CN206385894U - The expansible air dome of loading line - Google Patents
The expansible air dome of loading line Download PDFInfo
- Publication number
- CN206385894U CN206385894U CN201720010781.1U CN201720010781U CN206385894U CN 206385894 U CN206385894 U CN 206385894U CN 201720010781 U CN201720010781 U CN 201720010781U CN 206385894 U CN206385894 U CN 206385894U
- Authority
- CN
- China
- Prior art keywords
- air dome
- loading line
- valve
- loading
- line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Landscapes
- Tents Or Canopies (AREA)
Abstract
The utility model belongs to tent field, specifically provides a kind of loading line expansible air dome.The utility model aims to solve the problem that the problem of can not being extended after existing air dome shaping according to physical condition.The air dome includes multiple loading lines, the loading line constitutes the framework of the air dome, the air dome also includes multiple valves, the valve is arranged on the both sides of the loading line and detachably connected with the loading line, so that the air dome can increase or reduce the loading line in the air dome.Due to above structure, the air dome is set to increase or reduce the loading line, so that air dome can be adjusted according to actual conditions, in addition, during the air dome is safeguarded, every loading line can be investigated one by one by the control of valve, provided conveniently for the maintenance test of the air dome.
Description
Technical field
The utility model belongs to tent field, specifically provides a kind of loading line expansible air dome.
Background technology
Nowadays the application of tent is more and more wider, such as outdoor travel, field exploration, rescue and relief work and military combat
Etc. numerous aspects, the species of tent be also be related to it is numerous, wherein air dome compared to other support tents, with light weight,
The advantages of volume after folding is small, convenient transport is carried and is easy to set up with dismounting.
Current air dome bonds the technique productions being combined with high frequency heat seal, the specification of shaped article using adhesive
It is usually fixed, it is impossible to be extended on existing product, some are used for the large-scale air dome of wedding dinner and rescue and relief work,
Will be because physical condition produces larger requirement to the specification of air dome, it is impossible to neatly adjust size.
Meanwhile, the connected mode of the air dome existed in the market is that the thin flexible pipe of a section is heat sealing at into supervisor
On the TPU pipes in road, if the phenomenons such as damaged gas leakage occurs in small hose flexible pipe in the folding process of tent, need to enter pipeline
Row integral replacing;And main pipeline is now most in the case of excellent, increase the replacement cost of consumer.
Correspondingly, this area needs a kind of Inflatable tent to solve the above problems.
Utility model content
It has been that the existing air dome of solution can not be adjusted according to physical condition to solve above mentioned problem of the prior art
The problem of whole size, the utility model provides a kind of expansible air dome of loading line, and the air dome includes multiple
Loading line, the loading line constitutes the framework of the air dome, it is characterised in that the air dome also includes multiple
Valve, each valve is arranged between two adjacent loading lines and removably connected with the loading line
Connect, so that the air dome can increase or reduce the quantity of the loading line and therefore adjustment size.
In the optimal technical scheme of the expansible air dome of above-mentioned pipeline, the first end of the valve is provided with spiral shell
Line and it is threadedly coupled with the loading line.
In the optimal technical scheme of the expansible air dome of above-mentioned loading line, it is provided with the loading line
Screwed hole, the loading line is threadedly coupled by the screwed hole with the first end of the valve.
In the optimal technical scheme of the expansible air dome of above-mentioned loading line, the first end of the valve is set
There is sealing gasket, the sealing gasket is rubber blanket.
In the optimal technical scheme of the expansible air dome of above-mentioned loading line, the air dome also includes connecting
The connecting line of the adjacent valve is connect, the connecting line is connected with the second end of the adjacent valve.
In the optimal technical scheme of the expansible air dome of above-mentioned loading line, at least one described loading line
Lower end be provided with inflation inlet, the inflatable and deflatable of the loading line can be carried out by the inflation inlet.
It will be appreciated to those of skill in the art that due to being removably provided with valve in the both sides of the loading line
Door, enables the air dome to increase or reduce the loading line as needed, so that the air dome can
Size is adjusted according to actual conditions., can be by by the control of valve in addition, during the air dome is safeguarded
One every loading line of investigation, is provided conveniently for the maintenance test of the air dome;Because by valve by connecting line
With loading line connection, connecting line divides with the TPU of loading line to be opened, when tent is folded due to no small hose, Bu Huifa
The gas leakage of raw small hose, and if connecting line leaks air, then only need to change connecting line, without changing supervisor
Road, the cost reduction of replacing.
Brief description of the drawings
Fig. 1 is the front view of the expansible air dome of loading line of the present utility model.
Embodiment
Preferred embodiment of the present utility model described with reference to the accompanying drawings.It should be understood by those skilled in the art that
It is that these embodiments are used only for explaining technical principle of the present utility model, it is not intended that limitation protection of the present utility model
Scope.
It should be noted that in description of the present utility model, term " on ", " under ", "left", "right", " both sides ", " two
The direction of instruction such as end ", " interior ", " outer " or the term of position relationship are to be based on direction shown in the drawings or position relationship, and this is only
Description is for only for ease of, rather than indicates or imply that described device or element there must be specific orientation, with specific side
Position construction and operation, therefore it is not intended that to limitation of the present utility model.In addition, term " first ", " second " are only used for retouching
Purpose is stated, and it is not intended that indicating or implying relative importance.
In addition it is also necessary to explanation, in description of the present utility model, unless otherwise clearly defined and limited, art
Language " installation ", " connected ", " connection " should be interpreted broadly, for example, it may be fixedly connected or be detachably connected, or
It is integrally connected;Can be mechanical connection or electrical connection;Can be joined directly together, can also be by between intermediary
Connect connected, can be the connection of two element internals.To those skilled in the art, it can understand above-mentioned as the case may be
Concrete meaning of the term in the utility model.
Referring initially to Fig. 1, Fig. 1 is the front view of the expansible air dome of loading line of the present utility model.Such as Fig. 1 institutes
Show, the air dome includes multiple loading lines 1, the loading line 1 constitutes the framework of the air dome, the inflation
Tent also includes multiple valves 3, each valve 3 be arranged between two adjacent loading lines 1 and with it is described
Loading line 1 is detachably connected, so that the air dome can increase or reduce the loading line 1, so as to change
Become size.
With continued reference to Fig. 1, the first end 31 of the valve is provided with screw thread and is threadedly coupled with the loading line 1.
Specifically, screwed hole 4 is provided with the loading line 1, the loading line 1 is by the screwed hole 4 and the valve
First end 31 is removably threadedly coupled.Preferably, the screwed hole 4 is formed on the wall of the loading line 1, the valve
First end 31 directly can be connected with the screwed hole 4.So design and be advantageous in that, save the loading line
Connecting line between 1 and the first end 31 of the valve, simplifies the overall structure of the air dome.Meanwhile, by subtracting
Few connecting line, can avoid the problem of gas leakage occurs for junction and/or connecting line, so as to be effectively improved the inflation
The air-tightness of tent.Even if the air dome there occurs gas leak phenomenon, the object of investigation can also have been reduced, significantly carried
The high efficiency of investigation, can be such that the air dome rapidly puts into use.In addition, airtight in order to ensure connection
Property, sealing gasket (not shown) can be set in the first end 31 of the valve, the sealing gasket can using rubber blanket or
Other any appropriate materials.
With continued reference to Fig. 1, the air dome also includes connecting line 5, the two ends of the connecting line 5 respectively with it is adjacent
The second end 32 of two valves connect.Preferably, the connecting line 5 uses TPU connecting tubes, the connecting line 5
Two ends clamping sleeve blow-out patch can be set, the second end 32 with the valve is detachably connected, on the other hand, can be described
Second end 32 of valve sets taper pipeline and locking nut, the connecting line 5 is inserted into the taper pipeline and
Locked by the locking nut, can equally complete the connection of the connecting line 5 and the valve 3.
Finally referring again to Fig. 1, the lower end of at least one loading line 1 is provided with inflation inlet 2, the energy of inflation inlet 2
Enough carry out the inflatable and deflatable of the loading line 1.Specifically, when valve 3 is fully open, to filling for loading line 1
Gas port 2, which carries out inflation/deflation operation, can just make other loading lines 1 while also by inflation/deflation, can effectively improve the inflation account
The operating efficiency of erection and the dismounting of paulin.
The application method of the air dome expansible to loading line of the present utility model and work are former below in conjunction with the accompanying drawings
Reason is described briefly.
First, the valve 3 is opened, be inflated by any 2 pairs of air domes of inflation inlet, according to place bar
The scale increase of part and required tent reduces the loading line 1.Simultaneously as between two adjacent loading lines 1
At least one valve 3 is provided with, can be quickly by the control of the valve 3 when the air dome leaks air phenomenon
Where investigation goes wrong, problematic loading line 1 or connecting line 5, which are changed, just can make the air dome again
It is subnormal to use.
So far, combined preferred embodiment shown in the drawings describes the technical solution of the utility model, still, this
Art personnel are it is easily understood that protection domain of the present utility model is expressly not limited to these embodiments.
On the premise of principle of the present utility model, those skilled in the art can make equivalent change to correlation technique feature
Or replace, the technical scheme after these are changed or replaced it is fallen within protection domain of the present utility model.
Claims (6)
1. a kind of expansible air dome of pipeline, the air dome includes multiple loading lines, the loading line is constituted
The framework of the air dome, it is characterised in that the air dome also includes multiple valves, each valve is arranged on phase
It is between two adjacent loading lines and detachably connected with the loading line, so that the air dome can
Increase or reduce the quantity and therefore adjustment size of the loading line.
2. the expansible air dome of pipeline according to claim 1, it is characterised in that the first end of the valve is set
There is screw thread and be threadedly coupled with the loading line.
3. the expansible air dome of pipeline according to claim 2, it is characterised in that be provided with the loading line
Screwed hole, the loading line is threadedly coupled by the screwed hole with the first end of the valve.
4. the expansible air dome of pipeline according to claim 3, it is characterised in that the first end of the valve is set
There is sealing gasket, the sealing gasket is rubber blanket.
5. the expansible air dome of pipeline according to claim 4, it is characterised in that the air dome also includes connecting
The connecting line of the adjacent valve is connect, the connecting line is connected with the second end of the adjacent valve.
6. the expansible air dome of pipeline according to claim 5, it is characterised in that at least one described loading line
One end be provided with inflation inlet, the inflatable and deflatable of the loading line can be carried out by the inflation inlet.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720010781.1U CN206385894U (en) | 2017-01-05 | 2017-01-05 | The expansible air dome of loading line |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201720010781.1U CN206385894U (en) | 2017-01-05 | 2017-01-05 | The expansible air dome of loading line |
Publications (1)
Publication Number | Publication Date |
---|---|
CN206385894U true CN206385894U (en) | 2017-08-08 |
Family
ID=59491697
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201720010781.1U Expired - Fee Related CN206385894U (en) | 2017-01-05 | 2017-01-05 | The expansible air dome of loading line |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN206385894U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664042A (en) * | 2020-12-21 | 2021-04-16 | 浙江工商大学 | Inflatable tent convenient to adjust size for tourism |
-
2017
- 2017-01-05 CN CN201720010781.1U patent/CN206385894U/en not_active Expired - Fee Related
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112664042A (en) * | 2020-12-21 | 2021-04-16 | 浙江工商大学 | Inflatable tent convenient to adjust size for tourism |
CN112664042B (en) * | 2020-12-21 | 2022-03-25 | 浙江工商大学 | Inflatable tent convenient to adjust size for tourism |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105097203B (en) | A kind of transformer vacuum oil of bidirectional modulation, detecting system | |
CN101525048B (en) | Double-wall pipeline for connecting gas valve group and engine on LNG ship and installation method thereof | |
CN210950412U (en) | Anti-leakage safety plugging device for pressure fluid pipeline | |
CN205826248U (en) | Water supply and sewerage pipeline detection device | |
CN108729949A (en) | A kind of underground connection roadway rapid sealing device and its application method | |
CN211368880U (en) | Expansion tank for water supply system | |
CN101135245B (en) | Device for automatically enclosing tunnel rapidly | |
CN206385894U (en) | The expansible air dome of loading line | |
CN101377100B (en) | External hanging type high pressure inflatable tent | |
CN205298561U (en) | A aerify axial seal device for under vacuum environment | |
CN201868315U (en) | Sulfur hexafluoride gas-filling device | |
CN201103416Y (en) | Tunnel automatic fast closing device | |
CN208596018U (en) | A kind of pipeline vacuum leak test plant | |
CN202884469U (en) | Vehicle liquefied natural gas bottle control pipeline structure | |
CN207455049U (en) | A kind of portable repairs repairing leakage of pipeline device | |
CN207316316U (en) | Plough groove type Three-way half joint | |
CN207935622U (en) | Air heave type plugging pipelines tool with pressure relief | |
CN203444919U (en) | Vacuum oiling and detecting system for transformer | |
CN102966841B (en) | Multifunctional combined type gasbag device | |
CN218671110U (en) | Anticorrosive type PE bellows compensator | |
CN202301229U (en) | Inflating device of portable energy storage | |
CN213629131U (en) | Petroleum pipeline valve with good sealing performance | |
CN202501135U (en) | Exhaust type SF6 equipment inflation special connector with adjustable pressure protection | |
CN206546999U (en) | A kind of submarine cable draw-gear | |
CN101493161B (en) | Pipe mouth sealing device used in construction site |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20170808 Termination date: 20210105 |
|