CN206427933U - A kind of bridge crane - Google Patents

A kind of bridge crane Download PDF

Info

Publication number
CN206427933U
CN206427933U CN201621410267.9U CN201621410267U CN206427933U CN 206427933 U CN206427933 U CN 206427933U CN 201621410267 U CN201621410267 U CN 201621410267U CN 206427933 U CN206427933 U CN 206427933U
Authority
CN
China
Prior art keywords
longeron
crossbeam
trolley
crane
track
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621410267.9U
Other languages
Chinese (zh)
Inventor
杨龙海
程双俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangzhou Five Machinery Co Ltd
Original Assignee
Guangzhou Five Machinery Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangzhou Five Machinery Co Ltd filed Critical Guangzhou Five Machinery Co Ltd
Priority to CN201621410267.9U priority Critical patent/CN206427933U/en
Application granted granted Critical
Publication of CN206427933U publication Critical patent/CN206427933U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)

Abstract

The utility model discloses a kind of bridge crane, including support column, longeron, crossbeam and trolley, the support top end is provided with longeron, the pair of support column supports a longeron, the support column has two pairs, the longeron top is provided with longeron guide rail, the longeron guide rail is used to vertically move crossbeam, the longeron guide rail is channel configuration, contribute to the stable movement of crossbeam, the crossbeam is combined for a pair, and formula crane is that crossbearer carries out the crane gear of material handling in workshop, warehouse and stock ground overhead.Because its two ends are seated on tall and big concrete column or metallic support, shape is like bridge.The crane span structure of bridge crane along be laid on both sides it is overhead on track it is longitudinally running, the space handling material below crane span structure can be made full use of, do not hindered by ground installation.It is using a kind of most hoisting machinery of widest in area, quantity.

Description

A kind of bridge crane
Technical field
The utility model is related to basic field of mechanical technique, specially a kind of bridge crane.
Background technology
Bridge crane is that crossbearer carries out the crane gear of material handling in workshop, warehouse and stock ground overhead.Due to it Two ends are seated on tall and big concrete column or metallic support, and shape is like bridge.The crane span structure of bridge crane is high along both sides are laid on Track on frame is longitudinally running, can make full use of the space handling material below crane span structure, not hindered by ground installation.It is Use a kind of most hoisting machinery of widest in area, quantity.A kind of crane span structure type crane that crane span structure is run on aerial conveyor, again Claim overhead traveling crane.The crane span structure of bridge crane along be laid on both sides it is overhead on track it is longitudinally running, trolley is along being laid on crane span structure On track laterally run, constitute a rectangle working range, it is possible to make full use of the space handling material below crane span structure, no Hindered by ground installation.This crane is widely used in indoor and outdoor warehouse, factory building, harbour and outdoor yard etc..Commonly Bridge crane mainly uses driven by power, is usually to be manipulated in drivers' cab, also there is far distance controlled.Lifting capacity is reachable 500 tons, span is up to 60 meters.The ordinary bridge crane of big elevating capacity is for ease of installing and adjusting, and drive device is frequently with ten thousand To shaft coupling.Crane travel mechanism is typically only with 4 actives and driven wheel, if lifting capacity is very big, commonly uses increase wheel Method reduce wheel load.When wheel is more than 4, it is necessary to use articulated balance bicycle frame device, make the uniform load of crane Ground is distributed on each wheel.Bridge crane be realize production process mechanization in modern industry production and lifting transport, it is automatic The important tool and equipment of change.So bridge crane outer industrial and mining enterprises, steel chemical, railway traffic, port and pier indoors And department and the place such as logistics turnover are widely used.
So, a kind of bridge crane how is designed, the problem of currently being solved as us.
Utility model content
The purpose of this utility model is to provide a kind of bridge crane, with asking for solving to propose in above-mentioned background technology Topic.
To achieve the above object, the utility model provides following technical scheme:A kind of bridge crane, including support column, Longeron, crossbeam and trolley, it is characterised in that:The support top end is provided with longeron, and the support column support stringer is described Support column has two pairs, and the longeron top is provided with longeron guide rail, and the longeron guide rail is used to vertically move crossbeam, and the longeron is led Rail is channel configuration, contributes to the stable movement of crossbeam, the longeron side is provided with stair;The crossbeam is a pair of combinations one Rise, connected between the crossbeam and trolley by track, the track is identical with rail shape, the track is set respectively In two beam tops, the trolley is on track, and the trolley bottom is provided with grabhook, the grabhook For lifting weight.
As further program of the utility model, the trolley includes motor, cable wire wheel and movable pulley composition, institute Stating movable pulley has a pair of composition lorrys, and the movable pulley is placed on track, and the motor is used to provide to trolley Lifting driving force and locomotivity, the cable wire wheel are used for the cable wire of folding and unfolding trolley, and the cable wire is wound on cable wire wheel, Engaged and connected by gear between the motor, cable wire wheel and movable pulley.
As further program of the utility model, a support column side is provided with electric cabinet, and the electric cabinet is used In controlling whole crane work, the stair are arranged on longeron side, lower and upper cross-member are facilitated for staff.
As further program of the utility model, the beam top is provided with fence, and the fence can be effectively ensured The safety of staff, prevents work progress imprudence personnel from falling.
As further program of the utility model, the crossbeam bottom is provided with driver's cabin, and the driver's cabin is arranged on horizontal stroke Beam bottom can ensure the wide of visual field during work, it is to avoid maloperation during lifting heavy goods.
Compared with prior art, the beneficial effects of the utility model are:This crane is widely used in indoor and outdoor warehouse, factory Room, harbour and outdoor yard etc..Ordinary bridge crane mainly uses driven by power, is usually to be manipulated in drivers' cab, Also there is far distance controlled.Lifting capacity is up to 500 tons, and span is up to 60 meters, and trolley is horizontal along the track being laid on crane span structure To operation, the working range of a rectangle is constituted, it is possible to the space handling material below crane span structure is made full use of, not by ground installation Obstruction.
Brief description of the drawings
Fig. 1 is overall structure diagram of the present utility model;
Fig. 2 is trolley structural representation of the present utility model;
In figure:1- support columns;2- longerons;3- longeron guide rails;4- driver's cabins;5- crossbeams;6- fences;7- trolleys;8- Grabhook;9- stair;10- tracks;11- movable pulleys;12- gears;13- motors;14- cable wire wheels;15- cable wires;16- electric cabinets.
Embodiment
Below in conjunction with the accompanying drawing in the utility model embodiment, the technical scheme in the utility model embodiment is carried out Clearly and completely describe, it is clear that described embodiment is only a part of embodiment of the utility model, rather than whole Embodiment.Based on the embodiment in the utility model, those of ordinary skill in the art are not under the premise of creative work is made The every other embodiment obtained, belongs to the scope of the utility model protection.
Fig. 1-2 is referred to, the utility model provides a kind of technical scheme:A kind of bridge crane, including it is support column 1, vertical Beam 2, crossbeam 5 and trolley 7, the top of support column 1 are provided with longeron 2, the support stringer 2 of support column 1, the support column 1 has two pairs, and the top of longeron 2 is provided with longeron guide rail 3, and the longeron guide rail 3 is used to vertically move crossbeam 5, and the longeron is led Rail 3 is channel configuration, contributes to the stable movement of crossbeam 5, the side of longeron 2 is provided with stair 9;The crossbeam 5 is a pair of combinations Together, connected between the crossbeam 5 and trolley 7 by track 10, the track 10 is identical with rail shape, described Track 10 is respectively arranged at two tops of crossbeam 5, and the trolley 7 is on track 10, and the bottom of trolley 7 is set There is grabhook 8, the grabhook 8 is used to lift weight.
As further program of the utility model, the trolley 7 includes motor 13, cable wire wheel 14 and movable pulley 11 Composition, the movable pulley 11 has a pair of composition lorrys, and the movable pulley 11 is placed on track 10, and the motor 13 is used for Lifting driving force and locomotivity are provided to trolley 7, the cable wire wheel 14 is used for the cable wire 15 of folding and unfolding trolley 7, described Cable wire 15 is wound on cable wire wheel 14, is engaged and connected by gear 12 between the motor 13, cable wire wheel 14 and movable pulley 11.
As further program of the utility model, a support column 1 side is provided with electric cabinet 16, the electric cabinet 16 are used to control whole crane to work, and the stair 9 are arranged on the side of longeron 2, lower and upper cross-member 5 is facilitated for staff.
As further program of the utility model, the top of crossbeam 5 is provided with fence 6, and the fence 6 can be protected effectively The safety of staff is demonstrate,proved, prevents work progress imprudence personnel from falling.
As further program of the utility model, the bottom of crossbeam 5 is provided with driver's cabin 4, and the driver's cabin 4 is arranged on The bottom of crossbeam 5 can ensure the wide of visual field during work, it is to avoid maloperation during lifting heavy goods.
Operation principle:First, when needing lifting heavy goods, the circuit control of electric cabinet 16 is opened, crane now can be with Work, is controlled by staff in driver's cabin 4, above moving beam 5 to the weight for needing to lift by crane, now, if position is closed If suitable, it is not necessary to the mobile position of trolley 7, grabhook 8 can be directly put down, can be with if position is not above weight The position of mobile trolley 7 now starts to put down grabhook 8 to correct position by controlled motor 13, in turn, can be The weight of lifting is needed to be moved to suitable position.
While there has been shown and described that embodiment of the present utility model, for the ordinary skill in the art, It is appreciated that these embodiments can be carried out in the case where not departing from principle of the present utility model and spirit a variety of changes, repaiies Change, replace and modification, scope of the present utility model is defined by the appended claims and the equivalents thereof.

Claims (5)

1. a kind of bridge crane, including support column, longeron, crossbeam and trolley, it is characterised in that:The support top end Provided with longeron, the support column support stringer, the support column has two pairs, and the longeron top is provided with longeron guide rail, described vertical Beam guide rail is used to vertically move crossbeam, and the longeron guide rail is channel configuration, contributes to the stable movement of crossbeam, the longeron side Provided with stair;The crossbeam is combined for a pair, is connected between the crossbeam and trolley by track, the track Identical with rail shape, the track is respectively arranged at two beam tops, and the trolley is on track, described Weight dolly bottom is provided with grabhook, and the grabhook is used to lift weight.
2. a kind of bridge crane according to claim 1, it is characterised in that:The trolley includes motor, cable wire Wheel and movable pulley composition, the movable pulley have a pair of composition lorrys, and the movable pulley is placed on track, and the motor is used In providing lifting driving force and locomotivity to trolley, the cable wire wheel is used for the cable wire of folding and unfolding trolley, the cable wire It is wound on cable wire wheel, is engaged and connected by gear between the motor, cable wire wheel and movable pulley.
3. a kind of bridge crane according to claim 1, it is characterised in that:A piece support column side is provided with automatically controlled Case, the electric cabinet is used to control whole crane to work, and the stair are arranged on longeron side, convenient for staff Sill.
4. a kind of bridge crane according to claim 1, it is characterised in that:The beam top is provided with fence, described The safety of staff can be effectively ensured in fence, prevent work progress imprudence personnel from falling.
5. a kind of bridge crane according to claim 1, it is characterised in that:The crossbeam bottom is provided with driver's cabin, institute The wide of visual field during work can be ensured by stating driver's cabin and being arranged on crossbeam bottom, it is to avoid maloperation during lifting heavy goods.
CN201621410267.9U 2016-12-21 2016-12-21 A kind of bridge crane Expired - Fee Related CN206427933U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621410267.9U CN206427933U (en) 2016-12-21 2016-12-21 A kind of bridge crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621410267.9U CN206427933U (en) 2016-12-21 2016-12-21 A kind of bridge crane

Publications (1)

Publication Number Publication Date
CN206427933U true CN206427933U (en) 2017-08-22

Family

ID=59587119

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621410267.9U Expired - Fee Related CN206427933U (en) 2016-12-21 2016-12-21 A kind of bridge crane

Country Status (1)

Country Link
CN (1) CN206427933U (en)

Cited By (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686059A (en) * 2017-08-24 2018-02-13 芜湖市长江起重设备制造有限公司 A kind of bridge crane special hanger
CN107902562A (en) * 2017-12-27 2018-04-13 无锡石油化工起重机有限公司 Damp-proof overhead explosion-proof crane
CN108726386A (en) * 2018-08-08 2018-11-02 河南东起机械有限公司 Multi-functional truss handling station
CN109227526A (en) * 2018-09-20 2019-01-18 沈阳清林机械有限公司 Wheel is to intelligently matching manipulator
CN109437023A (en) * 2018-10-31 2019-03-08 郑州海威光电科技有限公司 A kind of gantry skeleton for mechanical and electric equipment installation
CN109835813A (en) * 2019-03-19 2019-06-04 叶存玉 A kind of Port Container Cranes convenient for remote control
CN110839567A (en) * 2019-12-11 2020-02-28 清远清农电商有限公司 Automatic change feeding equipment of raising chickens
WO2020155600A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Building construction system and construction method therefor
CN116038635A (en) * 2023-01-18 2023-05-02 上海振华重工(集团)股份有限公司南通分公司 Trolley modularized debugging jig frame and debugging process thereof

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN107686059A (en) * 2017-08-24 2018-02-13 芜湖市长江起重设备制造有限公司 A kind of bridge crane special hanger
CN107902562A (en) * 2017-12-27 2018-04-13 无锡石油化工起重机有限公司 Damp-proof overhead explosion-proof crane
CN108726386A (en) * 2018-08-08 2018-11-02 河南东起机械有限公司 Multi-functional truss handling station
CN109227526A (en) * 2018-09-20 2019-01-18 沈阳清林机械有限公司 Wheel is to intelligently matching manipulator
CN109227526B (en) * 2018-09-20 2021-03-12 沈阳清林机械有限公司 Wheel pair intelligent matching manipulator
CN109437023A (en) * 2018-10-31 2019-03-08 郑州海威光电科技有限公司 A kind of gantry skeleton for mechanical and electric equipment installation
WO2020155600A1 (en) * 2019-02-02 2020-08-06 广东博智林机器人有限公司 Building construction system and construction method therefor
CN109835813A (en) * 2019-03-19 2019-06-04 叶存玉 A kind of Port Container Cranes convenient for remote control
CN109835813B (en) * 2019-03-19 2020-06-12 徐州国联建机有限公司 Port container crane convenient to remote control
CN110839567A (en) * 2019-12-11 2020-02-28 清远清农电商有限公司 Automatic change feeding equipment of raising chickens
CN116038635A (en) * 2023-01-18 2023-05-02 上海振华重工(集团)股份有限公司南通分公司 Trolley modularized debugging jig frame and debugging process thereof

Similar Documents

Publication Publication Date Title
CN206427933U (en) A kind of bridge crane
CN108706433A (en) Symmetrical displacement type doube bridge crane
CN202785364U (en) Movable dual-door-type mast hoisting device
CN104150353A (en) Liftable and detachable bridge crane
CN104847098A (en) Multi-guide-rail attachment type electric ascending and descending scaffold
CN203673746U (en) Bridge-type crane model for teaching
CN103556848A (en) Moving shelter factory building adopting portal crane
CN201250058Y (en) Improved lifting trolley
CN204096679U (en) A kind of bag cargo automatic loading machine
CN203684019U (en) Height and span adjustable track laying machine for subway construction
CN202037427U (en) Tooling device for crane
CN102689840A (en) Double-beam bridge type crane
CN204873574U (en) Hoist girder construction of stretching out and drawing back
CN203257106U (en) Multifunctional power-driven walking type walking system
CN203922384U (en) The side-mounted elevator of a kind of machine room
CN207061690U (en) Bridge crane with suspender maintenance rig
CN214495431U (en) Prefabricated component installation auxiliary device
CN206367987U (en) Handling apparatus
CN204873485U (en) River course is bridge crane usefulness walking portal frame for pier
CN212374664U (en) Assembled intelligent single-tower nested double-cage construction elevator
CN204311802U (en) A kind of sweep elevating mechanism for multi-storied garage
CN205275061U (en) Semi -portal crane
CN204980736U (en) Dedicated pair of cage elevator of building site construction
CN105692463A (en) Novel telescopic beam structure of crane
CN207377568U (en) The low vcehicular tunnel maintenance and reinforcement platform and device for influencing traffic

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170822