CN206273898U - A kind of dirty groove of U-shaped section of Fast Installation - Google Patents

A kind of dirty groove of U-shaped section of Fast Installation Download PDF

Info

Publication number
CN206273898U
CN206273898U CN201621365411.1U CN201621365411U CN206273898U CN 206273898 U CN206273898 U CN 206273898U CN 201621365411 U CN201621365411 U CN 201621365411U CN 206273898 U CN206273898 U CN 206273898U
Authority
CN
China
Prior art keywords
section
groove
type groove
dirty
fast installation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN201621365411.1U
Other languages
Chinese (zh)
Inventor
熊亮
梁涛
袁幸朝
杨培清
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 5 Co Ltd
Original Assignee
Sinohydro Bureau 5 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 5 Co Ltd filed Critical Sinohydro Bureau 5 Co Ltd
Priority to CN201621365411.1U priority Critical patent/CN206273898U/en
Application granted granted Critical
Publication of CN206273898U publication Critical patent/CN206273898U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Landscapes

  • Revetment (AREA)

Abstract

The utility model discloses a kind of U-shaped section of dirty groove of Fast Installation, connect to forming the U-type groove section of pipelined channel including multistage, each U-type groove section side is fixed on concrete wall surface, and the upstream end of U-type groove section is provided with the upper hem being folded in groove, and downstream is provided with the lower hem being folded to outside groove;The lower hem of the upstream slot section in two neighboring U-type groove section and the upper hem phase clasp joint of downstream slot section, and seam crossing is provided with ring rubber water-proof bar.Of the present utility model section of dirty groove can have been carried out good row and fallen on the premise of construction speed and construction quality is ensured to dam body two sides construction waste water, realize the dry ground operation in dam filing area, be that the complete of engineering is built and retaining creates safely good condition;And with install it is simple, be easy to makings, good economy performance, adaptability is good, quality guarantee rate is high, repeatable utilization the features such as.

Description

A kind of dirty groove of U-shaped section of Fast Installation
Technical field
The utility model is related to earth and rockfill dam filling construction facility technology field, U-shaped section of dirt of specially a kind of Fast Installation Groove.
Background technology
In earth-rock works contact clay generally fill in two sides cover plate concrete contact site and with core-wall gravelly soil Material contact site, as " buffer body " of coordinating soft, hard medium different distortion, primarily serves the effect for adapting to dam deformation, together When should also have certain plasticity, thixotropy, viscosity, resistance to compression and intensity.
If seepage occur in core-wall area two sides grouting slurries, its slurries will be flowed directly into contact clay reclamation district, due to slurry The presence of liquid layer, will form a seepage channel, cause high degree influence safely on the retaining of dam body.Meanwhile, be in the milk slurries Infiltration fill material earth material, filter material, Transition Materials, in stockpile, its cement mortar with fill material it is warm after will form block oversize stone, Will be unable to play the effect compatible deformation for filling material and function.When fill material pollute it is removed when, can be made to filling material Into waste, substantial amounts of time, machinery are consumed, its filled soils will be directly affected, it is impossible to realize continuous construction operation, engineering is applied Work causes certain economic loss.
During earth and rockfill dam filling construction, due to being arranged by project under construction, duration, working procedure is influenceed, and is often existed The present situation that core-wall area earth material filling building intersects with top cementing operations.In order to ensure dam filing quality, at the same make dam filing and Grouting works are smoothed out, and are set on the concrete cover generally in grout compartment and between filling layer and cut a dirty groove.
The conventional dirty groove that cuts is made using light-duty iron sheet, needs to carry out the erection of track first during installation, Then carry out cutting the shaping and fixation of dirty channel skin again.This kind cuts dirty groove and can substantially realize the row of sewage slurries function, but deposits In certain defect:Cut between dirty groove and connected using overlap joint, slurries Seepage easily occurs in overlapping part;Cut dirty groove and concrete Closed using mortar between cover plate, meet high temperature season or crack or obscission easily occurs in adverse circumstances mortar, the position Easily there is slurries Seepage;, easily there is disrepair phenomenon in light-duty iron sheet low intensity;Install and remove complex procedures;Running In need to carry out long term maintenance.Due to cutting the presence of dirty groove series of defect, lead to not meet rapid construction and earth and rockfill dam is filled and applied The requirement of working medium amount.
Utility model content
Regarding to the issue above, the purpose of this utility model is to provide one kind to ensure construction speed and construction quality On the premise of, while good row can have been carried out to dam body two sides construction waste water falling, realize the dry ground operation of dam filing area The dirty groove of U-shaped section of Fast Installation.Technical scheme is as follows:
A kind of dirty groove of U-shaped section of Fast Installation, including multistage connects to forming the U-type groove section of pipelined channel, each U-type groove section side Face is fixed on concrete wall surface, and the upstream end of U-type groove section is provided with the upper hem being folded in groove, and downstream is provided with and is folded to outside groove Lower hem;The lower hem of the upstream slot section in two neighboring U-type groove section sets with the upper hem phase clasp joint of downstream slot section, and seam crossing There is ring rubber water-proof bar.
Further, it is provided with oblique rubber water-proof bar at the gap between the affixed side and concrete wall surface of the U-type groove section.
Further, the U-type groove section and oblique rubber water-proof bar are fixed by expansion bolt.
Further, it is provided with rubber O-ring seal at the nut of the expansion bolt.
The beneficial effects of the utility model are:Of the present utility model section of dirty groove can ensure construction speed and construction quality On the premise of, good row is carried out to dam body two sides construction waste water and has been fallen, the dry ground operation in dam filing area is realized, it is engineering Complete build and retaining creates safely good condition;And with install it is simple, be easy to that making, good economy performance, adaptability is good, matter Amount fraction is high, repeat the features such as utilizing.
Brief description of the drawings
Fig. 1 is the U-shaped section of lateral generalized section of dirty groove of the utility model Fast Installation.
Fig. 2 is the U-shaped section of cell body horizontal section scheme of installation of dirty groove of the utility model Fast Installation.
In figure:1- U-type grooves section;2- rubber O-ring seals;3- expansion bolts;The oblique rubber water-proof bars of 4-;5- concrete walls Face;6- ring rubber water-proof bars;7- upper hems;8- lower hems;9- upstream slots section;10- downstream slots section.
Specific embodiment
Do further detailed to the technical solution of the utility model and technique effect with specific embodiment below in conjunction with the accompanying drawings Explanation.As depicted in figs. 1 and 2:A kind of dirty groove of U-shaped section of Fast Installation, including multistage connects to forming the U-type groove section of pipelined channel 1, each 1 side of U-type groove section is fixed on concrete wall surface 5, and the upstream end of U-type groove section 1 is provided with the upper hem 7 being folded in groove, under Trip end is provided with the lower hem 8 being folded to outside groove;The lower hem 8 of the upstream slot section 9 in two neighboring U-type groove section 1 and downstream slot section 10 The phase clasp joint of upper hem 7, and seam crossing is provided with ring rubber water-proof bar 6.
Using the segmentation fixed installation of U-type groove section 1, it is to avoid be the erection of traditional construction middle orbit, assembling and disassembling operation is simple, It is easy to safeguard.Using the mode of clasp joint, and the gap between upper hem 7 and lower hem 8 is carried out using ring rubber water-proof bar 6 Filling, reaches water-stagnating effect, effectively prevent the generation that slurries Seepage easily occurs in conventional overlapping part.
Dam filing, cover plate concrete, grouting construction operation, technique and arrangement of time are combined in construction, before dam filing The construction waste water of two sides is excluded using U-shaped section of dirty groove, cutting dirty groove end should stretch into rockfill outside.With cover plate coagulation The rotation that soil, grouting, the rising of dam embankment cut dirty groove replaces.
Oblique rubber water-proof bar 4 is provided with gap between the affixed side and concrete wall surface 5 of the U-type groove section 1 of the present embodiment, Play the effect of sealing.Using oblique rubber water-proof bar 4 gap between concrete wall surface 5 and concrete wall surface is carried out instead of mortar Filling, not only avoid and run into high temperature season or adverse circumstances, because there is crack in mortar or comes off and caused by slurries seepage Phenomenon, and rubber water-proof bar 4 has stronger adaptability, it is to avoid the setting time of mortar, after U-shaped section of dirty groove is installed The scene row of carrying out falls to work.
U-type groove section 1 and concrete wall surface 5 are connected as an entirety, U-type groove 1 He of section by the present embodiment by expansion bolt 3 Oblique rubber water-proof bar 4 is fixed also by expansion bolt 3, convenient disassembly, and solid and reliable.It is provided with the nut of expansion bolt 3 Rubber O-ring seal 2, plays the effect of sealing.Rubber O-ring seal, sealing rod should have certain toughness and intensity, be suitable for scene The change of condition.
The purpose of the dirty groove of U-shaped section of the present embodiment is that two sides grouting slurries arrange difficult asking during solving rock fill dam construction Topic, needs to be carried out with reference to on-site actual situations in implementation process;For the benefit of the row of slurries falls, and the gradient of U-shaped section of dirty groove should be greater than 10°;
U-type groove section 1 uses thickness to be made up of the steel plate of 5mm, and size is that (* * wide long are high for 100cm*30cm*30cm), so as to In live quick-assembling, dismounting;U-shaped section of dirty groove upper hem 7 and the length of lower hem 8 are 3.0cm, for ease of live quick-assembling, Remove, flanging is 7mm with U-type groove 1 spacing of section(More than steel plate thickness 2.0mm).For ease of two smooth splicings of U-type groove section 1, Upper hem 7 and lower hem 8 use grading structure, gradual change(Reduce)Size is a section dirty channel-section steel plate thickness.
Each U-type groove section 1 and corresponding oblique rubber water-proof bar all should uniformly reserve 3~4 holes, be easy to expanding screw The installation of bolt, while can also strengthen oblique rubber water-proof bar and the degree of adhesion between pouring concrete.
Setting height(from bottom) and position that actual conditions reasonable selection cuts dirty groove should be combined during field conduct, is mainly implemented suitable Sequence is:
(1)Linear to the dirty groove installation in Jie Wu areas section to carry out unwrapping wire, the blowdown gradient should be greater than 10%;
(2)According to linear expansion bolt 3 and the making hole construction of concrete wall surface 5 of carrying out of draining;
(3)Rubber O-ring seal 2, oblique rubber water-proof bar 4 are installed on 3 in expansion bolt;
(4)U-type groove section 1, rubber O-ring seal 2, expansion bolt 3, oblique rubber water-proof bar 4 are fixedly secured in concrete walls On face 5;
(5)The lower hem 8 of upstream slot section 9 is fixed installation with the phase clasp joint of upper hem 7 of downstream slot section 10;
(6)The gap between upper hem 7 and lower hem 8 is clogged using ring rubber water-proof bar 6;
(7)Above-mentioned sequence of construction is repeated, until forming whole drainage channel, cutting dirty groove end should stretch into rockfill outside, Reach the purpose for cutting dirt, discharging pollution.
Implementation-specific consideration:
(1), U-shaped section of dirty groove should carry out setting-out work before installing, it is ensured that blowdown is smooth;
(2), U-shaped section of dirty groove end should stretch out rockfill outside, with certain precipitation measure;
(3), U-shaped section of dirty slot welding should do corresponding infiltration test in connecing manufacturing process;
(4), rubber O-ring seal, oblique rubber water-proof bar size should match with expansion bolt, it is to avoid seepage;
(5), oblique rubber water-proof bar installation position should clean to concrete slab, it is to avoid there is dust, scum silica frost scene, Influence water-stagnating effect;
(6), concrete slab should be as far as possible smooth, uneven place occur should be made up a deficiency using rubber strip;
(7), expansion bolt should firmly install, it is to avoid occur loosening phenomenon;
(8), during field conduct should according to filling, be in the milk, concrete work lifting height carries out U-shaped section of dirty groove in time The adjustment of setting height(from bottom).
Engineering application:Sill may power station long is located at Sichuan Province Tibetan Autonomous Prefecture of Garze Dardo County within the border, is Dadu River mainstream 10th grade of power station of Construction of Step Hydropower Station, Project Areas are located on below Upper Reaches of Dadu River Jin Tanghekou about 4km~7km sections, dam Away from Danba county town 82km on location, under away from Luding county town 49km.Power station total installation of generating capacity 2600MW, reservoir operation scheme 1690m, Height of dam 240m, with season regulating power.
Sill may power plant dam long has the features such as filling complicated, long in time limit material, height of dam.Construction time is filled, concrete is poured Build, two sides grouting the cross-operation time it is long.In this regard, the fine of each link should be carried out for the construction quality of superelevation earth rockfill dam with central core Control, falls for the row of grouting slurries and controls one important step that will also turn into dam filing quality control.
After this engineering is using a kind of U-shaped section of dirty groove of Fast Installation, on the premise of construction speed and construction quality is ensured, Dam body two sides construction waste water has been carried out by good row has fallen, the dry ground operation in dam filing area has been realized, be engineering it is complete build and Retaining creates safely good condition.Experience can be provided for similar engineering.

Claims (4)

1. U-shaped section of a kind of Fast Installation dirty groove, it is characterised in that connect to forming the U-type groove section of pipelined channel including multistage (1), each U-type groove section(1)Concrete wall surface is fixed in side(5)On, U-type groove section(1)Upstream end be provided be folded to it is upper in groove Flanging(7), downstream is provided with the lower hem being folded to outside groove(8);Two neighboring U-type groove section(1)In upstream slot section(9)Lower folding Side(8)With downstream slot section(10)Upper hem(7)Phase clasp joint, and seam crossing is provided with ring rubber water-proof bar(6).
2. U-shaped section of Fast Installation according to claim 1 dirty groove, it is characterised in that the U-type groove section(1)Fixation Side and concrete wall surface(5)Between gap at be provided with oblique rubber water-proof bar(4).
3. U-shaped section of Fast Installation according to claim 2 dirty groove, it is characterised in that the U-type groove section(1)With it is oblique Rubber water-proof bar(4)By expansion bolt(3)It is fixed.
4. U-shaped section of Fast Installation according to claim 3 dirty groove, it is characterised in that the expansion bolt(3)Nut Place is provided with rubber O-ring seal(2).
CN201621365411.1U 2016-12-13 2016-12-13 A kind of dirty groove of U-shaped section of Fast Installation Expired - Fee Related CN206273898U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201621365411.1U CN206273898U (en) 2016-12-13 2016-12-13 A kind of dirty groove of U-shaped section of Fast Installation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201621365411.1U CN206273898U (en) 2016-12-13 2016-12-13 A kind of dirty groove of U-shaped section of Fast Installation

Publications (1)

Publication Number Publication Date
CN206273898U true CN206273898U (en) 2017-06-23

Family

ID=59063713

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201621365411.1U Expired - Fee Related CN206273898U (en) 2016-12-13 2016-12-13 A kind of dirty groove of U-shaped section of Fast Installation

Country Status (1)

Country Link
CN (1) CN206273898U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498956A (en) * 2016-12-13 2017-03-15 中国水利水电第五工程局有限公司 A kind of dirty groove of U-shaped section of Fast Installation

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106498956A (en) * 2016-12-13 2017-03-15 中国水利水电第五工程局有限公司 A kind of dirty groove of U-shaped section of Fast Installation

Similar Documents

Publication Publication Date Title
CN107620312A (en) High hydraulic pressure precipitation well construction and hydrostatic slip casting method for blocking in a kind of Metro station excavation
CN201485823U (en) Anti-seepage structure of hydraulic asphalt concrete panel
CN205604225U (en) Stake of concrete trough shaped plate
CN108049370A (en) Cemented gravel dam antiseepage drainage system
CN111472326B (en) A method and structure for building a gravity dam on a thick overburden layer
CN206844275U (en) Mutual buckle type precast concrete cover ditch and its suspender
CN206273898U (en) A kind of dirty groove of U-shaped section of Fast Installation
CN105822068B (en) Ultralong thin walled concrete walls under hot environment pour and maintenance process
CN204456058U (en) A kind of constructing structure reducing building base subsidence speed
CN203487418U (en) Subgrade surface reinforcement waterproof structure of ballastless track high speed railway
CN207537972U (en) Cemented gravel dam antiseepage drainage system
CN106544987B (en) A kind of anti-seepage of channels construction method storing flooded wetland
CN103993609B (en) The multi-functional fast hard concrement manual repair foundation pit waterproof curtain of silicon ash sand guide drainage
CN205152994U (en) Tower crane embedded joint penetrating bottom plate waterproof device
CN204174629U (en) A kind of light-duty precipitation well point ater-casting, underground building multi-way prevention plugging structure
CN203174746U (en) Wavy tailing dam slope drainage ditches for coping with rainstorm
CN106498956A (en) A kind of dirty groove of U-shaped section of Fast Installation
CN204875418U (en) Water permeability road surface structure
CN206693158U (en) Plugging structure under a kind of CFRD percolating water
CN112593528B (en) Reinforcement and anti-seepage method of molybdenum mine tailings sand and its building structure
CN203741855U (en) Foundation pit waterproof curtain capable of being repaired manually and with multifunctional coagulation body with quickly hardening silica fume layer and integrating water guiding, discharging and filtering functions
CN204510147U (en) Upper storage reservoir storehouse basin leakage preventing structure
CN201232204Y (en) Waterproof material for dividing rack and grouting waterproofing structure thereof
CN208009175U (en) A kind of high liquid limit red clay railway embankment of hydrous fluids
CN208009603U (en) A kind of stormwater channel with rain sewage diversion function

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20170623

Termination date: 20211213

CF01 Termination of patent right due to non-payment of annual fee