bathroom dress assembled using this chassis is greatly reduced It is more convenient with dismounting, and thoroughly prevented leak and infiltration phenomenon, save the special place to Traditional bathroom building structure, waterproof Reason.
Brief description of the drawings
Fig. 1 is top view of the present utility model;
Fig. 2 is stereogram of the present utility model;
Fig. 3 is upward view of the present utility model;
Fig. 4 is the sectional view in Fig. 1 along B-B faces;
Fig. 5 is the sectional view in Fig. 1 along C-C faces;
Fig. 6 is the enlarged drawing of part A in Fig. 4;
Fig. 7 is the enlarged drawing of G parts in Fig. 4.
Embodiment
The utility model is described in detail with reference to Figure of description.
As shown in Figures 1 to 7, a kind of integrated bathroom water-proof chassis that the utility model is provided, including a rectangular slab The body 1 of shape, the top surface surrounding of body 1 is integrally formed and is vertically provided with side wall 2, and top surface and side wall 2 the formation groove of body 1 8 shape, therefore coordinate some installation fittings to realize bathroom wallboard in integrated bathroom wallboard installation process, groove 8 Blind dress location and installation,
The material of body 1 is preferably SMC composites, and the top surface of body 1 is integrally formed provided with an arc cut-off rule 5, And the top surface of body 1 is divided into guiding region 4 and the two parts of shower area 6, and guiding region 4 and shower area 6 by arc cut-off rule 5 It is seamlessly connected by arc cut-off rule 5, shower area 6 is set with plane-parallel, guiding region 4 is tilted horizontal by certain angle Set, and a ground small opening 3 is offered on guiding region 4, ground small opening 3 is close to a side wall 2 of body 1, and guiding region 4 is by edge The gradient to closely small opening 3 is gradually tilted from high to low, and body 1 is once molding formed using assembling die, water meeting when using Floor drain hole 3 is flowed into along the gradient, has thoroughly prevented leak and infiltration phenomenon.
It is covered with latticed reinforcement 7 on the bottom surface of body 1, to strengthen the intensity of body 1.
The utility model additionally provides a kind of assembling die for making above-mentioned integrated bathroom water-proof chassis, including die cavity, Assembling die have it is multiple can be with the module of dismountable, therefore can be combined into can in the die cavity of different length size, die cavity Matchingly accommodate and make respectively the body and the side wall of a variety of different length sizes, and preferably a set of combination die Tool can make 24 kinds of various sizes of chassis.
The utility model, coordinates because chassis surrounding band is fluted, therefore in integrated bathroom wallboard installation process Installation fitting can realize blind dress location and installation, and the technical requirements of assembly crewman are reduced in assembling, are more prone to installation It is convenient, standardized work is realized, the time needed for installing, and the integrated bathroom dress assembled using this chassis is greatly reduced It is more convenient with dismounting, and thoroughly prevented leak and infiltration phenomenon, save the special place to Traditional bathroom building structure, waterproof Reason.
The utility model is not limited to above-mentioned preferred forms, and anyone should learn that under enlightenment of the present utility model The structure change made, it is every that there is same or like technical scheme with the utility model, each fall within guarantor of the present utility model Within the scope of shield.

Claims (6)

1. a kind of integrated bathroom water-proof chassis, it is characterised in that including:
The body of one rectangle tabular,
It is arranged on the surrounding top surface of the body and perpendicular to the side wall of the body, the top surface of the body and the side wall The shape of groove is formed,
The guiding region and shower area for being split to form the top surface of the body by an arc cut-off rule, the guiding region and shower Area is configured to:The shower area is set with plane-parallel, and the guiding region is obliquely installed horizontal by certain angle, institute Guiding region and shower area is stated to be seamlessly connected by arc cut-off rule,
Be opened in the ground small opening on the guiding region, the guiding region by edge to the gradient close to described ground small opening from high to low Gradually tilt.
2. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that be covered with the bottom surface of the body latticed Reinforcement.
3. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that described ground small opening close to the body one Individual side wall.
4. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that the material of the body is SMC composite woods Material.
5. integrated bathroom water-proof chassis as claimed in claim 1, it is characterised in that the body uses mould of assembling die It is molded.
6. a kind of assembling die for making the integrated bathroom water-proof chassis as described in claim 1 to 5 any one, its feature exists In including die cavity, the die cavity can make the body and the side wall of a variety of different length sizes.
CN201720142586.4U 2017-02-16 2017-02-16 A kind of integrated bathroom water-proof chassis and combinations thereof mould Expired - Fee Related CN206448346U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201720142586.4U CN206448346U (en) 2017-02-16 2017-02-16 A kind of integrated bathroom water-proof chassis and combinations thereof mould

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201720142586.4U CN206448346U (en) 2017-02-16 2017-02-16 A kind of integrated bathroom water-proof chassis and combinations thereof mould

Publications (1)

Publication Number Publication Date
CN206448346U true CN206448346U (en) 2017-08-29

Family

ID=59665359

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201720142586.4U Expired - Fee Related CN206448346U (en) 2017-02-16 2017-02-16 A kind of integrated bathroom water-proof chassis and combinations thereof mould

Country Status (1)

Country Link
CN (1) CN206448346U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109106260A (en) * 2018-08-31 2019-01-01 宁波联城住工科技有限公司 Glass reinforced plastic bathroom chassis and its manufacturing method
CN109750867A (en) * 2017-11-06 2019-05-14 北京好生活住工科技发展有限公司 Bathroom water-proof drainage chassis system
CN111655096A (en) * 2018-01-25 2020-09-11 柯勒米拉有限公司 Sanitary ware comprising a hollow shell and a filling material arranged in the shell
CN111962646A (en) * 2020-09-14 2020-11-20 浙江亚厦装饰股份有限公司 Take slope drainage device with double folds
CN112240083A (en) * 2019-07-17 2021-01-19 天津达因建材有限公司 Toilet chassis

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109750867A (en) * 2017-11-06 2019-05-14 北京好生活住工科技发展有限公司 Bathroom water-proof drainage chassis system
CN111655096A (en) * 2018-01-25 2020-09-11 柯勒米拉有限公司 Sanitary ware comprising a hollow shell and a filling material arranged in the shell
CN111655096B (en) * 2018-01-25 2023-08-29 柯勒米拉有限公司 Sanitary ware comprising a hollow shell and a filling material arranged in the shell
CN109106260A (en) * 2018-08-31 2019-01-01 宁波联城住工科技有限公司 Glass reinforced plastic bathroom chassis and its manufacturing method
CN112240083A (en) * 2019-07-17 2021-01-19 天津达因建材有限公司 Toilet chassis
CN111962646A (en) * 2020-09-14 2020-11-20 浙江亚厦装饰股份有限公司 Take slope drainage device with double folds

Similar Documents

Publication Publication Date Title
CN206448346U (en) A kind of integrated bathroom water-proof chassis and combinations thereof mould
CN105370060B (en) A kind of integral bathroom water-proof chassis of moulding by casting
CN203701649U (en) Sunshine room
CN205743083U (en) A kind of variable-sized assembly type water-proof chassis mould, water-proof chassis and waterproof compartment
CN205171922U (en) Box of split type waterproof end
CN111827484A (en) Whole bathroom of assembled convenient to installation
CN108634837A (en) A kind of water-proof chassis of integral bathroom
CN205063051U (en) End box on ground between whole bathroom
CN206859747U (en) Integrated toilet
CN210263926U (en) Combined built-in box
CN201521117U (en) Wall plate function modularized toilet
CN205224660U (en) Wood type of moulding container formula bathroom
CN214423879U (en) Waterproof chassis structure for integral toilet
CN207260429U (en) A kind of building construction New-type EPS wall body module
CN108104585A (en) A kind of membrane structure canopy of the heavens apical cap
CN207794313U (en) A kind of embedded module building structure
CN209603371U (en) Heat preservation decoration integrative clear-water concrete precast facade hanging plate and its production mould
CN201840389U (en) Shower tray structure
CN110847639A (en) Mounting structure of assembled bathroom base plate
CN216466139U (en) A mold for producing high stability and leak-proof shower room bottom basin
CN204940650U (en) A kind of module unit type dome structure
CN215859291U (en) Prefabricated concrete integrated bathroom structure
CN205025269U (en) Integral window wrap
CN209391829U (en) A kind of pedestal of shower house
CN208934088U (en) A kind of threading structure floor drain component

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20180104

Address after: 101300 Road 1 in Ma Po Town, Beijing City, No. 1

Patentee after: One day residence product technology Co., Ltd.

Address before: No. 65, No. 101399, white road, Juyuan industrial area, Ma Pozhen, Shunyi District, Beijing

Patentee before: Zhuang Yilang

TR01 Transfer of patent right
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170829

Termination date: 20210216

CF01 Termination of patent right due to non-payment of annual fee